HARGA SATUAN BAHAN & UPAH KERJA

TRIWULAN I TAHUN ANGGARAN 2021

NO BAHAN MATERIAL DAN UPAH KERJA

1 2
A. BAHAN ATAP

1 Genteng Flat Corak / garis/ polos Natural (tidak dicat) 33x39x20 cm - 10 Bh/M2
2 Genteng Flat Corak / garis/ polos Warna Standar 33x39x20 cm - 10 Bh/M2
3 Genteng Flat Corak / garis/ polos Warna Spesial 33x39x20 cm - 10 Bh/M2
4 Genteng Elabana Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2
5 Genteng Elabana Warna Standar 42x33x15 cm - 9 Bh/M2
6 Genteng Elabana Warna Spesial 42x33x15 cm - 9 Bh/M2
7 Genteng Kiat Beton Natural (tidak dicat) 36x32x15 cm - 12 Bh/M2
8 Genteng Kiat Beton Warna Standar 36x32x15 cm - 12 Bh/M2
9 Genteng Kiat Beton Warna Spesial 36x32x15 cm - 12 Bh/M2
10 Genteng Kiat Beton Warna Khusus 36x32x15 cm - 12 Bh/M2
11 Genteng Garuda Permata Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2
12 Genteng Garuda Permata Warna Standar 42x33x15 cm - 9 Bh/M2
13 Genteng Garuda Permata Warna Spesial 42x33x15 cm - 9 Bh/M2
14 Genteng Royal Permata Natural (tidak dicat) 38x31x15 cm - 12 Bh/M2
15 Genteng Royal Permata Warna Standar 38x31x15 cm - 12 Bh/M2
16 Genteng Royal Permata Warna Spesial 38x31x15 cm - 12 Bh/M2

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 1
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
17 Nok Genteng Biasa tanpa warna
18 Nok Genteng Keramik
19 Atap Genteng Keramik Standar
20 Atap Genteng Keramik Warna
21 Nok Segi Natural (tidak dicat) 35x27x15 cm - 3,3 Bh/M'
22 Nok Segi Warna Standar 35x27x15 cm - 3,3 Bh/M'
23 Nok Segi Warna Spesial 35x27x15 cm - 3,3 Bh/M'
24 Nok Segi Warna Khusus 35x27x15 cm - 3,3 Bh/M'
25 Nok Bulat Natural (tidak dicat) 30x24x15 cm - 3,5 Bh/ M'
26 Nok Bulat Warna Standar 30x24x15 cm - 3,5 Bh/ M'
27 Nok Bulat Warna Spesial 30x24x15 cm - 3,5 Bh/ M'
28 Nok Samping/T.Flat Natural (tidak dicat) 2,5 Bh/ M'
29 Nok Samping/T.Flat Warna Standar 2,5 Bh/ M'
30 Nok Samping/T.Flat Warna Spesial 2,5 Bh/ M'
31 Nok Samping/T.Flat Warna Khusus 2,5 Bh/ M'
32 Nok Cabang 3/Ujung Natural (tidak dicat)
33 Nok Cabang 3/Ujung Warna Standar
34 Nok Cabang 3/Ujung Warna Spesial
35 Nok Genteng Multi Roof Kasar, pjg 80 cm
36 Nok Genteng Multi Roof Licin, pjg 80 cm
37 Nok Genteng Surya, pjg 80 cm
38 Nok Genteng Sakura, pjg 80 cm
39 Genteng Metal Multi Roof Kasar pjg. 77, lb. 100 cm
40 Genteng Metal Multi Roof Kasar pjg 77, lb. 80 cm

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 2
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
41 Genteng Metal Multi Roof Licin pjg 77 lb. 100 cm
42 Genteng Metal Multi Roof Licin pjg 77 lb. 80 cm
43 Genteng Metal Surya Licin pjg 77 lb, 80 cm
44 Genteng Metal Sakura Kasar pjg 77 lb, 80 cm
45 Genteng Metal Star Licin pjg 77 lb. 80 cm
46 Seng BWG 33 BJLS 0,20 MM
47 Seng BWG 28 BJLS 0,35 MM
48 Seng Gelombang bjls 0,35 (6 Kaki)
49 Seng Gelombang bjls 0,30 (6 Kaki)
50 Seng Gelombang bjls 0,25 (6 Kaki)
51 Seng Gelombang bjls 0,20 (7 Kaki)
52 Seng Gelombang bjls 0,20 (10 Kaki)
53 Seng Plat bjls 0,35 (6 KK)
54 Seng Plat bjls 0,30 (6 KK)
55 Seng Plat bjls 0,20 (6 KK)
56 Seng Fiber
57 Fiber Semen Harflex ( 240x105x0,4 )
58 Eternit Jibesmen 1 m x 1 m
59 Eternit Harflex 1 m x 1 m
60 Eternit Atrisco 1 m x 1 m
61 Karet Lapis Paku Asbes
62 Karet Talang (50 cm)
63 Karet Lapisan Genteng ( 50 cm)
64 Karet Lapisan Genteng ( 90 cm)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 3
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
65 Karet Lapisan Genteng Tipis (110 mm) Uk. 1 x 20 m
66 Karet Lapisan Genteng Tebal (150 mm) Uk. 1 x 20 m
67 Onduline panjang 2 m + baut
68 Nok onduline 1 m
69 Ondulclear 95 x 2 m + baut

B. BAHAN DASAR
1 Batu Kali
2 Batu kali Belah
3 Batu Gunung
4 Batu gunung Belah 10 - 15 cm
5 Batu Pecah 7 - 10 cm
6 Batu Pecah 5 - 7 cm
7 Batu Pecah 3 - 5 cm
8 Batu Pecah 2 - 3 cm
9 Batu Pecah 1- 2 cm
10 Batu Pecah 0,5 - 1 cm
11 Batu Merah Standar
12 Bata Ringan
13 Batako 40x20x10 cm - 13 Bh/M2 @Rp.4950
14 Roster Beton 20 x 20 cm
15 Roster Keramik 20 x 20 cm
16 Roster Keramik 30 x 30 cm
17 Roster Keramik 20 x 40 cm

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 4
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
18 Glass Block
19 Gravel
20 Pasir Kasar/Pasir Beton/Pasir Pasangan
21 Sirtu A
22 Sirtu B
23 Sirtu C
24 Pasir Timbunan
25 Tanah Timbunan
26 Kerikil Sungai
27 Semen 50 kg (Tonasa) PC
28 Semen 40 kg (Tonasa) PC
29 Semen (Bosowa 40 kg) PC
30 Semen Tiga Roda 40 Kg PC
31 Semen Holcim 40 Kg PC
32 Semen Putih 40 kg per sak
33 Pigmen Warna
34 Semen Nat Tegel
35 Semen Abu Tiga Roda 40 Kg
36 Semen Abu Tiga Roda 50 Kg
37 Semen Putih Tiga Roda 40 Kg
38 Semen Acian Mortar Putih 40 Kg
39 Water Proofing
40 Paku jembatan
41 Plastik untuk beton

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 5
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
42 Batu Kecil Gravel Batu Pecah atau Batu Tumbuk (Batu Gunung)

C. BAHAN BAMBU DAN GORONG - GORONG


1 Bambu - Petung
2 Bambu - Besar
3 Bambu - Sedang
4 Bambu - Kecil
5 Rotan Pengikat
6 Gorong-gorong ᶲ 30/ m
7 Gorong-gorong ᶲ 40/ m
8 Gorong-gorong ᶲ 70/ m
9 Gorong-gorong ᶲ 80/ m

D 'BAHAN BESI
1 Angker Mur Baut Kecil
2 Angker Baut Tinggi 70 cm
3 Baut Diameter 12 mm x 10 cm (stainless) wf 150
4 Baut Diameter 12 mm x 12,50 cm (stainless)
5 Baut Diameter 12 mm x 18 cm
6 Baut Diameter 12 mm x 20 cm
7 Baut Diameter 12 mm x 25 cm
8 Baut Diameter 12 mm x 30 cm
9 Baut Skrup
10 Baut Baja

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 6
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
11 Besi Streep 30 x 3 mm
12 Besi Hollow 40.60.1,2 mm P = 6 m
13 Besi Hollow 40.60.1 mm P = 6 m
14 Besi Hollow 40.40. 2 mm P = 6 m /40.40. 1,8 P = 6 m
15 Besi Hollow 40.40.1,5 mm P = 6 m
16 Besi Hollow 40.20.2 mm P =6 m
17 Besi Hollow 40.20.1,5 mm P =6 m
18 Besi Hollow 40.20.1,2 mm P = 6 m
19 Besi Hollow 20.20.1,5 mm P = 6 m
20 Besi Hollow 2x4 (12x31), 0.25mm P = 4m
21 Besi Hollow 2x4 (15x35), 0.25mm P = 4m
22 Besi Hollow 2x4 (18x38), 0.25mm P = 4m
23 Besi Hollow 2x4 (18x38), 0.30mm P = 4m
24 Besi Hollow 2x4 (18x38), 0.35mm P = 4m
25 Besi Hollow 4x4 (34x37), 0.25mm P = 4m
26 Besi Hollow 4x4 (34x37), 0.30mm P = 4m
27 Besi Hollow 4x4 (34x37), 0.40mm P = 4m
28 Besi Kanal C 8 cm, 0.55mm P = 6m
29 Besi Kanal C 8 cm, 0.60mm P = 6m
30 Besi Kanal C 8 cm, 0.65mm P = 6m
31 Besi Kanal C 8 cm, 0.70mm P = 6m
32 Besi Kanal C 8 cm, 0.75mm P = 6m
33 Besi Kanal C 8 cm, 1mm P = 6m
34 Besi Kanal C 8 cm, 0.55mm P = 5,8m

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 7
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
35 Besi Kanal C 8 cm, 0.60mm P = 5,8m
36 Besi Kanal C 8 cm, 0.65mm P = 5,8m
37 Besi Kanal C 8 cm, 0.70mm P = 5,8m
38 Besi Kanal C 8 cm, 0.75mm P = 5,8m
39 Besi Reng 3 cm, 0,4mm P = 6m
40 Besi Reng 3 cm, 0,45mm P = 6m
41 Besi Reng 3 cm, 0,4mm P = 5,8m
42 Besi Reng 3 cm, 0,45mm P = 5,8m
43 Besi Reng 3,8 cm, 0,4mm P = 6m
44 Besi Reng 3,8 cm, 0,45mm P = 6m
45 Besi Reng 3,8 cm, 0,4mm P = 5,8m
46 Besi Reng 3,8 cm, 0,45mm P = 5,8m
47 Plat Besi Kembang 2,3 mm
48 Besi Metal Stud L. 76 mm
49 Besi Siku L. 30.30.3/ 2,8 mm banci
50 Besi siku L. 40.40.4/ 3,8 mm
51 Besi siku L. 50.50.5/ 4,8 mm
52 Besi Siku L. 60. 60. 6/ 5,8 mm
53 Besi Siku L. 70. 70. 7 / 6,8 mm
54 Besi Siku L. 70.70.6 / 5 mm
55 Besi Siku L.100.100.10
56 Besi Beton Polos 6 mm ( 0, 22 kg / M' ) (5,7)
57 Besi Beton Polos 8 mm ( 0,39 kg / M' ) (7,8)
58 Besi Beton polos 10 mm ( 0, 62 kg / M' ) (9,8)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 8
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
59 Besi Beton Polos 12 mm ( 0, 89 kg / M' ) (11,8)
60 Besi Beton 14 mm ( 1, 21 kg / M' ) (13,8)
61 Besi Beton 16 mm ( 1, 39 kg / M' ) (15,8)
62 Besi Beton 19 mm ( 2, 23 kg / M' )
63 Besi Beton 20 mm ( 2, 46 kg / M' )
64 Besi Beton Ulir Dia 8 mm ( 0, 39 kg / M' ) ulir 10 full
65 Besi Beton Ulir Dia. 16 mm SNI
66 Besi Plat 1,5mm 1,2 mm
67 Besi Plat 2 mm (1,8)
68 Besi Plat 2,5mm
69 Besi Plat 3 mm (2,8)
70 Besi Plat 3,5mm
71 Besi Plat 4 mm
72 Besi Plat 4,5mm
73 Besi Plat 5 mm (4,8)
74 Besi Plat 5,5mm
75 Besi Plat 6 mm (5,8)
76 Besi Plat 8 mm (7,8)
77 Besi Plat 9 mm 10 mm (9,8)
78 Besi Plat T = 12 mm Ukr. 120x240
79 Besi Plat T = 16 mm Ukr. 120x240
80 Besi Plat T = 18 mm Ukr. 120x240
81 Baja Tulangan ( Polos ) U24 ᶲ 6
82 Baja Tulangan ( Polos ) U24 ᶲ 8

