STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA

PEMERINTAH PROVINSI SULAWESI SELATAN


KOTA MAKASSAR
TAHUN 2016

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA


1 2 3 4 5
BAHAN ATAP
Asbes Genteng T = 4
1 Rp 56,000
mm
Asbes Genteng T = 5
2 Lembar Rp 57,000
mm
3 Asbes Nok 4 mm Lembar Rp 53,000
4 Asbes Nok 5 mm Lembar Rp 67,000
atap Genteng Biasa
5 Lembar Rp 33,000
Tanpa Warna
Atap genteng
6 Buah Rp 31,000
Keramik
Atap Genteng
7 Buah Rp 16,000
Keramik Standar
Atap Genteng
8 Buah Rp 24,000
Keramik Warna
9 Eternit Buah Rp 27,000

10 Eternit Atrisco 1 m x 1 m Lembar Rp 26,000

11 Eternit Harflex 1 m x 1 m Lembar Rp 32,000

Jibesmen 1 m x 1
12 Fiber Lembar Rp 9,000
m

Gentang Flat Corak


Natural (tidak dicat) Semen Harflex
13 Lembar Rp 7,000
33x39x20cm - 10 (240x105x0,4)
Bh/M2

Gentang Flat Corak


Warna Khusus
14 Buah Rp 9,000
33x39x20cm - 10
Bh/M2

Gentang Flat Corak


Warna Spesial
15 Buah Rp 10,000
33x39x20cm - 10
Bh/M2
16 Genteng Buah Rp 17,000
Beton Biasa
17 Genteng Buah Rp 167,000
Tanpa Warna
Metal Multi Roof
18 Genteng Kasar pjg 77 lb, Lembar Rp 68,000
100 cm

Metal Multi Roof


19 Genteng Kasar pjg 77 lb, Lembar Rp 142,000
80 cm

Metal Multi Roof


20 Genteng Licin pjg 77 lb, Lembar Rp 114,000
100 cm

Metal Multi Roof


21 Genteng Licin pjg 77 lb, 80 Lembar Rp 77,000
cm

Metal Surya Licin


22 Genteng Lembar Rp 74,000
pjg 77 lb, 80 cm

Metal Sakura pjg


23 Genteng Lembar Rp 54,000
77 lb, 100 cm

Metal Sakura
24 Genteng Licin pjg 77 lb, 80 Lembar Rp 58,000
cm

Genteng Elabana
Natural (tidak dicat) Metal Star Licin
25 Lembar Rp 7,000
42x33x15cm - 9 pjg 77 lb, 80 cm
Bh/M2

Genteng Elabana
Warna Spesial
26 Buah Rp 9,000
42x33x15cm - 9
Bh/M2

Genteng Elabana
Warna Standar
27 42x33x15cm - 9 Buah Rp 8,000
Bh/M2

Genteng Flat Corak


Warna Standar
28 Buah Rp 9,000
33x39x20cm - 10
Bh/M2

Genteng Flat Polos


Natural (tidak dicat)
29 Buah Rp 8,000
38x20x20cm - 15
Bh/M2
Genteng Flat Polos
Warna Khusus
30 Buah Rp 8,000
38x20x20cm - 15
Bh/M2

Genteng Flat Polos


Warna Spesial
31 Buah Rp 10,000
38x20x20cm - 15
Bh/M2

Genteng Flat Polos


Warna Standar
32 Buah Rp 9,000
38x20x20cm - 15
Bh/M2

Genteng Garuda
Natural (tidak dicat)
33 Buah Rp 10,000
42x33x15cm - 9
Bh/M2

Genteng Garuda
Permata Natural
34 (tidak dicat) Buah Rp 7,000
42x33x15cm - 9
Bh/M2

Genteng Garuda
Permata Warna
35 Buah Rp 10,000
Spesial 42x33x15cm
- 9 Bh/M3

Genteng Garuda
Permata Warna
36 Buah Rp 8,000
Standar 42x33x15cm
- 9 Bh/M2

Genteng Garuda
Warna Khusus
37 42x33x15cm - 9 Buah Rp 11,000
Bh/M2

Genteng Garuda
Warna Spesial
38 Buah Rp 8,000
42x33x15cm - 9
Bh/M2

Genteng Garuda
Warna Standar
39 Buah Rp 11,000
42x33x15cm - 9
Bh/M2
Genteng Kiat Beton
Natural (tidak dicat)
40 Buah Rp 7,000
36x32x15cm - 12
Bh/M2

Genteng Kiat Beton


Warna Khusus
41 Buah Rp 11,000
36x32x15cm - 12
Bh/M2

Genteng Kiat Beton


Warna Spesial
42 Buah Rp 9,000
36x32x15cm - 12
Bh/M2

Genteng Kiat Beton


Warna Standar
43 Buah Rp 9,000
36x32x15cm - 12
Bh/M2

Genteng Royal
Permata Natural
44 (tidak dicat) Buah Rp 10,000
38x31x15cm - 12
Bh/M2

Genteng Royal
Permata Warna
45 Buah Rp 10,000
Spesial 38x31x15cm
- 12 Bh/M3

Genteng Royal
Permata Warna
46 Buah Rp 9,000
Standar 38x31x15cm
- 12 Bh/M2

47 Karet Lapis Paku Asbes Biji Rp 7,000

Lapisan Genteng
48 Karet M Rp 12,000
(50 cm)

Lapisan Genteng
49 Karet M Rp 16,000
(90 cm)
Lapisan Genteng
50 Karet M Rp 19,000
Tipis (110 cm)

Lapisan Genteng
51 Karet M Rp 48,000
Tebal (110 cm)

52 Karet Talang (50 cm) M Rp -


Nok Bulat Natural
(tidak dicat)
53 Buah Rp 8,000
30x24x15cm - 3,5
Bh/M'

Nok Bulat Warna


54 Khusus 30x24x15cm Buah Rp 12,000
- 3,5 Bh/M'

Nok Bulat Warna


55 Spesial 30x24x15cm Buah Rp 10,000
- 3,5 Bh/M'

Nok Bulat Warna


56 Standar 30x24x15cm Buah Rp 9,000
- 3,5 Bh/M'

Nok Cabang 3/Ujung


57 Buah Rp 67,000
Natural (tidak dicat)

Nok Cabang 3/Ujung


58 Buah Rp 71,000
Warna Spesial

Nok Cabang 3/Ujung


59 Buah Rp 64,000
Warna Standar

Nok Flat Natural


60 (tidak dicat) 2,5 Buah Rp 8,000
Bh/M'
Nok Flat Warna
61 Buah Rp 13,000
Khusus 2,5 Bh/M'
Nok Flat Warna
62 Buah Rp 11,000
Spesial 2,5 Bh/M'
Nok Flat Warna
63 Buah Rp 10,000
Standar 2,5 Bh/M'
Multi Roof Kasar,
64 Nok Genteng Buah Rp 79,000
pjg 40 cm
Multi Roof Kasar,
65 Nok Genteng Buah Rp 96,000
pjg 80 cm
Multi Roof Licin,
66 Nok Genteng Buah Rp 74,000
pjg 40 cm
Multi Roof Licin,
67 Nok Genteng Buah Rp 80,000
pjg 80 cm
68 Nok Genteng Surya, pjg 40 cm Buah Rp 55,000
69 Nok Genteng Surya, pjg 80 cm Buah Rp 79,000

70 Nok Genteng Sakura, pjg 80 cm Buah Rp 69,000

Nok Samping/T.Flat
71 Natural (tidak dicat) Buah Rp 8,000
2,5 Bh/M'

Nok Samping/T.Flat
72 Warna Khusus 2,5 Buah Rp 92,000
Bh/M'

Nok Samping/T.Flat
73 Warna Spesial 2,5 Buah Rp 50,000
Bh/M'

Nok Samping/T.Flat
74 Warna Standar 2,5 Buah Rp 42,000
Bh/M'

Nok Segi Warna


75 Khusus 35x27x15cm Buah Rp 13,000
- 3,3 Bh/M'

Nok Segi Warna


76 Spesial 35x27x15cm Buah Rp 12,000
- 3,3 Bh/M'

Nok Segi Warna


77 Standar 35x27x15cm Buah Rp 11,000
- 3,3 Bh/M'

NokSegi Natural
(tidak dicat)
78 Buah Rp 10,000
35x27x15cm-
3,3bh/m'

BWG 33 BJLS 0,20


79 Seng Kaki Rp 10,000
MM
BWG 28 BJLS 0,35
80 Seng Lembar Rp 134,000
MM
Gelombang bjls
81 Seng Lembar Rp 123,000
0,35 (6 Kaki)
Gelombang bjls
82 Seng Lembar Rp 56,000
0,25 (6 Kaki)
Gelombang bjls
83 Seng Lembar Rp 71,000
0,20 (7 Kaki)
Gelombang bjls
84 Seng Lembar Rp 101,000
0,20 (10 Kaki)
Gelombang bjls
85 Seng Kaki Rp 9,000
0,20
Plat bjls 0,35 (6
86 Seng Lembar Rp 123,000
KK)
Plat bjls 0,30 (6
87 Seng Lembar Rp 102,000
KK)

88 Seng Plat bjls 0,20 (6 Lembar Rp 80,000


KK)
89 Seng Fiber KK Rp 19,000
Gelombang bjls
90 Seng Lembar Rp 83,000
0,30 (6 Kaki)

BAHAN DASAR
21x10,5x6 cm -
91 Bata Block Buah Rp 44,000
60 Bh/M2
21x10,5x8 cm -
92 Bata Block Buah Rp 51,000
47 Bh/M2
40x20x10 cm -
93 Batako Buah Rp 90,000
13 Bh/M2
94 Batu Belah 10 - 15 cm M3 Rp 518,000
Batu Belas / Kerikil
95 M3 Rp 388,000
Quarry
96 Batu Gunung M3 Rp 319,000
97 Batu Kali M3 Rp 249,000
98 Batu Kali Belah M3 Rp 238,000
99 Batu Merah Standar Biji Rp 1,000
100 Batu Pecah 7 - 10 cm M3 Rp 586,000
101 Batu Pecah 5 - 7 cm M3 Rp 564,000
102 Batu Pecah 3 - 5 cm M3 Rp 399,000
103 Batu Pecah 2 - 3 cm M3 Rp 395,000
104 Batu Pecah 1 - 2 cm M3 Rp 414,000
105 Batu Pecah 0,5 - 1 cm M3 Rp 427,000
106 Glass Block Buah Rp 32,000
Kapur
107 Hidrasi/kapur M3 Rp 11,000
pasangan
108 Kapur Karung 3 Kg Kg Rp 43,000
109 Kerikil Sungai Royalty M3 Rp 396,000
Pasir Kasar/Pasir
110 Beton/Pasir M3 Rp 252,000
Pasangan
111 Pasir Quarry M3 Rp 296,000
112 Pasir Timbunan M3 Rp 284,000
113 Pigmen Warna Sak Rp 288,000
114 Plastik untuk beton M2 Rp 160,000
115 Roster 15 x 30 cm Buah Rp 69,000
40 kg P,C
116 Semen Sak Rp 79,000
(Tonasa)
50 kg P,C
117 Semen Sak Rp 93,000
(Tonasa)
Putih 40 Kg per
118 Semen Sak Rp 149,000
sak
119 Semen Tonasa kg Rp 1,860
120 Semen Nat Tegel Kg Rp 25,000
121 Sirtu Quarry M3 Rp 153,000
122 Sirtu Royalty M3 Rp 223,000
Urugan
123 Pilihan/Tanah M3 Rp 208,000
Timbunan
124 Water Proofing M2 Rp 166,000

BAHAN BAMBU
125 Bambu - Petung Batang Rp 100,000
126 Bambu - Besar Batang Rp 47,000
127 Bambu - Sedang Batang Rp 37,000
128 Bambu - Kecil Batang Rp 29,000
129 Box Culver Rp -
130 Gorong - Gorong ᶲ 30/m Buah Rp 270,000
131 Gorong - Gorong ᶲ 40/m Buah Rp 360,000
132 Gorong - Gorong ᶲ 70/m Buah Rp 143,000
133 Gorong - Gorong ᶲ 80/m Buah Rp 176,000
134 Penutup Menhol Rp -
135 Rotan Pengikat Ikat Rp 38,000
136 Yudis Rp -

BAHAN BESI
4" Brown - 6
137 Aluminium Batang Rp 212,000
Meter
3" Brown - 6
138 Aluminium Batang Rp 172,000
Meter
Slimar 4"
139 Aluminium Brown untuk Batang Rp 238,000
Daun Jendela
Slimar 3"
140 Aluminium Brown untuk Batang Rp 212,000
Daun Jendela
141 Angker Baut Tinggi 70 cm Buah Rp 50,000
142 Angker Mur Baut Kecil Buah Rp 28,000
Diameter 12
143 Baut Batang Rp 104,000
mm x 10 cm
Diameter 12
144 Baut Batang Rp 133,000
mm x 12,50 cm
Diameter 12
145 Baut Batang Rp 9,000
mm x 18 cm
Diameter 12
146 Baut Batang Rp 10,000
mm x 20 cm
Diameter 12
147 Baut Batang Rp 14,000
mm x 25 cm
Diameter 12
148 Baut Batang Rp 13,000
mm x 30 cm
149 Baut Skrup Buah Rp 1,000
150 Baut Baja Buah Rp 32,000
Streep 30 x 3
151 Besi M' Rp 72,000
mm
Beton Polos
152 Besi Kg Rp 20,000
(Campuran)
Beton Ulir
153 Besi Kg Rp 24,000
(Campuran)
Beton 6 mm
154 Besi Batang Rp 42,000
( 0,22 kg / M' )
Beton 8 mm
155 Besi Batang Rp 68,000
( 0,39 kg / M' )
Beton 10 mm
156 Besi Batang Rp 97,000
( 0,62 kg / M' )
Beton 12 mm
157 Besi Batang Rp 138,000
( 0,89 kg / M' )
Beton 14 mm
158 Besi Batang Rp 210,000
( 1,21 kg / M' )
Beton 16 mm (
159 Besi Batang Rp 273,000
1,39 kg / M' )
Beton 19 mm
160 Besi Batang Rp 418,000
( 2,23 kg / M' )
Beton 20 mm
161 Besi Batang Rp 645,000
( 2,46 kg / M' )
Beton Ulir
162 Besi Diameter 8 mm Batang Rp 150,000
( 0,39 kg / M' )
Beton Ulir
163 Besi Diameter 13 Batang Rp 186,000
mm
40.40.2 mm P =
164 Besi Hollow Batang Rp 216,000
6m
40.40.1,5 mm P
165 Besi Hollow Batang Rp 220,000
=6m
40.20.2 mm P =
166 Besi Hollow Batang Rp 209,000
6m
40.20.1,5 mm P
167 Besi Hollow Batang Rp 193,000
=6m
40.20.1,2 mm P
168 Besi Hollow Batang Rp 143,000
=6m
20.20.1,5 mm P
169 Besi Hollow Batang Rp 141,000
=6m
170 Besi Metal Stud Batang Rp 80,000
171 Besi Siku L.30.30.3 Batang Rp 126,000
172 Besi Siku L.60.60.6 Batang Rp 368,000
173 Besi Siku L.70.70.7 Batang Rp 547,000
174 Besi Siku L.70.70.5 M' Rp 527,000
175 Besi Siku L.100.100.10 Batang Rp 1,580,000
176 Beugel Kap V Plat Besi Kg Rp 192,000
177 Door Closer Set Unit Rp 230,000
Aluminium
178 Hollow Rangka Plafond Batang Rp 46,000
40x40x2 mm
Aluminium
179 Hollow Rangka Plafond Batang Rp 29,000
40x20x2 mm
Aluminium
180 Hollow Rangka Plafond Batang Rp 56,000
40x40x8 mm
Aluminium
181 Hollow Rangka Plafond Batang Rp 38,000
40x20x8 mm
untuk Pintu dan
182 Karet Jendela M' Rp 22,000
Aluminium PPC
183 Kawat Ikat Beton Kg Rp 28,000
Duri ( 1 Roll =
184 Kawat Kg Rp 171,000
M')
Ram Lubang 3,0
185 Kawat M' Rp 40,000
cm
186 Kawat Nyamuk Plastik M Rp 31,000
Nyamuk
187 Kawat M Rp 38,000
Aluminium
188 Kawat Nyamuk Baja M Rp 44,000
Saringan Pasir /
189 Kawat M Rp 37,000
Ayakan
190 Kawat Bronjong Kg Rp 39,000
Penggantung
191 Kawat Hollow Kg Rp 42,000
Aluminium
192 Kawat Las Dos Rp 192,000
Kayu dan Karet
193 Lem Tube Rp 21,000
(Fox) Besar
Karet (Fox)
194 Lem Tube Rp 24,000
Besar
195 Lem Seng M Rp 18,000
Polycarbonite
196 Lembaran Atap untuk Kanopi Roll Rp 2,422,000
tebal 3 mm
Polycarbonite
197 Lembaran Atap untuk Kanopi Roll Rp -
tebal 5 mm
Jadi Besi
198 Pagar M' Rp 698,000
( Tinggi 1 M )
BRC ( Tinggi 1
199 Pagar M' Rp 266,000
M)

200 Pagar Pracetak 5 Panel M' Rp 612,000

201 Pagar Pracetak 6 Panel M' Rp 717,000

202 Pagar Pracetak 7 Panel M' Rp 856,000


Campuran (5-10
203 Paku Kg Rp 24,000
cm)

204 Paku Asbes dan Karet Kg Rp 54,000

( 1 1/2 - 2 1/2
205 Paku cm ) (Setara Kg Rp 35,000
Paku 2-3 cm)
206 Paku 4 Cm Kg Rp 31,000
207 Paku 2 - 3 cm Kg Rp 32,000
Sirap (Setara
208 Paku Kg Rp 38,000
Paku 2-3 Cm)
Seng
209 Paku Kg Rp 43,000
( 1Kg/Dos )
210 Paku Skrup Biji Rp 1,000
211 Paku Jembatan Kg Rp 56,000
212 Paku Beton 5 cm Dos Rp 26,000
213 Paku Beton 6 cm Dos Rp 25,000
214 Paku Beton 7 cm Dos Rp 21,000
215 Paku Beton 8 - 10 cm Dos Rp 20,000

Payung Berulir (
216 Paku Kg Rp 48,000
1 Kg/Dos )
217 Paku Asbes Berulir Dos Rp 56,000
218 Paku Asbes Biasa Dos Rp 26,000
Triplex (Setara
219 Paku Kg Rp 34,000
Paku 2-3 Cm)
Eternit (Setara
220 Paku Kg Rp 35,000
Paku 2-3 Cm)
221 Paku Ripet Biji Rp 1,000
Besi Hollow -
222 Paku Skrup 1000 Biji per Dos Rp 101,000
Dos
Gypsum - 500
223 Paku Skrup Biji per Dos Rp 79,000
Bungkus
Aluminium +
Kaca Tebal 5
224 Pas. Daun Jendela M2 Rp 1,366,000
mm + Karet dan
Sealent
Aluminium
Panil Kaca
225 Pas. Daun Pintu Tebal 5 mm Unit Rp 1,694,000
(Lengkap
Accessories)
226 Pas. Kusen Aluminium 4" M' Rp 121,000
Aluminium
227 Pintu KM/WC (Lengkap Unit Rp 431,000
Accessories)
PVC Kw.1
228 Pintu KM/WC (Lengkap Unit Rp 798,000
Accessories)
Kembang 2,3
229 Plat Besi M2 Rp 894,000
mm
230 Rangka Baja Ringan M2 Rp 212,000
Paku Tembak
231 Skamp Hollow Buah Rp 2,000
Aluminium
232 Spandek M2 Rp 68,000
233 Tiang Beton Untuk 5 Daun Buah Rp 198,000
234 Tiang Beton Untuk 6 Daun Buah Rp 234,000
235 Tiang Beton Untuk 7 Daun Buah Rp 264,000

BAHAN
FINISHING
236 Bahan Anti Karat Kg Rp 57,000
Ex Aqugart
Bubuk + Air
237 untuk Kg Rp 132,000
Pelarut
Waterproofing

238 Cat Minyak Afduner Liter Rp 20,000

Kayu Ex Avian
239 Cat Kaleng Rp 80,000
(0,9 Kg)
Minyak Ex
240 Cat Kg Rp 90,000
Emco
Kayu Ex
241 Cat Kaleng Rp 88,000
Mowilex 1 Kg
242 Cat Minyak Liter Rp 44,000
243 Cat Minyak Super Liter Rp 36,000
Kayu Dulux 1
244 Cat Kg Rp 54,000
Kg
Minyak Super
245 Cat Kaleng Rp 44,000
Tenner
246 Cat Dasar 3,5 Kg Kaleng Rp 101,000
Dasar Meni 3,5
247 Cat Kaleng Rp 124,000
Kg
Meni Glatik 3,5
248 Cat Kaleng Rp 136,000
Kg
249 Cat Tenner Kg Rp 84,000
Genteng Cap
250 Cat Kg Rp 53,000
Belmas 1 Kg
Genteng Yoko 4
251 Cat Kaleng Rp 58,000
Kg
Genteng Biasa
252 Cat Kaleng Rp 241,000
AGA (4 Kg)
Genteng
253 Cat Minyak Nippon Kaleng Rp 343,000
2,5 Liter
Residu / Cloter
254 Cat Kaleng Rp 180,000
(10 kg)
Seng Nippon
255 Cat Kaleng Rp 299,000
(2,5 Kg)
256 Cat Seng Nippon Kg Rp 119,600

Tembok
257 Cat Kaleng Rp 143,000
Metrolite (5 Kg)

