HARGA SATUAN BAHAN & UPAH KERJA

TRIWULAN I TAHUN ANGGARAN 2019

NO BAHAN MATERIAL DAN UPAH KERJA

1 2
A. BAHAN ATAP

1 Genteng Flat Corak / garis/ polos Natural (tidak dicat) 33x39x20 cm - 10 Bh/M2
2 Genteng Flat Corak / garis/ polos Warna Standar 33x39x20 cm - 10 Bh/M2
3 Genteng Flat Corak / garis/ polos Warna Spesial 33x39x20 cm - 10 Bh/M2
4 Genteng Elabana Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2
5 Genteng Elabana Warna Standar 42x33x15 cm - 9 Bh/M2
6 Genteng Elabana Warna Spesial 42x33x15 cm - 9 Bh/M2
7 Genteng Kiat Beton Natural (tidak dicat) 36x32x15 cm - 12 Bh/M2
8 Genteng Kiat Beton Warna Standar 36x32x15 cm - 12 Bh/M2
9 Genteng Kiat Beton Warna Spesial 36x32x15 cm - 12 Bh/M2
10 Genteng Kiat Beton Warna Khusus 36x32x15 cm - 12 Bh/M2
11 Genteng Garuda Permata Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2
12 Genteng Garuda Permata Warna Standar 42x33x15 cm - 9 Bh/M2
13 Genteng Garuda Permata Warna Spesial 42x33x15 cm - 9 Bh/M2
14 Genteng Royal Permata Natural (tidak dicat) 38x31x15 cm - 12 Bh/M2
15 Genteng Royal Permata Warna Standar 38x31x15 cm - 12 Bh/M2
16 Genteng Royal Permata Warna Spesial 38x31x15 cm - 12 Bh/M2
17 Nok Genteng Biasa tanpa warna
18 Nok Genteng Keramik
19 Atap Genteng Keramik Standar
20 Atap Genteng Keramik Warna

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 1
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
21 Nok Segi Natural (tidak dicat) 35x27x15 cm - 3,3 Bh/M'
22 Nok Segi Warna Standar 35x27x15 cm - 3,3 Bh/M'
23 Nok Segi Warna Spesial 35x27x15 cm - 3,3 Bh/M'
24 Nok Segi Warna Khusus 35x27x15 cm - 3,3 Bh/M'
25 Nok Bulat Natural (tidak dicat) 30x24x15 cm - 3,5 Bh/ M'
26 Nok Bulat Warna Standar 30x24x15 cm - 3,5 Bh/ M'
27 Nok Bulat Warna Spesial 30x24x15 cm - 3,5 Bh/ M'
28 Nok Samping/T.Flat Natural (tidak dicat) 2,5 Bh/ M'
29 Nok Samping/T.Flat Warna Standar 2,5 Bh/ M'
30 Nok Samping/T.Flat Warna Spesial 2,5 Bh/ M'
31 Nok Samping/T.Flat Warna Khusus 2,5 Bh/ M'
32 Nok Cabang 3/Ujung Natural (tidak dicat)
33 Nok Cabang 3/Ujung Warna Standar
34 Nok Cabang 3/Ujung Warna Spesial
35 Nok Genteng Multi Roof Kasar, pjg 80 cm
36 Nok Genteng Multi Roof Licin, pjg 80 cm
37 Nok Genteng Surya, pjg 80 cm
38 Nok Genteng Sakura, pjg 80 cm
39 Genteng Metal Multi Roof Kasar pjg. 77, lb. 100 cm
40 Genteng Metal Multi Roof Kasar pjg 77, lb. 80 cm
41 Genteng Metal Multi Roof Licin pjg 77 lb. 100 cm
42 Genteng Metal Multi Roof Licin pjg 77 lb. 80 cm
43 Genteng Metal Surya Licin pjg 77 lb, 80 cm
44 Genteng Metal Sakura Kasar pjg 77 lb, 80 cm
45 Genteng Metal Star Licin pjg 77 lb. 80 cm
46 Seng BWG 33 BJLS 0,20 MM
47 Seng BWG 28 BJLS 0,35 MM
48 Seng Gelombang bjls 0,35 (6 Kaki)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 2
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
49 Seng Gelombang bjls 0,30 (6 Kaki)
50 Seng Gelombang bjls 0,25 (6 Kaki)
51 Seng Gelombang bjls 0,20 (7 Kaki)
52 Seng Gelombang bjls 0,20 (10 Kaki)
53 Seng Plat bjls 0,35 (6 KK)
54 Seng Plat bjls 0,30 (6 KK)
55 Seng Plat bjls 0,20 (6 KK)
56 Seng Fiber
57 Fiber Semen Harflex ( 240x105x0,4 )
58 Eternit Jibesmen 1 m x 1 m
59 Eternit Harflex 1 m x 1 m
60 Eternit Atrisco 1 m x 1 m
61 Karet Lapis Paku Asbes
62 Karet Talang (50 cm)
63 Karet Lapisan Genteng ( 50 cm)
64 Karet Lapisan Genteng ( 90 cm)
65 Karet Lapisan Genteng Tipis (110 mm) Uk. 1 x 20 m
66 Karet Lapisan Genteng Tebal (150 mm) Uk. 1 x 20 m
67 Onduline panjang 2 m + baut
68 Nok onduline 1 m
69 Ondulclear 95 x 2 m + baut

B. BAHAN DASAR
1 Batu Kali
2 Batu kali Belah
3 Batu Gunung
4 Batu gunung Belah 10 - 15 cm
5 Batu Pecah 7 - 10 cm

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 3
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
6 Batu Pecah 5 - 7 cm
7 Batu Pecah 3 - 5 cm
8 Batu Pecah 2 - 3 cm
9 Batu Pecah 1- 2 cm
10 Batu Pecah 0,5 - 1 cm
11 Batu Merah Standar
12 Bata Ringan
13 Batako 40x20x10 cm - 13 Bh/M2 @Rp.4950
14 Roster Beton 20 x 20 cm
15 Roster Keramik 20 x 20 cm
16 Roster Keramik 30 x 30 cm
17 Roster Keramik 20 x 40 cm
18 Glass Block
19 Gravel
20 Pasir Kasar/Pasir Beton/Pasir Pasangan
21 Sirtu A
22 Sirtu B
23 Sirtu C
24 Pasir Timbunan
25 Tanah Timbunan
26 Kerikil Sungai
27 Semen 50 kg (Tonasa) PC
28 Semen 40 kg (Tonasa) PC
29 Semen (Bosowa 40 kg) PC
30 Semen Tiga Roda 40 Kg PC
31 Semen Holcim 40 Kg PC
32 Semen Putih 40 kg per sak
33 Pigmen Warna

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 4
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
34 Semen Nat Tegel
35 Semen Abu Tiga Roda 40 Kg
36 Semen Abu Tiga Roda 50 Kg
37 Semen Putih Tiga Roda 40 Kg
38 Semen Acian Mortar Putih 40 Kg
39 Water Proofing
40 Paku jembatan
41 Plastik untuk beton
42 Batu Kecil Gravel Batu Pecah atau Batu Tumbuk (Batu Gunung)

C. BAHAN BAMBU DAN GORONG - GORONG


1 Bambu - Petung
2 Bambu - Besar
3 Bambu - Sedang
4 Bambu - Kecil
5 Rotan Pengikat
6 Gorong-gorong ᶲ 30/ m
7 Gorong-gorong ᶲ 40/ m
8 Gorong-gorong ᶲ 70/ m
9 Gorong-gorong ᶲ 80/ m

D 'BAHAN BESI
1 Angker Mur Baut Kecil
2 Angker Baut Tinggi 70 cm
3 Baut Diameter 12 mm x 10 cm (stainless) wf 150
4 Baut Diameter 12 mm x 12,50 cm (stainless)
5 Baut Diameter 12 mm x 18 cm
6 Baut Diameter 12 mm x 20 cm

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 5
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
7 Baut Diameter 12 mm x 25 cm
8 Baut Diameter 12 mm x 30 cm
9 Baut Skrup
10 Baut Baja
11 Besi Streep 30 x 3 mm
12 Besi Hollow 40.60.1,2 mm P = 6 m
13 Besi Hollow 40.60.1 mm P = 6 m
14 Besi Hollow 40.40. 2 mm P = 6 m /40.40. 1,8 P = 6 m
15 Besi Hollow 40.40.1,5 mm P = 6 m
16 Besi Hollow 40.20.2 mm P =6 m
17 Besi Hollow 40.20.1,5 mm P =6 m
18 Besi Hollow 40.20.1,2 mm P = 6 m
19 Besi Hollow 20.20.1,5 mm P = 6 m
20 Besi Hollow 2x4 (12x31), 0.25mm P = 4m
21 Besi Hollow 2x4 (15x35), 0.25mm P = 4m
22 Besi Hollow 2x4 (18x38), 0.25mm P = 4m
23 Besi Hollow 2x4 (18x38), 0.30mm P = 4m
24 Besi Hollow 2x4 (18x38), 0.35mm P = 4m
25 Besi Hollow 4x4 (34x37), 0.25mm P = 4m
26 Besi Hollow 4x4 (34x37), 0.30mm P = 4m
27 Besi Hollow 4x4 (34x37), 0.40mm P = 4m
28 Besi Kanal C 8 cm, 0.55mm P = 6m
29 Besi Kanal C 8 cm, 0.60mm P = 6m
30 Besi Kanal C 8 cm, 0.65mm P = 6m
31 Besi Kanal C 8 cm, 0.70mm P = 6m
32 Besi Kanal C 8 cm, 0.75mm P = 6m
33 Besi Kanal C 8 cm, 1mm P = 6m
34 Besi Kanal C 8 cm, 0.55mm P = 5,8m

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 6
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
35 Besi Kanal C 8 cm, 0.60mm P = 5,8m
36 Besi Kanal C 8 cm, 0.65mm P = 5,8m
37 Besi Kanal C 8 cm, 0.70mm P = 5,8m
38 Besi Kanal C 8 cm, 0.75mm P = 5,8m
39 Besi Reng 3 cm, 0,4mm P = 6m
40 Besi Reng 3 cm, 0,45mm P = 6m
41 Besi Reng 3 cm, 0,4mm P = 5,8m
42 Besi Reng 3 cm, 0,45mm P = 5,8m
43 Besi Reng 3,8 cm, 0,4mm P = 6m
44 Besi Reng 3,8 cm, 0,45mm P = 6m
45 Besi Reng 3,8 cm, 0,4mm P = 5,8m
46 Besi Reng 3,8 cm, 0,45mm P = 5,8m
47 Plat Besi Kembang 2,3 mm
48 Besi Metal Stud L. 76 mm
49 Besi Siku L. 30.30.3/ 2,8 mm banci
50 Besi siku L. 40.40.4/ 3,8 mm
51 Besi siku L. 50.50.5/ 4,8 mm
52 Besi Siku L. 60. 60. 6/ 5,8 mm
53 Besi Siku L. 70. 70. 7 / 6,8 mm
54 Besi Siku L. 70.70.6 / 5 mm
55 Besi Siku L.100.100.10
56 Besi Beton Polos 6 mm ( 0, 22 kg / M' ) (5,7)
57 Besi Beton Polos 8 mm ( 0,39 kg / M' ) (7,8)
58 Besi Beton polos 10 mm ( 0, 62 kg / M' ) (9,8)
59 Besi Beton Polos 12 mm ( 0, 89 kg / M' ) (11,8)
60 Besi Beton 14 mm ( 1, 21 kg / M' ) (13,8)
61 Besi Beton 16 mm ( 1, 39 kg / M' ) (15,8)
62 Besi Beton 19 mm ( 2, 23 kg / M' )

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 7
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
63 Besi Beton 20 mm ( 2, 46 kg / M' )
64 Besi Beton Ulir Dia 8 mm ( 0, 39 kg / M' ) ulir 10 full
65 Besi Beton Ulir Dia. 16 mm SNI
66 Besi Plat 1,5mm 1,2 mm
67 Besi Plat 2 mm (1,8)
68 Besi Plat 2,5mm
69 Besi Plat 3 mm (2,8)
70 Besi Plat 3,5mm
71 Besi Plat 4 mm
72 Besi Plat 4,5mm
73 Besi Plat 5 mm (4,8)
74 Besi Plat 5,5mm
75 Besi Plat 6 mm (5,8)
76 Besi Plat 8 mm (7,8)
77 Besi Plat 9 mm 10 mm (9,8)
78 Besi Plat T = 12 mm Ukr. 120x240
79 Besi Plat T = 16 mm Ukr. 120x240
80 Besi Plat T = 18 mm Ukr. 120x240
81 Baja Tulangan ( Polos ) U24 ᶲ 6
82 Baja Tulangan ( Polos ) U24 ᶲ 8
83 Baja Tulangan ( Polos ) U24 ᶲ 10
84 Baja Tulangan ( Polos ) U24 ᶲ 12
85 Baja Tulangan ( Polos ) U24 ᶲ 16
86 Baja Tulangan ( Polos ) U24 ᶲ 16
87 Baja Tulang ( Ulir ) D32, D39 16
88 Baja Tulang ( Ulir ) D32, D39 18
89 Besi Profil H 200x200 P = 12 meter
90 Besi Profil H 100x100 P = 12 meter

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 8
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
91 Besi IWF 300 P = 12 meter
92 Besi IWF 200 P = 12 meter
93 Besi UNP 100 P = 6 meter
94 Beugel kap V Plat Besi
95 Kawat Ikat Beton 1 roll 20 Kg
96 Kawat Dul ( 1 Roll = M ')
97 Kawat Ram Lubang 3,0 cm ( Rang Armonika )
98 Kawat Nyamuk plastik Rang 1 cm L. 1,20 Rang 2 cm
99 Kawat Nyamuk Aluminium
100 Kawat Nyamuk Baja
101 Kawat Las 2,6 nikko
102 Kawat Saringan Pasir / Ayakan
103 Kawat Bronjong
104 Karet Untuk Pintu dan Jendela Aluminium PVC
105 Door Closer Set
106 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 400 per roll
107 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 500
108 Lem Kayu Dan Karet ( Fox ) Besar ( 800 gr )
109 Lem Karet ( Fox ) Besar 450 10 kg
110 Lem Seng
111 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 6 mm
112 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 5 mm
113 Paku Campuran ( 5-10 cm )
114 Paku Asbes dan Karet
115 Paku 5 cm 7 cm 10 cm
116 Paku ( 1 1/2 - 2 1/2 cm ) ( setara Paku 2-3 cm )
117 Paku 4 cm
118 Paku 2-3 cm

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 9
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
119 Paku Sirap ( Setara Paku 2-3 cm )
120 Paku Seng ( 1 kg/ Dos )
121 Paku Skrup 5 cm
122 Paku Skrup Besi Hollow - 1000 Biji Per dos ( bdrilling 450 b = 4,5 cm )
123 Paku skrup Gyapsum - 500 biji per dos bungkus
124 Paku Jembatan
125 Paku Beton 5 cm
126 Paku Beton 6 cm
127 Paku Beton 7 cm - 10 cm
128 Paku Payung Berulir ( 1 kg/ Dos )
129 Paku Asbes Berulir
130 Paku Asbes Biasa
131 Paku Tripl ( Setara Paku 2-3 cm)
132 Paku Eter ( Setara Paku 2-3 Cm )
133 Paku Ripet
134 Skamp ( Paku Tembak Hollow alumunium )
135 pagar Jadi Besi ( Tinggi 1 M )
136 Pagar Pracetak - 5 panel
137 Pagar Pracetak - 6 panel
138 Pagar Pracetak - 7 panel
139 Tiang Beton untuk 5 Daun
140 Tiang Beton untuk 6 Daun
141 Tiang Beton untuk 7 Daun
142 Rangka Baja Ringan 0,75
143 Spandek 0,25 silver
144 Spandek 0,35 silver
145 Spandek 0,4 silver
146 Spandek 0,45 0,35

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 10
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
147 Nok Spandek
148 Hollow Aluminium Rangka Plafond 0,25 (2x4)
149 Hollow Aluminium Rangka Plafond 0,3 2x4/4x4
150 Hollow Aluminium Rangka Plafond 40 X 20 X 2 mm
151 Hollow Aluminium Rangka Plafond 40 X 40 X 2 mm
152 Hollow Aluminium Rangka Plafond 40 X 20 X 8 mm
153 Kawat Penggantung Hollow Aluminium
154 Aluminium 4'' Brown - 6 Meter
155 Aluminium 3'' Brown - 6 Meter
156 Aluminium Slimar 4'' Brown Untuk Daun Jendela
157 Aluminium Slimar 3'' Brown Untuk Daun Jendela
158 Pas. Kusen Aluminium 4'
159 Pas. Daun Jendela Alumunium + Kaca Tabel 5 mm + Karet dan Sealent
160 Pas. Daun Pintu Aluminium panil Kaca Tebal 5 mm ( Lengkap Accessories )
161 Pintu KM/WC Alumunium ( lengkap Accessories ) lebar 6 cm
162 Pintu KM/WC PVC kw.1( lengkap Accessories ) lebar 10 cm
163 Pintu fiberglass KM/WC
164 Pintu KM/WC bahan PVC Lengkap Accessories ex MASPION star

E. BAHAN FINISHING :
1 Cat Minyak Afduner 1kg
2 Cat Kayu Ex Avian (0,9 kg)
3 Cat Minyak Ex Emco
4 Cat kKayu Ex Mowilex 1kg
5 Cat Minyak
6 Cat Minyak Super klg
7 Cat Kayu Dulux 1kg
8 Cat Dasar 3,5 kg

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 11
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
9 Cat Dasar Meni 3,5 Kg
10 Cat Meni Glatik 3,5 kg
11 Cat Tenner
12 Cat Genteng Cap Belmas 1kg
13 Cat Genteng yoko 4kg
14 Cat Genteng Biasa AGA (4 kg)
15 Cat Genteng Minyak Nippon 2,5 liter
16 Cat Residu/ cloter (10 kg) 30.000/ kg
17 Cat seng Nippon (2,5 kg)
18 Cat Tembok Sahara / Kembang / Postek Aries (25 Kg)
19 Cat Tembok Wintex / Maxilite (5kg)
20 Cat Tembok ICI (Dalam)
21 Cat Tembok Mowilex (Cat Dalam ) 2,5 Kg soff
22 Cat Tembok Mowilex (Cat Luar ) 2,5 Kg gelap & terang
23 Cat Tembok Aries 5kg
24 Cat Minyak Avian
25 Cat Tembok Kimex (5kg)
26 Cat Tembok Dulux (luar) 2,5 kg
27 Cat Tembok Warna Kuning , Hitam ,Merah (Belmax)
28 Vernis/Plitur (24 Klg)
29 Cat Altex
30 Cat Anti Lumut (Aquaseal) (Klg 20kg) Nodrop 20 kg
31 Cat Anti Lumut (No drop) (Klg 20 kg)
32 Cat Dasar Glatik kembang 1 kg
33 Plamur Tembok Boyo Dan Setara (5kg)
34 Minyak Cat (aff Dunner)
35 Dempul Kayu Cap Kuning / Merah (1 Kg) klg
36 Dempul Ex Impra

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 12
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
37 Dempul Ex Isamu
38 Tenner A ( Ex Avian) super
39 Minyak Te Botol
40 Kertas Gosok
41 Pewarna Natural
42 pewarna brown
43 Pewarna Ex Impra
44 Wood Filler Ex Impra
45 Clear
46 Clear ex Impra
47 Sending
48 Sending ex Impra
49 Cat Kayu Ex Dullux Mengkilap
50 Melamin Ex Impra
51 Cat Air Untuk Genteng, Bataco, Paving Block (AGA)
52 Cat Minyak Untuk Genteng, Bataco, Paving Block (AGA)
53 Kuas 2" (Eterna)
54 Kuas 3" (Eterna)
55 Kuas 4" (Eterna)
56 Bahan Anti Karat
57 Comice - 20 kg (dingding eksterior )
58 Comice - 20 kg (dingding interior)
59 Lem Fox Kaleng
60 Lem Efoxi
61 Perban Conpon
62 Bubuk + air pelarut Ex Aqugart untuk Waterproofing
63 Cat Waterproof eks aquaproo- kw.1
64 Cat waterproof- biasa

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 13
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
65 Cat Marka Jalan (aries gold 5kg)
66 Aluminium Composite Panel (ACP) Seven Polyster 0,21 (Indoor)
67 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Doft
68 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Glossy
69 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Metalic
70 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Sparking, Safron, Olive Brown
71 Aluminium Composite Panel (ACP) Seven Marble, Wood, Brush

