STATUS PROJECT NAME OWNER PROJECT

NUMBER
208 210 205 180
Done Relokasi Segment Jl. Lio Baru,Jakarta Barat PT.OII 2000248
Done PO Restorasi Project Segment Dalang - Pondok Rangon (P197/FiberisasiXL/7/17) PT.MTI 131410
P229/FTTH 2017/10/17 | Pekerjaan Project FTTH 130K Area Bekasi Batch I
Done PT.OII 2000402
Segment Distribusi: Bekasi Barat FDT 1 s.d. 5
P229/FTTH 2017/Pekerjaan OSP untuk project FTTH 130K Area Bekasi Segment
Done PT.OII 2000403
Feeder ( Feeder 4,5,7 POP Asia Ritel ) Sesuai PO. No. 2000403
Done 2018/11/BP/FTT/00024/0 l Pekerjaan OSP FTTX PT Simplefi Teknologi Indonesia PT.MTI 131602

Done OPRS : PROJECT ALFA RELOKASI JL CHAIRIL ANWAR BEKASI TIMUR |C| PT.OII 2001339

PO Additional untuk Fiberisasi XL Batch 2 Area Jakarta Timur Ring 8 & 9 (refer to
Done PT.MTI Done
PO 127984, 128095)
Penarikan FO Stasiun Ciganea to Stasiun SUkatani, Stasiun SUkatani to stasiun
Done PT. PPM Done
Plered
P434/Fiberisasi SF 6A,6B/10/19 | Penggelaran Kabel OSP Fiberisasi SF | West
Done PT.MTI 135755
Java | Bogor | Jabo_R01_Kracak <> BGR_01N704_Cibanten
P229/FTTH 2017/10/17 l Pekerjaan OSP Uplink OLT site Jatisampurna, Project
Done PT.OII 2000993
FTTH 130K

P229/FTTH 2017/10/17 l Pekerjaan OSP Jalur Feeder 2 POP Makassar; Feeder 1,


Done 2, 3 POP Kramat Jati, Feeder 3 POP Cipayung 1; Area Jaktim Batch 1, Project PT.OII 2000986
FTTH 130K (Step in dari PT Sarana Jaringan Mas - Refer PO 2000410)

P229/FTTH 2017/10/17 l Pekerjaan OSP Jalur Distribusi Kramat Jati FDT 1, 2;


Done Makassar FDT 5; Cipayung FDT 3, 4; Area Jaktim Batch I, FTTH 130K (Step in PT.OII 2000985
dari PT Sarana Jaringan Mas - Refer PO 2000409)
P229/FTTH 2017/10/17 l Pekerjaan OSP Bekasi Batch V, Segment Feeder 6 dan
Done PT.OII 2001046
12 POP Gunung Putri, Project FTTH 130K
P229/FTTH 2017/10/17 l Pekerjaan OSP Bekasi Batch V, Segment Distribusi
Done Rawalumbu FDT 4 (tdk jadi), Bekasi Selatan FDT 16, Jati Asih FDT 12, 13 (tdk PT.OII 2001045
jadi), Project FTTH 130K
P229/FTTH 2017/10/17 l Pekerjaan Additional Work Project FTTH 130K, Bekasi
Done PT.OII 2001175
Batch 1, Feeder 4, 5, 6 POP Asia Ritel
P229/FTTH 2017/10/17 l Pekerjaan Additional Work Project FTTH 130K, Bekasi
Done PT.OII 2001174
Batch 1, Distribusi Bekasi Barat FDT 1, 3, 4, 5
P229/FTTH 2017/10/17 l Jasa Project FTTH 130K Cluster Buffer Bekasi Batch V
Pending PT.OII 2001356
( F17 ART BSL D17) - Feeder 17 POP Asia Ritel
P229/FTTH 2017/10/17 l Jasa OSP Step in Project FTTH 130K Cluster Makasar 2
Done (Bagian dari Feeder 2 POP Makasar) - Dua Putra Cemerlang Utama, PT ( Step in PT.OII 2001328
from PT. Sajas )
P197/Fiberisasi XL/7/17 l Restorasi Project Fiberisasi XL Batch 2 Area Jakarta
Done PT.MTI 132697
Selatan Ring 6 Segment Pejaten Barat – Arteri | Y |
P197/Fiberisasi XL/7/17 l Restorasi Project Fiberisasi XL Batch 1 Area Jakarta
Done Utara Ring 4 segment 3G BELIBIS TIPAR TIMUR - 3G BRANTAS SEMPER PT.MTI 133597
BARAT | Y |
P197/Fiberisasi XL/7/17 l Restorasi Project Fiberisasi XL Batch 1 Area Jakarta
Done PT.MTI 137222
Timur Ring 23 segment SUSUKAN MAKMUR - DAMAI SUSUKAN | Y |
P197/Fiberisasi XL/7/17 l Restorasi Project Fiberisasi XL Batch 1 Area Jakarta
Done PT.MTI 133588
Timur Ring 17 segment HUT JATINEGARA - 3G CIPINANG BESAR | Y |
P197/Fiberisasi XL/7/17 l Restorasi Project Fiberisasi XL Batch 1 Area Jakarta
Done PT.MTI 133591
Selatan Ring 7 segment 3G GAHARU - FATMAWATI ROAD | Y |
P197/Fiberisasi XL/7/17 l Restorasi Project Fiberisasi XL Batch 1 Area Jakarta
Done PT.MTI 132696
Barat Ring 2 Segment Pesing Poglar – 3G Perternakan Raya | Y |
P197/Fiberisasi XL/7/17 l Restorasi Project Fiberisasi XL Batch 1 Area Jakarta
Done PT.MTI 133593
Barat Ring 17 segment GLODOK1800 - LINDETEVES TRADE CENTER | Y |
P197/Fiberisasi XL/7/17 l Project Fiberisasi XL batch 1 Jakarta Timur Ring 17
Progress PT.MTI 134648
(Refer PR 17594 | Peralihan dari SCKP) | Y |
P197/Fiberisasi XL/7/17 l PO Fiberisasi XL To POP KU Bogor | Y | (MGW TO
Done PT.OII 2000754
CIBINONG )
Done P197/Fiberisasi XL/7/17 l PO Fiberisasi XL To POP KU Bogor | Y | (FE 01 JSP) PT.OII 2000754

Done BOGOR BARAT 2000754

P197/Fiberisasi XL/7/17 l Pergantian Vendor Project Fiberisasi XL Jakarta Timur


Done PT.MTI 134070
Ring 9 batch 1 (Refer PR 17594 | Peralihan dari SCKP) | Y |
P197/Fiberisasi XL/7/17 l Pergantian Vendor Project Fiberisasi XL Jakarta Timur
Done PT.MTI 134021
Ring 22 batch 1 (Refer PR 17594 | Peralihan dari SCKP) | Y |
P197/Fiberisasi XL/7/17 l Pergantian Vendor Project Fiberisasi XL Jakarta Timur
Progress PT.MTI 134071
Ring 10 batch 1 (Refer PR 17594 | Peralihan dari SCKP) | Y |
P197/Fiberisasi XL/7/17 l Pekerjaan Reterminasi Site STP Project Fiberisasi XL
Done PT.MTI 135040
batch 1 dan 2 Area Bodep | Y |
P197/Fiberisasi XL/7/17 l Pekerjaan Reterminasi Site STP Project Fiberisasi XL
Done PT.MTI 134869
batch 1 dan 2 Area Bekasi | Y |
P197/Fiberisasi XL/7/17 l Pekerjaan OSP Fiberisasi XL To POP Depok | Y | Pasar
Done PT.OII 2000756
Minggu
Done P197/Fiberisasi XL/7/17 l Pekerjaan OSP Fiberisasi XL To POP Depok | Y | Tapos PT.OII 2000756

P197/Fiberisasi XL/7/17 | Restorasi Project Fiberisasi XL Batch 1 Area Jakarta


Done PT.MTI 132814
Utara Tugu Semper - Hibrida | Y |
P197/Fiberisasi XL/7/17 | Restorasi Project Fiberisasi XL Batch 1 Area Jakarta
Done PT.MTI 132710
Utara Ring 32 Segment Citra MiniMakro - Tanjung Pura (2) | Y |
P197/Fiberisasi XL/7/17 | Restorasi Project Fiberisasi XL Batch 1 Area Jakarta
Done PT.MTI 132709
Utara Ring 32 Segment Citra Dua Mini Macro - Industry Tanjung Pura (1) |Y|
P197/Fiberisasi XL/7/17 | Restorasi Project Fiberisasi XL Batch 1 Area Jakarta
Done PT.MTI 132815
Utara Ring 1 Segment Waru Raya Kapuk - Kapuk |Y|
P197/Fiberisasi XL/7/17 | Restorasi Project Fiberisasi XL batch 1 area Jakarta
Done PT.MTI 132813
Timur Ring 8 Segment TMII - WismaBogani | Y |
P197/Fiberisasi XL/7/17 | Restorasi Project Fiberisasi XL Batch 1 Area Jakarta
Done PT.MTI 132811
Timur Ring 7 Segment Kramat Jati - Mandala |Y|
P197/Fiberisasi XL/7/17 | Restorasi Project Fiberisasi XL batch 1 Area Jakarta
Done PT.MTI 132707
Timur Ring 6 Segment Condet Gedong – Kp. Tengah | Y |
P197/Fiberisasi XL/7/17 | Restorasi Project Fiberisasi XL batch 1 Area Jakarta
Done PT.MTI 132705
Timur Ring 2 Segment Kelapa Dua Wetan - Buperta | Y |
P197/Fiberisasi XL/7/17 | Restorasi Project Fiberisasi XL Batch 1 Area Jakarta
Done PT.MTI 132810
Timur Ring 17 Segment Cipinang - Kol Sugiono
P197/Fiberisasi XL/7/17 | Restorasi Project Fiberisasi XL batch 1 Area Jakarta
Done PT.MTI 132704
Barat Ring 11 Segment Palmerah Utara – Anggrek Garuda | Y |

