Rab SP III Ke GRG 36 Kosong
Rab SP III Ke GRG 36 Kosong
PEMASANGAN PIPA FRP DARI SP. III KE GBG 36 DI FIELD PANGKALAN SUSU
Harga
NO URAIAN PEKERJAAN VOL.
Satuan (Rp.) Total (Rp.)
(1) (2) (3) (4) (5) (6)
I Transportasi Kerja
Field Pangkalan Susu
1 Transportasi tenaga kerja
1 Sewa Mobil 4WD hari
2 Transportasi peralatan dan material
1 Sewa Mobil 4WD Double Cabin hari
3 Transportasi Pipa dari fabrikator pipa FRP ke Pangkalan
1 container
Susu
IV Pekerjaan Pemipaan
Field Pangkalan Susu
Mengecer Pipa FRP
Ecer Pipa Ø3" / Jts 95 jts
SAMBUNG PIPA FRP
PEMASANGAN PIPA FRP DARI SP. III KE GBG 36 DI FIELD PANGKALAN SUSU
Harga
NO URAIAN PEKERJAAN VOL.
Satuan (Rp.) Total (Rp.)
(1) (2) (3) (4) (5) (6)
V Pekerjaan Road Crossing & River Crossing (termasuk centralizer & end seal)
Field Pangkalan Susu)
Pekerjaan road crossing open cut (termasuk memasukkan pipa dalam casing, c/w end seal & centralizer)
casing 8" 26 m
VI Pekerjaan Sipil
Field Pangkalan Susu
Pekerjaan Galian
Galian Tanah Biasa 752.40 M3
Backfilling (Pengurugan Kembali) (termasuk pemasangan 564.30
plastik tanda) M3
Pekerjaan Pengurugan Pasir 343.44 M3
Harga
NO URAIAN PEKERJAAN VOL.
Satuan (Rp.) Total (Rp.)
(1) (2) (3) (4) (5) (6)
1 Pekerjaan Pembersihan
1 Pembersihan 1 lot/spk
2 Pekerjaan As built drawing & Engineering
1 As Built Drawing & Engineering 1 lot/spk
TOTAL
PEMASANGAN PIPA FRP DARI SP. III KE GBG 36 DI FIELD PANGKALAN SUSU
REKAPITULASI BIAYA MATERIAL
Harga
No Jumlah Vol Unit
Satuan (Rp.) Total (Rp.)
Field Pangkalan Susu
1 Pipa Fiberglass 1500 Psig 3" @ 9 m 95 jts
2 Elbow 45⁰ Dia 3" Fiberglass 1500 psi 13 pcs
3 Flange Dia 3" Fiberglass 1500 psig 2 pcs
4 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 2' (Pin to Box)/(Pin to Pin incl. coupler) 2 pcs 694
5 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 4' (Pin to Box)/(Pin to Pin incl. coupler) 2 pcs 465
6 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 6' (Pin to Box)/(Pin to Pin incl. coupler) 2 pcs 278
7 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 8' (Pin to Box)/(Pin to Pin incl. coupler) 2 pcs 320
8 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 10' (Pin to Box)/(Pin to Pin incl. coupler) 7 pcs 362
9 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 2' (Pin to Pin) 10 pcs 404
10 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 4' (Pin to Pin) 2 pcs 174
11 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 6' (Pin to Pin) 3 pcs 212
12 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 8' (Pin to Pin) 2 pcs 250
13 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 10' (Pin to Pin) 2 pcs 288
14 Craddle/ Centralizer ukuran 4"x 8" (termasuk pemasangan) 12 pcs
15 Z seal/ End Seal 4" x 8" (termasuk pemasangan) 6 pcs