F BAHAN KAYU
1 Kayu Kls. I Bayam (balok) Chain Saw
2 Kayu Kls. I Bayam (balok) Sawmill
3 Kayu Kls. I Ulin (papan)
4 Kayu Kls. I Ulin (tiang)
5 Kayu Kls. I Bayam (papan) Shain Saw
6 Kayu Kls I Bayam(papan) sawmil
7 Kayu Klas. II Samarinda (papan)/ Lokal
8 Kayu Klas. II Samarinda (balok)/ Lokal
9 Kayu Kls. III Kapur (balok)/ Kemiri
10 Kayu Kls. III (papan)
11 Kayu Mangga/Kemiri (papan)
12 Kayu Kumea Balok
13 Kayu Kumea Papan
14 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,4 x 122 x 244)cm
15 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,3 x 122 x 244)cm
16 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,6 x 122 x 244)cm
17 Kayu lapis Tripleks Lapis Kayu Lainnya (18 mm)
18 Kayu lapis Tripleks Lapis Kayu Lainnya (12 mm)
19 Kayu lapis Tripleks Lapis Kayu Lainnya ( 9 mm)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 14
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
20 Kayu lapis Tripleks Lapis Kayu Lainnya 2 mm
21 Kayu lapis Tripleks Lapis Kayu Mewah jati Teakwood (0,3 x 122 x 244) cm

G BAHAN PENGGANTUNG
1 Engsel Baja
Engsel Baja (Dumont)
2 Engsel Kuningan 4 Lubang
Engsel Kuningan 4 Lubang (Dumont)
3 Engsel Stainless Steel
4 Engsel H3 Lubang
5 Engsel Kupu-kupu
6 Engsel antik jendela
7 Engsel Pintu Biasa (Merk 777)
Engsel Pintu Biasa (Dumont)
8 Engsel Pintu Lemari Biasa
Engsel Pintu Lemari Biasa (Dakson)
9 Engsel Jendela Biasa (Merk 777)
Engsel Jendela Biasa (Dumont)
10 Engsel Jendela Kuningan (merk Kuningan)
Engsel Jendela Kuningan (Dakson)
11 Engsel Pintu 4" (SES)
Engsel Pintu 4" (Dumont)
12 Engsel Jendela 3"(SES)
Engsel Jendela 3"(Dumont)
13 Engsel Pintu Kuningan SES
Engsel Pintu Kuningan (Dumont)
14 Gagang Pintu Lemari
Gagang Pintu Lemari (Dakson)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 15
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
15 Grendel jendela Kuningan
Grendel jendela Kuningan (Dakson)
16 Grendel Pintu Biasa
Grendel Pintu Biasa (Dumont)
17 Grendel Pintu Kuningan/ Vertikal
18 Grendel Pintu Besar
19 Grendel Pintu Tanam (Expanyolet)
20 Kunci Tanam Yale 1 x Putar
21 Kunci Tanam Yale 2 x Putar
22 Kunci Tanam Pintu 2 x Putar Besar Biasa
23 Kunci Tanam Pintu 2 x Putar kecil Biasa
24 Kunci Tanam Pintu 2 x Putar SES
25 Hak Angin Kecil Antik
26 Hak Angin Besar
Hak Angin Besar (Dumont)
27 Hak Angin Kecil
Hak Angin Kecil (Dumont)
28 Kait angin Jendela Alumunium Kualias 1
Kait angin Jendela Alumunium (Dumont)
29 Kait angin Jendela Alumunium biasa
Kait angin Jendela Alumunium (Dumont)

H BAHAN KACA
1 Kaca Bening 3 mm
2 Kaca Bening 5 mm
3 Kaca Bening 6 mm
4 Kaca Bening 8 mm
5 Kaca Bening 10 mm

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 16
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
6 Kaca Ryben Tebal 5 mm
7 Kaca Ryben Tebal 6 mm
8 Kaca Ryben Tebal 3 mm
9 Kaca Ryben Tebal 8 mm
10 Kaca Ryben Tebal 10 mm
11 Jendela Nako (Rangka+ Kaca Tebal 5mm) 0,8 m x 0,2 m 4 lbr terpasang + Stand
12 Kaca Es Buram 5 mm/ 10 mm
13 Kaca Lembaran Bening Tidak Berwarna FL Tebal 2 MM
14 Kaca Lembaran Bening Tidak Berwarna FL Tebal 3 MM
15 Kaca Lembaran Bening Tidak Berwarna FL Tebal 5 MM
Ukuran (1221 x 153)
Ukuran (200 x 90)
Ukuran (200 x 100)
Ukuran (213 x 122)
Ukuran (183 x 122)
Ukuran (244 x 183)
Kaca Lembaran Bening Tidak Berwarna FL Tebal 10 MM
16 Kaca Bening 12 mm
I BAHAN SANITER / SALURAN AIR
1 Kloset Duduk Lengkap(putih) Tangki Batu American standart
2 Kloset Duduk Ex KIA Lengkap (warna) Tanhki Batu
3 Kloset Duduk ex TOTO Lengkap Accessories warna Putih
4 Kloset Duduk ex TOTO Lengkap Accessories warna gelap
5 Kloset Jongkok KIA
6 Kloset Jongkok Biasa (American Standar)
7 Wastafel polos / putih lengkap
8 Wastafel warna lengkap
9 Slypon Wastafel Biasa

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 17
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
10 Urinoir Polos /Putih American Standart
11 Urinoir ex TOTO (lengkap)
12 Bak Tube Fiber Biasa
13 Bak Tube Fiber ex TOTO
14 Tangki Air Fiberglass Kap 0,25 M3
15 Tangki Air Fiberglass Kap 0,50 M3
16 Tangki Air Fiberglass Kap 1 M3
17 Tangki Air Alumunium Kap 1 M3
18 Kran Air Kuningan DIA 3/4 Biasa
19 Kran Air Kuningan DIA 1/2 Biasa
20 Kran Air Vernrkel DIA 3/4 Biasa
21 Kran Air Antik DIA 1/2
22 Bak Cuci Piring Stain -Kosong Tanpa Saluran Pembuangan & Kran Air
23 Kran air 2 / Biasa/ bisa
24 Seal Tape
25 Bak Mandi
26 Kloset Jongkok Biasa
27 Wallpaper & Penutup Dinding
28 Foil (Kertas Alumunium Foil)
29 Kloset Duduk (Data)
30 Kloset Jongkok TOTO (Putih)
31 Toilet Portable Fiberglass 400 Liter
32 Toilet Portable Fiberglass 400 Liter

J BAHAN LANGIT-LANGIT
1 Teakwood 120 x 240 cm t.3mm
2 Triplex 3 mm 120 x 240 cm
3 Triplex 4 mm 120 x 240 cm

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 18
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
4 Triplex 5 ml
5 Triplex 6 mm 120 x 240 cm
6 Triplex 7 ml
7 Triplex 10 ml
8 Triplex 15 ml
9 Triplex 20 ml
10 Triplex Ukuran Pintu
11 Triplex Melamin 120 x 240 cm 3 mm
12 Teakwood 120 x 240 cm t.4mm
13 Multiplex 120 x 240 cm t. 6 mm
14 Multiplex 120 x 240 cm t. 9 mm
15 Multiplex 120 x 240 cm t. 12 mm
16 Multiplex 120 x 240 cm t. 18 mm
17 Gypsum Board 122x244x tebal 9 mm ex Jayaboard untuk Plafond Gpyro
18 Kalsiboard tebal 3,5 mm
19 Kalsiboard tebal 4,5 mm
20 Kalsiboard tebal 6 mm
21 Kalsiboard tebal 8 mm
22 Kalsiboard tebal 10 mm
23 Kalsiboard tebal 20 mm
24 Kalsiplank 8mm (10cm x 3m)
25 Kalsiplank 8mm (10cm x 3m) Polos
26 Kalsiplank 8mm (20cm x 3m) Jati
27 Kalsiplank 8mm (30cm x 3m) Polos
28 Kalsiplank 8mm (30cm x 4m) Jati
29 Kalsiplank 9mm (20cm x 4m) Polos
30 Kalsiplank 9mm (20cm x 4m) Cedar
31 Lambriziring t:4mm, (4m')

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 19
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
32 HPL
33 Les Kayu Profil Lebar 5 cm ( 4 M' )
34 Les Kayu Profil Lebar 3 cm ( 4 M' )
35 Les Kayu Profil Lebar 11/2 cm ( 4 M' )
36 Les Kayu 1 x 10 x 400 cm
37 Les Kayu Profil 4 x 4 x 400 cm
38 Les Kayu Biasa 0,5 x 3 cm
39 Les Gypsum Polos
40 Les Gypsum Polos - Kecil
41 Les Gypsum Motif - Kecil - lebar 7 cm/10 cm
42 Les Gypsum - Sedang
43 Les Gypsum - lebar 10 cm
44 Les Gypsum - Besar - lebar 15 cm
45 Les Gypsum Profil
46 Beding Gypsum - Kecil
47 Beding Gypsum - Sedang
48 Beding Gypsum - Besar
K BAHAN LANTAI
1 Tegel PC 30 x30 cm
2 Tegel Motif 30 x30 cm Platinum Diego grey / brown 2
3 Tegel Keramik Putih 10 x 20 cm
4 Tegel Keramik Putih 20 x 20 cm
5 Tegel Keramik Putih 20 x 25 cm
6 Tegel Keramik Putih 30 x 30 cm
7 Tegel Keramik Putih 40 x 40 cm (accura)
8 Tegel Keramik Putih 50 x 50 cm # Platinum (accura motif)
9 Tegel Keramik Putih 60 x 60 cm Ex Granito (granit sandimas mega white)
10 Tegel Keramik Putih 60 x 60 cm Ex Garuda

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 20
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
11 Tegel Keramik Putih 30 x 60 cm Ex Granito (granit eleganza new vorio)
12 Tegel Keramik Warna 60 x 60 cm Ex Granito Top Gress Top Gress
13 Tegel Keramik Warna 60 x 60 cm EX Garuda/Pangress Double wodding (sandimas)
14 Tegel Keramik warna 30 x 60 cm Ex Garuda /Roman (kwalitas LebihBagus)
15 Tegel Keramik Putih 30 x 60 cm
16 Tegel Keramik Warna 20 x 20 cm
17 Tegel Keramik Warna 30 x 30 cm
18 Tegel Keramik Warna 20 x 25 cm
19 Tegel Keramik Warna 40 x 40 cm
20 Tegel Keramik Warna 50 x 50 cm
21 Tegel Keramik Warna 60 x 60 cm
22 Tegel Keramik Warna 30 x 60 cm
23 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (GNS Ruffian)
24 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (Topaz)
25 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (Cottonwood)
26 Granit Uku 60 x 160 x 185 cm Dasar Putih
27 Granit Uku 60 x 185 cm Dasar Hitam / 63 X 198 cm (sandimas 60x60)
28 Granit ukuran 30 x 30 cm Asia Tile
29 Granit ukuran 40 x 40 cm Granito Asia Tile
30 Granit ukuran 60 x 60 cm (sandimas)
31 Keramik WC 20 x 20 cm
32 Keramik WC 20 x 25 cm
33 Keramik WC 30 x 30 cm Asia Tile
34 Keramik uku 30 x 30 cm
35 Keramik uku 40 x 40 cm
36 Keramik Warna uk. 25 x 40 cm (accura)
37 Batu Alam 10 x 20 cm Polos
38 Batu Alam 20 x 20 cm Polos 10x30 cm

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 21
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
39 Batu Alam Motif Sirip/Garis-garis di pahat 10x30 cm / 20x40 cm
40 Batu Alam Motif Sirip/Garis-garis di pahat 20x40 cm
41 Batu Alam ukuran 10 x 20 cm Polos / 30 X 60 CM Polos
42 Marmer Ukuran Slabs(type Burito/acaro/Great I) / 100 x 100 cm
43 Marmer Ukuran Slabs(type Burito/acaro/Great II)
44 Marmer Ukuran Slabs(type Burito/acaro/Great III)
45 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great I) / cream urat kayu
46 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great II)
47 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great III)
48 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great I)
49 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great II)
50 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great III)
51 Ubin Lantai dari Tanah Liat diglazur Accura 40 x 40 cm
52 Ubin Lantai dari Tanah Liat diglazur KIA Polos 40 x 40 cm
53 Ubin Lantai dari Tanah Liat diglazur Keramik Merk Arwana
54 Ubin Lantai dari Tanah Liat diglazur Asiatile Kw 40 x40 cm
55 Ubin Lantai dari Tanah Liat diglazur Impresso uku. 40 x40 cm
56 Ubin Lantai dari Tanah Liat diglazur Masterina Polos uku. 30 x 30 cm
57 Ubin Lantai dari Tanah Liat diglazur Mulia KW 1 uku. 30 x 30 cm
58 Ubin Lantai dari Tanah Liat diglazur Kia Polos uku. 30 x 30 cm
59 Ubin Lantai dari Tanah Liat diglazur Asia Tile Kw 1 uku. 30 x 30 cm
60 Ubin Lantai dari Tanah Liat diglazur Impresso Kw 1 uku. 30 x 30 cm
61 Ubin Lantai dari Tanah Liat diglazur Accura Kw 1 uku. 30 x 30 cm
62 Ubin Lantai dari Tanah Liat diglazur Masterina Kw 1 uku. 30 x 30 cm
63 Ubin Lantai dari Tanah Liat diglazur Mulia Kw 1 uku. 30 x 30 cm

L BAHAN LAIN-LAIN
1 Paving Blok Segi Empat 6 cm ( K 225 )

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 22
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
2 Paving Blok Segi Empat 6 cm ( K 250 ) Standar
3 Paving Blok Segi Empat 6 cm ( K 250 ) Warna
4 Paving Blok Segi Empat 6 cm ( K 300 ) Standar
5 Paving Blok Segi Empat 6 cm ( K 300 ) Warna
6 Paving Blok Segi Empat 8 cm ( K 225 ) Standar
7 Paving Blok Segi Empat 8 cm ( K 225 ) Warna
8 Paving Blok Segi Empat 8 cm ( K 250 ) Standar
9 Paving Blok Segi Empat 8 cm ( K 250 ) Warna
10 Paving Blok Segi Empat 8 cm ( K 300 ) Standar
11 Paving Blok Segi Empat 8 cm ( K 300 ) Warna
12 Paving Blok Segi Empat 8 cm ( K 400 ) Standar
13 Paving Blok Segi Empat 8 cm ( K 400 ) Warna
14 Paving Blok Segi Empat 10 cm ( K 300 ) Standar
15 Paving Blok Segi Empat 10 cm ( K 300 ) Warna
16 Paving Blok Segi Empat 10 cm ( K 400 ) Standar
17 Paving Blok Segi Empat 10 cm ( K 400 ) Warna
18 Paving Blok SegiTiga Uskup 6 cm
19 Paving Blok SegiTiga Uskup 8 cm
20 Paving Blok Segi Enam 8 cm ( K 225 ) Standar
21 Paving Blok Segi Enam 8 cm ( K 225 ) Warna
22 Paving Blok Segi Enam 8 cm ( K 300 ) Standar
23 Paving Blok Segi Enam 8 cm ( K 300 ) Warna
24 Paving Blok Segi Enam 8 cm ( K 400 ) Standar
25 Paving Blok Segi Enam 8 cm ( K 400 ) Warna
26 Paving Kombinasi 6 cm ( K 300 )
27 Paving 20 x 20 8 cm ( K 300 )
28 1 tegel pedestrian untuk pengarah difabel 30 x 30
29 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Standar

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 23
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
30 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam
31 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat
32 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar
33 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam
34 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat
35 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar
36 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam
37 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat
38 Grass Block 8 cm Standar
39 Kanstin Type Segi 10-15 x 3 0 x 40 cm - 2,5 Bh/M'
40 Kanstin Type Kotak 10 x 2 0 x 40 cm - 2,5 Bh/M'
41 Kanstin Type Kotak 10 x 2 5 x 50 cm - 2 Bh/M'
42 Kanstin Pracetak 60 x 25 x 15 cm
43 Kanstin Pracetak Segitiga 40 x 20 x 10 cm
44 Kanstin Pracetak 15 x 20 x 40 cm
45 Kanstin Pracetak 15 x 25 x 40 cm
46 Kanstin Pracetak 15 x 30 x 40 cm
47 Kanstin Pracetak 15 x 30 x 50 cm 15x25x50cm
48 Kanstin Pracetak 12 x 25 x 40 cm
49 Kanstin Pracetak 25 x 30 x 50 cm 20x30x50cm
50 Kanstin Pracetak 22 x 25 x 60 cm
51 U Ditch L : 20 cm, T: 20 cm, P:60 cm
52 U Ditch L : 30 cm, T: 40 cm, P:80 cm
53 U Ditch L : 40 cm, T: 50 cm, P:100 cm
54 U Ditch L : 50 cm, T: 50 cm, P:100 cm
55 U Ditch L : 60 cm, T: 60 cm, P:100 cm
56 U Ditch L : 70 cm, T: 80 cm, P:100 cm
57 U Ditch L : 80 cm, T: 100 cm, P:100 cm 5 TON

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 24
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
58 U Ditch L : 100 cm, T: 120 cm, P:100 cm 5 TON
59 Gutter Crub 2.5 Bh/M'
60 Topi Uskup T = 6 cm
61 Topi Uskup T = 8 cm 3 Bh/M'
62 Tali Nilon
63 Aspal Emulsi
64 Aspal Bitumen
65 Aspal Curah (ton)
66 Aspal Drum 1 Drum. 155 kg / Drum
67 Aspal cement
68 B.0
69 Solar Non Industri
70 Solar Industri
71 Minyak Pelumas
72 Bensin
73 Minyak bakesting
74 Mortar
75 Filler/abu batu M3
76 Kerosen/Minyak Tanah
77 Beton Mutu K500
78 Beton Mutu K450
79 Beton Mutu K400
80 Beton Mutu K350
81 Beton Mutu K300
82 Beton Mutu K275
83 Beton Mutu K 250
84 Beton Mutu K 225
85 Beton Mutu K175

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 25
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
86 Beton Mutu K125
87 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Single
88 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Double
89 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Single
90 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Double
91 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm 5 TON Besi Single
92 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm Besi Double
93 Box Culvert L 80 Cm, T 80 Cm, P 100 Cm Tebal : 16 cm 5 TON Besi Single
94 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm 5 TON Besi Single
95 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm Besi Double
96 Deuker T 6 cm, L 60 cm
97 Deuker T 6 cm, L 80 cm
98 Deuker T 10 cm, L 60 cm
99 Deuker T 10 cm, L 80 cm
100 Deuker T 12 cm, L 60 cm
101 Deuker T 12 cm, L 80 cm
102 Deuker T 15 cm, L 60 cm
103 Deuker T 15 cm, L 80 cm
104 Sewa C. Pump Standard
105 Sewa C. Pump Long Boom
106 Plastik Untuk Beton L.1M P. 40 M =65.000/ L.1,20M P.25 M = 100.000
107 Kantung Plastik Uk 46 Isi 50
108 Kantung Plastik Uk 15 Isi 10
109 Aspal (Asphal grade 60/70)
110 Aspal (curah grade 60/70 Lokal) 6 drum
111 Exkontainer (Peti Kemas) Ukuran 20 Feet Kondisi 80 %
112 Exkontainer (Peti Kemas) Ukuran 40 Feet Kondisi 80 %
U-Ditch (ukuran lain)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 26
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
111 B600 x H400 x L1200 ; tebal = 70 mm 1.2 M Berat 0,360 ton
112 B600 x H500 x L1200 ; tebal = 70 mm 1.2 M Berat 0,400 ton
113 B600 x H600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,440 ton
114 B600 x H700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton
115 B600 x H800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,530 ton
116 B800 x B600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton
117 B800 x B700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,540 ton
118 B800 x B800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,580 ton
119 B800 x B1000 x L1200 ; tebal = 70 mm 1.2 M Berat 0,670 ton
120 B1000 x H800 x L1200 ; tebal =100 mm 1.2 M Berat 0,980 ton
121 B1000 x H1000 x L1200 ; tebal =100 mm 1.2 M Berat 1,090 ton
Tutup U-Ditch
122 B600 x L600 : Tebal = 70 mm 0,6 M Berat 0,063 Ton
123 B800 x L600 : Tebal = 70 mm 0,6 M Berat 0,084 Ton
124 B1000 x L600 : Tebal = 100 mm 0,6 M Berat 0,150 Ton
B500 x H500 x L1000 : Tebal = 80 mm 1 M Berat 0,468
RC Panel / Pagar Beton
125 Column Precast Kolom 200 x 200 x 4000 4 M Berat 0,400 Ton
126 Wall Precast / Dinding 80 x 2920 x 450 2,9 M Berat 0,260 Ton
127 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 6 cm K 400
128 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 8 cm K 400
129 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 10 cm K 400
130 Hexagon (Segi Enam) Ukuran 6 cm
131 Urug (terima jadi) Ukuran 8 cm
132 Pemasangan

M ALAT BANTU PEMELIHARAAN


1 Sekop

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 27
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
2 Gerobak Dorong Artco
3 Betel
4 Palu
5 Sendok Semen
6 Sikat Baja
7 Cerek Aspal
8 Garu
9 Sapu Lidi
10 Drum Pemasak Aspal
11 Kayu Bakar
12 Cangkul
13 Gergaji Kayu Cap Mata
14 Sekop Sampah Merk VTR
15 Sekop Cap Mata
16 Palu / Martil Uk. 1,5 inci

