Anda di halaman 1dari 4
REKAPITULASI BILL OF QUANTITY (BQ) REVITALISASI BANGUNAN GEDUNG BESERTA SARANA DAN PRASANA SATUAN PELAYANAN RUMAH PERLINDUNGAN SOSIAL LANJUT USIA SUKABUMI DINAS SOSIAL PROVINSI JAWA BARAT ‘TAHUN ANGGARAN 2022 No. URAIAN PEKERJAAN JUMLAH HARGA SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) IPERSIAPAN IPEKERJAAN REVITALISASI BANGUNAN GEDUNG I|PEKERJAAN PERSIAPAN DAN BONGKARAN II|PEKERJAAN STRUKTUR TI] PEKERJAAN ARSITEKTUR, MEKANIKAL & ELEKTRIKAL D__|PEKERJAAN REVITALISASI TEMBOK PENAHAN TANAH I|PEKERJAAN PERSIAPAN DAN BONGKARAN II|PEKERJAAN TANAH DAN PONDASI T1I|PEKERJAAN PEMBETONAN DAN DINDING PENAHAN TANAH omD> JUMLAH TOTAL | Rp = PPN (11%) | RP = JUMLAH TOTAL | Rp e DIBULATKAN | Ry = TERBILANG = . 2022 Penawar, JABATAN, BILL OF QUANTITY (BQ) REVITALISASI BANGUNAN GEDUNG BESERTA SARANA DAN PRASANA SATUAN PELAYANAN RUMAH PERLINDUNGAN SOSIAL LANJUT USIA SUKABUMI TAHUN ANGGARAN 2022 a Para ‘saTuan] vowume | HARGASATUAN | JUMLAHHARGA (ap.) (no) Z z z= = Es SE (a xB) ran RKK dan alPetugas i Konsukst Bn 2,000 fp b|Pengaranan Keselomatan Konstruks (Safty Briefing) org | 30,000 Ro 2 _|Alat Pelindung bi afoot peinauna (safety Helmet) pun | 30.000 Ro b}saruna tanaan (Safety loves) Pa | 30,000 Ro |Sepatu kesalamatan (Safety shoes) Pq | 30,000 Ro lomo Keelamatan (Safety Vest) pun | 30,000 Rp 3“ [Fasltas sarana, prasarana, dan alat keschatan: 2fPerlatanP3K (Kotak PBK, Tan, Obat Luka, Perban) Is 1,000 fp 4“ /Rambu- rambu yang dipertukan: alspanduk (Banner) » 2,000 Ro : poster b 2,000 ® : ¢|Papan informasl 3 Bua 2,000 RD cjpambu petunuk Bush 1,000 RD elRambu laranaan Bah 1000 RD */Rambu perngatan Bah 1000 Rp 5 _|Kegiatan dan peralatan terkait Pengendallan Risiko Keselamatan Konstruksi: ‘a]Alat Pemadam AD Ringan (APAR) Bush | 1,000 Ro : bJBendera ks Bush 17000 Ro : «saya B95 Kontrus| (BPS TH) is 1,000 ® 6 __|Keglatan Protokol Pencegahan Penyebaran Corona VIRUS DISEASE 2019 (COVID - 19) : lester Dus 6,000 Ro ond sanitizer Luter | 10,000 Ro cloenfeltan er 5,000 PERSIAPAN TPenbvatan kanfor sementare & Godang dengan inal pesteren m7 78,000 ® 2} Pepan nama provek Bush 1,000 Ro : 3]Pek str dan a kena is 17000 RD ]obiiae can cemobilas, is 11000 [PEKERJAAN PERSIAPAN DAN BONGKARAN. Tex. Penquxuran dan pemasangan bounDiank 7 $2,000 ® 2}Pa Bondar tao gertena m | s27.880 Ro : 5]Pe Bonakar Ranaka Atap Baja Rinaan SO% m | 263945 Ro 4]Pe Bonakarranaia lafoneksisina m | 37630 Ro 5]Pek Bonakarolafon eksising m | 376340 Ro 6 |Pek Bonghar Ringbalk Beton Existing ™ 3455 Rp 7}Pek Bongkar cnding m | 355780 Rp 83 ]Pek Bonar Instalat Ustk 509% toe | 26,000 Rp 9] Bongkar Klom Beton m 475 Rp 10}Pex. Bongkaran Sloot Beton m Ro 11|Pek Bongkar Rabat Beton Existing m Ro : 12|Pembuangan Bongkaran Ke Luar Aves m Ro : “JUMLAH I PEKERJAAN PERSTAPAN DAN GONGRARAN Rp 5 ra ‘STRUKTUR ‘A_| PEKERJAAN PONDAST T]Pex Galan Tanah Ponds Foor ak oy ™ 2}Pek Urugan Tanah Kemal ™ Ro 5]Pek Bor pondas Strauss Pile A Ro '4lPek Pondast Cycope Socm K-225, ™ Rp 5]? Pondas tous ile 630 cm fa Beton k= 225, ™ Rp [. Pembesian Bes! Polos ‘3 Ro 6| Be. Ponda Floor lst ls Beton K-25, m 5.240 fp lo. Pembesian Bes! Polos kg | 353828 Ro : ©. Beisting Pondas me | 22,700 ® : 7) Pk, Kolom Pedestal 20x30 la. Beton k= 225, m 1425 Ro [. Pembesian Bes! Polos kg | 239813 Ro €. Being Kolom Pedestal m | “11875 Rp 8 Pek. Urugan Pasir 10cm | m 2,086 Ro | bel, Lanta Kena Sam mm 1048 Bp > SUMLAH A PEKETOAAN PONDAST Rp = Z| PEKERIAAN STRUKTUR BETON. T]Pek loo Beton St 2 la Beton k= 225, 2,640 Rp [. Pembesian Bes! Polos kg | tt287 Rp . Being Slof Beton m2 | "26,300 Ro 2|pek Soot Beton St2 la. Beton k= 225, m 475 fp lo. Pembesian Bes! Polos ka | 46918 Ro : €. Beistng Slot Beton me | "33,000 ® : 3}Pek soot Beton st3 la. Beton k= 225, m 0,105 Ro lb. Pembesian Bes! Polos 'g 17,586 Ro ©, Bekistng Slo Beton m 1400 fp 4) Urugan Pasir bawah Slo 10cm m 27490 od 5 Lantal Kea Dt bawah Sloot Scm m 1245, Ro - 6| Pek. Kolom stukstur 20;30cm K-225 la. beton k= 225, m 4s15 Rp b. Pembesian Bes! Polos kg | 759,199 RD Being Kolom Struktar m_| 40325 RD =e ‘saTuan| votume | HARGASATUAN | JUMLAHHARGA cap.) (Rp) z = = cr S= (4x5) 7] Pa Kalam Pants TST la Beton K 175, m 0.508 Ro lp. Pembesian Bes! Polos kg | 191,656 Rp ©. Being Koiom Paks me 6,780 ® | Pe, alok unt! 10x20em la. Beton K-75, m 0.950 Rp [. Pembesian desi Polos kg | 2300058 Rp . Blitng Blok Lintel m | “iar Rp 9} Pek, Rinabalk 15x20 la. Beton K- 225, m 3525 Ro lb. Pembesan Bes! Polos ka | 18652 Ro Belting Balok Lite m2_| 23500 Ro SUMLAH B PEKERIAAN STRUKTUR BETON. Rp “JUMLAH TI PERERIAAN STRUI RD. KETJAAN PASANGAN DAN PELAPIS DINDING. Tek Pasangan ding 1/2 bata Ac. 1 PC: 3 PS m7 Te ® 2}Pek esteran dining 20mm Ad 1PC : 3 PS m 52a Ro 3] Pasangan cinding 1/2 bata Ad. 1 PC: 5 PS m | 286,774 Ro 4]Pak estan dining 20mm Ad IFC: 5 PS m | Sadar RD [Pek Pekerjaan aan m | 597353 Ro Opening pints & fendela m_| 159,000 Ro SUMLAH A PEKEIOAAN PASANGAN DAN PELAPIS DINDING. Rp | PEKERJAAN PASANGAN PENUTUP LANTAI DAN DINDING. Te Pasana lant Kerem Grant ukuran 60 x 69 cm me] aos % 2}Pak Pasana lata keramk Asa Tie ukuran 20 20 cm atisip m 12488 Ro 3]Pak Pasana dncina Kerik kamar mand m 56,150 Ro 4) Pek Rabat Beton m 36.520 Ro 5| Pek. Saluran ar bls beton 1/2 0 200m m_| 31300 fo Jumiah 8 PEKERJAAN PASANGAN PENUTUP LANTAT DAN DINDING Rp _—[-PEKERIAAN PASANGAN PLAFOND + RANGKA Tek. Rangla Pafond Ranoka How mt] 37630 Ro 2}Pakc Penutup Plafond Gypsum Sm m | 300340 Rp 3 |Peic Penutup Parond GRC m 75,400 Rp Slumlah C PEKERDAAN PASANGAN PLAFOND + RANGKA. Rp 1D | PEKERIAAN ATAP T] Pek, Ranga Atap Bais Rings mm | 385 ® 2| Bek. Penutup Atap Metal roof gant 10036 m | 527,880 Ro 3) Pek Bubungan Genteng Meta m 23,000 Ro Jumlah D PEKERIAAN ATAP_ Rp TE] BONGKAR DAN PASANG KUSEN, PINTU DAN JENDETA Te Pints PD la. Pek. Bonokar Pinu PD Unt fp lb. Pek: Bongkar Kusen PDI Unt Rp le: Pek. Pembuatan KusenAllumunum Warna 4" m Ro 1. Pek. Pembuatan Daun Pints Double Mutpek Lapis HPL 8O210 m | 877238 Rp Belistng Lanta, m. 20/500 Rp Rp [GOMLAH IIT PEKERIAAN PEMBETONAN DAN DINDING PENAHAN TANAR

Anda mungkin juga menyukai