Progress 2019/05/BP/FTT/02768/0 l Pekerjaan OSP FTTX PT Satya Mitra Perkasa |C| PT.MTI Belum PO

Progress 2019/03/BP/HOS/01968 l Pekerjaa OSP FTTX Asuransi Asoka |C| PT.MTI 133105

Progress 2019/03/BP/FTT/02017 l Pekerjaan OSP FTTX PT Kulina Lola |C| PT.MTI 132820

2019/02/BP/EDU/01837 l Pekerjaan OSP Tline Pelurusan Radio STIE


Done PT.MTI 132672
Management School (Serdang Wetan - NOC BSD) |C|

Done 2019/01/BP/GBO/01065/0 l Pekerjsaan OSP Re-Engineering Ditjen AHU Jakarta PT.MTI 132452
Done 2019/01/BP/FTT/01365/5 l Pekerjaan OSP FTTX PT Quiros Network |C| PT.MTI 134590
Done 2019/01/BP/FTT/01304/0 l Pekerjaan OSP FTTX PT NQA Indonesia PT.MTI 132301
2018/11/BP/EDU/00208/0 l Pekerjaan OSP Lastmile LFJ Lycee Francais De
Done PT.MTI 132296
Jakarta
P229/FTTH 2017/10/17 l PR Project FTTH 130K Cluster Buffer Bekasi Batch V
Pending PT.OII 2001355
( F17 ART BSL D17) - Distribution Bekasi Selatan FDT 17 (TDK JADI)
P002/SWAP ICON TO PT.MTI SF/1/20 | Pekerjaan OSP Lastmile Swap Icon -
done PT.MTI 136769
(Segment Pondok Kelapa - Jakasampurna) |C|
P002/SWAP ICON TO PT.MTI SF/1/20 | Pekerjaan OSP Lastmile Swap Icon -
done PT.MTI 136772
(Segment Bojong Gede - Citereup) |C|
P002/SWAP ICON TO PT.MTI SF/1/20 | Pekerjaan OSP Lastmile Swap Icon -
Done PT.MTI 136775
(Segment Jatirahayu - Jatibening) |C|
P002/SWAP ICON TO PT.MTI SF/1/20 | Pekerjaan OSP Lastmile Swap Icon -
Done PT.MTI 137053
(Segment Jakasampurna - Jatibening) |C|
P197/Fiberisasi XL/7/17 |Restorasi Project Fiberisasi XL Batch 2 Ring 9 Area
Done PT.MTI 136810
Tangerang Segment Cempaka Putih Bintaro - Rempoa Cempaka Biru ( Y )
P197/Fiberisasi XL/7/17 |Restorasi Fiberisasi XL Batch 1 Area Jakarta Barat Ring
Done PT.MTI 137143
8 Segment Krukut Pasar - Tambora Jembatan Besi ( Y )
P197/Fiberisasi XL/7/17 | Restorasi Project Fiberisasi XL Batch 1 Area Jakarta
Done PT.MTI 137218
Timur Ring 16 Segment SMU 21 Kp Ambon - 3G Pulomas Barat ( Y )
P197/Fiberasi XL/7/17 | Restorasi Project Fiberisasi XL Batch 1 Ring 8 Area
Done PT.MTI 136808
Jakarta Utara Segment Tugu Semper - Cacing Cilingling | Y |
P024/FTTx Outboundary/3/20 | Jasa OSP OSP-FO FTTx 4K BEKASI SULTAN
Done PT.MTI 137541
AGUNG KRANJI
Done P024/FTTx Outboundary/3/20 | Jasa OSP OSP-FO FTTx 4K BEKASI PEKAYON PT.MTI 137540
Done P197/Fiberisasi XL/7/17 | Restorasi Project Segment Danau Sunter PT.MTI 131403
P197/Fiberisasi XL/7/17 | PR Tarikan POP PT.MTI ke Site Bekasi | POP Gunung
Done PT.OII Done
Putri
Done P197/Fiberisasi XL/7/17 | PR Tarikan POP PT.MTI ke Site Bekasi | POP Asia Ritel PT.OII Done
Done PROJECT ALFA PMI Relokasi Vila Pamulang -19020081 |C| PT.OII 2001808
P229/FTTH 2017/10/17 | Pekerjaan OSP Project FTTH 130K Cibubur 2 (Bekasi
Progress Batch IV), Segment Distribusi (Jatisampurna FDT 1 s.d 6) dan Segment Feeder PT.OII 2000571
(Feeder 1 s.d. 4 POP Jatisampurna)
Done 2019/09/BP/HRB/05276 Pengadaan dan Instalasi Monopole 1,5 Gedung Kino PT.MTI 137672
Progress Additional FAT MKS D06 PT.OII 2002185
Progress Additional FAT KJT D01 PT.OII 2002185
Progress Additional FAT KJT D02 Belum PO
Progress P051/Swap DC ICON+ to PT.MTI/6/20 l Pekerjaan OSP Swap icon to kabel PT.MTI PT.MTI Belum PO
Progress OPRS : Projeck Alfa Relokasi Segmen JL Rawa Banteng Setu Cimuning PT.OII Belum PO
Progress OPRS : Relokasi Tiang Depan Mitshubisi PT.OII Belum PO
Progress OPRS : Impovement Di Site Ceger Permai <> Binamarga ( Colocated PT. Nurama) PT.OII Belum PO
Progress OPRS : Relokasi H3I Pangkalan 1 PT.OII Belum PO
Progress OPRS : Relokasi LTE Pangkalan 1 PT.OII Belum PO
Progress OPRS : Relokasi Tiang Pakayon PT.OII Belum PO
Progress OPRS : Restorasi Operastion Jababeka PT.OII Belum PO
Done OSP FIBERISASI XL Batch 2 Area Jakarta Timur Ring 8 Sesuai PO No. 127984 PT.MTI 127984
Done OSP FIBERISASI XL Batch 2 Area Jakarta Timur Ring 9 sesuai PO No. 128095 PT.MTI 128095
Done PT. Daswin Office Tower rev 1.1 PT.SPN Belum PO
Done Puri Park Residence PT.SPN Belum PO
Progress Mall Pejaten Village PT.SPN Belum PO
Progress Mall Kalibata City Square PT.SPN Belum PO
Done KEM Tower PT.SPN Belum PO
Progress Vittoria Residence PT.SPN Belum PO
Done Ruko Grogol Permai Jelambar V2 PT.SPN Belum PO
Done Gedung Tempo Pavillion PT.SPN Belum PO
Done Sudirman Residence PT.SPN Belum PO
Progress Rukan Blue Dot Centre. PT.SPN Belum PO
Progress Sixth Avenue Kalideres PT.SPN Belum PO
Done Apartement Aspen Tower C PT.SPN Belum PO
Progress Apt. Marina Mediterania Residence Ancol PT.SPN Belum PO
Progress The Manhatan Square PT.SPN Belum PO
Progress Migrasi Gedung Plaza Permata PT.SPN Belum PO
Progress TCC BATAVIA PT.SPN Belum PO
Progress Gading Mediterania PT.SPN Belum PO
Progress Rusun Karet Tengsin 2 PT.SPN Belum PO
Progress Dinas Pendidikan PT.SPN Belum PO
P197/Fiberisasi XL/7/17 l Restorasi Fiberisasi XL Ring 21 Jakarta Utara (Danau
Done PT.MTI 139647
Sunter - SMR) | Y |
P197/Fiberisasi XL/7/17 l Restorasi Fiberisasi XL Batch 1 Area Bogor Ring 8
Done PT.MTI 140004
(Ciluar Bogor - Cimandala)
P197/Fiberisasi XL/7/17 l Restorasi Fiberisasi XL Batch 1 Jakarta Timur ring 3
Done PT.MTI 141539
Manunggal Pekayon - Cibubur Cireping (WTD-19110655) | Y |
P197/Fiberisasi XL/7/17 l Restorasi Fiberisasi XL Batch 1 Jakarta Utara Ring 24
Done PT.MTI 141841
segment Enggano - HUT Walikota JAKUT (WTD-20041522) | Y |
P197/Fiberisasi XL/7/17 l Restorasi Fiberisasi XL Batch 1 Jakarta Utara Ring 24
Done PT.MTI 141843
segment 3G Edan II KB Bawang Relocation - Enggano (WTD-20041521) | Y |
P197/Fiberisasi XL/7/17 l Restorasi Fiberisasi XL Batch 1 area Jakarta Selatan
PT.MTI 142289
Ring 24 Segment Mampang Prapatan-LTE Komplek Menteri (WTD-19080569) | Y |
2021/02/BP/TEL/00418 l Fiberisasi XL Add Span HUT Jatinegara - SPK879 | Y | PT.MTI 143170
2021/09/BP/HOS/00393 | Pekerjaan OSP Lastmile PT. Swara Gangsing Jl.
Cancel PT.MTI 144393
Pemuda |C|
2021/05/BP/EDU/00373 | Pekerjaan OSP Lastmile Universitas Bhayangkara
Done PT.MTI 144547
Bekasi |C|
Done 2021/09/BP/HOS/00222 | Pekerjaan OSP Lastmile Sadulur Net Bogor |C PT.MTI 144592
2021/10/BP/EDU/00029 | Pekerjaan OSP Lastmile PT. Oriental Jaya Mandiri Indah
Done PT.MTI 144690
|C|
2021/05/BP/EDU/00216 | Pekerjaan OSP Lastmile Permodalan Nasional Madani
Cancel PT.MTI 144849
Office One Jakarta Selatan |C
P071/Add FTTH 2020/9/20 | Pekerjaan Addwork OSP FTTH 130K Segment
Done Feeder 2 POP Makasar dan Distribusi Makasar FDT 2 (Refer PO 2001328, PT.OII 2002401
Proposal
P009/FTTHP299)
2021/2/21 II FTTH National 2021 Jabodetabek - Jakarta OLT Pulo
