Anda di halaman 1dari 26

MEMBERS FORCE

MEMBERS FORCE BEAM 500mm x 300mm


B1
Beam L/C Node Fx kg Fy kg Fz kg Mx kNm My kNm Mz kNm
Max Fx 1240 3 Beban Kombinasi 475 4392.213 4266.232 -6.217 -0.517 0.073 34.932
Min Fx 942 3 Beban Kombinasi 400 -3088.747 7035.647 19.671 2.627 -0.322 65.369
Max Fy 909 3 Beban Kombinasi 388 -1045.572 18396.091 -366.549 -41.314 2.35 242.833
Min Fy 1026 3 Beban Kombinasi 386 -1047.394 -18397.737 365.954 41.316 2.346 242.852
Max Fz 1026 3 Beban Kombinasi 449 -1047.394 -16228.721 365.954 41.316 -2.319 22.131
Min Fz 909 3 Beban Kombinasi 388 -1045.572 18396.091 -366.549 -41.314 2.35 242.833
Max Mx 1202 3 Beban Kombinasi 458 1058.071 8437.274 7.757 44.784 -0.114 57.671
Min Mx 1600 3 Beban Kombinasi 680 703.242 -4093.327 0.18 -43.99 -0.029 -84.222
Max My 1281 3 Beban Kombinasi 508 1978.472 11671.597 -221.769 10.43 2.571 102.465
Min My 1278 3 Beban Kombinasi 505 1970.989 11674.645 217.41 -10.424 -2.517 102.521
Max Mz 1026 3 Beban Kombinasi 386 -1047.394 -18397.737 365.954 41.316 2.346 242.852
Min Mz 1612 3 Beban Kombinasi 686 2348.719 -9941.852 -0.436 -22.991 -0.181 -202.087

MEMBERS FORCE BEAM 400mm x 200mm


B2
Beam L/C Node Fx kg Fy kg Fz kg Mx kNm My kNm Mz kNm
Max Fx 1494 3 Beban Kombinasi 625 7.012 3730.791 0.029 -0.097 -0.001 29.055
Min Fx 959 3 Beban Kombinasi 409 -474.18 3970.618 -0.004 0 0 40.154
Max Fy 959 3 Beban Kombinasi 409 -474.18 3970.618 -0.004 0 0 40.154
Min Fy 1027 3 Beban Kombinasi 449 -93.981 -4371.03 -0.63 -0.052 -0.015 47.545
Max Fz 1029 3 Beban Kombinasi 419 -94.023 2962.282 0.619 0.052 -0.015 13.008
Min Fz 1027 3 Beban Kombinasi 415 -93.981 2962.229 -0.63 -0.052 0.016 13.006
Max Mx 980 3 Beban Kombinasi 423 -119.589 3819.865 0.099 0.251 -0.004 32.932
Min Mx 983 3 Beban Kombinasi 424 -120.508 3820.173 -0.103 -0.25 0.004 32.962
Max My 1027 3 Beban Kombinasi 415 -93.981 2962.229 -0.63 -0.052 0.016 13.006
Min My 1029 3 Beban Kombinasi 419 -94.023 2962.282 0.619 0.052 -0.015 13.008
Max Mz 1027 3 Beban Kombinasi 449 -93.981 -4371.03 -0.63 -0.052 -0.015 47.545
Min Mz 1027 3 Beban Kombinasi 415 -93.981 2962.229 -0.63 -0.052 0.016 13.006