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 9
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
83 Baja Tulangan ( Polos ) U24 ᶲ 10
84 Baja Tulangan ( Polos ) U24 ᶲ 12
85 Baja Tulangan ( Polos ) U24 ᶲ 16
86 Baja Tulangan ( Polos ) U24 ᶲ 16
87 Baja Tulang ( Ulir ) D32, D39 16
88 Baja Tulang ( Ulir ) D32, D39 18
89 Besi Profil H 200x200 P = 12 meter
90 Besi Profil H 100x100 P = 12 meter
91 Besi IWF 300 P = 12 meter
92 Besi IWF 200 P = 12 meter
93 Besi UNP 100 P = 6 meter
94 Beugel kap V Plat Besi
95 Kawat Ikat Beton 1 roll 20 Kg
96 Kawat Dul ( 1 Roll = M ')
97 Kawat Ram Lubang 3,0 cm ( Rang Armonika )
98 Kawat Nyamuk plastik Rang 1 cm L. 1,20 Rang 2 cm
99 Kawat Nyamuk Aluminium
100 Kawat Nyamuk Baja
101 Kawat Las 2,6 nikko
102 Kawat Saringan Pasir / Ayakan
103 Kawat Bronjong
104 Karet Untuk Pintu dan Jendela Aluminium PVC
105 Door Closer Set
106 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 400 per roll

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 10
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
107 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 500
108 Lem Kayu Dan Karet ( Fox ) Besar ( 800 gr )
109 Lem Karet ( Fox ) Besar 450 10 kg
110 Lem Seng
111 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 6 mm
112 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 5 mm
113 Paku Campuran ( 5-10 cm )
114 Paku Asbes dan Karet
115 Paku 5 cm 7 cm 10 cm
116 Paku ( 1 1/2 - 2 1/2 cm ) ( setara Paku 2-3 cm )
117 Paku 4 cm
118 Paku 2-3 cm
119 Paku Sirap ( Setara Paku 2-3 cm )
120 Paku Seng ( 1 kg/ Dos )
121 Paku Skrup 5 cm
122 Paku Skrup Besi Hollow - 1000 Biji Per dos ( bdrilling 450 b = 4,5 cm )
123 Paku skrup Gyapsum - 500 biji per dos bungkus
124 Paku Jembatan
125 Paku Beton 5 cm
126 Paku Beton 6 cm
127 Paku Beton 7 cm - 10 cm
128 Paku Payung Berulir ( 1 kg/ Dos )
129 Paku Asbes Berulir
130 Paku Asbes Biasa

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 11
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
131 Paku Tripl ( Setara Paku 2-3 cm)
132 Paku Eter ( Setara Paku 2-3 Cm )
133 Paku Ripet
134 Skamp ( Paku Tembak Hollow alumunium )
135 pagar Jadi Besi ( Tinggi 1 M )
136 Pagar Pracetak - 5 panel
137 Pagar Pracetak - 6 panel
138 Pagar Pracetak - 7 panel
139 Tiang Beton untuk 5 Daun
140 Tiang Beton untuk 6 Daun
141 Tiang Beton untuk 7 Daun
142 Rangka Baja Ringan 0,75
143 Spandek 0,25 silver
144 Spandek 0,35 silver
145 Spandek 0,4 silver
146 Spandek 0,45 0,35
147 Nok Spandek
148 Hollow Aluminium Rangka Plafond 0,25 (2x4)
149 Hollow Aluminium Rangka Plafond 0,3 2x4/4x4
150 Hollow Aluminium Rangka Plafond 40 X 20 X 2 mm
151 Hollow Aluminium Rangka Plafond 40 X 40 X 2 mm
152 Hollow Aluminium Rangka Plafond 40 X 20 X 8 mm
153 Kawat Penggantung Hollow Aluminium
154 Aluminium 4'' Brown - 6 Meter

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 12
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
155 Aluminium 3'' Brown - 6 Meter
156 Aluminium Slimar 4'' Brown Untuk Daun Jendela
157 Aluminium Slimar 3'' Brown Untuk Daun Jendela
158 Pas. Kusen Aluminium 4'
159 Pas. Daun Jendela Alumunium + Kaca Tabel 5 mm + Karet dan Sealent
160 Pas. Daun Pintu Aluminium panil Kaca Tebal 5 mm ( Lengkap Accessories )
161 Pintu KM/WC Alumunium ( lengkap Accessories ) lebar 6 cm
162 Pintu KM/WC PVC kw.1( lengkap Accessories ) lebar 10 cm
163 Pintu fiberglass KM/WC
164 Pintu KM/WC bahan PVC Lengkap Accessories ex MASPION star

E. BAHAN FINISHING :
1 Cat Minyak Afduner 1kg
2 Cat Kayu Ex Avian (0,9 kg)
3 Cat Minyak Ex Emco
4 Cat kKayu Ex Mowilex 1kg
5 Cat Minyak
6 Cat Minyak Super klg
7 Cat Kayu Dulux 1kg
8 Cat Dasar 3,5 kg
9 Cat Dasar Meni 3,5 Kg
10 Cat Meni Glatik 3,5 kg
11 Cat Tenner
12 Cat Genteng Cap Belmas 1kg

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 13
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
13 Cat Genteng yoko 4kg
14 Cat Genteng Biasa AGA (4 kg)
15 Cat Genteng Minyak Nippon 2,5 liter
16 Cat Residu/ cloter (10 kg) 30.000/ kg
17 Cat seng Nippon (2,5 kg)
18 Cat Tembok Sahara / Kembang / Postek Aries (25 Kg)
19 Cat Tembok Wintex / Maxilite (5kg)
20 Cat Tembok ICI (Dalam)
21 Cat Tembok Mowilex (Cat Dalam ) 2,5 Kg soff
22 Cat Tembok Mowilex (Cat Luar ) 2,5 Kg gelap & terang
23 Cat Tembok Aries 5kg
24 Cat Minyak Avian
25 Cat Tembok Kimex (5kg)
26 Cat Tembok Dulux (luar) 2,5 kg
27 Cat Tembok Warna Kuning , Hitam ,Merah (Belmax)
28 Vernis/Plitur (24 Klg)
29 Cat Altex
30 Cat Anti Lumut (Aquaseal) (Klg 20kg) Nodrop 20 kg
31 Cat Anti Lumut (No drop) (Klg 20 kg)
32 Cat Dasar Glatik kembang 1 kg
33 Plamur Tembok Boyo Dan Setara (5kg)
34 Minyak Cat (aff Dunner)
35 Dempul Kayu Cap Kuning / Merah (1 Kg) klg
36 Dempul Ex Impra

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 14
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
37 Dempul Ex Isamu
38 Tenner A ( Ex Avian) super
39 Minyak Te Botol
40 Kertas Gosok
41 Pewarna Natural
42 pewarna brown
43 Pewarna Ex Impra
44 Wood Filler Ex Impra
45 Clear
46 Clear ex Impra
47 Sending
48 Sending ex Impra
49 Cat Kayu Ex Dullux Mengkilap
50 Melamin Ex Impra
51 Cat Air Untuk Genteng, Bataco, Paving Block (AGA)
52 Cat Minyak Untuk Genteng, Bataco, Paving Block (AGA)
53 Kuas 2" (Eterna)
54 Kuas 3" (Eterna)
55 Kuas 4" (Eterna)
56 Bahan Anti Karat
57 Comice - 20 kg (dingding eksterior )
58 Comice - 20 kg (dingding interior)
59 Lem Fox Kaleng
60 Lem Efoxi

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 15
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
61 Perban Conpon
62 Bubuk + air pelarut Ex Aqugart untuk Waterproofing
63 Cat Waterproof eks aquaproo- kw.1
64 Cat waterproof- biasa
65 Cat Marka Jalan (aries gold 5kg)
66 Aluminium Composite Panel (ACP) Seven Polyster 0,21 (Indoor)
67 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Doft
68 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Glossy
69 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Metalic
70 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Sparking, Safron, Olive Brown
71 Aluminium Composite Panel (ACP) Seven Marble, Wood, Brush

F BAHAN KAYU
1 Kayu Kls. I Bayam (balok) Chain Saw
2 Kayu Kls. I Bayam (balok) Sawmill
3 Kayu Kls. I Ulin (papan)
4 Kayu Kls. I Ulin (tiang)
5 Kayu Kls. I Bayam (papan) Shain Saw
6 Kayu Kls I Bayam(papan) sawmil
7 Kayu Klas. II Samarinda (papan)/ Lokal
8 Kayu Klas. II Samarinda (balok)/ Lokal
9 Kayu Kls. III Kapur (balok)/ Kemiri
10 Kayu Kls. III (papan)
11 Kayu Mangga/Kemiri (papan)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 16
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
12 Kayu Kumea Balok
13 Kayu Kumea Papan
14 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,4 x 122 x 244)cm
15 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,3 x 122 x 244)cm
16 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,6 x 122 x 244)cm
17 Kayu lapis Tripleks Lapis Kayu Lainnya (18 mm)
18 Kayu lapis Tripleks Lapis Kayu Lainnya (12 mm)
19 Kayu lapis Tripleks Lapis Kayu Lainnya ( 9 mm)
20 Kayu lapis Tripleks Lapis Kayu Lainnya 2 mm
21 Kayu lapis Tripleks Lapis Kayu Mewah jati Teakwood (0,3 x 122 x 244) cm

G BAHAN PENGGANTUNG
1 Engsel Baja
Engsel Baja (Dumont)
2 Engsel Kuningan 4 Lubang
Engsel Kuningan 4 Lubang (Dumont)
3 Engsel Stainless Steel
4 Engsel H3 Lubang
5 Engsel Kupu-kupu
6 Engsel antik jendela
7 Engsel Pintu Biasa (Merk 777)
Engsel Pintu Biasa (Dumont)
8 Engsel Pintu Lemari Biasa
Engsel Pintu Lemari Biasa (Dakson)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 17
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
9 Engsel Jendela Biasa (Merk 777)
Engsel Jendela Biasa (Dumont)
10 Engsel Jendela Kuningan (merk Kuningan)
Engsel Jendela Kuningan (Dakson)
11 Engsel Pintu 4" (SES)
Engsel Pintu 4" (Dumont)
12 Engsel Jendela 3"(SES)
Engsel Jendela 3"(Dumont)
13 Engsel Pintu Kuningan SES
Engsel Pintu Kuningan (Dumont)
14 Gagang Pintu Lemari
Gagang Pintu Lemari (Dakson)
15 Grendel jendela Kuningan
Grendel jendela Kuningan (Dakson)
16 Grendel Pintu Biasa
Grendel Pintu Biasa (Dumont)
17 Grendel Pintu Kuningan/ Vertikal
18 Grendel Pintu Besar
19 Grendel Pintu Tanam (Expanyolet)
20 Kunci Tanam Yale 1 x Putar
21 Kunci Tanam Yale 2 x Putar
22 Kunci Tanam Pintu 2 x Putar Besar Biasa
23 Kunci Tanam Pintu 2 x Putar kecil Biasa
24 Kunci Tanam Pintu 2 x Putar SES

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 18
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
25 Hak Angin Kecil Antik
26 Hak Angin Besar
Hak Angin Besar (Dumont)
27 Hak Angin Kecil
Hak Angin Kecil (Dumont)
28 Kait angin Jendela Alumunium Kualias 1
Kait angin Jendela Alumunium (Dumont)
29 Kait angin Jendela Alumunium biasa
Kait angin Jendela Alumunium (Dumont)

H BAHAN KACA
1 Kaca Bening 3 mm
2 Kaca Bening 5 mm
3 Kaca Bening 6 mm
4 Kaca Bening 8 mm
5 Kaca Bening 10 mm
6 Kaca Ryben Tebal 5 mm
7 Kaca Ryben Tebal 6 mm
8 Kaca Ryben Tebal 3 mm
9 Kaca Ryben Tebal 8 mm
10 Kaca Ryben Tebal 10 mm
11 Jendela Nako (Rangka+ Kaca Tebal 5mm) 0,8 m x 0,2 m 4 lbr terpasang + Stand
12 Kaca Es Buram 5 mm/ 10 mm
13 Kaca Lembaran Bening Tidak Berwarna FL Tebal 2 MM

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 19
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
14 Kaca Lembaran Bening Tidak Berwarna FL Tebal 3 MM
15 Kaca Lembaran Bening Tidak Berwarna FL Tebal 5 MM
Ukuran (1221 x 153)
Ukuran (200 x 90)
Ukuran (200 x 100)
Ukuran (213 x 122)
Ukuran (183 x 122)
Ukuran (244 x 183)
Kaca Lembaran Bening Tidak Berwarna FL Tebal 10 MM
16 Kaca Bening 12 mm
I BAHAN SANITER / SALURAN AIR
1 Kloset Duduk Lengkap(putih) Tangki Batu American standart
2 Kloset Duduk Ex KIA Lengkap (warna) Tanhki Batu
3 Kloset Duduk ex TOTO Lengkap Accessories warna Putih
4 Kloset Duduk ex TOTO Lengkap Accessories warna gelap
5 Kloset Jongkok KIA
6 Kloset Jongkok Biasa (American Standar)
7 Wastafel polos / putih lengkap
8 Wastafel warna lengkap
9 Slypon Wastafel Biasa
10 Urinoir Polos /Putih American Standart
11 Urinoir ex TOTO (lengkap)
12 Bak Tube Fiber Biasa
13 Bak Tube Fiber ex TOTO

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 20
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
14 Tangki Air Fiberglass Kap 0,25 M3
15 Tangki Air Fiberglass Kap 0,50 M3
16 Tangki Air Fiberglass Kap 1 M3
17 Tangki Air Alumunium Kap 1 M3
18 Kran Air Kuningan DIA 3/4 Biasa
19 Kran Air Kuningan DIA 1/2 Biasa
20 Kran Air Vernrkel DIA 3/4 Biasa
21 Kran Air Antik DIA 1/2
22 Bak Cuci Piring Stain -Kosong Tanpa Saluran Pembuangan & Kran Air
23 Kran air 2 / Biasa / bisa
24 Seal Tape
25 Bak Mandi
26 Kloset Jongkok Biasa
27 Wallpaper & Penutup Dinding
28 Foil (Kertas Alumunium Foil)
29 Kloset Duduk (Data)
30 Kloset Jongkok TOTO (Putih)
31 Toilet Portable Fiberglass 400 Liter
32 Toilet Portable Fiberglass 400 Liter