Done Gadung Feeder 01 (PGD-D01-Add Segment 04) dan Feeder 05 (PGD-D08 & PT.OII 2002525
PGD-D09) Synchronize FTTX
P009/FTTH 2021/2/21 II Jasa OSP FTTH National 2021 Jabodetabek - Bogor OLT
Progress
Bojong Feeder 03 (BJG-D09 Additional FDT) & Feeder 05 (BJG-D10 & BJG-D11)
Progress F03-D09 PT.OII 2002612
Progress F05-D10
Progress F05-D11
Done PS-S0003-0000001 PROJECT MAINTENANCE MIGRASI RUKAN 66 PT.SPN 2021008079
PS-S0003-0000001 PROJECT MAINTENANCE MIGRASI GEDUNG KEM
Done PT.SPN 2021008542
TOWER
PS-S0003-0000001 PROJECT MAINTENANCE MIGRASI TEMPO PAVILION 1 &
Done PT.SPN 2021008548
2
Done PS-S0002-0000001 PROJECT EXPAND INDOGROSIR KEMAYORAN PT.SPN 2021008762
P197/FiberisasiXL/7/17|Restorasi Fiberisasi XL Batch 1 Jakarta Timur ring 3
Done PT.MTI 141539
Manunggal Pekayon - Cibubur Cireping (WTD-19110655)|Y|
P197/FiberisasiXL/7/17|Restorasi Fiberisasi XL Batch 1 Jakarta Utara Ring 24
Done PT.MTI 141841
Segment Enggano - HUT Walikota Jakut (WTD-20041522) |Y|
P197/FiberisasiXL/7/17|Restorasi Fiberisasi XL Batch 1 Jakarta Utara Ring 24
Done PT.MTI 141843
Segment 3G Edan II KB Bawang Relocation - Enggano (WTD-20041521) |Y|
Done PS-S0002-0000001 PROJECT EXPAND APARTMENT ASPEN TOWER C PT.SPN 2021028038
Done BIZNET - APT Robinson PT.SPN 2022014392
Progress 2021/10/BP/WIF/00018 | Pekerjaan OSP Lastmile Duta Net Kapuk Jakarta Utara |C PT.MTI 144502
Done Pekerjaan OSP Lastmile Kementerian Kominfo Dirjend PPI Wisma Antara PT.MTI 145802
Done Pekerjaan OSP Lastmile Kementrian Kominfo Dirjend PPI Gedung Utama PT.MTI 145805
Progress Pekerjaan OSP Lastmile Henkel Tangerang Singtel C PT.MTI 145832
Done Pekerjaan OSP Lastmile KEMKOMINFO PPI Gedung Sapta Pesona PT.MTI 145885
Done Pekerjaan OSP Lastmile GDPI Polonia Jatinegara Jakarta Timur PT.MTI 146047
Done Pekerjaan OSP Lastmile Bank BJB Bogor C PT.MTI 46432
Done Splice Core Perpustakaan Nasional Medan Merdeka & BUMN PT.MTI 145844
Progress FTTH National 2022 Bogor - OLT Bojong Gede Feeder 06 BGR-BJG-D12 PT.OII
2002744
Progress FTTH National 2022 Bogor - OLT Bojong Gede Feeder 06 BGR-BJG-D13 PT.OII
Progress Lastmile Universitas Jayabaya Pulomas Jakarta Timur PT.MTI 146481
Progress Lastmile MIPL PT. BASF Care Depok PT.MTI 146483
Done BIZNET - Mall Puri Indah PT.SPN 2022003397
Belum Progress BIZNET - Manhattan Square PT.SPN 2022004140
Belum Progress BIZNET - TCC Batavia PT.SPN 2022008263
Belum Progress BIZNET - Intiland Tower PT.SPN 2022008265
Progress BIZNET - Artha Gading Mall PT.SPN 2022008513
Done BIZNET - Apartement Grand Emerald PT.SPN 2022010230
Belum Progress Lastmile Splice Core UPLINK for Protection VIA Radio Komisi Yudisial PT.MTI 146555
Done BIZNET - Plaza Permata / Bank Index PT.SPN 2021028011
Progress BIZNET - Seasons City PT.SPN 2022025108
Progress Biznet - Salemba PT.SPN 2022039641
Progress Restorasi - PALMERAH UTARA - ANGGREK GARUDA 4 PT. MTI 147706
Progress Restorasi - 3G FAJAR BARU KAPUK - 3G DAAN MOGOT ESTATE KAPUK PT.MTI 147707
Progress Restorasi - 3G Anggrek Gardu - Rawabelong PT.MTI 147712
Progress Restorasi - WARU RAYA KAPUK - KAPUK PT.MTI 147916
Progress Restorasi - TAMAN PRIMA INDAH - JELAMBAR PT. MTI 147957
Progress Restorasi - WARU RAYA KAPUK - KAPUK PT.MTI
Progress Restorasi - JELAMBAR - JATAYU TUBAGUS ANGKE PT.MTI
Progress Restorasi - PARADISE ARTERI - MC_RATU PRABU PT. MTI 147690
Progress Restorasi - PARADISE ARTERI - 3G GAHARU DAGANG PT.MTI
Progress 3G TELUK PELENG - 3G KEBAGUSAN DALAM PT.MTI 147693
Progress 3G NANGKA FATMAWATI - SN KEMANG PT. MTI 147813
Progress 3G NANGKA FATMAWATI - SN KEMANG PT.MTI
Progress Mampang Prapatan - LTE_Komplek Mentri PT.MTI
Progress PULO GEBANG 3G - REMAJA UJUNG MENTENG PT. MTI 147687
Progress HUT JATINEGARA - 3G CIPINANG BESAR PT.MTI
Progress TIPAR CAKUNG PENGGILINGAN 3G - CAKUNG BARAT 3 PT.MTI
Progress ROROTAN 2 - 3G PERDANA CAKUNG PT. MTI
Progress HUT JATINEGARA - 3G CIPINANG BESAR PT.MTI 147708
Progress 3G CIPINANG_BESAR - KOLSUGIYONO PT.MTI 147711
Progress RYBGR - 3G PUSDIKA CIRACAS PT. MTI
Progress INDPULOGDG - 3G Bekasi Timur Raya PT.MTI 147725
Progress Kelapa Dua Wetan - Manunggal Delima Persahabatan PT.MTI 147726
Progress HUT JATINEGARA - 3G CIPINANG BESAR PT. MTI 147751
Progress SMU 21 KAMPUNG AMBON - 3G PULOMAS BARAT V PT.MTI 147810
Progress TIPAR CAKUNG PENGGILINGAN 3G - CAKUNG BARAT 1 PT.MTI 147831
Progress 3G PULOMAS BARAT V - JOHAR BARU PT. MTI 147834
Progress REMAJA UJUNG MENTENG - INDUSTRI PULO GEBANG PT.MTI 147912
Progress HUT JATINEGARA - 3G CIPINANG BESAR PT.MTI
Progress KOLSUGIYONO - MULYAJAYA PT. MTI
Progress SMU 21 KAMPUNG AMBON - 3G PULOMAS BARAT V PT.MTI
Progress JOHAR BARU - JUNCTION PRAMUKA PT.MTI
Progress INDUSTRI PULO GEBANG 3G - CAKUNG TIMUR PT. MTI 147922
Progress 3G PULOMAS BARAT V - JOHAR BARU 2 PT.MTI
Progress TUGU SELATAN - 3G PEGANGSAAN DUA PT.MTI 147705
Progress DANAU SUNTER SELATAN - DANAU SUNTER UTARA PT. MTI
Progress Cilincing - Akses Marunda PT.MTI
Progress SUKAPURA (REPLACING KEMANG PRAPANCA 3G) - TUGUSELATAN PT.MTI 147709
Progress Pademangan - 3G Danau Sunter Barat PT. MTI 147710
Progress SUKAPURA - TIPAR CAKUNG BENTENG PT.MTI 147715
Progress SUKAPURA - TIPAR CAKUNG BARAT PT.MTI 147756
Progress CILINCING - AKSES MARUNDA PT. MTI 147811
Progress TANGKI1800 3G - TAMANSARI MANGGA BESAR PT.MTI 147816
Progress TAMBORA JEMBATAN BESI - GAJAH MADA PT.MTI 147826
Progress CITRA DUA MINIMACRO - INDUSTRI TANJUNG PURA PT. MTI 147830
Progress 3G DANAU SUNTER BARAT - 3G SAHARI RAYA PADEMANGAN PT.MTI 147833
Progress TUBAGUS ANGKE - 3G DURI SELATAN I PT.MTI
Progress BRANTAS SEMPER BARAT - TUGU SEMPER PT. MTI 147924
Progress CITRA DUA MINIMACRO - INDUSTRI TANJUNG PURA PT.MTI
Progress INDUSTRI TANJUNG PURA - KAMPUNG BULAKSERE PT.MTI
Progress CITRA DUA MINIMACRO - INDUSTRI TANJUNG PURA PT. MTI
Progress CILINCING MARUNDA - CILINCING BAKTI PT.MTI
Progress PANGLIMA POLIM - PORIS PLAWAD PERMATA PT.MTI
Progress 3G_RAYA_KRESEK_PERAHU - Balaraja PT. MTI 147771
Progress PASARKOTATANGERANG - 2412432 Sukabakti Sukasari PT.MTI
Progress KH WAHID HASYIM - DOKTOR HAMKA PT.MTI
Progress 3G_RAYA_KRESEK_PERAHU - BALARAJA PT. MTI
Progress KH WAHID HASYI - DOKTOR HAMKA PT.MTI
Progress DOKTOR HAMKA - 3G PINANG PERAK PANINGGILAN PT.MTI
P040/Projct FTTH & FTTX/3/22 II Jasa OSP FTTH National 2022 Pekan Baru -
OLT MGW Pekan Baru
Progress PT.MTI 147968
Feeder 3 (PKB-SKJ-D01 & PKB-SKJ-D02) & Feeder 4 (PKB-BKR-D01 & PKB-
BKR-D02) (5000 HP)
DASHBOARD 2022
PT DUA PUTRA CEMERLANG UTAMA

