Anda di halaman 1dari 1

NATIONAL SLUMP

UPGRADING PROGRAM
(NSUP)
30
PROPINSI
17
SULAWESI UTARA
160
KOTA
PIPA GALVANIS 1.5"
MANADO
JALAN RABAT 18 25 10 PLESTERAN KECAMATAN
BETON ACIAN 1:4 TIKALA
30
KELURAHAN
10
TAAS
PASANGAN BATU
DIBUAT OLEH:
1:4
URUGAN PASIR FASILITATOR TEKNIK
T=5CM

KOLOM BETON 20/20


260 BETON K-225

BESI 8Ø12 MM
CICILIA KALANGIT, ST
BESI Ø8 - 150 MM DIPERIKSA OLEH:
ASKOT INFRASTRUKTUR
SLOOF BETON 20/30
BETON K-225

60 TANAH
HENKY A. ERUNGAN, ST
EKSISTING

DISETUJUI OLEH:
TIM TEKNIS BPPW SULAWESI UTARA
URUGAN PASIR
T=5CM

_______________________
NAMA GAMBAR
POTONGAN MELINTANG JALAN RABAT BETON DAN
AS-BUILT DRAWING
TALUD PENAHAN
(SEGMEN 5)
NO. GAMBAR JLH. LEMBAR
STA 0+027,6 S/D 0+031
SKALA 1:40

Anda mungkin juga menyukai