Anda di halaman 1dari 1

30

17
30
17
NATIONAL SLUMP
160 15 25 25
PIPA GALVANIS 1.5" PLESTERAN
ACIAN 1:4
TANAH EKSISTING 160

PIPA GALVANIS 1.5"


UPGRADING PROGRAM
JALAN RABAT
BETON
PASANGAN BATU
1:4
80
JALAN RABAT
BETON
20 25 20

40
PLESTERAN
ACIAN 1:4
(NSUP)
10 10

URUGAN PASIR,
T= 5 CM
PASANGAN BATU
URUGAN PASIR 1:4 PROPINSI
T=5CM

KOLOM BETON 20/20 SULAWESI UTARA


270 BETON K-225
270
BESI 8Ø12 MM

BESI Ø8 - 150 MM
KOTA
TALUD

SLOOF BETON 20/30


BETON K-225
POTONGAN MELINTANG JALAN
EKSISTING
MANADO
RABAT BETON DAN TALUD PENAHAN POTONGAN MELINTANG JALAN
60 TANAH
(SEGMEN 5) 60 TANAH
RABAT BETON DAN TALUD PENAHAN KECAMATAN
EKSISTING EKSISTING

(SEGMEN 5)
URUGAN PASIR
STA 0+000 S/D 0+019,5
STA 0+019,5 S/D 0+027,6
TIKALA
T=5CM
SKALA 1:100
SKALA 1:40 KELURAHAN
30 TAAS
17
160 DIBUAT OLEH:
PIPA GALVANIS 1.5"

JALAN RABAT PLESTERAN


FASILITATOR TEKNIK
18 25 10
BETON ACIAN 1:4

30

10

PASANGAN BATU
1:4
URUGAN PASIR
T=5CM

KOLOM BETON 20/20


260 BETON K-225

BESI 8Ø12 MM

BESI Ø8 - 150 MM
CICILIA KALANGIT, ST
SLOOF BETON 20/30
BETON K-225 POTONGAN MELINTANG JALAN DIPERIKSA OLEH:
60 TANAH
RABAT BETON DAN TALUD PENAHAN ASKOT INFRASTRUKTUR
EKSISTING

(SEGMEN 5)
URUGAN PASIR
T=5CM
STA 0+027,6 S/D 0+031
SKALA 1:40
300

HENKY A. ERUNGAN, ST
T=5CM
DISETUJUI OLEH:
300
300 300 300 300 300 300
TIM TEKNIS BPPW SULAWESI UTARA

270

_______________________
TALUD EKSISTING 340
1950
3100 NAMA GAMBAR
AS-BUILT DRAWING
POTONGAN MEMANJANG JALAN RABAT BETON DAN TALUD PENAHAN NO. GAMBAR JLH. LEMBAR
(SEGMEN 5)
P = 31 METER
SKALA 1:80