Anda di halaman 1dari 4

JADWAL PELAKSANAAN PEKERJAAN (KESELURUHAN)

Preservasi Jalan dan Jembatan Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
NAMA PAKET : Preservasi Jalan dan Jembatan Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
NO PAKET :
RUAS JALAN : Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
PANJANG JALAN : 90,69 KM
NAMA PENYEDIA : PT. LONADA SINAR HIKMAT

MASA PELAKSANAAN : 248 HARI KALENDER


MINGGU KE -
NILAI

BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
DIV U R A I A N PEKERJAAN KET

%
APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER
(%) 27/04/21 02/05/21 09/05/21 16/05/21 23/05/21 30/05/21 06/06/21 13/06/21 20/06/21 27/06/21 04/07/21 11/07/21 18/07/21 25/07/21 01/08/21 08/08/21 15/08/21 22/08/21 29/08/21 05/09/21 12/09/21 19/09/21 26/09/21 03/10/21 10/10/21 17/10/21 24/10/21 31/10/21 07/11/21 14/11/21 21/11/21 28/11/21 05/12/21 12/12/21 19/12/21 26/12/21
01/05/21 08/05/21 15/05/21 22/05/21 29/05/21 05/06/21 12/06/21 19/06/21 26/06/21 03/07/21 10/07/21 17/07/21 24/07/21 31/07/21 07/08/21 14/08/21 21/08/21 28/08/21 04/09/21 11/09/21 18/09/21 25/09/21 02/10/21 09/10/21 16/10/21 23/10/21 30/10/21 06/11/21 13/11/21 20/11/21 27/11/21 04/12/21 11/12/21 18/12/21 25/12/21 31/12/21
1 Umum 100
1.2 Mobilisasi 2,3908 0,0200 0,0200 0,5877 0,5877 0,5877 0,5877
1.8.(1) Manajemen Dan Keselamatan Lalu Lintas 2,0019 0,5000 0,5000 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295 0,0295
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian PH 0,0072 0,0012 0,0012 0,0012 0,0012 0,0012 0,0012 90

1.17.(1b) Pengujian Oksigen Terlarut (Do) 0,0080 0,0013 0,0013 0,0013 0,0013 0,0013 0,0013
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) 0,0077 0,0013 0,0013 0,0013 0,0013 0,0013 0,0013
1.17.(1d) Pengujian Tersuspensi (TSS) 0,0077 0,0013 0,0013 0,0013 0,0013 0,0013 0,0013
1.17.(1j) Pengujian Temperatur /suhu 0,0072 0,0012 0,0012 0,0012 0,0012 0,0012 0,0012
1.17.(ik) Pengujian Parameter Kualitas air lainnya 0,0072 0,0012 0,0012 0,0012 0,0012 0,0012 0,0012
1.17.(2c) Lainnya 0,0086 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014
1.17.(3f) Pengujian Total Partikulat (TSP)-Debu 0,0166 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 80

1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. 0,0159 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005 0,0005
1.19 Keselamatan Dan Kesehatan Kerja 0,8216 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242 0,0242
1.21 Managemen Mutu 2,1798 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641 0,0641

2 DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Saluran Selokan Drainase Dan Saluran Air 0,0138 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 0,0009 70

2.2.(1) Pasangan Batu Dengan Mortar 0,2740 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183
2.4.(1) Bahan Drainase Porous Atau Penyaring (Filter) 0,0885 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059 0,0059
2.4.(4) Pekerjaan Dranase Bawah Permukaan, Diamater 6 Inch 0,0380 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021 0,0021
60
3 DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa 0,0732 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061 0,0061
3.1.(4) Galian Struktur dengan Kedalaman 0-2 Meter 0,0547 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042 0,0042
3.1.(5) Galian Struktur dengan Kedalaman 2-4 Meter 0,1339 0,0122 0,0122 0,0122 0,0122 0,0122 0,0122 0,0122 0,0122 0,0122 0,0122 0,0122
3.2.(2a) Timbunan Pilihan Dari Sumber Galian 0,4241 0,0530 0,0530 0,0530 0,0530 0,0530 0,0530 0,0530 0,0530 50

3.3.(1) Penyiapan Badan Jalan 0,0118 0,0024 0,0024 0,0024 0,0024 0,0024
3.5.(1) (Kelas2) 0,0129 0,0026 0,0026 0,0026 0,0026 0,0026
0,0000
4 DIVISI 5. PERKERASAN BERBUTIR 0,0000 40

