PLTM USSU 3 X 1 MW Peiode : 31 September 2019 s/d 14 Januari 2020 PROGRESS HARGA BOBOT MG LALU MG INI NO URAIAN VOLUME SATUAN TOTAL HARGA (%) VOLUME % VOLUME % PEKERJAAN WATERWAY PANJANG 73,5 M A PEKERJAAN PERSIAPAN 1 Pekerjaan Persiapan ( Bauplank dll ) 1 Ism 500.000 500.000 0.19 1.00 100 0 B PEKERJAAN WATERWAY( LANTAI & DINDING) 1 Pas Batu Gunung Camp 1 : 4 286.28 m3 550.000 157,455,375 60.35 284.13 99.2 2.15 1 2 Beton K 250 ( Camp 1 : 2 : 3 ) u/ Watertay 51.45 m3 1,015,500 52,247,475 20.03 51.45 100 3 Bekisting 264.6 m3 125.00 33,075,000 12.58 264.60 100 4 Pembesian ( Fabrikasi & Install / pasang pembesian ) 4.684 kg 960 4,496,640 20.09 4.664 100 C PEKERJAAN BALOK BETON WATERWAT DIPASANG PERJARAK 6 M 1 Pas Batu Gunung Camp 1 : 4 4.95 m4 1,015,500 5,038,672 1.93 4.96 100 2 Beton K 250 ( Camp 1 : 2 : 3 ) u/ Balok 25.59 m5 125.000 3,198,529 1.23 25.59 100 3 Bekisting 370 kg 960 355.2000 0.14 370 100 D GALIAN TANAH UNTUK KUKU PASANGAN BATU 1 Galian 7.33 m3 100.000 733.000 0.55 14.33 100 E PEKERJAAN LANSIR MATERIAL 1 Lansir material 73.14 m3 15.000 1,097,100 10.82 71.57 100 71.57 50 TOTAL PROGRESS S/D MINGG
Note : PROGRESS YANG TELAH DIBA
NILAI PROGRESS DIBULATKAN Trebling : Seratus satu juta
PROGRES YANG DI TAGIH
Mengetahui Diperiksa
Syamsul Bachrie S Abdul Salam Asep Kostia
PLTM Ussu PLTM Ussu Progress ke : 4 ( empat ) SS S/D MG INI TOTAL URAIAN OPNAME ( Rp ) KETERANGAN VOLUME %
1.00 100 500.000.00 Pas batu u/ dinding sisi kanan
(menghadap headpond) L = 13,5 m3 286.28 100 157,455,375.00 Lebar bawah = 500 mm, atas 300 mnm 51.45 100 52,247,475.00 264.60 100 33,075,000.00 Pas pembesian, bekisting dan cor untuk 4.664 100 4,496,640.00 sloof, kolom 2 sisi dan balok gantung (FINISH) 4.96 100 5,038,672,06.00 25.59 100 3,198,529,41.00 370 100 355,200.00
7.33 99.98 733.000.00
73.14 100 1,097,100.00
SS S/D MINGGU INI 258,197,850,22 NG TELAH DIBAYAR 159,300,000.00 PROGRESS 98,897,856,22 PROGRES SAMPAI DGN INI ADALAH 100 % ULATKAN 98,897,850,22 ratus satu juta enam ratus ribu rupiah