Anda di halaman 1dari 67

RENCANA ANGGARAN BIAYA

PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS


DITJEN PEMBINAAN, PELATIHAN & PRODUKTIFITAS
DIREKTORAT BINA KELEMBAGAAN PELATIHAN

2017
JADWAL PELAKSANAAN
PEMBANGUNAN WORKSHOP KOMPUTER - BLK KOMUNITAS
DITJEN PEMBINAAN, PELATIHAN & PRODUKTIFITAS
DIREKTORAT BINA KELEMBAGAAN PELATIHAN
KEMENTERIAN KETENAGAKERJAAN RI
MINGGU KE
NO ITEM PEKERJAAN TOTAL % 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
100

90

i START / KONTRAK / TERMIN I


A PEKERJAAN PERSIAPAN - #DIV/0! #DIV/0!
80

B PEKERJAAN PONDASI & TANAH - #DIV/0! #DIV/0! #DIV/0! 70

C PEKERJAAN STRUKTUR - #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 60

D PEKERJAAN ATAP & PLAFOND - #DIV/0! #DIV/0! #DIV/0!


E PEKERJAAN PASANGAN - #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
50

F PEKERJAAN KUSEN PINTU & JENDELA - #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 40

G PEKERJAAN PENGECATAN - #DIV/0! #DIV/0! #DIV/0! #DIV/0! 30

H PEKERJAAN PLUMBING & SANITAIR - #DIV/0! #DIV/0! #DIV/0! #DIV/0! 20

I PEKERJAAN LISTRIK - #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!


J LAIN - LAIN - #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
10

ii TERMIN II 0

Bobot Rencana - #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Bobot Realisasi
Akumulasi Rencana #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Akumulasi Realisasi
Jakarta, 20
100

90

80

70

60

50

40

30

20

10

Jakarta, 2018
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

NO ITEM PEKERJAAN TOTAL

A PEKERJAAN PERSIAPAN -
B PEKERJAAN PONDASI & TANAH -
C PEKERJAAN STRUKTUR -
D PEKERJAAN ATAP & PLAFOND -
E PEKERJAAN PASANGAN -
F PEKERJAAN KUSEN PINTU & JENDELA -
G PEKERJAAN PENGECATAN -
H PEKERJAAN PLUMBING & SANITAIR -
I PEKERJAAN LISTRIK -
J LAIN - LAIN -

TOTAL -
PEMBULATAN 500,000,000.00
TERBILANG

#REF!
BILL OF QUANTITY

PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS


PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME SAT.
( Rp. ) ( Rp. )

A PEKERJAAN PERSIAPAN 0.00


1 Papan Proyek 1.00 unit 0.00 0.00
2 Pek. Pengukuran dan Bowplank 54.00 m' 0.00 0.00
3 Pek. Listrik & Air Kerja 1.00 ls 0.00 0.00
4 Pek. Laporan & Dokumentasi 1.00 ls 0.00 0.00
B PEKERJAAN PONDASI & TANAH 0.00
1 Pek. Galian Tanah Pondasi 75.48 m3 0.00 0.00
2 Pek. Urug Tanah Kembali 25.16 m3 0.00 0.00
3 Pek. Urug Tanah Peninggian Peil Lantai (t = 10 cm) 16.83 m3 0.00 0.00
4 Pek. Pasir Urug
- Bawah Pondasi 5.67 m3 0.00 0.00
- Bawah Lantai 22.36 m3 0.00 0.00
5 Pek. Pondasi Tapak P1 (100x100x20-40)
- Beton K-225 4.48 m3 0.00 0.00
- Pembesian 640.93 kg 0.00 0.00
- Bekisting 24.32 m2 0.00 0.00
6 Pek. Pondasi Batu Belah P2 26.18 m3 0.00 0.00
7 Pek. Sloof Beton (20/30)
- Beton K-225 4.49 m3 0.00 0.00
- Pembesian 839.54 kg 0.00 0.00
- Bekisting 44.88 m2 0.00 0.00
C PEKERJAAN STRUKTUR 0.00
C.1 STRUKTUR BETON
1 Pek. Kolom Beton K1 (30/30)
- Beton K-225 6.91 m3 0.00 0.00
- Pembesian 1,142.94 kg 0.00 0.00
- Bekisting 92.16 m2 0.00 0.00
2 Pek. Kolom Praktis KP (12/12)
- Beton K-175 0.55 m3 0.00 0.00
- Pembesian 118.52 kg 0.00 0.00
- Bekisting 14.58 m2 0.00 0.00
3 Pek. Balok Beton B1 (20/30)
- Beton K-225 3.60 m3 0.00 0.00
- Pembesian 703.74 kg 0.00 0.00
- Bekisting 48.00 m2 0.00 0.00
4 Pek. Balok Beton Lintel RB (12/15)
- Beton K-175 2.64 m3 0.00 0.00
- Pembesian 387.51 kg 0.00 0.00
- Bekisting 45.84 m2 0.00 0.00
5 Pek. Lantai Beton T=15 cm
- Beton K-225 21.66 m3 0.00 0.00
- Pembesian Wiremesh M-8 1 lapis 144.40 m2 0.00 0.00
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT.
( Rp. ) ( Rp. )

- Bekisting 7.80 m2 0.00 0.00


6 Pek. Ramp Beton T = 10 cm
- Beton K-175 0.35 m3 0.00 0.00
- Pembesian 42.24 kg 0.00 0.00
- Bekisting 0.69 m2 0.00 0.00
C.2 STRUKTUR BAJA
1 WF 150x75x5x7 + zinchromate 1,393.73 kg 0.00 0.00
2 H 100x100x6x8 + zinchromate 459.76 kg 0.00 0.00
3 CNP 125x50x20x2,3 + zinchromate 1,290.13 kg 0.00 0.00
4 Base Plate t = 16 mm 129.51 kg 0.00 0.00
5 Plat Buhul t = 12 mm 36.46 kg 0.00 0.00
6 Stiffner Plate t = 8 mm 59.74 kg 0.00 0.00
7 Ikatan Angin besi dia. 12 mm + asesories 42.80 kg 0.00 0.00
8 Sagrod besi dia. 8 mm 8.53 kg 0.00 0.00
9 Angkur D 16 64.00 bh 0.00 0.00
10 Baut M16 152.00 bh 0.00 0.00
D PEKERJAAN ATAP & PLAFOND 0.00
1 Atap Spandek t = 0.35 mm 281.55 m2 0.00 0.00
2 Atap Bubungan & Jurai 41.60 m' 0.00 0.00
3 Listplank GRC 64.75 m' 0.00 0.00
4 Plafond Gipsum 9 mm + Rangka Hollow 4/4 ; t = 0.35 12.00 m2 0.00 0.00
5 Plafond Calsiboard 4,5 mm + Rangka 59.51 m2 0.00 0.00
6 Lis Gipsum 5 cm 22.00 m' 0.00 0.00
E PEKERJAAN PASANGAN 0.00
1 Pasangan Dinding Bata 140.55 m2 0.00 0.00
2 Plester + Acian 275.80 m2 0.00 0.00
3 Pasangan Rolaag Bata 19.80 m' 0.00 0.00
4 Pasangan Saluran Terbuka 40.00 m' 0.00 0.00
5 Pekerjaan Rabat Beton t = 5 cm keliling bang lbr = 60 cm 2.04 m3 0.00 0.00
6 Pekerjaan Meja Beton Wastafel t = 8 cm 0.10 m3 0.00 0.00
7 Pasangan Keramik Lantai 40/40 Polished 12.00 m2 0.00 0.00
8 Pasangan Keramik Lantai 30/30 UnPolished 55.60 m2 0.00 0.00
9 Pasangan Keramik Lantai 20/20 Unpolished 3.04 m2 0.00 0.00
10 Pasangan Plint Keramik Lantai 40/10 polished 13.00 m' 0.00 0.00
11 Acian Lantai 144.40 m2 0.00 0.00
12 Cat minyak 144.40 m2 0.00 0.00
13 Pengecatan Jalur lantai 8.23 m2 0.00 0.00
14 Pasangan Keramik Bak & Meja Wastafel 20/20 Polished 1.77 m2 0.00 0.00
15 Pasangan Keramik Dinding 30/60 Polished 5.29 m2 0.00 0.00
16 Pasangan Batu Alam Candi Kolom Entrace 5.60 m2 0.00 0.00
17 Pek. Logo & Tulisan 1.00 ls 0.00 0.00
F PEKERJAAN KUSEN PINTU & JENDELA 0.00
1 Kusen/Pintu type P1 1.00 unit 0.00 0.00
2 Kusen/Pintu type P2 1.00 unit 0.00 0.00
3 Kusen/Pintu type P3 (Spandrel) 1.00 unit 0.00 0.00
4 Kusen/Jendela type J1 2.00 unit 0.00 0.00
5 Kusen/Jendela type J2 9.00 unit 0.00 0.00
6 Kusen/Jendela type J3 1.00 unit 0.00 0.00
7 Kusen/Jendela type BV 1.00 unit 0.00 0.00
8 Rolling Door T=0.8 Galvalume 1.00 unit 0.00 0.00
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT.
( Rp. ) ( Rp. )