Tembok
258 Cat Sahara/Kemban Kg Rp 20,000
g/Postek
Tembok
259 Cat Wintex/Maxilite Kaleng Rp 241,000
(5kg)
Tembok ICI (5
260 Cat Kaleng Rp 183,000
Kg)
Tembok
261 Cat Mowilex (Cat Kaleng Rp 218,000
Dalam) 2,5 Kg
Tembok
262 Cat Mowilex (Cat Kaleng Rp 326,000
Luar) 2,5 Kg
Tembok Aries 5
263 Cat Kaleng Rp 65,000
Kg
264 Cat Minyak Avian Liter Rp 78,000
Tembok Kimex
265 Cat Kaleng Rp 129,000
(5 kg)
Tembok Dulux
266 Cat Kaleng Rp 367,000
(Luar) 2,5 Kg
267 Cat Tembok Dulux Kg Rp 146,800
Tembok Warna
268 Cat Kuning, Hitam, Kg Rp 32,000
Merah (Belmax)

269 Cat Altex Kg Rp 167,000


Anti Lumut
270 Cat (Aquaseal) Klg Pail Rp 1,261,000
20 Kg
Anti Lumut (No
271 Cat Drop) Klg 20 Pail Rp 1,224,000
Kg
272 Cat Dasar Glatik Kg Rp 64,000
273 Cat Dasar Tembok Kg Rp 62,000
untuk Genteng,
274 Cat Air Bataco, Paving Kg Rp 120,000
Block (AGA)
Ex Dullux
275 Cat Kayu Kg Rp 90,000
Mengkilap
276 Cat Marka Jalan Kg Rp 52,000
untuk Genteng,
277 Cat Minyak Bataco, Paving Kg Rp 88,000
Block (AGA)
Eks Aquaproof -
278 Cat Waterproof Liter Rp 80,000
KW 1
279 Cat Waterproof Biasa Liter Rp 17,000
280 Clear Kaleng Rp 78,000
281 Clear Ex Impra Liter Rp 36,000

- 20 Kg (dinding
282 Cornice Kg Rp 6,000
eksterior)

- 20 Kg (dinding
283 Cornice Kg Rp 7,000
interior)

Kayu Cap
284 Dempul Kucing/Merah ( Kg Rp 49,000
Kg)
Ex Impra
285 Dempul Kg Rp 56,000
( Kg)
Ex Isamu
286 Dempul Kg Rp 79,000
( Kg)
287 Kertas Gosok Lembar Rp 5,000
288 Kuas 2" (Eterna) Buah Rp 12,000
289 Kuas 3" (Eterna) Buah Rp 18,000
290 Kuas 4" (Eterna) Buah Rp 24,000
291 Lem Fox Kaleng Kg Rp 66,000
292 Lem Efoxi Liter Rp 246,000
293 Melamin Ex Impra Kg Rp 85,000
294 Minyak Cat Aff Dunner Liter Rp 18,000
295 Minyak Tenner Super Liter Rp 41,000
296 Perban Compon Roll/Bh Rp 24,000
297 Pewarna Natural Kaleng Rp 80,000
298 Pewarna Brom Kaleng Rp 78,000
299 Pewarna Ex Impra Kaleng Rp 81,000
Tembok Boyo
300 Plamur dan Setara (5 Kaleng Rp 81,000
Kg)
301 Plamur kg Rp 16,200
302 Sending Kg Rp 79,000
303 Sending Ex Impra Liter Rp 83,000
304 Tenner A (Ex Avian) Liter Rp 44,000
305 Vernis/Plitur Kg Rp 92,000
306 Wood Filler Ex Impra Kaleng Rp 104,000

BAHAN KAYU
Kls. I Bayam
307 Kayu M3 Rp 14,444,000
(Balok) Senso
Kls. I Bayam
308 Kayu M3 Rp 21,069,000
(Balok) Sawmill
Kls. I Ulin
309 Kayu M3 Rp 29,441,000
(Papan)
Kls. I Ulin
310 Kayu M3 Rp 27,770,000
(Tiang)
Kls. I Bayam
311 Kayu M3 Rp 18,320,000
(Papan) Senso
Klas. II
312 Kayu Samarinda M3 Rp 21,600,000
(Balok) / Lokal
Klas. II
313 Kayu Samarinda M3 Rp 6,150,000
(Papan) / Lokal
Kls. III Kapur
314 Kayu M3 Rp 6,548,000
(Balok)
315 Kayu Kls. III (Papan) M3 Rp 4,422,000
316 Kayu Perancah M3 Rp 3,578,000
Mangga/Kemiri
317 Kayu M3 Rp 3,578,000
(Papan)
BAHAN
PENGGANTUNG

318 Engsel Baja Biji Rp 25,000


Kuningan 4
319 Engsel Pasang Rp 43,000
Lubang
320 Engsel Stainless Steel Pasang Rp 40,000
321 Engsel H 3 Lubang Pasang Rp 14,000
322 Engsel Kupu-Kupu Pasang Rp 19,000
323 Engsel Antik Jendela Pasang Rp 29,000
Pintu Biasa
324 Engsel Pasang Rp 14,000
(Merk 777)
Jendela Biasa
325 Engsel Pasang Rp 10,000
(Merk 777)

Jendela
326 Engsel Kuningan (Merk Pasang Rp 30,000
Kuningan)

327 Engsel Pintu 4" (SES) Buah Rp 36,000


Jendela 3"
328 Engsel Buah Rp 27,000
(SES)
Pintu Kuningan
329 Engsel Pasang Rp 34,000
(SES)
330 Gagang Pintu Lemari Buah Rp 9,000
Pintu Lemari
331 Grendel Pasang Rp 8,000
Biasa
Jendela
332 Grendel Buah Rp 22,000
Kuningan
333 Grendel Pintu Biasa Buah Rp 26,000
Pintu
334 Grendel Kuningan / Buah Rp 26,000
Vertikal
335 Grendel Pintu Besar Buah Rp 45,000
Pintu Tanam
336 Grendel Buah Rp 64,000
(Expanyolet)
337 Hak Angin Kecil Antik Buah Rp 17,000
338 Hak Angin Besar Buah Rp 30,000
339 Hak Angin Kecil Buah Rp 14,000
Kait angin Jendela
340 Kwalitas 1 Buah Rp 34,000
Aluminium
341 Kunci Tanam Yale 1 x Putar Buah Rp 148,000
342 Kunci Tanam Yale 2 x Putar Buah Rp 167,000
Pintu 2 x Putar
343 Kunci Tanam Buah Rp 223,000
Besar Biasa
Pintu 2 x Putar
344 Kunci Tanam Buah Rp 119,000
Besar Kecil
Pintu 2 x Putar
345 Kunci Tanam Buah Rp 372,000
SES

BAHAN KACA
(Rangka+Kaca
346 Jendela Nako Tebal 5mm) M2 Rp 327,000
0,60 m x 1 m
347 Kaca Bening 5 mm M2 Rp 200,000
348 Kaca Bening 3 mm M2 Rp 160,000
349 Kaca Ryben Tebal 5 mm M2 Rp 224,000
Dolken Kayu Ø 8-
350 Btg Rp 20,500
10/400 cm
BAHAN
SANITER /
SALURAN AIR
Stain Steel -
Kosong Tanpa
351 Bak Cuci Piring Saluran Buah Rp 306,000
Pembuangan &
Kran Air
352 Bak Tube Fiber Biasa Buah Rp 1,285,000
353 Bak Tube ( Mandi) Fiber Ex TOTO Buah Rp 3,915,000

Ex KIA
354 Kloset Duduk Lengkap (putih) Unit Rp 2,566,000
Tangki Batu
Ex KIA
Lengkap
355 Kloset Duduk Unit Rp 3,135,000
(warna) Tangki
Batu
Ex TOTO
Lengkap
356 Kloset Duduk Unit Rp 3,227,000
Accessories
Warna Putih
Ex TOTO
Lengkap
357 Kloset Duduk Unit Rp 3,491,000
Accessories
Warna Gelap
358 Kloset Jongkok Ex KIA Buah Rp 439,000
359 Kloset Jongkok Biasa Buah Rp 181,000
Kuningan
360 Kran Air Diameter 3/4 Buah Rp 53,000
Biasa
Vernekel
361 Kran Air Diameter 1/2 Buah Rp 64,000
Biasa
Vernekel
362 Kran Air Diameter 3/4 Buah Rp 48,000
Biasa
Antik Diameter
363 Kran Air Buah Rp 25,000
1/2
364 Kran Air 2 Mata Buah Rp 196,000
365 Seal Tape Buah Rp 6,000
366 Sippon Wastafel Biasa Buah Rp 76,000
Fiberglass, Kap.
367 Tangki Air Buah Rp 952,000
0,25 M3
Fiberglass, Kap.
368 Tangki Air Buah Rp 1,178,000
0,50 M3
Fiberglass, Kap.
369 Tangki Air Buah Rp 1,827,000
1 M3
Aluminium,
370 Tangki Air Buah Rp 5,365,000
Kap. 1 M3
Polos / Putih
371 Urinoir Buah Rp 702,000
Biasa
372 Urinoir Ex TOTO Unit Rp 3,669,000
Polos / Putih
373 Wastafel Buah Rp 493,000
Lengkap
374 Wastafel Warna Lengkap Buah Rp 678,000

BAHAN
LANGIT-
LANGIT
375 Beding Gypsum Kecil M' Rp 19,000
376 Beding Gypsum Sedang M' Rp 22,000
377 Beding Gypsum Besar M' Rp 26,000
122 x 224 x
Tebal 10 mm Ex
378 Gypsum Board Lembar Rp 146,000
Jayaboard untuk
Plafond
379 HPL Lembar Rp 240,000
380 Kalsiboard Tebal 4 mm Lembar Rp 104,000
381 Lambriziring t: 4 mm (4 M') Lembar Rp 32,000
382 Les Gypsum Polos Batang Rp 25,000
383 Les Gypsum Polos Kecil M' Rp 26,000
Kecil Lebar 7
384 Les Gypsum M' Rp 26,000
Cm
385 Les Gypsum Sedang M' Rp 30,000
386 Les Gypsum Lebar 10 Cm M' Rp 31,000
Besar Lebar 15
387 Les Gypsum M' Rp 38,000
Cm
388 Les Gypsum Profil Batang Rp 34,000
389 Les Kayu 1 x 10 x 400 cm Batang Rp 43,000

390 Les Kayu Biasa 0,5 x 3 cm Batang Rp 27,000

Lebar 5 cm ( 4
391 Les Kayu Profil Batang Rp 43,000
M' )
Lebar 3 cm ( 4
392 Les Kayu Profil Batang Rp 31,000
M' )
Lebar 11/2 cm
393 Les Kayu Profil Batang Rp 24,000
( 4 M' )
394 Les Kayu Profil 4 x 4 x 400 cm Batang Rp 43,000
120 x 240 cm t.
395 Multiplex Lembar Rp 178,000
9 mm
120 x 240 cm t.
396 Multiplex Lembar Rp 283,000
1,2 mm
Fiberglass
397 Pintu Lembar Rp 347,000
KM/WC
KM/WC bahan
PVC Lengkap
398 Pintu Unit Rp 367,000
Accessories ex
Maspion
120 x 240 cm t.
399 Teakwood Lembar Rp 96,000
3 mm
120 x 240 cm t.
400 Teakwood Lembar Rp 272,000
4 mm
3 mm 120 x 240
401 Triplex Lembar Rp 863,000
cm
4 mm 120 x 240
402 Triplex Lembar Rp 101,000
cm
6 mm 120 x 240
403 Triplex Lembar Rp 120,000
cm
Melamin 120 x
404 Triplex Lembar Rp 139,000
240 cm
BAHAN LANTAI

10 x 20 cm
405 Batu Alam M2 Rp 290,000
Polos
20 x 20 cm
406 Batu Alam M2 Rp 305,000
Polos
Motif Sirip /
Garis-Garis
407 Batu Alam M2 Rp 320,000
dipahat 10 x 30
cm
Motif Sirip /
Garis-Garis
408 Batu Alam Biji Rp 28,000
dipahat 20 x 40
cm
Ukuran 10 x 20
409 Batu Alam M2 Rp 237,000
cm Polos
Ukuran 60 x
410 Granit 185 cm Dasar M2 Rp 1,610,000
Putih

411 Keramik WC 20 x 20 Cm Dos Rp 95,000

412 Keramik WC 20 x 25 Cm Dos Rp 87,000

413 Keramik WC 30 x 30 Cm Dos Rp 97,000

414 Tegel PC 30 X 30 CM Dos Rp 72,000

Keramik Putih
415 Tegel Dos Rp 76,000
10 x 20 cm
Keramik Putih
416 Tegel Dos Rp 81,000
20 x 20 cm
Keramik Putih
417 Tegel Dos Rp 87,000
20 x 25 cm
Keramik Putih
418 Tegel Dos Rp 81,000
30 x 30 cm
Keramik Putih
419 Tegel Dos Rp 87,000
40 x 40 cm
Keramik Putih
420 Tegel Dos Rp 96,000
50 x 50 cm
Keramik Putih
421 Tegel 60 x 60 cm Ex Dos Rp 276,000
Granito
Keramik Putih
422 Tegel 60 x 60 cm Ex Dos Rp 240,000
Garuda
Keramik Putih
423 Tegel 30 x 60 cm Ex Dos Rp 415,000
Granito
Keramik Putih
424 Tegel 60 x 60 cm Ex Dos Rp 351,000
Granito
Keramik Putih
425 Tegel 60 x 60 cm Ex Dos Rp 256,000
Garuda
Keramik Putih
426 Tegel 30 x 60 cm Ex Dos Rp 312,000
Garuda
Keramik Putih
427 Tegel Dos Rp 144,000
30 x 60 cm
Keramik Warna
428 Tegel Dos Rp 92,000
20 x 20 cm
Keramik Warna
429 Tegel Dos Rp 90,000
30 x 30 cm
Keramik Warna
430 Tegel M2 Rp 98,000
20 x 25 cm
Keramik Warna
431 Tegel M2 Rp 95,000
40 x 40 cm
Keramik Warna
432 Tegel Dos Rp 232,000
50 x 50 cm
Keramik Warna
433 Tegel Dos Rp 266,000
60 x 60 cm
Keramik Warna
434 Tegel Dos Rp 232,000
30 x 60 cm
Ukuran 60 x
435 Tegel 185 cm Dasar M3 Rp 1,740,000
Hitam

BAHAN LAIN-
LAIN
436 Aspal Emulsi Kg Rp 20,000
437 Aspal Bitumen Kg Rp 21,000
438 Aspal Curah Kg Rp 22,000
439 Aspal Drum Drum Rp 18,000
440 Bensin Liter Rp 8,000
441 Beton Mutu K350 M3 Rp 1,312,000
442 Beton Mutu K300 M3 Rp 1,377,000
443 Beton Mutu K275 M3 Rp 1,340,000
444 Beton Mutu K250 M3 Rp 1,302,000
445 Beton Mutu K225 M3 Rp 1,251,000
446 Beton Mutu K175 M3 Rp 1,147,000
447 Drainase 1,2 Bh/M' M' Rp 288,000
448 Filler / Abu Batu Kg Rp 3,000
449 Grass Block 8 cm Standar Biji Rp 27,000
450 Gutter Crub 2.5 Bh/M' M' Rp 78,000
Type Segi 10-15
451 Kanstin x 30 x 40 cm - M' Rp 96,000
2,5 Bh/M'
Type Kotak 10 x
452 Kanstin 20 x 40 cm - 2,5 M' Rp 67,000
Bh/M'
Type Kotak 10 x
453 Kanstin 25 x 50 cm - 2 M' Rp 82,000
Bh/M'
Pracetak 60 x 25
454 Kanstin Biji Rp 53,000
x 15 cm
Pracetak
455 Kanstin Segitiga 40 x 20 Biji Rp 115,000
x 10 cm
Pracetak 15 x 20
456 Kanstin Biji Rp 36,000
x 40 cm
Pracetak 15 x 25
457 Kanstin Biji Rp 31,000
x 40 cm
Pracetak 15 x 30
458 Kanstin Biji Rp 36,000
x 40 cm
Pracetak 15 x 30
459 Kanstin Biji Rp 38,000
x 50 cm
Pracetak 12 x 25
460 Kanstin Biji Rp 34,000
x 40 cm
Pracetak 25 x 30
461 Kanstin Biji Rp 53,000
x 50 cm
Pracetak 22 x 25
462 Kanstin Biji Rp 53,000
x 60 cm
Kerosen / Minyak
463 Liter Rp 17,000
Tanah
464 Minyak Bakesting Liter Rp 7,000
465 Minyak Pelumas Liter Rp 59,000
Segi Empat 6
466 Paving Blok M2 Rp 79,000
cm ( K 225 )
Segi Empat 6
467 Paving Blok cm ( K 250 ) M2 Rp 92,000
Standar
Segi Empat 6
468 Paving Blok cm ( K 250 ) M2 Rp 115,000
Warna
Segi Empat 6
469 Paving Blok cm ( K 300 ) M2 Rp 86,000
Standar
Segi Empat 6
470 Paving Blok cm ( K 300 ) M2 Rp 128,000
Warna
Segi Empat 8
471 Paving Blok cm ( K 225 ) M2 Rp 95,000
Standar
Segi Empat 8
472 Paving Blok cm ( K 225 ) M2 Rp 116,000
Warna
Segi Empat 8
473 Paving Blok cm ( K 250 ) M2 Rp 97,000
Standar
Segi Empat 8
474 Paving Blok cm ( K 250 ) M2 Rp 119,000
Warna
Segi Empat 8
475 Paving Blok cm ( K 300 ) M2 Rp 104,000
Standar
Segi Empat 8
476 Paving Blok cm ( K 300 ) M2 Rp 144,000
Warna
Segi Empat 8
477 Paving Blok cm ( K 400 ) M2 Rp 109,000
Standar
Segi Empat 8
478 Paving Blok cm ( K 400 ) M2 Rp 158,000
Warna
Segi Empat 10
479 Paving Blok cm ( K 300 ) M2 Rp 117,000
Standar
Segi Empat 10
480 Paving Blok cm ( K 300 ) M2 Rp 139,000
Warna
Segi Empat 10
481 Paving Blok cm ( K 400 ) M2 Rp 133,000
Standar
Segi Empat 10
482 Paving Blok cm ( K 400 ) M2 Rp 192,000
Warna
Segitiga Uskup
483 Paving Blok Biji Rp 7,000
6 cm
Segitiga Uskup
484 Paving Blok Biji Rp 8,000
8 cm
Segi Enam 8 cm
485 Paving Blok ( K 225 ) M2 Rp 91,000
Standar

Segi Enam 8 cm
486 Paving Blok M2 Rp 126,000
( K 225 ) Warna

Segi Enam 8 cm
487 Paving Blok ( K 300 ) M2 Rp 115,000
Standar

Segi Enam 8 cm
488 Paving Blok M2 Rp 130,000
( K 300 ) Warna

Segi Enam 8 cm
489 Paving Blok ( K 400 ) M2 Rp 105,000
Standar

Segi Enam 8 cm
490 Paving Blok M2 Rp 140,000
( K 400 ) Warna

491 Solar Non Industri Liter Rp 7,000


492 Solar Industri Liter Rp 13,000
493 Tali Nilon Kg Rp 8,000
T = 6 cm 3
494 Topi Uskup M' Rp 16,000
Bh/M'
T = 8 cm 3
495 Topi Uskup M' Rp 18,000
Bh/M'
L: 30 cm, T: 40
496 U Ditch Pcs Rp 240,000
cm, P: 80 cm
L: 40 cm, T: 50
497 U Ditch Pcs Rp 399,000
cm, P: 100 cm
L: 50 cm, T: 50
498 U Ditch Pcs Rp 495,000
cm, P: 100 cm
L: 60 cm, T: 60
499 U Ditch Pcs Rp 638,000
cm, P: 100 cm
L: 80 cm, T: 100
500 U Ditch Pcs Rp 1,755,000
cm, P: 100 cm

ALAT BANTU
PEMELIHARAA
N
501 Betel Buah Rp 44,000
502 Cerek Aspal Buah Rp 112,000
Drum Pemasak
503 Buah Rp 240,000
Aspal
504 Garu Buah Rp 49,000
505 Gerobak Dorong Buah Rp 622,000
506 Kayu Bakar Buah Rp 1,160,000
507 Palu Buah Rp 70,000
508 Sapu Lidi Buah Rp 18,000
509 Sekop Buah Rp 102,000
510 Sendok Semen Buah Rp 27,000
511 Sikat Baja Buah Rp 19,000

BAHAN PIPA
PIPA PARALON PVC ( S II )
512 ½ Inci - 4 M Batang Rp 30,000
513 ¾ Inci - 4 M Batang Rp 42,000
514 1 Inci - 4 M Batang Rp 56,000
515 1¼ Inci - 4 M Batang Rp 54,000
516 1½ Inci - 4 M Batang Rp 72,000
517 2 Inci - 4 M Batang Rp 93,000
518 2½ Inci - 4 M Batang Rp 125,000
519 3 Inci - 4 M Batang Rp 204,000

PIPA PARALON
uPVC
520 ½ Inci - 6 M S-10 Batang Rp 37,000
521 ¾ Inci - 6 M S-10 Batang Rp 57,000
522 1 Inci - 6 M S-10 Batang Rp 91,000
523 1¼ Inci - 6 M S-10 Batang Rp 133,000

524 1½ Inci - 6 M S-10 Batang Rp 341,000


525 2 Inci - 6 M S-10 Batang Rp 335,000
526 2 Inci - 6 M S-10 Batang Rp 713,000
527 2 Inci - 6 M S-12.5 Batang Rp 272,000

528 2 Inci - 6 M S-12.5 Batang Rp 281,000

529 2½ Inci - 6 M S-10 Batang Rp 488,000

530 2½ Inci - 6 M S-10 Batang Rp 505,000

2½ Inci - 6 M S-
531 Batang Rp 369,000
12.5
2½ Inci - 6 M S-
532 Batang Rp 383,000
12.5
533 3 Inci - 6 M S-10 Batang Rp 698,000
534 3 Inci - 6 M S-10 Batang Rp 671,000
535 3 Inci - 6 M S-12.5 Batang Rp 624,000

536 3 Inci - 6 M S-12.5 Batang Rp 583,000


537 4 Inci - 6 M S-10 Batang Rp 619,000
538 4 Inci - 6 M S-10 Batang Rp 646,000
539 4 Inci - 6 M S-12.5 Batang Rp 495,000

