No. URAIAN JUMLAH TOTAL


1 Sewa Lahan 1H 7,500,000
2 Benih 2 Ton 45,000,000
3 Pupuk Kimia NPK 1,2 Ton 10,800,000
4 Pupuk Kondang 1000 Karung 17,250,000
5 Pestisida Sesuai Sasaran Hama 5,500,000
6 Perekat 5 Botol 600,000
7 PPC / ZPT 10 Lt 1,150,000
8 Nematisida Sesuai Sasaran Penyakit 2,000,000
9 Fungisida Sesuai Sasaran Hama 19,750,000
TENAGA KERJA
10 Olah Lahan 14 6,750,000
11 Membuat Lubang Tanam 14 1,250,000
12 Pemasangan Pupuk 14 1,100,000
13 Pemasangan Pupuk Kimia 14 400,000
14 Penanaman 14 1,500,000
15 Jaga Malam s/d Subuh 4 2,000,000
16 Aplikasi Pestisida 14 3,500,000
17 Angkut Sarana Borong 4,100,000
18 Transportasi 1 Musim 4,500,000
19 Power Sprayer + BBM 1 Unit 4,150,000
JUMLAH TOTAL 138,800,000
1 Mulsa 13 Rol 9,100,000
2 Semat 6 Karung 900,000
3 Terus 250 Bengket 7,500,000
4 Tali Paret 8 Pak 450,000
5 Drum 2
JUMLAH 17,950,000
1 Transportasi 1 Engkel 200,000,000
2 Mesin Semprot 1 3,000,000
3 Slang Semprot 2 Roll 4,000,000
4 Lain-Lain 2,000,000
JUMLAH 209,000,000
JUMLAH TOTAL 365,750,000
PERSIAPAN TANAMAN BIBIT INDUKAN
No. URAIAN JUMLAH TOTAL
1 Pupuk Kandang 30 K 330,000
2 Pupuk Kimia 50 Kg 9,000,000
3 Kokpit 100 K 1,500,000
4 Kapur Polomit 80 Kg 160,000
5 Planet Granola L 200 Btl 9,000,000
6 Fungisida Sesuai Kebutuhan - 2,000,000
7 Insektisida Sesuai Kebutuhan - 2,000,000
8 Perekat 2 Bh 100,000
9 Buat Guludan / Asbes / Bambu 10 L 300,000
10 Tenaga Kerja Harian 2 Orang / 1 Bulan 150,000
TOTAL 24,540,000
CV. PUTRA BUANA ALAM
ANALIS RAB BANGUNAN GREEN HOUSE

No. Uraian Volume Satuan Total


1 Batu Kali 2 Kubik 600,000 600,000
2 Bata Hebel 2 Kubik 1,500,000 1,500,000
3 Semen 5 Zak 400,000 400,000
JUMLAH 2,500,000
BAHAN BAJA RINGAN
1 Kenel C 75 X 75 70 Batang 92,000 6,440,000
2 Reng 7,5 50 Batang 56,000 2,800,000
3 Baud 3 Dus 150,000 450,000
4 Plastik Yuv 24 Meter 43,000 2,150,000
5 Insek Net 50 Meter 24,000 1,200,000
6 Paranet Hitam 20 Meter 24,000 480,000
7 Roda Pintu 2 Buah 15,000 30,000
JUMLAH 13,550,000
8 Tenaga Kerja Borong 9,500,000
BAHAN KEBUTUHAN
1 Paralon 1/2 Inch 10 Pcs 20,000 200,000
2 Paralon 1/2 Inch 3 Pcs 3,000 10,000
3 Sprayer 3 Bungkus 50,000 150,000
4 Drum 2 Buah 225,000 450,000
5 Tasco 1 Buah 250,000 250,000
6 Cangkul 2 Buah 50,000 100,000
7 Slang 1 Rol 700,000 700,000
8 Tray 200 Pcs 15,000 3,000,000
9 Angkul 1 Buah 950,000 950,000
JUMLAH 5,810,000
Lain-lain 2,000,000
JUMLAH TOTAL 33,360,000

1 Unit
Luas Tanah 54 m Persegi
Kebutuhan 4 Unit
Jumlah luas tanah 100 tumbak 1.400 m/segi
STRUKTUR ORGANISASI

KETUA
DADANG GUMILAR

SEKRETARIS BENDAHARA
HASBI SIDIK INA HASNI NURAENI

KARYAWAN