PO PROGRESS (DATE) CREATE DOCUMENT


ATP (DATE)
NILAI DELIVER TO DATE START FINISH START
Rp 25,888,815,309 158 152 115 120 95 102
Rp.57.717.000 CV. DPC 23-Apr-18 Done Done Done Done
Rp.8.096.000 CV. DPC 08-Dec-18 Done Done Done Done
Rp.548.992.186 CV. DPC 05-Jul-18 Done Done Done Done

Rp.159.232.260 CV. DPC 05-Jul-18 Done Done Done Done


Rp 13,080,100 CV. DPC 20-Dec-18 21-Dec-18 22-Oct-19 Done Done

Rp 33,128,700 PT. DPCU 26-Nov-19 26-Nov-20 10-Dec-19 Done Done

Rp 29,058,700 CV. DPC 14-Jan-19 14-Jan-19 20-Jan-19 Done Done


Rp 583,650,000 PT. DPCU 11-Sep-19 15-Sep-19 11-Oct-19 01-Oct-19 Done
Rp.407.583.000 PT. DPCU 29-Nov-19 Done Done Done Done
Rp 264,625,900 CV. DPC 27-Aug-19 28-Aug-19 22-Oct-19 Done Done

Rp 159,742,660 CV. DPC 23-Aug-19 24-Aug-19 22-Oct-19 Done Done

Rp 258,008,300 CV. DPC 23-Aug-19 24-Aug-19 22-Oct-19 Done Done

Rp 319,238,260 CV. DPC 18-Sep-19 19-Sep-19 20-Feb-20 Done Done

Rp 1,129,459,320 CV. DPC 18-Sep-19 19-Sep-19 22-Oct-19 Done Done

Rp 135,814,360 CV. DPC 21-Oct-19 21-Oct-19 21-Oct-19 21-Oct-19 Done


Rp 45,155,000 CV. DPC 21-Oct-19 21-Oct-19 21-Oct-19 Done Done

Rp 55,237,600 PT. DPCU 02-Dec-19 09-Dec-20 Done

Rp 384,025,950 PT. DPCU 21-Nov-19 25-Nov-19 27-Nov-19 Done Done

Rp 3,949,000 CV. DPC 24-Mar-19 25-Mar-19 22-Oct-19 Done Done

Rp 3,949,000 CV. DPC 24-Jun-19 25-Jun-19 22-Oct-19 Done Done

Rp.12.892.000 CV. DPC 24-Jun-19 25-Jun-19 22-Oct-19 Done Done

Rp 7,887,000 CV. DPC 24-Jun-19 25-Jun-19 22-Oct-19 29-Aug-19 Done

Rp 5,082,000 CV. DPC 24-Jun-19 25-Jun-19 22-Oct-19 Done Done

Rp 4,840,000 CV. DPC 24-Mar-19 25-Oct-19 22-Oct-19 Done Done

Rp 6,105,000 CV. DPC 24-Jun-19 25-Jun-19 22-Oct-19 Done Done

Rp 325,679,200 CV. DPC 24-Sep-19 24-Sep-19 30-Nov-20 Done Done


Rp 1,516,020,000 CV. DPC 20-Mar-19 04-Mar-19 31-Oct-19 Done Done

Rp 1,516,020,000 CV. DPC 20-Mar-19 04-Mar-19 31-Oct-19 Done Done

Rp 1,516,020,000 CV. DPC 20-Mar-19 04-Mar-19 31-Oct-19 Done Done

Rp 289,961,650 PT. DPCU 10-Aug-19 11-Aug-19 22-Oct-19 Done Done

Rp 367,006,200 CV. DPC 07-Aug-19 07-Aug-20 30-Nov-20 Done Done

Rp 472,254,000 PT. DPCU 10-Aug-19 12-Aug-19 22-Oct-19 Done Done

Rp 307,110,100 PT. DPCU 14-Oct-19 14-Oct-19 29-Oct-19 Done Done

Rp 440,060,500 PT. DPCU 03-Oct-19 04-Oct-19 30-Nov-19 Done Done


Rp 4,594,788,000 CV. DPC 21-Mar-19 Done 22-Oct-19 12-Jun-20 Done

Rp 4,594,788,000 CV. DPC 21-Mar-19 22-Mar-19 22-Oct-19 Done Done

Rp.22.402.600 CV. DPC 31-Mar-19 Done Done Done Done

Rp.9.625.000 CV. DPC 25-Mar-19 Done Done Done Done

Rp.10.516.000 CV. DPC 25-Mar-19 Done Done Done Done

Rp.20.391.800 CV. DPC 31-Mar-19 Done Done Done Done

Rp.82.522.000 CV. DPC 31-Mar-19 Done Done Done Done

Rp.11.792.000 CV. DPC 31-Mar-19 Done Done Done Done

Rp 3,866,500 CV. DPC 25-Mar-19 26-Mar-19 22-Oct-19 Done Done

Rp 4,873,000 CV. DPC 25-Mar-19 26-Mar-19 22-Oct-19 Done Done

Rp.12.666.500 CV. DPC 31-Mar-19 Done Done Done Done

Rp 4,741,000 CV. DPC 25-Mar-19 26-Mar-19 22-Oct-19 Done Done

Rp 16,500,000 CV. DPC 24-Jun-19 25-Jun-19 20-Nov-19 Done

Rp 13,403,500 CV. DPC 26-Apr-19 27-Apr-19 22-Oct-19

Rp 13,211,000 CV. DPC 01-Apr-19 02-Apr-19 22-Oct-19

Rp 8,431,500 CV. DPC 21-Mar-19 22-Mar-19 22-Oct-19

Rp 11,726,000 CV. DPC 03-Mar-19 04-Mar-19 03-Apr-19 Done Done


Rp 5,500,000 CV. DPC 19-Sep-19 19-Sep-19 22-Oct-19
Rp 11,000,000 CV. DPC 19-Feb-19 20-Feb-19 19-Mar-19 Done Done
Rp 22,462,000 CV. DPC 14-Feb-19 15-Feb-19 14-Mar-19 Done Done
Rp 1,286,656,760 PT. DPCU 02-Dec-20 09-Dec-19

Rp 7,645,000 PT. DPCU 01-Feb-20 Done Done 03-Jul-20

Rp 21,388,400 PT. DPCU 01-Feb-20 Done Done 02-Jul-20

Rp 14,091,000 PT. DPCU 01-Feb-20 Done Done Done Done

Rp 485,287,000 PT. DPCU 15-Feb-20 Done Done 26-Jun-20

Rp.3.965.500 PT. DPCU 03-Feb-20 Done Done Done Done

Rp.29.507.500 CV. DPC 23-Feb-20 Done Done Done Done

Rp.17.820.000 CV. DPC 01-Mar-20 Done Done Done Done

Rp.14.091.000 PT. DPCU 03-Feb-20 Done Done Done Done


Rp. 307.712.900 PT. DPCU 19-Mar-20 Done Done 26-Jun-20 18-Jun-20
RP.289.252.700 PT. DPCU 10-Mar-20 Done Done 02-Jun-20
Rp.20.674.500 CV. DPC Done Done Done Done Done
Rp.3.212.697.400 CV. DPC Done Done Done 29-Oct-19 Done
Rp.3.212.697.400 CV. DPC Done Done Done 29-Oct-19 Done
Rp.11.660.000 CV. DPC 27-Apr-20 Done Done Done Done
Rp. 2.106.155.700 CV. DPC 5-Nov-18 Done Done
Rp 11,088,000 PT. DPCU 31-Mar-20 Done Done Done Done
Rp 14,849,400 CV. DPC 3-Dec-20 Done Done 26-Jun-20
Rp 14,849,400 CV. DPC 3-Dec-20 Done Done 26-Jun-20