N BAHAN PIPA DAN SUMUR BOR


1.A PIPA PRALON PVC 1/2 Inci - 4 M
( SII ) 3/4 Inci - 4 M
1 Inci -4M
1 1/4 Inci - 4 M
1 1/2 Inci - 4 M
2 Inci -4M
2 1/2 Inci - 4 M
3 Inci -4M

1.B. PIPA PRALON uPVC 1/2 " -6M S - 10


3/4 " -6M S - 10

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 28
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
1" -6M S - 10
1 1/4 " -6M S - 10
1 1/2 " -6M S - 10
2" -6M S - 10
3" -6M S - 10
3" -6M S - 12.5
4" -6M S - 12.5

2 1/2 " -6M S - 10


S - 10
S - 12.5
S - 12.5

3" -6M S - 10
S - 10
S - 12.5
S - 12.5

4" -6M S - 10
S - 10
S - 12.5
S - 12.5

1C Pipa SUPRALON PVC 1/2" -6M S-8


S - 10 MOF
S - 12,5 MOF

3/4" -6M S-8

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 29
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
S - 10 MOF
S - 12,5 MOF

1" -6M S-8


S - 10 MOF
S - 10

-6M S-8
S - 10 MOF
S - 12,5

1 1/2" -6M S-8


S - 10 MOF
S - 12,5 MOF
S - 16

2" -6M S-8


S - 10 MOF
S - 10 RR
S - 12,5 MOF
S - 12,5 RR
S - 16

2 1/2" -6M S-8


S-8
S - 10 MOF
S - 10 RR
S - 12,5 MOF

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 30
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
S - 12,5 RR
S - 16
S - 16

3" -6M S-8


S-8
S - 10 MOF
S - 10 RR
S - 12,5 MOF
S - 12,5 RR
S - 16
S - 16

4" -6M S-8


S-8
S - 10 MOF
S - 10 RR
S - 12,5 MOF
S - 12,5 RR
S - 16
S - 16

1D Pipa MASPION PVC 3/8 " S - 6,3


S-8
S - 10
S - 12,5

1/2" S - 6,3

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 31
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
S-8
S - 10
-6M S - 12,5

3/4" S - 6,3
S-8
S - 10
-6M S - 12,5

1" S - 6,3
S-8
S - 10
S - 10
-6M S - 10 Mof

1 1/4" S - 6,3
S-8
S - 10
-6M S - 10 Mof
S - 12,5

1 1/2" S - 6,3
S-8
S - 10
-6M S - 10 Mof
S - 12,5
-6M S - 12,5 Mof
S - 16

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 32
NO BAHAN MATERIAL DAN UPAH KERJA

1 2

2" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof

2 1/2" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof
S - 12,5
-6M S - 12,5 RR
S - 16
S - 16

3" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 33
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
-6M S - 10 RR
S - 12,5
-6M S - 12,5
-6M S - 12,5 RR
S - 16
S - 16

4" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof
S - 12,5
-6M S - 12,5 RR
S - 16
S - 16

5" -6M S - 10 Mof


-6M S - 10 RR

6" -6M S - 10 Mof


-6M S - 10 RR
-6M S - 12,5 RR

8" -6M S - 10 Mof

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 34
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
-6M S - 10 RR
-6M S - 12,5 Mof
-6M S - 12,5 RR

10" -6M S - 10 Mof


-6M S - 10 RR
-6M S - 12,5 Mof
-6M S - 12,5 RR

12" -6M S - 10 Mof


-6M S - 10 RR
-6M S - 12,5 Mof

14" -6M S - 10 RR
-6M S - 12,5 RR

16" -6M S - 10 RR
-6M S - 12,5 RR

18" -6M S - 10 RR
-6M S - 12,5 RR

20" -6M S - 10 RR
-6M S - 12,5 RR

24" -6M S - 10 RR
-6M S - 12,5 RR

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 35
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
28" -6M S - 12,5 RR

1 E Pipa Wavin SNI Wavinsafe 1/2" -4M S - 10 / 10 Bar (1,0 Mpa )


3/4" -4M S - 10 / 10 Bar (1,0 Mpa )
1" -4M S - 10 / 10 Bar (1,0 Mpa )
11/4" -4M S - 10 / 10 Bar (1,0 Mpa )
11/2" -6M S - 10 / 10 Bar (1,0 Mpa )

2" -6M S - 10 / 12,5 Bar (12,5 Mpa )


3" -6M S - 10 / 12,5 Bar (12,5 Mpa )
4" -6M S - 10 / 12,5 Bar (12,5 Mpa )
6" -6M S - 10 / 12,5 Bar (12,5 Mpa )

2" -6M S - 12,5 / 10 Bar (1,0 Mpa )


3" -6M S - 12,5 / 10 Bar (1,0 Mpa )
4" -6M S - 12,5 / 10 Bar (1,0 Mpa )
6" -6M S - 12,5 / 10 Bar (1,0 Mpa )

11/2" -6M S - 12,5 / 8 Bar (0,8 Mpa )

1F Pipa Wavin SNI Wavinlok 2" -6M S - 10 / 12,5 Bar (12,5 Mpa )
3" -6M S - 10 / 12,5 Bar (12,5 Mpa )
4" -6M S - 10 / 12,5 Bar (12,5 Mpa )
6" -6M S - 10 / 12,5 Bar (12,5 Mpa )
8" -6M S - 10 / 12,5 Bar (12,5 Mpa )
10" -6M S - 10 / 12,5 Bar (12,5 Mpa )
12" -6M S - 10 / 12,5 Bar (12,5 Mpa )
16" -6M S - 10 / 12,5 Bar (12,5 Mpa )

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 36
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
20" -6M S - 10 / 12,5 Bar (12,5 Mpa )
24" -6M S - 10 / 12,5 Bar (12,5 Mpa )

2" -6M S - 12,5 / 10 Bar (1,0 Mpa )


3" -6M S - 12,5 / 10 Bar (1,0 Mpa )
4" -6M S - 12,5 / 10 Bar (1,0 Mpa )
6" -6M S - 12,5 / 10 Bar (1,0 Mpa )
8" -6M S - 12,5 / 10 Bar (1,0 Mpa )
10" -6M S - 12,5 / 10 Bar (1,0 Mpa )
12" -6M S - 12,5 / 10 Bar (1,0 Mpa )
16" -6M S - 12,5 / 10 Bar (1,0 Mpa )
20" -6M S - 12,5 / 10 Bar (1,0 Mpa )
24" -6M S - 12,5 / 10 Bar (1,0 Mpa )

1G Pipa GIP ( Galvanis ) 1/2" -6M


Med.A Super sni 3/4" -6M
1" -6M
1 1/4" -6M
1 1/2" -6M
2" -6M
21/2" -6M
3" -6M
4" -6M
5" -6M
6" -6M
8" -6M
10" -6M

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 37
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
12" -6M
16" -6M

1H Pipa GIP ( Galvanis ) 1/2" -6M


Med.A 3/4" -6M
1" -6M
1 1/4" -6M
1 1/2" -6M
2" -6M
21/2" -6M
3" -6M
4" -6M

1I Pipa GIP ( Galvanis ) 1/2" -6M


Med.B 3/4" -6M
1" -6M
1 1/4" -6M
1 1/2" -6M
2" -6M
21/2" -6M
3" -6M
4" -6M

1J Pipa PE 100 1 1/2" -6M SDR 17 PN 14


2" -6M SDR 17 PN 15
21/2" -6M SDR 17 PN 16
3" -6M SDR 17 PN 17

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 38
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
2 JENIS "D" UNTUK SALURAN 3/4" -4M
PEMBUANGAN AIR 1" -4M
1 1/2" -4M
2" -4M
21/2" -4M
3" -4M
4" -4M
5" -4M
6" -4M
8" -4M
10" -4M

3 PIPA JENIS "C' UNTUK 5/8 Inci - 4 M


INSTALASI LISTRIK 3/4 Inci - 4 M
PIPA PVC 1/2" (M.P.)
PIPA PVC 3/4 " (Maspion)
PIPA PVC 1 "
PIPA PVC 2 "
PIPA PVC 2 1/2
PIPA PVC Wavin Kual D(4"x 4 M)
PIPA PVC Winlon Kual D (4"'x 4 M)
PIPA PVC vinilon Kual D (4'' x 4 M)
PIPA PVC Maspion Kual D ( 4"x 4 M)
Plastik Lembaran dari Polimer Etilena (Polos Lebar 1 M)
Pipa PVC Wavin Kual D (4 x 4 M)
Pipa PVC Maspion Kual AW ( 4 x 4 M)
Pipa PVC Maspion Kual D( 4 x 4 M)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 39
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
Pipa PVC Wavin AW ( 4 x 4 M)
Pipa PVC Wavin Kual D (4 x 4 M)
Pipa PVC Maspion Kual (4 x 4 M)
Pipa PVC Pravilon 4 Inci
Pipa PVC Pravilon End 6 Mi

4 PIPA PVC KLAS B ( PIPA LIMBAH ) SUPRALON


Pipa PVC Klas B RRJ 2" 6M
Pipa PVC Klas B RRJ 3" 6M
Pipa PVC Klas B RRJ 4" 6M

5 AKSESORIS UNTUK PIPA KELAS B SUPRALON


Elbow RRJ 90 2"
Elbow RRJ 90 3"
Elbow RRJ 90 4"
Tee RRJ 2"
Tee RRJ 3"
Tee RRJ 4"
Endcap/ Dop 2"
Endcap/ Dop 3"
Endcap/ Dop 4"

6 Pipa Beton
ᶲ 40 Panjang 110 cm, tebal 7 cm NRCP
ᶲ 40 Panjang 110 cm, tebal 7 cm RCP
ᶲ 60 Panjang 110 cm, tebal 8 cm NRCP
ᶲ 60 Panjang 110 cm, tebal 8 cm RCP
ᶲ 80 Panjang 110 cm, tebal 9 cm NRCP

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 40
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
ᶲ 80 Panjang 110 cm, tebal 9 cm RCP
ᶲ 100 Panjang 110 cm, tebal 10 cm NRCP
ᶲ 100 Panjang 110 cm, tebal 10 cm RCP

7 Pipa Instalasi 5/8


8 Pipa Listrik 5/8
9 Sambungan Pipa Lurus 1/2
10 Sambungan Pipa L 1/2
11 Sambungan Pipa Besi 3/4"T
12 Knee 3/4"
13 Knee 1"
14 Knee PVC Diameter 2"
15 Saringan Pasir
16 Saringan Kotoran
17 Saringan Kotoran Kamar Mandi - Bahan Plastik (Floor Drain)
18 Saringan Kotoran Kamar Mandi - Bahan Besi/Kuningan (Floor Drain)
19 Lem FOX
20 Lem Pipa PVC
21 Lem Pipa PVC
22 Lem Besi - kw 1
23 Lem Besi - biasa
24 Talang PVC
25 Double Nipple GIV 1/2"
26 Double Nipple GIV 3/4"
27 Double Nipple 4"
28 Doubble Nipple 2"
29 Dop PVC 3/4"
30 Dop PVC 1"

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 41
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
31 Dop PVC 2"
32 Dop PVC 4"
33 Elbow GIV 3/4"
34 Elbow GIV 2"

O DAFTAR HARGA UNTUK PIPA DAN ALAT BANTU BESI


1 KNEE BESI 1/2"
3/4"
1"

2 PIPA BESI MEDIUM A. SUPER 1/2"


3/4"
1"
2'
3"
4"

3 PIPA GALVANISIR A. SUPER 1/2"


3/4"
1"
2'

4 STOP KRAN - BIASA 1/2"


3/4"
1"

5 STOP KRAN - KW.1 1/2"


3/4"

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 42
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
1"

6 TEE 1/2"
3/4"

7 V. KNIE 3/4"
1"

8 V NEPLE 3/4"
1"

9 WATER MUR 1/2"


10 WATER MUR 3/4"
11 Pipa Gip 1 1/2" (air bersih)
12 Pipa Baja Hitam -6M 1/2" tbl=2 mm
13 Pipa Baja Putih -6M 1/2" tbl=2 mm
14 Pipa Baja Hitam -6M 3/4" tbl=2 mm
15 Pipa Baja Putih -6M 3/4" tbl=2 mm
16 Pipa Baja Hitam -6M 1" tbl=2 mm
17 Pipa Baja Putih -6M 1" tbl=2 mm
18 Pipa Baja Hitam -6M 2" tbl=2 mm
19 Pipa Baja Putih -6M 2" tbl=2 mm
20 Pipa Baja Hitam -6M 3" tbl=2 mm
21 Pipa Baja Putih -6M 3" tbl=2 mm
22 Pipa Baja Hitam -6M 4" tbl=2 mm
23 Pipa Baja Putih -6M 4" tbl=2 mm
24 Pipa PVP dlm 2" Resapan
25 Pipa PVP dlm 3" Resapan

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 43
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
26 Pipa PVP dlm 4" Resapan

P MATERIAL POMPA
1 Pompa Air Shimiznu130 ( 125 Watt )
2 Pompa Air Shimizu 230 ( 200 Watt )
3 Pompa Air Panasonik 130 Jak ( 125 Watt )
4 Pompa Air Panasonik 200 Jak
5 Pompa Air Sanyo 137 AC
6 Pompa Air Sanyo PH 130 AC
7 Pompa Air Wasser 139 EA
8 Pompa Air Lakoni 129 A
9 Pompa Air Inoto I Hp + Kabel 50 Meter
10 Pompa Air Evak I Hp
11 Pompa Air Franklin I Hp
12 Pompa Wasser 60 Ea
13 Pompa Wasser 169 EA
14 Pompa Air Tsutumi 3
15 Mesin Las Hambatan dari Logam Otomatis (Las Listrik Yanmar TS 155 C 13 H
16 Generator SET ABB Mesin Diesel 8,5 PK Yanmar
17 Generator SET ABB Mesin Diesel 8,5 PK Kubota

Q BAHAN INSTALASI LISTRIK


1 Aram Lampu kap Hijau
2 Aram Mercury
3 Balon HPIT 250 W PH
4 Balon HPIT 400 W PH
5 Balon HPLN 125 W PH
6 Balon HQL 80 Watt Osram

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 44
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
7 Balon Neon panjang TL 40 / 36 W PH
8 Balon Son T 150 W
9 Balon Son T 250 W
10 Balon Son T 400 W
11 Body HPIT 400 W Lengkap
12 Body Lampu Taman TO-2
13 Body Lampu Taman TO-1
14 Balon HPLN 250 W
15 Body Mercury Hannock
16 Body Balon Son.T
17 Begel Per Pasang u/ tiang Beton
18 Begel Per Pasang u/ tiang Besi
19 Box Panel Meter
20 Box Panel Distribusi
21 Contactor 80 A Mitsubishi
22 Contactor 100 A Mitsubishi
23 Fitting Mercury E 27
24 Fitting Lampu Elektra segi Empat
25 Fitting Lampu Taman E 27
26 Fitting Lampu E 40
27 Fotosell 6 A
28 Ignitor HPIT 400 W ( SI.51 ) PH
29 Injektor 3 Kutub
30 Injektor SN 58
31 Isolasi Kabel Tanah (Bahan Karet)
32 Isolasi Unibell
33 Kabel NYA - 1 x 1,5 mm (Eterna)
34 Kabel NYA - 1 x 2,5 mm (Eterna)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 45
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
35 Kabel NYA - 1 x 2,5 mm (Extrana)
36 Kabel NYY 4 x 10 mm
37 Kabel NYY 4 x 6 mm
38 Kabel NYY 2 x 2,5 mm
39 Kabel WLC NYY 3 x 1,5 mm (Untuk Sumur Bor)
40 Kabel NYM 2 x 1,5 mm
41 Kabel NYM 2 x 1,5 mm
42 Kabel NYM 2 x 2,5 mm
43 Kabel NYM 2 x 2,5 mm
44 Kabel NYFGBY 4 x 6 mm
45 Kabel NYFGBY 4 x 10 mm
46 Kabel NYFGBY 4 x 16 mm
47 Kabel Twistik 2 x 10 mm
48 Kabel Twistik 2 x 16 mm
49 Kap E 27 Hijau
50 Kapasitor HPIT 250 W PH
51 Kapasitor HPIT 400 W PH
52 Kapasitor SON T 400 W
53 Kapasitor SON T 250 W
54 Kapasitor SON T 150 W
55 Kapasitor 8 Mf
56 Kapasitor 25 Mf
57 Kapasitor 32 Mf
58 Konektor Double Baut
59 Konektor Kedap Air 1 Baut
60 Kontaktor SN 50/80 Ampere
61 Klem Service Plastik
62 Kawat Seng

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 46
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
63 Lampu Hemat Energi 18 W
64 Lampu Hemat Energi 23 W
65 Lampu Hemat Energi 85 W
66 Lampu Hemat Energi 75 W
67 Lampu Hemat Energi 70 W
68 Lampu Hemat Energi 65 W
69 Lampu Hemat Energi 50 W
70 Lampu LED Hemat Energi 7 W
71 Lampu LED Hemat Energi 10 W
72 Lampu LED Hemat Energi 13 W
73 Lampu Selang Hias
74 MCB 1 A MG 1 Phase
75 MCB 2 - 20 A MG 1 Phase
76 MCB 25 - 32 A MG 1 Phase
77 MCB 1 A 1 Phase
78 MCB 6 A 1 Phase
79 MCB 16 A 1 Phase
80 MCB 20 A 1 Phase
81 MCB 50 A 1 Phase
82 Mour / Baut
83 NFB 75 A Mitsubishi 3 Phase
84 NFB 80 A Mitsubishi 3 Phase
85 NFB 100 A Mitsubishi 3 Phase
86 Pipa Gip 1 1/2" (listrik)
87 Rang Lampu Taman TO.2
88 Relay lampu Selang
89 Saklar Engkel In Clipsal
90 Saklar Engkel In Broco

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 47
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
91 Saklar Seri II In Clipsal
92 Saklar Seri II In Broco
93 Skun Kabel 10 mm
94 Skun Kabel 16 mm
95 Skun Kabel 25 mm
96 Skun Kabel 50 mm
97 Selonsong 10
98 Selonsong 16
99 Stop Kontak Broco
100 Stop Kontak Clipsal
101 Terminal Elegram 25mm
102 Tiang PJU 9 M Galvanis Single David
103 Tiang PJU 9 M Galvanis Double David
104 Tiang Besi 7 M
105 Tiang Besi 9 M
106 Tiang Lampu Taman
107 Timer Sweet Thebend
108 Travo HPIT 400 Watt Philips
109 Travo HPLN 125 Watt PH / HQL 80 Watt
110 Travo Son T 400 W
111 Travo Son T 250 W
112 Travo Son T 150 W
113 Travo TL 40 W PH
114 Bohlam (Lampu Penerangan) TL Simbat 18 W
115 Bohlam (Lampu Penerangan) PCC 23 Watt Ecuat
116 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad)
117 Kawat Non Galbani Lainnya (Kawat Las)
118 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 48
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
119 Stop Kontak dan Soket (Broco 2 Saklar)
120 Control Desk / Meja Kontrol KWH METER 450 WATT
121 Control Desk / Meja Kontrol KWH METER 900 WATT
122 Kabel Listrik NYM (2 MM x 2.5 MM)
123 Kabel Listrik NYA Kabel Listrik NYA ( 1 MM x 2,5 MM)
124 Kabel Listrik NYY (3 x 2,5) MM
125 Kabel Lainnya Eterna (3 x 2,5) 50 M
126 Bohlam (Lampu Penerangan) Philips Pijar 40 Watt
127 Lampu Neon Philips 40 Watt 100 Buah
128 Lampu Neon Philips TL 40 Watt

R ALAT PENUNJANG INSTALASI LISTRIK


1 Accumulater Cell Tester
2 Detektor Kabel
3 Helm Proyek
4 Kaos Tangan Kerja
5 Kaos Tangan Tegangan Tinggi 20 KV
6 Kunci Pipa Besar
7 Linggis
8 Mantel Parasut
9 Megger Meter Insulation Tester 3111V
10 Mesin Las Listrik
11 MultiMeter Sanwa asli
12 Pakaian Kerja (Cattel Pak)
13 Palu-Palu
14 Pisau Cutter
15 Senter Kepala
16 Sepatu Kerja (listrik)

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 49
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
17 Sepatu Tegangan Tinggi 20 KV
18 Skop
19 Solder
20 Tang Ampere 600 A
21 Tang Press Skun Besar
22 Tang Press Skun Kecil
23 Tangga Aluminium untuk lampu jalan
24 Tangga Bambu 2,5 Meter
25 Tangga Bambu 5 Meter
26 Tangga Fiber
27 Tools Kit
28 Topi

