Done OPRS : PROJECT ALFA RELOKASI JL CHAIRIL ANWAR BEKASI TIMUR |C| PT.OII
PO Additional untuk Fiberisasi XL Batch 2 Area Jakarta Timur Ring 8 & 9 (refer to
Done PT. MTI
PO 127984, 128095)
Penarikan FO Stasiun Ciganea to Stasiun SUkatani, Stasiun SUkatani to stasiun
Done PT. PPM
Plered
P434/Fiberisasi SF 6A,6B/10/19 | Penggelaran Kabel OSP Fiberisasi SF | West
Done PT. MTI
Java | Bogor | Jabo_R01_Kracak <> BGR_01N704_Cibanten
P229/FTTH 2017/10/17 l Pekerjaan OSP Uplink OLT site Jatisampurna, Project
Done PT.OII
FTTH 130K
Done P197/Fiberisasi XL/7/17 l Pekerjaan OSP Fiberisasi XL To POP Depok | Y | Tapos PT.OII
Progress 2019/05/BP/FTT/02768/0 l Pekerjaan OSP FTTX PT Satya Mitra Perkasa |C| PT. MTI
Progress 2019/03/BP/HOS/01968 l Pekerjaa OSP FTTX Asuransi Asoka |C| PT. MTI
Progress 2019/03/BP/FTT/02017 l Pekerjaan OSP FTTX PT Kulina Lola |C| PT. MTI
Done 2019/01/BP/GBO/01065/0 l Pekerjsaan OSP Re-Engineering Ditjen AHU Jakarta PT. MTI
Done 2019/01/BP/FTT/01365/5 l Pekerjaan OSP FTTX PT Quiros Network |C| PT. MTI
Done 2019/01/BP/FTT/01304/0 l Pekerjaan OSP FTTX PT NQA Indonesia PT. MTI
2018/11/BP/EDU/00208/0 l Pekerjaan OSP Lastmile LFJ Lycee Francais De
Done PT. MTI
Jakarta
P229/FTTH 2017/10/17 l PR Project FTTH 130K Cluster Buffer Bekasi Batch V
Pending PT.OII
( F17 ART BSL D17) - Distribution Bekasi Selatan FDT 17 (TDK JADI)
P002/SWAP ICON TO PT.MTI SF/1/20 | Pekerjaan OSP Lastmile Swap Icon -
Done PT. MTI
(Segment Pondok Kelapa - Jakasampurna) |C|
P002/SWAP ICON TO PT.MTI SF/1/20 | Pekerjaan OSP Lastmile Swap Icon -
Done PT. MTI
(Segment Bojong Gede - Citereup) |C|
P002/SWAP ICON TO PT.MTI SF/1/20 | Pekerjaan OSP Lastmile Swap Icon -
Done PT. MTI
(Segment Jatirahayu - Jatibening) |C|
P002/SWAP ICON TO PT.MTI SF/1/20 | Pekerjaan OSP Lastmile Swap Icon -
Done PT. MTI
(Segment Jakasampurna - Jatibening) |C|
P197/Fiberisasi XL/7/17 |Restorasi Project Fiberisasi XL Batch 2 Ring 9 Area
Done PT. MTI
Tangerang Segment Cempaka Putih Bintaro - Rempoa Cempaka Biru ( Y )
P197/Fiberisasi XL/7/17 |Restorasi Fiberisasi XL Batch 1 Area Jakarta Barat Ring
Done PT. MTI
8 Segment Krukut Pasar - Tambora Jembatan Besi ( Y )
P009/FTTH 2021/2/21 II Jasa OSP FTTH National 2021 Jabodetabek - Bogor OLT
Progress
Bojong Feeder 03 (BJG-D09 Additional FDT) & Feeder 05 (BJG-D10 & BJG-D11)
PT. OII
Progress F03-D09
Progress F05-D10
Progress F05-D11
Done PS-S0003-0000001 PROJECT MAINTENANCE MIGRASI RUKAN 66 PT.SPN
PS-S0003-0000001 PROJECT MAINTENANCE MIGRASI GEDUNG KEM
Done PT.SPN
TOWER