5.1.(1) Lapis Pondasi Agregat Kelas A 0,0528 0,0528

5 DIVISI 6. PERKERASAN ASPAL


6.1 (1) Lapis Resap Pengikat - Aspal cair/Emulsi 0,0033 0,0004 0,0004 0,0004 0,0004 0,0004 0,0004 0,0004 0,0004 0,0004
6.1.(2a) Lapis Perekat - Aspal Cair/ Emulsi 0,0372 0,0041 0,0041 0,0041 0,0041 0,0041 0,0041 0,0041 0,0041 0,0041
6.3(5a) Laston Lapis Aus (AC-WC) 0,3196 0,0355 0,0355 0,0355 0,0355 0,0355 0,0355 0,0355 0,0355 0,0355
6.3.(6a) Laston Lapis Antara (AC-BC) 0,2357 0,0262 0,0262 0,0262 0,0262 0,0262 0,0262 0,0262 0,0262 0,0262
6.3.(8) Bahan Anti Pengelupasan 0,0123 0,0018 0,0018 0,0018 0,0018 0,0018 0,0018 0,0018

6 DIVISI 7. STRUKTUR
7.1 (6c) Beton struktur memadat sendiri, fc’ 25 Mpa 0,2723 0,1361 0,1361
7.1 (7a) Beton Struktur Fc 20 Mpa 15,7825 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864 0,9864
7.1.(7c) Beton struktur memadat sendiri, fc’ 20 Mpa 0,1651 0,0826 0,0826
7.1.(8) Beton Fc 15 Mpa 0,0566 0,0189 0,0189 0,0189
7.1.(9) Beton Siklop Fc 15 Mpa 0,1744 0,1744
7.1.(10) Beton Fc 10 Mpa 0,0479 0,0479
7.3.(1) Baja Tulangan Polos - BJTP 280 0,0166 0,0166
7.3.(3) Baja Tulangan Sirip BJTS 420 A 0,5364 0,1788 0,1788 0,1788
7.7.(1) Dinding Sumuran Silinder Terpasang, Diamater 200 1,3341 1,3341
7.9(1) Pasangan Batu 4,5668 0,4152 0,4152 0,4152 0,4152 0,4152 0,4152 0,4152 0,4152 0,4152 0,4152 0,4152
7.10.(3a) Bronjong dengan kawat yang dilapisi galvaniz 0,0370 0,0185 0,0185
30
7 DIVISI 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN
9.2.(1) Marka Jalan 0,0407 0,0407
9.2.(7) Rel Pengaman 1,1012 1,1012

8 DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 20

10.1.(4) Perbaikan Lapis Pondasi Agregat Kelas A 19,2804 0,7327 0,7327 0,7327 0,7712 0,7712 0,9640 0,9640 1,1568 1,1568 1,1568 1,7738 1,7738 1,7738 0,9640 0,9640 0,9640 0,9640 0,9640
10.1.(6) Perbaikan Lapis Pondasi Agregat Kelas S 2,2263 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795 0,0795
10.1.(9) Perbaikan Campuran Aspal Panas 17,0142 0,6466 0,6466 0,6466 0,6806 0,6806 0,8507 0,8507 1,0208 1,0208 1,0208 1,5653 1,5653 1,5653 0,7089 0,7089 0,7089 0,7089 0,7089 0,7089
10.1.(13) Residu Bitumen untuk pemeliharaan 1,2719 0,0483 0,0483 0,0483 0,0509 0,0509 0,0636 0,0636 0,0763 0,0763 0,0763 0,1170 0,1170 0,1170 0,0530 0,0530 0,0530 0,0530 0,0530 0,0530 10
10.1.(21) Pembersihan Drainase 2,0671 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591 0,0591
10.1.(22) Pengendalian Tanaman 24,7426 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069 0,7069