S UPAH KERJA
1 Mandor Lapangan
2 Kepala tukang
3 Kepala Tukang Listrik
4 Tukang Batu /Cat
5 Tukang Kayu / besi
6 Tukang pasang paving
7 Pembantu Sopir
8 Pembantu Mekanik
9 Pembantu Tukang Listrik
10 Pembantu Operator
11 Mekanik
12 Operator Terlatih
13 Pekerja
14 Sopir Terampil

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 50
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
15 Biaya Pasang Canstein
16 Biaya Pasang Paving

T BAHAN PERBENGKELAN
T1 AKI KENDARAAN
1 Accu N 50 A - 50 AH
2 Accu NS 60 A - 45 AH
3 Accu N 70 A - 70 AH
4 Accu N 100 A - 100 AH
5 Accu N 120 A - 120 AH

T2 BAN KENDARAAN
1 Ban Luar Dalam ukuran 750-16
2 Ban Luar Dalam ukuran 165-80/R13
3 Ban Luar Dalam ukuran 185-80/R14
4 Ban Luar Dalam ukuran 195-65/R15
5 Ban Luar Dalam ukuran 235-70/R 15 TG 36
6 Ban luar Dalam Ukr.1000-20 / 16
7 Ban Luar Dalam ukuran 700-14
8 Ban Luar Dalam ukuran 205/70 R15
9 Ban Luar dalam ukuran 825-16
10 Ban Luar Dalam ukuran 750-15
11 Ban Luar Dalam ukuran 265/65 R17

T3 PELUMAS OLI KENDARAAN


1 Oli Mesin Meditran SAE 40
2 Oli Hidrolik SAE 10
3 Oli Transmisi SAE 90
4 Oli Gardan SAE 140
5 Oli Mesin 15W40
6 Oli Mesin 20W50

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 51
NO BAHAN MATERIAL DAN UPAH KERJA

1 2

T4 SUKU CADANG SYSTEM ENGINE & EQUIPMENT


1 Saringan Bensin Kijang Pick Up Toyota
2 Saringan Bensin Toyota Rush
3 Saringan Bensin Toyota Hilux Single Cabin
4 Saringan Bensin Daihatsu Terios
5 Saringan Bensin Daihatsu Grand Max
6 Saringan Bensin Daihatsu Xenia
7 Saringan Bensin Mitsubishi Maven
8 Saringan Solar Dump Truck Toyota
9 Saringan Solar Dump Truck Izusu
10 Saringan Solar Dump Truck Daihatsu
11 Saringan Solar Mitsubishi Fuso
12 Saringan Solar Mitsubishi L - 300
13 Saringan Solar Mitsubishi Maven
14 Saringan Solar Dump Truck Nissan
15 Saringan Udara Dump Truck Toyota
16 Saringan Udara Kijang Pick Up Toyota
17 Saringan Udara Toyota Hiluxe Single Cabin
18 Saringan Udara Dump Truck Izusu
19 Saringan Udara Panther Pick Up Izusu
20 Saringan Udara Dump Truck Daihatsu
21 Saringan Udara Daihatsu Terios
22 Saringan Udara Daihatsu Grand Max
23 Saringan Udara Daihatsu Xenia
24 Saringan Udara Dump Truck Mitsubishi Fuso
25 Saringan Udara Dump Truck Nissan
26 Saringan Oli Dump Truck Toyota
27 Saringan Oli Kijang Pick Up Toyota
28 Saringan Oli Toyota Hiluxe Double Cabin
29 Saringan Oli Toyota Rush

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 52
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
30 Saringan Oli Toyota Hiluxe Single Cabin
31 Saringan Oli Dump Truck Izusu
32 Saringan Oli Panther Pick Up Izusu
33 Saringan Oli Dump Truck Daihatsu
34 Saringan Oli Daihatsu Xenia
35 Saringan Oli Mitsubishi L - 300
36 Saringan Oli Dump Truck Nissan
37 Saringan Oli Dump Truck Hino
38 Isi saringan solar Dump Truck Toyota
39 Isi saringan solar Dump Truck Nissan
40 Kampas Kopling Panther Pick Up Izusu
41 Kampas Kopling Dump Truck Toyota
42 Kampas Kopling Toyota Hilux Single Cabin
43 Kampas Kopling Dump Truck Izusu
44 Kampas Kopling Dump Truck Daihatsu
45 Kampas Kopling Dump Truck Mitsubishi Fuso
46 Kampas Kopling Dump Truck Nissan
47 Grapu Penindis Dump Truck Toyota
48 Grapu Penindis Dump Truck Isuzu
49 Lahar Penindis Dump Truck Toyota
50 Lahar Penindis Kijang Pick Up
51 Lahar Penindis Toyota Hilux Double Cabin
52 Lahar Penindis Toyota Hiluxe Single Cabin
53 Lahar Penindis Dump Truck Izusu
54 Lahar Penindis Panther Pick Up Izusu
55 Lahar Penindis Dump Truck Daihatsu
56 Lahar Penindis Dump Truck Mitsubishi Fuso
57 Lahar Penindis Dump Nissan
58 Matahari Dump truck Toyota
59 Matahari Toyota Hilux Double Cabin
60 Matahari Toyota Hiluxe Single Cabin

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 53
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
61 Matahari Dump Truck Izusu
62 Matahari Panther Pick Up Izusu
63 Matahari Dump Truck Mitsubishi Fuso
64 Matahari Dump Truck Nissan
65 Lahar Sumbu Dump Truck Toyota
66 Lahar Sumbu Kijang Pick Up Toyota
67 Lahar Sumbu Toyota Hilux Single Cabin
68 Lahar Sumbu Dump Truck Izusu
69 Lahar Sumbu Panther Pick Up Izusu
70 Lahar Sumbu Dump Truck Daihatsu
71 Lahar Sumbu Dump Truck Mitsubishi Fuso
72 Lahar Sumbu Mitsubishi Maven
73 Lahar Sumbu Dump Truck Nissan
74 Seher (Piston) Dump Truck Toyota
75 Seher (Piston) Dump Truck Izusu
76 Ring Seher Dump Truck Toyota
77 Ring Seher Dump Truck Izusu
78 Stang Seher Dump Truck Toyota
79 Stang Seher Dump Truck Izusu
80 Pen Seher Dump Truck Toyota
81 Pen Seher Dump Truck Izusu
82 Busing Pen Seher Dump Truck Toyota
83 Busing Pen Seher Dump Truck Izusu
84 Oil Seal Panggung Dump Truck Toyota
85 Oil Seal Panggung Dump Truck Izusu
86 Packing Set Dump Truck Toyota
87 Packing Set Dump Truck Izusu
88 Packing Set Dump Truck Mitsubishi Fuso
89 Packing Cylinder Head Dump Truck Toyota
90 Packing Cylinder Head Dump Truck Izusu
91 Baut Cylinder Head Dump Truck Toyota

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 54
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
92 Baut Cylinder Head Dump Truck Izusu
93 Bosh Klep Dump Truck Toyota
94 Bosh Klep Dump Truck Izusu
95 Cetting Klep Dump Truck Toyota
96 Cetting Klep Dump Truck Izusu
97 Clynder head Dump Truck Toyota
98 Clynder head Dump Truck Izusu
99 Baut klater Oli Dump Truck Toyota
100 Baut klater Oli Dump Truck Izusu
101 Karet dudukan mesin Dump Truck Toyota
102 Karet dudukan mesin Dump Truck Izusu
103 Pompa solar Dump Truck Toyota
104 Pompa solar Dump Truck Izusu
105 Radiator Kijang Toyota Hilux Single Cabin
106 Radiator Fanther Pick up Izusu
107 Radiator Dump Truck Hino
108 Radiator Dump Truck Toyota
109 Radiator DumP Truck Izusu
110 Tali Fan Belt Dump Truck Toyota
111 Tali Fan Belt Toyota Hiluxe single Cabin
112 Tali Fan Belt Dump Truck Izusu
113 Tali Fan Belt Dump Truck Mitsubishi Fuso
114 Tali Fan Belt Mitsubishi L -300
115 Tali Fan Belt Dump Truck Hino
116 Pompa Air Dump Truck Toyota
117 Pompa Air Dump Truck Izusu
118 Pot Air Atas Dump Truck Izusu
119 Pot Air Atas Dump Truck Toyota
120 Pot Air bawah Dump Truck Izusu
121 Pot Air bawah Dump Truck Toyota
122 Daun Kipas Dump Truck Toyota

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 55
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
123 Daun Kipas Dump Truck Izusu
124 Fully Fan Belt Dump Truck Toyota
125 Fully Fan Belt Dump Truck Izusu
126 Selang radiator atas Dump Truck Toyota
127 Selang radiator atas Toyota Hiluxe Single Cabin
128 Selang radiator atas Dump truck Izusu
129 Selang radiator atas Dump Truck Mitsubishi Fuso
130 Selang radiator atas Mitsubishi L-300
131 Selang radiator bawah Dump Truck Toyota
132 Selang radiator bawah Toyota Hilux single Cabin
133 Selang radiator bawah Dump truck Izusu
134 Selang radiator bawah Dump Truck Daihatsu
135 Selang radiator bawah Dump Truck Mitsubishi Fuso
136 Selang radiator bawah Dump Truck Nissan
137 Tabung reservoir Dump Truck Toyota
138 Tabung reservoir Dump Truck Izusu
139 Tutup Radiator Dump Truck Toyota
140 Tutup Radiator Dump Truck Izusu
141 Air Radiator

T5 SUKU CADANG SYSTEM HIDROLIK


1 Oil Seal Hidrolik Dump Truck Toyota
2 Oil Seal Hidrolik Dump Truck Izusu
3 Oil Seal Hidrolik Dump Truck Mitsubishi Fuso
4 Oil Seal Hidrolik Dump Truck Nissan
5 Oil Seal Hidrolik Dump Truck Hino
6 Oil Seal Hidrolik Dump Truck Daihatsu
7 Pompa PTO Dump Truck Toyota
8 Pompa PTO Dump Truck Izusu
9 Rod Piston (As Silinder) Dump Truck Toyota
10 Rod Piston (As Silinder) Dump Truck Izusu

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 56
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
11 Baut Nilon As Sylinder Dump Truck Toyota
12 Baut Nilon As Sylinder Dump Truck Izusu
13 Piston Cylinder Dump Truck Toyota
14 Piston Cylinder Dump Truck Izusu
15 Piston CylinderDump Truck Hino
16 Ring Piston As Silinder Dump Truck Toyota
17 Ring Piston As Silinder Dump Truck Izusu
18 Busing Pen Tongkang Dump Truck Toyota
19 Busing Pen Tongkang Dump Truck Izusu
20 Busing As Silinder Dump Truck Toyota
21 Busing As Silinder Dump Truck Izusu
22 Pen As Silinder Dump Truck Toyota
23 Pen As Silinder Dump Truck Izusu
24 Tali Tongkang Dump Truck Toyota
25 Tali Tongkang Dump Truck Izusu
26 Tali Tongkang Dump Truck Mitsubishi Fuso
27 Tali Tongkang Dump Truck Nissan
28 Tali Tongkang Dump Truck Hino
29 Oil seal P.T.O Dump Truck Toyota
30 Oil seal P.T.O Dump Truck Izusu
31 Fitting Grease Dump Truck Toyota
32 Fitting Grease Dump truck Izusu
33 Seal Dust Dump Tuck Toyota
34 Seal Dust Dump Truck Izusu
35 Gambiran PTO Dump Truck Toyota
36 Gambiran PTO Dump Truck Izusu
37 Hose Pompa Hidrolik Dump Truck Toyota
38 Hose Pompa Hidrolik Dump Truck Izusu
39 Hose Tangki Hydrolik Dump Truck Toyota
40 Hose Tangki Hydrolik Dump Truck Izusu
41 Handel Perseneling Dump Truck Toyota

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 57
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
42 Handel Perseneling Dump Truck Izusu
43 Tali perseneling Dump Truck Toyota
44 Tali perseneling Dump Truck Izusu
45 Tali Perseneling jumbo Dump Truck Mitsubishi Fuso
46 Tali Perseneling jumbo Dump Truck Nissan Assy
47 Tali perseneling Dump Truck Hino
48 Oil seal Transmisi muka/belakang Dump Truck Toyota
49 Oil seal Transmisi muka/belakang Dump Truck Izusu
50 Oil seal Transmisi muka/belakang Dump Truck Nissan
51 Oil seal Transmisi muka/belakang Dump Truck Mitsubishi Fuso
52 Oil seal Transmisi muka/belakang Dump Truck Hino
53 Oil seal Transmisi muka/belakang Dump Truck Daihatsu
54 Tali PTO Dump Truck Toyota
55 Tali PTO Dump Truck Izusu
56 Tali PTO Dump Truck Nissan
57 Tali PTO Dump Truck Mitsubishi Fuso
58 Tali PTO Dump Truck Hino
59 Cable Rem tangan Dump Truck Toyota
60 Cable rem tangan Dump Truck Izusu
61 Gambiran Blok Dump Truck Toyota
62 Gambiran Blok Kijang Pick Up Toyota
63 Gambiran Blok Kijang Diesel Toyota
64 Gambiran Blok Toyota Hiluxe Single Kabin
65 Gambiran Blok Dump Truck Izusu
66 Gambiran Blok Dump Truck Daihatsu
67 Gambiran Blok Dump Truck Mitsubishi Fuso
68 Gambiran Blok Mitsubishi L- 300
69 Gambiran Blok Dump Truck Nissan
70 Gambiran Blok Dump Truck Hino
71 Gear counter Dump Truck Toyota
72 Gear counter Dump Truck Izusu

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 58
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
73 Shaft Top Gear Dump Truck Toyota
74 Shaft Top Gear Dump Truck Izusu
75 Gear 1 mainshaft Dump Truck Toyota
76 Gear 1 mainshaft Dump Truck Izusu
77 Gear 2 mainshaft Dump Truck Toyota
78 Gear 2 mainshaft Dump Truck Izusu
79 Gear 3 mainshaft Dump Truck Toyota
80 Gear 3 mainshaft Dump Truck Izusu
81 Gear 4 mainshaft Dump Truck Toyota
82 Gear 4 mainshaft Dump Truck Izusu
83 Gear 5 mainshaft Dump Truck Toyota
84 Gear 5 mainshaft Dump Truck Izusu
85 Gear rev mainshaft Dump Truck Toyota
86 Gear rev mainshaft Dump Truck Izusu
87 Bearing (lahar) Transmisi Dump Truck Toyota
88 Bearing (lahar) Transmisi Toyota Hiluxe Single Cabin
89 Bearing (lahar) Transmisi Dump Truck Izusu
90 Bearing (lahar) Transmisi Dump Truck Daihatsu
91 Bearing (lahar) Transmisi Dump Truck Mitsubishi Fuso
92 Bearing (lahar) Transmisi Mitsubishi L- 300
93 Bearing (lahar) Transmisi Mitsubishi Maven
94 Bearing (lahar) Transmisi Dump Truck Nissan
95 Bearing Needle Mainshaft (Lahar Keranjang) Dump Truck Toyota
96 Bearing Needle Mainshaft (Lahar Keranjang)Dump Truck Izusu
97 Bearing Needle Gigi 5 Dump Truck Toyota
98 Bearing Needle Gigi 5 Dump Truck Izusu
99 Bearing Needle Gigi 2 Dump Truck Toyota
100 Bearing Needle Gigi 2 Dump Truck Izusu
101 Bearing Countershaft Dump Truck Toyota
102 Bearing Countershaft Dump Truck Izusu
103 Bearing Top gear Dump Truck Toyota

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 59
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
104 Bearing Top gear Dump Truck Izusu
105 Oil seal Gardan Dump Truck Toyota
106 Oil seal Gardan Toyota Hiluxe Single Cabin
107 Oil seal Gardan Dump Truck Izusu
108 Oil seal Gardan Izusu Panther Pick Up
109 Oil seal Gardan Dump Truck Hino
110 Oil seal Gardan Dump Truck Daihatsu
111 Oil seal Gardan Dump Truck Mitsubishi Fuso
112 Oil seal Gardan Dump Truck Nissan
113 Bearing gardan Dump Truck Toyota
114 Bearing gardan Toyota Hiluxe Single Cabin
115 Bearing gardan Dump Truck Izusu
116 Bearing gardan Dump Truck Hino
117 Ring synkronis Dump Truck Toyota
118 Ring synkronis Dump Truck Izusu
119 Dudukan persenellan Dump Truck Toyota
120 Dudukan persenellan Dump Truck Izusu
121 Kuku synkronis Dump Truck Toyota
122 Kuku synkronis Dump Truck Izusu
123 Kuku synkronis Dump Truck Mitsubishi Fuso
124 Kuku synkronis Dump Truck Nissan
125 Kuku synkronis Dump Truck Hino
T6 SUKU CADANG SYSTEM KELISTRIKAN
1 Lampu weser depan Dump Truck Toyota
2 Lampu weser depan Dump truck Izusu
3 Lampu weser depan Dump truck Mitsubishi Fuso
4 Lampu Weser depan Dump truck Nissan
5 Lampu Weser depan Dump truck Hino
6 Lampu weser depan Dump truck Daihatsu
7 Lahar dinamo stater Dump Truck Toyota
8 Lahar dinamo stater Dump Truck Izusu

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 60
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
9 IC dinamo strom Dump Truck Toyota
10 IC dinamo strom Dump Truck Izusu
11 Flunger Stater Dump Truck Toyota
12 Armature Strom (Angker Tengah) Dump Truck Toyota
13 Armature Strom (Angker Tengah) Dump Truck Izusu
14 Dinamo Strom Dump Truck Toyota
15 Dinamo Strom Dump Truck Izusu
16 Fully Dinamo Strom Dump Truck Toyota
17 Fully Dinamo Strom Kijang Pick Up Toyota
18 Fully Dinamo Strom Dump Truck Izusu
19 Rotor pompa vacum dinamo strom Dump truck Toyota
20 Rotor pompa vacum dinamo strom Dump truck Izusu
21 Rectifier (Dioda) Dinamo strom Dump Truck Toyota
22 Rectifier (Dioda) Dinamo strom Kijang Pick Up Toyota
23 Rectifier (Dioda) Dinamo strom Toyota Hilux Single Cabin
24 Rectifier (Dioda) Dinamo strom Dump Truck Izusu
25 Armature Stater (Angker Tengah) Dump Truck Toyota
26 Armature Stater (Angker Tengah) Dump Truck Izusu
27 Angker Dinding Dump Truck Toyota
28 Angker Dinding Dump Truck Izusu
29 Skun Kabel Dump Truck Toyota
30 Skun Kabel Kijang Diesel Toyota
31 Skun Kabel Toyota Hilux Single Cabin
32 Skun Kabel Dump Truck Izusu
33 Sekring Dump Truck Toyota
34 Sekring Kijang Diesel Toyota
35 Sekring Toyota Hiluxe Single Cabin
36 Sekring Dump Truck Izusu
37 Sekring Dump Truck Mitsubishi Fuso
38 Sekring Dump Truck Nissan
39 Dinamo Stater Dump Truck Toyota

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 61
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
40 Dinamo Stater Dump Truck Izusu
41 Dinamo Stater Euro NS Dump Truck Nissan
42 Switch Stater Dump Truck Toyoya
43 Switch Stater Dump Truck Izusu
44 Pinion (Bendis) Stater Dump Truck Toyota
45 Pinion (Bendis) Stater Dump Truck Izusu
46 Relay Lampu Dump Truck Toyota
47 Relay Lampu Dump truck Izusu
48 Socket Relay Lampu Dump Truck Toyota
49 Socket Relay Lampu Dump Truck Izusu
50 Kepala Accu Dump Truck Toyota
51 Kepala Accu Kijang Pick Up Toyota
52 Kepala Accu Kijang Diesel Toyota
53 Kepala Accu Toyota Hilux Single Cabin
54 Kepala Accu Dump Truck Izusu
55 Kepala Accu Panther Pick Up Izusu
56 Kepala Accu Dump Truck Daihatsu
57 Kepala Accu Daihatsu Terios
58 Balon Lampu Depan Dump Truck Toyota
59 Balon Lampu Depan Dump Truck Izusu
60 Balon Lampu Belakang Dump Truck Toyota
61 Balon Lampu Belakang Kijang Pick Up Toyota
62 Balon Lampu Belakang Toyota Hilux Single Cabin
63 Balon Lampu Belakang Dump Truck Izusu
64 Bak Lampu Depan Dump Truck Toyota
65 Bak Lampu Depan Dump Truck Izusu
66 Klakson 24 Volt Dump Truck Toyota
67 Klakson 24 Volt Dump Truck Izusu
68 Klakson 24 Volt Dump Truck Mitsubishi Fuso
69 Klakson 24 Volt Dump Truck Nissan
70 Klakson 24 Volt Dump Truck Hino