PS-S0003-0000001 PROJECT MAINTENANCE MIGRASI TEMPO PAVILION 1 &
Done PT.SPN
2
Done PS-S0002-0000001 PROJECT EXPAND INDOGROSIR KEMAYORAN PT.SPN
P197/FiberisasiXL/7/17|Restorasi Fiberisasi XL Batch 1 Jakarta Timur ring 3
Done PT. MTI
Manunggal Pekayon - Cibubur Cireping (WTD-19110655)|Y|
P197/FiberisasiXL/7/17|Restorasi Fiberisasi XL Batch 1 Jakarta Utara Ring 24
Done PT. MTI
Segment Enggano - HUT Walikota Jakut (WTD-20041522) |Y|
2001339 Rp 33,128,700
135755 Rp.407.583.000
2000993 Rp 264,625,900
2001175 Rp 135,814,360
2001356 Rp 55,237,600
133588 Rp 7,887,000
134648 Rp 325,679,200
2000754 Rp 1,516,020,000
2000754 Rp 1,516,020,000
2000754 Rp 1,516,020,000
134071 Rp 472,254,000
2000756 Rp 4,594,788,000
2000756 Rp 4,594,788,000
Belum PO Rp 16,500,000
133105 Rp 13,403,500
132820 Rp 13,211,000
132672 Rp 8,431,500
2001355 Rp 1,286,656,760
136769 Rp 7,645,000
136772 Rp 21,388,400
136775 Rp 14,091,000
137053 Rp 485,287,000
137540 RP.289.252.700
Done Done 131403 Rp.20.674.500
Done Done Done Rp.3.212.697.400
140004 Rp 3,420,000
141539 Rp 7,800,000
141841 Rp 10,086,000
141843 Rp 9,490,000
142289 Rp 8,830,000
143170 Rp 30,200,000
144393 Rp 36,345,000
144547 Rp 18,861,000
144592 Rp 7,550,000
144690 Rp 17,166,000
144849 Rp 134,711,000
2002401 Rp 1,690,000
2002525 Rp 810,706,500
2002612 Rp 823,946,000
2021008079 Rp 4,293,000
2021008542 Rp 7,320,000
2021008548 Rp 12,114,000
2021008762 Rp 8,480,000
141539 Rp 7,800,000
141841 Rp 10,086,000
141843 Rp 9,490,000
2021028038 Rp 23,677,000
1/7/22 Rp 16,235,667 2022014392 Rp 21,235,667
10/6/2022 Rp 36,960,000 144502 Rp 33,555,000
12/23/2021 Rp 22,052,000 145802 Rp 24,257,200
12/23/2021 Rp 22,230,000 145805 Rp 24,321,000
1/5/2022 Rp 122,457,000 145832 Rp 30,447,450
12/23/2021 Rp 32,645,000 145885 Rp 35,909,500
1/25/2022 Rp 22,025,000 146047 Rp 24,392,500
2/15/2022 Rp 23,610,000 46432 Rp 23,424,500
12/31/2021 Rp 19,900,000 145844 Rp 17,050,000
147968 Rp 1,023,443,000
148196 Rp 157,040,000
147687 Rp 13,585,000
147690 Rp 6,605,000
147693 Rp 6,290,000
147705 Rp 15,470,000
147706 Rp 4,776,000
147707 Rp 9,494,000
147708 Rp 15,012,000
147709 Rp 8,580,000
147710 Rp 9,460,000
147711 Rp 9,260,000
147712 Rp 6,540,000
147715 Rp 21,310,000
147725 Rp 10,536,000
147726 Rp 13,898,000
147751 Rp 10,170,000
147756 Rp 13,730,000
147771 Rp 7,720,000
147810 Rp 9,360,000
147811 Rp 10,915,000
147813 Rp 6,990,000
147816 Rp 90,500,000
147826 Rp 13,778,000
147830 Rp 9,231,000
147831 Rp 14,590,000
147833 Rp 7,130,000
147834 Rp 13,590,000
147912 Rp 13,995,000
147916 Rp 15,959,000
147917 Rp 10,340,000
