Preservasi Jalan dan Jembatan Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
NAMA PAKET : Preservasi Jalan dan Jembatan Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
NO PAKET :
RUAS JALAN : Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
PANJANG JALAN : 90,69 KM
NAMA PENYEDIA : PT. LONADA SINAR HIKMAT
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
DIV U R A I A N PEKERJAAN KET
%
APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER
(%) 27/04/21 02/05/21 09/05/21 16/05/21 23/05/21 30/05/21 06/06/21 13/06/21 20/06/21 27/06/21 04/07/21 11/07/21 18/07/21 25/07/21 01/08/21 08/08/21 15/08/21 22/08/21 29/08/21 05/09/21 12/09/21 19/09/21 26/09/21 03/10/21 10/10/21 17/10/21 24/10/21 31/10/21 07/11/21 14/11/21 21/11/21 28/11/21 05/12/21 12/12/21 19/12/21 26/12/21
01/05/21 08/05/21 15/05/21 22/05/21 29/05/21 05/06/21 12/06/21 19/06/21 26/06/21 03/07/21 10/07/21 17/07/21 24/07/21 31/07/21 07/08/21 14/08/21 21/08/21 28/08/21 04/09/21 11/09/21 18/09/21 25/09/21 02/10/21 09/10/21 16/10/21 23/10/21 30/10/21 06/11/21 13/11/21 20/11/21 27/11/21 04/12/21 11/12/21 18/12/21 25/12/21 31/12/21
1 Umum 100
1.2 Mobilisasi 2,3908 0,0200 0,0200 0,5877 0,5877 0,5877 0,5877
1.8.(1) Manajemen Dan Keselamatan Lalu Lintas 2,0019 0,5000 0,5000 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian PH 0,0072 0,0012 0,0012 0,0012 0,0012 0,0012 0,0012 90
1.17.(1b) Pengujian Oksigen Terlarut (Do) 0,0080 0,0013 0,0013 0,0013 0,0013 0,0013 0,0013
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) 0,0077 0,0013 0,0013 0,0013 0,0013 0,0013 0,0013
1.17.(1d) Pengujian Tersuspensi (TSS) 0,0077 0,0013 0,0013 0,0013 0,0013 0,0013 0,0013
1.17.(1j) Pengujian Temperatur /suhu 0,0072 0,0012 0,0012 0,0012 0,0012 0,0012 0,0012
1.17.(ik) Pengujian Parameter Kualitas air lainnya 0,0072 0,0012 0,0012 0,0012 0,0012 0,0012 0,0012
1.17.(2c) Lainnya 0,0086 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014
1.17.(3f) Pengujian Total Partikulat (TSP)-Debu 0,0166 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 80
1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. 0,0159 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005
1.19 Keselamatan Dan Kesehatan Kerja 0,8216 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242
1.21 Managemen Mutu 2,1798 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641
2 DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Saluran Selokan Drainase Dan Saluran Air 0,0138 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 70
2.2.(1) Pasangan Batu Dengan Mortar 0,2740 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183
2.4.(1) Bahan Drainase Porous Atau Penyaring (Filter) 0,0885 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059
2.4.(4) Pekerjaan Dranase Bawah Permukaan, Diamater 6 Inch 0,0380 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021
60
3 DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa 0,0732 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061
3.1.(4) Galian Struktur dengan Kedalaman 0-2 Meter 0,0547 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042
3.1.(5) Galian Struktur dengan Kedalaman 2-4 Meter 0,1339 0,0122 0,0122 0,0122 0,0122 0,0122 0,0122 0,0122 0,0122 0,0122 0,0122 0,0122