16 Pipe 3" Sch 80 BE ASTM A106 Gr.B ERW @ 6m 2 Jts
17 Elbow 90, 3", Sch80, TE, ASTM A234 WPB, , 2 pcs
18 Elbow 45, 3", Sch80, BE, ASTM A234 WPB, , 4 pcs
19 Gate Valve, 3", 600#, RF, A 216 WCB, , 1 pcs
20 Swing Check Valve, 3", 600#, RF, API600, A216 WCB 1 pcs
21 Flange, 3", 600#, RF, WN, Sch 80, ASTM A105 7 pcs
22 Flange, 3", 600#, RF, SO, , ASTM A105 1 pcs
23 Gasket, 3", 600#, RF, Spiral Wound, ASME B 16.20, 8 pcs
Bolt & Nut, 3/4 x 5+1/8 for flange 3 ", 600#, RF, ASTM A193 Gr B16 / ASTM A194 Gr 2H
26 64 pcs
Heavy Hex, Xylon coat or equal,
TOTAL
0
REKAPITULASI
PEMASANGAN PIPA FRP DARI SP. III KE GBG 36 DI FIELD PANGKALAN SUSU
PT PERTAMINA EP ASSET 1
REKAPITULASI BIAYA
A Material
Pengadaan Material FRP
B Jasa Konstruksi
I. Pekerjaan Persiapan
II. Project management
III. Transportasi Kerja
IV. Pekerjaan Pemipaan
V. Pekerjaan Road Crossing & River Crossing
VI. Pekerjaan Sipil
VII. Pekerjaan Pengujian
VIII. Pekerjaan Penyelesaian
Sub Total
C Resiko dan Keuntungan
TOTAL (A+B+C)
DIBULATKAN
Terbilang :
REKAPITULASI
PEMASANGAN PIPA FRP DARI SP. III KE GBG 36 DI FIELD PANGKALAN SUSU
PT PERTAMINA EP ASSET 1
REKAPITULASI BIAYA
A Material
Pengadaan Material FRP Rp - Rp - Rp -
B Jasa Konstruksi
I. Pekerjaan Persiapan Rp - Rp - Rp -
II. Project management Rp - Rp - Rp -
III. Transportasi Kerja Rp - Rp - Rp -
IV. Pekerjaan Pemipaan Rp - Rp - Rp -
V. Pekerjaan Road Crossing & River Crossing Rp - Rp - Rp -
VI. Pekerjaan Sipil Rp - Rp - Rp -
VII. Pekerjaan Pengujian Rp - Rp - Rp -
Harga Harga
No Jumlah Vol Unit Sumber
Satuan (Rp.) Total (Rp.) Satuan (USD) Total (USD)
Field Pangkalan Susu
1 Pipa Fiberglass 1500 Psig 3" @ 9 m 95 jts
2 Elbow 45⁰ Dia 3" Fiberglass 1500 psi 13 pcs
3 Flange Dia 3" Fiberglass 1500 psig 2 pcs
4 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 2' (Pin to Box)/(Pin to Pin incl. coupler) 2 pcs
5 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 4' (Pin to Box)/(Pin to Pin incl. coupler) 2 pcs
6 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 6' (Pin to Box)/(Pin to Pin incl. coupler) 2 pcs
7 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 8' (Pin to Box)/(Pin to Pin incl. coupler) 2 pcs
8 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 10' (Pin to Box)/(Pin to Pin incl. coupler) 7 pcs
9 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 2' (Pin to Pin) 10 pcs
10 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 4' (Pin to Pin) 2 pcs
11 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 6' (Pin to Pin) 3 pcs
12 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 8' (Pin to Pin) 2 pcs
13 Nipple (Pup Joint ) Fiberglass 1500 psig Dia 3", @ 10' (Pin to Pin) 2 pcs
IDR 0.00
GRAND TOTAL (IDR)
0
694
465
278
320
362
404
174
212
