Anda di halaman 1dari 26

Halaman

Proyek
Lokasi
Minggu Ke
Tanggal
RENCANA KERJA 2 MINGGUAN
NO. 19/RESET/CAY/13-06-2012
HARI
PERSENTASE BOBOT
14 15 16 17 18 19 20 21 22 23 24 25 26 27
Bobot BOBOT

MINGGU

MINGGU
SELASA

SELASA
NO ID PEKERJAAN QTY SAT RENCANA ACTUAL 2 RENCANA BOBOT

SABTU

SABTU
JUMAT

JUMAT
KAMIS

KAMIS
SENIN

SENIN
RABU

RABU
RAB RENCANA
2 MINGGU MINGGU 2 MINGGU 2 MINGGU
2 MINGGU
LALU LALU KEDEPAN LALU
INI

I PEKERJAAN PERSIAPAN
II. PEKERJAAN PONDASI & STRUKTUR
II.A Pekerjaan Tanah & Pondasi
II.B Pekerjaan Struktur Lantai Dasar
3 Struktur Canopy (Plat & balok Overstek) as B/3-5,B'/5-6,e/4-6,E-F/4,B/1-3
- Beton K225 0.421% 4.06 m3 0% 0% 100% 0.000% 0.421%
- Besi beton standard SNI 0.314% 193.55 kg 0% 0% 100% 0.000% 0.314%
- Bekisting 0.720% 38.71 m2 0% 0% 100% 0.000% 0.720%
- Plastik cor 0.019% 38.71 m2 0% 0% 100% 0.000% 0.019%
II.C Pekerjaan Struktur Lantai Atas
2 Struktur Balok + Janggutan
- Beton K225 0.761% 7.34 m3 0% 0% 100% 0.000% 0.761%
- Besi beton standard SNI 1.491% 917.87 kg 0% 0% 100% 0.000% 1.491%
- Bekisting 1.207% 60.80 m2 0% 20% 100% 0.241% 0.966%
3 Struktur Plat lantai
- Beton K225 1.645% 15.87 m3 0% 0% 100% 0.000% 1.645%
- Besi beton standard SNI 1.289% 793.66 kg 0% 20% 100% 0.258% 1.031%
- Bekisting 2.446% 131.43 m2 0% 20% 100% 0.489% 1.957%
- Plastik cor 0.067% 134.11 m2 0% 0% 100% 0.000% 0.067%
II.D Pekerjaan Struktur Lantai Atap
III PEKERJAAN DINDING + FINISHING
III.A Pekerjaan Dinding Lantai - 1
III.B Pekerjaan Dinding Lantai - 2
III.C Pekerjaan Dinding Lantai - Atap Dak Beton Parapet
IV. PEKERJAAN FINISHING LANTAI
IV.A Pekerjaan Finishing Lantai Dasar
IV.B Pekerjaan Finishing Lantai Atas
V. PEKERJAAN KUSEN PINTU & JENDELA
V.A Pintu Kayu (Kusen dan Daun) + Aksesoris
V.B Pintu PVC (Kusen dan Daun) + Aksesoris
V.C Pintu besi + acessories
V.D Pintu dan Jendela Aluminium dan Kaca (Kusen dan Daun)+ Aksesoris
VI. PEKERJAAN RAILLING & TANGGA SERVICE
VII. PEKERJAAN PLAFOND
VII.A Pekerjaan Plafond Lantai Dasar
VII.B Pekerjaan Plafond Lantai Atas
VIII. PEKERJAAN ATAP
IX. PEKERJAAN SANITARY
IX.A Pekerjaan Sanitary Lantai - 1
IX.B Pekerjaan Sanitary Lantai - 2
X. PEKERJAAN PLUMBING
X.A. Pekerjaan Instalasi Air Bersih
X.B. Pekerjaan Instalasi Air Panas Lt. Dasar & Lt. Atas
X.C. Pekerjaan Instalasi Air Hujan, Air Bekas & Air Kotor
3 Pekerjaan instalasi pipa lantai atas :
- PVC AW - dia. 4" 0.014% 1.30 m' 0% 0% 100% 0.000% 0.014%
- PVC AW - dia. 3" 0.043% 6.50 m' 0% 0% 100% 0.000% 0.043%
- PVC AW - dia. 2" 0.006% 1.50 m' 0% 0% 100% 0.000% 0.006%
- PVC AW - dia. 2" (pipa vent) 0.121% 31.47 m' 0% 0% 100% 0.000% 0.121%
X.D. Pekerjaan Sparing + Pancingan Instalasi SRTR, MATV
XI. PEKERJAAN ELEKTRIKAL
XI.A Pekerjaan Panel & Kabel Toevoer
XI.B Pekerjaan Instalasi Elektrikal
XI.C Pekerjaan Outlet Elektrikal
XII. PEKERJAAN LUAR DAN HALAMAN
100.000%
BOBOT s/d MINGGU LALU 12.37%
RENCANA BOBOT 2 MINGGU KEDEPAN 9.58%
RENCANA KUMULATIF BOBOT 2 MINGGU KEDEPAN 21.944%