3.2.(2a) Timbunan Pilihan Dari Sumber Galian 0,4241 0,0530 0,0530 0,0530 0,0530 0,0530 0,0530 0,0530 0,0530 50
3.3.(1) Penyiapan Badan Jalan 0,0118 0,0024 0,0024 0,0024 0,0024 0,0024
3.5.(1) (Kelas2) 0,0129 0,0026 0,0026 0,0026 0,0026 0,0026
0,0000
4 DIVISI 5. PERKERASAN BERBUTIR 0,0000 40
6 DIVISI 7. STRUKTUR
7.1 (6c) Beton struktur memadat sendiri, fc’ 25 Mpa 0,2723 0,1361 0,1361
7.1 (7a) Beton Struktur Fc 20 Mpa 15,7825 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864
7.1.(7c) Beton struktur memadat sendiri, fc’ 20 Mpa 0,1651 0,0826 0,0826
7.1.(8) Beton Fc 15 Mpa 0,0566 0,0189 0,0189 0,0189
7.1.(9) Beton Siklop Fc 15 Mpa 0,1744 0,1744
7.1.(10) Beton Fc 10 Mpa 0,0479 0,0479
7.3.(1) Baja Tulangan Polos - BJTP 280 0,0166 0,0166
7.3.(3) Baja Tulangan Sirip BJTS 420 A 0,5364 0,1788 0,1788 0,1788
7.7.(1) Dinding Sumuran Silinder Terpasang, Diamater 200 1,3341 1,3341
7.9(1) Pasangan Batu 4,5668 0,4152 0,4152 0,4152 0,4152 0,4152 0,4152 0,4152 0,4152 0,4152 0,4152 0,4152
7.10.(3a) Bronjong dengan kawat yang dilapisi galvaniz 0,0370 0,0185 0,0185
30
7 DIVISI 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN
9.2.(1) Marka Jalan 0,0407 0,0407
9.2.(7) Rel Pengaman 1,1012 1,1012
10.1.(4) Perbaikan Lapis Pondasi Agregat Kelas A 19,2804 0,7327 0,7327 0,7327 0,7712 0,7712 0,9640 0,9640 1,1568 1,1568 1,1568 1,7738 1,7738 1,7738 0,9640 0,9640 0,9640 0,9640 0,9640
10.1.(6) Perbaikan Lapis Pondasi Agregat Kelas S 2,2263 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795
10.1.(9) Perbaikan Campuran Aspal Panas 17,0142 0,6466 0,6466 0,6466 0,6806 0,6806 0,8507 0,8507 1,0208 1,0208 1,0208 1,5653 1,5653 1,5653 0,7089 0,7089 0,7089 0,7089 0,7089 0,7089
10.1.(13) Residu Bitumen untuk pemeliharaan 1,2719 0,0483 0,0483 0,0483 0,0509 0,0509 0,0636 0,0636 0,0763 0,0763 0,0763 0,1170 0,1170 0,1170 0,0530 0,0530 0,0530 0,0530 0,0530 0,0530 10
10.1.(21) Pembersihan Drainase 2,0671 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591
10.1.(22) Pengendalian Tanaman 24,7426 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069
0
PHO (Provissional Hand Over) 100,0000
RENCANA KEMAJUAN PEKERJAAN MINGGUAN 0,5200 1,2977 1,4836 2,2046 2,9086 2,9269 2,4614 2,5038 2,7088 2,8917 4,2236 4,5687 4,4325 5,2240 6,7900 5,4604 3,7178 2,5760 3,5400 4,2383 4,1721 4,1910 4,2311 3,2653 3,2419 2,4445 1,4319 1,5032 1,0352 1,0167 0,9637 0,9637 0,9754 0,9754 2,0261 0,8842
RENCANA KEMAJUAN PEKERJAAN MINGGUAN KUMULATIF - 0,5200 1,8177 3,3013 5,5059 8,4145 11,3414 13,8029 16,3067 19,0155 21,9072 26,1308 30,6995 35,1320 40,3560 47,1460 52,6064 56,3242 58,9002 62,4402 66,6784 70,8505 75,0415 79,2726 82,5379 85,7798 88,2243 89,6562 91,1594 92,1946 93,2114 94,1751 95,1388 96,1142 97,0896 99,1158 100,0000
REALISASI KEMAJUAN PEKERJAAN MINGGUAN -
REALISASI KEMAJUAN PEKERJAAN MINGGUAN KUMULATIF - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
DEVIASI (+/-) (0,5200) (1,8177) (3,3013) (5,5059) (8,4145) (11,3414) (13,8029) (16,3067) (19,0155) (21,9072) (26,1308) (30,6995) (35,1320) (40,3560) (47,1460) (52,6064) (56,3242) (58,9002) (62,4402) (66,6784) (70,8505) (75,0415) (79,2726) (82,5379) (85,7798) (88,2243) (89,6562) (91,1594) (92,1946) (93,2114) (94,1751) (95,1388) (96,1142) (97,0896) (99,1158) #######