J BAHAN LANGIT-LANGIT
1 Teakwood 120 x 240 cm t.3mm
2 Triplex 3 mm 120 x 240 cm
3 Triplex 4 mm 120 x 240 cm

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 21
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
4 Triplex 5 ml
5 Triplex 6 mm 120 x 240 cm
6 Triplex 7 ml
7 Triplex 10 ml
8 Triplex 15 ml
9 Triplex 20 ml
10 Triplex Ukuran Pintu
11 Triplex Melamin 120 x 240 cm 3 mm
12 Teakwood 120 x 240 cm t.4mm
13 Multiplex 120 x 240 cm t. 6 mm
14 Multiplex 120 x 240 cm t. 9 mm
15 Multiplex 120 x 240 cm t. 12 mm
16 Multiplex 120 x 240 cm t. 18 mm
17 Gypsum Board 122x244x tebal 9 mm ex Jayaboard untuk Plafond Gpyro
18 Kalsiboard tebal 3,5 mm
19 Kalsiboard tebal 4,5 mm
20 Kalsiboard tebal 6 mm
21 Kalsiboard tebal 8 mm
22 Kalsiboard tebal 10 mm
23 Kalsiboard tebal 20 mm
24 Kalsiplank 8mm (10cm x 3m)
25 Kalsiplank 8mm (10cm x 3m) Polos
26 Kalsiplank 8mm (20cm x 3m) Jati
27 Kalsiplank 8mm (30cm x 3m) Polos

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 22
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
28 Kalsiplank 8mm (30cm x 4m) Jati
29 Kalsiplank 9mm (20cm x 4m) Polos
30 Kalsiplank 9mm (20cm x 4m) Cedar
31 Lambriziring t:4mm, (4m')
32 HPL
33 Les Kayu Profil Lebar 5 cm ( 4 M' )
34 Les Kayu Profil Lebar 3 cm ( 4 M' )
35 Les Kayu Profil Lebar 11/2 cm ( 4 M' )
36 Les Kayu 1 x 10 x 400 cm
37 Les Kayu Profil 4 x 4 x 400 cm
38 Les Kayu Biasa 0,5 x 3 cm
39 Les Gypsum Polos
40 Les Gypsum Polos - Kecil
41 Les Gypsum Motif - Kecil - lebar 7 cm/10 cm
42 Les Gypsum - Sedang
43 Les Gypsum - lebar 10 cm
44 Les Gypsum - Besar - lebar 15 cm
45 Les Gypsum Profil
46 Beding Gypsum - Kecil
47 Beding Gypsum - Sedang
48 Beding Gypsum - Besar
K BAHAN LANTAI
1 Tegel PC 30 x30 cm
2 Tegel Motif 30 x30 cm Platinum Diego grey / brown 2

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 23
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
3 Tegel Keramik Putih 10 x 20 cm
4 Tegel Keramik Putih 20 x 20 cm
5 Tegel Keramik Putih 20 x 25 cm
6 Tegel Keramik Putih 30 x 30 cm
7 Tegel Keramik Putih 40 x 40 cm (accura)
8 Tegel Keramik Putih 50 x 50 cm # Platinum (accura motif)
9 Tegel Keramik Putih 60 x 60 cm Ex Granito (granit sandimas mega white)
10 Tegel Keramik Putih 60 x 60 cm Ex Garuda
11 Tegel Keramik Putih 30 x 60 cm Ex Granito (granit eleganza new vorio)
12 Tegel Keramik Warna 60 x 60 cm Ex Granito Top Gress Top Gress
13 Tegel Keramik Warna 60 x 60 cm EX Garuda/Pangress Double wodding (sandimas)
14 Tegel Keramik warna 30 x 60 cm Ex Garuda /Roman (kwalitas LebihBagus)
15 Tegel Keramik Putih 30 x 60 cm
16 Tegel Keramik Warna 20 x 20 cm
17 Tegel Keramik Warna 30 x 30 cm
18 Tegel Keramik Warna 20 x 25 cm
19 Tegel Keramik Warna 40 x 40 cm
20 Tegel Keramik Warna 50 x 50 cm
21 Tegel Keramik Warna 60 x 60 cm
22 Tegel Keramik Warna 30 x 60 cm
23 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (GNS Ruffian)
24 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (Topaz)
25 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (Cottonwood)
26 Granit Uku 60 x 160 x 185 cm Dasar Putih

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 24
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
27 Granit Uku 60 x 185 cm Dasar Hitam / 63 X 198 cm (sandimas 60x60)
28 Granit ukuran 30 x 30 cm Asia Tile
29 Granit ukuran 40 x 40 cm Granito Asia Tile
30 Granit ukuran 60 x 60 cm (sandimas)
31 Keramik WC 20 x 20 cm
32 Keramik WC 20 x 25 cm
33 Keramik WC 30 x 30 cm Asia Tile
34 Keramik uku 30 x 30 cm
35 Keramik uku 40 x 40 cm
36 Keramik Warna uk. 25 x 40 cm (accura)
37 Batu Alam 10 x 20 cm Polos
38 Batu Alam 20 x 20 cm Polos 10x30 cm
39 Batu Alam Motif Sirip/Garis-garis di pahat 10x30 cm / 1 20x40 cm
40 Batu Alam Motif Sirip/Garis-garis di pahat 20x40 cm
41 Batu Alam ukuran 10 x 20 cm Polos / 30 X 60 CM Polos
42 Marmer Ukuran Slabs(type Burito/acaro/Great I) / 100 x 100 cm
43 Marmer Ukuran Slabs(type Burito/acaro/Great II)
44 Marmer Ukuran Slabs(type Burito/acaro/Great III)
45 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great I) / cream urat kayu
46 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great II)
47 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great III)
48 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great I)
49 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great II)
50 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great III)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 25
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
51 Ubin Lantai dari Tanah Liat diglazur Accura 40 x 40 cm
52 Ubin Lantai dari Tanah Liat diglazur KIA Polos 40 x 40 cm
53 Ubin Lantai dari Tanah Liat diglazur Keramik Merk Arwana
54 Ubin Lantai dari Tanah Liat diglazur Asiatile Kw 40 x40 cm
55 Ubin Lantai dari Tanah Liat diglazur Impresso uku. 40 x40 cm
56 Ubin Lantai dari Tanah Liat diglazur Masterina Polos uku. 30 x 30 cm
57 Ubin Lantai dari Tanah Liat diglazur Mulia KW 1 uku. 30 x 30 cm
58 Ubin Lantai dari Tanah Liat diglazur Kia Polos uku. 30 x 30 cm
59 Ubin Lantai dari Tanah Liat diglazur Asia Tile Kw 1 uku. 30 x 30 cm
60 Ubin Lantai dari Tanah Liat diglazur Impresso Kw 1 uku. 30 x 30 cm
61 Ubin Lantai dari Tanah Liat diglazur Accura Kw 1 uku. 30 x 30 cm
62 Ubin Lantai dari Tanah Liat diglazur Masterina Kw 1 uku. 30 x 30 cm
63 Ubin Lantai dari Tanah Liat diglazur Mulia Kw 1 uku. 30 x 30 cm

L BAHAN LAIN-LAIN
1 Paving Blok Segi Empat 6 cm ( K 225 )
2 Paving Blok Segi Empat 6 cm ( K 250 ) Standar
3 Paving Blok Segi Empat 6 cm ( K 250 ) Warna
4 Paving Blok Segi Empat 6 cm ( K 300 ) Standar
5 Paving Blok Segi Empat 6 cm ( K 300 ) Warna
6 Paving Blok Segi Empat 8 cm ( K 225 ) Standar
7 Paving Blok Segi Empat 8 cm ( K 225 ) Warna
8 Paving Blok Segi Empat 8 cm ( K 250 ) Standar
9 Paving Blok Segi Empat 8 cm ( K 250 ) Warna

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 26
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
10 Paving Blok Segi Empat 8 cm ( K 300 ) Standar
11 Paving Blok Segi Empat 8 cm ( K 300 ) Warna
12 Paving Blok Segi Empat 8 cm ( K 400 ) Standar
13 Paving Blok Segi Empat 8 cm ( K 400 ) Warna
14 Paving Blok Segi Empat 10 cm ( K 300 ) Standar
15 Paving Blok Segi Empat 10 cm ( K 300 ) Warna
16 Paving Blok Segi Empat 10 cm ( K 400 ) Standar
17 Paving Blok Segi Empat 10 cm ( K 400 ) Warna
18 Paving Blok SegiTiga Uskup 6 cm
19 Paving Blok SegiTiga Uskup 8 cm
20 Paving Blok Segi Enam 8 cm ( K 225 ) Standar
21 Paving Blok Segi Enam 8 cm ( K 225 ) Warna
22 Paving Blok Segi Enam 8 cm ( K 300 ) Standar
23 Paving Blok Segi Enam 8 cm ( K 300 ) Warna
24 Paving Blok Segi Enam 8 cm ( K 400 ) Standar
25 Paving Blok Segi Enam 8 cm ( K 400 ) Warna
26 Paving Kombinasi 6 cm ( K 300 )
27 Paving 20 x 20 8 cm ( K 300 )
28 1 tegel pedestrian untuk pengarah difabel 30 x 30
29 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Standar
30 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam
31 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat
32 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar
33 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 27
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
34 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat
35 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar
36 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam
37 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat
38 Grass Block 8 cm Standar
39 Kanstin Type Segi 10-15 x 3 0 x 40 cm - 2,5 Bh/M'
40 Kanstin Type Kotak 10 x 2 0 x 40 cm - 2,5 Bh/M'
41 Kanstin Type Kotak 10 x 2 5 x 50 cm - 2 Bh/M'
42 Kanstin Pracetak 60 x 25 x 15 cm
43 Kanstin Pracetak Segitiga 40 x 20 x 10 cm
44 Kanstin Pracetak 15 x 20 x 40 cm
45 Kanstin Pracetak 15 x 25 x 40 cm
46 Kanstin Pracetak 15 x 30 x 40 cm
47 Kanstin Pracetak 15 x 30 x 50 cm 15x25x50cm
48 Kanstin Pracetak 12 x 25 x 40 cm
49 Kanstin Pracetak 25 x 30 x 50 cm 20x30x50cm
50 Kanstin Pracetak 22 x 25 x 60 cm
51 U-Ditch K350 kg/cm2
B400 x H600 x L1200; tebal = 50 mm
B500 x H600 x L1200; tebal = 70 mm
B500 x H700 x L1200; tebal = 70 mm
B600 x H400 x L1200; tebal = 70 mm
B600 x H600 x L1200; tebal = 70 mm
B600 x H700 x L1200; tebal = 70 mm

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 28
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
B600 x H800 x L1200; tebal = 70 mm
B800 x H800 x L1200; tebal = 70 mm
B800 x H1000 x L1200; tebal = 70 mm
B1000 x H800 x L1200; tebal = 100 mm
B1000 x H1000 x L1200; tebal = 100 mm
B1000 x H1200 x L1200; tebal = 100 mm

52 Cover U-Ditch K-350 kg/cm2


B600 x L600; tebal = 140 mm
B800 x L600; tebal = 140 mm
B1000 x L600; tebal = 200 mm

53 Box Culvert
B400 x H400 x L1200; (K350)
B500 x H500 x L1200; (K350)
B600 x H600 x L1200; (K350)
B800 x H800 x L1200; (K350)
B1500 x H1500 x L1200; (K400)
B2000 x H2000 x L1000; (K400)
B3000 x H3500 x L2000; tebal - 250 mm (K500)

54 Gutter Crub 2.5 Bh/M'


55 Topi Uskup T = 6 cm
56 Topi Uskup T = 8 cm 3 Bh/M'

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 29
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
57 Tali Nilon
58 Aspal Emulsi
59 Aspal Bitumen
60 Aspal Curah (ton)
61 Aspal Drum 1 Drum. 155 kg / Drum
62 Aspal cement
63 B.0
64 Solar Non Industri
65 Solar Industri
66 Minyak Pelumas
67 Bensin
68 Minyak bakesting
69 Mortar
70 Filler/abu batu M3
71 Kerosen/Minyak Tanah
72 Beton Mutu K500
73 Beton Mutu K450
74 Beton Mutu K400
75 Beton Mutu K350
76 Beton Mutu K300
77 Beton Mutu K275
78 Beton Mutu K 250
79 Beton Mutu K 225
80 Beton Mutu K175

