Anda di halaman 1dari 1

NATIONAL SLUMP

15 25 25 UPGRADING PROGRAM
(NSUP)
20 25 20
PLESTERAN PROPINSI
ACIAN 1:4 PLESTERAN
ACIAN 1:4
SULAWESI UTARA
PASANGAN BATU 1:4
PASANGAN BATU 1:4 KOTA
80 40 MANADO
20
KECAMATAN
10 10 TIKALA
18
10 10 URUGAN PASIR, KELURAHAN
T= 5 CM TAAS
URUGAN PASIR, DIBUAT OLEH:
T= 5 CM FASILITATOR TEKNIK
TIPIKAL MELINGTANG DRAINASE
SEGMEN 1
STA 0+0.005 S/D 0+0.016
TIPIKAL MELINGTANG DRAINASE
SKALA 1:20
SEGMEN 1
STA 0+0.000 S/D 0+0.005
SKALA 1:20
CICILIA KALANGIT, ST
DIPERIKSA OLEH:
ASKOT INFRASTRUKTUR

18 25 10
PLESTERAN
ACIAN 1:4 HENKY A. ERUNGAN, ST
PASANGAN BATU 1:4
DISETUJUI OLEH:
30 30 TIM TEKNIS BPPW SULAWESI UTARA

10 10
URUGAN PASIR,
T= 5 CM _______________________
NAMA GAMBAR
TIPIKAL MELINGTANG DRAINASE
AS-BUILT DRAWING
SEGMEN 1
STA 0+0.016 S/D 0+0.034
SKALA 1:20
NO. GAMBAR JLH. LEMBAR