Anda di halaman 1dari 1

PERMINTAAN PER.

22 NOVEMBER 2022

NO. TANGGAL MASUK DESKRIPSI JUMLAH JATUH TEMPO


Tagihan Invoice Outer Road Segmen 2
1 08 November 2022 Curing Jalan Desa 04 November 2022 Rp 300.000
08 - 22 November 2022 Pekerja Harian Outer Segmen 2 Rp 14.000.000
6- 18 November 2022 Solar Ara Rp 8.313.000
Sisa Sewa Dt Harian 15 Oktober - 02 November 2022 Rp 23.000.000
Sewa Dt Harian Sandi 03 - 22 November 2022 Rp 37.800.000
Sewa Dt Harian Sandi 03 - 22 November 2022 Rp 13.500.000
Upah Pemasangan & Nat Uditch Ranto Rp 13.900.000
Upah Pemasangan & Nat Uditch Jalal Rp 12.500.000
Upah Pemasangan & Nat Uditch Sirin Rp 12.700.000
Upah Pemasangan & Nat Uditch Sandi Rp 35.000.000
Beton K-400 USI Pengecoran Uditch Rp 48.000.000
Ops. Driver USI Rp 320.000
Ops. Teknisi USI Rp 200.000
14 Juli 2022 Invoice Pembuatan Uditch Warla 100 Unit Rp 35.000.000
10 Agustus 2022 Invoice Tanah Merah Johan 21 Jui - 9 Agustus2023 Rp 341.405.350 31 Agustus 2022
18 Agustus 2022 Invoice Batu Belah David 16 Juli - 16 Agustus 2022 Rp 127.450.100 08 September 2022
22 Agustus 2022 Invoice Tanah Merah David 12 Juli - 21 Agustus 2022 Rp 378.418.300 12 September 2022
24 Agustus 2022 Invoice Tanah Merah Johan 10 - 21 Agustus 2022 Rp 74.538.750 14 September 2022
03 September 2022 Invoice Batu Belah David 21 - 03 Agustus 2022 Rp 18.939.200 24 September 2022
09 September 2022 Invoice Batu Belah Jarwo 26 Agustus - 01 September 2022 Rp 104.049.700 30 September 2022
15 September 2022 Invoice Batu Belah Jarwo 14 September 2022 Rp 19.594.000 06 Oktober 2022
17 September 2022 Invoice Pembuatan Uditch Warla 100 Unit Rp 35.000.000
22 September 2022 Invoice Batu Belah Johan 13 September 2022 Rp 21.404.000 13 Oktober 2022
28 September 2022 Sisa Invoice 200 Unit Wiremesh M8, Besi 13 Ulir, Besi 8 Polos, Bendrat Warla Rp 50.000.000
Invoice Pembuatan Uditch 24 Oktober 2022 Rp 35.000.000
JUMLAH Rp 1.460.332.400
PANJAR Rp 200.000.000 DAVID
Rp 200.000.000 JOHAN
Rp 100.000.000 DAVID
Rp 100.000.000 JOHAN
Rp 50.000.000 JARWO
SISA Rp 810.332.400

NO. TANGGAL MASUK DESKRIPSI JUMLAH JATUH TEMPO


Tagihan Invoice Gate Toll
1 16-17 November 2022 Harian Gate (Persiapan Pelebaran Jalan) Rp 400.000
2 Material Ade GateToll sampai 02 Oktober 2022 Rp 15.611.000
3 19 November 2022 Ongkir Trailer Baja Rp 2.000.000
JUMLAH Rp 18.011.000

NO. TANGGAL MASUK DESKRIPSI JUMLAH JATUH TEMPO


Tagihan Invoice Pagar PANEL
1 08 - 10 November 2022 Uang Panel Yang Terpakai Rp 124.823.000 08 - 10 November 2022
2 11 November 2022 Um Operator 05 - 11 November 2022 Rp 22.575.000
3 18 November 2022 Um Operator 12 - 18 November 2022 Rp 23.900.000
4 22 November 2022 Perpanjangan Vibro Roller - Tiyok Rp 15.000.000
5 Perpanjangan Excavator Cobelco - Trisno Rp 16.000.000
6 Perpanjangan Excavator Cat - Ifan Rp 16.500.000
7 Perpanjangan Bulldozer - Andi Rp 16.000.000
8 Perpanjangan Excavator Cobelco - Heri Rp 8.000.000
9 Perpanjangan Excavator Cobelco - Indra Rp 16.500.000
10 Doposit Kebutuhan 742 Foot Plate Panel Rp 194.988.000
11 Kosan Operator November 2022 Rp 4.000.000 21 November 2022
12 12 - 22 November 2022 Kebutuhan Lapangan (Listrik dll) Rp 1.022.000
18 14 November 2022 Invoice Solar Jarwo 08 - 12 November 2022 Rp 18.900.000 21 November 2022
JUMLAH Rp 478.208.000

GRAND TOTAL Rp 1.306.551.400

Keterangan :
: OUTER ROAD SEGMEN 1
: OUTER ROAD SEGMEN 2
: GATE TOLL
: MESS KSOP
: PAGAR PANEL

Anda mungkin juga menyukai