540 4 Inci - 6 M S-12.5 Batang Rp 510,000

PIPA
SUPRALON PVC

541 ½ Inci - 6 M S - 10 Batang Rp 25,000

½ Inci - 6 M S -
542 Batang Rp 24,000
12,5
543 ½ Inci - 6 M S - 8 Batang Rp 30,000
544 ¾ Inci - 6 M S - 10 Batang Rp 36,000

¾ Inci - 6 M S -
545 Batang Rp 36,000
12,5
546 ¾ Inci - 6 M S - 8 Batang Rp 48,000
547 1 Inci - 6 M S - 10 Batang Rp 61,000

548 1 Inci - 6 M S - 10 Batang Rp 55,000


549 1 Inci - 6 M S - 8 Batang Rp 71,000
1¼ Inci - 6 M S -
550 Batang Rp 90,000
10
1¼ Inci - 6 M S -
551 Batang Rp 84,000
12,5

552 1¼ Inci - 6 M S - 8 Batang Rp 119,000

1½ Inci - 6 M S -
553 Batang Rp 146,000
10
1½ Inci - 6 M S -
554 Batang Rp 131,000
12,5
1½ Inci - 6 M S -
555 Batang Rp 112,000
16

556 1½ Inci - 6 M S - 8 Batang Rp 175,000

557 2 Inci - 6 M S - 10 Batang Rp 232,000

558 2 Inci - 6 M S - 10 Batang Rp 252,000

2 Inci - 6 M S -
559 Batang Rp 196,000
12,5
2 Inci - 6 M S -
560 Batang Rp 221,000
12,5

561 2 Inci - 6 M S - 16 Batang Rp 178,000

562 2 Inci - 6 M S - 16 Batang Rp 205,000


563 2 Inci - 6 M S - 8 Batang Rp 284,000
564 2 Inci - 6 M S - 8 Batang Rp 311,000
2½ Inci - 6 M S -
565 Batang Rp 336,000
10
2½ Inci - 6 M S -
566 Batang Rp 359,000
10
2½ Inci - 6 M S -
567 Batang Rp 281,000
12,5
2½ Inci - 6 M S -
568 Batang Rp 305,000
12,5
2½ Inci - 6 M S -
569 Batang Rp 234,000
16
2½ Inci - 6 M S -
570 Batang Rp 266,000
16

571 2½ Inci - 6 M S - 8 Batang Rp 409,000


572 2½ Inci - 6 M S - 8 Batang Rp 444,000

573 3 Inci - 6 M S - 10 Batang Rp 235,000

574 3 Inci - 6 M S - 10 Batang Rp 501,000

3 Inci - 6 M S -
575 Batang Rp 426,000
12,5
3 Inci - 6 M S -
576 Batang Rp 411,000
12,5

577 3 Inci - 6 M S - 16 Batang Rp 383,000

578 3 Inci - 6 M S - 16 Batang Rp 394,000


579 3 Inci - 6 M S - 8 Batang Rp 578,000
580 3 Inci - 6 M S - 8 Batang Rp 614,000
581 4 Inci - 6 M S - 10 Batang Rp 855,000

582 4 Inci - 6 M S - 10 Batang Rp 742,000

4 Inci - 6 M S -
583 Batang Rp 704,000
12,5
4 Inci - 6 M S -
584 Batang Rp 650,000
12,5

585 4 Inci - 6 M S - 16 Batang Rp 602,000

586 4 Inci - 6 M S - 16 Batang Rp 579,000


587 4 Inci - 6 M S - 8 Batang Rp 874,000
588 4 Inci - 6 M S - 8 Batang Rp 902,000

PIPA MASPION
PVC
589 ⅜ Inci S - 10 M' Rp 6,000
590 ⅜ Inci S - 12,5 M' Rp 5,000
591 ⅜ Inci S - 6,3 M' Rp 13,000
592 ⅜ Inci S - 8 M' Rp 7,000
593 ½ Inci S - 10 M' Rp 8,000
594 ½ Inci S - 12,5 M' Rp 7,000
595 ½ Inci S - 6,3 M' Rp 14,000
596 ½ Inci S - 8 M' Rp 9,000
597 ¾ Inci S - 10 M' Rp 11,000
598 ¾ Inci S - 12,5 M' Rp 10,000
599 ¾ Inci S - 6,3 M' Rp 15,000
600 ¾ Inci S - 8 M' Rp 13,000
601 1 Inci S - 10 M' Rp 18,000
602 1 Inci S - 10 M' Rp 16,000
603 1 Inci S - 6,3 M' Rp 26,000
604 1 Inci S - 8 M' Rp 21,000
605 1¼ Inci S - 10 M' Rp 26,000
606 1¼ Inci S - 12,5 M' Rp 24,000
607 1¼ Inci S - 6,3 M' Rp 52,000
608 1¼ Inci S - 8 M' Rp 31,000
609 1½ Inci S - 10 M' Rp 45,000
610 1½ Inci S - 12,5 M' Rp 35,000
611 1½ Inci S - 16 M' Rp 30,000
612 1½ Inci S - 6,3 M' Rp 60,000
613 1½ Inci S - 8 M' Rp 50,000
614 2 Inci S - 10 M' Rp 60,000
615 2 Inci S - 10 M' Rp 65,000
616 2 Inci S - 12,5 M' Rp 48,000
617 2 Inci S - 12,5 M' Rp 55,000
618 2 Inci S - 16 M' Rp 44,000
619 2 Inci S - 16 M' Rp 50,000
620 2 Inci S - 8 M' Rp 76,000
621 2 Inci S - 8 M' Rp 79,000
622 2½ Inci S - 10 M' Rp 85,000
623 2½ Inci S - 10 M' Rp 92,000
624 2½ Inci S - 12,5 M' Rp 69,000
625 2½ Inci S - 12,5 M' Rp 76,000
626 2½ Inci S - 16 M' Rp 60,000
627 2½ Inci S - 16 M' Rp 46,000
628 2½ Inci S - 8 M' Rp 104,000
629 2½ Inci S - 8 M' Rp 112,000
630 3 Inci S - 10 M' Rp 120,000
631 3 Inci S - 10 M' Rp 128,000
632 3 Inci S - 12,5 M' Rp 98,000
633 3 Inci S - 12,5 M' Rp 106,000
634 3 Inci S - 16 M' Rp 90,000
635 3 Inci S - 16 M' Rp 97,000
636 3 Inci S - 8 M' Rp 144,000
637 3 Inci S - 8 M' Rp 160,000
638 4 Inci S - 10 M' Rp 115,000
639 4 Inci S - 10 M' Rp 192,000
640 4 Inci S - 12,5 M' Rp 146,000
641 4 Inci S - 12,5 M' Rp 155,000
642 4 Inci S - 16 M' Rp 130,000
643 4 Inci S - 16 M' Rp 141,000
644 4 Inci S - 8 M' Rp 240,000
645 4 Inci S - 8 M' Rp 221,000

JENIS D UNTUK SALURAN


PEMBUANGAN AIR
646 ¾ Inci - 4 M Batang Rp 40,000
647 1 Inci - 4 M Batang Rp 56,000
648 10 Inci - 4 M Batang Rp 2,337,000
649 1½ Inci - 4 M Batang Rp 60,000
650 2 Inci - 4 M Batang Rp 76,000
651 2½ Inci - 4 M Batang Rp 96,000
652 3 Inci - 4 M Batang Rp 112,000
653 4 Inci - 4 M Batang Rp 211,000
654 5 Inci - 4 M Batang Rp 607,000
655 6 Inci - 4 M Batang Rp 847,000
656 8 Inci - 4 M Batang Rp 1,481,000
657 Dop PVC ¾" Buah Rp 6,000
658 Dop PVC 1" Buah Rp 6,000
659 Dop PVC 2" Buah Rp 8,000
660 Dop PVC 4" Buah Rp 25,000
661 Double Nipple 4" Buah Rp 160,000
662 Double Nipple 2" Buah Rp 49,000
663 Double Nipple GIV ½" Buah Rp 12,000

664 Double Nipple GIV ¾" Buah Rp 13,000


665 Elbow GIV ¾" Buah Rp 17,000
666 Elbow GIV 2" Buah Rp 12,000
INSTALASI
667 LISTRIK 3/4 INCI Batang Rp -
-4M
668 Knee ¾" Buah Rp 4,000
669 Knee 1" Buah Rp 6,000
PVC Diameter
670 Knee Buah Rp 37,000
2"
671 Seal tape onda buah Rp 4,000
672 Lem FOX Kg Rp 55,000
673 Lem PIPA PVC Tube Rp 14,000
674 Lem PIPA PVC Kg Rp 60,000
675 Lem BESI KW 1 Tube Rp 39,000
676 Lem Besi Biasa Tube Rp 16,000
677 PIPA PVC ½" (M.P) Batang Rp -
PVC ¾"
678 PIPA Batang Rp -
(Maspion)
679 PIPA PVC 1" Batang Rp 77,000
680 PIPA PVC 2" M' Rp 92,000
681 PIPA PVC 2½ M' Rp 135,000
682 Pipa listrik 5/8" M Rp 6,780
683 Pipa Instalasi ⅝ Batang Rp 13,000
PIPA JENIS C
684 UNTUK 5/8 INCI- Batang Rp -
4M
685 Pipa Listrik ⅝ Batang Rp 12,000
Sambungan Pipa
686 Buah Rp 13,000
Besi 3/4" T
Sambungan Pipa L
687 Buah Rp 4,000
1/2"
Sambungan Pipa
688 Buah Rp 4,000
Lurus 1/2
689 Saringan Kotoran Buah Rp 31,000
Saringan kotoran
Kamar Mandi
690 Bahan Buah Rp 34,000
Besi/Kuningan
(Floor Drain)

Saringan kotoran
Kamar Mandi
691 Buah Rp 15,000
Bahan Plastik
(Floor Drain)
692 Saringan Pasir M' Rp 49,000
693 Talang PVC Meter Rp 136,000
694 ijuk resapan kg Rp 4,200
DAFTAR HARGA UNTUK PIPA
695
& ALAT BANTU BESI
696 KNEE BESI ½" Buah Rp 10,000
697 ¾" Buah Rp 6,000
698 1" Buah Rp 23,000
PIPA BESI
699 A. SUPER ½" Batang Rp 236,000
MEDIUM
700 A. SUPER ¾" Batang Rp 247,000
701 A. SUPER 1" Batang Rp 435,000
702 A. SUPER 2" Batang Rp 718,000
703 A. SUPER 3" Batang Rp 1,595,000
704 A. SUPER 4" Batang Rp 2,106,000
PIPA
705 A. SUPER ½" Batang Rp 192,000
GALVANISIR
706 A. SUPER ¾" Batang Rp 251,000
707 A. SUPER 1" Batang Rp 391,000
708 A. SUPER 2" Batang Rp 830,000
709 STOP KRAN BIASA ½" Buah Rp 75,000
710 BIASA ¾" Buah Rp 94,000
711 BIASA 1" Buah Rp 120,000
712 STOP KRAN KW.1 ½" Buah Rp 273,000
713 KW.1 ¾" Buah Rp 347,000
714 KW.1 1" Buah Rp 475,000
715 TEE ½" Buah Rp 10,000
716 ¾" Buah Rp 11,000
717 V. KNIE ¾" Buah Rp 12,000
718 1" Buah Rp 17,000
719 V NEPLE ¾" Buah Rp 11,000
720 1" Buah Rp 12,000
721 WATER MUR ½" Buah Rp 16,000
722 WATER MUR ¾" Buah Rp 18,000
723 Pipa Gip 1½" Air Bersih Batang Rp 9,000
Hitam - 6 M ½"
724 Pipa Baja Batang Rp 288,000
tbl=2 mm
Putih - 6 M ½"
725 Pipa Baja Batang Rp 383,000
tbl=2 mm
Hitam - 6 M ¾"
726 Pipa Baja Batang Rp 383,000
tbl=2 mm
Putih - 6 M ¾"
727 Pipa Baja Batang Rp 479,000
tbl=2 mm
Hitam - 6 M 1"
728 Pipa Baja Batang Rp 503,000
tbl=2 mm
Putih - 6 M 1"
729 Pipa Baja Batang Rp 638,000
tbl=2 mm
Hitam - 6 M 2"
730 Pipa Baja Batang Rp 916,000
tbl=2 mm
Putih - 6 M 2"
731 Pipa Baja Batang Rp 13,000
tbl=2 mm
Hitam - 6 M 3"
732 Pipa Baja Batang Rp 1,914,000
tbl=2 mm
Putih - 6 M 3"
733 Pipa Baja Batang Rp 2,473,000
tbl=2 mm
Hitam - 6 M 4"
734 Pipa Baja Batang Rp 2,648,000
tbl=2 mm
Putih - 6 M 4"
735 Pipa Baja Batang Rp 3,190,000
tbl=2 mm
736 lampu Hias IKEA HEMMA Buah Rp 174,000

Neon philips
737 Lampu Buah Rp 39,000
tornado 20 watt
Super Philips
738 Lampu pijar Buah Rp 6,000
40 watt
739 Stop Kontak Panasonic Buah Rp 23,400
740 Saklar Tunggal Panasonic buah Rp 8,500
741 Saklar Ganda Panasonic Buah Rp 21,000
Eterna 3 x 2,5
742 Kabel NYM m Rp 8,540
mm
UPAH KERJA
Biaya Pasang
743 /M' Rp 12,000
Canstein
Biaya Pasang
744 /M2 Rp 28,000
Paving
745 Kepala Tukang Orang/Hari Rp 140,000
Kepala Tukang
746 Orang/Hari Rp 140,000
Listrik
747 Mandor Lapangan Orang/Hari Rp 140,000
748 Mekanik Orang/Hari Rp 154,000
749 Operator Terlatih Orang/Hari Rp 168,000
750 Pekerja Orang/Hari Rp 84,000
751 Pembantu Mekanik Orang/Hari Rp 98,000

752 Pembantu Operator Orang/Hari Rp 98,000


753 Pembantu Sopir Orang/Hari Rp 98,000
Pembantu Tukang
754 Orang/Hari Rp 126,000
Listrik
Penjaga / Pembantu
755 Orang/Hari Rp 147,000
Sopir
756 Sopir Terampil Orang/Hari Rp 112,000
757 Tukang Batu / Cat Orang/Hari Rp 112,000
Tukang Kayu /
758 Orang/Hari Rp 84,000
Besi
Tukang Pasang
759 Orang/Hari Rp 112,000
Paving
UPAH KERJA
N

Dalam Rupiah (Rp)


HARGA
5

56,000

57,000

53,000
67,000

33,000

31,000

16,000

24,000

27,000

26,000

32,000

9,000

7,000

9,000

10,000

17,000
167,000

68,000

142,000

114,000

77,000

74,000

54,000

58,000

7,000

9,000

8,000

9,000

8,000
8,000

10,000

9,000

10,000

7,000

10,000

8,000

11,000

8,000

11,000
7,000

11,000

9,000

9,000

10,000

10,000

9,000

7,000

12,000

16,000
19,000

48,000

8,000

12,000

10,000

9,000

67,000

71,000

64,000

8,000

13,000

11,000

10,000

79,000

96,000
74,000

80,000

55,000
79,000

69,000

8,000

92,000

50,000

42,000

13,000

12,000

11,000

10,000

10,000

134,000
123,000

56,000

71,000

101,000

9,000

123,000

102,000

80,000

19,000

83,000

44,000

51,000

90,000

518,000

388,000

319,000
249,000
238,000
1,000
586,000
564,000
399,000
395,000
414,000
427,000
32,000

11,000
43,000

396,000

252,000

296,000
284,000
288,000

160,000

69,000

79,000

93,000

149,000

1,860
25,000
153,000
223,000

208,000

166,000

100,000
47,000
37,000
29,000
-
270,000
360,000
143,000
176,000
-
38,000
-
212,000

172,000

238,000

212,000

50,000
28,000

104,000

133,000

9,000

10,000

14,000

13,000

1,000
32,000

72,000

20,000

24,000

42,000

68,000

97,000

138,000

210,000
273,000

418,000

645,000

150,000

186,000

216,000

220,000

209,000

193,000

143,000

141,000

80,000
126,000
368,000
547,000
527,000
1,580,000
192,000
230,000

46,000

29,000

56,000
38,000

22,000

28,000

171,000

40,000

31,000

38,000

44,000

37,000

39,000

42,000

192,000

21,000

24,000

18,000

2,422,000

698,000

266,000

612,000

717,000

856,000
24,000

54,000

35,000

31,000
32,000

38,000

43,000

1,000
56,000
26,000
25,000
21,000

20,000

48,000

56,000
26,000

34,000

35,000

1,000

101,000

79,000

1,366,000

1,694,000
121,000

431,000

798,000

894,000

212,000

2,000

68,000
198,000
234,000
264,000

57,000

132,000

20,000

80,000

90,000

88,000

44,000
36,000

54,000

44,000

101,000

124,000
kg 35400

136,000
84,000

53,000

58,000

241,000

343,000

180,000

299,000

119,600

143,000

20,000

241,000

183,000

218,000

326,000

65,000

78,000

129,000

367,000

146,800
32,000

167,000

1,261,000

1,224,000

64,000
62,000

120,000

90,000

52,000

88,000

80,000

17,000
78,000
36,000

6,000

7,000

49,000

56,000

79,000

5,000
12,000
18,000
24,000
66,000
246,000
85,000
18,000
41,000
24,000
80,000
78,000
81,000

81,000

16,200
79,000
83,000
44,000
92,000
104,000

14,444,000

21,069,000

29,441,000

27,770,000

18,320,000

21,600,000

6,150,000

6,548,000

4,422,000
3,578,000

3,578,000
25,000

43,000

40,000
14,000
19,000
29,000

14,000

10,000

30,000

36,000

27,000

34,000

9,000

8,000

22,000

26,000

26,000

45,000

64,000

17,000
30,000
14,000

34,000

148,000
167,000
223,000

119,000

372,000

327,000

200,000
160,000
224,000

20,500

306,000

1,285,000

3,915,000

2,566,000

3,135,000

3,227,000

3,491,000

439,000
181,000

53,000

64,000

48,000

25,000

196,000
6,000
76,000

952,000

1,178,000

1,827,000

5,365,000

702,000

3,669,000

493,000

678,000

19,000

22,000

26,000

146,000

240,000
104,000
32,000
25,000
26,000

26,000

30,000
31,000

38,000

34,000

43,000

27,000

43,000

31,000

24,000

43,000

178,000

283,000

347,000

367,000

96,000

272,000

863,000

101,000

120,000

139,000
290,000

305,000

320,000

28,000

237,000

1,610,000

95,000

87,000

97,000

72,000

76,000

81,000

87,000

81,000

87,000

96,000

276,000
240,000

415,000

351,000

256,000

312,000

144,000

92,000

90,000

98,000

95,000

232,000

266,000

232,000

1,740,000

20,000
21,000
22,000
18,000
8,000
1,312,000
1,377,000
1,340,000
1,302,000
1,251,000
1,147,000
288,000
3,000
27,000
78,000

96,000

67,000

82,000

53,000

115,000

36,000

31,000

36,000

38,000

34,000

53,000

53,000

17,000

7,000
59,000

79,000
92,000

115,000

86,000

128,000

95,000

116,000

97,000

119,000

104,000

144,000

109,000

158,000

117,000

139,000
133,000

192,000

7,000

8,000

91,000

126,000

115,000

130,000

105,000

140,000

7,000
13,000
8,000

16,000

18,000

240,000

399,000

495,000

638,000
1,755,000

44,000
112,000

240,000

49,000
622,000
1,160,000
70,000
18,000
102,000
27,000
19,000

30,000
42,000
56,000
54,000
72,000
93,000
125,000
204,000

37,000
57,000
91,000

133,000

341,000

335,000
713,000
272,000

281,000

488,000

505,000

369,000

383,000

698,000
671,000

624,000

583,000

619,000
646,000

495,000

510,000

25,000

24,000

30,000

36,000

36,000

48,000

61,000

55,000

71,000
90,000

84,000

119,000

146,000

131,000

112,000

175,000

232,000

252,000

196,000

221,000

178,000

205,000

284,000
311,000

336,000

359,000

281,000

305,000

234,000

266,000

409,000
444,000

235,000

501,000

426,000

411,000

383,000

394,000

578,000
614,000

855,000

742,000

704,000

650,000

602,000

579,000

874,000
902,000

6,000
5,000
13,000
7,000
8,000
7,000
14,000
9,000
11,000
10,000
15,000
13,000
18,000
16,000
26,000
21,000
26,000
24,000
52,000
31,000
45,000
35,000
30,000
60,000
50,000
60,000
65,000
48,000
55,000
44,000
50,000
76,000
79,000
85,000
92,000
69,000
76,000
60,000
46,000
104,000
112,000
120,000
128,000
98,000
106,000
90,000
97,000
144,000
160,000
115,000
192,000
146,000
155,000
130,000
141,000
240,000
221,000

40,000
56,000
2,337,000
60,000
76,000
96,000
112,000
211,000
607,000
847,000
1,481,000
6,000
6,000
8,000
25,000
160,000
49,000

12,000

13,000

17,000
12,000

4,000
6,000

37,000

4,000
55,000
14,000
60,000
39,000
16,000
-
-

77,000
92,000
135,000
6,780
13,000

12,000

13,000

4,000

4,000

31,000

34,000

15,000

49,000
136,000
4,200

10,000
6,000
23,000

236,000

247,000
435,000
718,000
1,595,000
2,106,000

192,000
251,000
391,000
830,000
75,000
94,000
120,000
273,000
347,000
475,000
10,000
11,000
12,000
17,000
11,000
12,000
16,000
18,000
9,000

