PEMBANGUNAN FASILITAS PENGOLAHAN SAMPAH

LANDFILL MINING DAN RDF PLANT


(RANCANG DAN BANGUN)

LAPORAN AKTIFITAS HARIAN


Pengguna Jasa : UPST DLH DKI Jakarta Nomor Kontrak : Tanggal :
Manajemen Konstruksi : KSO RE - TIS
Penyedia Jasa : KSO Adhi Jakon Area : Site Project Nomor Laporan :
Workshop :-
BRDF-RNJ-DAR-001
Shift : Jam Kerja
1 / 2 / 3 Shift Total Jam Kerja = 0 Hours
10

SUBKON A SUBKON B MANDOR A MANDOR B TOTAL QTY


MANPOWER
PEK. 1 PEK. 2 PEK. 3 PEK. 1 PEK. 2 PEK. 3 PEK. 1 PEK. 2 PEK. 3 PEK. 1 PEK. 2 PEK. 3 MANPOWER

1 PM & Site Manager (Subcon)


2 Asst. Supervisor (Subcon)
3 Supervisor (Subcon)
4 Safety Officer (Subcon)
5 Mandor (Foreman)
6 Tukang (Skill)
7 Helper

SUBKON A SUBKON B MANDOR A MANDOR B TOTAL QTY


PERALATAN
PEK. 1 PEK. 2 PEK. 3 PEK. 1 PEK. 2 PEK. 3 PEK. 1 PEK. 2 PEK. 3 PEK. 1 PEK. 2 PEK. 3 PERALATAN
1 Excavator 1
2 Vibro Roller
3 Dozer
4 Dump Truck
5 Crawler Crane
6 HSPD
7 Bar Bender
8 Bar Cutter
9 Pompa Beton
10
11

Aktifitas Hari ini : Permasalahan / Area of Concern : Rencana aktifitas besok :


Aktifitas Konstruksi: Permasalahan Konstruksi: Rencana Aktifitas Konstruksi:

Aktifitas HSE: Permasalahan/Tindakan HSE: Rencana Aktifitas HSE:

Total Jam
Kondisi Cuaca Keterangan
Jam Menit

1. 07.00 ~ 10.00 C / B / H / Hd C = Cerah


2. 10.00 ~ 13.00 C / B / H / Hd B = Berawan
3. 13.00 ~ 16.00 C / B / H / Hd H = Hujan
4. 16.00 ~ 19.00 C / B / H / Hd Hd = Hujan Deras
5. 19.00 ~ 22.00 C / B / H / Hd

Total 0 0 0 *Jam Kerja Hilang


Disiapkan oleh : Dicek oleh : Mengetahui : Disetujui :
KSO Adhi - Jakon KSO Adhi - Jakon KSO Adhi - Jakon MK/UPST

Supervisor Project Production Manager


PEMBANGUNAN FASILITAS PENGOLAHAN SAMPAH
LANDFILL MINING DAN RDF PLANT
(RANCANG DAN BANGUN)

LAPORAN AKTIFITAS HARIAN


Pengguna Jasa : UPST DLH DKI Jakarta Nomor Kontrak : Tanggal :
Manajemen Konstruksi : KSO RE - TIS
Penyedia Jasa : KSO Adhi Jakon Area : Site Project Nomor Laporan :
Workshop :-
BRDF-RNJ-DAR-001
Shift : Jam Kerja
1 / 2 / 3 Shift Total Jam Kerja = 0 Hours
10

SUBKON MANDOR MANDOR B

PT. PT. M. M. M. TOTAL QTY


MANPOWER PT. RNJ
SMP MPP WAWA MA'RU DARSO MANPOWER
PEK. PEK. PEK. PEK.
PEK. PEK.
PANCA SHEET SALUR PEMBE PEK. 3 PEK. 1 PEK. 2 PEK. 3
PGR TNH
NG PILE AN SIAN

1 PM & Site Manager (Subcon)


2 Asst. Supervisor (Subcon)
3 Supervisor (Subcon)
4 Safety Officer (Subcon)
5 Mandor (Foreman)
6 Tukang (Skill)
7 Helper

M. M. M.
PT. PT.
PT. RNJ WAWA MA'RU DARSO MANDOR B
SMP MPP TOTAL QTY
PERALATAN N F NO
PEK. PEK. PEK. PEK. PERALATAN
PEK. PEK.
PANCA SHEET SALUR PEMBE PEK. 3 PEK. 1 PEK. 2 PEK. 3
PGR TNH
NG PILE AN SIAN
1 Excavator 2
2 Vibro Roller
3 Dozer
4 Dump Truck 3
5 Crawler Crane
6 HSPD
7 Bar Bender
8 Bar Cutter
9 Pompa Beton
10
11

Aktifitas Hari ini : Permasalahan / Area of Concern : Rencana aktifitas besok :


Aktifitas Konstruksi: Permasalahan Konstruksi: Rencana Aktifitas Konstruksi:
- Penggalian Pagar Besi As A/1 - A/2 (PT. RNJ)
- Pemancangan 25 titik area LFW + Mapping (PT. SMP)
- Galian tanah area pilecap
- Pembesian tie beam area LFW as A/1-A/2 (M. MA'RUF)
- Pengecoran LC jalan
- Pemancangan sheetpile

Aktifitas HSE: Permasalahan/Tindakan HSE: Rencana Aktifitas HSE:


- Toolbox meeting - Lebih ketat dalam safety induction

Total Jam
Kondisi Cuaca Keterangan
Jam Menit

1. 07.00 ~ 10.00 C / B / H / Hd C = Cerah


2. 10.00 ~ 13.00 C / B / H / Hd B = Berawan
3. 13.00 ~ 16.00 C / B / H / Hd H = Hujan
4. 16.00 ~ 19.00 C / B / H / Hd Hd = Hujan Deras
5. 19.00 ~ 22.00 C / B / H / Hd

Total 0 0 0 *Jam Kerja Hilang


Disiapkan oleh : Dicek oleh : Mengetahui : Disetujui :
KSO Adhi - Jakon KSO Adhi - Jakon KSO Adhi - Jakon MK/UPST

Supervisor Project Production Manager