Anda di halaman 1dari 9

PERENCANAAN PENGGUNAAN DANA

KEGIATAN LINGKUNGAN BERBASIS MASYARAKAT (SLBM) TAHUN 2022


SEPTICTANK COMUNAL
KELOMPOK SWADAYA MASYARAKAT (KSM) KALIREJO

NO URAIAN VOL UNIT FREQ UNIT

SEPTIC TANK (20 Orang) 2 Buah 1 Kali


PIPA 4 meter 1 Lonjor 1 Kali
MINHUL 1 Buah 1 Kali
KENI 3" 1 Buah 1 Kali
PASIR 1 Pickup 1 Kali
KORAL 1 Tosa 1 Kali
BESI 8 mm 1 Lonjor 1 Kali
SEMEN 1 Zak 1 Kali
BENANG 1 Pack 1 Kali
PAKU 1 Kg 1 Kali
KEPALA TUKANG 1 Orang 1 Hari
TUKANG 1 Orang 1 Hari
PEKERJA 1 Orang 1 Hari
N DANA
AT (SLBM) TAHUN 2022

KSM) KALIREJO

NOMINAL JUMLAH

20,000,000 40,000,000
121,000 121,000
151,000 151,000
13,700 13,700
144,700 144,700
270,200 270,200
49,000 49,000
65,000 65,000
10,000 10,000
25,000 25,000
110,000 110,000
100,000 100,000
90,000 90,000
41,149,600
Dusun Kertosari

NO URAIAN VOL UNIT FREQ UNIT NOMINAL JUMLAH

SEPTIC TANK (20 Orang) 1 Buah 1 Kali 20,000,000 20,000,000


PIPA 4 meter 30 Lonjor 1 Kali 121,000 3,630,000
MANHOLE 10 Buah 1 Kali 150,000 1,500,000
KENI 3" 25 Buah 1 Kali 13,700 342,500
PASIR 2 Pickup 1 Kali 144,700 289,400
KORAL 2 Tosa 1 Kali 270,200 540,400
BESI 8 mm 5 Lonjor 1 Kali 49,000 245,000
SEMEN 20 Zak 1 Kali 65,000 1,300,000
KAYU USUK 1 Bandel 1 Kali 180,000 180,000
Lem PVC 12 Buah 1 Kali 6,500 78,000
BENANG 1 Pack 1 Kali 11,033 11,033
PAKU 1 Kg 1 Kali 25,000 25,000
KEPALA TUKANG 1 Orang 30 Hari 110,000 3,300,000
TUKANG 2 Orang 30 Hari 100,000 6,000,000
KULI 5 Orang 30 Hari 90,000 13,500,000
50,941,333
Dusun Kaligung 1

NO URAIAN VOL UNIT FREQ UNIT NOMINAL JUMLAH

SEPTIC TANK (20 Orang) 1 Buah 1 Kali 20,000,000 20,000,000


PIPA 4 meter 20 Lonjor 1 Kali 121,000 2,420,000
MANHOLE 8 Buah 1 Kali 150,000 1,200,000
KENI 3" 25 Buah 1 Kali 13,700 342,500
PASIR 2 Pickup 1 Kali 144,700 289,400
KORAL 2 Tosa 1 Kali 270,200 540,400
BESI 8 mm 5 Lonjor 1 Kali 49,000 245,000
SEMEN 20 Zak 1 Kali 65,000 1,300,000
KAYU USUK 1 Bandel 1 Kali 180,000 180,000
Lem PVC 12 Buah 1 Kali 6,500 78,000
BENANG 1 Pack 1 Kali 11,033 11,033
PAKU 1 Kg 1 Kali 25,000 25,000
KEPALA TUKANG 1 Orang 30 Hari 110,000 3,300,000
TUKANG 2 Orang 30 Hari 100,000 6,000,000
KULI 5 Orang 30 Hari 90,000 13,500,000
49,431,333
Dusun Kaligung 2

NO URAIAN VOL UNIT FREQ UNIT NOMINAL JUMLAH

SEPTIC TANK (20 Orang) 1 Buah 1 Kali 20,000,000 20,000,000


PIPA 4 meter 25 Lonjor 1 Kali 121,000 3,025,000
MANHOLE 7 Buah 1 Kali 150,000 1,050,000
KENI 3" 25 Buah 1 Kali 13,700 342,500
PASIR 2 Pickup 1 Kali 144,700 289,400
KORAL 2 Tosa 1 Kali 270,200 540,400
BESI 8 mm 5 Lonjor 1 Kali 49,000 245,000
SEMEN 20 Zak 1 Kali 65,000 1,300,000
KAYU USUK 1 Bandel 1 Kali 180,000 180,000
Lem PVC 10 Buah 1 Kali 6,500 65,000
BENANG 1 Pack 1 Kali 11,033 11,033
PAKU 1 Kg 1 Kali 25,000 25,000
KEPALA TUKANG 1 Orang 30 Hari 110,000 3,300,000
TUKANG 2 Orang 30 Hari 100,000 6,000,000
KULI 5 Orang 30 Hari 90,000 13,500,000
49,873,333
Dusun Kaligung 3