MEMBERS FORCE BEAM 300mm x 150mm


B3
Beam L/C Node Fx kg Fy kg Fz kg Mx kNm My kNm Mz kNm
Max Fx 1200 3 Beban Kombinasi 456 1188.152 6277.275 3.772 -0.775 -0.056 66.87
Min Fx 1412 3 Beban Kombinasi 582 -586.877 1691.742 1.698 -2.082 -0.026 11.104
Max Fy 1262 3 Beban Kombinasi 491 640.043 8719.17 -0.905 -0.53 0.008 79.544
Min Fy 1634 3 Beban Kombinasi 498 641.832 -8720.028 -0.371 0.531 -0.002 79.566
Max Fz 1328 3 Beban Kombinasi 505 -50.258 1904.438 53.664 -1.131 -0.259 12.622
Min Fz 1307 3 Beban Kombinasi 508 -41.689 1904.152 -55.706 1.129 0.268 12.62
Max Mx 1991 3 Beban Kombinasi 690 475.006 -1203.537 -6.664 3.661 0.123 -32.035
Min Mx 1300 3 Beban Kombinasi 458 222.674 1763.348 15.515 -2.546 -0.091 8.691
Max My 1307 3 Beban Kombinasi 508 -41.689 1904.152 -55.706 1.129 0.268 12.62
Min My 1328 3 Beban Kombinasi 505 -50.258 1904.438 53.664 -1.131 -0.259 12.622
Max Mz 1634 3 Beban Kombinasi 498 641.832 -8720.028 -0.371 0.531 -0.002 79.566
Min Mz 1262 3 Beban Kombinasi 706 640.043 6329.122 -0.905 -0.53 -0.008 -49.583
MEMBERS FORCE BEAM 200mm x 150mm
B4
Beam L/C Node Fx kg Fy kg Fz kg Mx kNm My kNm Mz kNm
Max Fx 1279 3 Beban Kombinasi 506 2528.242 4263.942 -2.438 -0.408 0.058 32.628
Min Fx 1242 3 Beban Kombinasi 477 -820.616 3307.499 0.115 -0.005 -0.009 27.067
Max Fy 1279 3 Beban Kombinasi 506 2528.242 4263.942 -2.438 -0.408 0.058 32.628
Min Fy 1424 3 Beban Kombinasi 464 1760.624 -5006.61 -3.426 -1.561 -0.062 43.153
Max Fz 1280 3 Beban Kombinasi 507 2519.92 4263.813 2.131 0.408 -0.054 32.626
Min Fz 1424 3 Beban Kombinasi 589 1760.624 -1700.374 -3.426 -1.561 0.022 -39.063
Max Mx 1436 3 Beban Kombinasi 597 1391.151 -1653.282 0.721 1.639 0.012 -38.359
Min Mx 1424 3 Beban Kombinasi 589 1760.624 -1700.374 -3.426 -1.561 0.022 -39.063
Max My 1279 3 Beban Kombinasi 506 2528.242 4263.942 -2.438 -0.408 0.058 32.628
Min My 1424 3 Beban Kombinasi 464 1760.624 -5006.61 -3.426 -1.561 -0.062 43.153
Max Mz 1424 3 Beban Kombinasi 464 1760.624 -5006.61 -3.426 -1.561 -0.062 43.153
Min Mz 1424 3 Beban Kombinasi 589 1760.624 -1700.374 -3.426 -1.561 0.022 -39.063

MEMBERS FORCE BEAM 700mm x 400mm


B5
Beam L/C Node Fx kg Fy kg Fz kg Mx kNm My kNm Mz kNm
Max Fx 1987 3 Beban Kombinasi 720 5,757 -1,883 4.172 15 0 -1.00E+02
Min Fx 945 3 Beban Kombinasi 398 -3,693 3,229 -0.053 0 0 4.34E+01
Max Fy 910 3 Beban Kombinasi 386 1,081 34,129 -836.986 -36 6 3.53E+02
Min Fy 912 3 Beban Kombinasi 388 1,078 -34,129 837.091 36 6 3.53E+02
Max Fz 912 3 Beban Kombinasi 189 1,078 -31,268 837 36 -6 -9.59E+01
Min Fz 910 3 Beban Kombinasi 386 1,081 34,129 -837 -36 6 3.53E+02
Max Mx 1538 3 Beban Kombinasi 650 -361 -8,972 -1 40 0 -3.12E+02
Min Mx 1537 3 Beban Kombinasi 390 -359 17,145 1 -40 0 2.00E+02
Max My 912 3 Beban Kombinasi 388 1,078 -34,129 837 36 6 3.53E+02
Min My 912 3 Beban Kombinasi 189 1,078 -31,268 837 36 -6 -9.59E+01
Max Mz 910 3 Beban Kombinasi 386 1,081 34,129 -836.986 -36 6 3.53E+02
Min Mz 911 3 Beban Kombinasi 409 587 13,225 61.211 28 1 -4.73E+02