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 30
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
81 Beton Mutu K125
82 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Single
83 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Double
84 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Single
85 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Double
86 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm 5 TON Besi Single
87 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm Besi Double
88 Box Culvert L 80 Cm, T 80 Cm, P 100 Cm Tebal : 16 cm 5 TON Besi Single
89 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm 5 TON Besi Single
90 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm Besi Double
91 Deuker T 6 cm, L 60 cm
92 Deuker T 6 cm, L 80 cm
93 Deuker T 10 cm, L 60 cm
94 Deuker T 10 cm, L 80 cm
95 Deuker T 12 cm, L 60 cm
96 Deuker T 12 cm, L 80 cm
97 Deuker T 15 cm, L 60 cm
98 Deuker T 15 cm, L 80 cm
99 Sewa C. Pump Standard
100 Sewa C. Pump Long Boom
101 Plastik Untuk Beton L.1M P. 40 M =65.000/ L.1,20M P.25 M = 100.000
102 Kantung Plastik Uk 46 Isi 50
103 Kantung Plastik Uk 15 Isi 10
104 Aspal (Asphal grade 60/70)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 31
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
105 Aspal (curah grade 60/70 Lokal) 6 drum
106 Exkontainer (Peti Kemas) Ukuran 20 Feet Kondisi 80 %
107 Exkontainer (Peti Kemas) Ukuran 40 Feet Kondisi 80 %
U-Ditch (ukuran lain)
111 B600 x H400 x L1200 ; tebal = 70 mm 1.2 M Berat 0,360 ton
112 B600 x H500 x L1200 ; tebal = 70 mm 1.2 M Berat 0,400 ton
113 B600 x H600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,440 ton
114 B600 x H700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton
115 B600 x H800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,530 ton
116 B800 x B600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton
117 B800 x B700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,540 ton
118 B800 x B800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,580 ton
119 B800 x B1000 x L1200 ; tebal = 70 mm 1.2 M Berat 0,670 ton
120 B1000 x H800 x L1200 ; tebal =100 mm 1.2 M Berat 0,980 ton
121 B1000 x H1000 x L1200 ; tebal =100 mm 1.2 M Berat 1,090 ton
Tutup U-Ditch
122 B600 x L600 : Tebal = 70 mm 0,6 M Berat 0,063 Ton
123 B800 x L600 : Tebal = 70 mm 0,6 M Berat 0,084 Ton
124 B1000 x L600 : Tebal = 100 mm 0,6 M Berat 0,150 Ton
B500 x H500 x L1000 : Tebal = 80 mm 1 M Berat 0,468
RC Panel / Pagar Beton
125 Column Precast Kolom 200 x 200 x 4000 4 M Berat 0,400 Ton
126 Wall Precast / Dinding 80 x 2920 x 450 2,9 M Berat 0,260 Ton
127 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 6 cm K 400

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 32
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
128 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 8 cm K 400
129 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 10 cm K 400
130 Hexagon (Segi Enam) Ukuran 6 cm
131 Urug (terima jadi) Ukuran 8 cm
132 Pemasangan

M ALAT BANTU PEMELIHARAAN


1 Sekop
2 Gerobak Dorong Artco
3 Betel
4 Palu
5 Sendok Semen
6 Sikat Baja
7 Cerek Aspal
8 Garu
9 Sapu Lidi
10 Drum Pemasak Aspal
11 Kayu Bakar
12 Cangkul
13 Gergaji Kayu Cap Mata
14 Sekop Sampah Merk VTR
15 Sekop Cap Mata
16 Palu / Martil Uk. 1,5 inci

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 33
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
N BAHAN PIPA DAN SUMUR BOR
1.A PIPA PRALON PVC 1/2 Inci -4M
( SII ) 3/4 Inci -4M
1 Inci -4M
1 1/4 Inci - 4 M
1 1/2 Inci - 4 M
2 Inci -4M
2 1/2 Inci - 4 M
3 Inci -4M

1.B. PIPA PRALON uPVC 1/2 " -6M S - 10


3/4 " -6M S - 10
1" -6M S - 10
1 1/4 " -6M S - 10
1 1/2 " -6M S - 10
2" -6M S - 10
3" -6M S - 10
3" -6M S - 12.5
4" -6M S - 12.5

2 1/2 " -6M S - 10


S - 10
S - 12.5
S - 12.5

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 34
NO BAHAN MATERIAL DAN UPAH KERJA

1 2

3" -6M S - 10
S - 10
S - 12.5
S - 12.5

4" -6M S - 10
S - 10
S - 12.5
S - 12.5

1C Pipa SUPRALON PVC 1/2" -6M S-8


S - 10 MOF
S - 12,5 MOF

3/4" -6M S-8


S - 10 MOF
S - 12,5 MOF

1" -6M S-8


S - 10 MOF
S - 10

-6M S-8

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 35
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
S - 10 MOF
S - 12,5

1 1/2" -6M S-8


S - 10 MOF
S - 12,5 MOF
S - 16

2" -6M S-8


S - 10 MOF
S - 10 RR
S - 12,5 MOF
S - 12,5 RR
S - 16

2 1/2" -6M S-8


S-8
S - 10 MOF
S - 10 RR
S - 12,5 MOF
S - 12,5 RR
S - 16
S - 16

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 36
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
3" -6M S-8
S-8
S - 10 MOF
S - 10 RR
S - 12,5 MOF
S - 12,5 RR
S - 16
S - 16

4" -6M S-8


S-8
S - 10 MOF
S - 10 RR
S - 12,5 MOF
S - 12,5 RR
S - 16
S - 16

1D Pipa MASPION PVC 3/8 " S - 6,3


S-8
S - 10
S - 12,5

1/2" S - 6,3

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 37
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
S-8
S - 10
-6M S - 12,5

3/4" S - 6,3
S-8
S - 10
-6M S - 12,5

1" S - 6,3
S-8
S - 10
S - 10
-6M S - 10 Mof

1 1/4" S - 6,3
S-8
S - 10
-6M S - 10 Mof
S - 12,5

1 1/2" S - 6,3
S-8
S - 10

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 38
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
-6M S - 10 Mof
S - 12,5
-6M S - 12,5 Mof
S - 16

2" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof

2 1/2" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof
S - 12,5
-6M S - 12,5 RR

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 39
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
S - 16
S - 16

3" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5
-6M S - 12,5 RR
S - 16
S - 16

4" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof
S - 12,5

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 40
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
-6M S - 12,5 RR
S - 16
S - 16

5" -6M S - 10 Mof


-6M S - 10 RR

6" -6M S - 10 Mof


-6M S - 10 RR
-6M S - 12,5 RR

8" -6M S - 10 Mof


-6M S - 10 RR
-6M S - 12,5 Mof
-6M S - 12,5 RR

10" -6M S - 10 Mof


-6M S - 10 RR
-6M S - 12,5 Mof
-6M S - 12,5 RR

12" -6M S - 10 Mof


-6M S - 10 RR
-6M S - 12,5 Mof

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 41
NO BAHAN MATERIAL DAN UPAH KERJA

1 2

14" -6M S - 10 RR
-6M S - 12,5 RR

16" -6M S - 10 RR
-6M S - 12,5 RR

18" -6M S - 10 RR
-6M S - 12,5 RR

20" -6M S - 10 RR
-6M S - 12,5 RR

24" -6M S - 10 RR
-6M S - 12,5 RR

28" -6M S - 12,5 RR

1 E Pipa Wavin SNI Wavinsafe 1/2" -4M S - 10 / 10 Bar (1,0 Mpa )


3/4" -4M S - 10 / 10 Bar (1,0 Mpa )
1" -4M S - 10 / 10 Bar (1,0 Mpa )
11/4" -4M S - 10 / 10 Bar (1,0 Mpa )
11/2" -6M S - 10 / 10 Bar (1,0 Mpa )

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 42
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
2" -6M S - 10 / 12,5 Bar (12,5 Mpa )
3" -6M S - 10 / 12,5 Bar (12,5 Mpa )
4" -6M S - 10 / 12,5 Bar (12,5 Mpa )
6" -6M S - 10 / 12,5 Bar (12,5 Mpa )

2" -6M S - 12,5 / 10 Bar (1,0 Mpa )


3" -6M S - 12,5 / 10 Bar (1,0 Mpa )
4" -6M S - 12,5 / 10 Bar (1,0 Mpa )
6" -6M S - 12,5 / 10 Bar (1,0 Mpa )

11/2" -6M S - 12,5 / 8 Bar (0,8 Mpa )

1F Pipa Wavin SNI Wavinlok 2" -6M S - 10 / 12,5 Bar (12,5 Mpa )
3" -6M S - 10 / 12,5 Bar (12,5 Mpa )
4" -6M S - 10 / 12,5 Bar (12,5 Mpa )
6" -6M S - 10 / 12,5 Bar (12,5 Mpa )
8" -6M S - 10 / 12,5 Bar (12,5 Mpa )
10" -6M S - 10 / 12,5 Bar (12,5 Mpa )
12" -6M S - 10 / 12,5 Bar (12,5 Mpa )
16" -6M S - 10 / 12,5 Bar (12,5 Mpa )
20" -6M S - 10 / 12,5 Bar (12,5 Mpa )
24" -6M S - 10 / 12,5 Bar (12,5 Mpa )

2" -6M S - 12,5 / 10 Bar (1,0 Mpa )

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 43
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
3" -6M S - 12,5 / 10 Bar (1,0 Mpa )
4" -6M S - 12,5 / 10 Bar (1,0 Mpa )
6" -6M S - 12,5 / 10 Bar (1,0 Mpa )
8" -6M S - 12,5 / 10 Bar (1,0 Mpa )
10" -6M S - 12,5 / 10 Bar (1,0 Mpa )
12" -6M S - 12,5 / 10 Bar (1,0 Mpa )
16" -6M S - 12,5 / 10 Bar (1,0 Mpa )
20" -6M S - 12,5 / 10 Bar (1,0 Mpa )
24" -6M S - 12,5 / 10 Bar (1,0 Mpa )

1G Pipa GIP ( Galvanis ) 1/2" -6M


Med.A Super sni 3/4" -6M
1" -6M
1 1/4" -6M
1 1/2" -6M
2" -6M
21/2" -6M
3" -6M
4" -6M
5" -6M
6" -6M
8" -6M
10" -6M

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 44
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
12" -6M
16" -6M

1H Pipa GIP ( Galvanis ) 1/2" -6M


Med.A 3/4" -6M
1" -6M
1 1/4" -6M
1 1/2" -6M
2" -6M
21/2" -6M
3" -6M
4" -6M

1I Pipa GIP ( Galvanis ) 1/2" -6M


Med.B 3/4" -6M
1" -6M
1 1/4" -6M
1 1/2" -6M
2" -6M
21/2" -6M
3" -6M
4" -6M

1J Pipa PE 100 1 1/2" -6M SDR 17 PN 14

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 45
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
2" -6M SDR 17 PN 15
21/2" -6M SDR 17 PN 16
3" -6M SDR 17 PN 17

2 JENIS "D" UNTUK SALURAN 3/4" -4M


PEMBUANGAN AIR 1" -4M
1 1/2" -4M
2" -4M
21/2" -4M
3" -4M
4" -4M
5" -4M
6" -4M
8" -4M
10" -4M

3 PIPA JENIS "C' UNTUK 5/8 Inci -4M


INSTALASI LISTRIK 3/4 Inci -4M
PIPA PVC 1/2" (M.P.)
PIPA PVC 3/4 " (Maspion)
PIPA PVC 1 "
PIPA PVC 2 "
PIPA PVC 2 1/2

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 46
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
PIPA PVC Wavin Kual D(4"x 4 M)
PIPA PVC Winlon Kual D (4"'x 4 M)
PIPA PVC vinilon Kual D (4'' x 4 M)
PIPA PVC Maspion Kual D ( 4"x 4 M)
Plastik Lembaran dari Polimer Etilena (Polos Lebar 1 M)
Pipa PVC Wavin Kual D (4 x 4 M)
Pipa PVC Maspion Kual AW ( 4 x 4 M)
Pipa PVC Maspion Kual D( 4 x 4 M)
Pipa PVC Wavin AW ( 4 x 4 M)
Pipa PVC Wavin Kual D (4 x 4 M)
Pipa PVC Maspion Kual (4 x 4 M)
Pipa PVC Pravilon 4 Inci
Pipa PVC Pravilon End 6 Mi

4 PIPA PVC KLAS B ( PIPA LIMBAH ) SUPRALON


Pipa PVC Klas B RRJ 2" 6M
Pipa PVC Klas B RRJ 3" 6M
Pipa PVC Klas B RRJ 4" 6M

5 AKSESORIS UNTUK PIPA KELAS B SUPRALON


Elbow RRJ 90 2"
Elbow RRJ 90 3"
Elbow RRJ 90 4"
Tee RRJ 2"

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 47
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
Tee RRJ 3"
Tee RRJ 4"
Endcap/ Dop 2"
Endcap/ Dop 3"
Endcap/ Dop 4"

6 Pipa Beton
ᶲ 40 Panjang 110 cm, tebal 7 cm NRCP
ᶲ 40 Panjang 110 cm, tebal 7 cm RCP
ᶲ 60 Panjang 110 cm, tebal 8 cm NRCP
ᶲ 60 Panjang 110 cm, tebal 8 cm RCP
ᶲ 80 Panjang 110 cm, tebal 9 cm NRCP
ᶲ 80 Panjang 110 cm, tebal 9 cm RCP
ᶲ 100 Panjang 110 cm, tebal 10 cm NRCP
ᶲ 100 Panjang 110 cm, tebal 10 cm RCP

7 Pipa Instalasi 5/8


8 Pipa Listrik 5/8
9 Sambungan Pipa Lurus 1/2
10 Sambungan Pipa L 1/2
11 Sambungan Pipa Besi 3/4"T
12 Knee 3/4"
13 Knee 1"
14 Knee PVC Diameter 2"