0
PHO (Provissional Hand Over) 100,0000
RENCANA KEMAJUAN PEKERJAAN MINGGUAN 0,5200 1,2977 1,4836 2,2046 2,9086 2,9269 2,4614 2,5038 2,7088 2,8917 4,2236 4,5687 4,4325 5,2240 6,7900 5,4604 3,7178 2,5760 3,5400 4,2383 4,1721 4,1910 4,2311 3,2653 3,2419 2,4445 1,4319 1,5032 1,0352 1,0167 0,9637 0,9637 0,9754 0,9754 2,0261 0,8842
RENCANA KEMAJUAN PEKERJAAN MINGGUAN KUMULATIF - 0,5200 1,8177 3,3013 5,5059 8,4145 11,3414 13,8029 16,3067 19,0155 21,9072 26,1308 30,6995 35,1320 40,3560 47,1460 52,6064 56,3242 58,9002 62,4402 66,6784 70,8505 75,0415 79,2726 82,5379 85,7798 88,2243 89,6562 91,1594 92,1946 93,2114 94,1751 95,1388 96,1142 97,0896 99,1158 100,0000
REALISASI KEMAJUAN PEKERJAAN MINGGUAN -
REALISASI KEMAJUAN PEKERJAAN MINGGUAN KUMULATIF - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
DEVIASI (+/-) (0,5200) (1,8177) (3,3013) (5,5059) (8,4145) (11,3414) (13,8029) (16,3067) (19,0155) (21,9072) (26,1308) (30,6995) (35,1320) (40,3560) (47,1460) (52,6064) (56,3242) (58,9002) (62,4402) (66,6784) (70,8505) (75,0415) (79,2726) (82,5379) (85,7798) (88,2243) (89,6562) (91,1594) (92,1946) (93,2114) (94,1751) (95,1388) (96,1142) (97,0896) (99,1158) #######
JADWAL PELAKSANAAN PEKERJAAN (Pekerjaan Pemeliharaan Rutin Kondisi )
Preservasi Jalan dan Jembatan Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
NAMA PAKET : Preservasi Jalan dan Jembatan Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
NO PAKET :
RUAS JALAN : Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
PANJANG JALAN : 90,69 KM
NAMA PENYEDIA : PT. LONADA SINAR HIKMAT
Jadwal Pelaksanaan Pekerjaan Pemeliharaan Rutin Kondisi
MASA PELAKSANAAN : 248 HARI KALENDER
MINGGU KE -
NILAI

BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
DIV U R A I A N PEKERJAAN KET

%
APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER
(%) 27/04/21 02/05/21 09/05/21 16/05/21 23/05/21 30/05/21 06/06/21 13/06/21 20/06/21 27/06/21 04/07/21 11/07/21 18/07/21 25/07/21 01/08/21 08/08/21 15/08/21 22/08/21 29/08/21 05/09/21 12/09/21 19/09/21 26/09/21 03/10/21 10/10/21 17/10/21 24/10/21 31/10/21 07/11/21 14/11/21 21/11/21 28/11/21 05/12/21 12/12/21 19/12/21 26/12/21
01/05/21 08/05/21 15/05/21 22/05/21 29/05/21 05/06/21 12/06/21 19/06/21 26/06/21 03/07/21 10/07/21 17/07/21 24/07/21 31/07/21 07/08/21 14/08/21 21/08/21 28/08/21 04/09/21 11/09/21 18/09/21 25/09/21 02/10/21 09/10/21 16/10/21 23/10/21 30/10/21 06/11/21 13/11/21 20/11/21 27/11/21 04/12/21 11/12/21 18/12/21 25/12/21 31/12/21
1 Umum
1.2 Mobilisasi - - - - - -
1.8.(1) Manajemen Dan Keselamatan Lalu Lintas - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian PH - - - - - -
1.17.(1b) Pengujian Oksigen Terlarut (Do) - - - - - -
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) - - - - - -
1.17.(1d) Pengujian Tersuspensi (TSS) - - - - - -
1.17.(1j) Pengujian Temperatur /suhu - - - - - -
1.17.(ik) Pengujian Parameter Kualitas air lainnya - - - - - -
1.17.(2c) Lainnya - - - - - -
1.17.(3f) Pengujian Total Partikulat (TSP)-Debu - - - - - -
1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.19 Keselamatan Dan Kesehatan Kerja - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.21 Managemen Mutu - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2 DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Saluran Selokan Drainase Dan Saluran Air - - - - - - - - - - - - - - -
2.2.(1) Pasangan Batu Dengan Mortar - - - - - - - - - - - - - - -
2.4.(1) Bahan Drainase Porous Atau Penyaring (Filter) - - - - - - - - - - - - - - -
2.4.(4) Pekerjaan Dranase Bawah Permukaan, Diamater 6 Inch - - - - - - - - - - - - - - - - - -

3 DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(1) Galian Biasa - - - - - - - - - - - -
3.1.(4) Galian Struktur dengan Kedalaman 0-2 Meter - - - - - - - - - - - - -
3.1.(5) Galian Struktur dengan Kedalaman 2-4 Meter - - - - - - - - - - -
3.2.(2a) Timbunan Pilihan Dari Sumber Galian - - - - - - - -
3.3.(1) Penyiapan Badan Jalan - - - - -
3.5.(1) (Kelas2) - - - - -