250
288
RINCIAN PEKERJAAN
PEMASANGAN PIPA FRP DARI SP. III KE GBG 36 DI FIELD PANGKALAN SUSU
I Pekerjaan Persiapan - - - - Rp -
Field Pangkalan Susu
1 Pengurusan izin kerja
1 Pengurusan izin kerja 1 Lot/spk XXXX XXXX -
2 medical check up 20 Org XXXX XXXX XXXX XXXX XXXX XXXX -
2 Mobilisasi & Demobilisasi 2 hari XXXX XXXX XXXX XXXX XXXX XXXX -
II Project management - - - - Rp -
1 Management
1 HSE Officer 21 hari/org XXXX XXXX XXXX XXXX XXXX XXXX -
V Pekerjaan Road Crossing & River Crossing (termasuk centralizer & end seal) - - - Rp -
Field Pangkalan Susu)
1 Pekerjaan road crossing open cut (termasuk memasukkan pipa dalam casing, c/w end seal & centralizer)
casing 8" 26 m XXXX XXXX -
VI Pekerjaan Sipil - - - - Rp -
Field Pangkalan Susu
1 Pekerjaan Galian
Galian Tanah Biasa 752.40 M3 XXXX XXXX XXXX XXXX XXXX XXXX -
Galian Tanah Keras M3 XXXX XXXX XXXX XXXX XXXX XXXX -
2 Backfilling (Pengurugan Kembali) (termasuk pemasangan 564.30 XXXX XXXX XXXX XXXX XXXX XXXX -
plastik tanda) M3
3 Pekerjaan Pengurugan Pasir 275.04 M3 XXXX XXXX XXXX XXXX -
VII Pekerjaan Pengujian - - - - Rp -
Field Pangkalan Susu
1 Pengujian Hydrostatic Test
Pengujian Hydrostatic Test 3 hari XXXX XXXX -
TOTAL #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
`
RINCIAN PEKERJAAN
PEMASANGAN PIPA FRP DARI SP. III KE GBG 36 DI FIELD PANGKALAN SUSU
I Pekerjaan Persiapan - - - - Rp -
Field Pangkalan Susu
1 Survey 2 hari XXXX XXXX XXXX XXXX XXXX XXXX -
II Project management - - - - Rp -
Field Pangkalan Susu
1 Management
1 HSE Officer 21 hari/org XXXX XXXX XXXX XXXX XXXX XXXX -
III Transportasi Kerja #REF! #REF! #REF! #REF! #REF!
IV Pekerjaan Pemipaan - - -
Pengeceran Pipa Sch.40
Ecer Pipa Ø8" Sch.40 @ 6 M / Jts 4 jts XXXX XXXX XXXX XXXX -
Pengeceran Pipa Sch.80 -
Ecer Pipa Ø3" Sch.80 @ 6 M / Jts 6 jts XXXX XXXX XXXX XXXX -
MENYABLON PIPA @ 6 M -
Menyablon pipa Ø3" @ 6 M / Jts 6 jts XXXX XXXX XXXX XXXX -
Menyablon pipa Ø8" @ 6 M / Jts 4 jts XXXX XXXX XXXX XXXX -
Potong dan Bevel Pipa Sch.40 -
Memotong & Bevel Pipa Ø8" Sch.40 / Ttk 4 ttk XXXX XXXX -
Potong dan Bevel Pipa Sch.80
Memotong & Bevel Pipa Ø3" Sch.80 / Ttk 17 ttk XXXX XXXX -
Pengelasan Pipa Sch.40
Las pipa Minyak & Gas (Proyek) Ø8" Sch.40 @ 6 M / Jts 4 jts XXXX XXXX -
Pengelasan Pipa Sch.80 (pekerjaan Proyek)
Las pipa Minyak & Gas (Proyek) Ø3" Sch.80 @ 6 M / Jts 34 jts XXXX XXXX -
Stel dan las Flange sch.80 (class 600)
Stel & las Flange Ø3" WN Sch.80 / Pcs 14 pcs XXXX XXXX -
Mengecat Pipa dengan, Cat Menie & Cat Enamel XXXX
Pipa Ø3" Dengan Cat Enamel / Mtr 36 mtr XXXX XXXX -
Pasang Valve 600
Pasang Valve 3" - 600# / Pcs 2 pcs XXXX XXXX XXXX XXXX -
V Pekerjaan Road Crossing & River Crossing (termasuk centralizer & end seal) #REF! #REF! #REF! #REF!