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 48
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
15 Saringan Pasir
16 Saringan Kotoran
17 Saringan Kotoran Kamar Mandi - Bahan Plastik (Floor Drain)
18 Saringan Kotoran Kamar Mandi - Bahan Besi/Kuningan (Floor Drain)
19 Lem FOX
20 Lem Pipa PVC
21 Lem Pipa PVC
22 Lem Besi - kw 1
23 Lem Besi - biasa
24 Talang PVC
25 Double Nipple GIV 1/2"
26 Double Nipple GIV 3/4"
27 Double Nipple 4"
28 Doubble Nipple 2"
29 Dop PVC 3/4"
30 Dop PVC 1"
31 Dop PVC 2"
32 Dop PVC 4"
33 Elbow GIV 3/4"
34 Elbow GIV 2"

O DAFTAR HARGA UNTUK PIPA DAN ALAT BANTU BESI


1 KNEE BESI 1/2"
3/4"

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 49
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
1"

2 PIPA BESI MEDIUM A. SUPER 1/2"


3/4"
1"
2'
3"
4"

3 PIPA GALVANISIR A. SUPER 1/2"


3/4"
1"
2'

4 STOP KRAN - BIASA 1/2"


3/4"
1"

5 STOP KRAN - KW.1 1/2"


3/4"
1"

6 TEE 1/2"
3/4"

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 50
NO BAHAN MATERIAL DAN UPAH KERJA

1 2

7 V. KNIE 3/4"
1"

8 V NEPLE 3/4"
1"

9 WATER MUR 1/2"


10 WATER MUR 3/4"
11 Pipa Gip 1 1/2" (air bersih)
12 Pipa Baja Hitam -6M 1/2" tbl=2 mm
13 Pipa Baja Putih -6M 1/2" tbl=2 mm
14 Pipa Baja Hitam -6M 3/4" tbl=2 mm
15 Pipa Baja Putih -6M 3/4" tbl=2 mm
16 Pipa Baja Hitam -6M 1" tbl=2 mm
17 Pipa Baja Putih -6M 1" tbl=2 mm
18 Pipa Baja Hitam -6M 2" tbl=2 mm
19 Pipa Baja Putih -6M 2" tbl=2 mm
20 Pipa Baja Hitam -6M 3" tbl=2 mm
21 Pipa Baja Putih -6M 3" tbl=2 mm
22 Pipa Baja Hitam -6M 4" tbl=2 mm
23 Pipa Baja Putih -6M 4" tbl=2 mm
24 Pipa PVP dlm 2" Resapan
25 Pipa PVP dlm 3" Resapan

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 51
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
26 Pipa PVP dlm 4" Resapan

P MATERIAL POMPA
1 Pompa Air Shimiznu130 ( 125 Watt )
2 Pompa Air Shimizu 230 ( 200 Watt )
3 Pompa Air Panasonik 130 Jak ( 125 Watt )
4 Pompa Air Panasonik 200 Jak
5 Pompa Air Sanyo 137 AC
6 Pompa Air Sanyo PH 130 AC
7 Pompa Air Wasser 139 EA
8 Pompa Air Lakoni 129 A
9 Pompa Air Inoto I Hp + Kabel 50 Meter
10 Pompa Air Evak I Hp
11 Pompa Air Franklin I Hp
12 Pompa Wasser 60 Ea
13 Pompa Wasser 169 EA
14 Pompa Air Tsutumi 3
15 Mesin Las Hambatan dari Logam Otomatis (Las Listrik Yanmar TS 155 C 13 H
16 Generator SET ABB Mesin Diesel 8,5 PK Yanmar
17 Generator SET ABB Mesin Diesel 8,5 PK Kubota

Q BAHAN INSTALASI LISTRIK


1 Aram Lampu kap Hijau
2 Aram Mercury

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 52
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
3 Balon HPIT 250 W PH
4 Balon HPIT 400 W PH
5 Balon HPLN 125 W PH
6 Balon HQL 80 Watt Osram
7 Balon Neon panjang TL 40 / 36 W PH
8 Balon Son T 150 W
9 Balon Son T 250 W
10 Balon Son T 400 W
11 Body HPIT 400 W Lengkap
12 Body Lampu Taman TO-2
13 Body Lampu Taman TO-1
14 Balon HPLN 250 W
15 Body Mercury Hannock
16 Body Balon Son.T
17 Begel Per Pasang u/ tiang Beton
18 Begel Per Pasang u/ tiang Besi
19 Box Panel Meter
20 Box Panel Distribusi
21 Contactor 80 A Mitsubishi
22 Contactor 100 A Mitsubishi
23 Fitting Mercury E 27
24 Fitting Lampu Elektra segi Empat
25 Fitting Lampu Taman E 27
26 Fitting Lampu E 40

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 53
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
27 Fotosell 6 A
28 Ignitor HPIT 400 W ( SI.51 ) PH
29 Injektor 3 Kutub
30 Injektor SN 58
31 Isolasi Kabel Tanah (Bahan Karet)
32 Isolasi Unibell
33 Kabel NYA - 1 x 1,5 mm (Eterna)
34 Kabel NYA - 1 x 2,5 mm (Eterna)
35 Kabel NYA - 1 x 2,5 mm (Extrana)
36 Kabel NYY 4 x 10 mm
37 Kabel NYY 4 x 6 mm
38 Kabel NYY 2 x 2,5 mm
39 Kabel WLC NYY 3 x 1,5 mm (Untuk Sumur Bor)
40 Kabel NYM 2 x 1,5 mm
41 Kabel NYM 2 x 1,5 mm
42 Kabel NYM 2 x 2,5 mm
43 Kabel NYM 2 x 2,5 mm
44 Kabel NYFGBY 4 x 6 mm
45 Kabel NYFGBY 4 x 10 mm
46 Kabel NYFGBY 4 x 16 mm
47 Kabel Twistik 2 x 10 mm
48 Kabel Twistik 2 x 16 mm
49 Kap E 27 Hijau
50 Kapasitor HPIT 250 W PH

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 54
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
51 Kapasitor HPIT 400 W PH
52 Kapasitor SON T 400 W
53 Kapasitor SON T 250 W
54 Kapasitor SON T 150 W
55 Kapasitor 8 Mf
56 Kapasitor 25 Mf
57 Kapasitor 32 Mf
58 Konektor Double Baut
59 Konektor Kedap Air 1 Baut
60 Kontaktor SN 50/80 Ampere
61 Klem Service Plastik
62 Kawat Seng
63 Lampu Hemat Energi 18 W
64 Lampu Hemat Energi 23 W
65 Lampu Hemat Energi 85 W
66 Lampu Hemat Energi 75 W
67 Lampu Hemat Energi 70 W
68 Lampu Hemat Energi 65 W
69 Lampu Hemat Energi 50 W
70 Lampu LED Hemat Energi 7 W
71 Lampu LED Hemat Energi 10 W
72 Lampu LED Hemat Energi 13 W
73 Lampu Selang Hias
74 MCB 1 A MG 1 Phase

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 55
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
75 MCB 2 - 20 A MG 1 Phase
76 MCB 25 - 32 A MG 1 Phase
77 MCB 1 A 1 Phase
78 MCB 6 A 1 Phase
79 MCB 16 A 1 Phase
80 MCB 20 A 1 Phase
81 MCB 50 A 1 Phase
82 Mour / Baut
83 NFB 75 A Mitsubishi 3 Phase
84 NFB 80 A Mitsubishi 3 Phase
85 NFB 100 A Mitsubishi 3 Phase
86 Pipa Gip 1 1/2" (listrik)
87 Rang Lampu Taman TO.2
88 Relay lampu Selang
89 Saklar Engkel In Clipsal
90 Saklar Engkel In Broco
91 Saklar Seri II In Clipsal
92 Saklar Seri II In Broco
93 Skun Kabel 10 mm
94 Skun Kabel 16 mm
95 Skun Kabel 25 mm
96 Skun Kabel 50 mm
97 Selonsong 10
98 Selonsong 16

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 56
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
99 Stop Kontak Broco
100 Stop Kontak Clipsal
101 Terminal Elegram 25mm
102 Tiang PJU 9 M Galvanis Single David
103 Tiang PJU 9 M Galvanis Double David
104 Tiang Besi 7 M
105 Tiang Besi 9 M
106 Tiang Lampu Taman
107 Timer Sweet Thebend
108 Travo HPIT 400 Watt Philips
109 Travo HPLN 125 Watt PH / HQL 80 Watt
110 Travo Son T 400 W
111 Travo Son T 250 W
112 Travo Son T 150 W
113 Travo TL 40 W PH
114 Bohlam (Lampu Penerangan) TL Simbat 18 W
115 Bohlam (Lampu Penerangan) PCC 23 Watt Ecuat
116 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad)
117 Kawat Non Galbani Lainnya (Kawat Las)
118 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad)
119 Stop Kontak dan Soket (Broco 2 Saklar)
120 Control Desk / Meja Kontrol KWH METER 450 WATT
121 Control Desk / Meja Kontrol KWH METER 900 WATT
122 Kabel Listrik NYM (2 MM x 2.5 MM)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 57
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
123 Kabel Listrik NYA Kabel Listrik NYA ( 1 MM x 2,5 MM)
124 Kabel Listrik NYY (3 x 2,5) MM

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 58
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
125 Kabel Lainnya Eterna (3 x 2,5) 50 M
126 Bohlam (Lampu Penerangan) Philips Pijar 40 Watt
127 Lampu Neon Philips 40 Watt 100 Buah
128 Lampu Neon Philips TL 40 Watt

R ALAT PENUNJANG INSTALASI LISTRIK


1 Accumulater Cell Tester
2 Detektor Kabel
3 Helm Proyek
4 Kaos Tangan Kerja
5 Kaos Tangan Tegangan Tinggi 20 KV
6 Kunci Pipa Besar
7 Linggis
8 Mantel Parasut
9 Megger Meter Insulation Tester 3111V
10 Mesin Las Listrik
11 MultiMeter Sanwa asli
12 Pakaian Kerja (Cattel Pak)
13 Palu-Palu
14 Pisau Cutter
15 Senter Kepala
16 Sepatu Kerja (listrik)
17 Sepatu Tegangan Tinggi 20 KV
18 Skop

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 59
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
19 Solder
20 Tang Ampere 600 A
21 Tang Press Skun Besar
22 Tang Press Skun Kecil
23 Tangga Aluminium untuk lampu jalan
24 Tangga Bambu 2,5 Meter
25 Tangga Bambu 5 Meter
26 Tangga Fiber
27 Tools Kit
28 Topi

S UPAH KERJA
1 Mandor Lapangan
2 Kepala tukang
3 Kepala Tukang Listrik
4 Tukang Batu /Cat
5 Tukang Kayu / besi
6 Tukang pasang paving
7 Pembantu Sopir
8 Pembantu Mekanik
9 Pembantu Tukang Listrik
10 Pembantu Operator
11 Mekanik
12 Operator Terlatih

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 60
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
13 Pekerja
14 Sopir Terampil
15 Biaya Pasang Canstein
16 Biaya Pasang Paving

Plt. KEPALA DINAS PEKERJAAN UMUM


KOTA MAKASSAR

Drs. H. IRWAN R. ADNAN, M.Si


Pembina Utama Muda

Nip. 19710303 199803 1 014

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 61
AN BAHAN & UPAH KERJA
TAHUN ANGGARAN 2021

SATUAN BAHAN/ HASIL SURVEY


UPAH KERJA TRIWULAN I

3 4

Buah Rp 4,900.00
Buah Rp 6,400.00
Buah Rp 7,000.00
Buah Rp 4,900.00
Buah Rp 6,400.00
Buah Rp 7,000.00
Buah Rp 4,900.00
Buah Rp 6,400.00
Buah Rp 7,000.00
Buah Rp 7,500.00
Buah Rp 4,900.00
Buah Rp 6,400.00
Buah Rp 7,000.00
Buah Rp 4,900.00
Buah Rp 6,400.00
Buah Rp 7,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 62
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Buah Rp 16,500.00
Buah Rp 18,700.00
Buah Rp 12,100.00
Buah Rp 16,500.00
Buah Rp 15,300.00
Buah Rp 20,900.00
Buah Rp 21,100.00
Buah Rp 27,500.00
Buah Rp 16,200.00
Buah Rp 20,800.00
Buah Rp 22,400.00
Buah Rp 13,800.00
Buah Rp 19,300.00
Buah Rp 19,000.00
Buah Rp 22,000.00
Buah Rp 93,500.00
Buah Rp 104,500.00
Buah Rp 126,500.00
Buah Rp 63,300.00
Buah Rp 68,800.00
Buah Rp 52,300.00
Buah Rp 36,300.00
Lembar Rp 118,800.00
Lembar Rp 118,300.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 63
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Lembar Rp 99,000.00
Lembar Rp 99,000.00
Lembar Rp 60,500.00
Lembar Rp 83,600.00
Lembar Rp 33,000.00
kaki Rp 8,000.00
kaki Rp 88,000.00
Lembar Rp 88,000.00
Lembar Rp 77,000.00
Lembar Rp 50,200.00
Lembar Rp 53,900.00
Lembar Rp 79,200.00
Lembar Rp 93,500.00
Lembar Rp 82,500.00
Lembar Rp 58,300.00
KK Rp 19,800.00
Lembar Rp 88,000.00
Lembar Rp 16,500.00
Lembar Rp 19,800.00
Lembar Rp 13,200.00
Biji Rp 8,000.00
M Rp 8,300.00
M Rp 8,800.00
M Rp 14,300.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 64
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Rol Rp 385,000.00
Rol Rp 440,000.00
Lbr Rp 181,500.00
Lbr Rp 86,900.00
Lbr Rp 352,000.00