MEMBERS FORCE BEAM 500mm x 150mm


B6
Beam L/C Node Fx kg Fy kg Fz kg Mx kNm My kNm Mz kNm
Max Fx 1620 3 Beban Kombinasi 689 2,839 555 -4.191 -2 0 -3.57E+01
Min Fx 1621 3 Beban Kombinasi 690 -587 -6,068 -0.567 -4 0 -7.33E+01
Max Fy 1605 3 Beban Kombinasi 682 -320 9,289 -5 -3.028 0 5.90E+01
Min Fy 1621 3 Beban Kombinasi 606 -587 -8,609 -0.567 -4 0 5.26E+01
Max Fz 1639 3 Beban Kombinasi 702 417 2,022 74 17 -1 -4.51E+01
Min Fz 1646 3 Beban Kombinasi 703 414 2,022 -75 -17.128 1 -4.51E+01
Max Mx 1639 3 Beban Kombinasi 702 417 2,022 74 17 -1 -4.51E+01
Min Mx 1450 3 Beban Kombinasi 590 699 -662 -70 -18 0 -6.36E+01
Max My 1646 3 Beban Kombinasi 703 414 2,022 -75 -17.128 1 -4.51E+01
Min My 1639 3 Beban Kombinasi 702 417 2,022 74 17 -1 -4.51E+01
Max Mz 1619 3 Beban Kombinasi 687 2,652 7,308 3 8.298 0 8.84E+01
Min Mz 1605 3 Beban Kombinasi 703 -320 6,747 -5 -3.028 0 -7.86E+01
BENDING MOMENT CHECK
CONCRETE BEAM
B1
KONDISI AKTUAL
CONCRETE BEAM 300 x 500 mm
Maksimum Moment Force : Mu (t.m) 0.24
: Mu (N.mm) 2428520.00
Strength reduction factor : φ 0.90
Nominal Moment : Mn = Mu / φ (N.mm) 2698355.56
Concrete Compressive Strength : fc' (MPa) 29.42
Bar yield strength : fy (MPa) 390.00
Elastic Modulus : Es (MPa) 200000.00
Beam Width : b (mm) 300.00
Beam Height : h (mm) 500.00
Concrete cover : d' (mm) 50.00
: d = h - d' (mm) 450.00
: β1 0.85
Balanced bar ratio : ρb
ρb = [ 0.85 β1 (fc'/fy) (600/(600+fy)) ] + [ ρ' (fs'/fy) ] 0.03306
Maximum bar ratio : ρmax = 0.75 ρb 0.02479
Minimum bar ratio : ρmin = 1.4 / fy 0.00359
: ρ' / ρ 0.75
A 0.00
B -357.50
C 0.04
Tension bar ratio : ρ 0.00012
Compress bar ratio : ρ' 0.00009
2
As Requiered : As = ρ b d (mm ) 16.81
2
As' Requiered : As' = ρ' b d (mm ) 12.61
2
As Available (assumed) : Asmin = ρmin b d (mm ) 484.62

CONTROL !!
Mu available ≥ Mu actual
177.81 ≥ 2.43 kN.m …… OK !!
18131 kg.m
: ρmin < ρ < ρmax Pakai As min !!
2
Luas Tulangan Tarik Perlu : Asperlu (mm ) 484.62
2
Luas Tulangan Tekan Perlu : As'perlu (mm ) 12.61
Diameter Tulangan (mm) 16
2
Luas 1 buah Tulangan (mm ) 201.06
Jumlah Tulangan Tarik : n (buah) 3
Jumlah Tulangan Tekan : n' (buah) 2
Jarak antar Tul. Tarik (mm) Hanya 1 Baris Tulangan !! 66.00
Jarak antar Tul. Tekan (mm) Hanya 1 Baris Tulangan !! 148.00
RESUME PENULANGAN BALOK BETON BERTULANG

TULANGAN LENTUR
Diamater Tulangan (mm) 16
Jumlah Tulangan Tarik Terpasang 6
Jumlah Tulangan Tekan Terpasang 4
Tulangan Tarik 6 D16
Tulangan Tekan 4 D16
As terpasang (mm2) 1206.37
As' terpasang (mm2) 804.25
Rasio Luas Tulangan thd Luas Beton 1.34 %
SKETSA TULANGAN BALOK

120.0 mm
4 D16

2 D13
500.0
Ø10 -120 mm
(mm)
380.0 mm
380.0 mm

6 D16

300.0
(mm)
SHEAR REINFORCEMENT
CONCRETE BEAM
B1
KONDISI AKTUAL
CONCRETE BEAM 300 x 500 mm
Max Shear force : Vu (ton) 18.40
: Vu (kN) 183.98
Strength reduction factor : φ 0.75
Shear force nominal : Vn = Vu / φ (kN) 245.30
Concrete Compressive Strength : fc' (MPa) 29.42
Bar yield strength : fy (MPa) 240.00
Beam Width : b (mm) 300.00
Beam Height : h (mm) 500.00
Concrete cover : d' (mm) 50.00
: d = h - d' (mm) 450.00
Maksimum space of shear bar : smax (mm) 225.00
Bar diameter (if assumed) : ds (mm) 10
2 2
Shear bar area : Av = 2 [1/4 π ds ] (mm ) 157.08
Concrete shear strength : Vc = 1/6 (√ fc' ) / (b d) (kN) 122.04
CONTROL !!
Vc/2 ≤ Vn
61.02 ≤ 245.30 Need shear bar !!
Nominal shear requiered : Vsreq = Vn - Vc (kN) 123.26
Space requiered : sreq (mm) 137.63
Jarak Sengkang Terpasang : sterpasang (mm) 120.00
Jarak OK !!
Vs = (Av fy ds) / sterpasang (kN) 141.37
Vn = Vc + Vs (kN) 263.41
Vu = φ Vn (kN) 197.56

