LAPORAN HARIAN PEKERJAAN

NAMA PROJECT : PELABUHAN KHUSUS PT. BMR LOKASI : JETTY


KONTRAKTOR : PT. SUMBER BANGUN SENTOSA TANGGAL LAPORAN : 14-Sep-22
KLIEN : WEATHER : HUJAN
NO. SPK : BMR/PRC/2022/VIII/097/SKLR DISIAPKAN OLEH : AZHAR
LAPORAN KE : 2 SBS Site Manager : ANTON HIDAYAT P.
Progress not use weight factor

1 PEKERJAAN HARI INI 2. MANPOWER


1. FOLLOW UP PEMBUATAN DIREKSI KEET
2. FOLLOW UP DEWA DT, TANGKI SOLAR WORKING HOURS : 12 HRS ( 08.00 AM - 17.00 PM )
3. FOLLOW UP KESIAPAN DATANGKAN ALAT BERAT ( EXCAVATOR ) 12 MANPOWER
4. FOLLOW UP PENGADAAN LV DAY NIGHT TODAY PREV. CUMM
5. SM 1 1 1
6. PELAKSANA 1 1 1
7. LOGISTIK 1 1 1
8. SURVEYOR 1 1 1
9. ASS SURVEYOR 1 1 1
10.
11.
12.
13.
14.
15.
TOTAL 5 0 5 0 5
16.

3 PROGRESS Progress
No . DESKRIPSI PEKERJAAN QTY SATUAN
Akumulasi
Hari ini Total Sisa Prog % Total %
Kemaren

TOTAL PROGRESS CAUSEWAY (8.5 Meter x 258,4 Meter)

GRAND TOTAL PROGRESS 0 0 0 0 0 #DIV/0! #DIV/0!

4 RENCANA KEGIATAN BESOK HARI : DAFTAR EQUIPMENT STATUS Qty & Unit
1. FOLLOW UP PEMBUATAN DIREKSI KEET Healthy/Breakdown
2. FOLLOW UP DEWA DT, TANGKI SOLAR
3. FOLLOW UP KESIAPAN DATANGKAN ALAT BERAT ( EXCAVATOR )
4. FOLLOW UP PENGADAAN LV
5.
6.
5 PERIHAL YANG MENJADI PERHATIAN UTAMA
1.
2.
3.
4.
5.
6.
6 PHOTO PROGRESS

7 APPROVAL

Reported by Approved by,


PT. SBS PT BMR

(ANTON HIDAYAT P ) ( )

Page 1 of 1