147988 Rp 13,280,000
147922 Rp 4,620,000
147924 Rp 4,620,000
147990 Rp 13,576,000
147957 Rp 16,210,000
147958 Rp 45,790,000
147959 Rp 6,636,000
147963 Rp 9,390,000
147965 Rp 6,415,000
147985 Rp 9,030,000
147986 Rp 19,310,000
140523 Rp 22,178,000
138071 Rp 17,970,000
139648 Rp 19,310,000
142525 Rp 20,540,000
138072
PO PROGRESS (DATE) CREATE DOCUMENT BAST (DATE)
ATP (DATE)
DELIVER TO DATE START FINISH START FINISH SUBMIT
173 167 117 121 95 102 95 92
CV. DPC 23-Apr-18 Done Done Done Done Done 18 Jul 2019
CV. DPC 08-Dec-18 Done Done Done Done Done 12 Aug 2019
CV. DPC 05-Jul-18 Done Done Done Done Done 12 Aug 2019
CV. DPC 05-Jul-18 Done Done Done Done Done 12 Aug 2019
CV. DPC 20-Dec-18 21-Dec-18 22-Oct-19 Done Done Done 24 Jun 2019
PT. DPCU 26-Nov-19 26-Nov-20 10-Dec-19 Done Done Done 7 Nov 2019
CV. DPC 14-Jan-19 14-Jan-19 20-Jan-19 Done Done Done 11 Jan 2019
PT. DPCU 11-Sep-19 15-Sep-19 11-Oct-19 01-Oct-19 Done Done 23 Sep 2019
CV. DPC 27-Aug-19 28-Aug-19 22-Oct-19 Done Done Done 14 Oct 2020
CV. DPC 23-Aug-19 24-Aug-19 22-Oct-19 Done Done Done 11 Jun 2020
CV. DPC 23-Aug-19 24-Aug-19 22-Oct-19 Done Done Done 11 Jun 2020
CV. DPC 18-Sep-19 19-Sep-19 20-Feb-20 Done Done Done 24 Jul 2020
CV. DPC 18-Sep-19 19-Sep-19 22-Oct-19 Done Done Done 24 Jul 2020
CV. DPC 21-Oct-19 21-Oct-19 21-Oct-19 21-Oct-19 Done Done 15 Oct 2019
CV. DPC 21-Oct-19 21-Oct-19 21-Oct-19 Done Done Done 15 Oct 2019
PT. DPCU 21-Nov-19 25-Nov-19 27-Nov-19 Done Done Done 10 Nov 2020
CV. DPC 24-Mar-19 25-Mar-19 22-Oct-19 Done Done Done 27 Mar 2019
CV. DPC 24-Jun-19 25-Jun-19 22-Oct-19 Done Done Done 18 Feb 2019
CV. DPC 24-Jun-19 25-Jun-19 22-Oct-19 Done Done Done 18 Mar 2019
CV. DPC 24-Jun-19 25-Jun-19 22-Oct-19 29-Aug-19 Done Done 5 Aug 2019
CV. DPC 24-Jun-19 25-Jun-19 22-Oct-19 Done Done Done 15 Mar 2019
CV. DPC 24-Mar-19 25-Oct-19 22-Oct-19 Done Done Done 26 Dec 2018
CV. DPC 24-Jun-19 25-Jun-19 22-Oct-19 Done Done Done 1 Mar 2019
CV. DPC 24-Sep-19 24-Sep-19 30-Nov-20 Done Done Done 6 Feb 2020
CV. DPC 20-Mar-19 04-Mar-19 31-Oct-19 Done Done Done 13 May 2019
CV. DPC 20-Mar-19 04-Mar-19 31-Oct-19 Done Done Done 13 May 2019
CV. DPC 20-Mar-19 04-Mar-19 31-Oct-19 Done Done Done 13 May 2019
PT. DPCU 10-Aug-19 11-Aug-19 22-Oct-19 Done Done Done 18 Nov 2019
CV. DPC 07-Aug-19 07-Aug-20 30-Nov-20 Done Done Done 20 Jan 2020
PT. DPCU 10-Aug-19 12-Aug-19 22-Oct-19 Done Done Done 14 Nov 2019
PT. DPCU 14-Oct-19 14-Oct-19 29-Oct-19 Done Done Done 20 Jan 2020
PT. DPCU 03-Oct-19 04-Oct-19 30-Nov-19 Done Done Done 13 Jan 2020