Tulangan Geser Ø10 -120 mm

KONTROL !!
Vu terpasang ≥ Vu actual
197.56 ≥ 183.98 …….. OK !!
BENDING MOMENT CHECK
CONCRETE BEAM
B2
KONDISI AKTUAL
CONCRETE BEAM 200 x 400 mm
Maksimum Moment Force : Mu (t.m) 0.05
: Mu (N.mm) 475450.00
Strength reduction factor : φ 0.90
Nominal Moment : Mn = Mu / φ (N.mm) 528277.78
Concrete Compressive Strength : fc' (MPa) 29.42
Bar yield strength : fy (MPa) 390.00
Elastic Modulus : Es (MPa) 200000.00
Beam Width : b (mm) 200.00
Beam Height : h (mm) 400.00
Concrete cover : d' (mm) 50.00
: d = h - d' (mm) 350.00
: β1 0.85
Balanced bar ratio : ρb
ρb = [ 0.85 β1 (fc'/fy) (600/(600+fy)) ] + [ ρ' (fs'/fy) ] 0.03304
Maximum bar ratio : ρmax = 0.75 ρb 0.02478
Minimum bar ratio : ρmin = 1.4 / fy 0.00359
: ρ' / ρ 0.75
A 0.00
B -348.21
C 0.02
Tension bar ratio : ρ 0.00006
Compress bar ratio : ρ' 0.00005
2
As Requiered : As = ρ b d (mm ) 4.36
2
As' Requiered : As' = ρ' b d (mm ) 3.27
2
As Available (assumed) : Asmin = ρmin b d (mm ) 251.28

CONTROL !!
Mu available ≥ Mu actual
90.31 ≥ 0.48 kN.m …… OK !!
9209.3 kg.m
: ρmin < ρ < ρmax Pakai As min !!
2
Luas Tulangan Tarik Perlu : Asperlu (mm ) 251.28
2
Luas Tulangan Tekan Perlu : As'perlu (mm ) 3.27
Diameter Tulangan (mm) 16
2
Luas 1 buah Tulangan (mm ) 201.06
Jumlah Tulangan Tarik : n (buah) 2
Jumlah Tulangan Tekan : n' (buah) 2
Jarak antar Tul. Tarik (mm) Hanya 1 Baris Tulangan !! 48.00
Jarak antar Tul. Tekan (mm) Hanya 1 Baris Tulangan !! 48.00
RESUME PENULANGAN BALOK BETON BERTULANG

TULANGAN LENTUR
Diamater Tulangan (mm) 16
Jumlah Tulangan Tarik Terpasang 4
Jumlah Tulangan Tekan Terpasang 3
Tulangan Tarik 4 D16
Tulangan Tekan 3 D16
As terpasang (mm2) 804.25
As' terpasang (mm2) 603.19
Rasio Luas Tulangan thd Luas Beton 1.76 %
SKETSA TULANGAN BALOK

120.0 mm
3 D16

2 D13
400.0
Ø10 -120 mm
(mm)
280.0 mm
280.0 mm

4 D16

200.0
(mm)
SHEAR REINFORCEMENT
CONCRETE BEAM
B2
KONDISI AKTUAL
CONCRETE BEAM 200 x 400 mm
Max Shear force : Vu (ton) 4.37
: Vu (kN) 43.71
Strength reduction factor : φ 0.75
Shear force nominal : Vn = Vu / φ (kN) 58.28
Concrete Compressive Strength : fc' (MPa) 29.42
Bar yield strength : fy (MPa) 240.00
Beam Width : b (mm) 200.00
Beam Height : h (mm) 400.00
Concrete cover : d' (mm) 50.00
: d = h - d' (mm) 350.00
Maksimum space of shear bar : smax (mm) 175.00
Bar diameter (if assumed) : ds (mm) 10
2 2
Shear bar area : Av = 2 [1/4 π ds ] (mm ) 157.08
Concrete shear strength : Vc = 1/6 (√ fc' ) / (b d) (kN) 63.28
CONTROL !!
Vc/2 ≤ Vn
31.64 ≤ 58.28 Need shear bar !!
Nominal shear requiered : Vsreq = Vn - Vc (kN) 0.00
Space requiered : sreq (mm) 175.00
Jarak Sengkang Terpasang : sterpasang (mm) 150.00
Jarak OK !!
Vs = (Av fy ds) / sterpasang (kN) 87.96
Vn = Vc + Vs (kN) 151.24
Vu = φ Vn (kN) 113.43