Yogyakarta, 30 Mei 2012


Disetujui oleh : Dibuat oleh :

YNA YPI
Dari :
Hyarta Residence
PRATISTA D 9
19 S/D 20
14 JUNI s/d 27 JUNI 2012

KETERANGAN
Yogyakarta, 30 Mei 2012
Dibuat oleh :
Halaman
Proyek
Lokasi
Minggu Ke
Tanggal
RENCANA KERJA 2 MINGGUAN
NO. 19/RESET/CAY/13-06-2012
HARI
PERSENTASE BOBOT
14 15 16 17 18 19 20 21 22 23 24 25 26 27
Bobot BOBOT

MINGGU

MINGGU

SELASA
SELASA
NO ID PEKERJAAN QTY SAT

JUMAT

JUMAT
SABTU

SABTU
RENCANA ACTUAL 2 RENCANA BOBOT

KAMIS

KAMIS
SENIN

SENIN
RABU

RABU
RAB RENCANA
2 MINGGU MINGGU 2 MINGGU 2 MINGGU
2 MINGGU
LALU LALU KEDEPAN LALU
INI

I PEKERJAAN PERSIAPAN
II. PEKERJAAN PONDASI & STRUKTUR
II.A Pekerjaan Tanah & Pondasi
3 Struktur Canopy (Plat & balok Overstek) as B/3-5,B'/5-6,e/4-6,E-F/4,B/1-3
- Beton K225 0.421% 4.06 m3 0% 0% 100% 0.000% 0.421%
- Besi beton standard SNI 0.314% 193.55 kg 0% 0% 100% 0.000% 0.314%
- Bekisting 0.720% 38.71 m2 0% 0% 100% 0.000% 0.720%
- Plastik cor 0.019% 38.71 m2 0% 0% 100% 0.000% 0.019%
II.C Pekerjaan Struktur Lantai Atas
2 Struktur Balok + Janggutan
- Beton K225 0.761% 7.34 m3 0% 0% 100% 0.000% 0.761%
- Besi beton standard SNI 1.491% 917.87 kg 0% 0% 100% 0.000% 1.491%
- Bekisting 1.207% 60.80 m2 0% 20% 100% 0.241% 0.966%
3 Struktur Plat lantai
- Beton K225 1.645% 15.87 m3 0% 0% 100% 0.000% 1.645%
- Besi beton standard SNI 1.289% 793.66 kg 0% 20% 100% 0.258% 1.031%
- Bekisting 2.446% 131.43 m2 0% 20% 100% 0.489% 1.957%
- Plastik cor 0.067% 134.11 m2 0% 0% 100% 0.000% 0.067%
II.D Pekerjaan Struktur Lantai Atap
III PEKERJAAN DINDING + FINISHING
III.A Pekerjaan Dinding Lantai - 1
III.B Pekerjaan Dinding Lantai - 2
III.C Pekerjaan Dinding Lantai - Atap Dak Beton Parapet
IV. PEKERJAAN FINISHING LANTAI
IV.A Pekerjaan Finishing Lantai Dasar
IV.B Pekerjaan Finishing Lantai Atas
V. PEKERJAAN KUSEN PINTU & JENDELA
V.A Pintu Kayu (Kusen dan Daun) + Aksesoris
V.B Pintu PVC (Kusen dan Daun) + Aksesoris
V.C Pintu besi + acessories
V.D Pintu dan Jendela Aluminium dan Kaca (Kusen dan Daun)+ Aksesoris
VI. PEKERJAAN RAILLING & TANGGA SERVICE
VII. PEKERJAAN PLAFOND
VII.A Pekerjaan Plafond Lantai Dasar
VII.B Pekerjaan Plafond Lantai Atas
VIII. PEKERJAAN ATAP
IX. PEKERJAAN SANITARY
IX.A Pekerjaan Sanitary Lantai - 1
IX.B Pekerjaan Sanitary Lantai - 2
X. PEKERJAAN PLUMBING
X.A. Pekerjaan Instalasi Air Bersih
X.B. Pekerjaan Instalasi Air Panas Lt. Dasar & Lt. Atas
X.C. Pekerjaan Instalasi Air Hujan, Air Bekas & Air Kotor
3 Pekerjaan instalasi pipa lantai atas :
- PVC AW - dia. 4" 0.014% 1.30 m' 0% 0% 100% 0.000% 0.014%
- PVC AW - dia. 3" 0.043% 6.50 m' 0% 0% 100% 0.000% 0.043%
- PVC AW - dia. 2" 0.006% 1.50 m' 0% 0% 100% 0.000% 0.006%
- PVC AW - dia. 2" (pipa vent) 0.121% 31.47 m' 0% 0% 100% 0.000% 0.121%
X.D. Pekerjaan Sparing + Pancingan Instalasi SRTR, MATV
XI. PEKERJAAN ELEKTRIKAL
XI.A Pekerjaan Panel & Kabel Toevoer
XI.B Pekerjaan Instalasi Elektrikal
XI.C Pekerjaan Outlet Elektrikal
XII. PEKERJAAN LUAR DAN HALAMAN
100.000%
BOBOT s/d MINGGU LALU 13.79%
RENCANA BOBOT 2 MINGGU KEDEPAN 9.58%
RENCANA KUMULATIF BOBOT 2 MINGGU KEDEPAN 23.370%

Yogyakarta, 30 Mei 2012


Disetujui oleh : Dibuat oleh :