CV. DPC 21-Mar-19 Done 22-Oct-19 12-Jun-20 Done Done 13 May 2019
CV. DPC 21-Mar-19 22-Mar-19 22-Oct-19 Done Done Done 13 May 2019
CV. DPC 31-Mar-19 Done Done Done Done Done 15 Apr 2019
CV. DPC 25-Mar-19 Done Done Done Done Done 15 Apr 2019
CV. DPC 25-Mar-19 Done Done Done Done Done 15 Apr 2019
CV. DPC 31-Mar-19 Done Done Done Done Done 15 Apr 2019
CV. DPC 31-Mar-19 Done Done Done Done Done 15 Apr 2019
CV. DPC 31-Mar-19 Done Done Done Done Done 15 Apr 2019
CV. DPC 25-Mar-19 26-Mar-19 22-Oct-19 Done Done Done 27 Mar 2019
CV. DPC 25-Mar-19 26-Mar-19 22-Oct-19 Done Done Done 27 Mar 2019
CV. DPC 31-Mar-19 Done Done Done Done Done 15 Apr 2019
CV. DPC 25-Mar-19 26-Mar-19 22-Oct-19 Done Done Done 27 Mar 2019
CV. DPC 03-Mar-19 04-Mar-19 03-Apr-19 Done Done Done 18 Jul 2019
CV. DPC 19-Sep-19 19-Sep-19 22-Oct-19
CV. DPC 19-Feb-19 20-Feb-19 19-Mar-19 Done Done Done 10 May 2019
CV. DPC 14-Feb-19 15-Feb-19 14-Mar-19 Done Done Done 12 Sep 2019
PT. DPCU 01-Feb-20 Done Done Done Done Done 19 Nov 2020
PT. DPCU 03-Feb-20 Done Done Done Done Done 7 Feb 2019
CV. DPC 23-Feb-20 Done Done Done Done Done 9 Mar 2020
CV. DPC 01-Mar-20 Done Done Done Done Done 9 Mar 2020
PT. DPCU 03-Feb-20 Done Done Done Done Done 19 Mar 2020
PT. DPCU 19-Mar-20 Done Done 26-Jun-20 18-Jun-20 18 Aug 2020
CV. DPC Done Done Done 29-Oct-19 Done Done 3 Feb 2020
CV. DPC 27-Apr-20 Done Done Done Done Done 18 Nov 2019
PT. DPCU 31-Mar-20 Done Done Done Done Done 31 Mar 2020
CV. DPC 3-Dec-20 Done Done 26-Jun-20
CV. DPC 3-Dec-20 Done Done 26-Jun-20
Sudah
PT. DPCU 15-Feb-21 Done Done Done Done Done 1 May 2021
PT. DPCU 5-Mar-21 Done Done Done Done Done 1 May 2021
PT. DPCU 5-Mar-21 Done Done Done Done Done 1 May 2021
PT. DPCU 28-Apr-21 Done Done Done Done Done 1 Jul 2021
PT. DPCU 19-Aug-21 Done Done Done Done Done 11 Jan 2022
CV. DPC 05-Mar-21 Done Done Done Done Done 1 May 2021
CV. DPC 05-Mar-21 Done Done Done Done Done 1 May 2021
PT. DPCU 17 Dec 2021 Done Done Done Done Done 5 Jan 2022
PT. DPCU 15 Mar 2022 17 Mar 2022 6 Apr 2022 17 Mar 2022 14 Mar 2022 14 Mar 2022
PT. DPCU 11 Oct 2021 14 Oct 2021 3 Feb 2022 22 Jun 2022 14 Oct 2021 9 May 2022 27 Jun 2022
PT. DPCU 3 Jan 2022 27 Dec 2021 31 Dec 2021 2 Feb 2022 31 Dec 2021 1 Feb 2022 8 Feb 2022
PT. DPCU 3 Jan 2022 29 Dec 2022 1 Jan 2022 10 Jan 2022 4 Jan 2022 9 Jan 2022 28 Jan 2022
PT. DPCU 6 Jan 2022 24 Jan 2022 24 Jan 2022
PT. DPCU 13 Jan 2022 29 Dec 2021 29 Jan 2022 2 Feb 2022 31 Dec 2022 1 Feb 2022 7 Feb 2022
PT. DPCU 25 Jan 2022 24 Jan 2022 21 Jan 2022 2 Feb 2022 27 Jan 2022 1 Feb 2022 7 Feb 2022