Tulangan Geser Ø10 -150 mm

KONTROL !!
Vu terpasang ≥ Vu actual
113.43 ≥ 43.71 …….. OK !!
BENDING MOMENT CHECK
CONCRETE BEAM
B3
KONDISI AKTUAL
CONCRETE BEAM 150 x 300 mm
Maksimum Moment Force : Mu (t.m) 0.08
: Mu (N.mm) 795660.00
Strength reduction factor : φ 0.90
Nominal Moment : Mn = Mu / φ (N.mm) 884066.67
Concrete Compressive Strength : fc' (MPa) 29.42
Bar yield strength : fy (MPa) 240.00
Elastic Modulus : Es (MPa) 200000.00
Beam Width : b (mm) 150.00
Beam Height : h (mm) 300.00
Concrete cover : d' (mm) 30.00
: d = h - d' (mm) 270.00
: β1 0.85
Balanced bar ratio : ρb
ρb = [ 0.85 β1 (fc'/fy) (600/(600+fy)) ] + [ ρ' (fs'/fy) ] 0.06313
Maximum bar ratio : ρmax = 0.75 ρb 0.04735
Minimum bar ratio : ρmin = 1.4 / fy 0.00583
: ρ' / ρ 0.75
A 0.00
B -220.00
C 0.08
Tension bar ratio : ρ 0.00037
Compress bar ratio : ρ' 0.00028
2
As Requiered : As = ρ b d (mm ) 14.88
2
As' Requiered : As' = ρ' b d (mm ) 11.16
2
As Available (assumed) : Asmin = ρmin b d (mm ) 236.25

CONTROL !!
Mu available ≥ Mu actual
13.12 ≥ 0.80 kN.m …… OK !!
1337.9 kg.m
: ρmin < ρ < ρmax Pakai As min !!
2
Luas Tulangan Tarik Perlu : Asperlu (mm ) 236.25
2
Luas Tulangan Tekan Perlu : As'perlu (mm ) 11.16
Diameter Tulangan (mm) 12
2
Luas 1 buah Tulangan (mm ) 113.10
Jumlah Tulangan Tarik : n (buah) 3
Jumlah Tulangan Tekan : n' (buah) 2
Jarak antar Tul. Tarik (mm) Lebih dari 1 Baris Tulangan !! 17.00
Jarak antar Tul. Tekan (mm) Hanya 1 Baris Tulangan !! 46.00
RESUME PENULANGAN BALOK BETON BERTULANG

TULANGAN LENTUR
Diamater Tulangan (mm) 12
Jumlah Tulangan Tarik Terpasang 2
Jumlah Tulangan Tekan Terpasang 2
Tulangan Tarik 2 D12
Tulangan Tekan 2 D12
As terpasang (mm2) 226.19
As' terpasang (mm2) 226.19
Rasio Luas Tulangan thd Luas Beton 1.01 %
SKETSA TULANGAN BALOK

120.0 mm
2 D12

2 D12
300.0
Ø10 -120 mm
(mm)
180.0 mm
180.0 mm

2 D12

150.0
(mm)
SHEAR REINFORCEMENT
CONCRETE BEAM
B3
KONDISI AKTUAL
CONCRETE BEAM 150 x 300 mm
Max Shear force : Vu (ton) 8.72
: Vu (kN) 87.20
Strength reduction factor : φ 0.75
Shear force nominal : Vn = Vu / φ (kN) 116.27
Concrete Compressive Strength : fc' (MPa) 29.42
Bar yield strength : fy (MPa) 240.00
Beam Width : b (mm) 150.00
Beam Height : h (mm) 300.00
Concrete cover : d' (mm) 30.00
: d = h - d' (mm) 270.00
Maksimum space of shear bar : smax (mm) 135.00
Bar diameter (if assumed) : ds (mm) 10
2 2
Shear bar area : Av = 2 [1/4 π ds ] (mm ) 157.08
Concrete shear strength : Vc = 1/6 (√ fc' ) / (b d) (kN) 36.61
CONTROL !!
Vc/2 ≤ Vn
18.31 ≤ 116.27 Need shear bar !!
Nominal shear requiered : Vsreq = Vn - Vc (kN) 79.65
Space requiered : sreq (mm) 127.79
Jarak Sengkang Terpasang : sterpasang (mm) 120.00
Jarak OK !!
Vs = (Av fy ds) / sterpasang (kN) 84.82
Vn = Vc + Vs (kN) 121.44
Vu = φ Vn (kN) 91.08