G PEKERJAAN PENGECATAN 0.00


1 Pek. Pengecatan Dinding Interior 165.48 m2 0.00 0.00
2 Pek. Pengecatan Dinding Exterior 116.07 m2 0.00 0.00
3 Pek. Pengecatan Plafond 71.51 m2 0.00 0.00
4 Pek. Pengecatan Listplank 19.43 m2 0.00 0.00
H PEKERJAAN PLUMBING & SANITAIR 0.00
1 Instalasi Pipa PVC AW 4" 16.00 m' 0.00 0.00
2 Instalasi Pipa PVC AW 2" 12.00 m' 0.00 0.00
3 Instalasi Pipa PVC AW 3/4" 20.00 m' 0.00 0.00
4 Instalasi Pipa PVC AW 1/2" 15.00 m' 0.00 0.00
5 Septic Tank dan Rembesan 1.00 unit 0.00 0.00
6 Pemasangan Closed Jongkok 1.00 bh 0.00 0.00
7 Pemasangan Kran Air 2.00 bh 0.00 0.00
8 Pemasangan Wastafel + Kran 2.00 bh 0.00 0.00
9 Pemasangan Cermin Wastafel 100x200 1.00 unit 0.00 0.00
I PEKERJAAN LISTRIK 0.00
1 Penyambungan Daya Listrik 11,000.00 VA 0.00 0.00
2 Perijinan Sertifikat Layak Operasi (SLO) 11,000.00 VA 0.00 0.00
3 Panel Listrik 1.00 unit 0.00 0.00
4 Pek. Instalasi Kabel Feeder NYY 4x10 mm2 2.00 m' 0.00 0.00
5 Pek. Instalasi Penerangan & Power NYM 3x2,5 mm2 + conduit 38.00 ttk 0.00 0.00
6 Pek. Instalasi Exhaust Fan 4.00 ttk 0.00 0.00
6 Pek. Instalasi kipas angin 2.00 ttk 0.00 0.00
7 Pemasangan Lampu TKO 2x36W dengan Penggantung 18.00 bh 0.00 0.00
8 Pemasangan Lampu Baret Kotak 22W 7.00 bh 0.00 0.00
9 Pemasangan Lampu E27ESS 8 Watt + Fitting 2.00 bh 0.00 0.00
10 Pemasangan Saklar Engkle 2.00 bh 0.00 0.00
11 Pemasangan Saklar Double 5.00 bh 0.00 0.00
12 Pemasangan Stop Kontak 13.00 bh 0.00 0.00
12 Pemasangan Exhaust Fan + ducting 4.00 unit 0.00 0.00
13 Pemasangan Kipas angin + ducting 2.00 unit 0.00 0.00
14 Grounding (max 2 Ohm) 1.00 lot 0.00 0.00
L LAIN - LAIN 0.00
1 IMB 1.00 dok 0.00 0.00
2 Transportasi 2.00 paket 0.00 0.00
3 Ketua Unit Pengelola Teknis 4.00 OB - -
4 Ketua Unit Pengelola Keuangan 4.00 OB - -
5 Anggota Pengelola Teknis 8.00 OB - -
6 Anggota Pengelola Keuangan 8.00 OB - -
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga

PEKERJAAN GALIAN

1 1 m3 Galian Untuk Tanah Biasa sedalam maks. 2 m Rp -


Upah An. SNI ( Revisi ) 6.2.1
1.2000 OH Pekerja Rp - Rp -
0.0450 OH Mandor Rp - Rp -
Sub total : Rp -

2 1 m3 Urugan kembali Rp -
Bahan - m3 Tanah Urug Rp - Rp -
Sub total : Rp -
Upah An. SNI ( Revisi ) 6.9.1
0.2500 OH Pekerja Rp - Rp -
0.0083 OH Mandor Rp - Rp -
Sub total : Rp -

3 1 m3 Urugan pasir dengan pasir urug Rp -


Bahan An. SNI ( Revisi ) 6.11.1
1.1000 m3 Pasir urug Rp - Rp -
Sub total : Rp -
Upah An. SNI ( Revisi ) 6.11.2
0.5000 OH Pekerja Rp - Rp -
0.0250 OH Mandor Rp - Rp -
Sub total : Rp -

4 1 m3 Urugan dengan kerikil Rp -


Bahan An. SNI ( Revisi ) 6.11.1
1.1000 m3 Split Rp - Rp -
Sub total : Rp -
Upah An. SNI ( Revisi ) 6.11.2
0.5000 OH Pekerja Rp - Rp -
0.0250 OH Mandor Rp - Rp -
Sub total : Rp -

5 1 m3 Urugan tanah pilihan Rp -


Bahan An. SNI ( Revisi ) 6.11.1
1.2000 m3 Tanah campur Rp - Rp -
Sub total : Rp -
Upah An. SNI ( Revisi ) 6.11.2
0.2500 OH Pekerja Rp - Rp -
0.0100 OH Mandor Rp - Rp -
Sub total : Rp -

6 1 m3 Pemadatan tanah Rp -
Upah An. SNI ( Revisi ) 6.11.2
0.2500 OH Pekerja Rp - Rp -
0.0080 OH Mandor Rp - Rp -
Sub total : Rp -
Alat
0.0210 jam Sewa Stamper Rp - Rp -
Sub total : Rp -
1 m2 Pemadatan tanah 20 cm Rp -

PEKERJAAN BETON
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga


1 1 m3 beton mutu f'c = 14.5 Mpa (K175), slump (12 +/- 2), w/c = 0.66 sitemix Rp -
Bahan
326.000 kg Portland Cement Rp - Rp -
0.543 m3 Pasir Beton Rp - Rp -
0.762 m3 Kerikil (maks.imum 30 mm) Rp - Rp -
215.000 ltr Air Rp - Rp -
Sub total : Rp -
Upah
1.650 OH Pekerja Rp - Rp -
0.275 OH Tukang batu Rp - Rp -
0.028 OH Kepala tukang Rp - Rp -
0.083 OH Mandor Rp - Rp -
Sub total : Rp -

2 1 m3 beton mutu f'c = 19.3 Mpa (K225), slump (12 +/- 2), w/c = 0.58 Rp -
Bahan
371.000 kg Portland Cement Rp - Rp -
0.499 m3 Pasir Beton Rp - Rp -
0.776 m3 Kerikil (maks.imum 30 mm) Rp - Rp -
215.000 ltr Air Rp - Rp -
Sub total : Rp -
Upah
1.650 OH Pekerja Rp - Rp -
0.275 OH Tukang batu Rp - Rp -
0.028 OH Kepala tukang Rp - Rp -
0.083 OH Mandor Rp - Rp -
Sub total : Rp -

3 Pembesian 10 kg dengan besi ulir Rp -


Pembesian 1 kg Rp -
Bahan
10.500 kg Besi Ulir Rp - Rp -
0.150 kg Kawat Beton Rp - Rp -
Sub total : Rp -
Upah
0.070 OH Pekerja Rp - Rp -
0.070 OH Tukang besi Rp - Rp -
0.007 OH Kepala tukang Rp - Rp -
0.004 OH Mandor Rp - Rp -
Sub total : Rp -

4 Pembesian 10 kg dengan besi polos Rp -


Pembesian 1 kg Rp -
Bahan
10.500 kg Besi Polos Rp - Rp -
0.150 kg Kawat Beton Rp - Rp -
Sub total : Rp -
Upah
0.070 OH Pekerja Rp - Rp -
0.070 OH Tukang besi Rp - Rp -
0.007 OH Kepala tukang Rp - Rp -
0.004 OH Mandor Rp - Rp -
Sub total : Rp -

5 1 M2 Pembesian Wiremesh M8-150 1 lapis Rp -


ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga


Bahan
0.088 Lbr Wiremesh M8 Rp - Rp -
10.000 bh Beton decking Rp - Rp -
Sub total : Rp -
Upah
0.070 OH Pekerja Rp - Rp -
0.070 OH Tukang besi Rp - Rp -
0.007 OH Kepala tukang Rp - Rp -
0.004 OH Mandor Rp - Rp -
Sub total : Rp -

6 Memasang 1 m2 bekisting untuk pondasi Rp -


Bahan
0.040 m3 Kayu kelas III Rp - Rp -
0.100 kg Paku 5 cm - 10 cm Rp - Rp -
0.100 ltr Minyak Bekisting Rp - Rp -
Sub total : Rp -
Penggunaan Bekisting dipakai 2x Rp -

Upah
0.520 OH Pekerja Rp - Rp -
0.260 OH Tukang Kayu Rp - Rp -
0.026 OH Kepala tukang Rp - Rp -
0.026 OH Mandor Rp - Rp -
Sub total : Rp -

7 Memasang 1 m2 bekisting untuk Sloof Rp -


Bahan
0.045 m3 Kayu kelas III Rp - Rp -
0.300 kg Paku 5 cm - 10 cm Rp - Rp -
0.100 ltr Minyak Bekisting Rp - Rp -
Sub total : Rp -
Penggunaan Bekisting dipakai3x Rp -