M3 Rp 385,000.00
M3 Rp 275,000.00
M3 Rp 385,000.00
M3 Rp 275,000.00
M3 Rp 440,000.00
M3 Rp 385,000.00
M3 Rp 385,000.00
M3 Rp 385,000.00
M3 Rp 385,000.00
M3 Rp 385,000.00
Biji Rp 1,100.00
M3 Rp 990,000.00
M2 Rp 70,800.00
Biji Rp 27,500.00
Biji Rp 57,200.00
Biji Rp 68,200.00
Biji Rp 68,200.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 65
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Biji Rp 33,000.00
M3 Rp 165,000.00
M3 Rp 247,500.00
M3 Rp 286,000.00
M3 Rp 286,000.00
M3 Rp 286,000.00
M3 Rp 176,000.00
M3 Rp 220,000.00
M3 Rp 357,500.00
Sak Rp 71,500.00
Sak Rp 52,800.00
Zak Rp 51,700.00
Zak Rp 51,700.00
Zak Rp 49,500.00
Sak Rp 77,000.00
Sak Rp 275,000.00
Kg Rp 22,000.00
Kg Rp 49,500.00
Kg Rp 62,200.00
Kg Rp 126,300.00
Kg Rp 121,300.00
M2 Rp 54,500.00
kg Rp 33,000.00
M2 Rp 88,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 66
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M3 Rp 385,000.00

Batang Rp 110,000.00
Batang Rp 44,000.00
Batang Rp 33,000.00
Batang Rp 27,500.00
Ikat Rp 38,500.00
Buah Rp 165,000.00
Buah Rp 220,000.00
Buah Rp 330,000.00
Buah Rp 385,000.00

Bh Rp 9,600.00
Bh Rp 8,000.00
Batang/Biji Rp 14,300.00
Batang Rp 23,100.00
Batang Rp 14,800.00
Batang Rp 15,500.00
Batang Rp 19,200.00
Batang Rp 22,000.00
Bh Rp 6,100.00
Bh Rp 27,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 67
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M'/ Btg Rp 209,000.00
Btg Rp 201,300.00
Btg Rp 203,500.00
Btg Rp 209,000.00
Btg Rp 176,000.00
Btg Rp 148,500.00
Btg Rp 126,500.00
Btg Rp 104,500.00
Btg Rp 93,500.00
Btg Rp 19,800.00
Btg Rp 20,900.00
Btg Rp 23,100.00
Btg Rp 26,400.00
Btg Rp 29,700.00
Btg Rp 27,500.00
Btg Rp 31,900.00
Btg Rp 40,700.00
Btg Rp 71,500.00
Btg Rp 78,100.00
Btg Rp 82,500.00
Btg Rp 88,000.00
Btg Rp 93,500.00
Btg Rp 127,600.00
Btg Rp 69,300.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 68
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Btg Rp 75,900.00
Btg Rp 80,300.00
Btg Rp 85,300.00
Btg Rp 90,800.00
Btg Rp 38,500.00
Btg Rp 40,700.00
Btg Rp 37,400.00
Btg Rp 39,600.00
Btg Rp 51,700.00
Btg Rp 57,200.00
Btg Rp 50,600.00
Btg Rp 55,600.00
M2 Rp 869,000.00
Btg Rp 77,000.00
Btg Rp 112,800.00
Btg Rp 187,000.00
Btg Rp 275,000.00
Btg Rp 495,000.00
Btg Rp 676,500.00
Btg Rp 574,200.00
Btg Rp 1,177,000.00
Btg Rp 30,800.00
Btg Rp 52,800.00
Btg Rp 71,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 69
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Btg Rp 93,500.00
Btg Rp 159,500.00
Btg Rp 204,600.00
Btg Rp 269,500.00
Btg Rp 407,000.00
Btg Rp 86,300.00
Btg Rp 211,700.00
M2 Rp 500,500.00
M2 Rp 711,700.00
M2 Rp 803,000.00
M2 Rp 1,001,000.00
M2 Rp 1,430,000.00
M2 Rp 1,540,000.00
M2 Rp 1,782,000.00
M2 Rp 1,903,000.00
M2 Rp 2,145,000.00
M2 Rp 2,255,000.00
M2 Rp 2,871,000.00
M2 Rp 3,685,000.00
Lembar Rp 4,139,600.00
Lembar Rp 5,482,400.00
Lembar Rp 6,283,200.00
Batang Rp 36,900.00
Batang Rp 48,400.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 70
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Batang Rp 72,600.00
Batang Rp 110,000.00
Batang Rp 198,000.00
Batang Rp 172,700.00
Batang Rp 181,500.00
Batang Rp 297,000.00
Batang Rp 11,642,400.00
Batang Rp 4,090,300.00
Batang Rp 8,106,600.00
Batang Rp 4,638,500.00
Batang Rp 542,100.00
kg Rp 15,200.00
kg Rp 385,000.00
Roll Rp 192,500.00
M' Rp 38,500.00
M Rp 11,000.00
M Rp 27,500.00
M Rp 38,500.00
Dos Rp 143,000.00
M Rp 19,800.00
kg Rp 27,500.00
M'/Roll Rp 71,500.00
Unit Rp 203,500.00
M2 Rp 632,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 71
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M2 Rp 275,000.00
Tube Rp 16,500.00
Tube Rp 203,500.00
M Rp 17,600.00
Roll Rp 1,622,500.00
Roll Rp 3,300,000.00
Kg Rp 18,700.00
Kg Rp 60,500.00
Kg Rp 18,700.00
Kg Rp 22,000.00
Kg Rp 19,800.00
Kg Rp 20,900.00
Kg Rp 24,200.00
Kg Rp 55,000.00
Biji Rp 275,000.00
Dos/ Bgks Rp 192,500.00
Dos/ Bgks Rp 66,000.00
Kg Rp 15,400.00
Dos Rp 16,500.00
Dos Rp 16,500.00
Dos Rp 16,500.00
Kg Rp 38,500.00
Dos Rp 52,300.00
Dos Rp 55,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 72
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Kg Rp 27,500.00
Kg Rp 27,500.00
Biji Rp 1,100.00
Bh Rp 27,500.00
M' Rp 440,000.00
M' Rp 495,000.00
M' Rp 550,000.00
M' Rp 631,400.00
Buah Rp 264,000.00
Buah Rp 316,800.00
Buah Rp 369,600.00
M2/ 6 Rp 85,800.00
M Rp 41,800.00
M Rp 57,200.00
M Rp 60,500.00
M Rp 61,600.00
M Rp 49,500.00
Btg Rp 20,900.00
Btg Rp 33,000.00
Btg Rp 26,400.00
Btg Rp 23,100.00
Btg Rp 71,500.00
Kg Rp 33,000.00
Btg Rp 231,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 73
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Btg Rp 137,500.00
Btg Rp 175,500.00
Btg Rp 99,900.00
M' Rp 132,000.00
M2 Rp 1,403,200.00
Unit Rp 302,500.00
Unit Rp 275,000.00
Unit Rp 253,000.00
Lembar Rp 242,000.00
Unit Rp 231,000.00

Liter/botol Rp 5,500.00
Kaleng Rp 69,300.00
Kg Rp 71,500.00
Kaleng Rp 46,200.00
Liter Rp 19,800.00
liter Rp 39,600.00
Kg Rp 58,300.00
Kaleng Rp 130,400.00
Kaleng Rp 150,700.00
Kaleng Rp 105,600.00
Kg Rp 31,000.00
Kg Rp 51,700.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 74
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Kaleng Rp 110,000.00
Kaleng Rp 203,500.00
Kaleng Rp 220,000.00
Kaleng Rp 330,000.00
Kaleng Rp 77,000.00
Kg Rp 176,000.00
Kaleng Rp 19,800.00
Kaleng Rp 176,000.00
Kaleng Rp 181,500.00
Kaleng Rp 286,000.00
Kaleng Rp 71,500.00
Liter Rp 181,500.00
Kaleng Rp 133,100.00
Kaleng Rp 143,000.00
kg Rp 88,000.00
kg Rp 62,700.00
Kg Rp 145,200.00
Pail Rp 797,500.00
Pail Rp 792,000.00
Kg Rp 33,000.00
Kaleng Rp 49,500.00
Liter Rp 8,800.00
Kg Rp 44,000.00
Kg Rp 44,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 75
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Kg Rp 60,500.00
Liter Rp 35,200.00
Liter Rp 9,400.00
Lembar Rp 5,500.00
Kaleng Rp 104,500.00
Kaleng Rp 77,000.00
Kaleng Rp 71,500.00
Kaleng Rp 71,500.00
Kaleng Rp 79,500.00
Ltr Rp 66,000.00
kg Rp 66,000.00
Ltr Rp 66,000.00
Kg Rp 93,500.00
kg Rp 148,500.00
kg Rp 214,500.00
kg Rp 111,700.00
Buah Rp 8,800.00
Buah Rp 13,200.00
Buah Rp 19,800.00
Kg Rp 55,000.00
kg Rp 82,500.00
kg Rp 62,700.00
kg Rp 159,500.00
ltr Rp 203,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 76
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Roll/Bh Rp 13,200.00
kg Rp 29,700.00
kg Rp 176,000.00
Liter Rp 145,200.00
kg Rp 74,300.00
Lembar Rp 522,500.00
Lembar Rp 763,400.00
Lembar Rp 781,000.00
Lembar Rp 799,700.00
Lembar Rp 812,900.00
Lembar Rp 1,059,300.00

M3 Rp 14,300,000.00
M3 Rp 16,500,000.00
M3 Rp 26,620,000.00
M3 Rp 27,500,000.00
M3 Rp 22,000,000.00
M3 Rp 22,000,000.00
M3 Rp 4,125,000.00
M3 Rp 3,850,000.00
M3 Rp 2,200,000.00
M3 Rp 2,200,000.00
M3 Rp 2,750,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 77
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M3 Rp 9,350,000.00
M3 Rp 10,450,000.00
Lembar Rp 66,000.00
Lembar Rp 55,000.00
Lembar Rp 88,000.00
Lembar Rp 308,000.00
Lembar Rp 198,000.00
Lembar Rp 132,000.00
Lembar Rp 55,000.00
Lembar Rp 220,000.00

Biji Rp 27,500.00
Biji Rp 181,500.00
Psg Rp 27,500.00
Psg Rp 84,700.00
Psg Rp 49,500.00
Psg Rp 16,500.00
Psg Rp 11,000.00
Psg Rp 16,500.00
Psg Rp 16,500.00
Psg Rp 84,700.00
Psg Rp 12,100.00
Psg Rp 66,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 78
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Psg Rp 13,800.00
Psg Rp 57,200.00
Psg Rp 22,000.00
Psg Rp 63,800.00
Bh Rp 38,500.00
Bh Rp 58,100.00
Bh Rp 27,500.00
Bh Rp 57,200.00
Psg Rp 84,700.00
Psg Rp 84,700.00
Bh Rp 27,500.00
Bh Rp 37,400.00
Bh Rp 52,800.00
Bh Rp 52,800.00
Bh Rp 38,500.00
Bh Rp 49,700.00
Bh Rp 22,000.00
Bh Rp 72,600.00
Bh Rp 165,000.00
Bh Rp 729,700.00
Bh Rp 275,000.00
Bh Rp 165,000.00
Bh Rp 110,000.00
Bh Rp 321,900.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 79
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Bh Rp 55,000.00
Bh Rp 44,000.00
Bh Rp 74,800.00
Bh Rp 27,500.00
Bh Rp 122,300.00
Bh Rp 17,300.00
Bh Rp 188,800.00
Bh Rp 8,300.00
Bh Rp 101,800.00

M2 Rp 121,000.00
M2 Rp 148,500.00
M2 Rp 275,000.00
M2 Rp 363,000.00
M2 Rp 484,000.00
M2 Rp 154,000.00
M2 Rp 462,000.00
M2 Rp 121,000.00
M2 Rp 632,500.00
M2 Rp 660,000.00
M2 Rp 59,400.00
M2 Rp 264,000.00
M2 Rp 71,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 80
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M2 Rp 170,500.00
M2 Rp 187,000.00
Lembar Rp 203,500.00
Lembar Rp 203,500.00
Lembar Rp 236,500.00
Lembar Rp 297,000.00
Lembar Rp 236,500.00
Lembar Rp 533,500.00
M2 Rp 2,491,500.00
M2 Rp 522,500.00

Unit Rp 1,650,000.00
Unit Rp 2,530,000.00
Unit Rp 3,284,600.00
Unit Rp 2,970,000.00
Bh Rp 385,000.00
Bh Rp 313,500.00
Bh Rp 715,000.00
Bh Rp 726,000.00
Bh Rp 385,000.00
Unit Rp 550,000.00
Unit Rp 1,540,000.00
Bh Rp 247,500.00
Bh Rp 3,300,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 81
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Bh Rp 550,000.00
Bh Rp 825,000.00
Bh Rp 1,320,000.00
Bh Rp 3,685,000.00
Bh Rp 59,400.00
Bh Rp 44,000.00
Bh Rp 44,000.00
Bh Rp 253,000.00
Bh Rp 247,500.00
Bh Rp 121,000.00
Bh Rp 5,500.00
Unit Rp 330,000.00
Bh Rp 121,000.00
Rol Rp 330,000.00
M Rp 176,000.00
Bh Rp 495,000.00
Bh Rp 379,500.00
Unit Rp 23,100,000.00
Unit Rp 29,260,000.00