JADWAL PELAKSANAAN PEKERJAAN (Pekerjaan Pemeliharaan Rutin Kondisi )
Preservasi Jalan dan Jembatan Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
NAMA PAKET : Preservasi Jalan dan Jembatan Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
NO PAKET :
RUAS JALAN : Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
PANJANG JALAN : 90,69 KM
NAMA PENYEDIA : PT. LONADA SINAR HIKMAT
Jadwal Pelaksanaan Pekerjaan Pemeliharaan Rutin Kondisi
MASA PELAKSANAAN : 248 HARI KALENDER
MINGGU KE -
NILAI
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
DIV U R A I A N PEKERJAAN KET
%
APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER
(%) 27/04/21 02/05/21 09/05/21 16/05/21 23/05/21 30/05/21 06/06/21 13/06/21 20/06/21 27/06/21 04/07/21 11/07/21 18/07/21 25/07/21 01/08/21 08/08/21 15/08/21 22/08/21 29/08/21 05/09/21 12/09/21 19/09/21 26/09/21 03/10/21 10/10/21 17/10/21 24/10/21 31/10/21 07/11/21 14/11/21 21/11/21 28/11/21 05/12/21 12/12/21 19/12/21 26/12/21
01/05/21 08/05/21 15/05/21 22/05/21 29/05/21 05/06/21 12/06/21 19/06/21 26/06/21 03/07/21 10/07/21 17/07/21 24/07/21 31/07/21 07/08/21 14/08/21 21/08/21 28/08/21 04/09/21 11/09/21 18/09/21 25/09/21 02/10/21 09/10/21 16/10/21 23/10/21 30/10/21 06/11/21 13/11/21 20/11/21 27/11/21 04/12/21 11/12/21 18/12/21 25/12/21 31/12/21
1 Umum
1.2 Mobilisasi - - - - - -
1.8.(1) Manajemen Dan Keselamatan Lalu Lintas - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian PH - - - - - -
1.17.(1b) Pengujian Oksigen Terlarut (Do) - - - - - -
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) - - - - - -
1.17.(1d) Pengujian Tersuspensi (TSS) - - - - - -
1.17.(1j) Pengujian Temperatur /suhu - - - - - -
1.17.(ik) Pengujian Parameter Kualitas air lainnya - - - - - -
1.17.(2c) Lainnya - - - - - -
1.17.(3f) Pengujian Total Partikulat (TSP)-Debu - - - - - -
1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.19 Keselamatan Dan Kesehatan Kerja - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.21 Managemen Mutu - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Saluran Selokan Drainase Dan Saluran Air - - - - - - - - - - - - - - -
2.2.(1) Pasangan Batu Dengan Mortar - - - - - - - - - - - - - - -
2.4.(1) Bahan Drainase Porous Atau Penyaring (Filter) - - - - - - - - - - - - - - -
2.4.(4) Pekerjaan Dranase Bawah Permukaan, Diamater 6 Inch - - - - - - - - - - - - - - - - - -
6 DIVISI 7. STRUKTUR
7.1 (6c) Beton struktur memadat sendiri, fc’ 25 Mpa - -
7.1 (7a) Beton Struktur Fc 20 Mpa - - - - - - - - - - - - - - - -
7.1.(7c) Beton struktur memadat sendiri, fc’ 20 Mpa - -
7.1.(8) Beton Fc 15 Mpa - - -
7.1.(9) Beton Siklop Fc 15 Mpa -
7.1.(10) Beton Fc 10 Mpa -
7.3.(1) Baja Tulangan Polos - BJTP 280 -
7.3.(3) Baja Tulangan Sirip BJTS 420 A - - -
7.7.(1) Dinding Sumuran Silinder Terpasang, Diamater 200 -
7.9(1) Pasangan Batu - - - - - - - - - - -
7.10.(3a) Bronjong dengan kawat yang dilapisi galvaniz - -
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
DIV U R A I A N PEKERJAAN KET
%
APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER
(%) 27/04/21 02/05/21 09/05/21 16/05/21 23/05/21 30/05/21 06/06/21 13/06/21 20/06/21 27/06/21 04/07/21 11/07/21 18/07/21 25/07/21 01/08/21 08/08/21 15/08/21 22/08/21 29/08/21 05/09/21 12/09/21 19/09/21 26/09/21 03/10/21 10/10/21 17/10/21 24/10/21 31/10/21 07/11/21 14/11/21 21/11/21 28/11/21 05/12/21 12/12/21 19/12/21 26/12/21
01/05/21 08/05/21 15/05/21 22/05/21 29/05/21 05/06/21 12/06/21 19/06/21 26/06/21 03/07/21 10/07/21 17/07/21 24/07/21 31/07/21 07/08/21 14/08/21 21/08/21 28/08/21 04/09/21 11/09/21 18/09/21 25/09/21 02/10/21 09/10/21 16/10/21 23/10/21 30/10/21 06/11/21 13/11/21 20/11/21 27/11/21 04/12/21 11/12/21 18/12/21 25/12/21 31/12/21
1 Umum
1.2 Mobilisasi - - - - - -
1.8.(1) Manajemen Dan Keselamatan Lalu Lintas - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian PH - - - - - -
1.17.(1b) Pengujian Oksigen Terlarut (Do) - - - - - -
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) - - - - - -
1.17.(1d) Pengujian Tersuspensi (TSS) - - - - - -
1.17.(1j) Pengujian Temperatur /suhu - - - - - -
1.17.(ik) Pengujian Parameter Kualitas air lainnya - - - - - -
1.17.(2c) Lainnya - - - - - -
1.17.(3f) Pengujian Total Partikulat (TSP)-Debu - - - - - -
1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.19 Keselamatan Dan Kesehatan Kerja - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.21 Managemen Mutu - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Saluran Selokan Drainase Dan Saluran Air - - - - - - - - - - - - - - -
2.2.(1) Pasangan Batu Dengan Mortar - - - - - - - - - - - - - - -
2.4.(1) Bahan Drainase Porous Atau Penyaring (Filter) - - - - - - - - - - - - - - -
2.4.(4) Pekerjaan Dranase Bawah Permukaan, Diamater 6 Inch - - - - - - - - - - - - - - - - - -
6 DIVISI 7. STRUKTUR
7.1 (6c) Beton struktur memadat sendiri, fc’ 25 Mpa - -
7.1 (7a) Beton Struktur Fc 20 Mpa - - - - - - - - - - - - - - - -
7.1.(7c) Beton struktur memadat sendiri, fc’ 20 Mpa - -
7.1.(8) Beton Fc 15 Mpa - - -
7.1.(9) Beton Siklop Fc 15 Mpa -
7.1.(10) Beton Fc 10 Mpa -
7.3.(1) Baja Tulangan Polos - BJTP 280 -
7.3.(3) Baja Tulangan Sirip BJTS 420 A - - -
7.7.(1) Dinding Sumuran Silinder Terpasang, Diamater 200 -
7.9(1) Pasangan Batu - - - - - - - - - - -
7.10.(3a) Bronjong dengan kawat yang dilapisi galvaniz - -
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
DV U R A A N P K R AAN K T
%
APRIL M UN U U U M OK O NO M D M
% 27/04/21 02/05/21 09/05/21 16/05/21 23/05/21 30/05/21 06/06/21 13/06/21 20/06/21 27/06/21 04/07/21 11/07/21 18/07/21 25/07/21 01/08/21 08/08/21 15/08/21 22/08/21 29/08/21 05/09/21 12/09/21 19/09/21 26/09/21 03/10/21 10/10/21 17/10/21 24/10/21 31/10/21 07/11/21 14/11/21 21/11/21 28/11/21 05/12/21 12/12/21 19/12/21 26/12/21
01/05/21 08/05/21 15/05/21 22/05/21 29/05/21 05/06/21 12/06/21 19/06/21 26/06/21 03/07/21 10/07/21 17/07/21 24/07/21 31/07/21 07/08/21 14/08/21 21/08/21 28/08/21 04/09/21 11/09/21 18/09/21 25/09/21 02/10/21 09/10/21 16/10/21 23/10/21 30/10/21 06/11/21 13/11/21 20/11/21 27/11/21 04/12/21 11/12/21 18/12/21 25/12/21 31/12/21
1 Umum
1.2 Mobilisasi 7,1585 0,0599 0,0599 1,7597 1,7597 1,7597 1,7597 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.8.(1) Manajemen Dan Keselamatan Lalu Lintas 5,9942 1,4971 1,4971 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882
