RENCANA ANGGARAN BIAYA TENAGA KERJA PRODUKSI PER SHIPMENT
PT. ARYA ANUGERAH PRASETIA
JUMLAH BIAYA BIAYA TENAGA
NO BIAYA TENAGA KERJA SATUAN ORANG TENAGA KERJA KERJA / BULAN A. KANTOR 1 DIREKTUR UTAMA 1 Orang Rp 50,000,000 Rp 50,000,000 2 DIREKTUR UMUM 1 Orang Rp 30,000,000 Rp 30,000,000 3 ASISTEN DIREKTUR UMUM 1 Orang Rp 25,000,000 Rp 25,000,000 4 MANAGER KEUANGAN 1 Orang Rp 20,000,000 Rp 20,000,000 5 MANAGER OPERASIONAL 1 Orang Rp 20,000,000 Rp 20,000,000 6 ASISTEN MANAGER OPERASIONAL 1 Orang Rp 15,000,000 Rp 15,000,000 7 MANAGER MARKETING 1 Orang Rp 20,000,000 Rp 20,000,000 8 HRD 1 Orang Rp 15,000,000 Rp 15,000,000 9 HUMAS 1 Orang Rp 10,000,000 Rp 10,000,000 10 ADMIN KEUANGAN 1 Orang Rp 5,000,000 Rp 5,000,000 11 ADMIN PERKANTORAN 1 Orang Rp 5,000,000 Rp 5,000,000 12 DRIVER OFICE 2 Orang Rp 3,000,000 Rp 6,000,000 13 OFICE BOY 1 Orang Rp 2,000,000 Rp 2,000,000 B. Penambangan 1 KTT TEAM 13 1 TEAM $ 0.7 Rp 344,750,000 2 Operator Alat Berat 11 Orang Rp 7,000,000 Rp 77,000,000 3 Driver Dump Truck 18 Orang Rp 7,000,000 Rp 126,000,000 4 Terpal Man 6 Orang Rp 1,500,000 Rp 9,000,000 5 Checker 4 Orang Rp 2,000,000 Rp 8,000,000 6 Flag Man 4 Orang Rp 1,500,000 Rp 6,000,000 7 Kepala Peralatan 1 Orang Rp 6,000,000 Rp 6,000,000 8 A. Foreman Peralatan 2 Orang Rp 4,000,000 Rp 8,000,000 9 Genset 1 Orang Rp 2,500,000 Rp 2,500,000 10 Fuel/BBM 4 Orang Rp 2,500,000 Rp 10,000,000 11 ADM Project 1 Orang Rp 5,000,000 Rp 5,000,000 12 Logistic 1 Orang Rp 3,500,000 Rp 3,500,000 13 Captain Perahu (Jolloro) 2 Orang Rp 1,500,000 Rp 3,000,000