NO URAIAN VOL UNIT FREQ UNIT NOMINAL JUMLAH

SEPTIC TANK (20 Orang) 1 Buah 1 Kali 20,000,000 20,000,000


PIPA 4 meter 30 Lonjor 1 Kali 121,000 3,630,000
MANHOLE 9 Buah 1 Kali 150,000 1,350,000
KENI 3" 25 Buah 1 Kali 13,700 342,500
PASIR 2 Pickup 1 Kali 144,700 289,400
KORAL 2 Tosa 1 Kali 270,200 540,400
BESI 8 mm 5 Lonjor 1 Kali 49,000 245,000
SEMEN 20 Zak 1 Kali 65,000 1,300,000
KAYU USUK 1 Bandel 1 Kali 180,000 180,000
Lem PVC 10 Buah 1 Kali 6,500 65,000
BENANG 1 Pack 1 Kali 11,034 11,034
PAKU 1 Kg 1 Kali 25,000 25,000
KEPALA TUKANG 1 Orang 30 Hari 110,000 3,300,000
TUKANG 2 Orang 30 Hari 100,000 6,000,000
KULI 5 Orang 30 Hari 90,000 13,500,000
50,778,334
Dusun Gumeng 1

NO URAIAN VOL UNIT FREQ UNIT NOMINAL JUMLAH

SEPTIC TANK (20 Orang) 1 Buah 1 Kali 20,000,000 20,000,000


PIPA 4 meter 23 Lonjor 1 Kali 121,000 2,783,000
MANHOLE 7 Buah 1 Kali 150,000 1,050,000
KENI 3" 25 Buah 1 Kali 13,700 342,500
PASIR 2 Pickup 1 Kali 144,700 289,400
KORAL 2 Tosa 1 Kali 270,200 540,400
BESI 8 mm 5 Lonjor 1 Kali 49,000 245,000
SEMEN 20 Zak 1 Kali 65,000 1,300,000
KAYU USUK 1 Bandel 1 Kali 180,000 180,000
Lem PVC 12 Buah 1 Kali 6,500 78,000
BENANG 1 Pack 1 Kali 11,034 11,034
PAKU 1 Kg 1 Kali 25,000 25,000
KEPALA TUKANG 1 Orang 30 Hari 110,000 3,300,000
TUKANG 2 Orang 30 Hari 100,000 6,000,000
KULI 5 Orang 30 Hari 90,000 13,500,000
49,644,334
Dusun Gumeng 2

NO URAIAN VOL UNIT FREQ UNIT NOMINAL JUMLAH

SEPTIC TANK (20 Orang) 1 Buah 1 Kali 20,000,000 20,000,000


PIPA 4 meter 23 Lonjor 1 Kali 121,000 2,783,000
MANHOLE 5 Buah 1 Kali 150,000 750,000
KENI 3" 25 Buah 1 Kali 13,700 342,500
PASIR 2 Pickup 1 Kali 144,700 289,400
KORAL 2 Tosa 1 Kali 270,200 540,400
BESI 8 mm 5 Lonjor 1 Kali 49,000 245,000
SEMEN 20 Zak 1 Kali 65,000 1,300,000
KAYU USUK 1 Bandel 1 Kali 180,000 180,000
Lem PVC 10 Buah 1 Kali 6,500 65,000
BENANG 1 Pack 1 Kali 11,033 11,033
PAKU 1 Kg 1 Kali 25,000 25,000
KEPALA TUKANG 1 Orang 30 Hari 110,000 3,300,000
TUKANG 2 Orang 30 Hari 100,000 6,000,000
KULI 5 Orang 30 Hari 90,000 13,500,000
49,331,333
Total Biaya Semua Per Dusun

KERTOSARI 50,941,333
KALIGUNG 1 49,431,333
KALIGUNG 2 49,873,333
KALIGUNG 3 50,778,334
GUMENG 1 49,644,334
GUMENG 2 49,331,333
300,000,000