YNA YPI
Dari :
Hyarta Residence
PRATISTA D 8
19 S/D 20
14 JUNI s/d 27 JUNI 2012

KETERANGAN
Yogyakarta, 30 Mei 2012
Dibuat oleh :
NO ID PEKERJAAN

I PEKERJAAN PERSIAPAN
II. PEKERJAAN PONDASI & STRUKTUR
II.A Pekerjaan Tanah & Pondasi
3 Struktur Canopy (Plat & balok Overstek) as B/3-5,B'/5-6,e/4-6,E-F/4,B/1-3
- Beton K225
- Besi beton standard SNI
- Bekisting
- Plastik cor
II.C Pekerjaan Struktur Lantai Atas
1 Struktur Kolom
- Beton K225
- Besi beton standard SNI
- Bekisting
2 Struktur Balok + Janggutan
- Beton K225
- Besi beton standard SNI
- Bekisting
3 Struktur Plat lantai
- Beton K225
- Besi beton standard SNI
- Bekisting
- Plastik cor
4 Struktur Canopy (Plat & balok Overstek) as C/5-6,E/4-6,4/E-F
- Beton K225
- Besi beton standard SNI
- Bekisting
- Plastik cor
II.D Pekerjaan Struktur Lantai Atap
1 Struktur Balok + Janggutan
- Beton K225
- Besi beton standard SNI
- Bekisting
2 Struktur Plat lantai
- Beton K225
- Besi beton standard SNI
- Bekisting
- Plastik cor
III PEKERJAAN DINDING + FINISHING
III.A Pekerjaan Dinding Lantai - 1
III.B Pekerjaan Dinding Lantai - 2
III.C Pekerjaan Dinding Lantai - Atap Dak Beton Parapet
IV. PEKERJAAN FINISHING LANTAI
IV.A Pekerjaan Finishing Lantai Dasar
IV.B Pekerjaan Finishing Lantai Atas
V. PEKERJAAN KUSEN PINTU & JENDELA
V.A Pintu Kayu (Kusen dan Daun) + Aksesoris
V.B Pintu PVC (Kusen dan Daun) + Aksesoris
V.C Pintu besi + acessories
V.D Pintu dan Jendela Aluminium dan Kaca (Kusen dan Daun)+ Aksesoris
VI. PEKERJAAN RAILLING & TANGGA SERVICE
VII. PEKERJAAN PLAFOND
VII.A Pekerjaan Plafond Lantai Dasar
VII.B Pekerjaan Plafond Lantai Atas
VIII. PEKERJAAN ATAP
IX. PEKERJAAN SANITARY
IX.A Pekerjaan Sanitary Lantai - 1
IX.B Pekerjaan Sanitary Lantai - 2
X. PEKERJAAN PLUMBING
X.A. Pekerjaan Instalasi Air Bersih
X.B. Pekerjaan Instalasi Air Panas Lt. Dasar & Lt. Atas
X.C. Pekerjaan Instalasi Air Hujan, Air Bekas & Air Kotor
3 Pekerjaan instalasi pipa lantai atas :
- PVC AW - dia. 4"
- PVC AW - dia. 3"
- PVC AW - dia. 2"
- PVC AW - dia. 2" (pipa vent)
X.D. Pekerjaan Sparing + Pancingan Instalasi SRTR, MATV
XI. PEKERJAAN ELEKTRIKAL
XI.A Pekerjaan Panel & Kabel Toevoer
XI.B Pekerjaan Instalasi Elektrikal
XI.C Pekerjaan Outlet Elektrikal
XII. PEKERJAAN LUAR DAN HALAMAN

BOBOT s/d MINGGU LALU


RENCANA BOBOT 2 MINGGU KEDEPAN
RENCANA KUMULATIF BOBOT 2 MINGGU KEDEPAN
RENCANA KERJA 2 MINGGUAN
NO. 19/RESET/CAY/13-06-2012

PERSENTASE BOBOT
14
Bobot BOBOT
QTY SAT RENCANA ACTUAL 2 RENCANA BOBOT

KAMIS
RAB RENCANA
2 MINGGU MINGGU 2 MINGGU 2 MINGGU
2 MINGGU
LALU LALU KEDEPAN LALU
INI

0.421% 4.06 m3 100% 0.000% 0.421%


0.314% 193.55 kg 100% 100% 0% 0.314% 0.000%
0.720% 38.71 m2 100% 100% 0% 0.720% 0.000%
0.019% 38.71 m2 100% 100% 0% 0.019% 0.000%

0.240% 2.32 m3 0% 0% 100% 0.000% 0.240%


0.571% 351.53 kg 0% 0% 100% 0.000% 0.571%
0.485% 39.85 m2 0% 0% 100% 0.000% 0.485%

0.761% 7.34 m3 0% 100% 100% 0.761% 0.000%


1.491% 917.87 kg 100% 100% 0% 1.491% 0.000%
1.207% 60.80 m2 100% 100% 0% 1.207% 0.000%

1.645% 15.87 m3 0% 0% 100% 0.000% 1.645%


1.289% 793.66 kg 100% 100% 0% 1.289% 0.000%
2.446% 131.43 m2 100% 100% 0% 2.446% 0.000%
0.067% 134.11 m2 100% 100% 0% 0.067% 0.000%

0.107% 1.03 m3 0% 0% 100% 0.000% 0.107%


0.092% 56.89 kg 100% 100% 0% 0.092% 0.000%
0.192% 10.34 m2 100% 100% 0% 0.192% 0.000%
0.005% 10.34 m2 100% 100% 0% 0.005% 0.000%

0.622% 6.00 m3 0% 0% 0% 0.000% 0.000%


1.111% 684.00 kg 0% 0% 50% 0.000% 0.556%
1.705% 85.88 m2 0% 0% 50% 0.000% 0.853%

0.950% 9.17 m3 0% 0% 0% 0.000% 0.000%


1.269% 781.07 kg 0% 0% 50% 0.000% 0.634%
1.423% 76.44 m2 0% 0% 50% 0.000% 0.711%
0.043% 84.93 m2 0% 0% 0% 0.000% 0.000%

0.014% 1.30 m' 0% 0% 100% 0.000% 0.014%


0.043% 6.50 m' 0% 0% 100% 0.000% 0.043%
0.006% 1.50 m' 0% 0% 100% 0.000% 0.006%
0.121% 31.47 m' 0% 0% 100% 0.000% 0.121%

100.000%
21.41%
6.41%
GU KEDEPAN 27.816%
Disetujui oleh :

YNA
Halaman Dari :
Proyek Hyarta Residence
Lokasi PRATISTA D 7
Minggu Ke 19 S/D 20
Tanggal 14 JUNI s/d 27 JUNI 2012

HARI
15 16 17 18 19 20 21 22 23 24 25 26 27
MINGGU

MINGGU
SELASA

SELASA
KETERANGAN
SABTU

SABTU
JUMAT

JUMAT
KAMIS
SENIN

SENIN
RABU

RABU
Yogyakarta, 30 Mei 2012
Dibuat oleh :

YPI
Halaman
Proyek
Lokasi
Minggu Ke
Tanggal
RENCANA KERJA 2 MINGGUAN
NO. 19/RESET/CAY/13-06-2012
HARI
PERSENTASE BOBOT
14 15 16 17 18 19 20 21 22 23 24 25 26 27
Bobot BOBOT

MINGGU

MINGGU

SELASA
SELASA
NO ID PEKERJAAN QTY SAT RENCANA ACTUAL 2 RENCANA BOBOT

JUMAT

JUMAT
SABTU

SABTU
KAMIS

KAMIS
SENIN

SENIN
RABU

RABU
RAB RENCANA
2 MINGGU MINGGU 2 MINGGU 2 MINGGU
2 MINGGU
LALU LALU KEDEPAN LALU
INI

I PEKERJAAN PERSIAPAN
II. PEKERJAAN PONDASI & STRUKTUR
II.A Pekerjaan Tanah & Pondasi
II.B Pekerjaan Struktur Lantai Dasar
1 Struktur Plat lantai bawah
3 Struktur Canopy (Plat & balok Overstek) as B/1-5,B/4-6,G/6-7,G-H/5,4/B-D
- Beton K225 0.310% 3.20 m3 0% 0% 50% 0.000% 0.155%
- Besi beton standard SNI 0.222% 146.66 kg 0% 0% 50% 0.000% 0.111%
- Bekisting 0.529% 30.45 m2 0% 0% 50% 0.000% 0.265%
II.C Pekerjaan Struktur Lantai Atas
1 Struktur Kolom
- Beton K225 0.295% 3.05 m3 0% 0% 0% 0.000% 0.000%
- Besi beton standard SNI 0.897% 591.17 kg 0% 0% 20% 0.000% 0.179%
- Bekisting 0.562% 49.46 m2 0% 0% 20% 0.000% 0.112%
2 Struktur Balok + Janggutan
- Beton K225 0.838% 8.66 m3 0% 0% 100% 0.000% 0.838%
- Besi beton standard SNI 1.598% 1,053.43 kg 0% 50% 100% 0.799% 0.799%
- Bekisting 1.838% 99.15 m2 0% 50% 100% 0.919% 0.919%
3 Struktur Plat lantai
- Beton K225 1.315% 13.59 m3 0% 0% 100% 0.000% 1.315%
- Besi beton standard SNI 0.986% 650.22 kg 0% 50% 100% 0.493% 0.493%
- Bekisting 1.969% 113.29 m2 0% 50% 100% 0.984% 0.984%
4 Struktur Canopy (Plat & balok Overstek) as G/5-7,D/1-3,G-H/5
- Beton K225 0.189% 1.95 m3 0% 0% 50% 0.000% 0.094%
- Besi beton standard SNI 0.133% 87.65 kg 0% 50% 0% 0.066% 0.000%
- Bekisting 0.277% 15.93 m2 0% 50% 0% 0.138% 0.000%
II.D Pekerjaan Struktur Lantai Atap
III PEKERJAAN DINDING + FINISHING
III.A Pekerjaan Dinding Lantai - 1
III.B Pekerjaan Dinding Lantai - 2
III.C Pekerjaan Dinding Lantai - Atap Dak Beton Parapet
IV. PEKERJAAN FINISHING LANTAI
IV.A Pekerjaan Finishing Lantai Dasar
IV.B Pekerjaan Finishing Lantai Atas
V. PEKERJAAN KUSEN PINTU & JENDELA
V.A Pintu Kayu (Kusen dan Daun) + Aksesoris
VI. PEKERJAAN RAILLING & TANGGA SERVICE
VII. PEKERJAAN PLAFOND
VII.A Pekerjaan Plafond Lantai Dasar
VII.B Pekerjaan Plafond Lantai Atas
VIII. PEKERJAAN ATAP
IX. PEKERJAAN SANITARY
IX.A Pekerjaan Sanitary Lantai - 1
IX.B Pekerjaan Sanitary Lantai - 2
X. PEKERJAAN PLUMBING
X.A. Pekerjaan Instalasi Air Bersih
X.B. Pekerjaan Instalasi Air Panas Lt. Dasar & Lt. Atas
X.C. Pekerjaan Instalasi Air Hujan, Air Bekas & Air Kotor
X.D. Pekerjaan Sparing + Pancingan Instalasi SRTR, MATV
XI. PEKERJAAN ELEKTRIKAL
XI.A Pekerjaan Panel & Kabel Toevoer
XI.B Pekerjaan Instalasi Elektrikal
XI.C Pekerjaan Outlet Elektrikal
XII. PEKERJAAN LUAR DAN HALAMAN
100.000%
BOBOT s/d MINGGU LALU 18.40%
RENCANA BOBOT 2 MINGGU KEDEPAN 8.57%
RENCANA KUMULATIF BOBOT 2 MINGGU KEDEPAN 26.967%

Yogyakarta, 30 Mei 2012


Disetujui oleh : Dibuat oleh :

YNA YPI
Dari :
Hyarta Residence
CAYAPATA D 3
19 S/D 20
14 JUNI s/d 27 JUNI 2012

KETERANGAN
Yogyakarta, 30 Mei 2012
Dibuat oleh :
NO ID PEKERJAAN

I PEKERJAAN PERSIAPAN
II. PEKERJAAN PONDASI & STRUKTUR
II.A Pekerjaan Tanah & Pondasi
II.B Pekerjaan Struktur Lantai Dasar
1 Struktur Plat lantai bawah
3 Struktur Canopy (Plat & balok Overstek) as B/1-5,B/4-6,G/6-7,G-H/5,4/B-D
- Beton K225
- Besi beton standard SNI
- Bekisting
II.C Pekerjaan Struktur Lantai Atas
1 Struktur Kolom
- Beton K225
- Besi beton standard SNI
- Bekisting
2 Struktur Balok + Janggutan
- Beton K225
- Besi beton standard SNI
- Bekisting
3 Struktur Plat lantai
- Beton K225
- Besi beton standard SNI
- Bekisting
4 Struktur Canopy (Plat & balok Overstek) as G/5-7,D/1-3,G-H/5
- Beton K225
- Besi beton standard SNI
- Bekisting
II.D Pekerjaan Struktur Lantai Atap
III PEKERJAAN DINDING + FINISHING
III.A Pekerjaan Dinding Lantai - 1
III.B Pekerjaan Dinding Lantai - 2
III.C Pekerjaan Dinding Lantai - Atap Dak Beton Parapet
IV. PEKERJAAN FINISHING LANTAI
IV.A Pekerjaan Finishing Lantai Dasar
IV.B Pekerjaan Finishing Lantai Atas
V. PEKERJAAN KUSEN PINTU & JENDELA
V.A Pintu Kayu (Kusen dan Daun) + Aksesoris
VI. PEKERJAAN RAILLING & TANGGA SERVICE
VII. PEKERJAAN PLAFOND
VII.A Pekerjaan Plafond Lantai Dasar
VII.B Pekerjaan Plafond Lantai Atas
VIII. PEKERJAAN ATAP
IX. PEKERJAAN SANITARY
IX.A Pekerjaan Sanitary Lantai - 1
IX.B Pekerjaan Sanitary Lantai - 2
X. PEKERJAAN PLUMBING
X.A. Pekerjaan Instalasi Air Bersih
X.B. Pekerjaan Instalasi Air Panas Lt. Dasar & Lt. Atas
X.C. Pekerjaan Instalasi Air Hujan, Air Bekas & Air Kotor
X.D. Pekerjaan Sparing + Pancingan Instalasi SRTR, MATV
XI. PEKERJAAN ELEKTRIKAL
XI.A Pekerjaan Panel & Kabel Toevoer
XI.B Pekerjaan Instalasi Elektrikal
XI.C Pekerjaan Outlet Elektrikal
XII. PEKERJAAN LUAR DAN HALAMAN

BOBOT s/d MINGGU LALU


RENCANA BOBOT 2 MINGGU KEDEPAN
RENCANA KUMULATIF BOBOT 2 MINGGU KEDEPAN

Disetujui oleh :
RENCANA KERJA 2 MINGGUAN
NO. 19/RESET/CAY/13-06-2012

PERSENTASE BOBOT
14
Bobot BOBOT
QTY SAT RENCANA ACTUAL 2 RENCANA BOBOT

KAMIS
RAB RENCANA
2 MINGGU MINGGU 2 MINGGU 2 MINGGU
2 MINGGU
LALU LALU KEDEPAN LALU
INI

0.310% 3.20 m3 0% 0% 50% 0.000% 0.155%


0.222% 146.66 kg 0% 0% 50% 0.000% 0.111%
0.529% 30.45 m2 0% 0% 50% 0.000% 0.265%

0.295% 3.05 m3 0% 0% 0% 0.000% 0.000%


0.897% 591.17 kg 0% 0% 20% 0.000% 0.179%
0.562% 49.46 m2 0% 0% 20% 0.000% 0.112%

0.838% 8.66 m3 0% 0% 100% 0.000% 0.838%


1.598% 1,053.43 kg 0% 50% 100% 0.799% 0.799%
1.838% 99.15 m2 0% 50% 100% 0.919% 0.919%

1.315% 13.59 m3 0% 0% 100% 0.000% 1.315%


0.986% 650.22 kg 0% 50% 100% 0.493% 0.493%
1.969% 113.29 m2 0% 50% 100% 0.984% 0.984%

0.189% 1.95 m3 0% 0% 50% 0.000% 0.094%


0.133% 87.65 kg 0% 50% 0% 0.066% 0.000%
0.277% 15.93 m2 0% 50% 0% 0.138% 0.000%
100.000%
18.40%
8.57%
GU KEDEPAN 26.967%

Disetujui oleh :

YNA
Halaman Dari :
Proyek Hyarta Residence
Lokasi CAYAPATA D 2
Minggu Ke 19 S/D 20
Tanggal 14 JUNI s/d 27 JUNI 2012

HARI
15 16 17 18 19 20 21 22 23 24 25 26 27
MINGGU

MINGGU
SELASA

SELASA
KETERANGAN
SABTU

SABTU
JUMAT

JUMAT
KAMIS
SENIN

SENIN
RABU

RABU
Yogyakarta, 30 Mei 2012
Dibuat oleh :

YPI