Tulangan Geser Ø10 -120 mm

KONTROL !!
Vu terpasang ≥ Vu actual
91.08 ≥ 87.20 …….. OK !!
BENDING MOMENT CHECK
CONCRETE BEAM
B4
KONDISI AKTUAL
CONCRETE BEAM 150 x 200 mm
Maksimum Moment Force : Mu (t.m) 0.04
: Mu (N.mm) 431530.00
Strength reduction factor : φ 0.90
Nominal Moment : Mn = Mu / φ (N.mm) 479477.78
Concrete Compressive Strength : fc' (MPa) 29.42
Bar yield strength : fy (MPa) 240.00
Elastic Modulus : Es (MPa) 200000.00
Beam Width : b (mm) 150.00
Beam Height : h (mm) 200.00
Concrete cover : d' (mm) 30.00
: d = h - d' (mm) 170.00
: β1 0.85
Balanced bar ratio : ρb
ρb = [ 0.85 β1 (fc'/fy) (600/(600+fy)) ] + [ ρ' (fs'/fy) ] 0.06307
Maximum bar ratio : ρmax = 0.75 ρb 0.04730
Minimum bar ratio : ρmin = 1.4 / fy 0.00583
: ρ' / ρ 0.75
A 0.00
B -208.24
C 0.11
Tension bar ratio : ρ 0.00053
Compress bar ratio : ρ' 0.00040
2
As Requiered : As = ρ b d (mm ) 13.55
2
As' Requiered : As' = ρ' b d (mm ) 10.16
2
As Available (assumed) : Asmin = ρmin b d (mm ) 148.75

CONTROL !!
Mu available ≥ Mu actual
8.23 ≥ 0.43 kN.m …… OK !!
839.69 kg.m
: ρmin < ρ < ρmax Pakai As min !!
2
Luas Tulangan Tarik Perlu : Asperlu (mm ) 148.75
2
Luas Tulangan Tekan Perlu : As'perlu (mm ) 10.16
Diameter Tulangan (mm) 12
2
Luas 1 buah Tulangan (mm ) 113.10
Jumlah Tulangan Tarik : n (buah) 2
Jumlah Tulangan Tekan : n' (buah) 2
Jarak antar Tul. Tarik (mm) Hanya 1 Baris Tulangan !! 46.00
Jarak antar Tul. Tekan (mm) Hanya 1 Baris Tulangan !! 46.00
RESUME PENULANGAN BALOK BETON BERTULANG

TULANGAN LENTUR
Diamater Tulangan (mm) 12
Jumlah Tulangan Tarik Terpasang 2
Jumlah Tulangan Tekan Terpasang 2
Tulangan Tarik 2 D12
Tulangan Tekan 2 D12
As terpasang (mm2) 226.19
As' terpasang (mm2) 226.19
Rasio Luas Tulangan thd Luas Beton 1.51 %
SKETSA TULANGAN BALOK

120.0 mm
2 D12

200.0
Ø10 -140 mm
(mm)
80.0 mm
80.0 mm

2 D12

150.0
(mm)
SHEAR REINFORCEMENT
CONCRETE BEAM
B4
KONDISI AKTUAL
CONCRETE BEAM 150 x 200 mm
Max Shear force : Vu (ton) 5.01
: Vu (kN) 50.07
Strength reduction factor : φ 0.75
Shear force nominal : Vn = Vu / φ (kN) 66.75
Concrete Compressive Strength : fc' (MPa) 29.42
Bar yield strength : fy (MPa) 240.00
Beam Width : b (mm) 150.00
Beam Height : h (mm) 200.00
Concrete cover : d' (mm) 30.00
: d = h - d' (mm) 170.00
Maksimum space of shear bar : smax (mm) 85.00
Bar diameter (if assumed) : ds (mm) 10
2 2
Shear bar area : Av = 2 [1/4 π ds ] (mm ) 157.08
Concrete shear strength : Vc = 1/6 (√ fc' ) / (b d) (kN) 23.05
CONTROL !!
Vc/2 ≤ Vn
11.53 ≤ 66.75 Need shear bar !!
Nominal shear requiered : Vsreq = Vn - Vc (kN) 43.70
Space requiered : sreq (mm) 85.00
Jarak Sengkang Terpasang : sterpasang (mm) 140.00
Jarak > s max !!
Vs = (Av fy ds) / sterpasang (kN) 45.78
Vn = Vc + Vs (kN) 68.83
Vu = φ Vn (kN) 51.62
Ø10 -140 mm
Tulangan Geser