Upah
0.520 OH Pekerja Rp - Rp -
0.260 OH Tukang Kayu Rp - Rp -
0.026 OH Kepala tukang Rp - Rp -
0.026 OH Mandor Rp - Rp -
Sub total : Rp -

8 Memasang 1 m2 bekisting untuk Kolom Rp -


Bahan
0.040 m3 Kayu kelas III Rp - Rp -
0.400 kg Paku 5 cm - 10 cm Rp - Rp -
0.200 ltr Minyak Bekisting Rp - Rp -
0.015 m3 Balok Kayu Kelas II Rp - Rp -
0.350 lbr Plywood tebal 9 mm Rp - Rp -
2.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp - Rp -
Sub total : Rp -
Penggunaan Bekisting dipakai 2x Rp -

Upah
0.660 OH Pekerja Rp - Rp -
0.330 OH Tukang Kayu Rp - Rp -
0.033 OH Kepala tukang Rp - Rp -
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga


0.033 OH Mandor Rp - Rp -
Sub total : Rp -

9 Memasang 1 m2 bekisting untuk Balok Rp -


Bahan
0.040 m3 Kayu kelas III Rp - Rp -
0.400 kg Paku 5 cm - 10 cm Rp - Rp -
0.200 ltr Minyak Bekisting Rp - Rp -
0.018 m3 Balok Kayu Kelas II Rp - Rp -
0.350 lbr Plywood tebal 9 mm Rp - Rp -
2.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp - Rp -
Sub total : Rp -
Penggunaan Bekisting dipakai 2x Rp -

Upah
0.660 OH Pekerja Rp - Rp -
0.330 OH Tukang Kayu Rp - Rp -
0.033 OH Kepala tukang Rp - Rp -
0.033 OH Mandor Rp - Rp -
Sub total : Rp -

10 Memasang 1 m2 bekisting untuk Lantai Rp -


Bahan
0.040 m3 Kayu kelas III Rp - Rp -
0.400 kg Paku 5 cm - 10 cm Rp - Rp -
0.200 ltr Minyak Bekisting Rp - Rp -
0.015 m3 Balok Kayu Kelas II Rp - Rp -
0.350 lbr Plywood tebal 9 mm Rp - Rp -
6.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp - Rp -
Sub total : Rp -
Penggunaan Bekisting dipakai 2x Rp -

Upah
0.660 OH Pekerja Rp - Rp -
0.330 OH Tukang Kayu Rp - Rp -
0.033 OH Kepala tukang Rp - Rp -
0.033 OH Mandor Rp - Rp -
Sub total : Rp -

11 Memasang 1 m2 bekisting untuk Dinding / Lisplang Rp -


Bahan
0.030 m3 Kayu kelas III Rp - Rp -
0.400 kg Paku 5 cm - 10 cm Rp - Rp -
0.200 ltr Minyak Bekisting Rp - Rp -
0.020 m3 Balok Kayu Kelas II Rp - Rp -
0.350 lbr Plywood tebal 9 mm Rp - Rp -
3.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp - Rp -
Sub total : Rp -
Penggunaan Bekisting dipakai 3x Rp -

Upah
0.660 OH Pekerja Rp - Rp -
0.330 OH Tukang Kayu Rp - Rp -
0.033 OH Kepala tukang Rp - Rp -
0.033 OH Mandor Rp - Rp -
Sub total : Rp -
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga

12 Memasang 1 m2 bekisting untuk Tangga Rp -


Bahan
0.030 m3 Kayu kelas III Rp - Rp -
0.400 kg Paku 5 cm - 10 cm Rp - Rp -
0.150 ltr Minyak Bekisting Rp - Rp -
0.015 m3 Balok Kayu Kelas II Rp - Rp -
0.350 lbr Plywood tebal 9 mm Rp - Rp -
2.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp - Rp -
Sub total : Rp -
Penggunaan Bekisting dipakai 3x Rp -

Upah
0.660 OH Pekerja Rp - Rp -
0.330 OH Tukang Kayu Rp - Rp -
0.033 OH Kepala tukang Rp - Rp -
0.033 OH Mandor Rp - Rp -
Sub total : Rp -

13 Memasang 1 m' Kolom Praktis Beton Bertulang (11x11) cm Rp -


Bahan
0.002 m3 Kayu kelas III Rp - Rp -
0.010 kg Paku 5 cm - 10 cm Rp - Rp -
3.000 kg Besi Beton Polos Rp - Rp -
0.450 kg Kawat Beton Rp - Rp -
4.000 kg Portland Cement Rp - Rp -
0.006 m3 Pasir Beton Rp - Rp -
0.009 m3 Kerikil Rp - Rp -
Sub total : Rp -
Upah
0.180 OH Pekerja Rp - Rp -
0.020 OH Tukang Kayu Rp - Rp -
0.020 OH Tukang Batu Rp - Rp -
0.020 OH Tukang Besi Rp - Rp -
0.006 OH Kepala tukang Rp - Rp -
0.009 OH Mandor Rp - Rp -
Sub total : Rp -

PEKERJAAN BAJA

1 1 Kg Fabrikasi Baja Profil WF , H Beam Rp -


Bahan
1.000 kg Baja profil Rp - Rp -
0.050 m2 Pengecatan zincromate Rp - Rp -
Sub total : Rp -
Upah
0.060 OH Pekerja Rp - Rp -
0.060 OH Tukang Las Rp - Rp -
0.006 OH Kepala tukang Rp - Rp -
0.003 OH Mandor Rp - Rp -
Sub total : Rp -
Alat
1.000 Ls Sewa Alat Rp - Rp -
Sub total : Rp -

2 1 kg Base Plate/Stiffner Rp -
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga


Bahan
1.000 kg Base Plate, Stiffner Rp - Rp -
Sub total : Rp -
Upah
0.060 OH Pekerja Rp - Rp -
0.060 OH Tukang Baja/Las Rp - Rp -
0.006 OH Kepala tukang Rp - Rp -
0.003 OH Mandor Rp - Rp -
Sub total : Rp -
Alat
1.000 ls Sewa alat Rp - Rp -
Sub total : Rp -

3 1 m2 Zincromate Baja Rp -
Pengecatan Zincromate /kg Baja 0.05 Rp -
Bahan
0.150 kg Cat Zincromate Rp - Rp -
0.100 lt Thinner Rp - Rp -
0.400 lmb Amplas Rp - Rp -
Sub total : Rp -
Upah
0.080 OH Pekerja Rp - Rp -
0.080 OH Tukang besi Rp - Rp -
0.040 OH Kepala tukang Rp - Rp -
0.004 OH Mandor Rp - Rp -
Sub total : Rp -

4 1 bh Angkur Besi 19 mm Rp -
Bahan
1.000 bh Angkur dia 19 mm L=80 cm Rp - Rp -
Sub total : Rp -
Upah
0.080 OH Pekerja Rp - Rp -
0.008 OH Mandor Rp - Rp -
Sub total : Rp -
Alat
1.000 ls Alat Bantu Rp - Rp -
Sub total : Rp -

5 1 bh Baut Baja dia 16 mm Rp -


Bahan
1.000 bh Baut HTB dia 16 mm Rp - Rp -
Sub total : Rp -
Upah
0.050 OH Pekerja Rp - Rp -
0.005 OH Mandor Rp - Rp -
Sub total : Rp -

PEKERJAAN ATAP

1 1 M^1 Nok Genteng Metal Zincalume Rp -


Bahan
1.05 m' Nok genteng zincalume Rp - Rp -
0.05 Kg Paku biasa 2" - 5" Rp - Rp -
Sub Total Rp -
Upah
ANALISA HARGA SATUAN
STRUKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

No Uraian Harga Satuan Jumlah Harga


0.2 OH Pekerja Rp - Rp -
0.1 OH Tukang Kayu Rp - Rp -
0.01 OH Kepala Tukang Kayu Rp - Rp -
0.01 OH Mandor Rp - Rp -
Sub Total Rp -

2 1 M2 Atap Corrugated Metal Rp -


Bahan
1.05 m2 Atap corrugated metal Rp - Rp -
0.03 Kg Paku biasa 2" - 5" Rp - Rp -
Sub Total Rp -
Upah
0.2 OH Pekerja Rp - Rp -
0.1 OH Tukang Kayu Rp - Rp -
0.01 OH Kepala Tukang Kayu Rp - Rp -
0.01 OH Mandor Rp - Rp -
Sub Total Rp -

3 1 M^1 Papan Lisplang GRC Rp -


Bahan An. SNI ( Revisi ) 6.50.1
1.050 m Lisplank GRC Rp - Rp -
0.05 Kg Paku biasa 2" - 5" Rp - Rp -
Sub Total Rp -
Upah An. SNI ( Revisi ) 6.50.2
0.11 OH Pekerja Rp - Rp -
0.22 OH Tukang kayu Rp - Rp -
0.022 OH Kepala tukang Rp - Rp -
0.005 OH Mandor Rp - Rp -
Sub Total Rp -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGA: 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH

I. PEKERJAAN PERSIAPAN

MEMASANG BOWPLANK M'


Kayu kaso 5x7x400 Meranti campur 0.0050 m3 - -
Kayu papan 3x20x400 meranti 0.0050 m3 - -
paku rata-rata 0.0350 kg - -
pekerja 0.1000 org/hr - -
mandor 0.0200 org/hr - -

jumlah -
dibulatkan -

MEMASANG PAPAN NAMA PROYEK unit


Papan Kamper Samarinda 3/30 0.0250 m3 - -
Balok kamper 0.0900 m3 - -
Paku biasa 2" - 5 " 0.6000 kg - -
Meni kayu 0.7500 kg - -
Dempul kayu 1.0000 kg - -
Amplas 2.0000 lbr - -
Kuas 0.5000 bh - -
Cat kayu 3.0000 kg - -
Semen Portland 0.5000 sak - -
Pasir beton 0.0600 m3 - -
Koral beton 0.1000 m3 - -
Pekerja 2.1000 org/hr - -
Tukang Batu 0.0175 org/hr - -
Tukang Kayu 1.0000 org/hr - -
Tukang Cat 1.0000 org/hr - -

jumlah -
dibulatkan -

PENGADAAN LISTRIK DAN AIR KERJA LS


Air kerja 4.0000 bulan - -
Listrik kerja 4.0000 bulan - -

jumlah -
dibulatkan -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGA: 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH

PENYUSUNAN LAPORAN & DOKUMENTASI LS


Kamera SLR (Digital) 4.0000 sewa/hr - -
CD copy soft file foto image 2.0000 bh - -
Foto printing uk.3R 40.0000 lbr - -
Foto album 6.0000 bh - -
Tukang foto 4.0000 OH - -

jumlah -
dibulatkan -

II PEKERJAAN PONDASI

CERUCUK DOLKEN TTK


dolken 0.5000 btg - -
pekerja 0.1000 org/hr - -
mandor 0.0100 org/hr - -

jumlah -
dibulatkan -

MEMASANG PONDASI AANSTAMPING M3


batu kali 1.1000 m3 - -
pasir urug 0.4320 m3 - -
tukang batu 0.3900 org/hr - -
kepala tukang batu 0.3900 org/hr - -
pekerja 0.7800 org/hr - -
mandor 0.3900 org/hr - -

jumlah -
dibulatkan -

MEMASANG PONDASI BATU KALI 1:4 M3


batu kali 1.1000 m3 - -
semen PC ( 50 kg ) tiga roda 2.6056 zak - -
pasir pasang 0.5200 m3 - -
tukang batu 0.6000 org/hr - -
kepala tukang batu 0.0600 org/hr - -
pekerja 1.5000 org/hr - -
mandor 0.0750 org/hr - -

jumlah -
dibulatkan -

MEMASANG ROLAG BATA t=20 CM M'


batu bata merah (press) 24.7934 m3 - -
semen PC ( 50 kg ) tiga roda 0.6000 zak - -
pasir pasang 0.1040 m3 - -
tukang batu 0.1000 org/hr - -
kepala tukang batu 0.0100 org/hr - -
pekerja 0.1000 org/hr - -
mandor 0.0050 org/hr - -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGA: 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


jumlah -
dibulatkan -

III PEKERJAAN PASANGAN

DINDING 1/2 BATU BATA 1:2 M2


(BATA PRESS)
batu bata merah 70.0000 bh - -
semen PC ( 50 kg ) tiga roda 0.3790 zak - -
pasir pasang 0.0380 m3 - -
alat bantu pas bata 1.0000 ls - -
tukang batu 0.1000 org/hr - -
kepala tukang batu 0.0100 org/hr - -
pekerja 0.3200 org/hr - -
mandor 0.0150 org/hr - -

jumlah -
dibulatkan -

DINDING 1/2 BATU BATA 1:4 M2


(bata press)
batu bata merah 70.0000 bh - -
semen PC ( 50 kg ) tiga roda 0.1936 zak - -
pasir pasang 0.0450 m3 - -
alat bantu pas bata 1.0000 ls - -
tukang batu 0.1000 org/hr - -
kepala tukang batu 0.0100 org/hr - -
pekerja 0.3200 org/hr - -
mandor 0.0150 org/hr - -

jumlah -
dibulatkan -

PLESTERAN DINDING 1:5 M2


tebal 15 mm
semen PC ( 50 kg ) tiga roda 0.2400 zak - -
pasir pasang 0.0190 m3 - -
alat bantu plester ddg 1.0000 ls - -
tukang batu 0.1500 org/hr - -
kepala tukang batu 0.0150 org/hr - -
pekerja 0.2000 org/hr - -
mandor 0.0100 org/hr - -

jumlah -
dibulatkan -

PLESTERAN BETON ad 1:3 tebal 15 mm M2


semen PC ( 50 kg ) tiga roda 0.2400 zak - -
pasir pasang 0.0190 m3 - -
alat bantu plester ddg 1.0000 ls - -
tukang batu 0.2000 org/hr - -
kepala tukang batu 0.0200 org/hr - -
pekerja 0.1500 org/hr - -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGA: 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


mandor 0.0150 org/hr - -

jumlah -
dibulatkan -

ACIAN M2
semen PC ( 50 kg ) tiga roda 0.1400 zak - -
alat bantu acian 1.0000 ls - -
tukang batu 0.1000 org/hr - -
kepala tukang batu 0.0100 org/hr - -
pekerja 0.0500 org/hr - -
mandor 0.0050 org/hr - -

jumlah -
dibulatkan -

TALI AIR, SIKUAN, SKONENGAN, BENANGAN M'


semen PC ( 50 kg ) tiga roda 0.0300 zak - -
alat bantu tali air 1.0000 ls - -
tukang batu 0.0800 org/hr - -
kepala tukang batu 0.0080 org/hr - -
pekerja 0.0600 org/hr - -
mandor 0.0060 org/hr - -

jumlah -
dibulatkan -

IV PEKERJAAN BETON

MEMBUAT LANTAI KERJA ad 1:3:5 M3


semen PC ( 50 kg ) tiga roda 2.5000 zak - -
pasir beton 0.5200 m3 - -
split 0.8700 m3 - -
tukang batu 0.8000 org/hr - -
kepala tukang batu 0.5000 org/hr - -
pekerja 0.8000 org/hr - -
mandor 0.5000 org/hr - -

jumlah -
dibulatkan -

Lantai kerja 1:3:5 , t 5 cm ; 1 M2 0.0500 m3 - -


dibulatkan -

BEKISTING BETON PRAKTIS M2


triplek 4x8 ft, 9 mm 0.2333 lbr - -
paku rata-rata 0.4000 kg - -
Kayu kaso 5x7x400 Meranti campur 0.0204 m3 - -
kayu balok 8x12x400 Meranti campur 0.0300 m3 - -
form tie type B 0.2500 bh - -
beton decking 4.0000 bh - -
tukang kayu 0.3000 org/hr - -
kepala tukang kayu 0.0300 org/hr - -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGA: 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


pekerja 0.2000 org/hr - -
mandor 0.0100 org/hr - -

jumlah -
dibulatkan -

V PEKERJAAN PINTU DAN JENDELA

MEMASANG KUSEN ALUMUNIUM 3 INCH M'


alumunium profil 3" 1.0000 m' - -
sekrup fixer 2.0000 bh - -
sealant 0.0600 tube - -
pekerja 0.0430 org/hr - -
tukang alumunium 0.0430 org/hr - -
kepala tukang allumunium 0.0430 org/hr - -
mandor 0.0021 org/hr - -

jumlah -
dibulatkan -

MEMASANG ALUMUNIUM KISI KREPYAK M2


profil alumunium kisi /krepyak 1.0000 m' - -
pekerja 0.0150 org/hr - -
tukang kaca/alumunium 0.0150 org/hr - -
kepala tukang kaca/alumunium 0.0150 org/hr - -
mandor 0.0080 org/hr - -

jumlah -
dibulatkan -

MEMASANG KACA CLEAR 5 MM M2


kaca clear 5 mm ; asahimas, mulia setara 1.0500 m2 - -
sealant - tube - -
pekerja 0.0150 org/hr - -
tukang kaca/alumunium 0.1500 org/hr - -
kepala tukang kaca/alumunium 0.0150 org/hr - -
mandor 0.0080 org/hr - -

jumlah -
dibulatkan -

MEMASANG KUSEN DAN DAUN PINTU TYPE P1 BH


Daun pintu double teakwood finish HPL - unit - -
Kusen Alumunium 3" CA 9.1200 m' - -
Jalusi Alumunium Krepyak 1.2600 m2 - -
Frame pintu aluminium 11.2000 m' - -
Kaca clear 5 mm 2.1808 m2 - -
Sealant kaca 9.8400 m' - -
Sealant kusen 7.6400 m' - -
Lever Handle pintu ex.lokal 2.0000 psg - -
Engsel pintu 4" S/S 2BB ex.lokal 2.0000 psg - -
Kunci pintu ex.lokal 1.0000 bh - -
tukang kaca/aluminium 4.2500 org/hr - -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGA: 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