PT. DPCU 21 Feb 2022 20 Feb 2022 23 Feb 2022 23 Feb 2022 20 Feb 2022 22 Feb 2022 1 Mar 2022
PT. DPCU 10 Jan 2022 6 Jan 2022 10 Jan 2022 15 Jan 2022 8 Jan 2022 14 Jan 2022 12 Jan 2022
28 May 2022 30 May 2022 29 Mar 2021 29 May 2022 7 Jun 2022
PT. DPCU 24 Feb 2022 28 Mar 2022
19 Apr 2022 21 Apr 2022 29 Mar 2021 19 Apr 2022 7 Jun 2022
PT. DPCU 23 Feb 2022 2 Mar 2022 16 Mar 2022 21 Mar 2022 2 Mar 2022 16 Mar 2022 21 Mar 2022
PT. DPCU 23 Feb 2022 9 Feb 2022 19 May 2022 23 May 2022 9 Feb 2022 19 May 2022
PT. DPCU 23 Jan 2022 5 Jan 2022 16 Feb 2022 14 Feb 2022 5 Feb 2022 14 Feb 2022 1 Mar 2022
PT. DPCU 26 Jan 2022 4 Jun 2022 13 Jun 2022 4 Jun 2022 13 Jun 2022 16 Jun 2022
PT. DPCU 15 Feb 2022
PT. DPCU 15 Feb 2022
PT. DPCU 16 Feb 2022 19 Feb 2022 26 Apr 2022 19 Feb 2022 17 May 2022 18 May 2022
PT. DPCU 23 Feb 2022 7 Mar 2022 4 Apr 2022 7 Mar 2022 4 Apr 2022 5 Apr 2022
PT. DPCU 1 Mar 2022
PT. DPCU 17 Dec 2021 16 Mar 2021 26 Mar 2022 16 Mar 2021 26 Mar 2022 28 Mar 2022
PT. DPCU 22 Apr 2022 21 Mar 2021 26 Apr 2022 21 Mar 2021 9 May 2022 17 May 2022
PT. DPCU 15 Jun 2022 18 Jun 2022 1 Jul 2022 18 Jun 2022
CV DPC 27-May-22
CV DPC 28-May-22
CV DPC 29-May-22
CV DPC 29-May-22
CV DPC 29-May-22
CV DPC 30-May-22
CV DPC 30-May-22
CV DPC 30-May-22
CV DPC 30-May-22
CV DPC 30-May-22
CV DPC 30-May-22
CV DPC 30-May-22
CV DPC 1-Jun-22
CV DPC 2-Jun-22
CV DPC 2-Jun-22
CV DPC 4-Jun-22
CV DPC 4-Jun-22
CV DPC 5-Jun-22
CV DPC 5-Jun-22
CV DPC 5-Jun-22
CV DPC 5-Jun-22
CV DPC 5-Jun-22
CV DPC 5-Jun-22
CV DPC 5-Jun-22
CV DPC 8-Jun-22
CV DPC 8-Jun-22
CV DPC 8-Jun-22
CV DPC 13-Jun-22
CV DPC 8-Jun-22
CV DPC 8-Jun-22
PT DPCU 13-Jun-22
PT DPCU 10-Jun-22
PT DPCU 10-Jun-22
PT DPCU 10-Jun-22
PT DPCU 10-Jun-22
PT DPCU 10-Jun-22
PT DPCU 13-Jun-22
PT DPCU 13-Jun-22
30-Nov-20
1-May-20
21-Sep-20
18-Apr-21
PT DPCU
BAST (DATE) INVOICE PAYMENT
RETENSI TAHUN
FINISHED DATE DATE
91 135 130 18 187
24 Jul 2019 29 Aug 2019 12 Aug 2019 2018
19 Aug 2019 29 Aug 2019 29 Aug 2019 2018
2019
2019
2019
2019
2019
2020
2020
2020
2020
2021
2021
2021
2021
2021
2022
2022
5 Jul 2022 2022
4 Jul 2022 2022
2021
2020
SUMMARY PO
SUMMARY RESTORASI
STATUS RESTORASI XL
Tahun
Approval Progress Dokumen Hilang Di MTI Belum Ada PO BLANK CLOSED
2018 0 0 0 0 1
2019 3 1 9 0 3
2020 4 7 22 0 2
2021 1 8 20 4 0
2022 0 0 0 -28 0
TOTAL 8 16 51 4 6
TOTAL
1
16
35
33
-28
85
NO SEGMENT
1
1
1
1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
CV 1
ADA CV 1
2
2
ADA CV 1
ADA CV 1
CV 1
ADA CV 1
CV 1
CV 1
CV 1
1
1
CV 1
ADA CV 1
ADA CV 1
CV 1
ADA CV 1
ADA CV 1
ADA CV 1
CV 1