Lembar Rp 220,000.00
Lembar Rp 55,000.00
Lembar Rp 66,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 82
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Lembar Rp 93,500.00
Lembar Rp 99,000.00
Lembar Rp 148,500.00
Lembar Rp 209,000.00
Lembar Rp 242,000.00
Lembar Rp 291,500.00
Lembar Rp 137,500.00
Lembar Rp 121,000.00
Lembar Rp 165,000.00
Lembar Rp 77,000.00
Lembar Rp 110,000.00
Lembar Rp 181,500.00
Lembar Rp 291,500.00
Lembar Rp 82,500.00
Lembar Rp 74,800.00
Lembar Rp 100,100.00
Lembar Rp 139,700.00
Lembar Rp 192,500.00
Lembar Rp 245,300.00
Lembar Rp 653,400.00
Lembar Rp 29,200.00
Lembar Rp 49,000.00
Lembar Rp 51,700.00
Lembar Rp 72,600.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 83
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Lembar Rp 74,800.00
Lembar Rp 70,400.00
Lembar Rp 73,700.00
Lembar Rp 49,500.00
Lembar Rp 242,000.00
Batang Rp 22,000.00
Batang Rp 40,300.00
Batang Rp 22,000.00
Btg Rp 63,300.00
Btg Rp 35,000.00
Btg Rp 78,300.00
Batang Rp 22,000.00
M' Rp 11,000.00
M' Rp 13,800.00
M' Rp 19,300.00
M' Rp 22,000.00
M' Rp 27,500.00
Batang Rp 27,800.00
M' Rp 11,000.00
M' Rp 16,500.00
M' Rp 27,500.00

Dos Rp 93,500.00
Dos Rp 101,200.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 84
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Dos Rp 63,000.00
Dos Rp 63,800.00
Dos Rp 65,600.00
Dos Rp 54,700.00
Dos Rp 117,700.00
Dos Rp 117,700.00
Dos Rp 261,800.00
Dos Rp 176,000.00
Dos Rp 290,300.00
Dos Rp 390,500.00
Dos Rp 192,500.00
Dos Rp 324,500.00
Dos Rp 118,700.00
Dos Rp 96,800.00
Dos Rp 66,000.00
M2 Rp 63,800.00
M2 Rp 71,500.00
Dos Rp 125,400.00
Dos Rp 151,800.00
Dos Rp 220,000.00
Dos Rp 462,000.00
Dos Rp 350,900.00
Dos Rp 379,500.00
M2 Rp 1,333,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 85
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M2 Rp 880,000.00
Dos Rp 55,200.00
Dos Rp 74,800.00
Dos Rp 198,000.00
Dos Rp 68,200.00
Dos Rp 66,000.00
Dos Rp 63,800.00
Dos Rp 551,100.00
Dos Rp 66,000.00
Dos Rp 84,700.00
M2 Rp 176,000.00
M2 Rp 212,800.00
M2 Rp 264,700.00
Bj Rp 115,500.00
M2 Rp 192,500.00
Dos Rp 881,700.00
Dos Rp 692,800.00
Dos Rp 691,900.00
Dos Rp 660,000.00
Dos Rp 495,000.00
Dos Rp 377,900.00
Dos Rp 315,000.00
Dos Rp 264,600.00
Dos Rp 189,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 86
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M2 Rp 74,800.00
Dos Rp 80,600.00
M2 Rp 74,800.00
M2 Rp 80,600.00
M2 Rp 74,800.00
M2 Rp 49,500.00
M2 Rp 49,500.00
M2 Rp 51,900.00
M2 Rp 57,600.00
M2 Rp 55,300.00
M2 Rp 51,900.00
M2 Rp 48,300.00
M2 Rp 55,300.00

M2 Rp 72,400.00
M2 Rp 75,600.00
M2 Rp 154,000.00
M2 Rp 77,800.00
M2 Rp 165,000.00
M2 Rp 92,300.00
M2 Rp 141,900.00
M2 Rp 96,700.00
M2 Rp 186,100.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 87
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M2 Rp 99,300.00
M2 Rp 198,600.00
M2 Rp 107,600.00
M2 Rp 190,300.00
M2 Rp 141,600.00
M2 Rp 197,500.00
M2 Rp 149,400.00
M2 Rp 216,700.00
Biji Rp 6,900.00
Biji Rp 7,500.00
M2 Rp 96,500.00
M2 Rp 146,100.00
M2 Rp 103,400.00
M2 Rp 173,800.00
M2 Rp 111,800.00
M2 Rp 192,500.00
M2 Rp 105,100.00
M2 Rp 117,700.00
Buah Rp 28,900.00
Buah Rp 18,100.00
Buah Rp 22,900.00
Buah Rp 25,300.00
Buah Rp 18,100.00
Buah Rp 22,900.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 88
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Buah Rp 25,300.00
Buah Rp 18,100.00
Buah Rp 22,900.00
Buah Rp 25,300.00
Bj Rp 33,800.00
M' Rp 96,200.00
M' Rp 84,200.00
M' Rp 103,000.00
Buah Rp 62,300.00
Buah Rp 31,600.00
Buah Rp 24,200.00
Buah Rp 40,100.00
Buah Rp 40,100.00
Buah Rp 34,100.00
Buah Rp 44,200.00
Buah Rp 49,500.00
Buah Rp 63,100.00

Buah Rp 502,000.00
Buah Rp 548,000.00
Buah Rp 646,000.00
Buah Rp 448,000.00
Buah Rp 558,000.00
Buah Rp 686,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 89
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Buah Rp 746,000.00
Buah Rp 809,000.00
Buah Rp 1,114,000.00
Buah Rp 1,267,000.00
Buah Rp 1,415,000.00
Buah Rp 1,837,000.00

Buah Rp 335,000.00
Rp 502,000.00
Rp 713,000.00

Rp 1,834,000.00
Rp 2,216,000.00
Rp 2,523,000.00
Rp 3,084,000.00
Rp 10,532,000.00
Rp 20,191,000.00
Rp 44,000,000.00

M' Rp 126,000.00
M' Rp 14,900.00
M' Rp 16,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 90
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Kg Rp 5,500.00
Kg Rp 16,400.00
Kg Rp 16,400.00
Kg Rp 16,400.00
kg Rp 1,375,000.00
Kg Rp 16,400.00
M3 Rp 671,000.00
Ltr Rp 5,700.00
Ltr Rp 9,400.00
Ltr Rp 44,000.00
Ltr Rp 7,100.00
Ltr Rp 26,400.00
M3 Rp 792,000.00
M3 Rp 258,500.00
Ltr Rp 14,300.00
M3 Rp 1,166,000.00
M2 Rp 1,105,500.00
M3 Rp 1,050,500.00
M3 Rp 1,006,500.00
M3 Rp 957,000.00
M3 Rp 880,000.00
M3 Rp 869,000.00
M3 Rp 836,000.00
M3 Rp 786,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 91
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M3 Rp 704,000.00
Buah Rp 1,157,800.00
Buah Rp 1,448,500.00
Buah Rp 1,351,900.00
Buah Rp 1,496,000.00
Buah Rp 1,938,200.00
Buah Rp 1,540,000.00
Buah Rp 4,088,700.00
Buah Rp 11,105,600.00
Buah Rp 10,920,300.00
M' Rp 151,400.00
M' Rp 223,700.00
M' Rp 257,700.00
M' Rp 193,300.00
M' Rp 222,700.00
M' Rp 296,900.00
M' Rp 396,800.00
M' Rp 529,000.00
M3 Rp 64,900.00
M3 Rp 137,500.00
M2 Rp 2,000.00
Bungkus Rp 110,000.00
Ikat Rp 22,000.00
Drum Rp 12,100,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 92
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
1 Ton Rp 8,250,000.00
Buah Rp 33,000,000.00
Buah Rp 49,500,000.00

Buah Rp 641,600.00
Buah Rp 705,300.00
Buah Rp 1,083,500.00
Buah Rp 1,182,500.00
Buah Rp 1,280,400.00
Buah Rp 981,000.00
Buah Rp 1,048,900.00
Buah Rp 1,665,400.00
Buah Rp 1,910,700.00
Buah Rp 1,702,800.00
Buah Rp 2,718,100.00

Buah Rp 238,400.00
Buah Rp 287,300.00
Buah Rp 365,900.00
Buah Rp 1,380,000.00

Buah Rp 495,000.00
Buah Rp 509,900.00
M2 Rp 72,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 93
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M2 Rp 89,800.00
M2 Rp 158,700.00
M2 Rp 31,200.00
M2 Rp 42,400.00
M2 Rp 16,500.00

Bh Rp 71,500.00
Bh Rp 572,000.00
Bh Rp 33,000.00
Bh Rp 77,000.00
Bh Rp 27,500.00
Bh Rp 16,500.00
Bh Rp 137,500.00
Bh Rp 16,500.00
Bh Rp 5,500.00
Bh Rp 192,500.00
M3 Rp 60,000.00
Bh Rp 66,000.00
Unit Rp 93,500.00
Unit Rp 8,300.00
Bh Rp 91,300.00
Bh Rp 60,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 94
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4

Batang Rp 27,500.00
Batang Rp 35,800.00
Batang Rp 46,800.00
Batang Rp 63,300.00
Batang Rp 52,800.00
Batang Rp 81,400.00
Batang Rp 99,000.00
Batang Rp 121,000.00

Batang Rp 27,500.00
Batang Rp 49,500.00
Batang Rp 74,300.00
Batang Rp 111,100.00
Batang Rp 275,000.00
Batang Rp 269,500.00
Batang Rp 552,800.00
Batang Rp 451,000.00
Batang Rp 665,500.00

Batang Rp 385,000.00
Batang Rp 409,200.00
Batang Rp 313,500.00
Batang Rp 338,300.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 95
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4

Batang Rp 577,500.00
Batang Rp 572,000.00
Batang Rp 501,100.00
Batang Rp 467,500.00

Batang Rp 341,000.00
Batang Rp 831,900.00
Batang Rp 753,500.00
Batang Rp 673,800.00

Batang Rp 22,000.00
Batang Rp 27,500.00
Batang Rp 22,600.00

Batang Rp 33,000.00
Batang Rp 40,700.00
Batang Rp 38,500.00

Batang Rp 60,500.00
Batang Rp 71,500.00
Batang Rp 39,100.00

Batang Rp 95,700.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 96
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Batang Rp 77,000.00
Batang Rp 69,900.00

Batang Rp 148,500.00
Batang Rp 170,500.00
Batang Rp 140,300.00
Batang Rp 121,000.00

Batang Rp 242,000.00
Batang Rp 249,700.00
Batang Rp 269,500.00
Batang Rp 203,500.00
Batang Rp 225,500.00
Batang Rp 181,500.00

Batang Rp 338,300.00
Batang Rp 379,500.00
Batang Rp 357,500.00
Batang Rp 379,500.00
Batang Rp 289,900.00
Batang Rp 319,000.00
Batang Rp 247,500.00
Batang Rp 270,100.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 97
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Batang Rp 478,500.00
Batang Rp 509,300.00
Batang Rp 330,000.00
Batang Rp 363,000.00
Batang Rp 264,000.00
Batang Rp 286,000.00
Batang Rp 350,400.00
Batang Rp 385,600.00

Batang Rp 723,800.00
Batang Rp 756,800.00
Batang Rp 522,500.00
Batang Rp 561,000.00
Batang Rp 396,000.00
Batang Rp 423,500.00
Batang Rp 528,000.00
Batang Rp 561,000.00

M' Rp 11,000.00
M' Rp 8,800.00
M' Rp 8,300.00
M' Rp 5,500.00

M' Rp 16,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 98
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M' Rp 9,400.00
M' Rp 8,300.00
M' Rp 6,600.00

M' Rp 16,500.00
M' Rp 11,000.00
M' Rp 8,300.00
M' Rp 13,800.00

M' Rp 22,600.00
M' Rp 19,800.00
M' Rp 16,500.00
M' Rp 10,500.00
M' Rp 11,000.00

M' Rp 44,600.00
M' Rp 33,000.00
M' Rp 17,100.00
M' Rp 14,900.00
M' Rp 22,000.00

M' Rp 57,800.00
M' Rp 41,300.00
M' Rp 22,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 99
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M' Rp 20,400.00
M' Rp 33,000.00
M' Rp 24,800.00
M' Rp 27,500.00

M' Rp 71,500.00
M' Rp 66,000.00
M' Rp 24,800.00
M' Rp 44,600.00
M' Rp 250,300.00
M' Rp 38,500.00
M' Rp 25,900.00
M' Rp 46,800.00

M' Rp 93,500.00
M' Rp 96,300.00
M' Rp 71,500.00
M' Rp 55,600.00
M' Rp 88,000.00
M' Rp 52,300.00
M' Rp 55,000.00
M' Rp 39,100.00
M' Rp 66,000.00
M' Rp 44,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 100
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M' Rp 61,100.00
M' Rp 46,800.00

M' Rp 121,600.00
M' Rp 132,000.00
M' Rp 1,050,500.00
M' Rp 46,800.00
M' Rp 126,500.00
M' Rp 258,500.00
M' Rp 74,300.00
M' Rp 90,800.00
M' Rp 60,500.00
M' Rp 74,300.00
M' Rp 88,000.00