288,000

383,000

383,000

479,000

503,000

638,000

916,000

13,000

1,914,000

2,473,000

2,648,000

3,190,000
174,000

39,000

6,000

23,400
8,500
21,000

8,540

12,000

28,000

140,000

140,000

140,000
154,000
168,000
84,000

98,000

98,000

98,000

126,000

147,000

112,000
112,000

84,000

112,000
URAIAN PEKERJAAN

I. PERSIAPAN
1.1 Pembersihan lapangan
1.2 Pengukuran dan pemasangan booplank
1.3 Pembuatan direksi keet
1.4 Los kerja
II. PEKERJAAN GALIAN
2.1 Galian tanah pondasi
2.2 Timbunan tanah kembali
2.3 Timbunan tanah bawah lantai
2.4 Uugan pasir di bawah pondasi
2.5 Urugan pasir di bawah lantai
III. PEKERJAAN PONDASI
3.1 Pekerjaan pondasi batu gunung 1:5
3.2 pekerjaan pasangan batu kosong

IV. PEKERJAAN BETON


4.1 Pekerjan sloof
4.2 pekerjaan kolom
4.3 Pekerjaan Ringbalk
4.4 pekerjaan Rabat Beton Bawah Lantai
4.5 Pekerjaan Rabat Beton bawah carport

V. PEKERJAAN TEMBOK DAN LANTAI


5.1 Pekerjaan dinding 1:5
5.2 Pekerjaan plesteran dan acian
a. Plesteran 1 : 3
b. Plesteran 1 : 5
c. Acian
5.3 Pek. Dinding Keramik WC dan tempat cuci (20 x 20)
5.4 Pekerjaan Lantai Keramik 40 X 40 cm
5.5 Pek. lantai teras 30 x 30 cm
5.6 Lantai Keramik WC 20 X 20 cm
5.7 Pasangan plint ukuran 10 x 40 cm
5.8 Pasangan plint ukuran 30 x 10 cm
5.9 Pasangan plint ukuran 20 x 10 cm
5.10 Pasangan plint ukuran 30 x 5 cm
VI. PEKERJAAN PINTU DAN JENDELA
6.1 Pekerjaan kusen pintu dan jendela
6.2 Pekerjaan daun pintu
6.3 Pekerjaan daun jendela
6.4 Pas. Kunci Tanam
6.5 Pas. Engsel Pintu
6.6 Pas. Grendel Pintu
6.7 Pas. Engsel Jendela
6.8 Pas. Grendel Jendela
6.9 Hak Angin

VII. PEKERJAAN ATAP DAN PLAFOND


7.1 Pekerjaan kuda-kuda
7.2 Pekerjaan gording
7.3 Pekerjaan nok atap
7.4 Pekerjaan atap seng
7.5 Pek. Rangka Plafond 5/7
7.6 Pek. Plafond 1,2 x 1,2 m tebal 6mm
7.7 Pek. List plafond 7 cm
7.8 PEK. LISTPLANK

VIII. PEKERJAAN PENGECATAN


8.1 Pekerjaan pengecatan tembok
8.2 Pekerjaan cat kusen, pintu dan jendela
8.3 Pek. Daun pintu dan jendela
8.4 Pekerjaan pengecatan plafond dan listplafond
8.5 Pekerjaan pengecatan listplank
8.6 Pekerjaan pengecatan atap

IX. PEKERJAAN INSTALASI LISTRIK


9.1 Pasangan saklar ganda `
9.2 Pasangan saklar tunggal
9.3 Pas. KWH meter
9.4 Pasangan lampu hias
9.5 pasangan lampu pijar 20 wat
9.6 Pasangan lampu pijar 40 wat

X. PEKERJAAN SANITASI
10.1 Pekerjaan stop keran
10.2 Pekerjaan pipa 3/4"
10.3 Pekerjaan pipa pvc 4"
10.4 Pasangan kloset duduk
10.5 Bak air fiber
10.6 Floor drain
10.7 Pekerjaan septictank
No Uraian Pekerjaan
I PEKERJAAN PERSIAPAN

1 Pembersihan lapangan

Ukuran = 7 x 14 m

16,5
7

Lebar = 14 m
Panjang = 7m

Luas = 98 m2

2 Pemasangan Bowplank

Pasangan Bowplank
Panjang = 14 m
Lebar = 7m
Keliling = 42 m

3 Pembuatan direksi keet

Direksi Keet

Panjang = 4m
Lebar = 3m

Luas = 12 m2
4 Gudang semen dan Alat-Alat
Panjang = 4m
Lebar = 2m
Luas = 8m

PEKERJAAN GALIAN

1 Galian Tanah Pondasi


Type I
1.4 m

0.76 m

Panjang Pondasi:
sumbu x = 3+3+5.3+2+3+7+4+4+1 32.3
sumbu y = 14+2+4+1.5+3+1.5+2+14 42
74.3

Jadi, Panjang Pondasi = 74.3 m


Volume = 128.3904 m3
Type II
1.1 m

0.48 m

Panjang Pondasi:
sumbu x = 4+7 11
sumbuy = 14+14 28
39

Panjang Pondasi = 39 m
Volume = 49.296 m3

Total Galian Pondasi = 177.69

2 Timbunan Tanah Kembali

Volume Galian = 177.69


Volume Timbunan = 44.4216

3 Timbunan Tanah Bawah Lantai

V. R. TAMU = 3 x 4 x
V. K. TIDUR (3) = 3 x 3 x
V. TERAS = 3 x 1 x
V. CARPORT = 3 x 5 x
V. KELUARGA = 4 x 3 x
V. R. MAKAN = (1,5x1,5x0,15) + (4x1x0.15)
= 0.3375 + 0.6 +
= 1.3875
V. DAPUR = (2x2,5x0,15) + (1x0,5x0,15)
= 0.75 + 0.075
= 0.825
V. T. CUCI = 2 x 1 x
V. TERAS BELAKANG = 1.5 x 1.5 x
Luas Timbunan = 85.75
Volume Timbunan = 85.75
= 17.15

4 Urugan Pasir Dibawah Pondasi

Type I

0.76 m

Panjang Pondasi = 47.68 m


Volume = 2.174208 m3

Type II

0.06

0.48 m

Panjang Pondasi = 39 m
Volume = 1.1232 m3

Total Urugan Pasir Bawah Pondasi


5 Urugan Pasir Di Bawah Lantai

V R. TAMU = 3 x 3.5 x
V K. TIDUR UTAMA = 3.5 x 3 x
V TERAS = 3 x 2 x
V CARPORT = 3 x 5 x
V KELUARGA = 3.5 x 2.5 x
V R. MAKAN = 3.5 x 2
V T. JEMURAN = 3.5 x 2 x
V K. TIDUR TAMU = 3 x 2 x
V DAPUR = 2 x 2 x
V T. CUCI = 1.5 x 2 x
V WC = 2 x 1.5 x
V WC = 2 x 1.5 x
V TAMAN = 4 x 3 x
V WC = 2 x 1.5 x

LUAS LANTAI = 11.51 m2


TEBAL PASIR = 0.1 m

VOLUME = 1.151 m3

III Pekerjaan Pondasi


1 Pas. Pondasi Batu Gunung 1:5
Type I
0.30 m

0.90 m

0.80 m
Panjang Pondasi = 47.68 m
Volume = 23.6016 m3

Type II
0.2 m

0.90 m
0.5 m
Panjang Pondasi = 41.91 m
Volume = 13.20165 m3

Total Volume Pondasi = 36.80325

2 Pas. Batu Kosong


Type I

0.20 m

0.90 m

Panjang Pondasi = 47.68 m


Volume = 8.5824 m3
Type II

0.2 m
0.54 m

Panjang Pondasi = 39 m
Volume = 4.212 m3

Total Pas. Batu Kosong = 12.79

IV PEKERJAAN BETON
1 Pek. Sloef 15
20

0.2 m

0.15 m

Panjang Sloef =
Sumbu x = 4.00+4.00+3.50+3.00+5.50+2.00+3.5+7.00+1.00
Sumbu y = 14.00+3.00+2.00+1.50+3.00+1.50+2.00+14.00

Volume = 2.175 m3

Pek. Begel ᴓ8-200


tebal selimut = 0.02 m
jumlah begel = 362.5 bh
panjang satu begel = 0.64 m
total kebtuhan besi begel = 232 m
total kebutuhan besi = 91.64 kg

2 Pek. Kolom
15 x 15

15
0.15 m
15
15

15
0.15 m

Tinggi kolom 1 = 3 m
Banyaknya kolom 1 = 13 kolom
Volume 1 = 0.8775 m3

Tinggi kolom 2 = 3.5 m


Banyaknya kolom 2 = 10 kolom
Volume 2 = 0.7875 m3

Volume = 1.67 m3

Pek. Begel ᴓ8-200


tebal selimut = 0.02 m
jumlah begel = 74
= 370 bh
panjang satu begel = 0.54 m
total kebtuhan besi begel = 39.96 m
total kebutuhan besi = 15.7842 kg
3 Pek. Ring Balk

15
0.2 m
15

0.15 m
Panjang Ring Balk =
Sumbu x = 4.00+4.00+3.50+3.00+5.50+2.00+3.5+7.00+1.00
Sumbu y = 16,5+16,5+2,5+3+3+1,5+1,5+3+6,85+6,85+6,8+6,8

Volume = 0.2
= 2.18

Pek. Begel ᴓ8-200


tebal selimut = 0.02 m
jumlah begel = 362.5 bh
panjang satu begel = 0.54 m
total kebtuhan besi begel = 195.75 m
total kebutuhan besi = 77.32125 kg

4 Pek. Rabat Beton Bawah Lantai


Luas Lantai Rumah = 85.75
Tebal Rabat Beton = 0.05
Volume Rabat Beton = 85.75
= 4.2875

5 Pek. Rabat Beton Carport

Luas Lantai Carport = 15


Tebal Rabat Beton = 0.05
Volume Rabat Beton = 15
= 0.75

V PEKERJAAN TEMBOK & LANTAI


1 Pek. Dinding
1,3 1
Volume Pintu dan Jendela
Type PJ1

L1 L2
1,6

2,1

jumlah = 1 bh
tebal = 0.15 m
volume= 0.63825 m3
0,9
0,9
Type P2

L = 0.7 x 2
= 1.4 m2

2,1
jumlah = 2 bh
tebal = 0.15 m
volume = 0.42 m3
0,8
TypeP3

L = 0.7 x 1.9
= 1.33 m 2

2,1
jumlah = 4 bh
tebal = 0.15 m
volume = 0.798 m3
Type J1 0,9

L = 1.85 x 1.5
= 2.775 m2

1,6
jumlah = 2 bh
tebal= 0.15 m
volume = 0.8325 m 3

Ventilasi
0,2
L = 0.2 x 0.3
= 0.06 m2

0,3
jumlah = 12 bh
tebal = 0.15 m
volume = 0.108 m3

volume total pintu, jendela, dan ventilasi = 2.79675 m3


Luas dinding = 336.72 m2

Volume dinding utuh = 336.72 x 0.15


= 50.508 m3

Volume dinding = volume dinding utuh -


= 50.508 -
= 47.71125 m
3

2 Plesteran dan Acian

luas pintu, jendela dan ventilasi


p1 1.85 x 2.3 = 4.255 x 1
p2 0.7 x 2 = 1.4 x 2
p3 0.7 x 1.9 = 1.33 x 2
p4 0.7 x 1.9 = 1.33 x 2
j1 0.775 x 0.775 = 0.60063 x 2
ventilasi
total
Tebal plasteran = 0.02 m
Plasteran 1:3

tempat cuci 1.5 x 2 = 3.0


WC 2 x 1.5 = 3.0
6.0 m2

Plesteran 1:5
Luas = 316.4 x 2 sisi
= 643.2 m2

Acian = 0.001 m
Luas yang diaci = 12.0 + 643.2
= 655.2 m2
=

3 Pek. Dinding Keramik WC dan tempat cuci (20 x 20)

0.2

0.2

Luas Kamar mandi 1


Keliling = 3 + 3
Tinggi dinding = 1.5 m
Luas = 6 x 1.5
Luas tempat cuci
Keliling = 2 + 1
Tinggi dinding = 1.0 m
Luas = 3 x 1.0

Luas pintu yg tidak dipasangi keramik


= 0.80 x 1.5
= 1.2 m2
Jadi luas secara keseluruhan dinding
= 6 - 1.2
= 4.80 m2

4 Pek. Lantai Keramik 40 x 40 cm

L. R. TAMU = 3 x 3.5 =
L. K. TIDUR UTAMA = 3.5 x 3 =
L. KELUARGA = 3.5 x 2.5 =
L. R. MAKAN = 3.5 x 2
L. K. TIDUR TAMU = 3 x 2 =

L. TERAS = 3 x 2 =
L. Dibawah kusen = (0,15x0,9) + (0,15x0,8x3)
= 0.135 + 0.36
= 0.495 m2
Jadi Luas Secara Keseluruhan Lantai Keramik 40x40 = 49.245

5 Pek. lantai teras 30 x 30 cm


L. DAPUR = 2 x 2
= 4 m2

6 Lantai Keramik WC 20 X 20 cm
Luas Wc/ KM = 1.35 x 1.35
= 1.8225 m2
Luas lantai di bawah kusen = 0.15 x 0.7
= 0.105 m2
Luas T. Cuci = 0.925 x 1.925
= 1.780625 m2

TOTAL = 3.708125 m2

7 Pasangan plint ukuran 10 x 40 cm

K. Tidur = 10.91 x 0.1 = 3.273 m2


R. Tamu = 12.3 x 0.1 = 1.23 m2
R. Keluarga = 9.1 x 0.1 = 0.91 m2
R. Makan = 10.5 x 0.1 = 1.05 m2
Dapur = 6.85 x 0.1 = 0.685 m2
7.148 m2
8 Pasangan plint ukuran 30 x 10 cm

Teras depan = 5.95 x 0.1 = 0.595 m2


Teras Belakang = 5.05 x 0.1 = 0.505

9 Pasangan plint ukuran 20 x 10 cm


Tempat cuci = 2.85 x 0.1 = 0.285 m2
wc = 0.4 x 0.1 = 0.04 m2
VI PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen Pintu dan Jendela
PJ1 5 / 15 ( 1 Buah
Panjang Balok
Luas = 1.85 x
Volume = 4.26 x

P2 5 / 15 ( 2 Buah
Panjang Balok
Luas = 0.70 x
Volume = 1.40 x

P3 5 / 15 ( 4 Buah
Panjang Balok
Luas = 0.70 x
Volume = 1.33 x

J1 5 / 15 ( 2 Buah
Panjang Balok
Luas = 1.85 x
Volume = 2.78 x

Jadi Total Volume


= PJ1 + P2 + P3 + J1
= 0.63825 + 0.42 + 0.798 + 0.8325
= 2.69 m3
Pasangan kusen dan daun pintu PVC (KM/WC)
Volume = 1 bh

2 Pek. Daun Pintu


PJ1 ( 1 Buah )
Tebal = 3 cm
Lebar = 2.30 m
Panjang = 1.85 m
Luas = 2.3 x 1.85

P2 ( 6 Buah )
Tebal = 3 cm
Lebar = 1.90 m
Panjang = 0.70 m
Luas = 1.9 x 0.7
Jadi Total Luas
= 4.255 + 7.980
= 12.235 m2

3 Pek. Daun Jendela


PJ1
Tebal = 3 cm
Luas = 1.85 x 1.50 = 0.833
J1
Tebal = 3 cm
Luas = 0.416 x 1.52 = 2.5308

Jadi Total Volume


= PJ1 + J1
= 0.833 + 2.5308
= 3.363 m2
3 Pek. Kaca Mati
J1
Tebal = 5 mm
Luas = 0.8325 m2

4 Pas. Kunci Tanam


= 6 Bh

5 Pas. Engsel Pintu


= 16 Bh

6 Pas. Grendel Pintu


= 8 Bh

7 Pas. Engsel Jendela

= 8 Bh
8 Pas. Grendel Jendela
= 4 Bh

9 Hak Angin
= 4 Bh

VII PEKERJAAN ATAP DAN PLAVOND


1 KUDA -KUDA 2 buah
PANJANG BALOK KUDA - KUDA 6/12 = 2x4.5+2x4.5
= 18 m
volume = 0.08 x 0.12 x 18
= 0.1728 m3

PANJANG BALOK KUDA - KUDA 8/12 = 1,63+1,63+2,56+2,56


= 8.38 m
volume = 0.08 x 0.12 x 8,38
= 0.080448 m3

PANJANG BALOK KUDA - KUDA 8/16 = 11,65+11,65+11,65+11,65+3,30+3,30+4,20+4,20+1+1+1


= 65.6 m
volume = 0.08 x 0.16 x 65,6
= 0.83968 m3

PANJANG BALOK KUDA-KUDA 2/20 = 5+2,85


= 7.85 m
volume = 0,02x0,2x7,925
= 0.0314 m3

2 PEK. GORDING 6/12 4 buah


PANJANG BALOK = 9m
volume = 0.06 x 0.12 x 9
= 0.0648 m3
= 0.2592 m3

PEK. GORDING 6/12 12 buah


PANJANG BALOK = 2.85 m
volume = 0.06 x 0.12 x 2,85
= 0.02052 m3
= 0.24624 m3
volume total = 0.50544 m3

3 Nok atap seng = 8.64 m

4 PEK. ATAP
LUAS = 57 m2

5 Pek. Rangka Plafond 5/7

L. R. TAMU = 2.85 x 3.85 =


L. K. TIDUR (3) = 2.85 x 2.85 =
L. KELUARGA = 3.85 x 2.85 =
L. R. MAKAN = (2,35x2,35) + (1,50x0,8)
= 5.5225 + 1.2 +
= 8.7475 m2
L. DAPUR = 1.925 x 2.35 +
Luas Wc/ KM = 1.35 x 1.35
= 1.8225 m2
Luas T. Cuci = 0.925 x 1.925
= 1.780625 m 2
Rangka Plafond = Luas : ukuran plafond
63.58 : (1.2*1.2)
63.58 : 1.44
44.15277778

Volume = 0.05 x 0.07


= 0.1545347 m3

6 Pek. Plafond 1,2 x 1,2 m tebal 6mm


L. R. TAMU = 2.85 x 3.85 =
L. K. TIDUR (3) = 2.85 x 2.85 =
L. KELUARGA = 3.85 x 2.85 =
L. R. MAKAN = (2,35x2,35) + (1,50x0,8)
= 5.5225 + 1.2 +
= 8.7475 m2
L. DAPUR = 1.925 x 2.35 +
Luas Wc/ KM = 1.35 x 1.35
= 1.8225 m2
Luas T. Cuci = 0.925 x 1.925
= 1.780625 m2

Luas total plafond = 63.58 m2

kebutuhan triplex = 44.15277778


jumlah triplex yang harus dibeli ukuran 1,2 x 2,4 m tebal 6 mm = 22.0764

7 Pek. List plafond 3 cm

R. TAMU = 13.4 m
K. TIDUR (3) = 11.4 x 3 = 34.2
R.KELUARGA = 11.85 m
R. MAKAN = 12.85 m
DAPUR = 9.7 m
Luas Wc/ KM = 5.4 m

Total = 87.4 m
jumlah yang dibtuhkan plafond panjang 4 m = 21.85 btg

8 PEK. LISTPLANK
PEK. LISTPLANK = 15.85 m
VIII PEKERJAAN PENGECETAN
1 Pek. Pengecetan tembok
luas total dinding yang dicat = 636.2 m2
2 Pek. Pengecetan kusen pintu dan jendela
luas PJ1 = 1.05 + 1.98 = 3.03
P2 = 0.48 + 0.705 = 1.185
J2 = 0.39 + 0.57 = 0.96
Total = 5.175 m2

3 Pek. Daun pintu dan jendela


luas PJI = 3.7904 + 1.824 + 3.1404
P2 = 3.3784 + 0.1482 = 3.5266
J2 = 0.608 + 0.2976 + 0.1404
Total = 13.3274 m 2

4 Pek. Pengecetan plavond dan list plafond


luas pek.pengecetan plavond dan list plafond = 69.698 m2
5 Pek. Pengecetan listplank
luas Pengecetan listplank = 3.487 m2
6 Pek. Pengecetan atap
luas Pengecetan atap = 57 m2
IX PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Listrik dalam ( 3 x 2,5 mm) = 43.47 m
2 Pas. Saklar ganda = 3 buah
3 Pas. Saklar tunggal = 5 buah
4 Pas. KWH meter = 1 buah
5 Pas. Stop Kontak = 7 buah
6 Pas.lampu hias = 1 buah
7 Pas.lampu 23 watt = 2 buah
8 Pas. Lampu 40 watt = 6 buah

XI PEKERJAAN SANITASI
1 pek. Stop kran = 3 unit
2 pek. Pipa 3/4"
panjang pipa 3/4" = 2.6 m
3 pek. Pipa PVC 4" = 38.5 m
4 pas. Klosed duduk = 1 pas
5 pek. Bak cuci piring = 1 pas
6 pek. Bak mandi = 0 pas
7 floor drain = 4 pas
8 Pek. Septictank = 1 unit
an Volume Satuan

98.00 m2

42.00 m

12.00 m2
8 m2

1.6 m
1.6 m

177.69 m3 177.69 m3

m3
m3 177.686 m3
44.42 m3

0.15 = 1.8
0.15 = 4.05
0.1 = 0.3
0.05 = 0.75
0.15 = 1.8
(4x1x0.15) + (2x1.5x0.15)
0.45

(1x0,5x0,15)

0.05 = 0.1
0.1 = 0.225
x 0.2
m3
17.15 m3

0.06 m

= 3.297408 m3 3.29741 m3
0.16 = 1.68
0.16 = 1.68
0.09 = 0.54
0.05 = 0.75
0.16 = 1.4
x 0.16 1.12
0.07 = 0.49
0.16 = 0.96
0.13 = 0.52
0.09 = 0.27
0.09 = 0.27
0.09 = 0.27
0.03 = 0.36
0.09 = 0.27

1.151 m3
36.80325 m3 36.8033 m3
12.79 m3 12.79 m3

33.5
39
72.5 m
2.175 m3

0.3
0.4

91.64 kg
1.67 m3

15.7842 kg
33.5
39
72.5
x 0.15 x 72.5
m3 2.18 m3

77.32 kg

m2
m
x 0.05
m3
4.29 m3

m2
m
x 0.05
m 3
0.75 m3

L1 = 1.85 x 2.3
= 4.255 m2
2,1

L = 4.255 m2

0,9
0,9
2,1

0,8
2,1
0,9
1,6

0,2
0,3

Vpj
2.79675 47.71 m3

= 4.255
= 2.8
= 2.66
= 2.66
= 1.20125
= 0.72 +
= 14.29625
x 2 sisi = 12.0 m2 12.0 m2