Rp 59,568,962 PT. DPCU 10-Aug-20 26-Aug-20 07-Sep-20


Rp 53,342,000 PT. DPCU 31-Dec-19 Done Done
PT. DPCU
PT. DPCU
PT. DPCU
PT. DPCU
PT. DPCU
PT. DPCU
Rp. 9.445.887 CV. DPC 29 des 2017
Rp. 21.027.655 CV. DPC 16-Jan-18
Sudah
Sudah

Sudah

Sudah
Sudah
Sudah

Rp 14,510,000 CV. DPC 21-Sep-20 Done Done Done Done


Rp 3,420,000 CV. DPC Done Done Done Done
20-Oct-20
Rp 7,800,000 PT. DPCU Done Done Done Done
15-Feb-21
Rp 10,086,000 PT. DPCU Done Done Done Done
5-Mar-21
Rp 9,490,000 PT. DPCU Done Done Done Done
5-Mar-21
Rp 8,830,000 CV. PANDETEL Done Done
4-Apr-21
Rp 30,200,000 PT. DPCU 13-Jun-21
Rp 36,345,000 PT. DPCU 1-Oct-21 Done Done
Rp 18,861,000 PT. DPCU 14-Oct-21 Done Done 6 JANUARI 2022
Rp 7,550,000 PT. DPCU 18-Oct-21 Done Done
Rp 17,166,000 PT. DPCU 25-Oct-21 Done Done
Rp 134,711,000 PT. DPCU
4-Nov-21
Rp 1,690,000 PT. DPCU Done Done Done Done
28-Apr-21
Rp 810,706,500 PT. DPCU Done Done Done Done
19-Aug-21
Done Done Done Done
Rp 823,946,000 PT. DPCU 13-Oct-21 Done Done Done Done
Done Done Done Done
Done Done Done Done
Rp 4,293,000 PT. DPCU 18-May-21 Done Done Done Done
Rp 7,320,000 PT. DPCU 28-May-21 Done Done Done Done
Rp 12,114,000 PT. DPCU 28-May-21 Done Done Done Done
Rp 8,480,000 PT. DPCU 03-Jun-21 Done Done Done Done
Rp 7,800,000 CV. DPC 15-Feb-21 Done Done Done Done

Rp 10,086,000 CV. DPC 05-Mar-21 Done Done Done Done

Rp 9,490,000 CV. DPC 05-Mar-21 Done Done Done Done


Rp 23,677,000 PT. DPCU 17 Dec 2021 Done Done Done Done
Rp 21,235,667 PT.SPN 15 Mar 2022 17 Mar 2022 6 Apr 2022 17 Mar 2022
Rp 33,555,000 PT.MTI 11 Oct 2021 14 Oct 2021 3 Feb 2022 22 Jun 2022 14 Oct 2021
Rp 24,257,200 PT.MTI 3 Jan 2022 27 Dec 2021 31 Dec 2021 2 Feb 2022 31 Dec 2021
Rp 24,321,000 PT. DPCU 3 Jan 2022 29 Dec 2022 1 Jan 2022 10 Jan 2022 4 Jan 2022
Rp 30,447,450 PT.MTI 6 Jan 2022 24 Jan 2022 24 Jan 2022
Rp 35,909,500 PT.MTI 13 Jan 2022 29 Dec 2021 29 Jan 2022 2 Feb 2022 31 Dec 2022
Rp 24,392,500 PT.MTI 25 Jan 2022 24 Jan 2022 21 Jan 2022 2 Feb 2022 27 Jan 2022
Rp 23,424,500 PT.MTI 21 Feb 2022 20 Feb 2022 23 Feb 2022 23 Feb 2022 20 Feb 2022
Rp 17,050,000 PT.MTI 10 Jan 2022 6 Jan 2022 10 Jan 2022 15 Jan 2022 8 Jan 2022
28 May 2022 30 May 2022 29 Mar 2021
Rp 458,065,300 PT.OII 24 Feb 2022 28 Mar 2022
19 Apr 2022 21 Apr 2022 29 Mar 2021
Rp 18,557,000 PT.MTI 23 Feb 2022 2 Mar 2022 16 Mar 2022 21 Mar 2022 2 Mar 2022
Rp 27,500,000 PT.MTI 23 Feb 2022 9 Feb 2022 19 May 2022 23 May 2022 9 Feb 2022
Rp 8,887,000 PT. DPCU 23 Jan 2022 5 Jan 2022 16 Feb 2022 14 Feb 2022 5 Feb 2022
Rp 28,246,500 PT. DPCU 26 Jan 2022 4 Jun 2022 13 Jun 2022 4 Jun 2022
Rp 15,353,900 PT. DPCU 15 Feb 2022
Rp 7,677,000 PT. DPCU 15 Feb 2022
Rp 33,134,750 PT. DPCU 16 Feb 2022 19 Feb 2022 26 Apr 2022 19 Feb 2022
Rp 39,635,500 PT. DPCU 23 Feb 2022 7 Mar 2022 4 Apr 2022 7 Mar 2022
Rp 7,600,000 PT. DPCU 1 Mar 2022
Rp 10,338,000 PT. DPCU 17 Dec 2021 16 Mar 2021 26 Mar 2022 16 Mar 2021
Rp 112,611,900 PT. DPCU 22 Apr 2022 21 Mar 2021 26 Apr 2022 21 Mar 2021
Rp 73,769,220 PT. DPCU 15 Jun 2022 18 Jun 2022 18 Jun 2022
Rp 4,776,000 CV. DPC 29 May 2022
Rp 9,494,000 CV. DPC 29 May 2022
Rp 6,540,000 CV. DPC 30 May 2022
Rp 15,959,000 CV. DPC 9 Jun 2022
Rp 16,210,000 PT. DPCU 10 Jun 2022

Rp 6,605,000 CV. DPC 27 May 2022

Rp 6,290,000 CV. DPC 27 May 2022

Rp 13,585,000 CV. DPC 25 May 2022

Rp 15,012,000 CV. DPC 29 May 2022


Rp 9,260,000 CV. DPC 30 May 2022

Rp 10,536,000 CV. DPC 30 May 2022


Rp 13,898,000 CV. DPC 30 May 2022
Rp 10,170,000 CV. DPC 1 Jun 2022
Rp 9,360,000 CV. DPC 4 Jun 2022
Rp 14,590,000 CV. DPC 5 Jun 2022
Rp 13,590,000 CV. DPC 5 Jun 2022
Rp 13,995,000 CV. DPC 8 Jun 2022
Rp 4,620,000 CV. DPC 8 Jun 2022

Rp 15,470,000 CV. DPC 28 May 2022

Rp 8,580,000 CV. DPC 30 May 2022


Rp 940,000 CV. DPC 30 May 2022
Rp 21,310,000 CV. DPC 30 May 2022
Rp 1,373,000 CV. DPC 2 Jun 2022
Rp 10,915,000 CV. DPC 4 Jun 2022
Rp 9,050,000 CV. DPC 5 Jun 2022
Rp 13,778,000 CV. DPC 5 Jun 2022
Rp 9,231,000 CV. DPC 5 Jun 2022
Rp 7,130,000 CV. DPC 5 Jun 2022

Rp 4,620,000 CV. DPC 8 Jun 2022

Rp 7,720,000 CV. DPC 2 Jun 2022

Rp 1,023,443,000 PT DPCU 10 Jun 2022


CREATE DOCUMENT BAST (DATE) INVOICE PAYMENT
RETENSI TAHUN
FINISH SUBMIT FINISHED DATE DATE
95 94 91 135 130 17 150
Done 18 Jul 2019 24 Jul 2019 29 Aug 2019 12 Aug 2019 2018
Done 12 Aug 2019 19 Aug 2019 29 Aug 2019 29 Aug 2019 2018
Done 12 Aug 2019 19 Aug 2019 29 Aug 2019 29 Aug 2019 2018

Done 12 Aug 2019 19 Aug 2019 29 Aug 2019 28 Sep 2019 2018
Done 24 Jun 2019 1 Jul 2019 11 Jul 2019 24 Aug 2019 2018

Done 7 Nov 2019 7 Nov 2019 7 Nov 2019 10 Jan 2020 2019

Done 11 Jan 2019 18 Jan 2019 27 Jan 2019 11 Mar 2019 2019
Done 23 Sep 2019 1 Oct 2019 15 Oct 2019 25 Sep 2019 2019
Done Done Done 23 Mar 2020 22 Apr 2020 2019
Done 14 Oct 2020 14 Oct 2020 10 Oct 2021 2019

Done 11 Jun 2020 11 Jun 2020 9 Aug 2020 8 Sep 2020 2019

Done 11 Jun 2020 11 Jun 2020 9 Jul 2020 8 Aug 2020 2019

Done 24 Jul 2020 24 Jul 2020 11 Aug 2020 14 Sep 2020 2019

Done 24 Jul 2020 24 Jul 2020 11 Aug 2020 14 Sep 2020 2019

Done 15 Oct 2019 21 Oct 2019 31 Oct 2019 30 Nov 2019 RETENSI 2019
Done 15 Oct 2019 21 Oct 2019 31 Oct 2019 30 Nov 2019 RETENSI 2019

2019

Done 10 Nov 2020 10 Nov 2020 12 Nov 2020 12 Dec 2020 2019

Done 27 Mar 2019 8 Apr 2019 22 Apr 2019 25 May 2019 2019

Done 18 Feb 2019 4 Mar 2019 11 Jul 2019 24 Aug 2019 2019

Done 18 Mar 2019 23 Mar 2019 30 Apr 2020 30 May 2020 2019

Done 5 Aug 2019 12 Aug 2020 20 Aug 2019 20 Sep 2019 2019

Done 15 Mar 2019 20 Mar 2019 11 Jul 2019 24 May 2019 2019

Done 26 Dec 2018 3 Jan 2019 22 Apr 2019 24 May 2019 2019

Done 1 Mar 2019 9 Mar 2019 20 Aug 2019 20 Sep 2019 2019

Done 6 Feb 2020 6 Feb 2020 6 Feb 2020 7 Mar 2020 2019
Done 13 May 2019 13 May 2019 13 May 2019 14 Jun 2019 2019

