0.50 0.50
23.50
23.50
1 2 3 4 5 6
8.00
8.00
1 17
2 18
6.00
6.00
ROW 4.00
SALURAN II
3 19
6.00
6.00
4 20
6.00
6.00
4.00
5 21
6.00
6.00
6 22
6.00
6.00
122.43
SALURAN I
7 23
6.00
6.00
8
6.00
4.80
PEMBERI TUGAS
9 24
6.00
FASUM
1.00
17.00
10 25 SALURAN III
6.00
ATANG WIRANATA.NG
ROW 4.00
PERENCANA
11 26
6.00
12 27
53.80
6.00
HENDRA MANALU, ST
13.00
JUDUL GAMBAR
13 28 SALURAN IV
6.00
33 34
4.00
6.00
14 ROW 4.00 SALURAN V
6.00
31 32
PEIL BANJIR
15 29
6.00
ROW 4.00
13.00
16 30
6.00
ARSITEKTUR :
STRUKTUR :
M-E :
13.00 6.00 13.00 7.00 7.00
DIGAMBAR :
DIPERIKSA
PEIL BANJIR SALURAN VI
MANAJER PROYEK DIREKTUR
1: AR-
KETERANGAN
23.50
23.50
ELV. -065 ELV. -065
KEMIRINGAN 1%
8.00
8.00
6.00
6.00
67.58
6.00
6.00
6.00
6.00
KEMIRINGAN 1%
103.58
6.00
6.00
6.00
6.00
122.43
122.52
6.00
6.00
6.00
4.80
PEMBERI TUGAS
6.00
FASUM
1.00
KEMIRINGAN 1%
17.00
ATANG WIRANATA.NG
6.00
PERENCANA
6.00
53.80
6.00
HENDRA MANALU, ST
13.00
JUDUL GAMBAR
JOIN ELV. -050
6.00
KEMIRINGAN 1%
PANGKAL ELV. -0.40
KEMIRINGAN 1%
6.00
27.50
6.00
KEMIRINGAN 1%
JOIN ELV. -050
6.00
13.46
13.00
6.00
ARSITEKTUR :
PEIL BANJIR
STRUKTUR :
M-E :
13.00 6.00 13.00 7.00 7.00
DIGAMBAR :
1: AR-
KETERANGAN
30
PASANGAN
40
BATU BATA 1:4
55
PASANGAN
BATU BATA 1:4 PASANGAN
BATU BATA 1:4
10
10
COR BETON 1:3:5
10 40 10
10
COR BETON 1:3:5
10 40 10
PEMBERI TUGAS
ATANG WIRANATA.NG
PERENCANA
HENDRA MANALU, ST
JUDUL GAMBAR
0.6
4.20
Pipa Air TINJA PVC Ø3" Pipa Air TINJA PVC Ø3"
M-E :
DIGAMBAR :
DIPERIKSA
1: AR-