643.2 m2

655.2 m2

= 6.0

= 3 m2
= 3.0

= 3 m2

4.80 m2

10.5
10.5
8.75
= 7
6

m2 49.245 m2

4.00 m2
3.70813 m2

m2
)

2.30 = 4.26 m2
0.15 = 0.63825 m3
= 0.63825 m3
)

2.00 = 1.40 m2
0.15 = 0.21 m3
= 0.42 m3
)

1.90 = 1.33 m2
0.15 = 0.1995 m3
= 0.798 m3
)

1.50 = 2.78 m2
0.15 = 0.416 m3
= 0.8325 m3

0.638 m3

= 4.255 m2
= 4.255 m2

= 1.330 m2
= 7.980 m2
12.235 m2

Jumlah 2
m 2

Jumlah 4
m2

3.363 m2

Jumlah 2

0.833 m2

6 Bh

16 Bh

8 Bh

8 Bh
4 Bh

4 Bh

,30+3,30+4,20+4,20+1+1+1+1
10.9725 m2
24.3675 m2
10.9725 m2
(1,50x0,8) + (1,35x1,50)
2.025

0.425 x 0.925 = 4.916875 m2


x 44.153
0.15453 m3

10.9725 m2
24.3675 m2
10.9725 m2
(1,50x0,8) + (1,35x1,50)
2.025

0.425 x 0.925 = 4.916875 m2

lbr 22.0764 lbr

21.85 btg

15.85 m
m2
m2
m2

= 8.7548 m2
m2
= 1.046 m2
NO. URAIAN DAN JENIS PEKERJAAN SATUAN VOLUME
1 Pekerjaan Persiapan
- Pembersihan lapangan m2 98.00
- Pemasangan Bowplank m 42.00
- Pembuatan direksi keet m2 12.00
- Gudang semen dan Alat-Alat m2 8.00

2 Pekerjaan Galian
- Galian Tanah Pondasi m3 177.69
- Timbunan tanah kembali m3 44.42
- Timbunan tanah bawah lantai m3 17.15
- Urugan pasir dibawah pondasi m3 3.297408
- Urugan pasir dibawah lantai m3 1.151

3 Pekerjaan Pondasi
- Pas. Pondasi Batu Gunung 1:5 m3 36.80325
- Pas. Batu Kosong m3 12.79

4 Pekerjaan Beton
- Pek. Sloef m3 2.175
Pek. Begel kg 91.64
- Pek. Kolom m3 1.67
Pek. Begel kg 15.7842
- Pek. Ring Balk m3 2.18
Pek. Begel kg 77.32
-Pek. Rabat Beton Bawah Lantai m3 4.29
-Pek. Rabat Beton Carport m3 0.75

5 Pekerjaan Tembok dan Lantai


- Pek. Dinding m3 47.71125
- Plesteran dan Acian
a. plesteran 1 : 3 m2 12
b. plesteran 1 :5 m2 643.2035
c. acian m2 655.2035
- Pek. Dinding Keramik WC dan tempat cuci (20 x 20 m2 4.80
- Pek. Lantai Keramik 40 x 40 cm m2 49.245
- Pek. lantai teras 30 x 30 cm m2 4.00
- Lantai Keramik WC 20 X 20 cm m2 3.708125
- Pasangan plint ukuran 10 x 40 cm m2 7.148
- Pasangan plint ukuran 30 x 10 cm m2 1.1
- Pasangan plint ukuran 20 x 10 cm m2 0.325
6 Pekerjaan Pintu dan Jendela
- Pek. Kusen Pintu dan Jendela m3 0.63825
-Pek. Daun Pintu m2 12.235
- Pek. Daun Jendela m2 3.36
- Pek. Kaca Mati m2 0.83
- Pasangan kusen dan daun pintu PVC (KM/WC) bh 1.00
- Pas. Kunci Tanam bh 6.00
-Pas. Engsel Pintu bh 16.00
-Pas. Grendel Pintu bh 8
- Pas. Engsel Jendela bh 8
- Pas. Grendel Jendela bh 4
- Hak Angin bh 4

7 Pekerjaan Atap dan Plafond


1. KUDA-KUDA
- BALOK KUDA - KUDA 6/12 m3 0.1728
- BALOK KUDA - KUDA 8/12 m3 0.080448
- BALOK KUDA - KUDA 8/16 m3 0.83968
- BALOK KUDA - KUDA 2/20 m3 0.0314
2. PEK. GORDING 6/12 m3 0.50544
3. Nok atap seng m 8.64
4. PEK. ATAP m2 57
5. Pek. Rangka Plafond 5/7 m3 0.154534722
6. Pek. Plafond 1,2 x 1,2 m tebal 6mm lbr 22.07638889
7. Pek. List plafond 5 cm btg 21.85
8. PEK. LISTPLANK m 15.85

8 Pekerjaan pengecetan
- Pek. Pengecetan tembok m2 636.15
- Pek. Kusen pintu dan jendela m2 5.175
-Pek. Daun pintu dan jendela m2 13.3274
-Pek. Pengecetan plavond dan list plafond m2 69.698
-Pek. Pengecetan listplank m2 3.487
-Pek. Pengecetan atap m2 57

9 Pekerjaan Instalasi listrik


- Pas. Instalasi Listrik dalam ( 3 x 2,5 mm) m 43.47
- Pas. Saklar ganda bh 3
- Pas. Saklar tunggal bh 5
- Pas. KWH meter bh 1
- Pas. Stop Kontak bh 7
- Pas.lampu hias bh 1
- Pas.lampu 23 watt bh 2
- Pas. Lampu 40 watt bh 6
10 Pekerjaan Sanitasi
- pek. Stop kran unit 3
- pek. Pipa 3/4" m 2.6
- pek. Pipa PVC 4" m 38.5
- pas. Klosed duduk pas 1
- pek. Bak cuci piring pas 1
- pek. Bak mandi pas 0
- floor drain pas 4
- Pek. Septictank unit 1
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KOTA MAKASSAR
TAHUN 2017

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA


1 2 3 4 5
BAHAN KAYU

Kayu Kelas 1 bayam


1 m3 Rp 8,882,500
(balok) chain saw

Kayu kelas 1 bayam


2 m3 Rp 8,882,500
(balok) sawmill

Kayu kelas 1 Ulin


3 m3 Rp 25,500,000
(papan)
Kayu Kelas 1 ulin
4 m3 Rp 23,460,000
(tiang)

Kayu Kelas 1 bayam (


5 m3 Rp 19,855,000
Papan) shain saw

Kayu Kelas 1 bayam (


6 m3 Rp 19,855,000
Papan) sawmill

Kayu kelas II
7 samarinda m3 Rp 3,657,000
(balok)/lokal

Kayu kelas II
8 samarinda m3 Rp 3,135,000
(papan)/lokal

Kayu Kelas III kapur


9 m3 Rp 1,672,000
(balok)/kemiri

10 Kayu kelas III (papan) m3 Rp 2,926,000

11 Kayu Perancah m3 Rp 3,657,000

Kayu Mangga/Kemiri
12 m3 Rp 2,990,000
papan

13 Kayu kumea balok m3 Rp 5,747,000


14 Kayu kumea papan m 3
Rp 6,792,500
15 Papan kelas 1 m3 Rp 19,855,000
16 papan kelas 11 m3 Rp 3,657,500
Kayu lapis Tripleks
17 Lembar Rp 62,700
Lapis Kayu lainnya
Kayu lapis Tripleks
18 Lembar Rp 52,250
Lapis Kayu lainnya
Kayu lapis Tripleks
19 Lembar Rp 78,400
Lapis Kayu lainnya
Dolken Kayu Ø 8-
20 Btg Rp 20,500
10/400 cm

21 Minyak Bekisting ltr Rp 20,000

Bahan Besi
22 Paku Campuran 5-10 cm kg Rp 15,700

23 Paku asbes dan karet kg Rp 25,000

24 Paku kg Rp 15,700

25 Paku 1 1/2 - 2 1/2 cm 2-3 cm kg Rp 18,300

26 Paku 4 cm kg Rp 15,700
27 paku 2-3 cm kg Rp 20,900
28 Paku sirap 2-3 cm kg Rp 20,900
29 Paku seng 1kg/dos kg Rp 16,000
30 Paku skrup Biji Rp 700
Paku skrup besi
hollow 1000 biji per Bariling 450 bj =
31 Dos/bungkus Rp 65,000
4,5 cm
d

Paku skrup gypsum-


32 500 biji perbungkus Dos/bungkus Rp 45,000

33 Paku jembatan kg Rp 42,200


34 Paku Beton 5 cm Dos Rp 12,500
35 Paku Beton 6 cm Dos Rp 12,500
36 Paku Beton 7-10 cm Dos Rp 12,500

37 Paku Payung Berulir 1 kg/ dos kg Rp 31,400

38 Paku asbes berulir dos Rp 31,400


39 Paku asbes biasa dos Rp 19,200
setara paku 2-3
40 Paku Triplex kh Rp 20,900
cm
setara paku 2-3
41 Paku eternit kg Rp 20,900
cm
42 Paku ripet Biji Rp 200
43 Besi Streep 30 x 3 mm m' Rp 54,200
44 Kawat ikat beton kg Rp 20,900

Besi Beton Polos ( campuran) kg Rp 14,800


45
Bahan Dasar
46 Agregat Kasar m3 Rp 266,500
47 Agregat Halus m3 Rp 324,000
48 Batu kali m3 Rp 266,500
49 Batu Kali Bela m 3
Rp 179,200
50 Batu Gunung m3 Rp 363,700
51 Batu Belah 10-15 cm m3 Rp 388,800
52 Batu Pecah 7-10 cm m3 Rp 316,200
53 Batu Pecah 5-7 cm m 3
Rp 376,200
54 Batu Pecah 3-5 cm m3 Rp 412,800
55 Batu Pecah 2-3 cm m 3
Rp 424,300
56 Batu Pecah 1- 2 cm m 3
Rp 438,900
57 Batu Pecah 0,5 - 1 cm m3 Rp 475,900

58 Batu merah standar BIji Rp 600

59 Bata Ringan m3 Rp 1,141,200


21x10,5x6cm -60
60 Bata block m3 Rp 33,400
Bh/M2
21x10,5x6cm -60
61 Bata block Buah Rp 37,900
Bh/M3
21x10,5x6cm -60
62 Batako m3 Rp 68,600
Bh/M4
63 Roster 15 x 30 cm m3 Rp 51,800
64 Glass Block m 3
Rp 26,200
65 Gravel m3 Rp 148,400
66 Material Pilihan m 3
Rp 136,600
67 Urugan Pilihan m 3
Rp 162,200
Pasirkasar/pasir
68 beton/pasir m3 Rp 235,000
pasangan
69 Sirtu A m3 Rp 210,000
70 Sirtu B m 3
Rp 195,500
71 Sirtu C m3 Rp 177,000
72 Pasir Timbunan m3 Rp 151,600
73 Tanah timbunan m 3
Rp 168,500
74 Kerikil Sungai m3 Rp 237,400

75 Semen
50 kg P,C sak Rp 67,300
(Tonasa)

76 Semen 40 kg P,C (Tonasa) sak Rp 52,700

77 Semen
Putih 40 Kg per sak Rp 130,700
sak
78 Semen tonasa kg Rp 1,346
79 Pigmen warana kg Rp 300,200
80 Semen nat tegel sak Rp 20,900
Bahan Atap
BWG 33 BJLS 0,20
81 Seng BWG Kaki Rp 61,000
MM
BWG 28 BJLS 0,35
82 Seng BWG Lembar Rp 75,000
MM
Gelombang bjls
83 Seng Lembar Rp 88,400
0,35 (6 Kaki)
Gelombang bjls
84 Seng Lembar Rp 80,600
0,25 (6 Kaki)
Gelombang bjls
85 Seng Lembar Rp 72,200
0,20 (7 Kaki)
Gelombang bjls
86 Seng Lembar Rp 42,000
0,20 (10 Kaki)
Gelombang bjls
87 Seng Lembar Rp 60,000
0,20
Plat bjls 0,35 (6
88 Seng plat bjls Lembar Rp 83,600
KK)
Plat bjls 0,30 (6
89 Seng plat bjls Lembar Rp 73,200
KK)
Plat bjls 0,20 (6
90 Seng plat bjls Lembar Rp 47,100
KK)
91 Seng Fiber Fiber Lembar Rp 16,500
Bahan Kaca
92 Kaca bening 3 mm m2 Rp 109,800
93 Kaca bening 5 mm m2 Rp 125,400
94 Kaca bening 6 mm m2 Rp 229,900
95 Kaca bening 8 mm m2 Rp 313,500
96 Kaca bening 10 mm m2 Rp 438,900
Bahan
Penggantung
97 Engsel Baja Biji Rp 21,800
98 Engsel Kuningan pasang Rp 78,400
Engsel Stainless
99 pasang Rp 138,000
steel

100 Engsel H-3 lubang pasang Rp 63,800

101 Engsel Kupu-Kupu pasang Rp 25,200


Engsel antik
102 pasang Rp 201,700
jendela

103 Engsel pintu Biasa merk 777 pasang Rp 53,300

Engsel pintu lemari


104 pasang Rp 10,450
biasa
Engsel jendela
105 merk 777 pasang Rp 36,600
biasa
Engsel Jendela
106 pasang Rp 31,350
Kuningan
107 Engsel Pintu 4" (SES) Bh Rp 25,000
108 Engsel Jendela 5" (SES) Bh Rp 20,000
Engsel pintu
109 Pasang Rp 28,300
kuningan SES
Gagang Pintu
110 Bh Rp 15,000
lemari
Grendel jendela
111 Bh Rp 36,600
kuningan

112 Grendel Pintu biasa Royalty Bh Rp 10,450

Grendel pintu
113 Bh Rp 109,800
kuningan/vertikal
Grendel pintu
114 Buah Rp 36,600
besar
Grendel pintu
115 tanam Buah Rp 209,000
( expanyolet)
116 Kunci tanam yale 1xputar Buah Rp 119,100
117 Kunci tanam yale 2xputqr Buah Rp 136,600

Kunci tanam pintu 2xputar besar


118 Buah Rp 120,200
biasa

Kunci tanam pintu 2 x putar kecil


119 Buah Rp 94,100
biasa

120 Kunci tanam pintu 2 x putas SES Buah Rp 292,600

Hak angin kecil


121 Buah Rp 15,700
antik
122 Hak angin besar Buah Rp 26,200
123 Hak angin kecil Buah Rp 15,700
Bahan langit-
langit
Pinyu fiberglass
124 Lembar Rp 261,300
KM/WC

Pintu
KM/WCBahan PVC
125 Unit Rp 940,500
Lengkap asesoris
ex MASPION

120 x 240 cm t.
126 Teakwood Lembar Rp 114,300
3mm

127 3 mm 120 x 240 Lembar Rp 45,000


Triplex
cm
128 4 mm 120 x 240 Lembar Rp 68,000
Triplex
cm
129 Triplex 5 mm Lembar Rp 55,000

130 6 mm 120 x 240 Lembar Rp 65,000


Triplex
cm
131 Triplex 7 mm Lembar Rp 135,900
132 Triplex 9 mm Lembar Rp 140,000
133 Triplex 10 mm Lembar Rp 188,100
134 Triplex 15 mm Lembar Rp 214,300
135 Triplex 20 mm Lembar Rp 255,400
Triplex ukuran Lembar Rp 101,900
136
pintu
120 x 240 cm 3 Lembar Rp 114,800
137 Triplex melamin
mm
120 x 240 cm 4 Lembar Rp 204,900
138 Teakwood
mm
120 x 240 cm 6 Lembar Rp 85,000
139 Multiplex
mm
120 x 240 cm 9 Lembar Rp 95,000
140 Multiplex
mm
120 x 240 cm Lembar Rp 145,000
141 Multiplex
12 mm
120 x 240 cm Lembar Rp 285,000
142 Multiplex
18 mm
122 x 244 cm 9 Lembar Rp 68,000
143 Gypsum board
mm
144 Kalsiboard 4 m' Lembar Rp 55,000
145 Lambrizing Lembar Rp 41,000
Lebar 5 cm ( 4 Lembar Rp 210,000
146 HPL
m')
Lebar 3 cm ( 4 Rp 17,000
147 Les kayu Profil batang
m')
Lebar 1 1/2 cm ( Rp 36,000
148 Les kayu Profil batang
4 m')

149 Les kayu Profil 1 x 10 x 400 cm batang Rp 18,000

150 Les kayu 4 x 4 x 400 cm batang Rp 57,000


151 Les Kayu Profil 0,5 x 3 cm batang Rp 31,000
152 Les kayu Biasa batang Rp 71,000
Bahan lantai
153 Tegel pc 30 x 30 cm Dos Rp 68,000
154 tegel motif 30 x 30 cm Dos Rp 180,000
Tegel keramik Rp 52,700
155 10 x 20 cm Dos
putih
Tegel keramik Rp 50,200
156 20 x 20 cm Dos
putih
Tegel keramik Rp 150,000
157 20 x 25 cm Dos
putih
Tegel keramik Rp 65,000
158 30 x 30 cm Dos
putih
Tegel keramik Rp 44,000
159 40 x 40 cm Dos
putih
Tegel keramik Rp 62,700
160 50 x 50 cm Dos
putih
Tegel keramik 60 x 60 cm Ex Rp 360,000
161 Dos
putih granito
Tegel keramik 60 x 60 cm Ex Rp 400,800
162 Dos
putih garuda
Tegel keramik 30 x 60 cm Ex Rp 263,900
163 Dos
putih granito
Tegel keramik 60 x 60 cm Ex Rp 343,500
164 Dos
putih granito
Tegel Keramik 60 x 60 cm Ex Rp 162,000
165 Dos
Warna garuda
Tegel Keramik 30 x 60 cm Ex Rp 234,000
166 Dos
Warna garuda
Tegel keramik Rp 107,900
167 30 x 60 cm Dos
putih
Tegel Keramik Rp 58,000
168 20 x 20 cm Dos
Warna
Tegel Keramik Rp 52,000
169 30 x 30 cm Dos
Warna
Tegel Keramik Rp 58,000
170 20 x 25 cm m2
Warna
Tegel Keramik Rp 56,000
171 40 x 40 cm m2
Warna
Tegel Keramik 50 x 50 cm Rp 97,000
172 Dos
Warna (Platinum)
Tegel Keramik 60 x 60 cm Rp 145,000
173 Dos
Warna (Enem polos)
Tegel Keramik Rp 174,300
174 30 x 60 cm Dos
Warna
175 Keramik WC 20 x 20 cm Dos Rp 56,000
176 Keramik WC 20 x 25 cm Dos Rp 60,000
177 Keramik WC 30 x 30 cm Dos Rp 65,000
178 Keramik 30 x 30 cm Dos Rp 50,100
179 Keramik 40 x 40 cm Dos Rp 47,100

Bahan Finishing
180 Cat dasar 3,5 kg /kaleng kaleng Rp 130,000
181 Cat Dasar meni 3,5 kg /kaleng kaleng Rp 83,600
182 Cat meni glatik 3,5 kg /kaleng kaleng Rp 106,200
183 Cat meni kg Rp 37,143
Plamur tembok Rp 41,800
184 5kg Kaleng
Boyo dan setara
185 Palmur Kg Rp 8,360
186 Cat dasar Tembok Kg Rp 130,700
187 Cat tembok dulux 2,5 kg kaleng Rp 280,000
188 Cat tembok dulux Kg Rp 112,000
189 Cat seng Nippon 2,5 kg kaleng Rp 167,200
190 Cat seng Nippon kg Rp 66,880
Bahan instalasi
listrik
Eterna 3 x 2,5 Rp 8,540
191 Kabel NYM M
mm
192 Saklar Tunggal Panasonic buah Rp 8,500
193 Saklar Ganda Panasonic Buah Rp 21,000
194 Stop kontak Broco Bh Rp 12,500

195 Stop kontak Clipsal Bh Rp 33,400

196 lampu Hias IKEA HEMMA buah Rp 174,000

Bohlam (lampu
197 penerangan) PCC pcs Rp 34,500
23 Watt Ecuat
Bohlam (lampu
penerangan) Rp 7,300
198 buah
Philips pijar 40
watt
Bahan pipa
Pipa jenis C untuk Rp 12,500
199 5/8" -4 m Batang
instalasi listrik
Pipa jenis C untuk Rp 3,125
200 5/8" m
instalasi listrik
201 Pipa PVC 3/4" - 4 m Batang Rp 31,400
202 Pipa PVC 3/4" m Rp 7,850
203 Pipa PVC 4" - 4 m batang Rp 137,300
204 Pipa PVC 4" m Rp 34,325
PIPA GIP Rp 261,300
205 1 1/2" - 6m Batang
( Galvanis)
PIPA GIP Rp 43,550
206 1 1/2" m
( Galvanis)

Bahan
saniter/saluran air

Kloset Duduk Ex
207 KIA lengkap unit Rp 2,162,300
(putih) tangki batu

Kloset Duduk Ex
208 KIA lengkap unit Rp 2,948,500
(warna) tangki batu
Kloset duduk ex
Toto lengkap Rp 2,612,500
209 unit
accessories warna
putih
Kloset duduk ex
Toto lengkap Rp 2,455,800
210 unit
accessories warna
gelap
Kloset jongkok ex Rp 275,500
211 Buah
KIA
Kloset jongkok Rp 90,000
212 Buah
biasa
213 Kran air kuningan DIA 3/4 Biasa Buah Rp 47,100
Kran air vernekel Rp 31,400
214 DIA 1/2 Biasa Buah
DIA 1/2 biasa
Kran air vernekel Rp 41,800
215 DIA 3/4 Biasa Buah
DIA 3/4 biasa
Kran air antik DIA Rp 130,700
216 DIA 1/2 Biasa Buah
1/2
217 Seal tape Buah Rp 2,500
218 Bak Cuci Piring Stain Steel Buah Rp 783,800
Bak tube fiber Rp 679,300
219 Buah
biasa
Bak tube fiber ex
220 Buah Rp 31,000
toto
Saringan kotoran
Kamar Mandi
221 Bahan Buah Rp 34,000
Besi/Kuningan
(Floor Drain)