4 DIVISI 5. PERKERASAN BERBUTIR


5.1.(1) Lapis Pondasi Agregat Kelas A -

5 DIVISI 6. PERKERASAN ASPAL


6.1 (1) Lapis Resap Pengikat - Aspal cair/Emulsi - - - - - - - - -
6.1.(2a) Lapis Perekat - Aspal Cair/ Emulsi - - - - - - - - -
6.3(5a) Laston Lapis Aus (AC-WC) - - - - - - - - -
6.3.(6a) Laston Lapis Antara (AC-BC) - - - - - - - - -
6.3.(8) Bahan Anti Pengelupasan - - - - - - -

6 DIVISI 7. STRUKTUR
7.1 (6c) Beton struktur memadat sendiri, fc’ 25 Mpa - -
7.1 (7a) Beton Struktur Fc 20 Mpa - - - - - - - - - - - - - - - -
7.1.(7c) Beton struktur memadat sendiri, fc’ 20 Mpa - -
7.1.(8) Beton Fc 15 Mpa - - -
7.1.(9) Beton Siklop Fc 15 Mpa -
7.1.(10) Beton Fc 10 Mpa -
7.3.(1) Baja Tulangan Polos - BJTP 280 -
7.3.(3) Baja Tulangan Sirip BJTS 420 A - - -
7.7.(1) Dinding Sumuran Silinder Terpasang, Diamater 200 -
7.9(1) Pasangan Batu - - - - - - - - - - -
7.10.(3a) Bronjong dengan kawat yang dilapisi galvaniz - -

7 DIVISI 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN


9.2.(1) Marka Jalan -
9.2.(7) Rel Pengaman -

8 DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.1.(4) Perbaikan Lapis Pondasi Agregat Kelas A 17,8815 - - - 0,6795 0,6795 0,6795 0,7152 0,7152 0,8941 0,8941 1,0729 1,0729 1,0729 1,6451 1,6451 1,6451 - - 0,8941 0,8941 0,8941 0,8941 0,8941 - - - - - - - - - - - - -
10.1.(6) Perbaikan Lapis Pondasi Agregat Kelas S 2,0647 - - - - - - 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 0,0737 - -
10.1.(9) Perbaikan Campuran Aspal Panas 15,5859 - - - - 0,5923 0,5923 0,5923 0,6234 0,6234 0,7793 0,7793 0,9351 0,9351 0,9351 1,4339 1,4339 1,4339 - - 0,6494 0,6494 0,6494 0,6494 0,6494 0,6494 - - - - - - - - - - -
10.1.(13) Residu Bitumen untuk pemeliharaan 1,8024 - - - - 0,0685 0,0685 0,0685 0,0721 0,0721 0,0901 0,0901 0,1081 0,1081 0,1081 0,1658 0,1658 0,1658 - - 0,0751 0,0751 0,0751 0,0751 0,0751 0,0751 - - - - - - - - - - -
10.1.(21) Pembersihan Drainase 3,5122 - 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003 0,1003
10.1.(22) Pengendalian Tanaman 59,1533 - 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901 1,6901

PHO (Provissional Hand Over) 100,0000


RENCANA KEMAJUAN PEKERJAAN MINGGUAN - 1,7904 1,7904 2,4700 3,1308 3,1308 3,2402 3,2749 3,4538 3,6276 3,8064 3,9803 3,9803 4,5526 5,1090 5,1090 3,4639 1,8642 2,7583 3,4828 3,4828 3,4828 3,4828 2,5887 2,5887 1,8642 1,8642 1,8642 1,8642 1,8642 1,8642 1,8642 1,8642 1,8642 1,7904 1,7904
RENCANA KEMAJUAN PEKERJAAN MINGGUAN KUMULATIF - - 1,7904 3,5809 6,0509 9,1816 12,3124 15,5526 18,8276 22,2813 25,9090 29,7154 33,6958 37,6761 42,2286 47,3377 52,4467 55,9106 57,7748 60,5330 64,0158 67,4986 70,9813 74,4641 77,0528 79,6415 81,5057 83,3698 85,2340 87,0982 88,9624 90,8266 92,6908 94,5549 96,4191 98,2096 100,0000
REALISASI KEMAJUAN PEKERJAAN MINGGUAN -
REALISASI KEMAJUAN PEKERJAAN MINGGUAN KUMULATIF - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
DEVIASI (+/-) - (1,7904) (3,5809) (6,0509) (9,1816) (12,3124) (15,5526) (18,8276) (22,2813) (25,9090) (29,7154) (33,6958) (37,6761) (42,2286) (47,3377) (52,4467) (55,9106) (57,7748) (60,5330) (64,0158) (67,4986) (70,9813) (74,4641) (77,0528) (79,6415) (81,5057) (83,3698) (85,2340) (87,0982) (88,9624) (90,8266) (92,6908) (94,5549) (96,4191) (98,2096) #######
JADWAL PELAKSANAAN PEKERJAAN (Pekerjaan Penunjang Holding )
Preservasi Jalan dan Jembatan Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
NAMA PAKET : Preservasi Jalan dan Jembatan Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
NO PAKET :
RUAS JALAN : Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
PANJANG JALAN : 90,69 KM
NAMA PENYEDIA : PT. LONADA SINAR HIKMAT
Jadwal Pelaksanaan Pekerjaan Penunjang Holding
MASA PELAKSANAAN : 248 HARI KALENDER
MINGGU KE -
NILAI

BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
DIV U R A I A N PEKERJAAN KET

%
APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER
(%) 27/04/21 02/05/21 09/05/21 16/05/21 23/05/21 30/05/21 06/06/21 13/06/21 20/06/21 27/06/21 04/07/21 11/07/21 18/07/21 25/07/21 01/08/21 08/08/21 15/08/21 22/08/21 29/08/21 05/09/21 12/09/21 19/09/21 26/09/21 03/10/21 10/10/21 17/10/21 24/10/21 31/10/21 07/11/21 14/11/21 21/11/21 28/11/21 05/12/21 12/12/21 19/12/21 26/12/21
01/05/21 08/05/21 15/05/21 22/05/21 29/05/21 05/06/21 12/06/21 19/06/21 26/06/21 03/07/21 10/07/21 17/07/21 24/07/21 31/07/21 07/08/21 14/08/21 21/08/21 28/08/21 04/09/21 11/09/21 18/09/21 25/09/21 02/10/21 09/10/21 16/10/21 23/10/21 30/10/21 06/11/21 13/11/21 20/11/21 27/11/21 04/12/21 11/12/21 18/12/21 25/12/21 31/12/21
1 Umum
1.2 Mobilisasi - - - - - -
1.8.(1) Manajemen Dan Keselamatan Lalu Lintas - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian PH - - - - - -
1.17.(1b) Pengujian Oksigen Terlarut (Do) - - - - - -
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) - - - - - -
1.17.(1d) Pengujian Tersuspensi (TSS) - - - - - -
1.17.(1j) Pengujian Temperatur /suhu - - - - - -
1.17.(ik) Pengujian Parameter Kualitas air lainnya - - - - - -
1.17.(2c) Lainnya - - - - - -
1.17.(3f) Pengujian Total Partikulat (TSP)-Debu - - - - - -
1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.19 Keselamatan Dan Kesehatan Kerja - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.21 Managemen Mutu - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2 DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Saluran Selokan Drainase Dan Saluran Air - - - - - - - - - - - - - - -
2.2.(1) Pasangan Batu Dengan Mortar - - - - - - - - - - - - - - -
2.4.(1) Bahan Drainase Porous Atau Penyaring (Filter) - - - - - - - - - - - - - - -
2.4.(4) Pekerjaan Dranase Bawah Permukaan, Diamater 6 Inch - - - - - - - - - - - - - - - - - -

3 DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(1) Galian Biasa - - - - - - - - - - - -
3.1.(4) Galian Struktur dengan Kedalaman 0-2 Meter - - - - - - - - - - - - -
3.1.(5) Galian Struktur dengan Kedalaman 2-4 Meter - - - - - - - - - - -
3.2.(2a) Timbunan Pilihan Dari Sumber Galian - - - - - - - -
3.3.(1) Penyiapan Badan Jalan - - - - -
3.5.(1) (Kelas2) - - - - -

4 DIVISI 5. PERKERASAN BERBUTIR


5.1.(1) Lapis Pondasi Agregat Kelas A -

5 DIVISI 6. PERKERASAN ASPAL


6.1 (1) Lapis Resap Pengikat - Aspal cair/Emulsi - - - - - - - - -
6.1.(2a) Lapis Perekat - Aspal Cair/ Emulsi - - - - - - - - -
6.3(5a) Laston Lapis Aus (AC-WC) - - - - - - - - -
6.3.(6a) Laston Lapis Antara (AC-BC) - - - - - - - - -
6.3.(8) Bahan Anti Pengelupasan - - - - - - -

6 DIVISI 7. STRUKTUR
7.1 (6c) Beton struktur memadat sendiri, fc’ 25 Mpa - -
7.1 (7a) Beton Struktur Fc 20 Mpa - - - - - - - - - - - - - - - -
7.1.(7c) Beton struktur memadat sendiri, fc’ 20 Mpa - -
7.1.(8) Beton Fc 15 Mpa - - -
7.1.(9) Beton Siklop Fc 15 Mpa -
7.1.(10) Beton Fc 10 Mpa -
7.3.(1) Baja Tulangan Polos - BJTP 280 -
7.3.(3) Baja Tulangan Sirip BJTS 420 A - - -
7.7.(1) Dinding Sumuran Silinder Terpasang, Diamater 200 -
7.9(1) Pasangan Batu - - - - - - - - - - -
7.10.(3a) Bronjong dengan kawat yang dilapisi galvaniz - -