KONTROL !!
Vu terpasang ≥ Vu actual
51.62 ≥ 50.07 …….. OK !!
BENDING MOMENT CHECK
CONCRETE BEAM
B5
KONDISI AKTUAL
CONCRETE BEAM 400 x 700 mm
Maksimum Moment Force : Mu (t.m) 0.47
: Mu (N.mm) 4733850.00
Strength reduction factor : φ 0.90
Nominal Moment : Mn = Mu / φ (N.mm) 5259833.33
Concrete Compressive Strength : fc' (MPa) 29.42
Bar yield strength : fy (MPa) 390.00
Elastic Modulus : Es (MPa) 200000.00
Beam Width : b (mm) 400.00
Beam Height : h (mm) 700.00
Concrete cover : d' (mm) 50.00
: d = h - d' (mm) 650.00
: β1 0.85
Balanced bar ratio : ρb
ρb = [ 0.85 β1 (fc'/fy) (600/(600+fy)) ] + [ ρ' (fs'/fy) ] 0.03304
Maximum bar ratio : ρmax = 0.75 ρb 0.02478
Minimum bar ratio : ρmin = 1.4 / fy 0.00359
: ρ' / ρ 0.75
A 0.00
B -367.50
C 0.03
Tension bar ratio : ρ 0.00008
Compress bar ratio : ρ' 0.00006
2
As Requiered : As = ρ b d (mm ) 21.59
2
As' Requiered : As' = ρ' b d (mm ) 16.19
2
As Available (assumed) : Asmin = ρmin b d (mm ) 933.33

CONTROL !!
Mu available ≥ Mu actual
265.19 ≥ 4.73 kN.m …… OK !!
27042 kg.m
: ρmin < ρ < ρmax Pakai As min !!
2
Luas Tulangan Tarik Perlu : Asperlu (mm ) 933.33
2
Luas Tulangan Tekan Perlu : As'perlu (mm ) 16.19
Diameter Tulangan (mm) 16
2
Luas 1 buah Tulangan (mm ) 201.06
Jumlah Tulangan Tarik : n (buah) 5
Jumlah Tulangan Tekan : n' (buah) 2
Jarak antar Tul. Tarik (mm) Hanya 1 Baris Tulangan !! 50.00
Jarak antar Tul. Tekan (mm) Hanya 1 Baris Tulangan !! 248.00
RESUME PENULANGAN BALOK BETON BERTULANG

TULANGAN LENTUR
Diamater Tulangan (mm) 16
Jumlah Tulangan Tarik Terpasang 6
Jumlah Tulangan Tekan Terpasang 4
Tulangan Tarik 6 D16
Tulangan Tekan 4 D16
As terpasang (mm2) 1206.37
As' terpasang (mm2) 804.25
Rasio Luas Tulangan thd Luas Beton 0.72 %
SKETSA TULANGAN BALOK

120.0 mm
4 D16

2 D13

700.0
Ø10 -100 mm
(mm)
580.0 mm
580.0 mm
2 D13

6 D16

400.0
(mm)
SHEAR REINFORCEMENT
CONCRETE BEAM
B5
KONDISI AKTUAL
CONCRETE BEAM 400 x 700 mm
Max Shear force : Vu (ton) 34.13
: Vu (kN) 341.29
Strength reduction factor : φ 0.75
Shear force nominal : Vn = Vu / φ (kN) 455.06
Concrete Compressive Strength : fc' (MPa) 29.42
Bar yield strength : fy (MPa) 240.00
Beam Width : b (mm) 400.00
Beam Height : h (mm) 700.00
Concrete cover : d' (mm) 50.00
: d = h - d' (mm) 650.00
Maksimum space of shear bar : smax (mm) 325.00
Bar diameter (if assumed) : ds (mm) 10
2 2
Shear bar area : Av = 2 [1/4 π ds ] (mm ) 157.08
Concrete shear strength : Vc = 1/6 (√ fc' ) / (b d) (kN) 235.04
CONTROL !!
Vc/2 ≤ Vn
117.52 ≤ 455.06 Need shear bar !!
Nominal shear requiered : Vsreq = Vn - Vc (kN) 220.01
Space requiered : sreq (mm) 111.38
Jarak Sengkang Terpasang : sterpasang (mm) 100.00
Jarak OK !!
Vs = (Av fy ds) / sterpasang (kN) 245.04
Vn = Vc + Vs (kN) 480.08
Vu = φ Vn (kN) 360.06
Ø10 -100 mm
Tulangan Geser

