PEMBANGUNAN JALAN TOL RUAS SIGLI - BANDA ACEH

LAPORAN HARIAN
HARI : Jumat
TANGGAL : 10-07-20

A. PEKERJAAN B. MATERIAL YANG DIGUNAKAN


No. ITEM PEKERJAAN SAT VOLUME LOKASI No. TIPE SAT VOLUME LOKASI

1 Joint Survey MC-0 0+000 - 0+975

Total Volume Clearing m2 0


*) Volume yang dicatat hanya perkiraan bukan untuk persetujuan pembayaran
C. PENGUJIAN LAPANGAN DAN LABORATORIUM D. ALAT YANG DIGUNAKAN
No. JENIS PENGUJIAN SAT VOLUME LOKASI No. NAMA ALAT SAT VOLUME LOKASI
- - - - - 1 Total Station unit 2 Seksi 1
2 Prisma Ukur unit 4

E. SDM KONTRAKTOR F. LAPORAN CUACA


No. JABATAN JUMLAH KET No. KETERANGAN JAM LOKASI CATATAN
1 Project Manager 1 1 Cerah 08.00 - 14.00 Seksi 1 Jumat
2 Opr & Eng Mgr. 1 2 Cerah 14.00 - 17.00 Seksi 1 3
3 Hse Mgr 1
4 Adm & Keu 1
5 Engineering 1
6 Quantity Surveyor 1
7 Surveyor 1
8 Hse Supervisor 1
9 Supervisor 1
10 Drafter 1
11 Ass. Surveyor 2
12 Logistik 1
13 Driver 3
14 Mekanik 2 Total 3 Jam

G. KENDALA / MASALAH DLL

KETERANGAN

H. CATATAN
URAIAN NAMA TANDA TANGAN
PEMBERI TUGAS : PT. ADHI KARYA ( Persero ) Tbk
KONSULTAN SUPERVISI :
KONTRAKTOR : PT. BINA MITRA INDOSEJAHTERA
PEMBANGUNAN JALAN TOL RUAS SIGLI - BANDA ACEH

LAPORAN HARIAN
HARI : Jumat
TANGGAL : 10-07-20

DOKUMENTASI