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 62
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
71 Klakson 12 Volt Dump Truck Toyota
72 Klakson 12 Volt Dump Truck Izusu
73 Kabel Body Dump Truck Toyota
74 Kabel Body Dump Truck Izusu
75 Rumah Sekring Dump Truck Toyota
76 Rumah Sekring Dump Truck Izusu
77 Saklar Dem Lampu Dump Truck Toyota
78 Saklar Dem Lampu Dump Truck Izusu
79 Saklar Dem Lampu Dump Truck Mitsubishi Fuso
80 Saklar Dem Lampu Dump Truck Nissan
81 Flaser 24 Volt Dump Truck Toyota
82 Flaser 24 Volt Dump Truck Izusu
83 Flaser 24 Volt Dump Truck Mitsubishi Fuso
84 Flaser 24 Volt Dump Truck Nissan
85 Flaser 24 Volt Dump Truck Hino
86 Flaser 12 volt Dump Truck Toyota
87 Flaser 12 volt Kijang Pick Up Toyota
88 Flaser 12 volt Kijang Diesel Toyota
89 Flaser 12 volt Dump Truck Izusu
90 Isolasi Kabel Dump Truck
91 Kabel Positif Dump Truck Toyota
92 Kabel Positif Dump Truck Izusu
93 Rumah Skun Kabel Dump Truck Toyota
94 Rumah Skun Kabel Dump Truck Izusu
95 Swicth Attrek Dump Truck Toyota
96 Swicth Attrek Dump truck Izusu
97 Kabel positif Dump Truck Mitsubishi Fuso
98 Kabel Positif Dump Truck Nissan
99 Switch Rem Dump Truck Toyota
100 Switch Rem Toyota Hiluxe Single Cabin
101 Switch Rem Panther Pick Up Izusu

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 63
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
102 Switch Rem Dump Truck Izusu
103 Switch Rem Dump Truck Daihatsu
104 Switch Rem Dump Truck Mitsubishi Fuso
105 Switch Rem Dump Truck Nissan
106 Switch rem Dump Truck Hino
107 Switch Jamret 5/5 Dump Truck Toyota
108 Switch Jamret 5/5 Dump Truck Izusu
109 Soket Kabel Dump truck Toyota
110 Soket Kabel Dump Truck Izusu
111 Soket Kabel Kijang Pick Up Toyota
112 Soket Kabel Toyota Hilux Single Cabin
113 Kabel Accu Paralel Dump Truck Toyota
114 Kabel Accu Paralel Dump Truck Izusu
115 Kabel Accu Paralel Dump Truck Mitsubishi Fuso
116 Kabel Accu Paralel Dump Truck Nissan
117 Relay Stater 12 Volt Dump Truck Toyota
118 Relay Stater 24 Volt Dump Truck Toyota
119 Relay Stater 24 Volt Dump Truck Izusu
120 Lampu depan jarak dekat Dump Truck Toyota
121 Lampu depan jarak dekat Dump Truck Izusu
122 Lampu depan jarak dekat Dump Truck Daihatsu
123 Carbon brush (Kol) Dinamo strom Dump Truck Toyota
124 Carbon brush (Kol) Dinamo strom Dump Truck Izusu
125 Carbon brush (Kol) Dinamo strom Dump Truck nissan
126 Carbon brush (Kol) Dinamo stater Dump Truck Toyota
127 Carbon brush (Kol) Dinamo stater Dump Truck Izusu
128 Lampu Stop Dump Truck Toyota
129 Lampu Stop Dump Truck Izusu
130 Lampu Stop Mitsubishi L - 300
131 EL Dinamo Stater Dump Truck Toyota
132 EL Dinamo Stater Dump Truck Izusu

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 64
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
133 EL Dinamo Stater Dump Truck Mitsubishi Fuso
134 EL Dinamo Stater Dump Truck Nissan

T7 SUKU CADANG SYSTEM STEERING


1 Rumah saringan Udara Dump Truck Toyota
2 Rumah saringan Udara Dump Truck Izusu
3 Pipa (Selang) Bahan Bakar Dump Truck Toyota
4 Pipa (Selang) Bahan Bakar Dump Truck Izusu
5 Pipa Rem Dump Truck Toyota
6 Pipa Rem Dump Truck Izusu
7 Tromol Depan Dump Truck Toyota
8 Tromol Depan Dump Truck Izusu
9 Tromol belakang Dump Truck Toyota
10 Tromol belakang Dump Truck Izusu
11 Kampas Rem Tangan Dump Truck Toyota
12 Kampas Rem Tangan Dump Truck Izusu
13 Tutup Tangki Bahan Bakar Dump Truck Toyota
14 Tutup Tangki Bahan Bakar Dump Truck Izusu
15 Lahar Roda Depan Dump Truck Toyota
16 Lahar Roda Depan Dump Truck Izusu
17 Lahar Roda Depan Panther Pick Up Izusu
18 Lahar Roda Depan Dump Truck Mitsubishi Fuso
19 Lahar Roda Depan Mitsubishi L 300
20 Lahar Roda Depan Mitsubishi Maven
21 Lahar Roda Depan Dump Nissan
22 Lahar Roda Depan Dump Truck Hino
23 Lahar Roda Depan Dump Truck Daihatsu
24 Lahar Roda Belakang Dump Truck Toyota
25 Lahar Roda Belakang Kijang Diesel Toyota
26 Lahar Roda Belakang Dump Truck Izusu
27 Lahar Roda Belakang Panther Pick Up Izusu

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 65
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
28 Lahar Roda Belakang Dump Truck Nissan
29 Lahar Roda Belakang Dump Truck Hino
30 Baut Roda Depan Dump Truck Toyota
31 Baut Roda Depan Dump Truck Izusu
32 Baut Roda Depan Dump Truck Nissan
33 Baut Roda Depan Dump Truck Mitsubishi Fuso
34 Baut Roda Depan Dump Truck Hino
35 Baut Roda Depan Dump Truck Daihatsu
36 Baut Roda Belakang Dump Truck Toyota
37 Baut Roda Belakang Dump Truck Izusu
38 Baut Roda Belakang Dump Truck Mitsubishi Fuso
39 Baut Roda Belakang Depan Dump Truck Nissan
40 Baut Roda Belakang Dump Truck Hino
41 Baut Roda Belakang Dump Truck Daihatsu
42 As Roda Belakang Dump Truck Toyota
43 As Roda Belakang Dump Truck Izusu
44 Handel Pintu Kiri Dump Truck Toyota
45 Handel Pintu Kiri Dump Truck Izusu
46 Handel Pintu Kanan Dump Truck Toyota
47 Handel Pintu Kanan Dump Truck Izusu
48 Anak Kunci Pintu Kiri/Kanan Dump Truck Toyota
49 Anak Kunci Pintu Kiri/Kanan Kijang Diesel Toyota
50 Anak Kunci Pintu Kiri/Kanan Dump Truck Izusu
51 Door Lock pintu kiri/kanan Dump Truck Toyota
52 Door Lock pintu kiri/kanan Kijang Diesel Toyota
53 Door Lock pintu kiri/kanan Dump Truck Izusu
54 Penghapus Kaca Dump Truck Toyota
55 Penghapus Kaca Kijang Diesel Toyota
56 Penghapus Kaca Hiluxe Single Cabin Toyota
57 Penghapus Kaca Dump Truck Izusu
58 Penghapus Kaca Panther Pick Up Izusu

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 66
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
59 Penghapus Kaca Dump Truck Daihatsu
60 Penghapus Kaca Daihatsu Xenia
61 Penghapus Kaca Dump Truck Mitsubishi Fuso
62 Penghapus Kaca Mitsubishi L 300
63 Penghapus Kaca Mitsubishi Maven
64 Penghapus Kaca Dump Truck Nissan
65 Penghapus Kaca Dump Truck Hino
66 Kaca Spion Dump Truck Toyota
67 Stang Kaca Spion Dump Truck Toyota
68 Stang Kaca Spion Dump Truck Izusu
69 Kaca Spion Dump Truck Izusu
70 Gantungan Blok Dump Truck Toyota
71 Gantungan Blok Dump Truck Izusu
72 Gantungan Blok Kijang Diesel Toyota
73 Gantungan Blok Dump Truck Mitsubishi Fuso
74 Gantungan Blok Dump Truck Hino
75 Gantungan Blok Dump Truck Daihatsu
76 Stopper depan (Bantalan per dpn) Dump Truck Toyota
77 Stopper depan (Bantalan per dpn) Dump Truck Izusu
78 Stopper depan (Bantalan per dpn) dump Truck Hino
79 Stopper Belakang (Bantalan per Blk) Dump Truck Toyota
80 Stopper Belakang (Bantalan per Blk) Dump Truck Izusu
81 Stopper Belakang (Bantalan per Blk) dump Truck Hino
82 Oil Seal Roda Depan Dump Truck Toyota
83 Oil Seal Roda Depan Dump Truck Izusu
84 Oil Seal Roda Belakang Dump Truck Toyota
85 Oil Seal Roda Belakang Dump Truck Izusu
86 Karet Rem Roda Belakang Kijang Pick Up Toyota
87 Karet Rem Roda Belakang Kijang Diesel Toyota
88 Karet rem roda Belakang Dump Truck Toyota
89 Karet Rem Roda Belakang Toyota hilux Single Cabin

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 67
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
90 Karet Rem Roda Belakang Dump Truck Izusu
91 Karet Rem Roda Belakang Dump Truck Mitsubishi Fuso
92 Karet Roda Belakang Dump Truck Hino
93 Karet Roda Belakang Dump Truck Daihatsu
94 Karet Roda Belakang Dump Truck Nissan
95 Karet rem roda depan Dump Truck Toyota
96 Karet rem roda depan Toyota Hilux Single Cabin
97 Karet rem roda depan Dump Truck Izusu
98 Karet rem roda depan Dump Truck Mitsubishi Fuso
99 Karet rem roda depan Dump Truck Nissan
100 Knalpot Dump Truck Toyota
101 Knalpot Dump Truck Izusu
102 Tangki bahan bakar Dump Truck Toyota
103 Tangki bahan bakar Dump Truck Izusu
104 Master rem atas Dump Truck Toyota
105 Master rem atas Dump Truck Izusu
106 Master rem atas Toyota Hilux Singel Cabin
107 Isi Master silinder rem atas Dump Truck Toyota
108 Isi Master silinder rem atas Toyota Hilux Singel Cabin
109 Isi Master silinder rem atas Dump Truck Izusu
110 Isi Master Silinder rem Atas Dump Truck Nissan
111 Isi Master Silinder rem atas Dump Truck Mitsubishi Fuso
112 Isi Master Silinder atas Dump Truck Daihatsu
113 Kampas rem Roda depan Dump Truck Toyota
114 Kampas rem Roda depan Kijang Pick Up Toyota
115 Kampas rem Roda depan Toyota Hilux Single Cabin
116 Kampas rem Roda depan Dump Truck Izusu
117 Kampas rem Roda depan dump Truck Nissan
118 Kampas rem Roda depan dump Truck Mitsubishi Fuso
119 Kampas rem Roda depan dump Truck Hino
120 Kampas rem Roda depan dump Truck Daihatsu

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 68
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
121 Kampas rem Roda belakang Dump Truck Toyota
122 Kampas rem Roda belakang Toyota Hilux Single Cabin
123 Kampas rem Roda belakang Kijang Diesel Toyota
124 Kampas rem Roda belakang Dump Truck Izusu
125 Kampas rem Roda belakang Dump Truck Nissan
126 Kampas rem Roda belakang dump Truck Mitsubishi Fuso
127 Kampas rem Roda belakang dump Truck Hino
128 Kampas Rem Roda belakang dump Truck Daihatsu
129 Per kampas rem Roda depan Dump Truck Toyota
130 Per kampas rem Roda depan Dump Truck Izusu
131 Per kampas rem Roda belakang Dump Truck Toyota
132 Per kampas rem Roda belakang Dump Truck Izusu
133 Bak kopleng Atas Dump Truck Toyota
134 Bak kopleng Atas Kijang Diesel Toyota
135 Bak kopleng Atas Toyota Hilux Single Cabin
136 Bak kopleng Atas Dump Truck Izusu
137 Bak kopleng atas Dump Truck Nissan
138 Bak kopleng atas Dump Truck Mitsubishi Fuso
139 Bak kopleng atas Dump Truck Hino
140 Bak kopleng atas Dump Truck Daihatsu
141 Bak kopling Bawah Dump Truck Toyota
142 Bak Kopleng Bawah Kijang Diesel Toyota
143 Bak Kopleng Bawah Toyota Hilux Single Cabin
144 Bak Kopleng Bawah Dump Truck Izusu
145 Bak Kopleng Bawah Dump Truck Daihatsu
146 Bak Kopleng Bawah Dump Truck Mitsubishi Fuso
147 Bak rem Roda depan Dump Truck Toyota
148 Bak rem Roda depan Kijang Diesel Toyota
149 Bak rem Roda depan Toyota Hilux Single Cabin
150 Bak rem Roda depan Dump Truck Izusu
151 Bak rem Roda depan Dump Truck Daihatsu

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 69
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
152 Bak rem Roda Belakang Dump Truck Toyota
153 Bak rem Roda Belakang Kijang Diesel Toyota
154 Bak rem Roda Belakang Toyota Hilux Single Cabin
155 Bak rem Roda Belakang Dump Truck Izusu
156 Bak rem Roda Belakang Dump Truck Daihatsu
157 Bak rem Roda Belakang Dump Truck Mitsubishi Fuso
158 Oil seal Bambu Dump Truck Toyota
159 Oil seal Bambu Dump Truck Izusu
160 Selang kopling atas Dump Truck Toyota
161 Selang kopling atas Dump Truck Izusu
162 Selang kopling bawah Dump Truck Toyota
163 Selang kopling bawah Toyota Hilux Single Cabin
164 Selang kopling bawah Dump Truck Izusu
165 Baut As Roda belakang Dump Truck Toyota
166 Baut As Roda belakang Dump Truck Izusu
167 Dudukan baut As Roda belakang Dump Truck Toyota
168 Dudukan baut As Roda belakang Dump Truck Isuzu
169 Kaca pintu samping Dump Truck Toyota
170 Kaca pintu samping Dump Truck Izusu
171 Boster rem Dump Truck Toyota
172 Boster rem Dump Truck Izusu
173 Regulator kaca Dump Truck Toyota
174 Regulator kaca Dump Truck Izusu
175 Stang wifer kaca Dump Truck Toyota
176 Stang wifer kaca Dump Truck Izusu
177 Karet pintu kiri/kanan Dump Truck Toyota
178 Karet pintu kiri/kanan Dump Truck Izusu
179 Karet boster rem Dump Truck Toyota
180 Karet boster rem Dump Truck Izusu
181 Pegas (Per) Daun Roda Depan Dump Truck Toyota
182 Pegas (Per) Daun Roda Depan Dump Truck Izusu

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 70
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
183 Pegas (Per) Daun Roda Belakang Dump Truck Toyota
184 Pegas (Per) Daun Roda Belakang Dump Truck Izusu
185 Pegas (Per) Bantu Roda Belakang Dump Truck Toyota
186 Pegas (Per) Bantu Roda Belakang Dump Truck Izusu
187 Baut tromol Dump Truck Toyota
188 Baut tromol Dump Truck Izusu
189 Baut tromol Dump Truck Mitsubishi
190 Bantalan per daun Depan Dump Truck Toyota
191 Bantalan per daun Depan Dump Truck Izusu
192 Bantalan per daun belakang Dump Truck Toyota
193 Bantalan per daun belakang Dump Truck Izusu
194 Pen per Dump Truck Toyota
195 Pen per Dump Truck Izusu
196 Tali rem tangan Dump Truck Toyota
197 Tali rem tangan Kijang Pick Up Toyota
198 Tali rem tangan Toyota Hilux Single Cabin
199 Tali rem tangan Dump Truck Izusu
200 Isi rem tangan Dump Truck Toyota
201 Isi rem tangan Toyota Hilux Single Cabin
202 Isi rem tangan Dump Truck Izuzu
203 Shockbreaker depan kiri/kanan Dump Truck Toyota
204 Shockbreaker depan kiri/kanan Dump Truck Izusu
205 Shockbreaker belakang kiri/kanan Dump Truck Toyota
206 Shockbreaker belakang kiri/kanan Dump Truck Izusu
207 Sendimeter Dump Truck Toyota
208 Sendimeter Dump truck Izusu
209 Boster Rem jumbo Dump Truck Mitsubishi Fuso
210 Boster Rem jumbo Dump Truck Nissan
211 King Pin Dump Truck Toyota
212 King Pin Dump Truck Izusu
213 Drak Link Dump Truck Toyota

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 71
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
214 Drak Link Dump Truck Izusu
215 Drak Link Dump Truck Mitsubishi Fuso
216 Drak Link Dump Truck Nissan
217 Tie Rod End Dump Truck Toyota
218 Tie Rod End Dump Truck Izusu
219 Tie Rod End Dump Truck Mitsubishi Fuso
220 Tie Rod End euro Dump Truck Nissan
221 Boll joint atas Kijang Pick Up Toyota
222 Boll joint bawah Kijang Pick Up Toyota
223 Bak Stir Dump Truck Toyota
224 Bak Stir Dump Truck Izusu
225 Warm stir Dump Truck Toyota
226 Warm stir Dump Truck Izusu
227 Tali Spedometer Dump Truck Toyota
228 Tali Spedometer Dump Truck Izusu
229 Tali Spedometer Dump Truck Mitsubishi Fuso
230 Tali Spedometer Dump Truck Nissan
231 Veleg + Ring Dump Truck Toyota
232 Veleg + Ring Dump Truck Izusu
233 Veleg + Ring Dump Truck Mitsubishi Fuso

T8 SUKU CADANG SYSTEM TRANSMISI


1 Gear set Final Drive Dump Truck Toyota
2 Gear set Final Drive Dump Truck Izusu
3 Flange Final Drave Dump Truck Toyota
4 Flange Final Drave Dump Truck Izusu
5 Bearing Final pinion Dump Truck Toyota
6 Bearing Final pinion Dump Truck Izusu
7 Spider (salib) Difrensial Pinion Dump Truk Toyota
8 Spider (salib) Difrensial Pinion Dump Truk Izusu
9 Gear side disfrensial Dump Truck Toyota

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 72
NO BAHAN MATERIAL DAN UPAH KERJA

1 2
10 Gear side disfrensial Dump Truck Izusu
11 Gear pinion disfrensial Dump Truck Toyota
12 Gear pinion disfrensial Dump Truck Izusu
13 Cage Final pinion Dump Truck Toyota
14 Cage Final pinion Dump Truck Izusu
15 Washer Thrust side gear (gigi bolu) Dump Truck Toyota
16 Washer Thrust side gear (gigi bolu)Dump Truck Izusu
17 Propeller shaft (As Blok) Dump Truck Toyota
18 Propeller shaft (As Blok) Dump Truck Izusu
19 Oil seal pinion gear Dump Truck Toyota
20 Oil seal pinion gear Dump Truck Izusu
21 Oil seal pinion gear Dump Truck Mitsubishi Fuso
22 Oil seal pinion gear Dump Truck Nissan
23 Oil seal pinion gear Dump Truck Hino
24 Oil Seal Pinion gear Dump Truck Daihatsu
25 Pooring Dump Truck Toyota (per Set)
26 Pooring Dump Truck Izusu (per Set)
27 Metal Duduk Dump Truck Toyota
28 Metal Duduk Dump Truck Izusu
29 Metal Jalan Dump Truck Toyota
30 Metal JalanDump Truck Izusu
31 Metal Bulan Dump Truck Toyota
32 Metal Bulan Dump Truck Izusu
33 Klep Api Dump Truck Toyota
34 Klep Api Dump Truck Izusu
35 Klep minyak Dump Truck Toyota
36 Klep minyak Dump Truck Izusu
37 Klep In Dump Truck Toyota
38 Klep In Dump Truck Izusu
39 Klep Ex Dump Truck Toyota
40 Klep Ex Dump Truck Izusu

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 73
NO BAHAN MATERIAL DAN UPAH KERJA

1 2

Plt. KEPALA DINAS PEKERJAAN UMUM


KOTA MAKASSAR

Ir. M. ANSAR, M.Si


Pangkat : Pembina Utama Muda
Nip. 19630517 199203 1 004

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 74
AN BAHAN & UPAH KERJA
TAHUN ANGGARAN 2019