M' Rp 200,200.00
M' Rp 187,000.00
M' Rp 96,300.00
M' Rp 63,800.00
M' Rp 165,600.00
M' Rp 71,500.00
M' Rp 127,100.00
M' Rp 55,000.00
M' Rp 129,300.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 101
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M' Rp 374,000.00
M' Rp 107,800.00
M' Rp 121,600.00

M' Rp 165,000.00
M' Rp 163,400.00

M' Rp 165,000.00
M' Rp 220,600.00
M' Rp 162,300.00

M' Rp 330,000.00
M' Rp 336,100.00
M' Rp 269,500.00
M' Rp 239,300.00

M' Rp 515,400.00
M' Rp 537,400.00
M' Rp 426,800.00
M' Rp 352,000.00

M' Rp 825,000.00
M' Rp 847,000.00
M' Rp 673,800.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 102
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4

M' Rp 1,098,300.00
M' Rp 658,300.00

M' Rp 1,396,500.00
M' Rp 868,500.00

M' Rp 1,749,000.00
6M' Rp 1,089,000.00

M' Rp 2,310,600.00
M' Rp 1,430,600.00

M' Rp 2,172,500.00
M' Rp 2,167,600.00

M' Rp 3,168,600.00

Batang Rp 27,000.00
Batang Rp 38,000.00
Batang Rp 49,500.00
Batang Rp 71,800.00
Batang Rp 123,200.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 103
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Batang Rp 195,800.00
Batang Rp 393,800.00
Batang Rp 616,000.00
Batang Rp 1,265,000.00

Batang Rp 157,900.00
Batang Rp 328,400.00
Batang Rp 484,000.00
Batang Rp 1,034,000.00

Batang Rp 107,800.00

Batang Rp 194,200.00
Batang Rp 414,200.00
Batang Rp 623,200.00
Batang Rp 1,294,200.00
Batang Rp 1,998,200.00
Batang Rp 3,099,800.00
Batang Rp 4,936,800.00
Batang Rp 8,126,800.00
Batang Rp 12,669,800.00
Batang Rp 20,955,000.00

Batang Rp 162,800.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 104
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Batang Rp 349,800.00
Batang Rp 492,800.00
Batang Rp 1,064,800.00
Batang Rp 1,625,800.00
Batang Rp 2,549,800.00
Batang Rp 4,056,800.00
Batang Rp 6,502,100.00
Batang Rp 10,183,800.00
Batang Rp 17,008,200.00

Batang Rp 192,500.00
Batang Rp 242,000.00
Batang Rp 374,000.00
Batang Rp 473,000.00
Batang Rp 550,000.00
Batang Rp 742,500.00
Batang Rp 962,500.00
Batang Rp 1,265,000.00
Batang Rp 1,980,000.00
Batang Rp 1,820,500.00
Batang Rp 2,037,200.00
Batang Rp 3,140,500.00
Batang Rp 6,110,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 105
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Batang Rp 7,826,500.00
Batang Rp 12,237,500.00

Batang Rp 143,000.00
Batang Rp 187,000.00
Batang Rp 242,000.00
Batang Rp 308,000.00
Batang Rp 357,500.00
Batang Rp 440,000.00
Batang Rp 561,000.00
Batang Rp 715,000.00
Batang Rp 935,000.00

Batang Rp 93,500.00
Batang Rp 121,000.00
Batang Rp 192,500.00
Batang Rp 220,000.00
Batang Rp 242,000.00
Batang Rp 275,000.00
Batang Rp 357,500.00
Batang Rp 467,500.00
Batang Rp 605,000.00

Batang Rp 30,800.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 106
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Batang Rp 49,500.00
Batang Rp 69,300.00
Batang Rp 101,800.00

Batang Rp 27,500.00
Batang Rp 35,800.00
Batang Rp 38,500.00
Batang Rp 44,000.00
Batang Rp 58,300.00
Batang Rp 77,000.00
Batang Rp 121,000.00
Batang Rp 198,000.00
Batang Rp 253,000.00
Batang Rp 467,500.00
Batang Rp 770,000.00

Batang Rp 16,500.00
Batang Rp 19,300.00
Batang Rp 33,600.00
Batang Rp 40,700.00
Batang Rp 49,500.00
M' Rp 68,800.00
M' Rp 88,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 107
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Batang Rp 137,500.00
Batang Rp 148,500.00
Batang Rp 137,500.00
Batang Rp 253,000.00
M' Rp 374,000.00
Batang Rp 183,700.00
Batang Rp 456,500.00
Batang Rp 226,100.00
Batang Rp 352,000.00
Batang Rp 148,500.00
Batang Rp 187,000.00
Batang Rp 41,300.00
Batang Rp 46,800.00

Batang Rp 214,500.00
Batang Rp 302,500.00
Batang Rp 383,400.00

Bh Rp 41,300.00
Bh Rp 5,300.00
Bh Rp 82,500.00
Bh Rp 53,400.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 108
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Bh Rp 57,800.00
Bh Rp 121,000.00
Bh Rp 31,400.00
Bh Rp 52,300.00
Bh Rp 53,400.00

Pcs Rp 253,000.00
Pcs Rp 324,500.00
Pcs Rp 409,200.00
Pcs Rp 542,300.00
Pcs Rp 585,200.00
Pcs Rp 810,700.00
Pcs Rp 891,000.00
Pcs Rp 1,331,000.00

Batang Rp 14,900.00
Batang Rp 11,000.00
Bh Rp 13,200.00
Bh Rp 3,300.00
Bh Rp 27,500.00
Bh Rp 17,100.00
Bh Rp 19,300.00
Bh Rp 16,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 109
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M' Rp 30,300.00
Bh Rp 27,500.00
Bh Rp 16,500.00
Bh Rp 30,300.00
Kg Rp 49,500.00
Tube Rp 19,300.00
Kg Rp 79,800.00
Tube Rp 38,500.00
Tube Rp 27,500.00
Meter Rp 126,500.00
Buah Rp 8,300.00
Buah Rp 16,500.00
Buah Rp 148,500.00
Buah Rp 44,600.00
Buah Rp 3,900.00
Buah Rp 8,300.00
Buah Rp 16,500.00
Buah Rp 30,300.00
Buah Rp 22,000.00
Buah Rp 83,100.00

Buah Rp 11,600.00
Buah Rp 11,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 110
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Buah Rp 17,100.00

Batang Rp 194,200.00
Batang Rp 216,200.00
Batang Rp 359,200.00
Batang Rp 62,200.00
Batang Rp 1,338,200.00
Batang Rp 1,745,200.00

Batang Rp 159,500.00
Batang Rp 203,500.00
Batang Rp 330,000.00
Batang Rp 688,100.00

Buah Rp 52,300.00
Buah Rp 71,500.00
Buah Rp 107,300.00

Buah Rp 231,000.00
Buah Rp 74,800.00
Buah Rp 126,500.00

Buah Rp 10,500.00
Buah Rp 18,700.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 111
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4

Buah Rp 16,500.00
Buah Rp 17,100.00

Buah Rp 11,000.00
Buah Rp 27,500.00

Buah Rp 30,300.00
Buah Rp 51,700.00
Batang Rp 8,800.00
Batang Rp 239,800.00
Batang Rp 308,000.00
Batang Rp 305,800.00
Batang Rp 382,800.00
Batang Rp 381,700.00
Batang Rp 487,300.00
Batang Rp 704,000.00
Batang Rp 896,500.00
Batang Rp 1,487,000.00
Batang Rp 1,889,800.00
Batang Rp 2,010,800.00
Batang Rp 2,453,000.00
Batang Rp 71,500.00
Batang Rp 172,700.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 112
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Batang Rp 317,900.00

Buah Rp 577,500
Buah Rp 990,000
Buah Rp 616,000
Buah Rp 676,500
Buah Rp 621,500
Buah Rp 1,336,500
Buah Rp 2,876,500
Buah Rp 572,000
Buah Rp 2,942,500
Buah Rp 5,692,500
Buah Rp 11,220,000
Buah Rp 704,000
Buah Rp 1,056,000
Buah Rp 3,850,000
Unit Rp 28,665,200.00
Unit Rp 21,265,800.00
Unit Rp 20,576,100.00

Bh Rp 82,500
Bh Rp 159,500

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 113
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Bh Rp 247,500
Bh Rp 275,000
Bh Rp 66,000
Bh Rp 55,000
Bh Rp 16,500
Bh Rp 165,000
Bh Rp 170,500
Bh Rp 192,500
Set Rp 935,000
Bh Rp 214,500
Bh Rp 203,500
Bh Rp 99,000
Bh Rp 770,000
Bh Rp 522,500
Bh Rp 82,500
Bh Rp 82,500
Bh Rp 24,200
Bh Rp 819,500
Bh Rp 1,072,500
Bh Rp 1,430,000
Bh Rp 11,000
Bh Rp 5,500
Bh Rp 7,700
Bh Rp 33,000

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 114
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Bh Rp 110,000
Bh Rp 60,500
Bh Rp 93,500
Bh Rp 71,500
Roll Rp 82,500
Roll Rp 9,400
Meter Rp 2,800
Meter Rp 5,500
Meter Rp 4,400
Meter Rp 71,500
Meter Rp 44,000
Meter Rp 13,800
Meter Rp 12,100
Meter Rp 7,200
Meter Rp 7,200
Meter Rp 9,900
Meter Rp 10,400
Meter Rp 82,500
Meter Rp 103,200
Meter Rp 137,500
Meter Rp 5,200
Meter Rp 7,700
Bh Rp 31,100
Bh Rp 60,500

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 115
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Bh Rp 60,500
Bh Rp 63,300
Bh Rp 63,300
Bh Rp 77,000
Bh Rp 33,000
Bh Rp 66,000
Bh Rp 74,700
Bh Rp 29,200
Bh Rp 12,100
Bh Rp 770,000
Bh Rp 5,500
Kg Rp 28,800
Bh Rp 38,500
Bh Rp 49,500
Bh Rp 203,500
Bh Rp 148,500
Bh Rp 198,000
Bh Rp 330,000
Bh Rp 173,800
Bh Rp 51,700
Bh Rp 62,700
Bh Rp 74,800
Meter Rp 19,800
Bh Rp 77,000

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 116
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Bh Rp 60,500
Bh Rp 66,000
Bh Rp 49,500
Bh Rp 66,000
Bh Rp 66,000
Bh Rp 66,000
Bh Rp 187,000
Bh Rp 600
Bh Rp 880,000
Bh Rp 880,000
Bh Rp 880,000
Batang Rp 396,500
Bh Rp 229,900
Bh Rp 28,800
Bh Rp 18,400
Bh Rp 13,800
Bh Rp 29,200
Bh Rp 17,300
Bh Rp 2,200
Bh Rp 2,800
Bh Rp 3,900
Bh Rp 6,600
Bh Rp 3,300
Bh Rp 5,500

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 117
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Bh Rp 14,900
Bh Rp 36,800
Papan Rp 165,000
Bh Rp 4,125,000
Bh Rp 5,390,000
Bh Rp 2,200,000
Bh Rp 2,420,000
Bh Rp 93,500
Bh Rp 467,500
Bh Rp 286,000
Bh Rp 330,000
Bh Rp 500,500
Bh Rp 291,500
Bh Rp 275,000
Bh Rp 46,000
Pcs Rp 13,200
Pcs Rp 45,100
Ton Rp 18,100
Kg Rp 34,600
Kg Rp 18,400
Buah Rp 28,800
Buah Rp 130,300
Buah Rp 130,300
M Rp 9,900

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 118
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M Rp 5,500
M Rp 22,000

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 119
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
M Rp 16,500
Buah Rp 8,300
Buah Rp 16,500
Buah Rp 16,500

Buah Rp 246,000.00
Buah Rp 10,173,200.00
Buah Rp 77,000.00
Psng Rp 33,000.00
Psng Rp 440,000.00
Buah Rp 126,500.00
Buah Rp 60,500.00
Buah Rp 287,500.00
Buah Rp 4,719,000.00
Buah Rp 1,045,000.00
Buah Rp 506,000.00
Psng Rp 597,800.00
Buah Rp 71,500.00
Buah Rp 16,500.00
Buah Rp 104,500.00
Psng Rp 528,000.00
Psng Rp 550,000.00
Buah Rp 93,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 120
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
Buah Rp 16,500.00
Buah Rp 1,265,000.00
Buah Rp 1,210,000.00
Buah Rp 770,000.00
Buah Rp 1,705,000.00
Buah Rp 86,300.00
Buah Rp 149,500.00
Buah Rp 6,902,500.00
Set Rp 6,083,000.00
Buah Rp 33,000.00

O/H Rp 213,636.00
O/H Rp 192,272.40
O/H Rp 192,272.40
O/H Rp 178,030.00
O/H Rp 178,030.00
O/H Rp 178,030.00
O/H Rp 156,666.40
O/H Rp 189,423.92
O/H Rp 156,666.40
O/H Rp 206,514.80
O/H Rp 178,030.00
O/H Rp 213,636.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 121
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA TRIWULAN I

3 4
O/H Rp 142,424.00
O/H Rp 192,272.40
/M' Rp 156,666.40
/M2 Rp 192,272.40

Makassar, Januari 2021

KEPALA BIDANG BINA TEKNIK