Done 13 May 2019 13 May 2019 13 May 2019 14 Jun 2019 2019

Done 13 May 2019 13 May 2019 13 May 2019 14 Jun 2019 2019

Done 18 Nov 2019 27 Nov 2019 6 Feb 2020 27 Jan 2020 2019

Done 20 Jan 2020 27 Jan 2020 12 Dec 2019 27 Jan 2020 2019

Done 14 Nov 2019 14 Nov 2019 14 Nov 2019 14 Dec 2019 2019

Done 20 Jan 2020 27 Jan 2020 10 Feb 2020 8 May 2020 2019

Done 13 Jan 2020 21 Feb 2020 27 Feb 2020 24 Apr 2020 2019
Done 13 May 2019 13 May 2019 13 May05/07/2019
2019 500juta 26/07/2019 402juta 2019

Done 13 May 2019 13 May 2019 13 May05/07/2019


2019 500juta 26/07/2019 402juta 2019

Done 15 Apr 2019 22 Apr 2019 2 May 2019 2 May 2019 2019

Done 15 Apr 2019 22 Apr 2019 2 May 2019 2 May 2019 2019

Done 15 Apr 2019 22 Apr 2019 2 May 2019 2 May 2019 2019

Done 15 Apr 2019 22 Apr 2019 2 May 2019 2 May 2019 2019

Done 15 Apr 2019 22 Apr 2019 2 May 2019 2 May 2019 2019

Done 15 Apr 2019 22 Apr 2019 2 May 2019 2 May 2019 2019

Done 27 Mar 2019 8 Apr 2019 22 Apr 2019 24 May 2019 2019

Done 27 Mar 2019 8 Apr 2019 22 Apr 2019 24 May 2019 2019

Done 15 Apr 2019 22 Apr 2019 2 May 2019 2 May 2019 2019

Done 27 Mar 2019 8 Apr 2019 22 Apr 2019 24 May 2019 2019

2019

2019

2019

2019

Done 18 Jul 2019 25 Jul 2019 5 Aug 2019 6 Sep 2019 2019
2019
Done 10 May 2019 18 May 2019 23 May 2019 5 Jul 2019 2019
Done 12 Sep 2019 19 Sep 2019 26 Sep 2019 25 Oct 2019 2019
2020

2020

2020

Done 19 Nov 2020 19 Nov 2020 19 Nov 2020 Done 2020

2020

Done 7 Feb 2019 7 Feb 2019 27 Apr 2020 12 Jun 2020 2020

Done 9 Mar 2020 13 Mar 2020 23 Mar 2020 12 Jun 2020 2020

Done 9 Mar 2020 13 Mar 2020 23 Mar 2020 12 Jun 2020 2020

Done 19 Mar 2020 19 Mar 2020 13 May 2020 12 Jun 2020 2020
18 Aug 2020 18 Aug 2020 13 Nov 2020 13 Dec 2020 2020
06-Jun-20 18 Aug 2020 2020
Done 6 Apr 2020 13 Apr 2020 20 Dec 2018 19 Jan 2019 #VALUE!
Done 3 Feb 2020 10 Feb 2020 24 Feb 2020 09-Apr & 27-Apr 22-Feb-21 #VALUE!
Done 3 Feb 2020 10 Feb 2020 24 Feb 2020 09-Apr & 27-Apr 22-Feb-21 #VALUE!
Done 18 Nov 2019 25 Nov 2019 11 May 2020 10 Jun 2020 2020
11 Jun 2020 2018
Done 31 Mar 2020 25 Jul 2020 2 Jul 2020 1 Aug 2020 2020
2020
2020
1899
2020
2019
1899
1899
1899
1899
1899
1899
#VALUE!
2018
1899
1899
1899
1899
1899
1899
1899
1899
1899
1899
1899
1899
1899
1899
1899
1899
1899
1899
1899
Done 1 Mar 2021 1 Mar 2021 1 Mar 2021 23 Apr 2021 2020
Done 1 Mar 2021 1 Mar 2021 1 Mar 2021 23 Apr 2021 2020

Done 1 May 2021 1 May 2021 1 May 2021 11 Jun 2021 2021

Done 1 May 2021 1 May 2021 1 May 2021 11 Jun 2021 2021

Done 1 May 2021 1 May 2021 1 May 2021 11 Jun 2021 2021

2021
2021
2021
6 JANUARI 2022 2021
2021
2021
2021

Done 1 Jul 2021 1 Jul 2021 1 Jul 2021 27 Aug 2021 2021

Done 11 Jan 2022 15 Apr 2022 19 Apr 2022 - 15 Apr 2022 2021

Done 25 Feb 2022 2021


Done 27 Apr 2022 19 May 2022 27 Apr 2023 1900
Done 27 Apr 2022 19 May 2022 27 Apr 2023 1899
Done 27 Apr 2022 19 May 2022 27 Apr 2023 1899
Done 1 Jul 2021 1 Jul 2021 1 Jul 2021 4 Oct 2021 No Rentency 2021
Done 1 Jul 2021 1 Jul 2021 1 Jul 2021 4 Oct 2021 No Rentency 2021
23 Jan 2022 24 Jan 2022 24 Jan 2022 17 Feb 2022 6 Apr 2022 No Rentency 2021
Done 24 Aug 2021 24 Aug 2021 24 Aug 2021 No Rentency 2021
Done 1 May 2021 1 May 2021 1 May 2021 11 Jun 2021 2021

Done 1 May 2021 1 May 2021 1 May 2021 11 Jun 2021 2021

Done 1 May 2021 1 May 2021 1 May 2021 11 Jun 2021 2021
Done 5 Jan 2022 17 Feb 2022 17 Feb 2022 25 Mar 2022 2021
14 Mar 2022 14 Mar 2022 14 Mar 2022 7 Apr 2022 2022
9 May 2022 No Rentency 2021
1 Feb 2022 8 Feb 2022 24 Feb 2022 21 Feb 2022 No Rentency 2022
9 Jan 2022 28 Jan 2022 31/02/2022 3 Jan 2022 No Rentency 2022
2022
1 Feb 2022 7 Feb 2022 24 Feb 2022 1 Mar 2022 2/24/2023 2022
1 Feb 2022 7 Feb 2022 24 Feb 2022 25 Jan 2022 2022
22 Feb 2022 1 Mar 2022 23 May 2022 2022
14 Jan 2022 12 Jan 2022 10 Feb 2022 21 Feb 2022 2022
29 May 2022 7 Jun 2022 2022
19 Apr 2022 7 Jun 2022 2022
16 Mar 2022 21 Mar 2022 2022
19 May 2022 20 Jun 2022 20 Jun 2022 NO RETENCY 2022
14 Feb 2022 1 Mar 2022 1 Mar 2022 1 Mar 2022 2022
13 Jun 2022 16 Jun 2022 16 Jun 2022 15 Jun 2022 2022
2022
2022
17 May 2022 18 May 2022 18 May 2022 18 May 2022 2022
4 Apr 2022 5 Apr 2022 21 Apr 2022 7 Apr 2021 2022
2022
26 Mar 2022 28 Mar 2022 28 Mar 2022 28 Mar 2022 2022
9 May 2022 17 May 2022 18 Apr 2022 12 May 2022 2022

28 Jun 2022
21 May 2021

21 May 2021
SUMMARY PO

YEAR TOTAL PROJECT PROGRESS BAST INVOICE CLOSED


2018 7 1 1 2 2
2019 50 0 7 7 8
2020 18 2 7 8 8
2021 22 2 9 9 10
2022 21 4 8 7 21
Belum PO 0 0 0 0 0
TOTAL 118 9 32 33 49

SUMMARY RESTORASI

STATUS RESTORASI XL
Tahun
Approval Progress Dokumen Hilang Di MTI Belum Ada PO BLANK CLOSED
2018 0 0 0 0 1
2019 3 1 9 0 3
2020 4 7 22 0 2
2021 1 8 20 4 0
2022 0 0 0 -28 0
TOTAL 8 16 51 4 6
TOTAL

