Anda di halaman 1dari 3

KETERANGAN

DRAINASE RIOL KOTA DRAINASE RIOL KOTA

JL. TANDEM HILIR II 1.00


4.00
1.00

0.50 0.50

23.50

23.50
1 2 3 4 5 6

8.00

8.00
1 17

2 18

6.00

6.00
ROW 4.00
SALURAN II
3 19

6.00

6.00
4 20

6.00

6.00
4.00

5 21

6.00

6.00
6 22

6.00

6.00
122.43
SALURAN I
7 23
6.00

6.00
8
6.00

4.80
PEMBERI TUGAS

9 24
6.00

FASUM
1.00

17.00
10 25 SALURAN III
6.00

ATANG WIRANATA.NG

ROW 4.00
PERENCANA

11 26
6.00

12 27

53.80
6.00

HENDRA MANALU, ST

13.00
JUDUL GAMBAR

13 28 SALURAN IV
6.00

33 34
4.00

6.00
14 ROW 4.00 SALURAN V
6.00

31 32
PEIL BANJIR
15 29
6.00

ROW 4.00

13.00
16 30
6.00

ARSITEKTUR :

STRUKTUR :

M-E :
13.00 6.00 13.00 7.00 7.00
DIGAMBAR :

DIPERIKSA
PEIL BANJIR SALURAN VI
MANAJER PROYEK DIREKTUR

SKALA 1:750 NOMOR LEMBAR


TANGGAL SKALA

1: AR-
KETERANGAN

DRAINASE RIOL KOTA DRAINASE RIOL KOTA

JL. TANDEM HILIR II

23.50

23.50
ELV. -065 ELV. -065

KEMIRINGAN 1%
8.00

8.00
6.00

6.00
67.58
6.00

6.00
6.00

6.00
KEMIRINGAN 1%

103.58
6.00

6.00
6.00

6.00
122.43

122.52
6.00

6.00
6.00

4.80
PEMBERI TUGAS
6.00

FASUM
1.00

KEMIRINGAN 1%

17.00
ATANG WIRANATA.NG
6.00

PERENCANA
6.00

53.80
6.00

HENDRA MANALU, ST

13.00
JUDUL GAMBAR
JOIN ELV. -050
6.00

KEMIRINGAN 1%
PANGKAL ELV. -0.40
KEMIRINGAN 1%

6.00
27.50
6.00

PANGKAL ELV. -0.40 PEIL BANJIR


KEMIRINGAN 1%

KEMIRINGAN 1%
JOIN ELV. -050
6.00

13.46

13.00
6.00

ARSITEKTUR :

PEIL BANJIR
STRUKTUR :

M-E :
13.00 6.00 13.00 7.00 7.00
DIGAMBAR :

PANGKAL PANGKAL SKALA 1:750 MANAJER PROYEK


DIPERIKSA
DIREKTUR

ELV. -0.40 ELV. -0.40


TANGGAL SKALA NOMOR LEMBAR

1: AR-
KETERANGAN

30

PASANGAN

40
BATU BATA 1:4

55
PASANGAN
BATU BATA 1:4 PASANGAN
BATU BATA 1:4
10

COR BETON 1:3:5

10
COR BETON 1:3:5

10 40 10

10
COR BETON 1:3:5
10 40 10

DETAIL SALURAN TYPE 1 10 40 10


SKALA 1:20 DETAIL SALURAN TYPE 2
SKALA 1:20
DETAIL SALURAN TYPE 3
SKALA 1:20

PEMBERI TUGAS

ATANG WIRANATA.NG
PERENCANA

HENDRA MANALU, ST
JUDUL GAMBAR

SALURAN DRAINASE PAVING BLOCK SALURAN DRAINASE


TERSIER TERSIER

0,1 % KEMIRINGAN 0,1% DETAIL SALURAN


0.6

0.6

4.20

Pipa Air TINJA PVC Ø3" Pipa Air TINJA PVC Ø3"

0.6 0.4 4.0 0.4 0.6 ARSITEKTUR :


SEPTICTANK SEPTICTANK
STRUKTUR :

M-E :

DIGAMBAR :

DIPERIKSA

POTONGAN MELINTANG SALURAN MANAJER PROYEK DIREKTUR

TANGGAL SKALA NOMOR LEMBAR

1: AR-

Anda mungkin juga menyukai