SATUAN BAHAN/ HASIL SURVEY


UPAH KERJA
TRIWULAN I
3 4

Buah Rp 4,400.00
Buah Rp 5,800.00
Buah Rp 6,300.00
Buah Rp 4,400.00
Buah Rp 5,800.00
Buah Rp 6,300.00
Buah Rp 4,400.00
Buah Rp 5,800.00
Buah Rp 6,300.00
Buah Rp 6,800.00
Buah Rp 4,400.00
Buah Rp 5,800.00
Buah Rp 6,300.00
Buah Rp 4,400.00
Buah Rp 5,800.00
Buah Rp 6,300.00
Buah Rp 15,000.00
Buah Rp 17,000.00
Buah Rp 11,000.00
Buah Rp 15,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 75
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 13,860.00
Buah Rp 19,000.00
Buah Rp 19,140.00
Buah Rp 25,000.00
Buah Rp 14,700.00
Buah Rp 18,900.00
Buah Rp 20,300.00
Buah Rp 12,500.00
Buah Rp 17,500.00
Buah Rp 17,250.00
Buah Rp 20,000.00
Buah Rp 85,000.00
Buah Rp 95,000.00
Buah Rp 115,000.00
Buah Rp 57,500.00
Buah Rp 62,500.00
Buah Rp 47,500.00
Buah Rp 33,000.00
Lembar Rp 108,000.00
Lembar Rp 107,500.00
Lembar Rp 90,000.00
Lembar Rp 90,000.00
Lembar Rp 55,000.00
Lembar Rp 76,000.00
Lembar Rp 30,000.00
kaki Rp 7,200.00
kaki Rp 80,000.00
Lembar Rp 80,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 76
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Lembar Rp 70,000.00
Lembar Rp 45,600.00
Lembar Rp 49,000.00
Lembar Rp 72,000.00
Lembar Rp 85,000.00
Lembar Rp 75,000.00
Lembar Rp 53,000.00
KK Rp 18,000.00
Lembar Rp 80,000.00
Lembar Rp 15,000.00
Lembar Rp 18,000.00
Lembar Rp 12,000.00
Biji Rp 7,200.00
M Rp 7,500.00
M Rp 8,000.00
M Rp 13,000.00
Rol Rp 350,000.00
Rol Rp 400,000.00
Lbr Rp 165,000.00
Lbr Rp 79,000.00
Lbr Rp 320,000.00

M3 Rp 350,000.00
M3 Rp 250,000.00
M3 Rp 350,000.00
M3 Rp 250,000.00
M3 Rp 400,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 77
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M3 Rp 350,000.00
M3 Rp 350,000.00
M3 Rp 350,000.00
M3 Rp 350,000.00
M3 Rp 350,000.00
Biji Rp 1,000.00
M3 Rp 900,000.00
M2 Rp 64,350.00
Biji Rp 25,000.00
Biji Rp 52,000.00
Biji Rp 62,000.00
Biji Rp 62,000.00
Biji Rp 30,000.00
M3 Rp 150,000.00
M3 Rp 225,000.00
M3 Rp 260,000.00
M3 Rp 260,000.00
M3 Rp 260,000.00
M3 Rp 160,000.00
M3 Rp 200,000.00
M3 Rp 325,000.00
Sak Rp 65,000.00
Sak Rp 48,000.00
Zak Rp 47,000.00
Zak Rp 47,000.00
Zak Rp 45,000.00
Sak Rp 70,000.00
Sak Rp 250,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 78
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Kg Rp 20,000.00
Kg Rp 45,000.00
Kg Rp 56,500.00
Kg Rp 114,750.00
Kg Rp 110,250.00
M2 Rp 49,500.00
kg Rp 30,000.00
M2 Rp 80,000.00
M3 Rp 350,000.00

Batang Rp 100,000.00
Batang Rp 40,000.00
Batang Rp 30,000.00
Batang Rp 25,000.00
Ikat Rp 35,000.00
Buah Rp 150,000.00
Buah Rp 200,000.00
Buah Rp 300,000.00
Buah Rp 350,000.00

Bh Rp 8,700.00
Bh Rp 7,190.00
Batang/Biji Rp 12,941.00
Batang Rp 20,996.00
Batang Rp 13,365.00
Batang Rp 14,074.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 79
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 17,418.00
Batang Rp 19,951.00
Bh Rp 5,500.00
Bh Rp 25,000.00
M'/ Btg Rp 190,000.00
Btg Rp 183,000.00
Btg Rp 185,000.00
Btg Rp 190,000.00
Btg Rp 160,000.00
Btg Rp 135,000.00
Btg Rp 115,000.00
Btg Rp 95,000.00
Btg Rp 85,000.00
Btg Rp 18,000.00
Btg Rp 19,000.00
Btg Rp 21,000.00
Btg Rp 24,000.00
Btg Rp 27,000.00
Btg Rp 25,000.00
Btg Rp 29,000.00
Btg Rp 37,000.00
Btg Rp 65,000.00
Btg Rp 71,000.00
Btg Rp 75,000.00
Btg Rp 80,000.00
Btg Rp 85,000.00
Btg Rp 116,000.00
Btg Rp 63,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 80
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Btg Rp 69,000.00
Btg Rp 73,000.00
Btg Rp 77,500.00
Btg Rp 82,500.00
Btg Rp 35,000.00
Btg Rp 37,000.00
Btg Rp 34,000.00
Btg Rp 36,000.00
Btg Rp 47,000.00
Btg Rp 52,000.00
Btg Rp 46,000.00
Btg Rp 50,500.00
M2 Rp 790,000.00
Btg Rp 70,000.00
Btg Rp 102,500.00
Btg Rp 170,000.00
Btg Rp 250,000.00
Btg Rp 450,000.00
Btg Rp 615,000.00
Btg Rp 522,000.00
Btg Rp 1,070,000.00
Btg Rp 28,000.00
Btg Rp 48,000.00
Btg Rp 65,000.00
Btg Rp 85,000.00
Btg Rp 145,000.00
Btg Rp 186,000.00
Btg Rp 245,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 81
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Btg Rp 370,000.00
Btg Rp 78,400.00
Btg Rp 192,400.00
M2 Rp 455,000.00
M2 Rp 647,000.00
M2 Rp 730,000.00
M2 Rp 910,000.00
M2 Rp 1,300,000.00
M2 Rp 1,400,000.00
M2 Rp 1,620,000.00
M2 Rp 1,730,000.00
M2 Rp 1,950,000.00
M2 Rp 2,050,000.00
M2 Rp 2,610,000.00
M2 Rp 3,350,000.00
Lembar Rp 3,763,200.00
Lembar Rp 4,984,000.00
Lembar Rp 5,712,000.00
Batang Rp 33,500.00
Batang Rp 44,000.00
Batang Rp 66,000.00
Batang Rp 100,000.00
Batang Rp 180,000.00
Batang Rp 157,000.00
Batang Rp 165,000.00
Batang Rp 270,000.00
Batang Rp 10,584,000.00
Batang Rp 3,718,400.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 82
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 7,369,600.00
Batang Rp 4,216,800.00
Batang Rp 492,800.00
kg Rp 13,800.00
kg Rp 350,000.00
Roll Rp 175,000.00
M' Rp 35,000.00
M Rp 10,000.00
M Rp 25,000.00
M Rp 35,000.00
Dos Rp 130,000.00
M Rp 18,000.00
kg Rp 25,000.00
M'/Roll Rp 65,000.00
Unit Rp 185,000.00
M2 Rp 575,000.00
M2 Rp 250,000.00
Tube Rp 15,000.00
Tube Rp 185,000.00
M Rp 16,000.00
Roll Rp 1,475,000.00
Roll Rp 3,000,000.00
Kg Rp 17,000.00
Kg Rp 55,000.00
Kg Rp 17,000.00
Kg Rp 20,000.00
Kg Rp 18,000.00
Kg Rp 19,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 83
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Kg Rp 22,000.00
Kg Rp 50,000.00
Biji Rp 250,000.00
Dos/ Bgks Rp 175,000.00
Dos/ Bgks Rp 60,000.00
Kg Rp 14,000.00
Dos Rp 15,000.00
Dos Rp 15,000.00
Dos Rp 15,000.00
Kg Rp 35,000.00
Dos Rp 47,500.00
Dos Rp 50,000.00
Kg Rp 25,000.00
Kg Rp 25,000.00
Biji Rp 1,000.00
Bh Rp 25,000.00
M' Rp 400,000.00
M' Rp 450,000.00
M' Rp 500,000.00
M' Rp 574,000.00
Buah Rp 240,000.00
Buah Rp 288,000.00
Buah Rp 336,000.00
M2/ 6 Rp 78,000.00
M Rp 38,000.00
M Rp 52,000.00
M Rp 55,000.00
M Rp 56,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 84
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M Rp 45,000.00
Btg Rp 19,000.00
Btg Rp 30,000.00
Btg Rp 24,000.00
Btg Rp 21,000.00
Btg Rp 65,000.00
Kg Rp 30,000.00
Btg Rp 210,000.00
Btg Rp 125,000.00
Btg Rp 159,500.00
Btg Rp 90,800.00
M' Rp 120,000.00
M2 Rp 1,275,600.00
Unit Rp 275,000.00
Unit Rp 250,000.00
Unit Rp 230,000.00
Lembar Rp 220,000.00
Unit Rp 210,000.00

Liter/botol Rp 5,000.00
Kaleng Rp 63,000.00
Kg Rp 65,000.00
Kaleng Rp 42,000.00
Liter Rp 18,000.00
liter Rp 36,000.00
Kg Rp 53,000.00
Kaleng Rp 118,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 85
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Kaleng Rp 137,000.00
Kaleng Rp 96,000.00
Kg Rp 28,100.00
Kg Rp 47,000.00
Kaleng Rp 100,000.00
Kaleng Rp 185,000.00
Kaleng Rp 200,000.00
Kaleng Rp 300,000.00
Kaleng Rp 70,000.00
Kg Rp 160,000.00
Kaleng Rp 18,000.00
Kaleng Rp 160,000.00
Kaleng Rp 165,000.00
Kaleng Rp 260,000.00
Kaleng Rp 65,000.00
Liter Rp 165,000.00
Kaleng Rp 121,000.00
Kaleng Rp 130,000.00
kg Rp 80,000.00
kg Rp 57,000.00
Kg Rp 132,000.00
Pail Rp 725,000.00
Pail Rp 720,000.00
Kg Rp 30,000.00
Kaleng Rp 45,000.00
Liter Rp 8,000.00
Kg Rp 40,000.00
Kg Rp 40,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 86
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Kg Rp 55,000.00
Liter Rp 32,000.00
Liter Rp 8,500.00
Lembar Rp 5,000.00
Kaleng Rp 95,000.00
Kaleng Rp 70,000.00
Kaleng Rp 65,000.00
Kaleng Rp 65,000.00
Kaleng Rp 72,240.00
Ltr Rp 60,000.00
kg Rp 60,000.00
Ltr Rp 60,000.00
Kg Rp 85,000.00
kg Rp 135,000.00
kg Rp 195,000.00
kg Rp 101,500.00
Buah Rp 8,000.00
Buah Rp 12,000.00
Buah Rp 18,000.00
Kg Rp 50,000.00
kg Rp 75,000.00
kg Rp 57,000.00
kg Rp 145,000.00
ltr Rp 185,000.00
Roll/Bh Rp 12,000.00
kg Rp 27,000.00
kg Rp 160,000.00
Liter Rp 132,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 87
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
kg Rp 67,500.00
Lembar Rp 475,000.00
Lembar Rp 694,000.00
Lembar Rp 710,000.00
Lembar Rp 727,000.00
Lembar Rp 739,000.00
Lembar Rp 963,000.00

M3 Rp 13,000,000.00
M3 Rp 15,000,000.00
M3 Rp 24,200,000.00
M3 Rp 25,000,000.00
M3 Rp 20,000,000.00
M3 Rp 20,000,000.00
M3 Rp 3,750,000.00
M3 Rp 3,500,000.00
M3 Rp 2,000,000.00
M3 Rp 2,000,000.00
M3 Rp 2,500,000.00
M3 Rp 8,500,000.00
M3 Rp 9,500,000.00
Lembar Rp 60,000.00
Lembar Rp 50,000.00
Lembar Rp 80,000.00
Lembar Rp 280,000.00
Lembar Rp 180,000.00
Lembar Rp 120,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 88
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Lembar Rp 50,000.00
Lembar Rp 200,000.00

Biji Rp 25,000.00
Biji Rp 165,000.00
Psg Rp 25,000.00
Psg Rp 77,000.00
Psg Rp 45,000.00
Psg Rp 15,000.00
Psg Rp 10,000.00
Psg Rp 15,000.00
Psg Rp 15,000.00
Psg Rp 77,000.00
Psg Rp 11,000.00
Psg Rp 60,000.00
Psg Rp 12,500.00
Psg Rp 52,000.00
Psg Rp 20,000.00
Psg Rp 58,000.00
Bh Rp 35,000.00
Bh Rp 52,800.00
Bh Rp 25,000.00
Bh Rp 52,000.00
Psg Rp 77,000.00
Psg Rp 77,000.00
Bh Rp 25,000.00
Bh Rp 34,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 89
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Bh Rp 48,000.00
Bh Rp 48,000.00
Bh Rp 35,000.00
Bh Rp 45,100.00
Bh Rp 20,000.00
Bh Rp 66,000.00
Bh Rp 150,000.00
Bh Rp 663,300.00
Bh Rp 250,000.00
Bh Rp 150,000.00
Bh Rp 100,000.00
Bh Rp 292,600.00
Bh Rp 50,000.00
Bh Rp 40,000.00
Bh Rp 68,000.00
Bh Rp 25,000.00
Bh Rp 111,100.00
Bh Rp 15,700.00
Bh Rp 171,600.00
Bh Rp 7,500.00
Bh Rp 92,500.00

M2 Rp 110,000.00
M2 Rp 135,000.00
M2 Rp 250,000.00
M2 Rp 330,000.00
M2 Rp 440,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 90
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M2 Rp 140,000.00
M2 Rp 420,000.00
M2 Rp 110,000.00
M2 Rp 575,000.00
M2 Rp 600,000.00
M2 Rp 54,000.00
M2 Rp 240,000.00
M2 Rp 65,000.00
M2 Rp 155,000.00
M2 Rp 170,000.00
Lembar Rp 185,000.00
Lembar Rp 185,000.00
Lembar Rp 215,000.00
Lembar Rp 270,000.00
Lembar Rp 215,000.00
Lembar Rp 485,000.00
M2 Rp 2,265,000.00
M2 Rp 475,000.00

Unit Rp 1,500,000.00
Unit Rp 2,300,000.00
Unit Rp 2,986,000.00
Unit Rp 2,700,000.00
Bh Rp 350,000.00
Bh Rp 285,000.00
Bh Rp 650,000.00
Bh Rp 660,000.00
Bh Rp 350,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 91
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Unit Rp 500,000.00
Unit Rp 1,400,000.00
Bh Rp 225,000.00
Bh Rp 3,000,000.00
Bh Rp 500,000.00
Bh Rp 750,000.00
Bh Rp 1,200,000.00
Bh Rp 3,350,000.00
Bh Rp 54,000.00
Bh Rp 40,000.00
Bh Rp 40,000.00
Bh Rp 230,000.00
Bh Rp 225,000.00
Bh Rp 110,000.00
Bh Rp 5,000.00
Unit Rp 300,000.00
Bh Rp 110,000.00
Rol Rp 300,000.00
M Rp 160,000.00
Bh Rp 450,000.00
Bh Rp 345,000.00
Unit Rp 21,000,000.00
Unit Rp 26,600,000.00

Lembar Rp 200,000.00
Lembar Rp 50,000.00
Lembar Rp 60,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 92
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Lembar Rp 85,000.00
Lembar Rp 90,000.00
Lembar Rp 135,000.00
Lembar Rp 190,000.00
Lembar Rp 220,000.00
Lembar Rp 265,000.00
Lembar Rp 125,000.00
Lembar Rp 110,000.00
Lembar Rp 150,000.00
Lembar Rp 70,000.00
Lembar Rp 100,000.00
Lembar Rp 165,000.00
Lembar Rp 265,000.00
Lembar Rp 75,000.00
Lembar Rp 68,000.00
Lembar Rp 91,000.00
Lembar Rp 127,000.00
Lembar Rp 175,000.00
Lembar Rp 223,000.00
Lembar Rp 594,000.00
Lembar Rp 26,500.00
Lembar Rp 44,500.00
Lembar Rp 47,000.00
Lembar Rp 66,000.00
Lembar Rp 68,000.00
Lembar Rp 64,000.00
Lembar Rp 67,000.00
Lembar Rp 45,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 93
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Lembar Rp 220,000.00
Batang Rp 20,000.00
Batang Rp 36,600.00
Batang Rp 20,000.00
Btg Rp 57,500.00
Btg Rp 31,800.00
Btg Rp 71,100.00
Batang Rp 20,000.00
M' Rp 10,000.00
M' Rp 12,500.00
M' Rp 17,500.00
M' Rp 20,000.00
M' Rp 25,000.00
Batang Rp 25,200.00
M' Rp 10,000.00
M' Rp 15,000.00
M' Rp 25,000.00

Dos Rp 85,000.00
Dos Rp 92,000.00
Dos Rp 57,200.00
Dos Rp 58,000.00
Dos Rp 59,600.00
Dos Rp 49,700.00
Dos Rp 107,000.00
Dos Rp 107,000.00
Dos Rp 238,000.00
Dos Rp 160,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 94
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Dos Rp 263,900.00
Dos Rp 355,000.00
Dos Rp 175,000.00
Dos Rp 295,000.00
Dos Rp 107,900.00
Dos Rp 88,000.00
Dos Rp 60,000.00
M2 Rp 58,000.00
M2 Rp 65,000.00
Dos Rp 114,000.00
Dos Rp 138,000.00
Dos Rp 200,000.00
Dos Rp 420,000.00
Dos Rp 319,000.00
Dos Rp 345,000.00
M2 Rp 1,212,200.00
M2 Rp 800,000.00
Dos Rp 50,100.00
Dos Rp 68,000.00
Dos Rp 180,000.00
Dos Rp 62,000.00
Dos Rp 60,000.00
Dos Rp 58,000.00
Dos Rp 501,000.00
Dos Rp 60,000.00
Dos Rp 77,000.00
M2 Rp 160,000.00
M2 Rp 193,400.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 95
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M2 Rp 240,600.00
Bj Rp 105,000.00
M2 Rp 175,000.00
Dos Rp 801,500.00
Dos Rp 629,800.00
Dos Rp 629,000.00
Dos Rp 600,000.00
Dos Rp 450,000.00
Dos Rp 343,500.00
Dos Rp 286,300.00
Dos Rp 240,500.00
Dos Rp 171,800.00
M2 Rp 68,000.00
Dos Rp 73,200.00
M2 Rp 68,000.00
M2 Rp 73,200.00
M2 Rp 68,000.00
M2 Rp 45,000.00
M2 Rp 45,000.00
M2 Rp 47,100.00
M2 Rp 52,300.00
M2 Rp 50,200.00
M2 Rp 47,100.00
M2 Rp 43,900.00
M2 Rp 50,200.00

M2 Rp 65,800.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 96
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M2 Rp 68,700.00
M2 Rp 140,000.00
M2 Rp 70,700.00
M2 Rp 150,000.00
M2 Rp 83,900.00
M2 Rp 129,000.00
M2 Rp 87,900.00
M2 Rp 169,100.00
M2 Rp 90,200.00
M2 Rp 180,500.00
M2 Rp 97,800.00
M2 Rp 173,000.00
M2 Rp 128,700.00
M2 Rp 179,500.00
M2 Rp 135,800.00
M2 Rp 197,000.00
Biji Rp 6,200.00
Biji Rp 6,800.00
M2 Rp 87,700.00
M2 Rp 132,800.00
M2 Rp 94,000.00
M2 Rp 158,000.00
M2 Rp 101,600.00
M2 Rp 175,000.00
M2 Rp 95,500.00
M2 Rp 107,000.00
Buah Rp 26,200.00
Buah Rp 16,400.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 97
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 20,800.00
Buah Rp 23,000.00
Buah Rp 16,400.00
Buah Rp 20,800.00
Buah Rp 23,000.00
Buah Rp 16,400.00
Buah Rp 20,800.00
Buah Rp 23,000.00
Bj Rp 30,700.00
M' Rp 87,400.00
M' Rp 76,500.00
M' Rp 93,600.00
Buah Rp 56,600.00
Buah Rp 28,700.00
Buah Rp 22,000.00
Buah Rp 36,400.00
Buah Rp 36,400.00
Buah Rp 31,000.00
Buah Rp 40,100.00
Buah Rp 45,000.00
Buah Rp 57,300.00
Buah Rp 97,000.00
Buah Rp 192,000.00
Buah Rp 330,000.00
Buah Rp 445,000.00
Buah Rp 575,000.00
Buah Rp 945,000.00
Buah Rp 1,737,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 98
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 2,471,000.00
M' Rp 114,500.00
M' Rp 13,500.00
M' Rp 15,000.00
Kg Rp 5,000.00
Kg Rp 14,900.00
Kg Rp 14,900.00
Kg Rp 14,900.00
kg Rp 1,250,000.00
Kg Rp 14,900.00
M3 Rp 610,000.00
Ltr Rp 5,150.00
Ltr Rp 8,500.00
Ltr Rp 40,000.00
Ltr Rp 6,450.00
Ltr Rp 24,000.00
M3 Rp 720,000.00
M3 Rp 235,000.00
Ltr Rp 13,000.00
M3 Rp 1,060,000.00
M2 Rp 1,005,000.00
M3 Rp 955,000.00
M3 Rp 915,000.00
M3 Rp 870,000.00
M3 Rp 800,000.00
M3 Rp 790,000.00
M3 Rp 760,000.00
M3 Rp 715,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 99
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M3 Rp 640,000.00
Buah Rp 1,052,500.00
Buah Rp 1,316,800.00
Buah Rp 1,229,000.00
Buah Rp 1,360,000.00
Buah Rp 1,762,000.00
Buah Rp 1,400,000.00
Buah Rp 3,717,000.00
Buah Rp 10,096,000.00
Buah Rp 9,927,500.00
M' Rp 137,600.00
M' Rp 203,300.00
M' Rp 234,200.00
M' Rp 175,700.00
M' Rp 202,400.00
M' Rp 269,900.00
M' Rp 360,700.00
M' Rp 480,900.00
M3 Rp 59,000.00
M3 Rp 125,000.00
M2 Rp 1,800.00
Bungkus Rp 100,000.00
Ikat Rp 20,000.00
Drum Rp 11,000,000.00
1 Ton Rp 7,500,000.00
Buah Rp 30,000,000.00
Buah Rp 45,000,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 100
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 583,200.00
Buah Rp 641,100.00
Buah Rp 985,000.00
Buah Rp 1,075,000.00
Buah Rp 1,164,000.00
Buah Rp 891,800.00
Buah Rp 953,500.00
Buah Rp 1,514,000.00
Buah Rp 1,737,000.00
Buah Rp 1,548,000.00
Buah Rp 2,471,000.00