KONTROL !!
Vu terpasang ≥ Vu actual
360.06 ≥ 341.29 …….. OK !!
BENDING MOMENT CHECK
CONCRETE BEAM
B6
KONDISI AKTUAL
CONCRETE BEAM 150 x 500 mm
Maksimum Moment Force : Mu (t.m) 0.09
: Mu (N.mm) 884050.00
Strength reduction factor : φ 0.90
Nominal Moment : Mn = Mu / φ (N.mm) 982277.78
Concrete Compressive Strength : fc' (MPa) 29.42
Bar yield strength : fy (MPa) 390.00
Elastic Modulus : Es (MPa) 200000.00
Beam Width : b (mm) 150.00
Beam Height : h (mm) 500.00
Concrete cover : d' (mm) 30.00
: d = h - d' (mm) 470.00
: β1 0.85
Balanced bar ratio : ρb
ρb = [ 0.85 β1 (fc'/fy) (600/(600+fy)) ] + [ ρ' (fs'/fy) ] 0.03305
Maximum bar ratio : ρmax = 0.75 ρb 0.02479
Minimum bar ratio : ρmin = 1.4 / fy 0.00359
: ρ' / ρ 0.75
A 0.00
B -371.33
C 0.03
Tension bar ratio : ρ 0.00008
Compress bar ratio : ρ' 0.00006
2
As Requiered : As = ρ b d (mm ) 5.61
2
As' Requiered : As' = ρ' b d (mm ) 4.21
2
As Available (assumed) : Asmin = ρmin b d (mm ) 253.08

CONTROL !!
Mu available ≥ Mu actual
63.62 ≥ 0.88 kN.m …… OK !!
6487.7 kg.m
: ρmin < ρ < ρmax Pakai As min !!
Luas Tulangan Tarik Perlu : Asperlu (mm2) 253.08
Luas Tulangan Tekan Perlu : As'perlu (mm2) 4.21
Diameter Tulangan (mm) 16
2
Luas 1 buah Tulangan (mm ) 201.06
Jumlah Tulangan Tarik : n (buah) 2
Jumlah Tulangan Tekan : n' (buah) 2
Jarak antar Tul. Tarik (mm) Hanya 1 Baris Tulangan !! 38.00
Jarak antar Tul. Tekan (mm) Hanya 1 Baris Tulangan !! 38.00
RESUME PENULANGAN BALOK BETON BERTULANG

TULANGAN LENTUR
Diamater Tulangan (mm) 16
Jumlah Tulangan Tarik Terpasang 2
Jumlah Tulangan Tekan Terpasang 2
Tulangan Tarik 2 D16
Tulangan Tekan 2 D16
2
As terpasang (mm ) 402.12
As' terpasang (mm2) 402.12
Rasio Luas Tulangan thd Luas Beton 1.07 %
SKETSA TULANGAN BALOK

120.0 mm
2 D16

2 D16
500.0
Ø8 -150 mm
(mm)
380.0 mm
380.0 mm
2 D16

2 D16

150.0
(mm)
SHEAR REINFORCEMENT
CONCRETE BEAM
B6
KONDISI AKTUAL
CONCRETE BEAM 150 x 500 mm
Max Shear force : Vu (ton) 7.31
: Vu (kN) 73.08
Strength reduction factor : φ 0.75
Shear force nominal : Vn = Vu / φ (kN) 97.44
Concrete Compressive Strength : fc' (MPa) 29.42
Bar yield strength : fy (MPa) 240.00
Beam Width : b (mm) 150.00
Beam Height : h (mm) 500.00
Concrete cover : d' (mm) 30.00
: d = h - d' (mm) 470.00
Maksimum space of shear bar : smax (mm) 235.00
Bar diameter (if assumed) : ds (mm) 8
2 2
Shear bar area : Av = 2 [1/4 π ds ] (mm ) 100.53
Concrete shear strength : Vc = 1/6 (√ fc' ) / (b d) (kN) 63.73
CONTROL !!
Vc/2 ≤ Vn
31.87 ≤ 97.44 Need shear bar !!
Nominal shear requiered : Vsreq = Vn - Vc (kN) 33.70
Space requiered : sreq (mm) 235.00
Jarak Sengkang Terpasang : sterpasang (mm) 150.00
Jarak OK !!
Vs = (Av fy ds) / sterpasang (kN) 75.60
Vn = Vc + Vs (kN) 139.33
Vu = φ Vn (kN) 104.50
Ø8 -150 mm
Tulangan Geser

KONTROL !!
Vu terpasang ≥ Vu actual
104.50 ≥ 73.08 …….. OK !!

Anda mungkin juga menyukai