kepala tukang allumunium 0.4250 org/hr - -
pekerja 6.3750 org/hr - -
mandor 0.0425 org/hr - -

jumlah -
dibulatkan -

MEMASANG KUSEN DAN DAUN PINTU TYPE P2 BH


Daun pintu double triplek 6mm finish duco - unit - -
Kusen Alumunium 3" CA 6.9200 m' - -
frame pintu allumunium 2.0640 m2 - -
Kaca clear 5 mm 1.4448 m2 - -
Sealant kaca 10.1200 m' - -
Sealant kusen 6.0400 m' - -
Lever Handle pintu ex.lokal 1.0000 psg - -
Engsel pintu 4" S/S 2BB ex.lokal 1.0000 psg - -
Engsel jendela 3" S/S 2BB ex.lokal 1.0000 psg - -
Kunci pintu ex.lokal 1.0000 bh - -
Rambuncis ex.dekson 1.0000 bh - -
tukang kaca 2.1250 org/hr - -
kepala tukang allumunium 0.2125 org/hr - -
pekerja 3.1875 org/hr - -
mandor 0.0213 org/hr - -

jumlah -
dibulatkan -

MEMASANG KUSEN DAN DAUN PINTU TYPE P3 (Spandrel) BH


Daun pintu alumunium spandrel 1.0000 unit - -
Kusen Alumunium 3" CA 6.9200 m' - -
frame pintu allumunium - m2 - -
Kaca clear 5 mm 0.2800 m2 - -
Sealant kaca 2.2000 m' - -
Sealant kusen 6.0400 m' - -
Lever Handle pintu ex.lokal - psg - -
Engsel pintu 4" S/S 2BB ex.lokal 1.0000 psg - -
Engsel jendela 3" S/S 2BB ex.lokal - psg - -
Kunci pintu ex.lokal - bh - -
tukang kaca 0.5000 org/hr - -
kepala tukang allumunium 0.0500 org/hr - -
pekerja 0.7500 org/hr - -
mandor 0.0050 org/hr - -

jumlah -
dibulatkan -

MEMASANG ROLLING DOOR T=0.8 Galvalume BH


Daun pintu alumunium spandrel 1.0000 unit - -
Kusen Alumunium 3" CA 8.5000 m' - -
frame pintu allumunium 12.0000 m2 - -
Kaca clear 5 mm 8.0000 m2 - -
Sealant kaca 11.4000 m' - -
Sealant kusen 8.5000 m' - -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGA: 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


Lever Handle pintu ex.lokal - psg - -
Engsel pintu 4" S/S 2BB ex.lokal 1.0000 psg - -
Engsel jendela 3" S/S 2BB ex.lokal - psg - -
Kunci pintu ex.lokal - bh - -
tukang kaca 0.5000 org/hr - -
kepala tukang allumunium 0.0500 org/hr - -
pekerja 0.7500 org/hr - -
mandor 0.0050 org/hr - -

jumlah -
dibulatkan -
-
MEMASANG KUSEN DAN DAUN JENDELA TYPE J.1 BH
Kusen Alumunium 3" CA 11.0100 m' - -
frame jendela allumunium 2.2400 m2 - -
Kaca clear 5 mm 2.3680 m2 - -
Sealant kaca 11.4400 m' - -
Sealant kusen 5.8200 m' - -
Engsel Casement 24" 2.0000 set - -
rambuncis lokal 2.0000 bh - -
tukang kaca 0.5000 org/hr - -
kepala tukang allumunium 0.0500 org/hr - -
pekerja 0.7500 org/hr - -
mandor 0.0500 org/hr - -

jumlah -
dibulatkan -

MEMASANG JENDELA BOUVENLIGH B1 1BH


alumunium 3" 2.1600 m' - -
kaca clear 5 mm 0.2176 m2 - -
sealant kaca 2.1600 m' - -

jumlah -
dibulatkan -

MEMASANG KUSEN DAN DAUN JENDELA TYPE J.2 BH


Kusen Alumunium 3" CA 13.2300 m' - -
frame jendela allumunium 1.1200 m2 - -
Kaca clear 5 mm 4.2194 m2 - -
Sealant kaca 14.8720 m' - -
Sealant kusen 7.5660 m' - -
Engsel Casement 24" 1.0000 set - -
rambuncis lokal 1.0000 bh - -
tukang kaca 0.5000 org/hr - -
kepala tukang allumunium 0.0500 org/hr - -
pekerja 0.7500 org/hr - -
mandor 0.0500 org/hr - -

jumlah -
dibulatkan -

MEMASANG KUSEN DAN DAUN JENDELA TYPE J.3 BH


ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGA: 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


Kusen Alumunium 3" CA 7.5400 m' - -
frame jendela allumunium - m2 - -
Kaca clear 5 mm 2.3220 m2 - -
Sealant kaca 8.6200 m' - -
Sealant kusen 6.4600 m' - -
Engsel Casement 24" - set - -
rambuncis lokal - bh - -
tukang kaca 0.5000 org/hr - -
kepala tukang allumunium 0.0500 org/hr - -
pekerja 0.7500 org/hr - -
mandor 0.0500 org/hr - -

jumlah -
dibulatkan -

VI PEKERJAAN PLAFOND

MEMASANG PLAFOND GYPSUM TILE M2


gypsum board 4x8 ft , t = 9 mm 0.3472 lbr - -
hollow 20 x 40 x 0.35 mm 0.8000 btg - -
hollow 40 x 40 x 0.35 mm 0.5000 btg - -
penggantung plafond 1.0000 bh - -
compound 0.1000 sak - -
textile tape 0.2000 rol - -
skrup gypsum 15.0000 bh - -
tukang gypsum 0.1000 org/hr - -
kepala tukang 0.0060 org/hr - -
pekerja 0.1000 org/hr - -
mandor 0.0230 org/hr - -
jumlah -
dibulatkan -

PLAFOND GRC + RANGKA HOLLOW GALVALUM M2


panel GRC 4x8 ft , t - 4.5 mm 0.3472 lbr - -
hollow 20 x 40 x 0.4 mm 0.8000 btg - -
hollow 40 x 40 x 0.4 mm 0.5000 btg - -
penggantung plafond 1.0000 bh - -
compound 0.1000 kg - -
textile tape 0.2000 rol - -
skrup gypsum 15.0000 bh - -
tukang gypsum 0.1000 org/hr - -
kepala tukang 0.0060 org/hr - -
pekerja 0.1000 org/hr - -
mandor 0.0230 org/hr - -

jumlah -
dibulatkan -

LIST GYPSUM UK. 5x5 CM M'


List gypsum 5 x 5 1.0500 m' - -
compound 0.0250 kg - -
tukang gypsum 0.0600 org/hr - -
kepala tukang 0.0060 org/hr - -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGA: 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


pekerja 0.0200 org/hr - -
mandor 0.0010 org/hr - -

jumlah -
dibulatkan -

VII PEKERJAAN PELAPIS LANTAI DAN DINDING

MEMASANG LANTAI KERAMIK 20x20 m2


adukan 1:5, tebal 5 cm
lantai keramik 20x20 1.1000 m2 - -
pasir pasang 0.0300 m3 - -
semen PC ( 50 kg ) tiga roda 0.2300 zak - -
semen isian naat 0.2000 kg - -
tukang batu 0.1350 org/hr - -
kepala tukang batu 0.0135 org/hr - -
pekerja 0.2700 org/hr - -
mandor 0.0135 org/hr - -

jumlah -
dibulatkan -

MEMASANG LANTAI KERAMIK 30x30 m2


adukan 1:5, tebal 5 cm
lantai keramik 30x30 1.1000 m2 - -
pasir pasang 0.0300 m3 - -
semen PC ( 50 kg ) tiga roda 0.2300 zak - -
semen isian naat 0.2000 kg - -
tukang batu 0.1350 org/hr - -
kepala tukang batu 0.0135 org/hr - -
pekerja 0.2700 org/hr - -
mandor 0.0135 org/hr - -

jumlah -
dibulatkan -

MEMASANG KERAMIK LANTAI UK. 40x40 M2


adukan 1:5, tebal 5 cm
lantai keramik 40x40 1.1000 m2 - -
pasir pasang 0.0300 m3 - -
semen PC ( 50 kg ) tiga roda 0.2300 zak - -
semen isian naat 0.2000 kg - -
tukang batu 0.1350 org/hr - -
kepala tukang batu 0.0135 org/hr - -
pekerja 0.2700 org/hr - -
mandor 0.0135 org/hr - -

jumlah -
dibulatkan -

MEMASANG DINDING KERAMIK 30 x 60 M2


adukan 1:5, tebal 5 cm
dinding keramik 20 x 40 1.0500 m2 - -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGA: 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