Saringan kotoran
Kamar Mandi
222 Buah Rp 15,000
Bahan Plastik
(Floor Drain)
223 ijuk resapan kg Rp 4,200
UPAH KERJA
1 Mandor Lapangan Orang/Hari Rp 150,000
2 Kepala Tukang Orang/Hari Rp 130,000
Kepala Tukang
3 Orang/Hari Rp 130,000
Listrik
4 Tukang Batu / Cat Orang/Hari Rp 120,000
Tukang Kayu /
5 Orang/Hari Rp 120,000
Besi
Tukang Pasang
6 Orang/Hari Rp 120,000
Paving
7 Pembantu Sopir Orang/Hari Rp 100,000
8 Pembantu Mekanik Orang/Hari Rp 128,000

Pembantu Tukang
9 Orang/Hari Rp 100,000
Listrik

10 Pembantu Operator Orang/Hari Rp 140,000


11 Mekanik Orang/Hari Rp 120,000
12 Operator Terlatih Orang/Hari Rp 152,000
13 Pekerja Orang/Hari Rp 96,000
14 Sopir Terampil Orang/Hari Rp 130,000
Biaya pasang
15 /M' Rp 100,000
Canstein
Biaya pasang
16 /M2 Rp 130,000
Paving
UPAH KERJA
N

Dalam Rupiah (Rp)


HARGA
5

8,882,500

8,882,500

25,500,000

23,460,000

19,855,000

19,855,000

3,657,000

3,135,000

1,672,000

2,926,000

3,657,000

2,990,000

5,747,000
6,792,500
19,855,000
3,657,500

62,700
52,250

78,400

20,500

20,000

-
15,700

25,000

15,700

18,300

15,700
20,900
20,900
16,000
700

65,000

45,000

42,200
12,500
12,500
12,500

31,400

31,400
19,200

20,900

20,900

200
54,200
20,900

14,800

266,500
324,000
266,500
179,200
363,700
388,800
316,200
376,200
412,800
424,300
438,900
475,900

600

1,141,200

33,400

37,900

68,600

51,800
26,200
148,400
136,600
162,200

235,000

210,000
195,500
177,000
151,600
168,500
237,400

67,300

52,700

130,700

1,346
300,200
20,900

61,000

75,000
88,400

80,600

72,200

42,000

60,000

83,600

73,200

47,100

16,500

109,800
125,400
229,900
313,500
438,900

21,800
78,400

138,000

63,800

25,200

201,700

53,300

10,450

36,600

31,350

25,000
20,000

28,300
15,000

36,600

10,450

109,800

36,600

209,000

119,100
136,600

120,200

94,100

292,600

15,700

26,200
15,700

261,300

940,500

114,300

45,000

68,000

55,000

65,000

135,900
140,000
188,100
214,300
255,400

101,900

114,800

204,900

85,000

95,000

145,000

285,000

68,000

55,000
41,000

210,000

17,000

36,000

18,000

57,000
31,000
71,000

68,000
180,000

52,700

50,200

150,000

65,000

44,000

62,700
360,000

400,800

263,900

343,500

162,000

234,000

107,900

58,000

52,000

58,000

56,000

97,000

145,000

174,300

56,000
60,000
65,000
50,100
47,100

130,000
83,600
106,200
37,143

41,800

8,360
130,700
280,000
112,000
167,200
66,880

8,540

8,500
21,000

12,500

33,400

174,000

34,500

7,300

12,500

3,125

31,400
7,850
137,300
34,325

261,300

43,550

2,162,300

2,948,500
2,612,500

2,455,800

275,500

90,000

47,100

31,400

41,800

130,700

2,500
783,800

679,300

961,400

34,000

15,000

4,200

150,000
130,000

130,000

120,000

120,000

120,000

100,000
128,000

100,000

140,000

120,000
152,000
96,000
130,000

100,000

130,000
Analisa Harga Satuan Pekerjaan

Pekerjaan :
Lokasi :
Tahun :

No Jenis Pekerjaan Sat

1 PEKERJAAN PERSIAPAN
A. Pembersihan Lahan (m²)
Tenaga
Pekerja Oh
Mandor Oh
Sub Total
b. Memasang Bouwplank (m¹)
Bahan
Kayu 5/7 M³
Paku Biasa 2"-5" Kg
Kayu Papan Bengkirai 3/20 M³
Tenaga
Tukang Kayu Oh
Pekerja Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
C. 1 m Pembuatan Gudang semen dan Alat-Alat
2

Bahan
Dolken Kayu Ø 8-10/400 cm Btg
Kayu 5/7 M3
Paku Biasa 2"-5" kg
Semen Portland kg
Pasir Beton M3
Koral Beton M3
Seng glombang BJLS 35 Lbr
Tenaga
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
E. Membuat direksi keet (m²)
Bahan
Dolken Kayu Ø 8-10/400 cm btg
Kayu 5/7 M³
Paku Biasa 2"-5" Kg
Besi Strip M
Semen Portland Kg
Pasir Pasang M³
Pasir Beton M³
Koral Beton M³
Bata Merah Bh
Seng Plat Lbr
Kaca Polos 3 mm M²
Kunci Tanam Bh
Plywood 6 mm Lbr
Tenaga
Tukang Kayu Oh
Tukang Batu Oh
Pekerja Oh
Kepala Tukang Oh
Mandor Oh
Sub Total

2 PEKERJAAN TANAH
6.1 A. Galian Tanah Biasa sedalam 1 m (m³)
Tenaga
Pekerja Oh
Mandor Oh
Sub Total
6.9 B. Urugan Kembali (m³)
Tenaga
Pekerja Oh
Mandor Oh
Sub Total
6.11 C. Urugan Pasir(m³)
Bahan
Pasir Urug M³
Tenaga
Pekerja Oh
Mandor Oh
Sub Total
6.11 D. Urugan Tanah(m³)
Bahan
Tanah Urug M³
Tenaga
Pekerja Oh
Mandor Oh
Sub Total

3 PEKERJAAN PONDASI
6.6 A. Pasangan Pondasi Batu Gunung 1 Pc: 5 Ps (m³)
Bahan
Batu Gunung M³
Semen Portland Kg
Pasir Pasang M³
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.6 B. Pasangan Pondasi Batu kosong (m³)
Bahan
Batu Belah M³
pasir urug Kg
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total

4 PEKERJAAN Tembok
6.11 A. Pasangan Tembok ½ Bata 1Pc:5Ps (m3)
Bahan
Bata Merah 5 X 11 X 22 cm Bh
Semen Portland Kg
Pasir Pasang M³
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.11 B. Pasangan Tembok ½ Bata 1Pc:3Ps (m3)
Bahan
Bata Merah 5 X 11 X 22 cm Bh
Semen Portland Kg
Pasir Pasang M³
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.14 C. Plesteran Dinding 1Pc:3Ps (m²) tebal 20 mm
Bahan
Semen Portland Kg
Pasir Pasang M³
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.9 D. Plesteran Dinding 1Pc:5Ps (m²) tebal 20 mm
Bahan
Semen Portland Kg
Pasir Pasang M³
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.9 E. Acian Plasteran (m²)
Bahan
Semen Portland Kg
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total

5 PEKERJAAN KAYU
6.1 A. Pasang Kusen Pintu dan Jendela Kayu Bayam (m³)
Bahan
Kayu Bayam, balok kelas 1 M³
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.7 B. Pasang Daun Pintu dan jendela Panel Kayu Bayam (m²)
Bahan
Kayu bayam, papan kelas 1 M³
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.7 C. 1 M3 Pasang Konstruksi Kuda-kuda
Bahan
Balok Kayu Kelas 1 M³
Besi Strip M
Paku Biasa 2"-5" Kg
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
D. 1 M Pasang Gurding
3

Bahan
Kayu Bayam, balok kelas 2 M³
Besi Strip M
Paku Biasa 2"-5" Kg
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.35 E. Pemasangan 1 m' Atap nok Seng
Bahan
Seng plat bjls 0,30 ( 6 kaki) Lbr
Paku Biasa 1/2"-1" Kg
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.53 F. Pemasangan 1 m2 Atap seng Gelombang
Bahan
Seng Gelombang bjls 0,35 ( 6 kaki) lbr
Paku Biasa 1/2"-1" Kg
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.40 F Pasang Rangka Langit-langit 1X1 m Kayu Borneo (m²)
Bahan
Kayu borneo, balok kelas 2 M³
Paku biasa 2"-5" Kg
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.40 G. Pemasangan langit - langit trpleks ukuran 120 x 240 cm tebal 6mm
Bahan
tripleks Lbr
Paku biasa 2"-5" Kg
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.40 H. List Plafond Kayu profil 3 cm
Bahan
List kayu profil batang
Paku biasa 2"-5" Kg
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.40 H. Pasang Lipslank ukuran 2x2/20
Bahan
Papan kelas 2 M³
Paku biasa 2"-5" Kg
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total

6 PEKERJAAN BETON
6.39 A. Membuat sloof Beton Bertulang (200Kg besi+bekisting) (m³)
Bahan
Kayu Terentang M³
Paku Biasa 2"-5" Kg
Minyak Bekisting Lt
Besi Beton polos Kg
Kawat Beton Kg
Semen Portland Kg
Pasir Beton M³
Koral Beton M³
Tenaga
Pekerja Oh
Tukang Batu Oh
Tukang Kayu Oh
Tukang Besi Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.40 B. Membuat Kolom Beton Bertulang (300Kg besi+bekisting) (m³)
Bahan
Kayu Terentang M³
Paku Biasa 2"-5" Kg
Minyak Bekisting Lt
Besi Beton polos Kg
Kawat Beton Kg
Semen Portland Kg
Pasir Beton M³
Koral Beton M³
Kayu Borneo Balok M³
Plywood 9 mm Lbr
Dolken Kayu Ø 8-10/400 cm Btg
Tenaga
Pekerja Oh
Tukang Batu Oh
Tukang Kayu Oh
Tukang Besi Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.46 C. Membuat Ring Balok Beton Bertulang (15X15cm) (m³)
Bahan
Kayu Albasiah M³
Paku Biasa 2"-5" Kg
Besi Beton polos Kg
Kawat Beton Kg
Semen Portland Kg
Pasir Beton M³
Koral Beton M³
Tenaga
Pekerja Oh
Tukang Batu Oh
Tukang Kayu Oh
Tukang Besi Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.5 D. 1 M3 membuat Beton cor mutu K-225
Bahan
Semen Portland Kg
Pasir Beton M³
Koral Beton M³
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.5 E. Membuat Beton Tumbuk1Pc:3Ps:6Kr (m³)
Bahan
Semen Portland Kg
Pasir Beton M³
Koral Beton M³
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total

7 PEKERJAAN PENUTUP LANTAI DAN DINDING


6.47 A. Pasang Dinding Keramik warna 20x20 cm (m²)
Bahan
Keramik Warna 20x20cm m2
Semen Portland Kg
Pasir Pasang M³
Semen Warna Kg
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.42 B. Pasang Lantai Keramik 40X40 cm (m²)
Bahan
Ubin Keramik 40X40 cm m2
Semen Portland Kg
Pasir Pasang M³
Semen Warna Kg
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.3 C. Pasang Lantai Keramik Warna 30 x30 cm (m²)
Bahan
Ubin Keramik 30 X 30 cm m2
Semen Portland Kg
Pasir Pasang M³
Semen Warna Kg
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.17 D. Pasang Lantai Keramik Warna 20 X 20 cm (m²)
Bahan
Keramik Warna 20 x 20 cm m2
Semen Portland Kg
Pasir Pasang M³
Semen Warna Kg
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.42 E. Pasang 1 m plint ubin PC warna ukuran 10 x 40 cm
Bahan
Keramik Warna 40X40 cm m2
Semen Portland Kg
Pasir Pasang M³
Semen Warna Kg
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.3 F. Pasang 1 m plint ubin PC warna ukuran 10x30 cm
Bahan
Keramik Warna 30X 30 cm m2
Semen Portland Kg
Pasir Pasang M³
Semen Warna Kg
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.17 G. Pasang 1m plint ubin PC warna ukuran 10x20 cm
Bahan
Keramik warna 20 x 20 cm m2
Semen Portland Kg
Pasir Pasang M³
Semen Warna Kg
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total

8 PEKERJAAN KUNCI DAN KACA


6.2 A. Pasang Kunci Tanam 2 kali putar(Bh)
Bahan
Kunci Tanam Biasa Bh
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.5 B. Pasang Engsel pintu (Bh)
Bahan
Engsel Pintu Bh
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.6 C. Pasang Engsel Jendela Kupu-kupu (Bh)
Bahan
Engsel Jendela Bh
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.12 D. Pasang Grendel pintu (Bh)
Bahan
Grendel Pintu Bh
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.16 E. Pasang Grendel Jendela (Bh)
Bahan
Grendel Jendela Bh
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.16 F. Pasang Kait Angin(Bh)
Bahan
Kait Angin Bh
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.23 G. Pasang Kaca tebal 5 mm (m²)
Bahan
Kaca bening 5 mm M²
Tenaga
Pekerja Oh
Tukang Kayu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total

9 PEKERJAAN PENGECATAN
A. Pengecatan Kayu (m²)
Bahan
Cat Meni Kg
Plamir Kg
Cat dasar Kg
Cat penutup 2 kali Kg
Tenaga
Pekerja Oh
Tukang Cat Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
B. Pengecatan Tembok Baru (m²)
Bahan
Plamir Kg
Cat Dasar Kg
Cat Penutup 2x Kg
Tenaga
Pekerja Oh
Tukang Cat Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
C. Pengecatan 1 m2 permukaan baja lapis seng secara manual
Bahan
Cat Besi setara ICI Kg
Tenaga
Pekerja Oh
Tukang Cat Oh
Kepala Tukang Oh
Mandor Oh
Sub Total

10 PEKERJAAN INSTALASI LISTRIK


A. Pek. Instalasi Lampu
Bahan
Kabel Listrik eterna NYM 3 x 2,5 mm m
pipa pvc 5/8" m
Tenaga
Pekerja Oh
Pembantu tukang Listrik Oh
Kepala Tukang Listrik Oh
Sub Total
B. Pek. Saklar Ganda
Bahan
Saklar Ganda bh
Tenaga
Pekerja Oh
Pembantu tukang Listrik Oh
Kepala Tukang Listrik Oh
Sub Total
C. Pek. Saklar Tunggal
Bahan
Saklar Tunggal bh
Tenaga
Pekerja Oh
Pembantu tukang Listrik Oh
Kepala Tukang Listrik Oh
Sub Total
D. 1 unit pasang Box KWH dan meter
Tenaga
Pekerja Oh
Pembantu tukang Listrik Oh
Kepala Tukang Listrik Oh
Sub Total
E. Pek. Stop Kontak
Bahan
Stop kontak bh
Tenaga
Pekerja Oh
Pembantu tukang Listrik Oh
Kepala Tukang Listrik Oh
Sub Total
F. Pek. Lampu hias
Bahan
Lampu Hias bh
Tenaga
Pekerja Oh
Pembantu tukang Listrik Oh
Kepala Tukang Listrik Oh
Sub Total
G. Pek. Lampu 23 watt
Bahan
Lampu 23 watt bh
Tenaga
Pekerja Oh
Pembantu tukang Listrik Oh
Kepala Tukang Listrik Oh
Sub Total
H. Pek. Lampu 40 watt
Bahan
Lampu 40 watt bh
Tenaga
Pekerja Oh
Pembantu tukang Listrik Oh
Kepala Tukang Listrik Oh
Sub Total

11 PEKERJAAN SANITASI
6.2 A. Memasang Kloset Duduk (Bh)
Bahan
Kloset Duduk Bh
Perlengkapan 6% harga closet ls
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.35 B. Memasang Kran Air Ø ¾" (Bh)
Bahan
Kran Air bh
Sealm Tape Bh
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.27 C. Memasang pipa PVC 3/4" (m¹)
Bahan
Pipa PVC m¹
Perlengkapan 35 % harga pipa ls
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.32 D. Memasang pipa PVC tipe AW Ø 4" (m¹)
Bahan
Pipa PVC m'
Perlengkapan 35 % harga pipa ls
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.32 E. Memasang pipa GIP 1 1/2" (m)
Bahan
Pipa PVC m¹
Perlengkapan 35 % harga pipa ls
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.17 F. 1 buah Bak cuci piring stainless steel(Bh)
Bahan
Bak cuci stainless steel + asesoris lengkap bh
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.17 G. 1 buah Bak mandi fibreglass
Bahan
Bak fibreglass bh
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.17 H. 1 buah Floor drain
Bahan
Floor drain bh
Tenaga
Pekerja Oh
Tukang Batu Oh
Kepala Tukang Oh
Mandor Oh
Sub Total
6.17 I. 1 unit septictank + rembesan
Galian tanah M3
Pasir Urug M3
Lantai Kerja M3
Pas bata 1pc :3ps M2
Plat beton K-225 M3
Plesterean 1pc : 3ps M2
Pipa PVC 4" M
Pipa GIP 1 1/2" M
Galian tanah untuk rembesan M3
Pas ijuk Kg
Urugan kerikir 3/5 M3
Pipa PVC 4" berlbang m
Urugan dan Perataan tanah M3
Sub Total
uan Pekerjaan

Harga Satuan (Rp) Total Harga


Indeks
Bahan Upah Satuan (Rp)

0.100 96,000.00 9,600.00


0.050 150,000.00 7,500.00
17,100.00

0.012 3,657,000.00 43,884.00


0.020 15,700.00 314.00
0.007 2,926,000.00 20,482.00

0.100 120,000.00 12,000.00


0.100 96,000.00 9,600.00
0.010 130,000.00 1,300.00
0.005 150,000.00 750.00
88,330.00

1.700 20,500.00 34,850.00


0.210 1,672,000.00 351,120.00
0.300 15,700.00 4,710.00
10.500 1,346.00 14,133.00
0.030 235,000.00 7,050.00
0.050 438,900.00 21,945.00
1.500 88,400.00 132,600.00

1.000 120,000.00 120,000.00


0.800 130,000.00 104,000.00
0.050 150,000.00 7,500.00
909,888.00

1.250 20,500.00 25,625.00


0.180 1,672,000.00 300,960.00
0.850 15,700.00 13,345.00
1.650 54,200.00 89,430.00
35.000 1,346.00 47,110.00
0.150 235,000.00 35,250.00
0.100 235,000.00 23,500.00
0.150 438,900.00 65,835.00
30.000 600.00 18,000.00
0.250 83,600.00 20,900.00
0.080 125,400.00 10,032.00
0.150 119,100.00 17,865.00
0.060 85,000.00 5,100.00

2.000 120,000.00 240,000.00


1.000 120,000.00 120,000.00
2.000 96,000.00 192,000.00
0.800 130,000.00 104,000.00
0.050 150,000.00 7,500.00
1,336,452.00

0.400 96,000.00 38,400.00


0.040 150,000.00 6,000.00
44,400.00

0.192 96,000.00 18,432.00


0.019 150,000.00 2,850.00
21,282.00

1.200 151,600.00 181,920.00

0.300 96,000.00 28,800.00


0.010 150,000.00 1,500.00
212,220.00

1.200 168,500.00 202,200.00

0.912 96,000.00 87,552.00


0.010 150,000.00 1,500.00
291,252.00

1.100 363,700.00 400,070.00


136.000 1,346.00 183,056.00
0.544 235,000.00 127,840.00

1.500 96,000.00 144,000.00


0.600 120,000.00 72,000.00
0.060 130,000.00 7,800.00
0.075 150,000.00 11,250.00
946,016.00

1.200 388,800.00 466,560.00


0.300 151,600.00 45,480.00

0.780 96,000.00 74,880.00


0.390 120,000.00 46,800.00
0.039 130,000.00 5,070.00
0.039 150,000.00 5,850.00
644,640.00

70.000 600.00 42,000.00


9.680 1,346.00 13,029.28
0.045 235,000.00 10,575.00

0.320 96,000.00 30,720.00


0.100 120,000.00 12,000.00
0.010 130,000.00 1,300.00
0.015 150,000.00 2,250.00
111,874.28

70.000 600.00 42,000.00


14.370 1,346.00 19,342.02
0.040 235,000.00 9,400.00

0.320 96,000.00 30,720.00


0.100 120,000.00 12,000.00
0.010 130,000.00 1,300.00
0.015 150,000.00 2,250.00
117,012.02

10.800 1,346.00 14,536.80


0.026 235,000.00 6,110.00

0.250 96,000.00 24,000.00


0.200 120,000.00 24,000.00
0.020 130,000.00 2,600.00
0.013 150,000.00 1,875.00
73,121.80
7.290 1,346.00 9,812.34
0.014 235,000.00 3,290.00

0.250 96,000.00 24,000.00


0.200 120,000.00 24,000.00
0.020 130,000.00 2,600.00
0.013 150,000.00 1,875.00
65,577.34

4.000 1,346.00 5,384.00

0.143 96,000.00 13,728.00


1.107 120,000.00 132,840.00
1.011 130,000.00 131,365.00
0.011 150,000.00 1,575.00
284,892.00

1.100 8,882,500.00 9,770,750.00

6.000 96,000.00 576,000.00


20.000 120,000.00 2,400,000.00
2.000 130,000.00 260,000.00
0.300 150,000.00 45,000.00
13,051,750.00

0.040 19,855,000.00 794,200.00

1.000 96,000.00 96,000.00


2.500 120,000.00 300,000.00
0.250 130,000.00 32,500.00
0.050 150,000.00 7,500.00
1,230,200.00

1.100 8,882,500.00 9,770,750.00


22.500 54,200.00 1,219,500.00
0.800 15,700.00 12,560.00

4.000 96,000.00 384,000.00


12.000 120,000.00 1,440,000.00
1.200 130,000.00 156,000.00
0.200 150,000.00 30,000.00
13,012,810.00

