1. Kegiatan : Rabat Beton Lebbae
2. Sumber dana : Dana Desa 2020
3. Lokasi : Desa Timusu
RABAT BETON
Patok Lebar Tinggi Luas TOTAL
Luas JARAK
rata-rata VOLUME
M2 M2 M' M3
1 2 3 4=2x3 5 6 7=5x6
0+00 P0 0.9 0.9 0.61 0.82 0.5 0.35 0.46 0.20 0.63
0.62 25 15.58
0+25 P1 0.9 0.9 0.6 0.81 0.5 0.35 0.45 0.19 0.62
0.63 19.6 12.31
0+44,6 P2 0.93 0.93 0.61 0.85 0.53 0.4 0.46 0.21 0.64
Panjang / Volume I 44.60 27.89
0+00 P0 0.9 0.9 0.6 0.81 0.5 0.35 0.45 0.19 0.62
0.62 25 15.47
0+25 P1 0.9 0.9 0.6 0.81 0.5 0.35 0.45 0.19 0.62
Panjang / Volume II 25.00 15.47
0+00 P0 0.25 0.25 0.9 0.23 0.25 0.4 0.75 0.25 0.25
0.25 21.3 5.27
0+21,3 P1 0.25 0.25 0.9 0.23 0.25 0.4 0.75 0.25 0.25
Panjang / Volume III 21.30 5.27
90.90 48.63
PERHITUNGAN VOLUME
T = 0.60 m
= 0.90 x 0.60 x 69.60
P = 69.60 m
60
= 37.58 m3
Type II 25
L = 0.25 m Volume = L X T X P
T = 0.70 m
= 0.25 x 0.70 x 21.30
70
P = 21.30 m
= 3.73 m3
B : 0.50 + 0.35
x 0.45 x 69.60
2
45
: 0.85
x 31.32
2
: 0.425 x 31.32
15
: 13.31 m3
Volume Bersih
b2 35 V : A-B
P = 69.60 m : 37.584 - 13.31
: 24.27 m3
25
Volume Type II
A : 0.25 x 0.55 x 21.30
: 2.93 m3
55
: 2.08 m3
Volume Total
b2 V : A+B
: 37.584 + 2.08
15
: 37.58 m3
P = 21.30 m
40
90 Volume Type I
50 Luasan
20 20 a = 0.2 + 0.50 + 0.35 + 0.50 + 0.2
= 1.75 m
Volume
45
= a x P
= 1.75 x 69.60
= 121.80 m2
15
b2
35
P = 69.60 M
25 Volume Type II
Luasan
a = 0.25 + 0.55 + 0.4
= 1.20 m
55
Volume
70
= a x P
= 1.2 x 21.30
= 25.56 m2
15
b2
40
P = 21.30 M
BACKUP SERTIFIKASI
1. Bidang : Pembangunan Jalan Desa
2. Kegiatan : Drainase Lannikie Dusun Jolle
3. Sumber dana : Dana Desa Tahun 2018
4. Lokasi : Desa Umpungeng Kec. Lalabata Kab. Soppeng
0+00 P1 2.3 2.1 1.35 4.523 1.6 1.4 1.33 3.059 1.464
1.193 25.0 29.825
0+25 P2 2.3 2.1 1.35 4.523 1.7 1.4 1.5 3.600 0.923
1.283 18.0 23.085
0+43 P3 2.3 2.1 1.35 4.523 1.7 1.4 1.2 2.880 1.643
PANJANG / VOLUME 74.00 93.64
BACKUP DATA
1 Plat Beton
t = 0.10 V = t x b x L x n 0.44 M3
b = 1.90
L = 2.30
t b B n = 1.00
L
-43-
SERTIFIKASI
(PEMERIKSAAN KEGIATAN )
Kegiatan : #REF!
Desa : Umpungeng
Kecamatan : Lalabata
Kabupaten/ Kota : Soppeng
Tanggal :
Semen Portland 40 kg
Paku
Kayu klas III
Rooster beton
Kayu Kls II
Kawat Beton
Besi Ø 12
Besi Ø 10
Besi Ø 8
Batu Gunung
Kerikil
Bata
Pasir
Kawat Duri
Besi Siku
Alat
Molen
60 L = 0.35 m Volume = L X T X P
T = 0.25 m
= 0.35 x 0.25 x 61.40
30
P = 61.40 m
= 5.37 m3
25
0.25 Luas : 0.25 + 0.60 x 0.85 x 12.50
2
: 0.85 x 10.63
2
0.85 : 0.425 x 10.63
Vol : 4.52 m3
130
b2
P = 12.50 m
0.6 Volume Type II
60
2
: 0.3 x 3.15
: 0.95 m3
b2 0.35
60
P = 9.00 m
0.85 Volume
= a x P
130
= 1.10 x 12.50
= 13.75 m2
b2
P = 12.50 M
60
Volume Type II
Luasan
a = 0.25 + 0.30
0.25
25 = 0.55 m
Volume
= a x P
130
60
b2
P = 9.00 M
Data sertifikasi
1. Kegiatan : Rabat Beton Lebbae
2. Sumber dana : Dana Desa 2020
3. Lokasi : Desa Timusu
RABAT BETON
Patok Lebar Tinggi Luas TOTAL
Luas JARAK
rata-rata VOLUME
M2 M2 M' M3
1 2 3 4=2x3 5 6 7=5x6
Data sertifikasi
1. Kegiatan : Bahu Jalan Sebelah Kanan Rabat Beton Watan Pattojo
2. Sumber dana : Dana Desa 2020
3. Lokasi : Desa Pattojo
RABAT BETON
Patok Lebar Tinggi Luas TOTAL
Luas JARAK
rata-rata VOLUME
M2 M2 M' M3
1 2 3 4=2x3 5 6 7=5x6
: 0.1 x 571
42.8
: 42.8 x 2
Vol : 85.65 m3
Data sertifikasi
TALUD
Lebar Luas TOTAL
Patok Lebar Atas Tinggi Luas JARAK
Bawah rata-rata VOLUME
M2 M2 M' M3
1 2 3 4=2x3 5 6 7=5x6
: 0.61 x 9.88
2
: 0.305 x 9.88
Vol : 3.01 m3
b2
P = 7.60 m
Volume Type II
: 0.61 x 2.52
2
: 0.305 x 2.52
: 0.77 m3
b2
P = 2.40 m
Volume Type III
: 0.60 x 2
2
: 0.3 x 2
: 0.60 m3
b2
P = 4.00 m
Volume Type IV
: 0.60 x 12.07
2
: 0.3 x 12.07
: 3.62 m3
b2
P = 12.70 m
Volume Type V
: 0.55 x 4.025
2
: 0.275 x 4.025
: 1.11 m3
b2
P = 11.50 m