pasir pasang 0.0180 m3 - -
semen PC ( 50 kg ) tiga roda 0.1860 zak - -
semen isian naat 0.1000 kg - -
tukang batu 0.3200 org/hr - -
kepala tukang batu 0.0300 org/hr - -
pekerja 0.5000 org/hr - -
mandor 0.0300 org/hr - -

jumlah -
dibulatkan -

MEMASANG PLINT KERAMIK UK. 10x40 M'


lantai keramik 10x40 2.5000 bh - -
pasir pasang 0.0020 m3 - -
semen PC ( 50 kg ) tiga roda 0.0200 zak - -
tukang batu 0.0900 org/hr - -
kepala tukang batu 0.0090 org/hr - -
pekerja 0.0900 org/hr - -
mandor 0.0050 org/hr - -

jumlah -
dibulatkan -

MEMASANG BATU ALAM M2


adukan 1:5, tebal 5 cm
batu alam candi 1.0500 m2 - -
pasir pasang 0.0180 m3 - -
semen PC ( 50 kg ) tiga roda 0.1860 zak - -
tukang batu 0.3200 org/hr - -
kepala tukang batu 0.0300 org/hr - -
pekerja 0.5000 org/hr - -
mandor 0.0300 org/hr - -

jumlah -
dibulatkan -

VIII PEKERJAAN PENGECATAN

CAT DINDING DALAM CATYLAC M2


(dinding baru , 3 lapis)
plamur tembok 0.3000 kg - -
amplas 0.5000 lbr - -
cat dasar alkali 0.1000 kg - -
cat tembok dalam Catylac 0.3000 kg - -
kuas roll 0.0250 bh - -
tukang cat 0.0800 org/hr - -
kepala tukang cat 0.0080 org/hr - -
pekerja 0.0400 org/hr - -
mandor 0.0040 org/hr - -

jumlah -
dibulatkan -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGA: 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


CAT DINDING DALAM MOWILEX M2
(dinding baru , 3 lapis)
plamur tembok 0.3000 kg - -
amplas 0.5000 lbr - -
cat dasar 0.1000 kg - -
cat tembok mowilex interior 0.3000 kg - -
kuas roll 0.0250 bh - -
tukang cat 0.0800 org/hr - -
kepala tukang cat 0.0080 org/hr - -
pekerja 0.0400 org/hr - -
mandor 0.0040 org/hr - -

jumlah -
dibulatkan -

CAT DINDING LUAR MOWILEX M2


(dinding baru , 3 lapis)
plamur tembok 0.1905 kg - -
amplas 0.2500 lbr - -
cat dasar alkali 0.0952 kg - -
cat tembok mowilex 0.3000 kg - -
kuas roll 0.0238 bh - -
tukang cat 0.0800 org/hr - -
kepala tukang cat 0.0080 org/hr - -
pekerja 0.0400 org/hr - -
mandor 0.0040 org/hr - -

jumlah -
dibulatkan -

CAT PLAFOND VINILEX M2


(dinding baru , 3 lapis)
amplas 0.5000 lbr - -
cat vililex putih 0.3000 kg - -
kuas roll 0.0250 bh - -
tukang cat 0.0800 org/hr - -
kepala tukang cat 0.0080 org/hr - -
pekerja 0.0400 org/hr - -
mandor 0.0040 org/hr - -

jumlah -
dibulatkan -

CAT MINYAK M2
amplas 0.5000 lbr - -
cat besi Glotex 0.2500 kg - -
meni besi 0.1670 kg - -
thinner impala 0.1500 ltr - -
kuas besar 0.0476 bh - -
tukang cat 0.0667 org/hr - -
kepala tukang cat 0.0333 org/hr - -
pekerja 0.0333 org/hr - -
mandor 0.0167 org/hr - -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGA: 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH

jumlah -
dibulatkan -

IX PEKERJAAN SANITAIR

WASTAFEL TANAM BH
wastafel gantung + accessories ex.lokal 1.0000 bh - -
sealant 0.5000 bh - -
tukang plambing 1.2500 org/hr - -
kepala tukang plambing 0.1250 org/hr - -
pekerja 0.2500 org/hr - -
mandor 0.0250 org/hr - -

jumlah -
dibulatkan -

CLOSED JONGKOK BH
closed jongkok 1.0000 bh - -
semen putih ( 50 kg ) 0.0200 zak - -
pas bata 1.6000 m2 - -
plesteran 1:2 1.0000 m2 - -
tukang batu 0.3000 org/hr - -
kepala tukang batu 0.0500 org/hr - -
pekerja 0.3000 org/hr - -
mandor 0.0500 org/hr - -

jumlah -
dibulatkan -

MEMASANG KRAN AIR LOKAL BH


kran air lokal 1.0000 bh - -
seal tape 0.5000 bh - -
tukang plambing 0.0300 org/hr - -
kepala tukang plambing 0.0300 org/hr - -
pekerja 0.2500 org/hr - -
mandor 0.0250 org/hr - -

jumlah -
dibulatkan -

MEMASANG CERMIN WASTAFEL (Uk. 100x200) BH


kaca cermin 5 mm 1.0000 m2 - -
sekrup fisher 6.0000 bh - -
bevel kaca 3.0000 m' - -
tukang plambing 0.4000 org/hr - -
kepala tukang plambing 0.0400 org/hr - -
pekerja 0.3000 org/hr - -
mandor 0.0300 org/hr - -

jumlah -
dibulatkan -
ANALISA HARGA SATUAN
ARSITEKTUR
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGA: 2018

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


X PEKERJAAN LAIN-LAIN

LOGO DAN TULISAN unit


Logo (tampak muka gedung) 1.0000 set - -

jumlah -
dibulatkan -

MEMASANG BUIS BETON 30 M'


galian tanah 0.6400 m3 - -
urug tanah kembali 0.1850 m3 - -
urug pasir 0.0650 m3 - -
buis beton ø 30 cm, panj.0.50 m 0.8333 m' - -
pasir pasang 0.0200 m3 - -
semen PC ( 50 kg ) tiga roda 0.1000 zak - -
upah pas saluran 1.0000 m' - -

jumlah -
dibulatkan -

SEPTIC TANK DAN REMBESAN unit


Galian tanah Septictank & rembesan 7.5000 m3 - -
Pasir urug 0.2100 m3 - -
Lantai kerja 2.2500 m3 - -
Pasang bata 1 Pc : 2 Psr 15.0000 m2 - -
Pelat beton penutup dan balok 0.3000 m3 - -
Pipa PVC 3" AW & perlengkapannya 7.5000 m' - -
Plesteran 1 Pc : 3 Psr 30.0000 m2 - -
Pasangan ijuk 5.0000 ikat - -
Urugan kerikil 3,5 cm 1.0500 m3 - -
Pipa PVC 1½" AW di lubang 3.0000 m' - -
Urugan kembali 1.1300 m3 - -
Pembantu Tukang 4.0000 org - -
Tukang batu 3.0000 org - -

jumlah -
dibulatkan -
ANALISA HARGA PEK. ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS


Lokasi :
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

1 Memasang 1 buah instalasi titik lampu / penerangan


Bahan An. SNI ( Revisi ) 6.1.1
8.000 m Kabel NYM 3x2,5 mm2 @ Rp. 0.00 = Rp 0.00
8.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.1.2
0.200 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.180 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.050 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.040 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

2 Memasang 1 buah instalasi titik AC


Bahan An. SNI ( Revisi ) 6.1.1
8.000 m Kabel NYM 3x2,5 mm2 @ Rp. 0.00 = Rp 0.00
8.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.1.2
0.200 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.180 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.050 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.040 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

3 Memasang 1 m' instalasi kabel feeder NYY 4x10 mm2


Bahan An. SNI ( Revisi ) 6.1.1
1.000 m Kabel NYY 4x10 mm2 @ Rp. 0.00 = Rp 0.00
1.000 m Conduit pipa dia. 20 @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.1.2
0.200 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.180 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.050 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.040 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

4 Memasang Stop Kontak daya


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak 6 A @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.070 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.020 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.015 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

5 Memasang Stop Kontak Ganda


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak Ganda @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.070 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.020 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.015 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

6 Memasang Stop Kontak AC


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak AC @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.070 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.020 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.015 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

7 Memasang Grounding (max 2 Ohm)


Bahan An. SNI ( Revisi ) 6.18.1
10.000 m' NYA 1 x 50 mm2 @ Rp. 0.00 = Rp 0.00
3.000 m' Pipa galvanis ø 1 1/2" @ Rp. 0.00 = Rp 0.00
2.000 bh Split tembaga @ Rp. 0.00 = Rp 0.00
4.000 bh Klem tembaga @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.070 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.020 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.015 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

8 Memasang Saklar Tunggal


Bahan An. SNI ( Revisi ) 6.21.1
1.000 bh Saklar Tunggal @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.21.2
0.150 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.115 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.030 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.020 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

9 Memasang Saklar Ganda


Bahan An. SNI ( Revisi ) 6.22.1
1.000 bh Saklar ganda @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.22.2
0.150 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.115 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.030 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.020 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

10 Memasang Lampu TKO 2x36 W


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu TKO 2 x 36 W @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.166 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.033 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.017 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