1.17 Pengamanan Lingkungan Hidup - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.17.(1a) Pengujian PH 0,0216 - 0,0036 0,0036 - - - - - - - - - - - - - - 0,0036 0,0036 - - - - - - - - - - - - - 0,0036 0,0036 - -
1.17.(1b) Pengujian Oksigen Terlarut (Do) 0,0241 - 0,0040 0,0040 - - - - - - - - - - - - - - 0,0040 0,0040 - - - - - - - - - - - - - 0,0040 0,0040 - -
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) 0,0231 - 0,0038 0,0038 - - - - - - - - - - - - - - 0,0038 0,0038 - - - - - - - - - - - - - 0,0038 0,0038 - -
1.17.(1d) Pengujian Tersuspensi (TSS) 0,0231 - 0,0038 0,0038 - - - - - - - - - - - - - - 0,0038 0,0038 - - - - - - - - - - - - - 0,0038 0,0038 - -
1.17.(1j) Pengujian Temperatur /suhu 0,0216 - 0,0036 0,0036 - - - - - - - - - - - - - - 0,0036 0,0036 - - - - - - - - - - - - - 0,0036 0,0036 - -
1.17.(ik) Pengujian Parameter Kualitas air lainnya 0,0216 - 0,0036 0,0036 - - - - - - - - - - - - - - 0,0036 0,0036 - - - - - - - - - - - - - 0,0036 0,0036 - -
1.17.(2c) Lainnya 0,0257 - 0,0043 0,0043 - - - - - - - - - - - - - - 0,0043 0,0043 - - - - - - - - - - - - - 0,0043 0,0043 - -
1.17.(3f) Pengujian Total Partikulat (TSP)-Debu 0,0498 - 0,0083 0,0083 - - - - - - - - - - - - - - 0,0083 0,0083 - - - - - - - - - - - - - 0,0083 0,0083 - -
1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. 0,0477 - - 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014
1.19 Keselamatan Dan Kesehatan Kerja 2,4602 - - 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724
1.21 Managemen Mutu 6,5267 - - 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 DIVISI 2. DRAINASE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2.1.(1) Galian Untuk Saluran Selokan Drainase Dan Saluran Air 0,0413 - - - - 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 - - - - - - - - - - - - - - - - -
2.2.(1) Pasangan Batu Dengan Mortar 0,8205 - - - - - 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 - - - - - - - - - - - - - - - -
2.4.(1) Bahan Drainase Porous Atau Penyaring (Filter) 0,2651 - - - - - - - 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 - - - - - - - - - - - - - -
2.4.(4) Pekerjaan Dranase Bawah Permukaan, Diamater 6 Inch 0,1137 - - - - 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3.1.(1) Galian Biasa 0,2191 - - - - 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 - - - - - - - - - - - - - - - - - - - -
3.1.(4) Galian Struktur dengan Kedalaman 0-2 Meter 0,1638 - - - - - - 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 - - - - - - - - - - - - - - - - -
3.1.(5) Galian Struktur dengan Kedalaman 2-4 Meter 0,4009 - - - - - - - - 0,0364 0,0364 0,0364 0,0364 0,0364 0,0364 0,0364 0,0364 0,0364 0,0364 0,0364 - - - - - - - - - - - - - - - - -
3.2.(2a) Timbunan Pilihan Dari Sumber Galian 1,2700 - - - - - - - - - - - - - - - - - - - - - - 0,1587 0,1587 0,1587 0,1587 0,1587 0,1587 0,1587 0,1587 - - - - - -
3.3.(1) Penyiapan Badan Jalan 0,0352 - - - - - - - - - - - - - - - - - 0,0070 0,0070 0,0070 0,0070 0,0070 - - - - - - - - - - - - - -