CV 1
CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
BOQ belum 1
ADA CV 1
ADA PT 1
ADA CV 1
double 2
double 2
ADA PT 1
ADA CV 2
ADA CV 1
ADA PT 2
ADA PT 2
1
ADA CV 1
ADA CV 1
ADA CV 1
ADA PT 1
ADA PT 1
ADA PT 1
ADA PT 1
ADA PT 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV WTD DI BAST 21020617 1
ADA CV 1
ADA CV 1
ADA PT 1
ADA PT 1
ADA CV 1
ADA PT 1
ADA PT 1
ADA PT 1
ADA CV 1
ADA CV 1
ADA CV
9,375,000.00
37,500.00
NO BAST No Ticket No Tahun Owner
141 91 104 86 86
46 015 WTD-19020149 2019 CV. DPC
47 018 WTD-19060621 2019 CV. DPC
48 024 WTD-19121010 2019 CV. DPC
49 026 WTD-20030180 2020 CV. DPC
50 028 WTD-20030934 2020 CV. DPC
51 029 WTD-20041306 2020 CV. DPC
52 032 WTD-20050193 2020 CV. DPC
53 037 WTD-20050754 2020 CV. DPC
54 041 WTD-20060895 2020 CV. DPC
55 042 WTD-20061048 2020 CV. DPC
56 043 WTD-20061198 2020 CV. DPC
58 059 WTD-20092204 2020 CV. DPC
59 062 WTD-20101128 2020 CV. DPC
60 064 WTD-20101772 2020 CV. DPC
63 004 NO TT 2021 CV. DPC
65 014 WTD-21030561 2021 CV. DPC
66 015 WTD-21030804 2021 CV. DPC
67 016 WTD-21031190 2021 CV. DPC
68 017 WTD-21031524 2021 CV. DPC
69 018 WTD-21031523 2021 CV. DPC
81 030 WTD-21070461 2021 PT.DPCU
83 032 WTD-21071501 2021 PT.DPCU
95 WTD-
96 WTD-
106 WTD-20081236
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
Segment Ticket No
104 104
HUT JATINEGARA - 3G CIPINANG BESAR WTD-19020149
HUT JATINEGARA - 3G CIPINANG BESAR WTD-19060621
MULYAJAYA - HUT JATINGARA WTD-19121010
HUT JATINEGARA - 3G CIPINANG BESAR WTD-20030180
PADANG PUTRA - MANILA PEJATEN WTD-20030934
HUT JATINEGARA - 3G CIPINANG BESAR WTD-20041306
HUT JATINEGARA - 3G CIPINANG BESAR WTD-20050193
SUNTER PRATAMA I - 3G SUNTER MAS TENGAH WTD-20050754
HUT Jatinegara - 3G_CIPINANG_BESAR / MULYA JAYA WTD-20060895
KH WAHID HASYIM - DOKTOR HAMKA WTD-20061048
3G_RAYA_KRESEK_PERAHU - BALARAJA WTD-20061198
SUKAPURA - TUGUSELATAN 2 WTD-20092204
TIPAR CAKUNG PENGGILINGAN 3G - CAKUNG BARAT WTD-20101128
CILINCING - AKSES MARUNDA WTD-20101772
RELOKASI TIANG CILINCING - AKSES MARUNDA WTD-20061201
RAWABELONG - PALMERAH BARAT WTD-21030561
PALMERAH UTARA - ANGGREK GARUDA WTD-21030804
ASUHAN BUDHI - BAMBU LARANGAN 2 WTD-21031190
TAMANMINI - WISMA BOGANI WTD-21031524
KOKROSONO PD GEDE - TAMANMINI WTD-21031523
Mampang Prapatan - LTE_Komplek Mentri WTD-21070461
WARU RAYA KAPUK - KAPUK WTD-21071501
TUGU SELATAN - 3G PEGANGSAAN DUA WTD-
HUT JATINEGARA - 3G CIPINANG BESAR WTD-
3G BEKASI TIMUR RAYA -SEGMENT INDPULOGDG WTD-20081236
SUMMARY RESTORASI
Di Project Di Project
Di Project Di Project