7 DIVISI 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN


9.2.(1) Marka Jalan -
9.2.(7) Rel Pengaman -

8 DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.1.(4) Perbaikan Lapis Pondasi Agregat Kelas A 34,5575 - - - 1,3133 1,3133 1,3133 1,3823 1,3823 1,7278 1,7278 2,0734 2,0734 2,0734 3,1793 3,1793 3,1793 - - 1,7279 1,7279 1,7279 1,7279 1,7279 - - - - - - - - - - - - -
10.1.(6) Perbaikan Lapis Pondasi Agregat Kelas S 3,9904 - - - - - - 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 0,1425 - -
10.1.(9) Perbaikan Campuran Aspal Panas 30,5939 - - - - 1,1626 1,1626 1,1626 1,2237 1,2237 1,5297 1,5297 1,8356 1,8356 1,8356 2,8146 2,8146 2,8146 - - 1,2747 1,2747 1,2747 1,2747 1,2747 1,2747 - - - - - - - - - - -
10.1.(13) Residu Bitumen untuk pemeliharaan 1,9641 - - - - 0,0746 0,0746 0,0746 0,0786 0,0786 0,0982 0,0982 0,1178 0,1178 0,1178 0,1807 0,1807 0,1807 - - 0,0818 0,0818 0,0818 0,0818 0,0818 0,0818 - - - - - - - - - - -
10.1.(21) Pembersihan Drainase 2,8966 - 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828 0,0828
10.1.(22) Pengendalian Tanaman 25,9977 - 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428 0,7428

PHO (Provissional Hand Over) 100,0000


RENCANA KEMAJUAN PEKERJAAN MINGGUAN - 0,8255 0,8255 2,1388 3,3761 3,3761 3,5876 3,6526 3,9982 4,3238 4,6693 4,9949 4,9949 6,1008 7,1427 7,1427 3,9634 0,9681 2,6959 4,0525 4,0525 4,0525 4,0525 2,3246 2,3246 0,9681 0,9681 0,9681 0,9681 0,9681 0,9681 0,9681 0,9681 0,9681 0,8255 0,8255
RENCANA KEMAJUAN PEKERJAAN MINGGUAN KUMULATIF - - 0,8255 1,6511 3,7899 7,1660 10,5421 14,1297 17,7823 21,7805 26,1043 30,7736 35,7685 40,7634 46,8642 54,0069 61,1496 65,1130 66,0811 68,7770 72,8295 76,8820 80,9345 84,9871 87,3117 89,6363 90,6044 91,5725 92,5405 93,5086 94,4767 95,4447 96,4128 97,3808 98,3489 99,1745 100,0000
REALISASI KEMAJUAN PEKERJAAN MINGGUAN -
REALISASI KEMAJUAN PEKERJAAN MINGGUAN KUMULATIF - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
DEVIASI (+/-) - (0,8255) (1,6511) (3,7899) (7,1660) (10,5421) (14,1297) (17,7823) (21,7805) (26,1043) (30,7736) (35,7685) (40,7634) (46,8642) (54,0069) (61,1496) (65,1130) (66,0811) (68,7770) (72,8295) (76,8820) (80,9345) (84,9871) (87,3117) (89,6363) (90,6044) (91,5725) (92,5405) (93,5086) (94,4767) (95,4447) (96,4128) (97,3808) (98,3489) (99,1745) #######
JADWAL PELAKSANAAN PEKERJAAN (Pekerjaan Penangan Longsoran)
Preservasi Jalan dan Jembatan Ruas Tebelian - Sintang - SP Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
NAMA PAKET : Preservasi Jalan dan Jembatan Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
NO PAKET :
RUAS JALAN : Ruas Tebelian - Sintang - SP. Nanga Silat - Sejiram Dan Jalan Dalam Kota Sintang
PANJANG JALAN : 90,69 KM
NAMA PENYEDIA : PT. LONADA SINAR HIKMAT
adwa Pe ak anaan Peke aan Penangan Long o an
MA A P AK ANAAN 248 HAR KA ND R
M NGGU K
N A

BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
DV U R A A N P K R AAN K T