1
16
35
33
-28
85
NO SEGMENT

1 TUGU SEMPER - CACING CILINGCING


2 TAMAN SARI MANGGA BESAR - GAJAH MADA
4 SMU 21 KP. AMBON - 3G PULOMAS
5 SUSUKAN MAKMUR - DAMAI SUSUKAN
10 PULO GEBANG 3G - REMAJA UJUNG MENTENG
11 HUT JATINEGARA - 3G CIPINANG BESAR
13 PARADISE ARTERI - MC_RATU PRABU
14 PARADISE ARTERI - 3G GAHARU DAGANG
15 HUT JATINEGARA - 3G CIPINANG BESAR
16 3G TELUK PELENG - 3G KEBAGUSAN DALAM
17 TUGU SELATAN - 3G PEGANGSAAN DUA
18 HUT JATINEGARA - 3G CIPINANG BESAR
20 HUT JATINEGARA - 3G CIPINANG BESAR
23 TIPAR CAKUNG PENGGILINGAN 3G - CAKUNG BARAT 3
24 MULYAJAYA - HUT JATINGARA
25 ROROTAN 2 - 3G PERDANA CAKUNG
26 HUT JATINEGARA - 3G CIPINANG BESAR
28 PADANG PUTRA - MANILA PEJATEN
29 HUT JATINEGARA - 3G CIPINANG BESAR
30 SUKAPURA - TUGUSELATAN
31 DANAU SUNTER - 3G SAHARI RAYA
32 HUT JATINEGARA - 3G CIPINANG BESAR
35 3G FAJAR BARU KAPUK - 3G DAAN MOGOT ESTATE KAPUK
36 DANAU SUNTER SELATAN - DANAU SUNTER UTARA
37 SUNTER PRATAMA I - 3G SUNTER MAS TENGAH
38 SMU 21 KAMPUNG AMBON - 3G PULOMAS BARAT V
SU HUT JATINEGARA - 3G CIPINANG BESAR
SY PANGLIMA POLIM <> PORIS PLAWAD PERMATA 2
41 MULYAJAYA - HUT JATINEGARA 2
42 KH WAHID HASYIM <> DOKTOR HAMKA
43 RAYA KRESEK PERAHU <> BALARAJA
44 CILINCING <> AKSES MARUNDA
45 SUKAPURA (REPLACING KEMANG PRAPANCA 3G) <> TUGUSELATAN
47 KOL SUGIYONO-MULYAJAYA
48 PADEMANGAN - 3G DANAU SUNTER BARAT
49 3G PULOMAS V - JOHAR BARU 2
50 3G_CIPINANG BESAR - KOL SUGIYONO
51 CITRA DUA MINIMACRO - INDUSTRI TANJUNG PURA
52 JOHAR BARU - JUNCTION PRAMUKA
53 KH WAHID HASYI - DOKTOR HAMKA
54 DOKTOR HAMKA - 3G PINANG PERAK PANINGGILAN
55 Mampang Prapatan - LTE_Komplek Mentri
56 3G BEKASI TIMUR RAYA -SEGMENT INDPULOGDG
57 CILINCING - AKSES MARUNDA
58 DOKTOR HAMKA - 3G PINANG PERAK PANINGGILAN
59 KH WAHID HASYIM - DOKTOR HAMKA
60 TAMBORA JEMBATAN BESI GAJAH MADA
61 3G NANGKA FATMAWATI - SN KEMANG
62 REMAJA UJUNG MENTENG - INDUSTRI PULO GEBANG
63 Kelapa Dua Wetan - Manunggal Delima Persahabatan
64 CITRA DUA MINIMACRO - INDUSTRI TANJUNG PURA
65 TAMAN PRIMA INDAH - JELAMBAR
66 WARU RAYA KAPUK - KAPUK
67 TUBAGUS ANGKE - 3G DURI SELATAN I
68 INDUSTRI PULO GEBANG 3G - CAKUNG TIMUR
69 SUKAPURA - TIPAR CAKUNG BENTENG
70 RYBGR - 3G PUSDIKA CIRACAS
71 TUGU SELATAN - 3G PEGANGSAAN DUA
72 WARU RAYA KAPUK - KAPUK
73 TAMBORA JEMBATAN BESI - GAJAH MADA
74 PASAR KOTA TANGGERANG - SUKABAKTI SUKASARI
75 TANGKI1800 3G - TAMANSARI MANGGA BESAR
76 TIPAR CAKUNG PENGGILINGAN 3G - CAKUNG BARAT 1
77 CITRA DUA MINIMACRO - INDUSTRI TANJUNG PURA
78 3G DANAU SUNTER BARAT - 3G SAHARI RAYA PADEMANGAN
79 3G PULOMAS V - JOHAR BARU
80 3G RAYA KRESEK PERAHU BALARAJA
81 HUT JATINEGARA - 3G CIPINANG BESAR
82 BRANTAS SEMPERM BARAT - TUGU SEMPER
83 INDUSTRI TANJUNG PURA - KAMPUNG BILAKSERE
84 SMU 21 KP. AMBON - 3G PULOMAS BARAT
85 JELAMBAR - JATAYU TUBAGUS ANGKE
86 3G RAYA KRESEK PERAHU BALARAJA
87 KH WAHID HASYIM - DOKTOR HAMKA
88 3G ANGGREK GARDU - RAWABELONG
89 SUKAPURA - CAKUNG BARAT4
90 INDPULOGDG - 3G BEKASI TIMUR RAYA
PEKERJAAN RESTORASI FIB. XL JAKARTA
PO
OWNER PROJECT
Trouble Ticket Nilai
WTD-19020099 #N/A
WTD 23,920,000
WTD-19040306 #N/A
WTD-19021070 #N/A
WTD-19030946 13,585,000
WTD-19031155 10,340,000
WTD-19031317 6,605,000
WTD-19031232 7,290,000
WTD-19020149 n/a
WTD-19030178 6,290,000
WTD- 15,470,000
WTD- 7,300,000
WTD-19110792 7,300,000
WTD-19111090 7,130,000
WTD-19121010 n/a
WTD-20021809 7,380,000
WTD-20030180 7,300,000
WTD-20030934 7,420,000
WTD-20041306 7,420,000
WTD-20041387 8,580,000
WTD-19081645 #N/A
WTD-20050193 12,860,000
WTD-20041593 9,494,000
WTD-20040786 10,170,000
WTD-20050754 6,450,000
WTD-20060107 9,360,000
WTD-19020116 15,012,000
WTD-20060687 35,382,000
WTD-20060895 13,270,000
WTD-20061048 n/a
WTD-20061198 6,966,000
WTD-20061201 81,994,500
WTD-20041387 8,580,000
WTD-20061666 13,280,000
WTD-20050195 9,460,000
WTD-20070249 14,180,000
WTD-20070449 9,260,000
WTD-21071746 7,300,000
WTD-20121824 14,028,500
WTD-21071740 n/a
WTD-21071760 n/a
WTD-21070636 8,190,000
WTD-20081236 9,036,000
WTD-20101224 10,915,000
WTD-21071760 6,730,000
WTD-21071740 6,340,000
WTD-21011755 13,778,000
WTD-21010479 4,370,000
WTD-21030346 13,995,000
WTD-20090079 13,946,000
WTD-21050988 13,576,000
WTD-21060209 15,066,000
WTD-21060528 45,790,000
WTD-21030699 5,270,000
WTD-21042355 4,620,000
WTD-20071846 21,310,000
WTD-20080836 26,980,000
WTD-19061017 15,470,000
WTD-21030552 15,959,000
WTD-21021755 13,778,000
WTD-20121496 5,630,000
WTD-21021170 9,050,000
WTD-21010674 14,590,000
WTD-20122443 9,231,000
WTD-21011435 7,130,000
WTD-21020675 13,590,000
WTD-20121424 7,720,000
WTD-19020249 10,170,000
WTD-21050003 4,620,000
WTD-21062006 9,390,000
WTD-20120001 9,360,000
WTD-21061749 9,856,000
WTD-21070226 6,415,000
WTD-21061477 6,636,000
WTD-20070496 6,540,000
WTD-20101404 13,730,000
WTD-20081236 10,536,000
AAN RESTORASI FIB. XL JAKARTA
PO Progress Date
REMARK
Deliver To Date Start
0
0
0
0
1
1
1
1
1
1
0
0
1 10-Nov-19
1 22-Nov-19 REPAIR JB
1 17-Des-19 KABEL DISMANTEL
1 29-Feb-20 KABEL POP BEKASI
1 3-Mar-20
1 15-Mar-20 data sor belum
1 22-Apr-20
0 24-Apr-20
0
1 4-May-20 4-May-20
1 30-Apr-20 data sor belum 30-Apr-20
1 15-May-20 data sor belum 15-May-20
1 15-May-20 data sor belum 15-May-20
1 3-Jun-20 3-Jun-20
1 5-Feb-19
1 12-Jun-20 13-Jun-20
1 17-Jun-20 17-Jun-20
1 19-Jun-20 19-Jun-20
1 23-Jun-20 23-Jun-20
2 23-Jun-19 24-Jun-20
1 25-Mar-20 26-Jun-20
1
0
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Progress Date
SUBMIT STATUS BAST
Finish
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
29-Nov-19 SUDAH BAST
29-Nov-19 SUDAH BAST
29-Nov-19 SUDAH BAST
29-Nov-19 SUDAH BAST
29-Nov-19 Submit Pak Heri 17-Jul-20
29-Nov-19 SUDAH BAST
29-Nov-19 Submit Pak Heri 17-Jul-20
29-Nov-19 Submit Pak Heri 17-Jul-20
15-Apr-20 SUDAH BAST
15-Apr-20 SUDAH BAST
rev. Submit 20-Jul-20
15-Apr-20 SUDAH BAST
rev. Submit 20-Jul-20
rev
11-May-20 Submit Pak Heri 17-Jul-20
11-May-20 SUDAH BAST
15-Apr-20 BELUM TTD CTO
rev Submit 20-Jul-20
SUDAH BAST
SUDAH BAST
Submit 20-Jul-20
SUDAH BAST
5-Feb-20 SUDAH BAST
SUDAH BAST
rev. Submit 20-Jul-21
20-Jun-20 Submit 20-Jul-20
24-Jun-20 Submit 20-Jul-20
24-Jun-20 SUDAH BAST
27-Jun-20 Submit 20-Jul-20
20-Jul-20 SUDAH BAST
SUDAH BAST
Submit 20-Jul-20
SUDAH BAST
28-Jul-21 SUDAH BAST
SUDAH BAST
26-Jul-21 SUDAH BAST
26-Jul-21 SUDAH BAST
26-Jul-21 SUDAH BAST
SUDAH BAST
SUDAH BAST
26-Jul-21 SUDAH BAST
26-Jul-21 SUDAH BAST
TIDAK ADA DOKUMEN
SUDAH BAST
SUDAH BAST
SUDAH BAST
14-Jun-21 SUDAH BAST
28-Jun-21 SUDAH BAST
24-Jun-21 SUDAH BAST
8-Apr-21 SUDAH BAST
21-May-21 SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
SUDAH BAST
STATUS DOKUMEN DRAFT INVOICE

