ANGGARAN BIAYA PEKERJAAN FINISHING DATA CENTER REDBOX

NO NAMA PEKERJAAN QTY SAT HRG SAT JUMLAH


1 Pemasangan Automatic Main Failure 1 Paket 6.000.000 6.000.000
1.1 Module AMF
1.2 MCB 3 Phase
1.3 MCB 2 Phase Baterry Starter
1.4 Relay 2 Induk DC 24 V
1.5 Charger Batery
1.6 Pemasangan dan Penyetelan
2 Pemasangan Automatic Transfer Switch 1 Paket 9.000.000 9.000.000
2.1 COS 4P 40 A
2.2 Ampere Meter 0‐50 A 3 CT 50/5A (10 V)
2.3 Voltmeter 0‐500 V
2.4 Selector Volt 7 POS
2.5 Ampere Meter DC 0‐15 A
2.6 Frequensi Meter
2.7 Selector M‐O ‐A
2.8 Push Button
2.9 Pilot Lamp
2.10 PFR
2.11 Relay
2.12 Timer
2.13 Voltmeter DC 0‐30 v
2.14 Emergency Stop
2.15 Baterey Charger
2.16 MCCB 3P 50A
2.17 Terminal kabel
2.18 Pemasangan dan Penyetelan
3 Pemasangan Caging Panel Listrik 1 Paket 10.000.000 10.000.000
3.1 Caging Alumunium
4 Pemasangan Firealarm & Smoke Detector system 1 Paket 20.000.000 20.000.000
4.1 Master Control Panel Fire Alarm ( MCFA )
4.2 Smoke Detector
4.3 Manual Call point (MCP)
4.4 Horn strobe alarm Alarm Bell 24 volt
4.5 Terminal Box Fire alarm
4.6 Indicating Lamp
4.7 Kabel NYAF1,5
4.8 Pipa Conduit PVC
4.9 System Actuator integrate with FM 200 tube
Total 45.000.000 45.000.000