Anda di halaman 1dari 1

LIST KEBUTUHAN MATERIAL, PEKERJAAN LAP.

BADMINTON, PARKIR MOBIL, PARKIR MOTOR DAN JALAN BETON

No. ITEM HARGA TOTAL


Rp. Rp.

1 Pasir Urug 9.00 DT 1,700,000 15,300,000 67.50 m3 TOKO ADE


2 Triplek 9 mm 86.00 lbr 145,000 12,470,000 TOKO ADE
3 Kaso 5x5 30 ikat 110,000 3,300,000 TOKO ADE
4 Paku dll 1,000,000 1,000,000 TOKO ADE
5 Plastik Beton 10 rol 140,000 1,400,000 TOKO ADE

33,470,000

1 Beton k 175 22 m3 775,000 17,050,000 3.67 tm BMN, Harga Non PPN


2 Beton k 300 218 m3 865,000 188,570,000 36.33 tm BMN, Harga Non PPN

205,620,000

1 Sewa Gerobak 150,000


2 Bensin 50 9,500 475,000

625,000

TOTAL KEBUTUHAN MATERIAL 239,715,000

TAHAP AWAL LAP. BADMINTON

1 TRIPLEK 9 mm 16 Lbr 145,000 2,320,000 TOKO ADE


2 KASO (1 ikat, 10 btg) 5 ikat 110,000 550,000 TOKO ADE
3 PASIR URUG 1 DT 1,700,000 1,700,000 TOKO ADE
4 PAKU DLL 1 LS 250,000 250,000 TOKO ADE
5 Bensin Vibro 10 ltr 9,500 95,000
6 SEWA GEROBAK (2 BH, 3 hr) 6 25,000 150,000

5,065,000

Anda mungkin juga menyukai