11 Memasang Lampu Baret 18 W


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu Baret 18 W @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.166 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.033 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.017 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

12 Memasang Downlight E27ESS 8 Watt + Fitting


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Downlight E27ESS 8 Watt @ Rp. 0.00 = Rp 0.00
1.000 bh Fitting @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi @ Rp. = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.166 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.033 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.017 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00
13 Memasang Exhaust Fan + ducting
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Exhaust Fan + ducting @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.166 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.033 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.017 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

14 Memasang Kipas angin + ducting


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Kipas angin + ducting @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.166 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
0.033 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.017 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

15 Memasang Panel Distribusi


Bahan An. SNI ( Revisi ) 6.55.1
1.000 bh Panel Distribusi @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.55.2
2.500 OH Pekerja @ Rp. 0.00 = Rp 0.00
3.500 OH Tukang listrik @ Rp. 0.00 = Rp 0.00
1.500 OH Kepala tukang istrik @ Rp. 0.00 = Rp 0.00
0.800 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

ANALISA HARGA PEK. PLUMBING

Pekerjaan : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS


Lokasi :
ANALISA HARGA PEK. PLUMBING

Pekerjaan : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS


Lokasi :
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
Tahun Anggaran : 2017
35.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI RSNIT-15-2002
0.054 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.090 OH Tukang Plumbing @ Rp. 0.00 = Rp 0.00
0.009 OH Kep. Tkg Plumbing @ Rp. 0.00 = Rp 0.00
0.0027 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

5 Memasang 1 m' Pipa PVC tipe AW dia 3"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 3" @ Rp. 0.00 = Rp 0.00
35.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI RSNIT-15-2002
0.081 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.135 OH Tukang Plumbing @ Rp. 0.00 = Rp 0.00
0.0135 OH Kep. Tkg Plumbing @ Rp. 0.00 = Rp 0.00
0.0041 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00

6 Memasang 1 m' Pipa PVC tipe AW dia 4"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 4" @ Rp. 0.00 = Rp 0.00
35.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI RSNIT-15-2002
0.081 OH Pekerja @ Rp. 0.00 = Rp 0.00
0.135 OH Tukang Plumbing @ Rp. 0.00 = Rp 0.00
0.0135 OH Kep. Tkg Plumbing @ Rp. 0.00 = Rp 0.00
0.0041 OH Mandor @ Rp. 0.00 = Rp 0.00
Sub total : = Rp 0.00
Total upah+bahan : = Rp 0.00
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)

I. MATERIAL ALAM
batu bata merah bh
batu kali m3
split m3
beton decking bh
pasir beton m3
pasir pasang m3
pasir urug m3
tanah urug (lokal) m3

II. SEMEN
semen PC ( 50 kg ) kg
semen PC ( 50 kg ) zak
semen putih ( 50 kg ) zak
semen isian naat / warna kg

III. BESI , BAJA & ASESORIES


wiremesh M8 (2.1 x 5.4 m) lmbr
besi beton polos rata2 kg
besi beton ulir rata2 kg
form tie type B bh
baut HTB dia.16 mm bh
ikatan gording dia.12 mm + turnbuckle kg
angkur dia. 19 mm L = 80 cm bh
plat besi 8,10, 12, 16 mm kg
baja WF, H Beam kg
kawat beton kg
paku rata-rata kg

IV. KAYU & MULTIPLEKS


dolken btg
kayu balok 8x12x400 Meranti klas II campur m3
kayu kaso 5x7x400 Meranti klas II campur m3
kayu papan 3x20x400 Meranti campur m3
kayu papan 3x30x400 Meranti campur m3
triplek 122x244, 9 mm lbr

V. PINTU DAN JENDELA


Pintu :
Daun pintu double teakwood finish HPL bh
Daun pintu double triplek 6mm finish duco bh
Daun pintu alumunium spandrel bh
Asesories :
engsel casement 24" psg
engsel pintu 4" S/S 2BB ex.lokal psg
engsel jendela 3" S/S 2BB ex.lokal psg
lever handle pintu ex.lokal psg
kunci pintu ex.lokal set
kunci pintu keet bh
rambuncis ex.dekson bh
Kaca :
bevel kaca m'
kaca clear 5 mm m2
kaca cermin 5 mm m2
Alumunium / Frame :
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)
jalusi/kisi/krepyak m'
frame pintu alumunium m'
kusen alumunium 3" CA m'
sealant kusen m'
sealant kaca m'
sealant kusen/jendela tube
sekrup fischer bh

VI. ATAP
nok galvalum m'
atap spandek galvalum t=0.35 mm m2

VII. PLAFOND
gypsum board 4x8 ft , t = 9 mm lbr
penggantung plafond bh
hollow 20 x 40 x 0.35 mm btg
hollow 40 x 40 x 0.35 mm btg
List gypsum 5 x 5 m'
panel GRC 4x8 ft , t - 4.5 mm lbr
Lisplang GRC 20 cm m'
compound zak
skrup gypsum bh
textile tape roll

VIII. MATERIAL LANTAI


dinding keramik 20 x 20 unpolished m2
dinding keramik 30 x 60, Asia Tile/KIA/Mulia m2
lantai keramik 30x30, Asia Tile/KIA/Mulia m2
lantai keramik 40x40, Asia Tile/KIA/Setara m2
plint keramik uk.10x40 bh
batu alam candi m2

IX. CAT
cat dasar alkali Catylac kg
amplas lbr
cat besi Glotex kg
cat besi zinkromate kg
meni kayu kg
meni besi kg
cat tembok dalam Catylac kg
cat tembok mowilex (interior) kg
cat tembok catylac (luar) kg
cat plafond putih vinilex kg
plamur tembok kg
thinner impala ltr
plamur kayu kg
kuas besar bh
kuas roll bh

X. SANITAIR
closet jongkok INA bh
wastafel tanam + accessories ex.lokal bh
kran air lokal bh
seal tape bh
sealant silicon tube
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)
XI. JALAN & LANDSCAPE
buis beton ø 30 cm, panj.0.50 m m'

XII. BBM & LISTRIK


Oli / Pelumas ltr
Penyambungan Daya Listrik VA
Perijinan Sertifikat Layak Operasi (SLO) VA
Air kerja m3
Air kerja ltr
Listrik kerja W

XIII BAHAN KABEL


Kabel NYY 3 x 2,5 mm2 m'
Kabel NYY 4 x 10 mm2 m'
Kabel NYA 1 x 50 mm2 m'

XIV BAHAN LAMPU, SAKLAR & STOP KONTAK


Lampu TL TKO 2 x 36 watt + rumah bh
Lampu Baret 18W Philip bh
Downlight E27ESS 8 Watt bh
Fitting bh
Stop kontak bh
Saklar Seri/Ganda bh
Stop kontak Ganda bh
Stop kontak AC bh
Exhaust Fan 1000 CFM + ducting bh
Kipas angin + ducting bh

XV BAHAN PANEL
Box Panel Standard unt
MCB : 1 P , 6/10/16/25 A unt

XVI ASESORIES & LAIN-LAIN


Logo (tampak muka gedung) set
Flexible conduit 20 mm m'
Splitzen 3/4" bh
Klem Penyambung Kabel BC bh
Kamera SLR (Digital) sewa/hr
CD copy soft file foto image bh
Foto printing uk.3R lbr
Foto album bh
Ijuk ikat
IMB dok
Transportasi paket
Stamper jam

XVII BAHAN PIPA


Pipa PVC tipe AW diameter 1/2" @4m btg
Pipa PVC tipe AW diameter 3/4" @4m btg
Pipa PVC tipe AW diameter 1 1/2" @4m btg
Pipa PVC tipe AW diameter 2" @4m btg
Pipa PVC tipe AW diameter 3" @4m btg
Pipa PVC tipe AW diameter 4" @4m btg
Pipa GIP Medium diameter 1 1/2" @6m btg
HARGA SATUAN UPAH
PEKERJAAN : PEMBANGUNAN WORKSHOP LAS - BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018

NO. PEKERJA SATUAN HARGA UPAH

1 Mandor Org / hr
2 Kepala Tukang Galian Org / hr
3 Tukang Galian Org / hr
4 Kepala Tukang Batu Org / hr
5 Tukang Batu Org / hr
6 Kepala Tukang Las Org / hr
7 Tukang Las Org / hr
8 Kepala Tukang Besi Org / hr
9 Tukang Besi Org / hr
10 Kepala Tukang Kaca/Aluminium/Gipsum Org / hr
11 Tukang Kaca/Alumunium/Gipsum Org / hr
12 Kepala Tukang Kayu Org / hr
13 Tukang Kayu Org / hr
14 Kepala Tukang Cat Org / hr
15 Tukang Cat Org / hr
16 Kepala Tukang Pipa/Plumbing Org / hr
17 Tukang Plumbing Org / hr
18 Instalator / Kepala Tukang Listrik Org / hr
19 Pembantu Instalator / Tukang Listrik Org / hr
20 Pekerja / Kenek Org / hr
21 Tukang foto Org / hr
22 Ketua Unit Pengelola Teknis Org / hr
23 Ketua Unit Pengelola Keuangan Org / hr
24 Anggota Pengelola Teknis Org / hr
25 Anggota Pengelola Keuangan Org / hr
VOLUME BAJA & ARSITEKTUR