1.100 3,657,000.00 4,022,700.00


22.500 54,200.00 1,219,500.00
3.000 15,700.00 47,100.00

2.400 96,000.00 230,400.00


7.200 120,000.00 864,000.00
0.720 130,000.00 93,600.00
0.120 150,000.00 18,000.00
6,495,300.00

0.300 73,200.00 21,960.00


0.040 20,900.00 836.00

0.150 96,000.00 14,400.00


0.070 120,000.00 8,400.00
0.007 130,000.00 910.00
0.006 150,000.00 900.00
47,406.00

0.700 88,400.00 61,880.00


0.020 20,900.00 418.00

0.120 96,000.00 11,520.00


0.060 120,000.00 7,200.00
0.006 130,000.00 780.00
0.006 150,000.00 900.00
82,698.00

0.012 3,657,000.00 43,884.00


0.100 15,700.00 1,570.00

0.150 96,000.00 14,400.00


0.150 120,000.00 18,000.00
0.015 130,000.00 1,950.00
0.011 150,000.00 1,575.00
81,379.00

1.000 65,000.00 65,000.00


0.030 15,700.00 471.00
0.100 96,000.00 9,600.00
0.100 120,000.00 12,000.00
0.010 130,000.00 1,300.00
0.005 150,000.00 750.00
89,121.00

1.000 17,000.00 17,000.00


0.010 15,700.00 157.00

0.050 96,000.00 4,800.00


0.050 120,000.00 6,000.00
0.005 130,000.00 650.00
0.003 150,000.00 450.00
29,057.00

0.011 3,135,000.00 33,858.00


0.001 15,700.00 10.90

0.100 96,000.00 9,600.00


0.200 120,000.00 24,000.00
0.020 130,000.00 2,600.00
0.005 150,000.00 750.00
70,818.90

0.270 2,926,000.00 790,020.00


2.000 15,700.00 31,400.00
0.600 20,000.00 12,000.00
200.000 14,800.00 2,960,000.00
3.000 20,900.00 62,700.00
323.000 1,346.00 434,758.00
0.520 235,000.00 122,200.00
0.780 424,300.00 330,954.00

4.850 96,000.00 465,600.00


0.350 120,000.00 42,000.00
1.560 120,000.00 187,200.00
1.400 120,000.00 168,000.00
0.331 130,000.00 43,030.00
0.170 150,000.00 25,500.00
5,675,362.00

0.400 2,926,000.00 1,170,400.00


4.000 15,700.00 62,800.00
2.000 20,000.00 40,000.00
300.000 14,800.00 4,440,000.00
4.500 20,900.00 94,050.00
323.000 1,346.00 434,758.00
0.520 235,000.00 122,200.00
0.780 424,300.00 330,954.00
0.150 1,672,000.00 250,800.00
3.500 95,000.00 332,500.00
20.000 20,500.00 410,000.00

7.300 96,000.00 700,800.00


0.350 120,000.00 42,000.00
3.300 120,000.00 396,000.00
2.100 120,000.00 252,000.00
0.570 130,000.00 74,100.00
0.250 150,000.00 37,500.00
9,190,862.00

0.003 2,926,000.00 8,778.00


0.020 15,700.00 314.00
3.600 14,800.00 53,280.00
0.050 20,900.00 1,045.00
5.500 1,346.00 7,403.00
0.009 235,000.00 2,115.00
0.015 424,300.00 6,364.50

0.100 96,000.00 9,600.00


0.033 120,000.00 3,960.00
0.033 120,000.00 3,960.00
0.033 120,000.00 3,960.00
0.010 130,000.00 1,300.00
0.005 150,000.00 750.00
102,829.50

338.000 1,346.00 454,948.00


0.650 235,000.00 152,750.00
0.650 424,300.00 275,795.00

6.000 96,000.00 576,000.00


1.000 120,000.00 120,000.00
0.100 130,000.00 13,000.00
0.300 150,000.00 45,000.00
1,637,493.00
197.000 1,346.00 265,162.00
0.470 235,000.00 110,450.00
0.940 424,300.00 398,842.00

1.650 96,000.00 158,400.00


0.250 120,000.00 30,000.00
0.025 130,000.00 3,250.00
0.080 150,000.00 12,000.00
978,104.00

1.000 58,000.00 58,000.00


9.300 1,346.00 12,517.80
0.018 235,000.00 4,230.00
1.940 20,900.00 40,546.00

0.900 96,000.00 86,400.00


0.450 120,000.00 54,000.00
0.045 130,000.00 5,850.00
0.045 150,000.00 6,750.00
268,293.80

1.000 56,000.00 56,000.00


11.380 1,346.00 15,317.48
0.042 235,000.00 9,870.00
1.500 20,900.00 31,350.00

0.620 96,000.00 59,520.00


0.350 120,000.00 42,000.00
0.035 130,000.00 4,550.00
0.030 150,000.00 4,500.00
223,107.48

1.000 52,000.00 52,000.00


11.380 1,346.00 15,317.48
0.042 235,000.00 9,870.00
1.500 20,900.00

0.620 96,000.00 59,520.00


0.350 120,000.00 42,000.00
0.035 130,000.00 4,550.00
0.030 150,000.00 4,500.00
187,757.48

1.000 58,000.00 58,000.00


11.380 1,346.00 15,317.48
0.042 235,000.00 9,870.00
1.500 20,900.00

0.620 96,000.00 59,520.00


0.350 120,000.00 42,000.00
0.035 130,000.00 4,550.00
0.030 150,000.00 4,500.00
193,757.48

0.400 56,000.00 22,400.00


1.140 1,346.00 1,534.44
0.003 235,000.00 705.00
0.100 20,900.00 2,090.00

0.090 96,000.00 8,640.00


0.090 120,000.00 10,800.00
0.009 130,000.00 1,170.00
0.005 150,000.00 750.00
48,089.44

0.300 52,000.00 15,600.00


1.140 1,346.00 1,534.44
0.003 235,000.00 705.00
0.100 20,900.00

0.090 96,000.00 8,640.00


0.090 120,000.00 10,800.00
0.009 130,000.00 1,170.00
0.005 150,000.00 750.00
39,199.44

0.200 58,000.00 11,600.00


1.140 1,346.00 1,534.44
0.003 235,000.00 705.00
0.100 20,900.00

0.090 96,000.00 8,640.00


0.090 120,000.00 10,800.00
0.009 130,000.00 1,170.00
0.005 150,000.00 750.00
35,199.44

1.000 120,200.00 120,200.00

0.060 96,000.00 5,760.00


0.600 120,000.00 72,000.00
0.060 130,000.00 7,800.00
0.003 150,000.00 450.00
206,210.00

1.000 25,200.00 25,200.00

0.015 96,000.00 1,440.00


0.150 120,000.00 18,000.00
0.015 130,000.00 1,950.00
0.001 150,000.00 120.00
46,710.00

1.000 25,200.00 25,200.00

0.010 96,000.00 960.00


0.100 120,000.00 12,000.00
0.010 130,000.00 1,300.00
0.001 150,000.00 75.00
39,535.00

1.000 10,450.00 10,450.00

0.010 96,000.00 960.00


0.100 120,000.00 12,000.00
0.010 130,000.00 1,300.00
0.001 150,000.00 150.00
24,860.00

1.000 36,600.00 36,600.00

0.010 96,000.00 960.00


0.100 120,000.00 12,000.00
0.010 130,000.00 1,300.00
0.001 150,000.00 112.50
50,972.50
1.000 15,700.00 15,700.00

0.015 96,000.00 1,440.00


0.150 120,000.00 18,000.00
0.015 130,000.00 1,950.00
0.001 150,000.00 120.00
37,210.00

1.100 125,400.00 137,940.00

0.015 96,000.00 1,440.00


0.150 120,000.00 18,000.00
0.015 130,000.00 1,950.00
0.001 150,000.00 120.00
159,450.00

0.200 37,142.86 7,428.57


0.150 8,360.00 1,254.00
0.170 79,000.00 13,430.00
0.260 54,000.00 14,040.00

0.070 96,000.00 6,720.00


0.009 120,000.00 1,080.00
0.006 130,000.00 780.00
0.003 150,000.00 375.00
45,107.57

0.100 8,360.00 836.00


0.100 130,700.00 13,070.00
0.260 112,000.00 29,120.00

0.020 96,000.00 1,920.00


0.063 120,000.00 7,560.00
0.006 130,000.00 819.00
0.003 150,000.00 375.00
53,700.00

0.300 66,880.00 20,064.00

0.006 96,000.00 576.00


0.060 120,000.00 7,200.00
0.012 130,000.00 1,560.00
0.006 150,000.00 900.00
30,300.00

1.000 8,540.00 8,540.00


1.000 3,125.00 3,125.00

0.480 96,000.00 46,080.00


0.048 100,000.00 4,800.00
0.048 130,000.00 6,240.00
68,785.00

1.000 21,000.00 21,000.00

0.400 96,000.00 38,400.00


0.040 100,000.00 4,000.00
0.040 130,000.00 5,200.00
68,600.00

1.000 8,500.00 8,500.00

0.400 96,000.00 38,400.00


0.040 100,000.00 4,000.00
0.040 130,000.00 5,200.00
56,100.00

0.750 96,000.00 72,000.00


0.500 100,000.00 50,000.00
0.250 130,000.00 32,500.00
154,500.00

1.000 12,500.00 12,500.00

0.200 96,000.00 19,200.00


0.020 100,000.00 2,000.00
0.020 130,000.00 2,600.00
36,300.00

1.000 174,000.00 174,000.00


0.200 96,000.00 19,200.00
0.020 100,000.00 2,000.00
0.020 130,000.00 2,600.00
197,800.00

1.000 34,500.00 34,500.00

0.200 96,000.00 19,200.00


0.020 100,000.00 2,000.00
0.020 130,000.00 2,600.00
58,300.00

1.000 7,300.00 7,300.00

0.200 96,000.00 19,200.00


0.020 100,000.00 2,000.00
0.020 130,000.00 2,600.00
31,100.00

1.000 2,612,500.00 2,612,500.00


0.060 2,612,500.00 156,750.00

3.300 96,000.00 316,800.00


1.100 120,000.00 132,000.00
0.001 130,000.00 130.00
0.160 150,000.00 24,000.00
3,242,180.00

1.000 41,800.00 41,800.00


0.025 2,500.00 62.50

0.010 96,000.00 960.00


0.100 120,000.00 12,000.00
0.010 130,000.00 1,300.00
0.005 150,000.00 750.00
56,872.50

1.200 7,850.00 9,420.00


0.350 9,420.00 3,297.00
0.081 96,000.00 7,776.00
0.135 120,000.00 16,200.00
0.014 130,000.00 1,755.00
0.004 150,000.00 615.00
39,063.00

1.200 34,325.00 41,190.00


0.350 41,190.00 14,416.50

0.081 96,000.00 7,776.00


0.135 120,000.00 16,200.00
0.014 130,000.00 1,755.00
0.004 150,000.00 615.00
81,952.50

1.200 43,550.00 52,260.00


0.350 52,260.00 18,291.00

0.036 96,000.00 3,456.00


0.060 120,000.00 7,200.00
0.006 130,000.00 780.00
0.002 150,000.00 270.00
82,257.00

1.000 783,800.00 783,800.00

0.030 96,000.00 2,880.00


0.300 120,000.00 36,000.00
0.030 130,000.00 3,900.00
0.002 150,000.00 225.00
826,805.00

1.000 961,400.00 961,400.00

0.030 96,000.00 2,880.00


0.300 120,000.00 36,000.00
0.030 130,000.00 3,900.00
0.002 150,000.00 225.00
1,004,405.00

1.000 34,000.00 34,000.00

0.030 96,000.00 2,880.00


0.300 120,000.00 36,000.00
0.030 130,000.00 3,900.00
0.002 150,000.00 225.00
77,005.00

4.500 44,400.00 199,800.00


0.214 212,220.00 45,415.08
2.250 978,104.00 2,200,734.00
15.000 117,012.02 1,755,180.30
0.300 1,637,493.00 491,247.90
15.000 73,121.80 1,096,827.00
5.400 81,952.50 442,543.50
5.000 82,257.00 411,285.00
3.375 44,400.00 149,850.00
5.400 4,200.00 22,680.00
1.050 424,300.00 445,515.00
9.000 81,952.50 737,572.50
1.125 21,282.00 23,942.25
7,822,792.53
Rencanana Anggaran Biaya

Pekerjaan :
Lokasi :
Tahun :

Harga Satuan
No Jenis Pekerjaan Satuan Volume
(Rp)
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan m² 98.000 17,100.00
2 Pemasangan Bouwplank m¹ 42.000 88,330.00
3 Pembuatan Direksi Keet m 2
12.000 1,336,452.00
4 Pembuatan Gudang semen dan Alat-Alat m 2
8.000 909,888.00

B Pekerjaan Galian
1 Galian Tanah Pondasi m³ 177.686 44,400.00
2 Timbunan Tanah Kembali m³ 44.422 21,282.00
3 Timbunan Tanah bawah lantai m 3
17.150 291,252.00
4 Urugan pasir di Bawah pondasi m3 3.297 212,220.00
5 Urugan pasir di Bawah lantai m³ 1.151 212,220.00

C PEKERJAAN PONDASI
1 Pasangan Pondasi Batu Gunung 1 Pc: 5 Ps m³ 36.803 946,016.00
2 Pasangan Batu Kosong m³ 12.794 644,640.00

D Pekerjaan Beton
1 Pekerjaan Sloof M3 2.175 5,675,362.00
2 Pekerjaan Kolom M 3
1.665 9,190,862.00
3 Pekerjaan Ring Balk M 3
2.175 102,829.50
4 Pekerjaan Rabat Beton Bawah Lantai M 3
4.288 978,104.00
5 Pekerjaan Rabat Beton Carport M3 0.750 978,104.00

E Pekerjaan Tembok dan Lantai


1 Pekerjaan dinding ½ Bata 1Pc:5Ps M3 47.711 111,874.28
2 Plesteran Dinding 1 Pc : 3 Ps tebal 20 mm M2 12.000 73,121.80
3 Plesteran Dinding 1 Pc : 5 Ps tebal 20 mm M 2
643.204 65,577.34
4 Acian M 2
655.204 284,892.00
5 Pek. Dinding Keramik WC dan tempat cuci (20 x 20) M2 4.800 268,293.80
6 Pek. Lantai Keramik 40 x 40 cm M2 49.245 223,107.48
7 Pek. lantai teras 30 x 30 cm M 2
4.000 187,757.48
8 Lantai Keramik WC 20 X 20 cm M 2
3.708 193,757.48
9 Pasangan plint ukuran 10 x 40 cm M2 7.148 48,089.44
10 Pasangan plint ukuran 30 x 10 cm M2 1.100 39,199.44
11 Pasangan plint ukuran 20 x 10 cm M 2
0.325 35,199.44

F Pekerjaan Pintu dan Jendela


1 Pasang Kusen Pintu dan Jendela Kayu Bayam m³ 0.638 13,051,750.00
2 Pasang Daun Pintu Kayu Bayam m² 12.235 1,230,200.00
3 Pasang Daun jendela Kayu Bayam m2 3.363 1,230,200.00
4 Pekerjaan kaca Mati m² 0.833 159,450.00
5 Pasangan kusen dan daun pintu PVC (KM/WC) bh 1.000 798,000.00
6 Pas. Kunci Tanam bh 6.000 206,210.00
7 Pas. Engsel Pintu bh 16.000 46,710.00
8 Pas. Grendel Pintu bh 8.000 24,860.00
9 Pas. Engsel Jendela bh 8.000 39,535.00
10 Pas. Grendel Jendela bh 4.000 50,972.50
11 Hak Angin bh 4.000 37,210.00

G Pekerjaan Atap dan Plafond


1 KUDA - KUDA m³ 1.124 13,012,810.00
2 PEK. GORDING 6/12 m³ 0.505 6,495,300.00
3 Nok atap seng m 8.640 47,406.00
4 PEK. ATAP m 2
57.000 82,698.00
5 Pek. Rangka Plafond 5/7 m3 0.155 81,379.00
6 Pek. Plafond 1,2 x 1,2 m tebal 6mm lbr 22.076 89,121.00
7 Pek. List plafond 3 cm btg 21.850 29,057.00
8 PEK. LISTPLANK m 15.850 70,818.90

H Pekerjaan pengecetan
1 Pek. Pengecetan tembok m2 636.150 53,700.00
2 Pek. Kusen pintu dan jendela m 2
5.175 45,107.57
3 Pek. Daun pintu dan jendela m2 13.327 45,107.57
4 Pek. Pengecetan plavond dan list plafond m 2
69.698 53,700.00
5 Pek. Pengecetan listplank m 2
3.487 45,107.57
6 Pek. Pengecetan atap m² 57.000 30,300.00

I Pekerjaan Instalasi listrik


1 Pas. Instalasi Listrik dalam ( 3 x 2,5 mm) m 43.470 68785
2 Pas. Saklar ganda Bh 3.000 68600
3 Pas. Saklar tunggal Bh 5.000 56100
4 Pas. KWH meter Bh 1.000 154500
5 Pas. Stop Kontak Bh 7.000 36300
6 Pas.lampu hias Bh 1.000 197800
7 Pas.lampu 23 watt Bh 2.000 58,300.00
8 Pas. Lampu 40 watt Bh 6.000 31,100.00

J Pekerjaan Sanitasi
1 Pek. Stop kran Unit 3.000 56,872.50
2 Pek. Pipa 3/4" m' 2.600 39,063.00
3 Pek. Pipa PVC 4" m' 38.500 81,952.50
4 Pas. Klosed duduk Pas 1.000 3,242,180.00
5 Pek. Bak cuci piring Pas 1.000 826,805.00
6 Pek. Bak mandi Pas 0.000 1,004,405.00
7 Floor drain Pas 4.000 77,005.00
8 Pek. Septictank Unit 1.000 7,822,792.53
ya

Jumlah Harga
Total Harga (Rp)
(Rp)
28,702,188.00 5.89%
1,675,800.00 0.34%
3,709,860.00 0.76%
16,037,424.00 3.29%
7,279,104.00 1.49%

14,773,669.60 3.03%
7,889,276.16 1.62%
945,380.49 0.19%
4,994,971.80 1.03%
699,775.93 0.14%
244,265.22 0.05%

43,064,245.37 8.84%
34,816,463.35 7.15%
8,247,782.02 1.69%

32,797,550.64 6.73%
12,343,912.35 2.53%
15,302,785.23 3.14%
223,654.16 0.05%
4,193,620.90 0.86%
733,578.00 0.15%

249,199,480.96 51.14%
5,337,661.74 1.10%
877,461.60 0.18%
42,179,574.61 8.66%
186,662,235.52 38.31%
1,287,810.24 0.26%
10,986,927.85 2.25%
751,029.92 0.15%
718,476.96 0.15%
343,743.32 0.07%
43,119.38 0.01%
11,439.82 0.00%

31,302,560.22 6.42%
8,330,279.44 1.71%
15,051,497.00 3.09%
4,137,531.66 0.85%
132,742.13 0.03%
798,000.00 0.16%
1,237,260.00 0.25%
747,360.00 0.15%
198,880.00 0.04%
316,280.00 0.06%
203,890.00 0.04%
148,840.00 0.03%

26,774,445.71 5.50%
14,630,666.64 3.00%
3,282,984.43 0.67%
409,587.84 0.08%
4,713,786.00 0.97%
12,575.88 0.00%
1,967,469.85 0.40%
634,895.45 0.13%
1,122,479.61 0.23%

40,623,026.03 8.34%
34,161,255.00 7.01%
233,431.68 0.05%
601,166.65 0.12%
3,742,782.60 0.77%
157,290.10 0.03%
1,727,100.00 0.35%

4,385,983.95 0.90%
2,990,083.95 0.61%
205,800.00 0.04%
280,500.00 0.06%
154,500.00 0.03%
254,100.00 0.05%
197,800.00 0.04%
116,600.00 0.02%
186,600.00 0.04%

15,627,150.08 3.21%
170,617.50 0.04%
101,563.80 0.02%
3,155,171.25 0.65%
3,242,180.00 0.67%
826,805.00 0.17%
- 0.00%
308,020.00 0.06%
7,822,792.53 1.61%
487,250,300.56 100.00%
PERHITUNGAN BOBOT PEKERJAAN

No. URAIAN
1a Pembersihan Lapangan
Volume =
Harga Satuan =
Harga Bangunan =

PBP =

1b Memasang Bowplank
Volume =
Harga Satuan =
Harga Bangunan =

PBP =

1c Direksi Keet
Volume =
Harga Satuan =
Harga Bangunan =

PBP =

1d Gudang semen dan alat - alat


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
=

2a Galian Tanah Pondasi


Volume =
Harga Satuan =
Harga Bangunan =

PBP =

2b Timbunan Tanah Kembali


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

2c Timbunan Tanah bawah lantai


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

2d Urugan pasir di Bawah pondasi


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=
=

2e Urugan pasir di Bawah lantai


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

3a Pasangan Pondasi Batu Gunung 1 Pc: 5 Ps


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

3b Pasangan Batu Kosong


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan

4a Pekerjaan Sloof
Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=
=

4b Pekerjaan Kolom
Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

4c Pekerjaan Ring Balk


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

4d Pekerjaan Rabat Beton Bawah Lantai


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

4e Pekerjaan Rabat Beton Carport


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

=
5a Pekerjaan dinding ½ Bata 1Pc:5Ps
Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

5b Plesteran Dinding 1 Pc : 3 Ps tebal 20 mm


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

5c Plesteran Dinding 1 Pc : 5 Ps tebal 20 mm


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

5d Acian
Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

5e Pek. Dinding Keramik WC dan tempat cuci (20 x 20)


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

5f Pek. Lantai Keramik 40 x 40 cm


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

5g Pek. lantai teras 30 x 30 cm


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

5h Lantai Keramik WC 20 X 20 cm
Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