VI Pekerjaan Sipil #REF! #REF! #REF! #REF! #REF!
VII Pekerjaan Pengujian - - - - Rp -
Field Pangkalan Susu
Pekerjaan Commissioning
Comisioning (termasuk flushing, pigging dandewatering) 1 lot/spk XXXX XXXX XXXX XXXX -
Pemeriksaan Radiography
Radiography Pipa Dia. Ø 3" / Jts 5 jts XXXX XXXX -
VIII Pekerjaan Penyelesaian - - - - Rp -
Field Pangkalan Susu
1 Pekerjaan Pembersihan
1 Pembersihan 1 lot/spk XXXX XXXX XXXX XXXX XXXX XXXX -
2 Pekerjaan As built drawing & Engineering
1 As Built Drawing & Engineering 1 lot/spk XXXX XXXX XXXX XXXX XXXX XXXX -
TOTAL #REF! #REF! #REF! #REF!
`
PEMASANGAN PIPA FRP DARI SP. III KE GBG 36 DI FIELD PANGKALAN SUSU
REKAPITULASI BIAYA MATERIAL
Harga Harga
No Jumlah Vol Unit Sumber
Satuan (Rp.) Total (Rp.) Satuan (USD) Total (USD)
Field Pangkalan Susu
14 Craddle/ Centralizer ukuran 4"x 8" (termasuk pemasangan) 12 pcs
15 Z seal/ End Seal 4" x 8" (termasuk pemasangan) 6 pcs
16 Pipe 3" Sch 80 BE ASTM A106 Gr.B ERW @ 6m 2 Jts
17 Elbow 90, 3", Sch80, TE, ASTM A234 WPB, , 2 pcs
18 Elbow 45, 3", Sch80, BE, ASTM A234 WPB, , 4 pcs
19 Gate Valve, 3", 600#, RF, A 216 WCB, , 1 pcs
20 Swing Check Valve, 3", 600#, RF, API600, A216 WCB 1 pcs
21 Flange, 3", 600#, RF, WN, Sch 80, ASTM A105 7 pcs
22 Flange, 3", 600#, RF, SO, , ASTM A105 1 pcs
23 Gasket, 3", 600#, RF, Spiral Wound, ASME B 16.20, 8 pcs
Bolt & Nut, 3/4 x 5+1/8 for flange 3 ", 600#, RF, ASTM A193 Gr B16 / ASTM A194 Gr 2H
26 64 pcs
Heavy Hex, Xylon coat or equal,
TOTAL
0
REKAPITULASI
PEMASANGAN PIPA FRP DARI SP. III KE GBG 36 DI FIELD PANGKALAN SUSU
PT PERTAMINA EP ASSET 1
REKAPITULASI BIAYA
A Material
Pengadaan Material FRP
B Jasa Konstruksi
I. Pekerjaan Persiapan Rp -
II. Project management Rp -
III. Transportasi Kerja #REF!
IV. Pekerjaan Pemipaan
V. Pekerjaan Road Crossing & River Crossing #REF!
VI. Pekerjaan Sipil #REF!
VII. Pekerjaan Pengujian Rp -
VIII. Pekerjaan Penyelesaian Rp -
REKAPITULASI BIAYA
A Material
Pengadaan Material FRP Rp -
B Jasa Konstruksi
I. Pekerjaan Persiapan Rp - Rp -
II. Project management Rp - Rp -
III. Transportasi Kerja Rp - #REF!
IV. Pekerjaan Pemipaan Rp -
V. Pekerjaan Road Crossing & River Crossing Rp - #REF!
VI. Pekerjaan Sipil Rp - #REF!
VII. Pekerjaan Pengujian Rp - Rp -
VIII. Pekerjaan Penyelesaian Rp - Rp -
#REF!
#REF! %