1
1
1
1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
CV 1
ADA CV 1
2
2
ADA CV 1
ADA CV 1
CV 1
ADA CV 1
CV 1
CV 1
CV 1
1
1
CV 1
ADA CV 1
ADA CV 1
CV 1
ADA CV 1
ADA CV 1
ADA CV 1
CV 1
CV 1
CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
BOQ belum 1
ADA CV 1
ADA PT 1
ADA CV 1
double 2
double 2
ADA PT 1
ADA CV 2
ADA CV 1
ADA PT 2
ADA PT 2
1
ADA CV 1
ADA CV 1
ADA CV 1
ADA PT 1
ADA PT 1
ADA PT 1
ADA PT 1
ADA PT 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV 1
ADA CV WTD DI BAST 21020617 1
ADA CV 1
ADA CV 1
ADA PT 1
ADA PT 1
ADA CV 1
ADA PT 1
ADA PT 1
ADA PT 1
ADA CV 1
ADA CV 1
ADA CV
9,375,000.00
37,500.00
NO BAST No Ticket No Tahun Owner

141 91 104 86 86
46 015 WTD-19020149 2019 CV. DPC
47 018 WTD-19060621 2019 CV. DPC
48 024 WTD-19121010 2019 CV. DPC
49 026 WTD-20030180 2020 CV. DPC
50 028 WTD-20030934 2020 CV. DPC
51 029 WTD-20041306 2020 CV. DPC
52 032 WTD-20050193 2020 CV. DPC
53 037 WTD-20050754 2020 CV. DPC
54 041 WTD-20060895 2020 CV. DPC
55 042 WTD-20061048 2020 CV. DPC
56 043 WTD-20061198 2020 CV. DPC
58 059 WTD-20092204 2020 CV. DPC
59 062 WTD-20101128 2020 CV. DPC
60 064 WTD-20101772 2020 CV. DPC
63 004 NO TT 2021 CV. DPC
65 014 WTD-21030561 2021 CV. DPC
66 015 WTD-21030804 2021 CV. DPC
67 016 WTD-21031190 2021 CV. DPC
68 017 WTD-21031524 2021 CV. DPC
69 018 WTD-21031523 2021 CV. DPC
81 030 WTD-21070461 2021 PT.DPCU
83 032 WTD-21071501 2021 PT.DPCU
95 WTD-
96 WTD-
106 WTD-20081236
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
Segment Ticket No

104 104
HUT JATINEGARA - 3G CIPINANG BESAR WTD-19020149
HUT JATINEGARA - 3G CIPINANG BESAR WTD-19060621
MULYAJAYA - HUT JATINGARA WTD-19121010
HUT JATINEGARA - 3G CIPINANG BESAR WTD-20030180
PADANG PUTRA - MANILA PEJATEN WTD-20030934
HUT JATINEGARA - 3G CIPINANG BESAR WTD-20041306
HUT JATINEGARA - 3G CIPINANG BESAR WTD-20050193
SUNTER PRATAMA I - 3G SUNTER MAS TENGAH WTD-20050754
HUT Jatinegara - 3G_CIPINANG_BESAR / MULYA JAYA WTD-20060895
KH WAHID HASYIM - DOKTOR HAMKA WTD-20061048
3G_RAYA_KRESEK_PERAHU - BALARAJA WTD-20061198
SUKAPURA - TUGUSELATAN 2 WTD-20092204
TIPAR CAKUNG PENGGILINGAN 3G - CAKUNG BARAT WTD-20101128
CILINCING - AKSES MARUNDA WTD-20101772
RELOKASI TIANG CILINCING - AKSES MARUNDA WTD-20061201
RAWABELONG - PALMERAH BARAT WTD-21030561
PALMERAH UTARA - ANGGREK GARUDA WTD-21030804
ASUHAN BUDHI - BAMBU LARANGAN 2 WTD-21031190
TAMANMINI - WISMA BOGANI WTD-21031524
KOKROSONO PD GEDE - TAMANMINI WTD-21031523
Mampang Prapatan - LTE_Komplek Mentri WTD-21070461
WARU RAYA KAPUK - KAPUK WTD-21071501
TUGU SELATAN - 3G PEGANGSAAN DUA WTD-
HUT JATINEGARA - 3G CIPINANG BESAR WTD-
3G BEKASI TIMUR RAYA -SEGMENT INDPULOGDG WTD-20081236
SUMMARY RESTORASI

SPH STATUS DOKUMEN PO


Rp 204,824,000 NUMBER REQUEST DATE
109 71 42
1
Rp 10,880,000 1
1
Rp 7,300,000 1
Rp 7,420,000 1
Rp 7,420,000 1
Rp 12,860,000 1
Rp 6,450,000 1
Rp 13,270,000 1
1
Rp 6,966,000 1
Rp 13,270,000 1
Rp 16,220,000 1
1
Rp 7,356,000 1
Rp 6,600,000 1
Rp 13,978,000 1
Rp 14,083,000 1
Rp 11,400,000 1
1
Rp 9,375,000 1
1
Rp 15,470,000 1
Rp 15,470,000 1
Rp 9,036,000 1
PO SUBMIT BAST INVOICE
PO DATE
2 22 83 20
Approval Progress
Dokumen Hilang Di MTI
Approval Progress
Approval Progress
Approval Progress
Approval Progress
Dokumen Hilang Di MTI
Dokumen Hilang Di MTI
Dokumen Hilang Di MTI
Dokumen Hilang Di MTI
Approval Progress
Dokumen Hilang Di MTI
Dokumen Hilang Di MTI
Dokumen Hilang Di MTI
1-Mar-21 Dokumen Hilang Di MTI
16-Mar-21 Dokumen Hilang Di MTI
16-Mar-21 Dokumen Hilang Di MTI
23-Mar-21 Dokumen Hilang Di MTI
23-Mar-21 Approval Progress

26-Jul-21 Dokumen Hilang Di MTI


26-Jul-21 Dokumen Hilang Di MTI
PAYMENT NOTES
29-Sep-20 18-Aug-21
6 22
revisi submit 29-sept-20 Dok akan dikirim ke Rumah engineering oleh DPC
revisi submit 29-sept-20 Dok akan dikirim ke Rumah engineering oleh DPC
revisi submit 29-sept-20 Dok akan dikirim ke Rumah engineering oleh DPC
Dok akan dikirim ke Rumah engineering oleh DPC
revisi submit 29-sept-20 Dok akan dikirim ke Rumah engineering oleh DPC
Dok akan dikirim ke Rumah engineering oleh DPC
Dok akan dikirim ke Rumah engineering oleh DPC
revisi submit 29-sept-20 Dok akan dikirim ke Rumah engineering oleh DPC
revisi submit 29-sept-20 Dok akan dikirim ke Rumah engineering oleh DPC
revisi submit 29-sept-20 Dok akan dikirim ke Rumah engineering oleh DPC
revisi submit 29-sept-20 Dok akan dikirim ke Rumah engineering oleh DPC
Dok akan dikirim ke Rumah engineering oleh DPC
Dok akan dikirim ke Rumah engineering oleh DPC
Dok akan dikirim ke Rumah engineering oleh DPC
Dok akan dikirim ke Rumah engineering oleh DPC
Dok akan dikirim ke Rumah engineering oleh DPC
Dok akan dikirim ke Rumah engineering oleh DPC
Dok akan dikirim ke Rumah engineering oleh DPC
Dok akan dikirim ke Rumah engineering oleh DPC

Revisi 3-Aug-21 Langsung submit


Masih diproject
23-Aug-21 26-Aug-21 7-Sep-21

Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto


Di Project Di Project Di Project
Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto
Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto
Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto
Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto

Di Project Di Project Di Project


Di Project Di Project Di Project
13-Sep-21 22-Sep-21 27-Sep-21

Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto


Di Project Di Project Di Project
Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto
Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto
Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto
Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Di Project Di Project Di Project
Dokumen Di Pak Toto Dokumen Di Pak Toto Dokumen Di Pak Toto

Di Project Di Project Di Project


Di Project Di Project Di Project
5-Oct-21 11-Oct-21

Dokumen Di Pak Toto Dokumen Di Pak Toto


Di Project Di Project
Dokumen Di Pak Toto Dokumen Di Pak Toto
Dokumen Di Pak Toto Dokumen Di Pak Toto
Dokumen Di Pak Toto Dokumen Di Pak Toto
Dokumen Di Pak Toto Dokumen Di Pak Toto
Di Project Di Project
Di Project Di Project
Di Project Di Project
Di Project Di Project
Dokumen Di Pak Toto Dokumen Di Pak Toto
Di Project Di Project
Di Project Di Project
Di Project Di Project
Di Project Di Project
Di Project Di Project
Di Project Di Project
Di Project Di Project
Dokumen Di Pak Toto Dokumen Di Pak Toto

Di Project Di Project
Di Project Di Project