Anda di halaman 1dari 1

RINCIAN BIAYA KEBUTUHAN PEMBUATAN PAPAN NAMA

FAKULTAS KEHUTANAN UNIPA

HARGA JUMLAH
NO URAIAN KEBUTUHAN VOLUME SAT
SATUAN (Rp) HARGA (Rp)
B BAHAN DAN TENAGA
1 List Kayu profil 7 Btg 34,999 244,993
2 Kayu Besi 2/3 8 Btg 35,000 280,000
3 Tripleks 5 mm 3 Lbr 110,000 330,000
4 Tripleks 9 mm 3 Lbr 200,000 600,000
5 Cat Mowilex 2 Klg 90,000 180,000
6 Pelitur 3 Klg 75,000 225,000
7 Paku campur 1 Kg 25,000 25,000
8 Plamilr 1 Kg 30,000 30,000
9 Lem Rajawali 2 Kg 25,000 50,000
10 Isi Pisau Cater 5 Dos 20,000 100,000
11 Lem Rajawali 4 Kg 15,000 60,000
12 Sekrup 1 Dos 25,000 25,000
12 Tenaga Pembuatan Papan Nama 20 Pc 75,000 1,500,000
Sub Total 3,649,993

Anda mungkin juga menyukai