Buah Rp 216,700.00
Buah Rp 261,100.00
Buah Rp 332,600.00
Buah Rp 1,254,500.00

Buah Rp 450,000.00
Buah Rp 463,500.00
M2 Rp 65,900.00
M2 Rp 81,600.00
M2 Rp 144,200.00
M2 Rp 28,300.00
M2 Rp 38,500.00
M2 Rp 15,000.00

Bh Rp 65,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 101
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Bh Rp 520,000.00
Bh Rp 30,000.00
Bh Rp 70,000.00
Bh Rp 25,000.00
Bh Rp 15,000.00
Bh Rp 125,000.00
Bh Rp 15,000.00
Bh Rp 5,000.00
Bh Rp 175,000.00
M3 Rp 54,500.00
Bh Rp 60,000.00
Unit Rp 85,000.00
Unit Rp 7,500.00
Bh Rp 83,000.00
Bh Rp 55,000.00

Batang Rp 25,000.00
Batang Rp 32,500.00
Batang Rp 42,500.00
Batang Rp 57,500.00
Batang Rp 48,000.00
Batang Rp 74,000.00
Batang Rp 90,000.00
Batang Rp 110,000.00

Batang Rp 25,000.00
Batang Rp 45,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 102
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 67,500.00
Batang Rp 101,000.00
Batang Rp 250,000.00
Batang Rp 245,000.00
Batang Rp 502,500.00
Batang Rp 410,000.00
Batang Rp 605,000.00

Batang Rp 350,000.00
Batang Rp 372,000.00
Batang Rp 285,000.00
Batang Rp 307,500.00

Batang Rp 525,000.00
Batang Rp 520,000.00
Batang Rp 455,500.00
Batang Rp 425,000.00

Batang Rp 310,000.00
Batang Rp 756,200.00
Batang Rp 685,000.00
Batang Rp 612,500.00

Batang Rp 20,000.00
Batang Rp 25,000.00
Batang Rp 20,500.00

Batang Rp 30,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 103
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 37,000.00
Batang Rp 35,000.00

Batang Rp 55,000.00
Batang Rp 65,000.00
Batang Rp 35,500.00

Batang Rp 87,000.00
Batang Rp 70,000.00
Batang Rp 63,500.00

Batang Rp 135,000.00
Batang Rp 155,000.00
Batang Rp 127,500.00
Batang Rp 110,000.00

Batang Rp 220,000.00
Batang Rp 227,000.00
Batang Rp 245,000.00
Batang Rp 185,000.00
Batang Rp 205,000.00
Batang Rp 165,000.00

Batang Rp 307,500.00
Batang Rp 345,000.00
Batang Rp 325,000.00
Batang Rp 345,000.00
Batang Rp 263,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 104
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 290,000.00
Batang Rp 225,000.00
Batang Rp 245,500.00

Batang Rp 435,000.00
Batang Rp 463,000.00
Batang Rp 300,000.00
Batang Rp 330,000.00
Batang Rp 240,000.00
Batang Rp 260,000.00
Batang Rp 318,500.00
Batang Rp 350,500.00

Batang Rp 658,000.00
Batang Rp 688,000.00
Batang Rp 475,000.00
Batang Rp 510,000.00
Batang Rp 360,000.00
Batang Rp 385,000.00
Batang Rp 480,000.00
Batang Rp 510,000.00

M' Rp 10,000.00
M' Rp 8,000.00
M' Rp 7,500.00
M' Rp 5,000.00

M' Rp 15,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 105
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M' Rp 8,500.00
M' Rp 7,500.00
M' Rp 6,000.00

M' Rp 15,000.00
M' Rp 10,000.00
M' Rp 7,500.00
M' Rp 12,500.00

M' Rp 20,500.00
M' Rp 18,000.00
M' Rp 15,000.00
M' Rp 9,500.00
M' Rp 10,000.00

M' Rp 40,500.00
M' Rp 30,000.00
M' Rp 15,500.00
M' Rp 13,500.00
M' Rp 20,000.00

M' Rp 52,500.00
M' Rp 37,500.00
M' Rp 20,000.00
M' Rp 18,500.00
M' Rp 30,000.00
M' Rp 22,500.00
M' Rp 25,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 106
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4

M' Rp 65,000.00
M' Rp 60,000.00
M' Rp 22,500.00
M' Rp 40,500.00
M' Rp 227,500.00
M' Rp 35,000.00
M' Rp 23,500.00
M' Rp 42,500.00

M' Rp 85,000.00
M' Rp 87,500.00
M' Rp 65,000.00
M' Rp 50,500.00
M' Rp 80,000.00
M' Rp 47,500.00
M' Rp 50,000.00
M' Rp 35,500.00
M' Rp 60,000.00
M' Rp 40,000.00
M' Rp 55,500.00
M' Rp 42,500.00

M' Rp 110,500.00
M' Rp 120,000.00
M' Rp 955,000.00
M' Rp 42,500.00
M' Rp 115,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 107
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M' Rp 235,000.00
M' Rp 67,500.00
M' Rp 82,500.00
M' Rp 55,000.00
M' Rp 67,500.00
M' Rp 80,000.00

M' Rp 182,000.00
M' Rp 170,000.00
M' Rp 87,500.00
M' Rp 58,000.00
M' Rp 150,500.00
M' Rp 65,000.00
M' Rp 115,500.00
M' Rp 50,000.00
M' Rp 117,500.00
M' Rp 340,000.00
M' Rp 98,000.00
M' Rp 110,500.00

M' Rp 150,000.00
M' Rp 148,500.00

M' Rp 150,000.00
M' Rp 200,500.00
M' Rp 147,500.00

M' Rp 300,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 108
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M' Rp 305,500.00
M' Rp 245,000.00
M' Rp 217,500.00

M' Rp 468,500.00
M' Rp 488,500.00
M' Rp 388,000.00
M' Rp 320,000.00

M' Rp 750,000.00
M' Rp 770,000.00
M' Rp 612,500.00

M' Rp 998,400.00
M' Rp 598,400.00

M' Rp 1,269,500.00
M' Rp 789,500.00

M' Rp 1,590,000.00
6M' Rp 990,000.00

M' Rp 2,100,500.00
M' Rp 1,300,500.00

M' Rp 1,975,000.00
M' Rp 1,970,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 109
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
M' Rp 2,880,500.00

Batang Rp 24,500.00
Batang Rp 34,500.00
Batang Rp 45,000.00
Batang Rp 65,200.00
Batang Rp 112,000.00

Batang Rp 178,000.00
Batang Rp 358,000.00
Batang Rp 560,000.00
Batang Rp 1,150,000.00

Batang Rp 143,500.00
Batang Rp 298,500.00
Batang Rp 440,000.00
Batang Rp 940,000.00

Batang Rp 98,000.00

Batang Rp 176,500.00
Batang Rp 376,500.00
Batang Rp 566,500.00
Batang Rp 1,176,500.00
Batang Rp 1,816,500.00
Batang Rp 2,818,000.00
Batang Rp 4,488,000.00
Batang Rp 7,388,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 110
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 11,518,000.00
Batang Rp 19,050,000.00

Batang Rp 148,000.00
Batang Rp 318,000.00
Batang Rp 448,000.00
Batang Rp 968,000.00
Batang Rp 1,478,000.00
Batang Rp 2,318,000.00
Batang Rp 3,688,000.00
Batang Rp 5,911,000.00
Batang Rp 9,258,000.00
Batang Rp 15,462,000.00

Batang Rp 175,000.00
Batang Rp 220,000.00
Batang Rp 340,000.00
Batang Rp 430,000.00
Batang Rp 500,000.00
Batang Rp 675,000.00
Batang Rp 875,000.00
Batang Rp 1,150,000.00
Batang Rp 1,800,000.00
Batang Rp 1,655,000.00
Batang Rp 1,852,000.00
Batang Rp 2,855,000.00
Batang Rp 5,555,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 111
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 7,115,000.00
Batang Rp 11,125,000.00

Batang Rp 130,000.00
Batang Rp 170,000.00
Batang Rp 220,000.00
Batang Rp 280,000.00
Batang Rp 325,000.00
Batang Rp 400,000.00
Batang Rp 510,000.00
Batang Rp 650,000.00
Batang Rp 850,000.00

Batang Rp 85,000.00
Batang Rp 110,000.00
Batang Rp 175,000.00
Batang Rp 200,000.00
Batang Rp 220,000.00
Batang Rp 250,000.00
Batang Rp 325,000.00
Batang Rp 425,000.00
Batang Rp 550,000.00

Batang Rp 28,000.00
Batang Rp 45,000.00
Batang Rp 63,000.00
Batang Rp 92,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 112
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 25,000.00
Batang Rp 32,500.00
Batang Rp 35,000.00
Batang Rp 40,000.00
Batang Rp 53,000.00
Batang Rp 70,000.00
Batang Rp 110,000.00
Batang Rp 180,000.00
Batang Rp 230,000.00
Batang Rp 425,000.00
Batang Rp 700,000.00

Batang Rp 15,000.00
Batang Rp 17,500.00
Batang Rp 30,500.00
Batang Rp 37,000.00
Batang Rp 45,000.00
M' Rp 62,500.00
M' Rp 80,000.00
Batang Rp 125,000.00
Batang Rp 135,000.00
Batang Rp 125,000.00
Batang Rp 230,000.00
M' Rp 340,000.00
Batang Rp 167,000.00
Batang Rp 415,000.00
Batang Rp 205,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 113
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 320,000.00
Batang Rp 135,000.00
Batang Rp 170,000.00
Batang Rp 37,500.00
Batang Rp 42,500.00

Batang Rp 195,000.00
Batang Rp 275,000.00
Batang Rp 348,500.00

Bh Rp 37,500.00
Bh Rp 4,800.00
Bh Rp 75,000.00
Bh Rp 48,500.00
Bh Rp 52,500.00
Bh Rp 110,000.00
Bh Rp 28,500.00
Bh Rp 47,500.00
Bh Rp 48,500.00

Pcs Rp 230,000.00
Pcs Rp 295,000.00
Pcs Rp 372,000.00
Pcs Rp 493,000.00
Pcs Rp 532,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 114
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Pcs Rp 737,000.00
Pcs Rp 810,000.00
Pcs Rp 1,210,000.00

Batang Rp 13,500.00
Batang Rp 10,000.00
Bh Rp 12,000.00
Bh Rp 3,000.00
Bh Rp 25,000.00
Bh Rp 15,500.00
Bh Rp 17,500.00
Bh Rp 15,000.00
M' Rp 27,500.00
Bh Rp 25,000.00
Bh Rp 15,000.00
Bh Rp 27,500.00
Kg Rp 45,000.00
Tube Rp 17,500.00
Kg Rp 72,500.00
Tube Rp 35,000.00
Tube Rp 25,000.00
Meter Rp 115,000.00
Buah Rp 7,500.00
Buah Rp 15,000.00
Buah Rp 135,000.00
Buah Rp 40,500.00
Buah Rp 3,500.00
Buah Rp 7,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 115
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 15,000.00
Buah Rp 27,500.00
Buah Rp 20,000.00
Buah Rp 75,500.00

Buah Rp 10,500.00
Buah Rp 10,000.00
Buah Rp 15,500.00

Batang Rp 176,500.00
Batang Rp 196,500.00
Batang Rp 326,500.00
Batang Rp 56,500.00
Batang Rp 1,216,500.00
Batang Rp 1,586,500.00

Batang Rp 145,000.00
Batang Rp 185,000.00
Batang Rp 300,000.00
Batang Rp 625,500.00

Buah Rp 47,500.00
Buah Rp 65,000.00
Buah Rp 97,500.00

Buah Rp 210,000.00
Buah Rp 68,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 116
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 115,000.00

Buah Rp 9,500.00
Buah Rp 17,000.00

Buah Rp 15,000.00
Buah Rp 15,500.00

Buah Rp 10,000.00
Buah Rp 25,000.00

Buah Rp 27,500.00
Buah Rp 47,000.00
Batang Rp 8,000.00
Batang Rp 218,000.00
Batang Rp 280,000.00
Batang Rp 278,000.00
Batang Rp 348,000.00
Batang Rp 347,000.00
Batang Rp 443,000.00
Batang Rp 640,000.00
Batang Rp 815,000.00
Batang Rp 1,351,800.00
Batang Rp 1,718,000.00
Batang Rp 1,828,000.00
Batang Rp 2,230,000.00
Batang Rp 65,000.00
Batang Rp 157,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 117
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Batang Rp 289,000.00

Buah Rp 525,000
Buah Rp 900,000
Buah Rp 560,000
Buah Rp 615,000
Buah Rp 565,000
Buah Rp 1,215,000
Buah Rp 2,615,000
Buah Rp 520,000
Buah Rp 2,675,000
Buah Rp 5,175,000
Buah Rp 10,200,000
Buah Rp 640,000
Buah Rp 960,000
Buah Rp 3,500,000
Unit Rp 26,059,200.00
Unit Rp 19,332,500.00
Unit Rp 18,705,500.00

Bh Rp 75,000
Bh Rp 145,000
Bh Rp 225,000
Bh Rp 250,000
Bh Rp 60,000
Bh Rp 50,000

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 118
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Bh Rp 15,000
Bh Rp 150,000
Bh Rp 155,000
Bh Rp 175,000
Set Rp 850,000
Bh Rp 195,000
Bh Rp 185,000
Bh Rp 90,000
Bh Rp 700,000
Bh Rp 475,000
Bh Rp 75,000
Bh Rp 75,000
Bh Rp 22,000
Bh Rp 745,000
Bh Rp 975,000
Bh Rp 1,300,000
Bh Rp 10,000
Bh Rp 5,000
Bh Rp 7,000
Bh Rp 30,000
Bh Rp 100,000
Bh Rp 55,000
Bh Rp 85,000
Bh Rp 65,000
Roll Rp 75,000
Roll Rp 8,500
Meter Rp 2,500
Meter Rp 5,000

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 119
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Meter Rp 4,000
Meter Rp 65,000
Meter Rp 40,000
Meter Rp 12,500
Meter Rp 11,000
Meter Rp 6,500
Meter Rp 6,500
Meter Rp 9,000
Meter Rp 9,400
Meter Rp 75,000
Meter Rp 93,750
Meter Rp 125,000
Meter Rp 4,700
Meter Rp 7,000
Bh Rp 28,200
Bh Rp 55,000
Bh Rp 55,000
Bh Rp 57,500
Bh Rp 57,500
Bh Rp 70,000
Bh Rp 30,000
Bh Rp 60,000
Bh Rp 67,900
Bh Rp 26,500
Bh Rp 11,000
Bh Rp 700,000
Bh Rp 5,000
Kg Rp 26,100

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 120
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Bh Rp 35,000
Bh Rp 45,000
Bh Rp 185,000
Bh Rp 135,000
Bh Rp 180,000
Bh Rp 300,000
Bh Rp 158,000
Bh Rp 47,000
Bh Rp 57,000
Bh Rp 68,000
Meter Rp 18,000
Bh Rp 70,000
Bh Rp 55,000
Bh Rp 60,000
Bh Rp 45,000
Bh Rp 60,000
Bh Rp 60,000
Bh Rp 60,000
Bh Rp 170,000
Bh Rp 500
Bh Rp 800,000
Bh Rp 800,000
Bh Rp 800,000
Batang Rp 360,400
Bh Rp 209,000
Bh Rp 26,100
Bh Rp 16,700
Bh Rp 12,500

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 121
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Bh Rp 26,500
Bh Rp 15,700
Bh Rp 2,000
Bh Rp 2,500
Bh Rp 3,500
Bh Rp 6,000
Bh Rp 3,000
Bh Rp 5,000
Bh Rp 13,500
Bh Rp 33,400
Papan Rp 150,000
Bh Rp 3,750,000
Bh Rp 4,900,000
Bh Rp 2,000,000
Bh Rp 2,200,000
Bh Rp 85,000
Bh Rp 425,000
Bh Rp 260,000
Bh Rp 300,000
Bh Rp 455,000
Bh Rp 265,000
Bh Rp 250,000
Bh Rp 41,800
Pcs Rp 12,000
Pcs Rp 41,000
Ton Rp 16,400
Kg Rp 31,400
Kg Rp 16,700

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 122
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 26,100
Buah Rp 118,400
Buah Rp 118,400
M Rp 9,000
M Rp 5,000
M Rp 20,000
M Rp 15,000
Buah Rp 7,500
Buah Rp 15,000
Buah Rp 15,000

Buah Rp 223,600.00
Buah Rp 9,248,300.00
Buah Rp 70,000.00
Psng Rp 30,000.00
Psng Rp 400,000.00
Buah Rp 115,000.00
Buah Rp 55,000.00
Buah Rp 261,300.00
Buah Rp 4,290,000.00
Buah Rp 950,000.00
Buah Rp 460,000.00
Psng Rp 543,400.00
Buah Rp 65,000.00
Buah Rp 15,000.00
Buah Rp 95,000.00
Psng Rp 480,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 123
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Psng Rp 500,000.00
Buah Rp 85,000.00
Buah Rp 15,000.00
Buah Rp 1,150,000.00
Buah Rp 1,100,000.00
Buah Rp 700,000.00
Buah Rp 1,550,000.00
Buah Rp 78,400.00
Buah Rp 135,900.00
Buah Rp 6,275,000.00
Set Rp 5,530,000.00
Buah Rp 30,000.00

O/H Rp 200,000.00
O/H Rp 173,000.00
O/H Rp 173,000.00
O/H Rp 160,000.00
O/H Rp 160,000.00
O/H Rp 160,000.00
O/H Rp 133,000.00
O/H Rp 171,000.00
O/H Rp 133,000.00
O/H Rp 186,000.00
O/H Rp 160,000.00
O/H Rp 203,000.00
O/H Rp 128,700.00
O/H Rp 173,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 124
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
/M' Rp 133,000.00
/M2 Rp 173,000.00

Buah Rp 900,000.00
Buah Rp 843,750.00
Buah Rp 1,293,750.00
Buah Rp 1,743,750.00
Buah Rp 2,137,500.00

Buah Rp 1,575,000.00
Buah Rp 489,375.00
Buah Rp 611,415.00
Buah Rp 640,665.00
Buah Rp 1,060,290.00
Buah Rp 3,318,750.00
Buah Rp 787,500.00
Buah Rp 849,375.00
Buah Rp 1,996,875.00
Buah Rp 1,710,000.00
Buah Rp 1,575,000.00

Liter Rp 28,935.00
Liter Rp 28,935.00
Liter Rp 33,165.00
Liter Rp 33,885.00
Liter Rp 28,215.00
Liter Rp 29,565.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 125
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4