%
APRIL M UN U U U M OK O NO M D M
% 27/04/21 02/05/21 09/05/21 16/05/21 23/05/21 30/05/21 06/06/21 13/06/21 20/06/21 27/06/21 04/07/21 11/07/21 18/07/21 25/07/21 01/08/21 08/08/21 15/08/21 22/08/21 29/08/21 05/09/21 12/09/21 19/09/21 26/09/21 03/10/21 10/10/21 17/10/21 24/10/21 31/10/21 07/11/21 14/11/21 21/11/21 28/11/21 05/12/21 12/12/21 19/12/21 26/12/21
01/05/21 08/05/21 15/05/21 22/05/21 29/05/21 05/06/21 12/06/21 19/06/21 26/06/21 03/07/21 10/07/21 17/07/21 24/07/21 31/07/21 07/08/21 14/08/21 21/08/21 28/08/21 04/09/21 11/09/21 18/09/21 25/09/21 02/10/21 09/10/21 16/10/21 23/10/21 30/10/21 06/11/21 13/11/21 20/11/21 27/11/21 04/12/21 11/12/21 18/12/21 25/12/21 31/12/21
1 Umum
1.2 Mobilisasi 7,1585 0,0599 0,0599 1,7597 1,7597 1,7597 1,7597 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.8.(1) Manajemen Dan Keselamatan Lalu Lintas 5,9942 1,4971 1,4971 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882 0,0882
1.17 Pengamanan Lingkungan Hidup - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1.17.(1a) Pengujian PH 0,0216 - 0,0036 0,0036 - - - - - - - - - - - - - - 0,0036 0,0036 - - - - - - - - - - - - - 0,0036 0,0036 - -
1.17.(1b) Pengujian Oksigen Terlarut (Do) 0,0241 - 0,0040 0,0040 - - - - - - - - - - - - - - 0,0040 0,0040 - - - - - - - - - - - - - 0,0040 0,0040 - -
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) 0,0231 - 0,0038 0,0038 - - - - - - - - - - - - - - 0,0038 0,0038 - - - - - - - - - - - - - 0,0038 0,0038 - -
1.17.(1d) Pengujian Tersuspensi (TSS) 0,0231 - 0,0038 0,0038 - - - - - - - - - - - - - - 0,0038 0,0038 - - - - - - - - - - - - - 0,0038 0,0038 - -
1.17.(1j) Pengujian Temperatur /suhu 0,0216 - 0,0036 0,0036 - - - - - - - - - - - - - - 0,0036 0,0036 - - - - - - - - - - - - - 0,0036 0,0036 - -
1.17.(ik) Pengujian Parameter Kualitas air lainnya 0,0216 - 0,0036 0,0036 - - - - - - - - - - - - - - 0,0036 0,0036 - - - - - - - - - - - - - 0,0036 0,0036 - -
1.17.(2c) Lainnya 0,0257 - 0,0043 0,0043 - - - - - - - - - - - - - - 0,0043 0,0043 - - - - - - - - - - - - - 0,0043 0,0043 - -
1.17.(3f) Pengujian Total Partikulat (TSP)-Debu 0,0498 - 0,0083 0,0083 - - - - - - - - - - - - - - 0,0083 0,0083 - - - - - - - - - - - - - 0,0083 0,0083 - -
1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. 0,0477 - - 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014 0,0014
1.19 Keselamatan Dan Kesehatan Kerja 2,4602 - - 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724 0,0724
1.21 Managemen Mutu 6,5267 - - 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920 0,1920
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 DIVISI 2. DRAINASE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2.1.(1) Galian Untuk Saluran Selokan Drainase Dan Saluran Air 0,0413 - - - - 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 0,0028 - - - - - - - - - - - - - - - - -
2.2.(1) Pasangan Batu Dengan Mortar 0,8205 - - - - - 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 0,0547 - - - - - - - - - - - - - - - -
2.4.(1) Bahan Drainase Porous Atau Penyaring (Filter) 0,2651 - - - - - - - 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 0,0177 - - - - - - - - - - - - - -
2.4.(4) Pekerjaan Dranase Bawah Permukaan, Diamater 6 Inch 0,1137 - - - - 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 0,0063 - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3.1.(1) Galian Biasa 0,2191 - - - - 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 0,0183 - - - - - - - - - - - - - - - - - - - -
3.1.(4) Galian Struktur dengan Kedalaman 0-2 Meter 0,1638 - - - - - - 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 0,0126 - - - - - - - - - - - - - - - - -