5i Pasangan plint ukuran 10 x 40 cm


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

5j Pasangan plint ukuran 30 x 10 cm


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

5k Pasangan plint ukuran 20 x 10 cm


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

6a Pasang Kusen Pintu dan Jendela Kayu Bayam


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

6b Pasang Daun Pintu Kayu Bayam


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

6c Pasang Daun jendela Kayu Bayam


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

6d Pekerjaan kaca Mati


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

6e Pasangan kusen dan daun pintu PVC (KM/WC)


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

6f Pas. Kunci Tanam


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

6g Pas. Engsel Pintu


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

6h Pas. Grendel Pintu


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

6i Pas. Engsel Jendela


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

6j Pas. Grendel Jendela


Volume =
Harga Satuan =
Harga Bangunan =
PBP =
Harga Bangunan
=

6k Hak Angin
Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

7a KUDA - KUDA
Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

7b PEK. GORDING 6/12


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

7c Nok atap seng


Volume =
Harga Satuan =
Harga Bangunan =
PBP =
Harga Bangunan
=

7d PEK. ATAP
Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

7e Pek. Rangka Plafond 5/7


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

7f Pek. Plafond 1,2 x 1,2 m tebal 6mm


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

7g Pek. List plafond 3 cm


Volume =
Harga Satuan =
Harga Bangunan =
PBP =
Harga Bangunan
=

7h PEK. LISTPLANK
Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

8a Pek. Pengecetan tembok


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

8b Pek. Kusen pintu dan jendela


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

8c Pek. Daun pintu dan jendela


Volume =
Harga Satuan =
Harga Bangunan =
PBP =
Harga Bangunan
=

8d Pek. Pengecetan plavond dan list plafond


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

8e Pek. Pengecetan listplank


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

8f Pek. Pengecetan atap


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

9a Pas. Instalasi Listrik dalam ( 3 x 2,5 mm)


Volume =
Harga Satuan =
Harga Bangunan =
PBP =
Harga Bangunan
=

9b Pas. Saklar ganda


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

9c Pas. Saklar tunggal


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

9d Pas. KWH meter


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

9e Pas. Stop Kontak


Volume =
Harga Satuan =
Harga Bangunan =
PBP =
Harga Bangunan
=

9f Pas.lampu hias
Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

9g Pas.lampu 23 watt
Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

9h Pas. Lampu 40 watt


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

10a Pek. Stop kran


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

10b Pek. Pipa 3/4"


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

10c Pek. Pipa PVC 4"


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

10d Pas. Klosed duduk


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

10e Pek. Bak cuci piring


Volume =
Harga Satuan =
Harga Bangunan =
PBP =
Harga Bangunan
=

10f Pek. Bak mandi


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

10g Floor drain


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

10h Pek. Septictank


Volume =
Harga Satuan =
Harga Bangunan =

PBP =
Harga Bangunan
=

=
AN BOBOT PEKERJAAN

Persentase
URAIAN
Bobot Pekerjaan (%)

98.00 m2
17,100.00
###

Volume x Harga satuan


x 100%
Harga Bangunan
98.00 x 17,100
x 100%
535975000.00
0.00312664 x 100 % = 0.313

42.00 m'
88,330.00
###

Volume x Harga satuan


x 100%
Harga Bangunan
42.0 x 88,330
x 100%
535975000.00
0.00692170 x 100 % = 0.692

12 m2
1,336,452.00
###

Volume x Harga satuan


x 100%
Harga Bangunan
12 x 1,336,452
x 100%
535975000.00
0.02992196 x 100 % = 2.992

8 m2
909,888.00
###

Volume x Harga satuan


x 100%
Harga Bangunan
8 x 909,888
x 100%
535975000.00
0.01358105 x 100 % = 1.358

177.69 m3
44,400.00
###

Volume x Harga satuan


x 100%
Harga Bangunan
177.686 x 44,400
x 100%
535975000.00
0.01471949 x 100 % = 1.47

44.422 m3
21,282.00
###

Volume x Harga satuan x 100%


Harga Bangunan
44.422 x 21,282 x 100%
###
0.00176385 x 100 % = 0.18

17.150 m3
291,252.00
###

Volume x Harga satuan x 100%


Harga Bangunan
17.150 x 291,252 x 100%
###
0.00931941 x 100 % = 0.93

3.297 m3
212,220.00
###

Volume x Harga satuan x 100%


Harga Bangunan
3.297 x 212,220 x 100%
###
0.00130561 x 100 % = 0.13

1.151 m3
212,220.00
###

Volume x Harga satuan x 100%


Harga Bangunan
1.151 x 212,220 x 100%
###
0.00046 x 100 % = 0.05

nung 1 Pc: 5 Ps
36.803 m3
946,016.00
###

Volume x Harga satuan x 100%


Harga Bangunan
36.803 x 946,016 x 100%
###
0.06496 x 100 % = 6.50

12.794 m3
644,640
###

Volume x Harga satuan x 100%


Harga Bangunan

12.794 x 644,640 x 100%


###
0.01538837 x 100 % = 1.54

2.175 m3
5,675,362.00
###

Volume x Harga satuan x 100%


Harga Bangunan
2.175 x 5,675,362 x 100%
###
0.02303076 x 100 % = 2.30

1.665 m3
9,190,862.00
###

Volume x Harga satuan x 100%


Harga Bangunan
1.665 x 9,190,862 x 100%
###
0.02855130 x 100 % = 2.86

2.175 m3
102,830
###

Volume x Harga satuan x 100%


Harga Bangunan
2.175 x 102,830 x 100%
###
0.00041728 x 100 % = 0.042

wah Lantai
4.288 m3
978,104
###

Volume x Harga satuan x 100%


Harga Bangunan
4.288 x 978,104 x 100%
###
0.00782428 x 100 % = 0.782

0.750 m3
978,104
###

Volume x Harga satuan x 100%


Harga Bangunan
0.750 x 978,104 x 100%
###
0.00136868 x 100 % = 0.14
1Pc:5Ps
47.711 m3
111,874
###

Volume x Harga satuan x 100%


Harga Bangunan
47.711 x 111,874 x 100%
###
0.00995879 x 100 % = 1.00

Ps tebal 20 mm
12.000 m2
73,122
###

Volume x Harga satuan x 100%


Harga Bangunan
12.000 x 73,122 x 100%
###
0.00163713 x 100 % = 0.16

Ps tebal 20 mm
643.204 m2
65,577
###

Volume x Harga satuan x 100%


Harga Bangunan
643.204 x 65,577 x 100%
###
0.07869691 x 100 % = 7.87

655.204 m2
284,892
###

Volume x Harga satuan x 100%


Harga Bangunan
655.204 x 284,892 x 100%
###
0.34826668 x 100 % = 34.83

an tempat cuci (20 x 20)


4.800 m2
268,294
###

Volume x Harga satuan x 100%


Harga Bangunan
4.800 x 268,294 x 100%
###
0.00240274 x 100 % = 0.24

49.245 m2
223,107
###

Volume x Harga satuan x 100%


Harga Bangunan
49.245 x 223,107 x 100%
###
0.02049896 x 100 % = 2.05

4.000 m2
187,757
###

Volume x Harga satuan x 100%


Harga Bangunan
4.000 x 187,757 x 100%
###
0.00140124 x 100 % = 0.14

3.708 m2
193,757
###

Volume x Harga satuan x 100%


Harga Bangunan
3.708 x 193,757 x 100%
###
0.00134050 x 100 % = 0.13

7.148 m2
48,089
###

Volume x Harga satuan x 100%


Harga Bangunan
7.148 x 48,089 x 100%
###
0.00064134 x 100 % = 0.06

1.1 m2
39,199
###

Volume x Harga satuan x 100%


Harga Bangunan
1.100 x 39,199 x 100%
###
0.00008045 x 100 % = 0.01

0.33 m2
35,199
###

Volume x Harga satuan x 100%


Harga Bangunan
0.325 x 35,199 x 100%
###
0.00002134 x 100 % = 0.00

ndela Kayu Bayam


0.64 m3
13,051,750
###

Volume x Harga satuan x 100%


Harga Bangunan
0.638 x 13,051,750 x 100%
###
0.01554229 x 100 % = 1.55

12.24 m2
1,230,200
###

Volume x Harga satuan x 100%


Harga Bangunan
12.235 x 1,230,200 x 100%
###
0.02808246 x 100 % = 2.81

Bayam
3.363 m2
1,230,200
###

Volume x Harga satuan x 100%


Harga Bangunan
3.363 x 1,230,200 x 100%
###
0.00771964 x 100 % = 0.77

0.833 m2
159,450
###

Volume x Harga satuan x 100%


Harga Bangunan
0.833 x 159,450 x 100%
###
0.00024766 x 100 % = 0.02

pintu PVC (KM/WC)


1.000 Buah
798,000
###

Volume x Harga satuan x 100%


Harga Bangunan
1.000 x 798,000 x 100%
###
0.00148888 x 100 % = 0.15

6.000 Buah
206,210
###

Volume x Harga satuan x 100%


Harga Bangunan
6.000 x 206,210 x 100%
###
0.00230843 x 100 % = 0.23

16.000 Buah
46,710
###

Volume x Harga satuan x 100%


Harga Bangunan
16.000 x 46,710 x 100%
###
0.00139439 x 100 % = 0.14

8.00 Buah
24,860
###

Volume x Harga satuan x 100%


Harga Bangunan
8.000 x 24,860 x 100%
###
0.00037106 x 100 % = 0.04

8.00 Buah
39,535
###

Volume x Harga satuan x 100%


Harga Bangunan
8.000 x 39,535 x 100%
###
0.00059010 x 100 % = 0.06

4.00 Buah
50,973
###
Volume x Harga satuan x 100%
Harga Bangunan
4.000 x 50,973 x 100%
###
0.00038041 x 100 % = 0.04

4.00 Buah
37,210
###

Volume x Harga satuan x 100%


Harga Bangunan
4.000 x 37,210 x 100%
###
0.00027770 x 100 % = 0.03

1.12 m3
13,012,810
###

Volume x Harga satuan x 100%


Harga Bangunan
1.124 x 13,012,810 x 100%
###
0.02729729 x 100 % = 2.73

0.51 m3
6,495,300
###

Volume x Harga satuan x 100%


Harga Bangunan
0.505 x 6,495,300 x 100%
###
0.00612526 x 100 % = 0.61

8.64 m'
47,406
###
Volume x Harga satuan x 100%
Harga Bangunan
8.640 x 47,406 x 100%
###
0.00076419 x 100 % = 0.08

57.00 m2
82,698
###

Volume x Harga satuan x 100%


Harga Bangunan
57.000 x 82,698 x 100%
###
0.00879479 x 100 % = 0.88

0.15 m3
81,379
###

Volume x Harga satuan x 100%


Harga Bangunan
0.155 x 81,379 x 100%
###
0.00002346 x 100 % = 0.00

bal 6mm
22.08 Lbr
89,121
###

Volume x Harga satuan x 100%


Harga Bangunan
22.076 x 89,121 x 100%
###
0.00367082 x 100 % = 0.37

21.85 btg
29,057
###
Volume x Harga satuan x 100%
Harga Bangunan
21.850 x 29,057 x 100%
###
0.00118456 x 100 % = 0.12

16 m'
70,819
###

Volume x Harga satuan x 100%


Harga Bangunan
15.850 x 70,819 x 100%
###
0.00209428 x 100 % = 0.21

636 m2
53,700
###

Volume x Harga satuan x 100%


Harga Bangunan
636.150 x 53,700 x 100%
###
0.06373666 x 100 % = 6.37

5 m2
45,108
###

Volume x Harga satuan x 100%


Harga Bangunan
5.175 x 45,108 x 100%
###
0.00043553 x 100 % = 0.04

13 m2
45,108
###
Volume x Harga satuan x 100%
Harga Bangunan
13.327 x 45,108 x 100%
###
0.00112163 x 100 % = 0.11

an list plafond
70 m2
53,700
###

Volume x Harga satuan x 100%


Harga Bangunan
69.698 x 53,700 x 100%
###
0.00698313 x 100 % = 0.70

3 m2
45,108
###

Volume x Harga satuan x 100%


Harga Bangunan
3.487 x 45,108 x 100%
###
0.00029347 x 100 % = 0.03

57.000 m2
30,300
###

Volume x Harga satuan x 100%


Harga Bangunan
57.000 x 30,300 x 100%
###
0.00322235 x 100 % = 0.32

( 3 x 2,5 mm)
43.470 m
68,785
###
Volume x Harga satuan x 100%
Harga Bangunan
43.470 x 68,785 x 100%
###
0.00557878 x 100 % = 0.56

3.000 Buah
68,600
###

Volume x Harga satuan x 100%


Harga Bangunan
3.000 x 68,600 x 100%
###
0.00038397 x 100 % = 0.04

5.000 Buah
56,100
###

Volume x Harga satuan x 100%


Harga Bangunan
5.000 x 56,100 x 100%
###
0.00052335 x 100 % = 0.05

1.000 Buah
154,500
###

Volume x Harga satuan x 100%


Harga Bangunan
1.000 x 154,500 x 100%
###
0.00028826 x 100 % = 0.03

7.000 Buah
36,300
###
Volume x Harga satuan x 100%
Harga Bangunan
7.000 x 36,300 x 100%
###
0.00047409 x 100 % = 0.05

1 Buah
197,800
###

Volume x Harga satuan x 100%


Harga Bangunan
1.000 x 197,800 x 100%
###
0.00036905 x 100 % = 0.04

2 Buah
58,300
###

Volume x Harga satuan x 100%


Harga Bangunan
2.000 x 58,300 x 100%
###
0.00021755 x 100 % = 0.02

6 Buah
31,100
###

Volume x Harga satuan x 100%


Harga Bangunan
6.000 x 31,100 x 100%
###
0.00034815 x 100 % = 0.03

3 Buah
56,873
###

Volume x Harga satuan x 100%


Harga Bangunan
3.000 x 56,873 x 100%
###
0.00031833 x 100 % = 0.03

3 m'
39,063.00
###

Volume x Harga satuan x 100%


Harga Bangunan
2.600 x 39,063 x 100%
###
0.00018949 x 100 % = 0.02

39 m'
81,952.50
###

Volume x Harga satuan x 100%


Harga Bangunan
38.500 x 81,953 x 100%
###
0.00588679 x 100 % = 0.59

1 Pas
3,242,180.00
###

Volume x Harga satuan x 100%


Harga Bangunan
1.000 x 3,242,180 x 100%
###
0.00604913 x 100 % = 0.60

1 Pas
826,805.00
###
Volume x Harga satuan x 100%
Harga Bangunan
1.000 x 826,805 x 100%
###
0.00154262 x 100 % = 0.15

- Pas
1,004,405.00
###

Volume x Harga satuan x 100%


Harga Bangunan
0.000 x 1,004,405 x 100%
###
- x 100 % = 0.00

4 Pas
77,005.00
###

Volume x Harga satuan x 100%


Harga Bangunan
4.000 x 77,005 x 100%
###
0.00057469 x 100 % = 0.06

1.000 Unit
7,822,792.53
###

Volume x Harga satuan x 100%


Harga Bangunan
1.000 x 7,822,793 x 100%
###
0.01459544 x 100 % = 1.46
91
Kegiatan
1 Pekerjaan Persiapan
a 1 Pembersihan lapangan
2 Memasang bouwplank
3 Direksi keet
4 Gudang semen dan alat - alat
Pekerjaan Tanah dan pasir
b 1 Galian tanah pondasi
2 Urugan Kembali galian
3 timbunan tanah bawah lantai
4 Pasir urug bawah lantai
5 Pasir urug bawah pondasi
Pasangan Pondasi Batu kali
c 1 Pas.pondasi batu gunung
2 pek.pas batu kosong
2 Pekerjaan Beton
a 1 Beton sloef
3 pek.kolom
4 pek. Ring balk
5 pek. Rabat beton bawah lantai
6 pek. Rabat beton carport
3 Pekerjaan Tembok dan lantai
a 1 Pek. Dinding 1 : 5
2 pek. Plesteran 1 : 3
3 pek. Plesteran 1 : 5
4 pek. Acian
5 pek. Dinding keramik wc 20X20
6 pek. Lantai keramik 40x 40
7 Pek. lantai teras 30 x 30 cm
8 pek. Lantai keramik 20x20
9 Pasangan plint ukuran 10 x 40 cm
10 Pasangan plint ukuran 30 x 10 cm
11 Pasangan plint ukuran 20 x 10 cm
4 pekerjaan Pintu Dan Jendela
a 1 pek. Kusen pintu dan jendela
2 pek. Daun pintu
3 pek. Daun jendela
4 pek. Kaca mati
5 pas. Kunci tanam
6 pas. Engsel pintu
7 pas. Grandel pintu
8 Pas. Engsel jendela
9 pas. Grandel jendela
10 pas. Hak angin
11 Pasangan kusen dan daun pintu PVC (KM/WC)
5 Pekerjaan Atap dan plafon
a 1 pek. Kuda-kuda
2 pek. Gording 6/12
3 Nok atap seng
4 PEK. ATAP
5 Pek. Rangka Plafond 5/7
6 Pek. Plafond 1,2 x 1,2 m tebal 6mm
7 Pek. List plafond 3 cm
8 PEK. LISTPLANK
6 Pekerjaan Pengecetan
a 1 pek.pengecetan tembok
2 Pek. Kusen pintu dan jendela
3 Pek. Daun pintu dan jendela
4 Pek. Pengecetan plavond dan list plafond
5 pek. Pengecetan listplank
6 pek. Pengecetan atap
7 Pekerjaan instalasi listrik
a 1 Pas. Instalasi Listrik dalam
2 Pas. Saklar Ganda
3 Pas. Saklar Tunggal
4 Pas. Stop Kontak
5 Pas. KWH meter
6 Pas. Lampu Hias
7 Pas.lampu 23 watt
8 Pas. Lampu 40 watt
8 Pekerjaan Sanitasi
a 1 Pek. Stop Kran
2 Pek. Pipa 3/4 '
3 Pek. Pipa PVC 4"
4 Pas. Kloset Duduk
5 Pek. Bak Cuci Piring
6 Bak Air Fiber
7 Floor Drain
8 Pek. Septiktank
JUMLAH
Bobot
pekerjaan bagian sub. Bagian

0.313
0.692
5.89 2.992
1.358

1.47
16.68 2.76 0.18
0.93
0.05
0.13

8.03 6.50
1.54

2.30
6.12 2.86
0.04
0.78
0.14

1.00
0.16
7.87
46.49 34.83
0.24
2.05
0.14
0.13
0.06
0.01
0.00

1.55
2.81
0.77
0.02
5.84 0.23
0.14
0.04
0.06
0.04
0.03
tu PVC (KM/WC) 0.15

2.73
0.61
0.08
0.88
5.50 0.00
0.37
0.12
0.21

6.37
0.04
0.11
3.67 0.70
0.03
0.32

0.56
0.04
0.05
0.82 0.05
0.03
0.04
0.02
0.03

0.03
0.02
0.59
0.60 0.60
0.15
0.00
0.06
nk 1.46
85.73
Daftar Rekapitulasi Rencanana Anggaran Biaya

Pekerjaan :
Lokasi :
Tahun :

No Jenis Pekerjaan Harga (Rp)


I PEKERJAAN PERSIAPAN Rp 28,702,188.00
II PEKERJAAN GALIAN Rp 14,773,669.60
III PEKERJAAN PONDASI Rp 43,064,245.37
IV PEKERJAAN BETON Rp 32,797,550.64
V PEKERJAAN TEMBOK DAN LANTAI Rp 249,199,480.96
VI PEKERJAAN PINTU DAN JENDELA Rp 31,302,560.22
VII PEKERJAAN ATAP DAN PLAFOND Rp 26,774,445.71
VIII PEKERJAAN PENGECATAN Rp 40,623,026.03
IX PEKERJAAN INSTALASI LISTRIK Rp 4,385,983.95
X PEKERJAAN SANITASI Rp 15,627,150.08
Real Cost Rp 487,250,300.56
PPN 10 % Rp 48,725,030.06
jumlah Rp 535,975,330.61
Dibulatkan Rp 535,975,000.00
lima ratus tiga puluh lima juta sembilan ratus tujuh puluh lima ribu rupiah
JADWAL WAKTU PEL

NILAI
NO. URAIAN PEKERJAAN BOBOT BULAN I
(%) 1 2 3 4

I. PEKERJAAN PERSIAPAN 5.89 2.95 2.95

II. PEKERJAAN GALIAN 3.03 3.03

III. PEKERJAAN PONDASI 8.84 1.00 7.84

IV. PEKERJAAN BETON 6.73 4.00

V. PEKERJAAN TEMBOK DAN LANTAI 51.14

VI. PEKERJAAN PINTU DAN JENDELA 6.42

VII. PEKERJAAN ATAP DAN PLAFOND 5.50

VIII. PEKERJAAN PENGECATAN 8.34

IX. PEKERJAAN INSTALASI LISTRIK 0.90

X. PEKERJAAN SANITASI 3.21

JUMLAH BOBOT 100.00


RENCANA KEMAJUAN PEKERJAAN (%) 2.95 6.98 7.84 4.00
KOMULATIF KEMAJUAN PEKERJAAN (%) 2.95 9.92 17.76 21.76

langkah2 membuat kurva S


1 menghitung bobot pekerjaan bobot = harga per item pek. x 100%
harga total
2 membagi bobot trhdp durasi pelaksanaan pekerjaan
3 menjumlahkan kemajuan pkrjaan per minggu
4 menghitung kumulatif
JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE )

WAKTU PELAKSANAAN
BULAN II BULAN III BULAN IV
5 6 7 8 9 10 11 12 13 14

4.10 -1.37

5.31 5.62 10.00 10.00 10.00 10.21

2.14 2.14 2.14

7.55 -2.05

4.17 4.17

0.45

4.10 3.94 5.62 10.00 12.14 12.14 12.36 7.55 2.11 4.62
25.86 29.80 35.42 45.42 57.56 69.70 82.06 89.61 91.72 96.34
NILAI
BULAN IV KURVA KET.
15 16 (%)

100% 112 Hari


Masa Pelaksanaan

120 Hari
Masa Pemeliharaan
75%

50%

25%

0.45

1.60 1.60 0%

2.05 1.60
98.40 100.00