Buah Rp 45,000.00
Set Rp 1,350,000.00
Buah Rp 399,150.00
Buah Rp 1,350,000.00
Buah Rp 1,350,000.00
Buah Rp 1,350,000.00
Buah Rp 337,500.00
Buah Rp 140,400.00
Buah Rp 146,250.00
Buah Rp 157,500.00
Buah Rp 67,500.00
Buah Rp 101,250.00
Buah Rp 67,500.00
Buah Rp 101,250.00
Buah Rp 90,000.00
Buah Rp 90,000.00
Buah Rp 405,000.00
Buah Rp 123,750.00
Buah Rp 67,500.00
Buah Rp 168,750.00
Buah Rp 112,500.00
Buah Rp 56,250.00
Buah Rp 112,500.00
Buah Rp 281,250.00
Buah Rp 281,250.00
Buah Rp 112,500.00
Buah Rp 27,900.00
Buah Rp 78,750.00
Buah Rp 39,150.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 126
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 78,750.00
Buah Rp 168,750.00
Buah Rp 39,150.00
Buah Rp 168,750.00
Buah Rp 39,150.00
Buah Rp 151,650.00
Buah Rp 281,250.00
Buah Rp 112,500.00
Buah Rp 101,250.00
Buah Rp 168,750.00
Buah Rp 534,150.00
Buah Rp 2,081,250.00
Buah Rp 1,001,250.00
Buah Rp 2,362,500.00
Buah Rp 596,250.00
Buah Rp 5,343,750.00
Buah Rp 5,287,500.00
Buah Rp 281,250.00
Buah Rp 225,000.00
Buah Rp 506,250.00
Buah Rp 196,650.00
Buah Rp 1,687,500.00
Buah Rp 225,000.00
Buah Rp 562,500.00
Buah Rp 252,900.00
Buah Rp 337,500.00
Buah Rp 1,012,500.00
Buah Rp 843,750.00
Buah Rp 1,631,250.00
Buah Rp 1,237,500.00
Buah Rp 888,750.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 127
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 1,462,500.00
Buah Rp 843,750.00
Buah Rp 3,093,750.00
Buah Rp 3,262,500.00
Buah Rp 50,400.00
Buah Rp 50,400.00
Buah Rp 45,000.00
Buah Rp 39,150.00
Buah Rp 45,000.00
Buah Rp 45,000.00
Buah Rp 90,000.00
Buah Rp 45,000.00
Buah Rp 50,400.00
Set Rp 3,825,000.00
Set Rp 1,237,500.00
Set Rp 2,250,000.00
Set Rp 1,260,000.00
Set Rp 2,250,000.00
Set Rp 956,250.00
Buah Rp 168,750.00
Buah Rp 112,500.00
Set Rp 393,750.00
Set Rp 225,000.00
Set Rp 495,000.00
Set Rp 135,000.00
Set Rp 2,531,250.00
Set Rp 1,125,000.00
Set Rp 1,687,500.00
Buah Rp 927,900.00
Buah Rp 506,250.00
Buah Rp 56,250.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 128
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 67,500.00
Buah Rp 168,750.00
Buah Rp 112,500.00
Buah Rp 56,250.00
Buah Rp 56,250.00
Buah Rp 11,250,000.00
Buah Rp 7,380,000.00
Buah Rp 33,750.00
Buah Rp 33,750.00
Buah Rp 225,000.00
Buah Rp 168,750.00
Buah Rp 337,500.00
Buah Rp 337,500.00
Buah Rp 2,418,750.00
Buah Rp 1,687,500.00
Buah Rp 2,587,500.00
Buah Rp 2,587,500.00
Buah Rp 2,587,500.00
Buah Rp 56,250.00
Buah Rp 1,293,750.00
Buah Rp 56,250.00
Buah Rp 168,750.00
Buah Rp 56,250.00
Buah Rp 135,000.00
Set Rp 731,250.00
Set Rp 562,500.00
Buah Rp 225,000.00
Buah Rp 168,750.00
Buah Rp 225,000.00
Buah Rp 168,750.00
Buah Rp 168,750.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 129
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 168,750.00
Buah Rp 450,000.00
Buah Rp 675,000.00
Buah Rp 67,500.00
Buah Rp 67,500.00
Buah Rp 67,500.00
Buah Rp 67,500.00
Buah Rp 45,000.00
Buah Rp 135,000.00
Buah Rp 207,900.00
Buah Rp 67,500.00
Buah Rp 101,250.00
Buah Rp 67,500.00
Buah Rp 101,250.00
Buah Rp 112,500.00
Buah Rp 652,500.00
Buah Rp 84,150.00
Buah Rp 84,150.00
Galon Rp 135,000.00

Set Rp 900,000.00
Set Rp 843,750.00
Set Rp 956,250.00
Set Rp 956,250.00
Set Rp 900,000.00
Set Rp 900,000.00
Buah Rp 2,812,500.00
Buah Rp 2,812,500.00
Buah Rp 1,927,170.00
Buah Rp 2,083,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 130
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 369,450.00
Buah Rp 397,890.00
Buah Rp 1,046,250.00
Buah Rp 1,687,500.00
Buah Rp 1,046,250.00
Buah Rp 2,475,000.00
Buah Rp 315,000.00
Buah Rp 595,260.00
Buah Rp 94,320.00
Buah Rp 281,250.00
Buah Rp 281,250.00
Buah Rp 393,750.00
Buah Rp 393,750.00
Buah Rp 225,000.00
Buah Rp 225,000.00
Buah Rp 225,000.00
Buah Rp 225,000.00
Buah Rp 225,000.00
Buah Rp 112,500.00
Buah Rp 112,500.00
Buah Rp 22,500.00
Buah Rp 22,500.00
Buah Rp 22,500.00
Buah Rp 22,500.00
Buah Rp 112,500.00
Buah Rp 112,500.00
Buah Rp 393,750.00
Buah Rp 393,750.00
Buah Rp 393,750.00
Buah Rp 393,750.00
Buah Rp 140,625.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 131
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 168,750.00
Buah Rp 821,250.00
Buah Rp 393,750.00
Buah Rp 596,250.00
Buah Rp 1,434,375.00
Buah Rp 630,000.00
Set Rp 112,500.00
Set Rp 90,000.00
Set Rp 168,750.00
Set Rp 168,750.00
Set Rp 112,500.00
Set Rp 225,000.00
Buah Rp 225,000.00
Buah Rp 225,000.00
Buah Rp 225,000.00
Buah Rp 225,000.00
Buah Rp 225,000.00
Pcs Rp 393,750.00
Pcs Rp 393,750.00
Buah Rp 281,250.00
Buah Rp 331,875.00
Buah Rp 331,875.00
Buah Rp 596,250.00
Buah Rp 112,500.00
Buah Rp 168,750.00
Buah Rp 225,000.00
Buah Rp 168,750.00
Buah Rp 202,500.00
Buah Rp 1,462,500.00
Set Rp 2,250,000.00
Set Rp 2,137,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 132
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Set Rp 3,093,750.00
Set Rp 3,262,500.00
Set Rp 2,812,500.00
Set Rp 1,350,000.00
Set Rp 1,350,000.00
Set Rp 1,125,000.00
Set Rp 1,350,000.00
Set Rp 1,125,000.00
Set Rp 1,687,500.00
Set Rp 1,012,500.00
Set Rp 1,237,500.00
Set Rp 900,000.00
Buah Rp 1,406,250.00
Buah Rp 1,068,750.00
Buah Rp 562,500.00
Buah Rp 562,500.00
Buah Rp 562,500.00
Buah Rp 562,500.00
Buah Rp 843,750.00
Buah Rp 281,250.00
Buah Rp 225,000.00
Buah Rp 787,500.00
Buah Rp 225,000.00
Buah Rp 225,000.00
Buah Rp 215,010.00
Buah Rp 234,270.00
Buah Rp 159,930.00
Buah Rp 184,680.00
Buah Rp 186,660.00
Buah Rp 401,850.00
Buah Rp 463,860.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 133
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 642,600.00
Buah Rp 331,875.00
Buah Rp 112,500.00
Buah Rp 112,500.00
Buah Rp 67,500.00
Buah Rp 331,875.00
Buah Rp 90,000.00
Buah Rp 463,500.00
Buah Rp 112,500.00
Buah Rp 281,250.00
Buah Rp 450,000.00
Buah Rp 450,000.00
Buah Rp 506,250.00
Buah Rp 1,575,000.00
Buah Rp 1,800,000.00
Buah Rp 517,500.00
Buah Rp 56,250.00
Buah Rp 112,500.00
Buah Rp 112,500.00
Buah Rp 112,500.00
Buah Rp 112,500.00
Buah Rp 112,500.00

Buah Rp 101,250.00
Buah Rp 101,250.00
Buah Rp 337,500.00
Buah Rp 140,400.00
Buah Rp 286,650.00
Buah Rp 286,650.00
Buah Rp 112,500.00
Buah Rp 112,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 134
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 281,250.00
Buah Rp 281,250.00
Buah Rp 84,150.00
Buah Rp 450,000.00
Buah Rp 393,750.00
Set Rp 2,250,000.00
Set Rp 2,812,500.00
Set Rp 477,900.00
Set Rp 281,250.00
Set Rp 477,900.00
Set Rp 225,000.00
Set Rp 225,000.00
Buah Rp 450,000.00
Buah Rp 450,000.00
Buah Rp 506,250.00
Buah Rp 393,750.00
Buah Rp 337,500.00
Buah Rp 337,500.00
Buah Rp 337,500.00
Buah Rp 337,500.00
Buah Rp 11,250.00
Buah Rp 11,250.00
Buah Rp 11,250.00
Buah Rp 11,250.00
Buah Rp 5,400.00
Buah Rp 5,400.00
Buah Rp 5,400.00
Buah Rp 5,400.00
Buah Rp 5,400.00
Buah Rp 5,400.00
Buah Rp 5,062,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 135
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 4,950,000.00
Buah Rp 6,187,500.00
Set Rp 393,750.00
Set Rp 281,250.00
Set Rp 168,750.00
Set Rp 168,750.00
Buah Rp 78,750.00
Buah Rp 112,500.00
Buah Rp 56,250.00
Buah Rp 56,250.00
Set Rp 27,900.00
Set Rp 22,500.00
Set Rp 27,900.00
Set Rp 27,900.00
Set Rp 27,900.00
Set Rp 27,900.00
Set Rp 22,500.00
Set Rp 22,500.00
Buah Rp 45,000.00
Buah Rp 45,000.00
Buah Rp 5,400.00
Buah Rp 5,400.00
Buah Rp 33,750.00
Buah Rp 5,400.00
Set Rp 978,750.00
Set Rp 225,000.00
Set Rp 252,900.00
Set Rp 252,900.00
Set Rp 252,900.00
Set Rp 252,900.00
Set Rp 252,900.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 136
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Set Rp 168,750.00
Set Rp 151,650.00
Set Rp 3,937,500.00
Set Rp 3,375,000.00
Buah Rp 11,250.00
Buah Rp 11,250.00
Set Rp 675,000.00
Set Rp 562,500.00
Set Rp 1,350,000.00
Set Rp 1,350,000.00
Buah Rp 112,500.00
Buah Rp 168,750.00
Buah Rp 112,500.00
Buah Rp 168,750.00
Buah Rp 112,500.00
Buah Rp 56,250.00
Buah Rp 78,750.00
Buah Rp 112,500.00
Buah Rp 112,500.00
Buah Rp 16,650.00
Buah Rp 168,750.00
Buah Rp 168,750.00
Buah Rp 33,750.00
Buah Rp 33,750.00
Buah Rp 56,250.00
Buah Rp 112,500.00
Buah Rp 168,750.00
Buah Rp 135,000.00
Buah Rp 56,250.00
Buah Rp 168,750.00
Buah Rp 39,150.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 137
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 56,250.00
Buah Rp 33,750.00
Buah Rp 56,250.00
Buah Rp 225,000.00
Buah Rp 112,500.00
Buah Rp 337,500.00
Buah Rp 337,500.00
Buah Rp 22,500.00
Buah Rp 22,500.00
Buah Rp 39,150.00
Buah Rp 39,150.00
Buah Rp 84,150.00
Buah Rp 84,150.00
Buah Rp 84,150.00
Buah Rp 84,150.00
Buah Rp 225,000.00
Buah Rp 225,000.00
Buah Rp 225,000.00
Buah Rp 168,750.00
Buah Rp 112,500.00
Buah Rp 168,750.00
Set Rp 45,000.00
Set Rp 45,000.00
Set Rp 45,000.00
Set Rp 45,000.00
Set Rp 45,000.00
Buah Rp 56,250.00
Buah Rp 67,500.00
Buah Rp 56,250.00
Set Rp 33,750.00
Set Rp 33,750.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 138
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Set Rp 33,750.00
Set Rp 33,750.00

Buah Rp 731,250.00
Buah Rp 393,750.00
Buah Rp 140,580.00
Buah Rp 112,500.00
Buah Rp 39,330.00
Buah Rp 39,330.00
Set Rp 731,250.00
Set Rp 787,500.00
Set Rp 900,000.00
Set Rp 900,000.00
Set Rp 112,500.00
Set Rp 112,500.00
Buah Rp 56,250.00
Buah Rp 56,250.00
Set Rp 393,750.00
Set Rp 393,750.00
Set Rp 168,750.00
Set Rp 506,250.00
Set Rp 196,830.00
Set Rp 393,750.00
Set Rp 506,250.00
Set Rp 450,000.00
Set Rp 450,000.00
Set Rp 618,750.00
Set Rp 168,750.00
Set Rp 618,750.00
Set Rp 168,750.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 139
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Set Rp 675,000.00
Set Rp 675,000.00
Buah Rp 67,500.00
Buah Rp 67,500.00
Buah Rp 90,000.00
Buah Rp 112,500.00
Buah Rp 84,330.00
Buah Rp 90,000.00
Buah Rp 90,000.00
Buah Rp 112,500.00
Buah Rp 112,500.00
Buah Rp 112,500.00
Buah Rp 101,250.00
Buah Rp 112,500.00
Buah Rp 1,687,500.00
Buah Rp 1,350,000.00
Buah Rp 84,330.00
Buah Rp 84,330.00
Buah Rp 84,330.00
Buah Rp 84,330.00
Set Rp 84,330.00
Set Rp 84,330.00
Set Rp 95,580.00
Set Rp 562,500.00
Set Rp 562,500.00
Set Rp 450,000.00
Buah Rp 56,250.00
Buah Rp 56,250.00
Buah Rp 56,250.00
Buah Rp 56,250.00
Buah Rp 90,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 140
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 90,000.00
Buah Rp 90,000.00
Buah Rp 135,000.00
Buah Rp 90,000.00
Buah Rp 90,000.00
Buah Rp 135,000.00
Buah Rp 135,000.00
Set Rp 101,250.00
Buah Rp 135,000.00
Buah Rp 112,500.00
Set Rp 101,250.00
Buah Rp 337,500.00
Buah Rp 337,500.00
Buah Rp 1,631,250.00
Buah Rp 731,250.00
Buah Rp 337,500.00
Buah Rp 393,750.00
Buah Rp 78,750.00
Buah Rp 78,750.00
Buah Rp 112,500.00
Buah Rp 78,750.00
Buah Rp 78,750.00
Buah Rp 112,500.00
Buah Rp 56,250.00
Buah Rp 56,250.00
Buah Rp 168,750.00
Buah Rp 196,830.00
Buah Rp 9,000.00
Buah Rp 9,000.00
Buah Rp 13,500.00
Buah Rp 13,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 141
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 13,500.00
Buah Rp 16,830.00
Buah Rp 13,500.00
Buah Rp 11,250.00
Buah Rp 13,500.00
Buah Rp 11,250.00
Buah Rp 11,250.00
Buah Rp 13,500.00
Buah Rp 16,830.00
Buah Rp 13,500.00
Set Rp 731,250.00
Set Rp 731,250.00
Buah Rp 1,575,000.00
Buah Rp 1,518,750.00
Buah Rp 1,068,750.00
Buah Rp 956,250.00
Buah Rp 1,012,500.00
Buah Rp 168,750.00
Buah Rp 196,830.00
Buah Rp 281,250.00
Buah Rp 731,250.00
Buah Rp 731,250.00
Buah Rp 281,250.00
Set Rp 900,000.00
Set Rp 270,000.00
Set Rp 787,500.00
Set Rp 787,500.00
Set Rp 433,080.00
Set Rp 433,080.00
Set Rp 1,406,250.00
Set Rp 506,250.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 142
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Set Rp 900,000.00
Set Rp 731,250.00
Set Rp 196,830.00
Set Rp 393,750.00
Set Rp 506,250.00
Set Rp 393,750.00
Set Rp 1,406,250.00
Set Rp 225,000.00
Buah Rp 22,500.00
Buah Rp 28,080.00
Buah Rp 28,080.00
Buah Rp 28,080.00
Buah Rp 225,000.00
Buah Rp 393,750.00
Buah Rp 320,580.00
Buah Rp 309,330.00
Buah Rp 393,750.00
Buah Rp 309,330.00
Buah Rp 309,330.00
Buah Rp 309,330.00
Buah Rp 168,750.00
Buah Rp 168,750.00
Buah Rp 168,750.00
Buah Rp 225,000.00
Buah Rp 281,250.00
Buah Rp 135,000.00
Set Rp 365,580.00
Set Rp 253,080.00
Set Rp 168,750.00
Set Rp 253,080.00
Set Rp 281,250.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 143
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Set Rp 450,000.00
Set Rp 196,830.00
Set Rp 196,830.00
Set Rp 253,080.00
Set Rp 253,080.00
Set Rp 506,250.00
Buah Rp 56,250.00
Buah Rp 67,500.00
Buah Rp 67,500.00
Buah Rp 67,500.00
Buah Rp 67,500.00
Buah Rp 67,500.00
Buah Rp 67,500.00
Buah Rp 16,830.00
Buah Rp 28,080.00
Buah Rp 22,500.00
Buah Rp 22,500.00
Buah Rp 506,250.00
Buah Rp 365,580.00
Buah Rp 1,406,250.00
Buah Rp 1,125,000.00
Buah Rp 95,580.00
Buah Rp 292,500.00
Buah Rp 50,580.00
Buah Rp 112,500.00
Buah Rp 168,750.00
Buah Rp 168,750.00
Buah Rp 22,500.00
Buah Rp 22,500.00
Set Rp 1,788,750.00
Set Rp 1,406,250.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 144
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Set Rp 3,600,000.00
Set Rp 1,608,750.00
Set Rp 1,350,000.00
Set Rp 1,012,500.00
Buah Rp 56,250.00
Buah Rp 56,250.00
Buah Rp 84,330.00
Buah Rp 112,500.00
Buah Rp 84,330.00
Buah Rp 112,500.00
Buah Rp 84,330.00
Buah Rp 56,250.00
Buah Rp 56,250.00
Buah Rp 281,250.00
Buah Rp 112,500.00
Buah Rp 168,750.00
Buah Rp 168,750.00
Buah Rp 281,250.00
Buah Rp 225,000.00
Buah Rp 225,000.00
Set Rp 241,830.00
Set Rp 225,000.00
Set Rp 241,830.00
Set Rp 225,000.00
Buah Rp 393,750.00
Buah Rp 393,750.00
Buah Rp 2,925,000.00
Buah Rp 2,936,250.00
Set Rp 1,575,000.00
Set Rp 562,500.00
Buah Rp 506,250.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 145
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 562,500.00
Buah Rp 562,500.00
Buah Rp 562,500.00
Set Rp 675,000.00
Set Rp 787,500.00
Set Rp 843,750.00
Set Rp 787,500.00
Buah Rp 236,250.00
Buah Rp 292,500.00
Set Rp 9,562,500.00
Set Rp 10,125,000.00
Buah Rp 843,750.00
Buah Rp 675,000.00
Buah Rp 309,330.00
Buah Rp 236,250.00
Buah Rp 506,250.00
Buah Rp 483,750.00
Buah Rp 956,250.00
Buah Rp 956,250.00
Buah Rp 1,068,750.00

Set Rp 5,130,000.00
Set Rp 5,220,000.00
Buah Rp 1,017,000.00
Buah Rp 1,035,000.00
Buah Rp 861,300.00
Buah Rp 900,000.00
Buah Rp 1,440,000.00
Buah Rp 1,620,000.00
Buah Rp 1,350,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 146
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4
Buah Rp 1,350,000.00
Buah Rp 1,367,100.00
Buah Rp 1,234,800.00
Buah Rp 2,116,800.00
Buah Rp 2,734,200.00
Buah Rp 238,500.00
Buah Rp 267,300.00
Buah Rp 2,205,000.00
Buah Rp 1,984,500.00
Buah Rp 228,600.00
Buah Rp 233,100.00
Buah Rp 271,800.00
Buah Rp 271,800.00
Buah Rp 206,100.00
Buah Rp 271,800.00
Set Rp 5,733,000.00
Set Rp 7,056,000.00
Set Rp 363,600.00
Set Rp 376,200.00
Set Rp 364,500.00
Set Rp 380,700.00
Set Rp 240,300.00
Set Rp 265,500.00
Buah Rp 238,500.00
Buah Rp 250,200.00
Buah Rp 162,900.00
Buah Rp 180,000.00
Buah Rp 271,800.00
Buah Rp 277,200.00
Buah Rp 271,800.00
Buah Rp 277,200.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 147
SATUAN BAHAN/ HASIL SURVEY
UPAH KERJA
TRIWULAN I
3 4

Makassar, Maret 2019

KEPALA BIDANG BINA TEKNIK


DINAS PU KOTA MAKASSAR

ANSUARD, ST. M.Si


Pangkat : Penata Tk. I
Nip. 19691031 200312 1 001

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2019 Hal. 148