3.1.(5) Galian Struktur dengan Kedalaman 2-4 Meter 0,4009 - - - - - - - - 0,0364 0,0364 0,0364 0,0364 0,0364 0,0364 0,0364 0,0364 0,0364 0,0364 0,0364 - - - - - - - - - - - - - - - - -
3.2.(2a) Timbunan Pilihan Dari Sumber Galian 1,2700 - - - - - - - - - - - - - - - - - - - - - - 0,1587 0,1587 0,1587 0,1587 0,1587 0,1587 0,1587 0,1587 - - - - - -
3.3.(1) Penyiapan Badan Jalan 0,0352 - - - - - - - - - - - - - - - - - 0,0070 0,0070 0,0070 0,0070 0,0070 - - - - - - - - - - - - - -
3.5.(1) (Kelas2) 0,0385 - - - - - - - - - - - - - - - - - 0,0077 0,0077 0,0077 0,0077 0,0077 - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 DIVISI 5. PERKERASAN BERBUTIR - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5.1.(1) Lapis Pondasi Agregat Kelas A 0,1581 - - - - - - - - - - - - - - - - - - - - - - - - - - - 0,1581 - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 DIVISI 6. PERKERASAN ASPAL - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6.1 (1) Lapis Resap Pengikat - Aspal cair/Emulsi 0,0097 - - - - - - - - - - - - - - - 0,0011 0,0011 0,0011 0,0011 0,0011 0,0011 0,0011 0,0011 0,0011 - - - - - - - - - - - -
6.1.(2a) Lapis Perekat - Aspal Cair/ Emulsi 0,1115 - - - - - - - - - - - - - - - 0,0124 0,0124 0,0124 0,0124 0,0124 0,0124 0,0124 0,0124 0,0124 - - - - - - - - - - - -
6.3(5a) Laston Lapis Aus (AC-WC) 0,9568 - - - - - - - - - - - - - - - - 0,1063 0,1063 0,1063 0,1063 0,1063 0,1063 0,1063 0,1063 0,1063 - - - - - - - - - - -
6.3.(6a) Laston Lapis Antara (AC-BC) 0,7056 - - - - - - - - - - - - - - - - - 0,0784 0,0784 0,0784 0,0784 0,0784 0,0784 0,0784 0,0784 0,0784 - - - - - - - - - -
6.3.(8) Bahan Anti Pengelupasan 0,0369 - - - - - - - - - - - - - - - - 0,0053 0,0053 0,0053 0,0053 0,0053 0,0053 0,0053 - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6 DIVISI 7. STRUKTUR - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
7.1 (6c) Beton struktur memadat sendiri, fc’ 25 Mpa 0,8153 - - - - - - - - - - 0,4076 0,4076 - - - - - - - - - - - - - - - - - - - - - - - -
7.1 (7a) Beton Struktur Fc 20 Mpa 47,2564 - - - - - - - - - - 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 2,9535 - - - - - - - - - -
7.1.(7c) Beton struktur memadat sendiri, fc’ 20 Mpa 0,4944 - - - - - - - - - - - - - - - - - 0,2472 0,2472 - - - - - - - - - - - - - - - - -
7.1.(8) Beton Fc 15 Mpa 0,1696 - - - - - - - - - - - - - - - - - - - - - 0,0565 0,0565 0,0565 - - - - - - - - - - - -
7.1.(9) Beton Siklop Fc 15 Mpa 0,5223 - - - - - - - - - - - - - 0,5223 - - - - - - - - - - - - - - - - - - - - - -
7.1.(10) Beton Fc 10 Mpa 0,1434 - - - - - - - - - - - - - - - - - - - 0,1434 - - - - - - - - - - - - - - - -
7.3.(1) Baja Tulangan Polos - BJTP 280 0,0497 - - - - - - - - - - 0,0497 - - - - - - - - - - - - - - - - - - - - - - - - -
7.3.(3) Baja Tulangan Sirip BJTS 420 A 1,6061 - - - - - - - - - - - 0,5354 0,5354 0,5354 - - - - - - - - - - - - - - - - - - - - - -
7.7.(1) Dinding Sumuran Silinder Terpasang, Diamater 200 3,9945 - - - - - - - - - - - - - - 3,9945 - - - - - - - - - - - - - - - - - - - - -
7.9(1) Pasangan Batu 13,6740 - - - - - - - - - - - - - - - - - 1,2431 1,2431 1,2431 1,2431 1,2431 1,2431 1,2431 1,2431 1,2431 1,2431 1,2431 - - - - - - - -
7.10.(3a) Bronjong dengan kawat yang dilapisi galvaniz 0,1108 - - - - - - - - - - - - - - - - - - - - - - - - - - - 0,0554 0,0554 - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
7 DIVISI 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
9.2.(1) Marka Jalan 0,1220 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0,1220 -
9.2.(7) Rel Pengaman 3,2973 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3,2973 -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8 DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -