No. Jenis Pekerjaan KONTRAK LAMA PEKERJAAN TAMBAH PEKERJAAN KURANG KONTRAK BARU
(Rp.) (Rp.) (Rp.) (Rp.)
Dua Milyar Lima Ratus Tiga Juta Tiga Ratus Satu Ribu Sembilan Ratus Rupiah
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan patok 2,270.00 m' 33,400.00 75,818,000.00 - m' 33,400.00 - - m' 33,400.00 - 2,270.00 m' 33,400.00 75,818,000.00
2 Direksi kit (Sewa) 4.00 bln 3,000,000.00 12,000,000.00 - bln 3,000,000.00 - - bln 3,000,000.00 - 4.00 bln 3,000,000.00 12,000,000.00
3 Biaya air kerja 1.00 ls 5,000,000.00 5,000,000.00 - ls 5,000,000.00 - - ls 5,000,000.00 - 1.00 ls 5,000,000.00 5,000,000.00
4 Biaya dokumentasi 1.00 ls 5,000,000.00 5,000,000.00 - ls 5,000,000.00 - - ls 5,000,000.00 - 1.00 ls 5,000,000.00 5,000,000.00
5 Papan nama proyek 1.00 ls 1,500,000.00 1,500,000.00 - ls 1,500,000.00 - - ls 1,500,000.00 - 1.00 ls 1,500,000.00 1,500,000.00
99,318,000.00 - - 99,318,000.00
II K3
1 Topi pelindung (safety helmet) 50.00 bh 75,000.00 3,750,000.00 - bh 75,000.00 - - bh 75,000.00 - 50.00 bh 75,000.00 3,750,000.00
2 Sarung tangan 50.00 bh 15,000.00 750,000.00 - bh 15,000.00 - - bh 15,000.00 - 50.00 bh 15,000.00 750,000.00
3 Sepatu keselamatan (safety shoes) 50.00 bh 200,000.00 10,000,000.00 - bh 200,000.00 - - bh 200,000.00 - 50.00 bh 200,000.00 10,000,000.00
4 Pembatas area 5.00 ls 250,000.00 1,250,000.00 - ls 250,000.00 - - ls 250,000.00 - 5.00 ls 250,000.00 1,250,000.00
5 Papan informasi K3 3.00 bh 250,000.00 750,000.00 - bh 250,000.00 - - bh 250,000.00 - 3.00 bh 250,000.00 750,000.00
6 Pembuatan Manual, Prosedur, dan Instruksi Kerja 1.00 ls 3,000,000.00 3,000,000.00 - ls 3,000,000.00 - - ls 3,000,000.00 - 1.00 ls 3,000,000.00 3,000,000.00
7 Pembuatan Kartu Identitas Pekerja (KIP) 50.00 bh 25,000.00 1,250,000.00 - bh 25,000.00 - - bh 25,000.00 - 50.00 bh 25,000.00 1,250,000.00
8 Pelindung Pernafasan Dan Mulut (Masker); 50.00 bh 10,000.00 500,000.00 - bh 10,000.00 - - bh 10,000.00 - 50.00 bh 10,000.00 500,000.00
9 Petugas K3 1.00 org 12,000,000.00 12,000,000.00 - org 12,000,000.00 - - org 12,000,000.00 - 1.00 org 12,000,000.00 12,000,000.00
10 Kerucut Lalu Lintas (Traffic Cone) 10.00 bh 150,000.00 1,500,000.00 - bh 150,000.00 - - bh 150,000.00 - 10.00 bh 150,000.00 1,500,000.00
11 Rambu Pekerjaan Sementara 5.00 bh 250,000.00 1,250,000.00 - bh 250,000.00 - - bh 250,000.00 - 5.00 bh 250,000.00 1,250,000.00
12 Rambu Petunjuk 5.00 bh 250,000.00 1,250,000.00 - bh 250,000.00 - - bh 250,000.00 - 5.00 bh 250,000.00 1,250,000.00
37,250,000.00 - - 37,250,000.00
II K3 37,250,000.00 - - 37,250,000.00
II PEKERJAAN TAMAN
1 Galian tanah biasa sedalam 1 m B.001 35.00 m3 53,100.00 1,858,500.00 - - 35.00 m3 53,100.00 1,858,500.00
5.21 m3 53,100.00 276,651.00 5.21 m3 53,100.00 276,651.00
2 Urugan Tanah B.016 35.00 m3 74,500.00 2,607,500.00 35.00 m3 74,500.00 2,607,500.00
Urugan Tanah 13.25 m3 74,500.00 987,274.00 - - 13.25 m3 74,500.00 987,274.00
3 Kansteen 10x20x50 M.065a 280.00 m' 44,400.00 12,432,000.00 - - 0.35 m' 44,400.00 15,540.00 279.65 m' 44,400.00 12,416,460.00
4 Menanam rumput manila S.002 252.00 m² 31,800.00 8,013,600.00 - - 50.95 m² 31,800.00 1,620,210.00 201.05 m² 31,800.00 6,393,390.00
5 Pohon Pinus 70.00 bh 1,000,000.00 70,000,000.00 - - 40.00 bh 1,000,000.00 40,000,000.00 30.00 bh 1,000,000.00 30,000,000.00
6 Pohon Kamboja Salju 70.00 bh 200,000.00 14,000,000.00 - - 40.00 bh 200,000.00 8,000,000.00 30.00 bh 200,000.00 6,000,000.00
40,000,000.00 - - 40,000,000.00
III PEKERJAAN PAVINGISASI DAN OVERLAY JALAN 148,380,966.00 11,410,247.13 108,821,309.55 50,969,903.57
2 Pasang paving stone (blok) segi empat biasa K-250 M.065 208.95 m2 85,800.00 17,927,910.00 33.49 m2 85,800.00 2,873,801.16 175.46 m2 85,800.00 15,054,108.84
3 Pasang paving stone (blok) segi empat warna K-250 M.066 89.55 m2 92,400.00 8,274,420.00 - - 36.81 m2 92,400.00 3,400,857.21 52.74 m2 92,400.00 4,873,562.79
4 Kansteen 10x20x40 M.065a 432.00 m1 44,400.00 19,180,800.00 - - 108.00 m1 44,400.00 4,795,200.00 324.00 m1 44,400.00 14,385,600.00
5 Bongkaran Beton Rabat (item baru) - m3 - 18.97 m3 389,800.00 7,394,506.00 - - 18.97 m3 389,800.00 7,394,506.00
6 Pembuangan tanah sejauh > 1 km B.020 - m3 - 28.10 m3 24,100.00 677,161.80 - - 28.10 m3 24,100.00 677,161.80
7 Plesteran 1 : 4 dan acian 1 : 2 (item baru) - m2 - 14.00 m3 81,800.00 1,145,200.00 - - 14.00 m2 81,800.00 1,145,200.00
2 Pembuangan tanah sejauh > 1 km B.020 51.22 m3 24,100.00 1,234,402.00 51.22 m3 24,100.00 1,234,402.00
Pembuangan tanah sejauh > 1 km 7.39 m3 24,100.00 177,978.50 - - 7.39 m3 24,100.00 177,978.50
3 Urugan pasir B.011 5.97 m3 141,800.00 846,546.00 5.97 m3 141,800.00 846,546.00
Urugan pasir 0.05 m3 141,800.00 6,381.00 - - 0.05 m3 141,800.00 6,381.00
4 Pas.Box U beton bertulang ukuran dalam 30 x 30 cm, t = 5cm 106.00 m1 585,200.00 62,031,200.00 106.00 m1 585,200.00 62,031,200.00
(U30/30-120)
Pas.Box U beton bertulang ukuran dalam 30 x 30 cm, t = 5cm 156.00 m1 486,062.58 75,825,762.19 - - 156.00 m1 486,062.58 75,825,762.19
(U30/30-120)
5 Pas.tutup Box U beton bertulang ukuran dalam 40 x 120 cm, t = J.084 106.00 m1 420,800.00 44,604,800.00 106.00 m1 420,800.00 44,604,800.00
10cm ( cover 40x120x10 crossing)
Pas.tutup Box U beton bertulang ukuran dalam 40 x 120 cm, t =
156.00 m1 420,800.00 65,644,800.00 - - 156.00 m1 420,800.00 65,644,800.00
10cm ( cover 40x120x10 crossing)
Pas.Box U beton bertulang ukuran dalam 40 x 60 cm, t = 6cm
6 J.083a 154.00 m1 783,000.00 120,582,000.00 154.00 m1 783,000.00 120,582,000.00 - m1 783,000.00 -
(U40/60-120)
7 Bongkaran Beton Bertulang (item baru) - m3 - 10.49 m3 618,100.00 6,480,778.50 - - 10.49 m3 618,100.00 6,480,778.50
3 Pasang bekisting tutup saluran G.030 1.05 m² 406,200.00 426,510.00 1.05 m² 406,200.00 426,510.00
Pasang bekisting tutup saluran 3.35 m² 401,598.84 1,345,356.13 - - 3.35 m² 401,598.84 1,345,356.13
4 Pasang pipa PVC AW dia 8" 0.50 m1 303,300.00 151,650.00 0.50 m1 303,300.00 151,650.00 - m1 303,300.00 -
5 Buis beton dia. 30 cm (item baru) - m' - 16.00 m' 190,500.00 3,048,000.00 - - 16.00 m' 190,500.00 3,048,000.00
6 Pasangan batu kali (item baru) - m3 - 5.40 m3 813,200.00 4,391,280.00 - - 5.40 m3 813,200.00 4,391,280.00
7 Bongkaran Beton Rabat (item baru) - m3 - 0.02 m3 389,800.00 6,821.50 - - 0.02 m3 389,800.00 6,821.50
8 Pembuangan tanah sejauh > 1 km B.020 - m3 - 0.02 m3 24,100.00 421.75 - - 0.02 m3 24,100.00 421.75
5 Pas.Box U beton bertulang ukuran dalam 40 x 60 cm, t = 5cm J.083 345.00 m1 585,200.00 201,894,000.00 105.00 m1 585,200.00 61,446,000.00 240.00 m1 585,200.00 140,448,000.00
(U40/60-120)
7 Ram Besi Standar 8.5.(1) 1.20 m² 750,000.00 900,000.00 - - - - 1.20 m² 750,000.00 900,000.00
Pas.Box U beton bertulang ukuran dalam 30 x 30 cm, t = 5cm
8 - m1 - 334.40 m1 486,062.58 162,539,326.13 334.40 m1 486,062.58 162,539,326.13
(U30/30-120)
Pas.tutup Box U beton bertulang ukuran dalam 40 x 120 cm, t =
9 J.084 - m1 - 334.40 m1 420,800.00 140,715,520.00 334.40 m1 420,800.00 140,715,520.00
10cm ( cover 40x120x10 crossing)
10 Bongkaran Beton Bertulang (item baru) - m3 - 45.74 m3 618,100.00 28,271,708.57 - - 45.74 m3 618,100.00 28,271,708.57
2 Pasang paving stone (blok) segi empat biasa K-250 M.065 387.80 m2 85,800.00 33,273,240.00 - - 387.80 m2 85,800.00 33,273,240.00
Pasang paving stone (blok) segi empat biasa K-250 111.96 m2 85,800.00 9,606,407.44 111.96 m2 85,800.00 9,606,407.44
3 Pasang paving stone (blok) segi empat warna K-250 M.066 166.20 m2 92,400.00 15,356,880.00 - - 61.36 m2 92,400.00 5,669,921.86 104.84 m2 92,400.00 9,686,958.14
4 Kansteen 10x20x40 M.065a 454.00 m1 44,400.00 20,157,600.00 - - 454.00 m1 44,400.00 20,157,600.00
Kansteen 10x20x40 190.00 m1 44,400.00 8,436,000.00 190.00 m1 44,400.00 8,436,000.00
5 Bongkaran Beton Rabat (item baru) - m3 - 23.00 m3 389,800.00 8,966,179.60 - - 23.00 m3 389,800.00 8,966,179.60
6 Pembuangan tanah sejauh > 1 km B.020 - m3 - 54.72 m3 24,100.00 1,318,703.80 - - 54.72 m3 24,100.00 1,318,703.80
7 Plesteran 1 : 4 dan acian 1 : 2 (item baru) - m2 - 15.00 m3 81,800.00 1,227,000.00 - - 15.00 m2 81,800.00 1,227,000.00
3 Urugan pasir B.011 6.30 m3 141,800.00 893,340.00 - - 0.90 m3 141,800.00 127,620.00 5.40 m3 141,800.00 765,720.00
Pas.Box U beton bertulang ukuran dalam 30 x 60 cm, t = 6cm
4 J.083 210.00 m1 585,200.00 122,892,000.00 210.00 m1 585,200.00 122,892,000.00 - m1 585,200.00 -
(U30/60-120)
8 Bongkaran Beton Bertulang (item baru) - m3 - 4.52 m3 618,100.00 2,793,812.00 - - 4.52 m3 618,100.00 2,793,812.00
Sub jumlah II Rp -
III Peralatan
Rp -
Sub jumlah II Rp -
III Peralatan
Rp -
Chandra Ariyanto
Direktur
REKAPITULASI
ANALISA HARGA SATUAN PEKERJAAN
Kode Harga
No. Jenis Pekerjaan Analisa Satuan Satuan
(Rp.)
#REF!
#REF!
#REF!
#REF!
ANALISA HARGA SATUAN PEKERJAAN
Sub jumlah II Rp -
III Peralatan
Page 13 of 53
IV Lain-lain
- Biaya umum[1] 1% x Sub jumlah (I+II+III) Rp 521.34
- Keuntungan 1% x Sub jumlah (I+II+III) Rp 521.34
Sub Jumlah IV Rp 1,042.68
Jumlah Harga = I+II+III+IV Rp 53,176.48
Harga satuan pekerjaan .......... (dibulatkan) Rp 53,100.00
Page 14 of 53
Sub jumlah III Rp -
Sub jumlah (I+II+III) Rp 73,040.00
IV Lain-lain
- Biaya umum[1] 1% x Sub jumlah (I+II+III) Rp 730.40
- Keuntungan 1% x Sub jumlah (I+II+III) Rp 730.40
Sub Jumlah IV Rp 1,460.80
Jumlah Harga = I+II+III+IV Rp 74,500.80
Harga satuan pekerjaan .......... (dibulatkan) Rp 74,500.00
Sub jumlah II Rp -
III Peralatan
Jenis pekerjaan : Beton mutu fc'=19,3 Mpa (K225) slump (12 ± 2) cm, w/c = 0,58
Satuan/Unit : m3
Kode Analisa : G.007
Page 15 of 53
Pasir beton m³ 0.4986 Rp 166,100.00 Rp 82,812.71
Semen Kg 371.0000 Rp 1,625.00 Rp 602,875.00
Air Ltr 215.0000 Rp 105.00 Rp 22,575.00
Page 16 of 53
Tukang Kayu O/h 0.3300 Rp 85,000.00 Rp 28,050.00
Kepala Tukang Kayu O/h 0.0330 Rp 85,500.00 Rp 2,821.50
Mandor O/h 0.0330 Rp 86,000.00 Rp 2,838.00
Jenis pekerjaan : Pas.Box U beton bertulang ukuran dalam 30 x 60 cm, t = 5cm (U40/60-120)
Satuan/Unit : m1
Kode Analisa : J.018
Page 17 of 53
Jenis pekerjaan :
Pas.tutup Box U beton bertulang ukuran dalam 40 x 60 cm, t = 10cm ( cover 50x60x10
crossing)
Satuan/Unit : m1
Kode Analisa :
Jenis pekerjaan : Pas.Box U beton bertulang ukuran dalam 30 x 60 cm, t = 6cm (U30/60-120)
Satuan/Unit : m1
Kode Analisa : J.083
Page 18 of 53
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Jam 0.1736 Rp 200,000.00 Rp 34,722.22
Mob/Demob Operator BBM)
Jenis pekerjaan :
Pas.tutup Box U beton bertulang ukuran dalam 40 x 120 cm, t = 10cm ( cover 50x60x10
crossing)
Satuan/Unit : m1
Kode Analisa : J.084
Jenis pekerjaan : Pas.Box U beton bertulang ukuran dalam 80 x 80 cm, t = 8cm (U80/80-120)
Satuan/Unit : m1
Kode Analisa : J.089
Page 19 of 53
Sub jumlah I Rp 18,284.56
II Bahan/Material
Box U beton bertulang ukuran dalam 80 x 80 m1 1.0500 Rp 1,371,084.00 Rp 1,439,638.20
cm, t = 8cm (U80/80-120)
Jenis pekerjaan : Pas.tutup Box U beton bertulang ukuran dalam 95 x 120 cm, t = 17cm ( cover
117x60x17crossing)
Satuan/Unit : m1
Kode Analisa : J.100
Page 20 of 53
Jenis pekerjaan : Pas.Box U beton bertulang ukuran dalam 40 x 60 cm, t = 6cm (U40/60-120)
Satuan/Unit : m1
Kode Analisa : J.083a
Jenis pekerjaan : Pas.tutup Box U beton bertulang ukuran dalam 40 x 120 cm, t = 10cm ( cover 40x120x10
crossing)
Satuan/Unit : m1
Kode Analisa : J.084
Page 21 of 53
Sub jumlah III Rp 29,513.89
Sub jumlah (I+II+III) Rp 412,622.97
IV Lain-lain
- Biaya umum[1] 1% x Sub jumlah (I+II+III) Rp 4,126.23
- Keuntungan 1% x Sub jumlah (I+II+III) Rp 4,126.23
Sub Jumlah IV Rp 8,252.46
Jumlah Harga = I+II+III+IV Rp 420,875.43
Harga satuan pekerjaan .......... (dibulatkan) Rp 420,800.00
Jenis pekerjaan : Pas.tutup Box U beton bertulang ukuran dalam 50 x 60 cm, t = 10cm ( cover 50x60x10
crossing)
Satuan/Unit : m1
Kode Analisa : J.084a
Jenis pekerjaan : Pas.Box U beton bertulang ukuran dalam 30 x 30 cm, t = 5cm (U30/30-120)
Satuan/Unit : m1
Kode Analisa :
Page 22 of 53
Sub jumlah I Rp 18,284.56
II Bahan/Material
Box U beton bertulang ukuran dalam 30 x 60 m1 1.0500 Rp 495,924.00 Rp 520,720.20
cm, t = 6cm (U30/60-120)
Jenis pekerjaan : Pasang paving stone (blok) segi empat biasa K-250
Satuan/Unit : m2
Kode Analisa : M.065
Page 23 of 53
Kuantitas/ Harga Satuan Dasar Harga
No. Uraian Satuan
Koefisien (Rp) (Rp)
1 2 3 4 5 6
I Upah/Tenaga Kerja
Mandor O/h 0.0010 Rp 86,000.00 Rp 86.00
Kepala Tukang Batu O/h 0.0250 Rp 85,500.00 Rp 2,137.50
Tukang Batu O/h 0.0500 Rp 85,000.00 Rp 4,250.00
Pekerja O/h 0.0500 Rp 84,000.00 Rp 4,200.00
Jenis pekerjaan : Pasang paving stone (blok) segi empat warna K-250
Satuan/Unit : m2
Kode Analisa : M.066
Page 24 of 53
Jumlah Harga = I+II+III+IV Rp 92,409.45
Harga satuan pekerjaan .......... (dibulatkan) Rp 92,400.00
Page 25 of 53
Sub jumlah III Rp 8,750.00
Sub jumlah (I+II+III) Rp 1,051,075.10
IV Lain-lain
- Biaya umum[1] 1% x Sub jumlah (I+II+III) Rp 10,510.75
- Keuntungan 1% x Sub jumlah (I+II+III) Rp 10,510.75
Sub Jumlah IV Rp 21,021.50
Jumlah Harga = I+II+III+IV Rp 1,072,096.61
Harga satuan pekerjaan .......... (dibulatkan) Rp 1,072,000.00
Page 26 of 53
Sub jumlah II Rp 76,390.71
III Peralatan
Wheel Loader Unit/jam 0.0009 Rp 425,000.00 Rp 370.67
AMP Unit/jam 0.0019 Rp 8,800,000.00 Rp 16,398.39
Genset listrik Unit/jam 0.0019 Rp 1,500,000.00 Rp 2,795.18
Dump Truck Unit/jam 0.0343 Rp 350,000.00 Rp 12,010.83
Asp. Finisher Unit/jam 0.0013 Rp 950,000.00 Rp 1,211.19
Tandem Roller Unit/jam 0.0033 Rp 525,000.00 Rp 1,709.54
P. Tyre Roller Unit/jam 0.0015 Rp 500,000.00 Rp 726.52
#REF!
#REF!
#REF!
#REF!
Page 27 of 53
DAFTAR UPAH, HARGA BAHAN DAN PERALATAN
TENAGA
1 Tukang Batu Org/hr Rp. 85,000.00
2 Kepala Tukang Batu Org/hr Rp. 85,500.00
3 Tukang Kayu Org/hr Rp. 85,000.00
4 Kepala Tukang Kayu Org/hr Rp. 85,500.00
5 Tukang Besi Org/hr Rp. 85,000.00
6 Kepala Tukang Besi Org/hr Rp. 85,500.00
7 Tukang Las Org/hr Rp. 85,000.00
8 Kepala Tukang Las Org/hr Rp. 85,500.00
9 Tukang Cat Org/hr Rp. 85,000.00
10 Kepala Tukang Cat Org/hr Rp. 85,500.00
11 Tukang Pipa Org/hr Rp. 85,000.00
12 Kepala Tukang Pipa Org/hr Rp. 85,500.00
13 Tukang Penganyam Org/hr Rp. 85,500.00
14 Pekerja Terlatih Org/hr Rp. 85,000.00
15 Pekerja Org/hr Rp. 84,000.00
16 Pekerja Penganyam Org/hr Rp. 84,000.00
17 Pekerja Pengisi Batu Org/hr Rp. 84,000.00
18 Mandor Org/hr Rp. 86,000.00
19 Kepala Tukang Listrik Org/hr Rp. 85,500.00
20 Tukang Listrik Org/hr Rp. 85,000.00
21 Juru Ukur Org/hr Rp. 85,500.00
22 Pembantu Juru Ukur Org/hr Rp. 84,000.00
23 Operator Alat Ringan Org/hr Rp. 85,000.00
24 Operator Alat Berat Org/hr Rp. 85,500.00
25 Operator Pompa Org/hr Rp. 85,000.00
26 Operator Org/hr Rp. 85,000.00
27 Pembantu Operator Org/hr Rp. 84,000.00
BAHAN ALAM
1 Batu kali m3 Rp. 155,000.00
2 Batu pecah 5-7 m3 Rp. 170,000.00
3 Batu pecah 3-5 m3 Rp. 225,000.00
4 Batu pecah 2-3 m3 Rp. 250,000.00
5 Kerikil alam 0,5/1 cm m3 Rp. 170,000.00
6 Kerikil alam 2/3 cm m3 Rp. 150,000.00
7 Kerikil alam 1/2 cm m3 Rp. 170,000.00
8 Kerikil pecah 2/3 cm m3 Rp. 250,000.00
9 Kerikil pecah 1/2 cm m3 Rp. 275,000.00
10 Pasir Beton m3 Rp. 166,100.00
11 Kerikil beton m3 Rp. 250,000.00
12 Pasir pasang m3 Rp. 165,000.00
13 Pasir urug m3 Rp. 85,000.00
14 Tanah urug m3 Rp. 30,000.00
15 Semen (40 kg) zak Rp. 65,000.00
Semen PC 50 Kg zak Rp. 81,250.00
16 Semen kg Rp. 1,625.00
17 Agregat Kasar m3 Rp. 135,000.00
18 Tanah Pilihan m3 Rp. 100,000.00
19 Genteng Keramik bh Rp. 13,000.00
20 Bubungan Genteng Keramik bh Rp. 25,000.00
21 Aggregat Klas B m3 Rp. 390,000.00
Aggregat Klas A m4 Rp. 425,000.00
22 Filler kg Rp. 1,500.00
23 Kerosene ltr Rp. 2,500.00
24 Batu merah Kls II bh Rp. 550.00
25 Air (biaya air tawar) LTR Rp. 100.00
26 Sirtu m3 Rp. 135,000.00
27 Batu alam tempel m2 Rp. 35,000.00
28 Batu bata bh Rp. 650.00
Page 28 of 53
29 Semen warna kg Rp. 7,500.00
Page 29 of 53
30 Campuran Beton Ready Mixed K 360 m3 Rp. 1,250,000.00
Agr 5-10 & 10-15 m3 Rp. 360,000.00
Agr 0-5 m3 Rp. 360,000.00
BAHAN KAYU
1 Kaso 4/6 cm m³ Rp. 1,750,000.00
kayu balok 5/7 cm m³ Rp. 1,750,000.00
2 Papan 2/20 m³ Rp. 2,000,000.00
Papan 3/20 m³ Rp. 2,000,000.00
3 Kayu Kelas III m³ Rp. 1,250,000.00
4 Balok kayu kelas II m³ Rp. 2,250,000.00
5 Plywood tebal 9 mm lbr Rp. 115,000.00
6 Dolken kayu galam,φ (8–10) cm, panjang 4 m btg Rp. 30,000.00
7 penjaga jarak bekisting/spacer bh Rp. 20,000.00
8 Kayu kaso ukuran 5/7 kelas II m³ Rp. 2,250,000.00
BAHAN PIPA
PIPA BESI
1 Pipa GIP Ø 400 mm m' Rp. 1,212,540.87
4 Pipa Steel ND. 560 mm m' Rp. -
Page 30 of 53
5 Pipa Steel ND. 150 mm m' Rp. -
m' Rp. -
m' Rp. -
PIPA PE -
PIPA HDPE Ø 63 ( PN 12,5 ) m' Rp. 66,840.00
PIPA HDPE Ø 110 ( PN 12,5 ) m' Rp. 120,672.00
PIPA HDPE Ø 160 ( PN 12,5 ) m' Rp. 255,628.80
PIPA HDPE Ø 200 ( PN 12,5 ) m' Rp. 398,160.00
PIPA HDPE Ø 250 ( PN 12,5 ) m' Rp. 623,376.00
PIPA HDPE Ø 315 ( PN 12,5 ) m' Rp. 989,496.00
PIPA HDPE Ø 355 ( PN 12,5 ) m' Rp. 1,254,657.60
PIPA HDPE Ø 400 ( PN 12,5 ) m' Rp. 1,592,496.00
PIPA HDPE Ø 500 ( PN 12,5 ) m' Rp. 2,587,996.80
PIPA HDPE Ø 630 ( PN 12,5 ) m' Rp. 4,103,136.00
Pipa HDPE S 8- SDR 17 (PN 10) Ø 800 mm m' Rp. 7,920,000.00
Pipa HDPE PN 10 ND. 560 mm m' Rp. -
Page 31 of 53
BAHAN BOX U DAN TUTUP
1 Box U beton bertulang ukuran dalam 30 x 60 cm, t = 5cm (U40/60- Unit Rp. 583,440.00
120)
-
2 Tutup Box U beton bertulang ukuran dalam 40 x 60 cm, t = 10cm Unit Rp. 350,064.00
( cover 50x60x10 crossing)
-
3 Box U beton bertulang ukuran dalam 30 x 60 cm, t = 6cm (U30/60- Unit Rp. 495,924.00
120)
-
4 Tutup Box U beton bertulang ukuran dalam 40 x 120 cm, t = 10cm Unit Rp. 350,064.00
( cover 50x60x10 crossing)
-
5 Box U beton bertulang ukuran dalam 80 x 80 cm, t = 8cm (U80/80- Unit Rp. 1,371,084.00
120)
-
6 Tutup Box U beton bertulang ukuran dalam 95 x 120 cm, t = 17cm Unit Rp. 685,542.00
( cover 117x60x17crossing)
-
7 Box U beton bertulang ukuran dalam 40 x 60 cm, t = 6cm (U40/60- Unit Rp. 680,680.00
120)
-
8 Tutup Box U beton bertulang ukuran dalam 40 x 120 cm, t = 10cm Unit Rp. 350,064.00
( cover 40x120x10 crossing)
-
9 Tutup Box U beton bertulang ukuran dalam 50 x 60 cm, t = 10cm Unit Rp. 427,856.00
( cover 50x60x10 crossing)
PERALATAN
1 Alat ukur unit/hari Rp. 150,000.00
2 Excavator 143 hp Jam Rp. 750,000.00
3 Excavator 85 hp Jam Rp. 550,000.00
4 Stamper Jam Rp. 35,000.00
5 Molen Jam Rp. 35,000.00
6 Dump truck Jam Rp. 350,000.00
7 Truck Jam Rp. 350,000.00
8 Jack Hammer Jam Rp. 85,000.00
9 Chainsaw unit/hari Rp. 75,000.00
10 Waterpass unit/hari Rp. 75,000.00
11 Theodolith unit/hari Rp. 125,000.00
12 Pompa dan conveyor beton unit/hari Rp. 1,200,000.00
13 Tripot/Tackel & handle crane 2 T unit/hari Rp. 200,000.00
14 Pompa air diesel 5 KW unit/hari Rp. 1,200,000.00
15 Crane 5-10 ton Jam Rp. 110,000.00
16 Alat pancang + Hammer 2 ton Jam Rp. 550,000.00
17 Alat penyambung tiang pancang bh Rp. 25,000.00
18 Mesin las HDPE unit/hari Rp. 500,000.00
19 pompa air 5 l/dt unit/hari Rp. 1,211,000.00
20 Genset listrik unit/hari Rp. 1,500,000.00
21 Mesin Las Listrik unit/hari Rp. 350,000.00
22 Wheel Loader Jam Rp. 425,000.00
23 Motor Grader Jam Rp. 550,000.00
24 Tandem Roller Jam Rp. 525,000.00
25 Water Tanker Jam Rp. 350,000.00
26 Asp. Distributor Jam Rp. 450,000.00
27 Compressor Jam Rp. 225,000.00
28 AMP Jam Rp. 8,800,000.00
29 Asp. Finisher Jam Rp. 950,000.00
30 P. Tyre Roller Jam Rp. 500,000.00
31 Sewa Crane 30 ton - Min. 8 Jam (Termasuk Mob/Demob Operator B Jam Rp. 200,000.00
32 Mobile crane =< 3 ton unit/hari Rp. 880,000.00
#REF!
#REF!
#REF!
Page 32 of 53
#REF!
Page 33 of 53
ANALISA TEKNIS SATUAN PEKERJAAN
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.1000
Kepala Tukang Kayu O/h 0.0100
Mandor O/h 0.0050
Tukang Kayu O/h 0.1000
II Bahan/Material
kayu balok 5/7 cm m3 0.0025
Papan 3/20 m3 0.0042
Paku 5 – 10 cm kg 0.2000
III Peralatan
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.5630
Mandor O/h 0.0563
II Bahan/Material
III Peralatan
Page 34 of 53
Jenis pekerjaan : Urugan pasir
Satuan/Unit : m3
Kode Analisa : B.011
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.4000
Mandor O/h 0.0400
II Bahan/Material
Pasir urug m³ 1.2000
III Peralatan
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.4000
Mandor O/h 0.0400
II Bahan/Material
Tanah Urug m³ 1.2000
Page 35 of 53
III Peralatan
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.2680
Mandor O/h 0.0134
II Bahan/Material
III Peralatan
Jenis pekerjaan : mutu fc'=19,3 Mpa (K225) slump (12 ± 2) cm, w/c = 0,58
Beton
Satuan/Unit : m3
Kode Analisa : G.007
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 1.3230
Tukang Batu O/h 0.1890
Kepala Tukang Batu O/h 0.0190
Mandor O/h 0.1320
Page 36 of 53
II Bahan/Material
Kerikil Beton m³ 0.7756
Pasir beton m³ 0.4986
Semen Kg 371.0000
Air Ltr 215.0000
III Peralatan
Molen Unit/Hr 0.2500
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.7000
Tukang Besi O/h 0.7000
Kepala Tukang Besi O/h 0.0700
Mandor O/h 0.0700
II Bahan/Material
Besi beton ulir Kg 105.0000
Kawat beton Kg 1.5000
III Peralatan
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Page 37 of 53
Pekerja O/h 0.6600
Tukang Kayu O/h 0.3300
Kepala Tukang Kayu O/h 0.0330
Mandor O/h 0.0330
II Bahan/Material
Kayu Kelas III m³ 0.0400
Paku 5 – 12 cm Kg 0.4000
Minyak Bekisting Kg 0.2000
Balok kayu kelas II m³ 0.0150
Plywood tebal 9 mm Lbr 0.3500
Dolken kayu galam,φ (8–10) cm, panjang 4 m Btg 6.0000
III Peralatan
Jenis pekerjaan : Pas.Box U beton bertulang ukuran dalam 30 x 60 cm, t = 5cm (U40/60-120)
Satuan/Unit : m1
Kode Analisa : J.018
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.0381
Operator O/h 0.1736
Mandor O/h 0.0038
II Bahan/Material
Box U beton bertulang ukuran dalam 30 x 60 m1 1.0500
cm, t = 5cm (U40/60-120)
III Peralatan
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Jam 0.1736
Mob/Demob Operator BBM)
Page 38 of 53
Jenis pekerjaan :
Pas.tutup Box U beton bertulang ukuran dalam 40 x 60 cm, t = 10cm ( cover
50x60x10 crossing)
Satuan/Unit : m1
Kode Analisa :
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.0324
Operator O/h 0.1476
Mandor O/h 0.0032
II Bahan/Material
Tutup Box U beton bertulang ukuran dalam m1 1.0500
40 x 60 cm, t = 10cm ( cover 50x60x10
crossing)
III Peralatan
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Jam 0.1476
Mob/Demob Operator BBM)
Jenis pekerjaan : Pas.Box U beton bertulang ukuran dalam 30 x 60 cm, t = 6cm (U30/60-120)
Satuan/Unit : m1
Kode Analisa : J.083
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.0381
Operator O/h 0.1736
Mandor O/h 0.0038
II Bahan/Material
Box U beton bertulang ukuran dalam 30 x 60 m1 1.0500
cm, t = 6cm (U30/60-120)
Page 39 of 53
III Peralatan
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Jam 0.1736
Mob/Demob Operator BBM)
Jenis pekerjaan :
Pas.tutup Box U beton bertulang ukuran dalam 40 x 120 cm, t = 10cm ( cover
50x60x10 crossing)
Satuan/Unit : m1
Kode Analisa : J.084
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.0324
Operator O/h 0.1476
Mandor O/h 0.0032
II Bahan/Material
Tutup Box U beton bertulang ukuran dalam m1 1.0500
40 x 120 cm, t = 10cm ( cover 50x60x10
crossing)
III Peralatan
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Jam 0.1476
Mob/Demob Operator BBM)
Jenis pekerjaan :
Pas.Box U beton bertulang ukuran dalam 80 x 80 cm, t = 8cm (U80/80-120)
Satuan/Unit : m1
Kode Analisa : J.089
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
Page 40 of 53
I Upah/Tenaga Kerja
Pekerja O/h 0.0381
Operator O/h 0.1736
Mandor O/h 0.0038
II Bahan/Material
Box U beton bertulang ukuran dalam 80 x 80 m1 1.0500
cm, t = 8cm (U80/80-120)
III Peralatan
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Jam 0.1736
Mob/Demob Operator BBM)
Jenis pekerjaan : Pas.tutup Box U beton bertulang ukuran dalam 95 x 120 cm, t = 17cm ( cover
117x60x17crossing)
Satuan/Unit : m1
Kode Analisa : J.100
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.0324
Operator O/h 0.1476
Mandor O/h 0.0032
II Bahan/Material
Tutup Box U beton bertulang ukuran dalam m1 1.0500
95 x 120 cm, t = 17cm ( cover
117x60x17crossing)
III Peralatan
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Jam 0.1476
Mob/Demob Operator BBM)
Page 41 of 53
Jenis pekerjaan : Pas.Box U beton bertulang ukuran dalam 40 x 60 cm, t = 6cm (U40/60-120)
Satuan/Unit : m1
Kode Analisa : J.083a
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.0381
Operator O/h 0.1736
Mandor O/h 0.0038
II Bahan/Material
Box U beton bertulang ukuran dalam 40 x 60 m1 1.0500
cm, t = 6cm (U40/60-120)
III Peralatan
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Jam 0.1736
Mob/Demob Operator BBM)
Jenis pekerjaan : Pas.tutup Box U beton bertulang ukuran dalam 40 x 120 cm, t = 10cm ( cover
40x120x10 crossing)
Satuan/Unit : m1
Kode Analisa : J.084
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.0324
Operator O/h 0.1476
Mandor O/h 0.0032
II Bahan/Material
Tutup Box U beton bertulang ukuran dalam m1 1.0500
40 x 120 cm, t = 10cm ( cover 40x120x10
crossing)
Page 42 of 53
III Peralatan
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Jam 0.1476
Mob/Demob Operator BBM)
Jenis pekerjaan : Pas.tutup Box U beton bertulang ukuran dalam 50 x 60 cm, t = 10cm ( cover
50x60x10 crossing)
Satuan/Unit : m1
Kode Analisa : J.084a
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.0324
Operator O/h 0.1476
Mandor O/h 0.0032
II Bahan/Material
Tutup Box U beton bertulang ukuran dalam m1 1.0500
50 x 60 cm, t = 10cm ( cover 50x60x10
crossing)
III Peralatan
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Jam 0.1476
Mob/Demob Operator BBM)
Jenis pekerjaan : Pas.Box U beton bertulang ukuran dalam 30 x 30 cm, t = 5cm (U30/30-120)
Satuan/Unit : m1
Kode Analisa :
Kuantitas/
No. Uraian Satuan
Koefisien
Page 43 of 53
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.0381
Operator O/h 0.1736
Mandor O/h 0.0038
II Bahan/Material
Box U beton bertulang ukuran dalam 30 x 60 m1 1.0500
cm, t = 6cm (U30/60-120)
III Peralatan
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Jam 0.1736
Mob/Demob Operator BBM)
Jenis pekerjaan : Pasang paving stone (blok) segi empat biasa K-250
Satuan/Unit : m2
Kode Analisa : M.065
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Mandor O/h 0.0250
Kepala Tukang Batu O/h 0.0250
Tukang Batu O/h 0.0500
Pekerja O/h 0.0500
II Bahan/Material
Paving Stone abu-abu Persegi Panjang Tebal m2 1.0000
6 cm K-250
III Peralatan
Page 44 of 53
Jenis pekerjaan : Kansteen 10x20x40
Satuan/Unit : m1
Kode Analisa : M.065a
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Mandor O/h 0.0010
Kepala Tukang Batu O/h 0.0250
Tukang Batu O/h 0.0500
Pekerja O/h 0.0500
II Bahan/Material
Semen PC 50 Kg Zak 0.0454
Pasir pasang m3 0.0054
Kanstin Trap uk. 15.25.40 (me) m' 1.1000
III Peralatan
Jenis pekerjaan : Pasang paving stone (blok) segi empat warna K-250
Satuan/Unit : m2
Kode Analisa : M.066
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Mandor O/h 0.0250
Kepala Tukang Batu O/h 0.0250
Tukang Batu O/h 0.0500
Pekerja O/h 0.0500
II Bahan/Material
Paving Stone merah Persegi Panjang Tebal 6 m2 1.0000
cm K-250
III Peralatan
Page 45 of 53
Jenis pekerjaan : Menanam rumput manila
Satuan/Unit : m²
Kode Analisa : S.002
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Mandor O/h 0.0100
Pekerja O/h 0.1000
II Bahan/Material
Rumput Manila m2 1.1000
III Peralatan
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 1.3230
Tukang Batu O/h 0.1890
Kepala Tukang Batu O/h 0.0190
Mandor O/h 0.1320
II Bahan/Material
Kerikil Beton m³ 0.7756
Pasir beton m³ 0.4986
Semen Kg 371.0000
Page 46 of 53
Air Ltr 215.0000
III Peralatan
Molen Unit/Hr 0.2500
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja O/h 0.1573
Tukang pipa O/h 0.0787
Mandor O/h 0.0160
II Bahan/Material
pipa PVC Ø 150 mm m 1.0500
III Peralatan
Tripot/Tackel & handle crane 2 T Hr 0.0160
Kuantitas/
No. Uraian Satuan
Koefisien
1 2 3 4
I Upah/Tenaga Kerja
Pekerja jam 0.0186
Mandor jam 0.0019
Page 47 of 53
II Bahan/Material
Agr 5-10 & 10-15 m³ 0.0307
Agr 0-5 m³ 0.0298
Semen kg 1.8514
Aspal kg 5.1615
III Peralatan
Wheel Loader Unit/jam 0.0009
AMP Unit/jam 0.0019
Genset listrik Unit/jam 0.0019
Dump Truck Unit/jam 0.0343
Asp. Finisher Unit/jam 0.0013
Tandem Roller Unit/jam 0.0033
P. Tyre Roller Unit/jam 0.0015
#REF!
#REF!
#REF!
#REF!
Page 48 of 53
DAFTAR PEKERJAAN UTAMA
ARIEF AR RACHMAN
Direktur
DAFTAR PEKERJAAN PENUNJANG
#REF!
#REF!
#REF!
#REF!
JADWAL WAKTU PELAKSANAAN
I PEKERJAAN PERSIAPAN 99,318,000 4.364 0.7274 0.7274 0.7274 0.7274 0.7274 0.7274
II K3 37,250,000 1.637 0.5456 0.5456 0.5456
2 RW I
I PEKERJAAN PEMBANGUNAN SALURAN AIR 619,056,512 27.203 2.7203 2.7203 2.7203 2.7203 2.7203 2.7203 2.7203 2.7203 2.7203 2.7203
II PEKERJAAN TAMAN 108,911,600 4.786 0.5318 0.5318 0.5318 0.5318 0.5318 0.5318 0.5318 0.5318 0.5318
III PEKERJAAN PAVINGISASI DAN OVERLAY JALAN 148,380,966 6.520 0.8150 0.8150 0.8150 0.8150 0.8150 0.8150 0.8150 0.8150
IV PEKERJAAN LAIN - LAIN 40,000,000 1.758 0.5859 0.5859 0.5859
3 RW II
I PEKERJAAN PAVINGISASI JALAN 46,968,165 2.064 0.5160 0.5160 0.5160 0.5160
II PEKERJAAN PEMBANGUNAN SALURAN AIR 309,650,130 13.607 1.5118 1.5118 1.5118 1.5118 1.5118 1.5118 1.5118 1.5118 1.5118
4 RW III
I PEKERJAAN PAVINGISASI JALAN 76,701,840 3.370 0.5617 0.5617 0.5617 0.5617 0.5617 0.5617
II PEKERJAAN PEMBANGUNAN SALURAN AIR 871,235 0.038 0.0128 0.0128 0.0128
5 RW IV
I PEKERJAAN PAVINGISASI JALAN 68,657,742 3.017 0.5028 0.5028 0.5028 0.5028 0.5028 0.5028
II PEKERJAAN PEMBANGUNAN SALURAN AIR 430,112,362 18.900 1.8900 1.8900 1.8900 1.8900 1.8900 1.8900 1.8900 1.8900 1.8900 1.8900
6 RW VI
I PEKERJAAN PAVINGISASI JALAN 72,023,634 3.165 0.3956 0.3956 0.3956 0.3956 0.3956 0.3956 0.3956 0.3956
II PEKERJAAN PEMBANGUNAN SALURAN AIR 217,827,540 9.572 0.9572 0.9572 0.9572 0.9572 0.9572 0.9572 0.9572 0.9572 0.9572 0.9572
0
2,275,729,726 100.00 1.273 1.273 5.883 7.807 8.351 8.351 9.001 9.383 9.886 9.886 9.886 10.402 3.718 2.815 1.497 0.586
1.273 2.546 8.429 16.236 24.587 32.938 41.939 51.322 61.208 71.095 80.981 91.383 95.101 97.917 99.414 100.00
#REF!
#REF!
#REF!
#REF!
HARGA MINTA DISKON
1 Box U beton bertulang ukuran dalam 30 x 60 cm, t = 5cm (U40/60-120) Unit Rp. 437,580.00
-
2 Tutup Box U beton bertulang ukuran dalam 40 x 60 cm, t = 10cm ( cover 50x60x10 crossing) Unit Rp. 262,548.00
-
3 Box U beton bertulang ukuran dalam 30 x 60 cm, t = 6cm (U30/60-120) Unit Rp. 371,943.00
-
4 Tutup Box U beton bertulang ukuran dalam 40 x 120 cm, t = 10cm ( cover 50x60x10 crossing) Unit Rp. 262,548.00
-
5 Box U beton bertulang ukuran dalam 80 x 80 cm, t = 8cm (U80/80-120) Unit Rp. 1,028,313.00
-
6 Tutup Box U beton bertulang ukuran dalam 95 x 120 cm, t = 17cm ( cover 117x60x17crossing) Unit Rp. 514,156.50
-
7 Box U beton bertulang ukuran dalam 40 x 60 cm, t = 6cm (U40/60-120) Unit Rp. 510,510.00
-
8 Tutup Box U beton bertulang ukuran dalam 40 x 120 cm, t = 10cm ( cover 40x120x10 crossing) Unit Rp. 262,548.00
-
9 Tutup Box U beton bertulang ukuran dalam 50 x 60 cm, t = 10cm ( cover 50x60x10 crossing) Unit Rp. 320,892.00
HARGA PENAWARAN RAB
1 Box U beton bertulang ukuran dalam 30 x 60 cm, t = 5cm (U40/60-120) Unit Rp. 583,440.00
-
2 Tutup Box U beton bertulang ukuran dalam 40 x 60 cm, t = 10cm ( cover 50x60x10 crossing) Unit Rp. 350,064.00
-
3 Box U beton bertulang ukuran dalam 30 x 60 cm, t = 6cm (U30/60-120) Unit Rp. 495,924.00
-
4 Tutup Box U beton bertulang ukuran dalam 40 x 120 cm, t = 10cm ( cover 50x60x10 crossing) Unit Rp. 350,064.00
-
5 Box U beton bertulang ukuran dalam 80 x 80 cm, t = 8cm (U80/80-120) Unit Rp. 1,371,084.00
-
6 Tutup Box U beton bertulang ukuran dalam 95 x 120 cm, t = 17cm ( cover 117x60x17crossing) Unit Rp. 685,542.00
-
7 Box U beton bertulang ukuran dalam 40 x 60 cm, t = 6cm (U40/60-120) Unit Rp. 680,680.00
-
8 Tutup Box U beton bertulang ukuran dalam 40 x 120 cm, t = 10cm ( cover 40x120x10 crossing) Unit Rp. 350,064.00
-
9 Tutup Box U beton bertulang ukuran dalam 50 x 60 cm, t = 10cm ( cover 50x60x10 crossing) Unit Rp. 427,856.00