3.5.(1) (Kelas2) 0,0385 - - - - - - - - - - - - - - - - - 0,0077 0,0077 0,0077 0,0077 0,0077 - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 DIVISI 5. PERKERASAN BERBUTIR - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5.1.(1) Lapis Pondasi Agregat Kelas A 0,1581 - - - - - - - - - - - - - - - - - - - - - - - - - - - 0,1581 - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 DIVISI 6. PERKERASAN ASPAL - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6.1 (1) Lapis Resap Pengikat - Aspal cair/Emulsi 0,0097 - - - - - - - - - - - - - - - 0,0011 0,0011 0,0011 0,0011 0,0011 0,0011 0,0011 0,0011 0,0011 - - - - - - - - - - - -
6.1.(2a) Lapis Perekat - Aspal Cair/ Emulsi 0,1115 - - - - - - - - - - - - - - - 0,0124 0,0124 0,0124 0,0124 0,0124 0,0124 0,0124 0,0124 0,0124 - - - - - - - - - - - -
6.3(5a) Laston Lapis Aus (AC-WC) 0,9568 - - - - - - - - - - - - - - - - 0,1063 0,1063 0,1063 0,1063 0,1063 0,1063 0,1063 0,1063 0,1063 - - - - - - - - - - -
6.3.(6a) Laston Lapis Antara (AC-BC) 0,7056 - - - - - - - - - - - - - - - - - 0,0784 0,0784 0,0784 0,0784 0,0784 0,0784 0,0784 0,0784 0,0784 - - - - - - - - - -
6.3.(8) Bahan Anti Pengelupasan 0,0369 - - - - - - - - - - - - - - - - 0,0053 0,0053 0,0053 0,0053 0,0053 0,0053 0,0053 - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6 DIVISI 7. STRUKTUR - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
7.1 (6c) Beton struktur memadat sendiri, fc’ 25 Mpa 0,8153 - - - - - - - - - - 0,4076 0,4076 - - - - - - - - - - - - - - - - - - - - - - - -
7.1 (7a) Beton Struktur Fc 20 Mpa 47,2564 - - - - - - - - - - 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 - - - - - - - - - -
7.1.(7c) Beton struktur memadat sendiri, fc’ 20 Mpa 0,4944 - - - - - - - - - - - - - - - - - 0,2472 0,2472 - - - - - - - - - - - - - - - - -
7.1.(8) Beton Fc 15 Mpa 0,1696 - - - - - - - - - - - - - - - - - - - - - 0,0565 0,0565 0,0565 - - - - - - - - - - - -
7.1.(9) Beton Siklop Fc 15 Mpa 0,5223 - - - - - - - - - - - - - 0,5223 - - - - - - - - - - - - - - - - - - - - - -
7.1.(10) Beton Fc 10 Mpa 0,1434 - - - - - - - - - - - - - - - - - - - 0,1434 - - - - - - - - - - - - - - - -
7.3.(1) Baja Tulangan Polos - BJTP 280 0,0497 - - - - - - - - - - 0,0497 - - - - - - - - - - - - - - - - - - - - - - - - -
7.3.(3) Baja Tulangan Sirip BJTS 420 A 1,6061 - - - - - - - - - - - 0,5354 0,5354 0,5354 - - - - - - - - - - - - - - - - - - - - - -
7.7.(1) Dinding Sumuran Silinder Terpasang, Diamater 200 3,9945 - - - - - - - - - - - - - - 3,9945 - - - - - - - - - - - - - - - - - - - - -
7.9(1) Pasangan Batu 13,6740 - - - - - - - - - - - - - - - - - 1,2431 1,2431 1,2431 1,2431 1,2431 1,2431 1,2431 1,2431 1,2431 1,2431 1,2431 - - - - - - - -
7.10.(3a) Bronjong dengan kawat yang dilapisi galvaniz 0,1108 - - - - - - - - - - - - - - - - - - - - - - - - - - - 0,0554 0,0554 - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
7 DIVISI 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
9.2.(1) Marka Jalan 0,1220 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0,1220 -
9.2.(7) Rel Pengaman 3,2973 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3,2973 -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8 DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -