Anda di halaman 1dari 1

NATIONAL SLUMP

UPGRADING PROGRAM
(NSUP)
PROPINSI
15 45 15
SULAWESI UTARA
PLESTERAN 1:4 15 45 15
ACIAN PLESTERAN 1:4 KOTA
ACIAN
MANADO
50 PAS. BATU 1:4 40 KECAMATAN
PAS. BATU 1:4 TIKALA

10 10 KELURAHAN
TAAS
DIBUAT OLEH:
SEGMEN 6B SEGMEN 6C FASILITATOR TEKNIK
STA 0+000 S/D 0+022 STA 0+000 S/D 0+033.5
SKALA 1:20 SKALA 1:20

CICILIA KALANGIT, ST
DIPERIKSA OLEH:
ASKOT INFRASTRUKTUR

15 40 15
10 30 10
PLESTERAN 1:4
HENKY A. ERUNGAN, ST
PAS.
ACIAN BATU 1:4 DISETUJUI OLEH:
30 PAS. BATU 1:4 TIM TEKNIS BPPW SULAWESI UTARA
45 PLESTERAN
ACIAN 1:4
JALAN
EKSISTING

10
10
_______________________
SEGMEN 6D SEGMEN 7
STA 0+000 S/D 0+030 STA 0+000 S/D 0+010.7 NAMA GAMBAR
SKALA 1:20 SKALA 1:20 AS-BUILT DRAWING

NO. GAMBAR JLH. LEMBAR

Anda mungkin juga menyukai