No Nama Mesin
I II III IV I II
1 Flatwork ironer Danube √ √
2 Washer Extractor 35 kg Danube p1 √ √
3 Washer Extractor 35 kg Danube p2 √ √
4 Dryer Machine 35 kg Danube p1 √
5 Dryer Machine 35 kg Danube p2 √
6 Panel p1 pp-VAC.Laundry Lt.1 Gd C √
7 Panel p2 pp-Laundry-Lt.1 Gd C √
8 Panel p3 Daya Laundry-Lt.1 Gd C √
Keterangan :
I = Minggu ke satu
II = Minggu ke dua
III = Minggu ke tiga
Preventive tanggal 14,15,16 kontak Bm ( Building maintenance)
Jadwal Pembersihan mesin Laundry
Keterangan :
I = Minggu ke satu
II = Minggu ke dua
III = Minggu ke tiga
Preventive tanggal 14,15,16 kontak Bm ( Building maintenance)
Jadwal Pembersihan mesin Laundry