Jml L A W Tot A
Type
n m m2 kg/m m2

1 WF 150.75.5.7 K1 3 11.50 14.00


WF 150.75.5.7 J1 4 8.13 14.00
WF 150.75.5.7 J2 4 2.60 14.00
WF 150.75.5.7 K2 1 4.55 14.00
WF 150.75.5.7 Pedestal 16 0.30 14.00
WF 150.75.5.7 stiffner 16 0.80 14.00

2 H 100.100.6.8 K1 3 2.35 17.20


H 100.100.6.8 J1 4 1.56 17.20
H 100.100.6.8 J2 4 0.90 17.20
H 100.100.6.8 K2 1 1.84 17.20
H 100.100.6.8 stiffner 16 0.50 17.20

3 Angkur dia 19 64
4 Base Plate t = 16 mm 16 0.06 129.51
5 Stiffner Plate T = 8 mm
K1 3 0.12 64.93
J1 4 0.08 64.93
J2 4 0.04 64.93
K2 1 0.08 64.93

6 Plat Buhul
T = 12 mm
K1 3 0.13 97.22
7 Baut dia 16
K1 60
J1 40
J2 32
K2 20

8 CNP 125.50.20.2,3 2 91.22 4.51


2 43.61 4.51
2 3.60 4.51
2 4.60 4.51

9 Ikatan Angin dia 12 4 12.00 0.892


10 Sagrod dia 8 6 3.60 0.395

ATAP n L T
Atap
1 Segitiga 2 12.75 5.54
2 Trapesium Utuh 2 18.60 8.15 7.30
3 Area Trapesium Terpotong 2 2.80 4.20
4 Area K2 2 3.42 4.15
2 3.42 3.15
A Total

Bubung
L atas 1 1 8.00
L atas 2 1 5.60
L jurai 4 7.00

Talang 2 5.76

Listplank
1 Depan 18.89
2 Belakang 18.06
3 Smp Kiri 13.9
4 Smp Kanan 13.9

Plafond
1 Gipsum 3.00 4.00
(1.95) 1.80

2 Calsiboard 1.95 1.80


2 15.50 0.82
2 11.50 0.82
2 2.00 0.82
1 3.50 2.00
2 0.90 3.42

3 List Gipsum 2 3.00 4


4 2.00 1.8
0 7.00
0 3.00
0 0.70
0 5.45

3 List Kayu 2 1.95 1.78


2 14.00
2 10.00
1 12.00

Dinding 2 16.00 10.00 3.25


1 4.00 3.25
1 3.00 3.25
1 2.65 3.25
1 1.85 3.25
P1 1 1.40 3.08
P2 1 0.80 2.58
P3 1 0.70 2.58
J1 1 1.52 2.15
J2 9 2.26 2.15
J3 1 1.08 2.15
BV&RD 1 0.68 0.48 3.2 2.5

Plester + Aci

Rollag 2 14.00 0.90 2.00


Keramik
Lantai 40x40 3.00 4.00 - -
Lantai 30x30 12 16.00 0.90 1.30 4.00
Lantai 20x20 unpolish 2.00 1.80 (0.75) 0.75
Lantai 20x20 polish 2.00 0.70 0.75 0.75
Dinding 30x60 2 1.85 1.70 (0.70) 2.58
Partisi - - - -
Total W
kg

483.00
455.00
145.60
63.73
67.20
179.20
1,393.73
121.26
107.33
61.92
31.65
137.60
459.76
64.00
129.51

23.38
20.78
10.39
5.19
59.74

36.46

152.00
822.80
393.36
32.47
41.49
1,290.13
42.80
8.532

70.64 1.31904761904762
195.28
(23.52)
28.39
10.77
281.55

8.00
5.60
28.00
41.60
11.52

64.75

12.00
-
12.00
3.51
25.42
18.86
1.64
7.00
3.08
59.51
14.00
8.00
-
-
-
-
22.00
7.46
28.00
20.00
12.00
67.46

169.00
13.00
9.75
8.61
6.01
(4.31)
(2.06)
(1.81)
(3.27)
(43.73)
(2.32)
(8.33)
140.55
281.09

19.80
12.00
55.60
3.04
1.77
5.29
-
VOLUME PONDASI PLAT DAN BATU BELAH

1 PONDASI PLAT P1 (1.2X1.2X0,30)M


Jumlah : 16.00
Dimensi : 1.00 x 1.00 m
Tebal : 0.28 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.28 m3
Jml Volume Beton = 4.48 m3
b) Tulangan : Jml D As s
Tul
n m m2 m
Bj. Besi Beton atas 7 0.013 0.000133 0.17
= 7850 kg/m3 7 0.013 0.000133 0.17
bawah 7 0.013 0.000133 0.17
7 0.013 0.000133 0.17
Pinggang 0 0.013 0.000133
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 640.93 kg
c) Bekisting : 1.52 m2
5.42857 m2/m3
Jml Vol bekisting = 24.32 m2

2 PONDASI BATU BELAH (80/30X80)CM


Panjang : 74.8 10 10 16 16 2 1.8 4
A : 0.3 + 0.7 x 0.35 = 0.35
Tinggi : 0.7 m
Volume : 26.18 m3

3 PONDASI ROLAAG BATA


Panjang : 65.8 18 18 12 12 2 2 0.9

4 PONDASI AANSTAMPING
Panjang 74.80
Lebar -
Tinggi -
Volume - m3

5 PASIR URUG BAWAH PONDASI


Panjang 74.80
Lebar 0.90
Tinggi 0.05
Volume 3.37 m3
A 1.2 x 1.2 x 16.00 = 23.04 m2
Tinggi 0.10
Volume 2.304 m3
Vol. Total 5.67 m3
VOLUME GALIAN TANAH

1 GALIAN PONDASI PLAT


Jumlah : 16.00
Dimensi : 1.20 x 1.20 x 1.15 = 1.656
Volume-1 : 26.496 m3
Panjang : 74.80 - 19.20 x 0.90 = 50.04
Volume-2 : 50.04 x 0.95 = 47.54
L Rolag : 65.80
Volume-3 : 65.80 x 0.10 x 0.22 = 1.4476

Vol Total 75.48

2 URUGAN
Urugan Kembali : 1/3 x 75.48 = 25.16053 m3

Urugan Peninggian : 10 x 16 = 160


56 x 0.9 = 50.4
210.4
210.4 x 0.08 = 16.832 m3

3 PASIR URUG BAWAH LANTAI


Panjang 18.00 1.00 0.90
Lebar 12.00 4.00 4.00
Tebal 0.10 0.10 0.10
Volume 21.60 0.40 0.36 22.36 m3

4 RABAT BETON BWH LANTAI 11.18 m3


Berat Pnjg Hak Ovrlap T.Pnjg Vol
kg/m m m m m kg
1.04195 1.4 0.156 0 10.892 11.3489
1.04195 1.12 0.156 0 8.932 9.30668
1.04195 1.12 0.156 0 8.932 9.30668
1.04195 1.12 0.156 0 8.932 9.30668
1.04195 4.3 0.156 0 0 0
0.39269
39.6616
0.39662
40.0583
143.065

4 3 2 2 4

0.9
m3

m
m3

m3

m3
VOLUME TIE BEAM/SLOOF

1 SLOOF S1 20/30 AS A,B,C,E,G


Jumlah : 11.00
Dimensi : 0.20 x 0.3 m
Panjang : 4.00 m
T. Plat : 0 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.24 m3
Jml Volume Beton = 2.64 m3
b) Tulangan : Jml D As s
Tul n m m2 m
Bj. Besi Beton Tumpuan (kiri) 3 0.0130 0.00013273
= 7850 kg/m3 Tumpuan (kiri) 3 0.0130 0.00013273
Sk 8 0.0080 5.0265E-05 0.15
Lapangan (tengah) 2 0.0130 0.00013273
Lapangan (tengah) 3 0.0130 0.00013273
Sk 15 0.0080 5.0265E-05 0.15
Tumpuan (kanan) 3 0.0130 0.00013273
Tumpuan (kanan) 3 0.0130 0.00013273
Sk 8 0.0080 5.0265E-05 0.15

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 472.26 kg
c) Bekisting : 2.4 m2
10 m2/m3
Jml Vol bekisting = 26.4 m2

2 SLOOF S1 20/30 AS F
Jumlah : 1.00
Dimensi : 0.20 x 0.3 m
Panjang : 1.80 m
T. Plat : 0 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.108 m3
Jml Volume Beton = 0.11 m3
b) Tulangan : Jml D As s
Tul n m m2 m
Bj. Besi Beton Tumpuan (kiri) 3 0.0130 0.00013273
= 7850 kg/m3 Tumpuan (kiri) 3 0.0130 0.00013273
Sk 4 0.0080 5.0265E-05 0.15
Lapangan (tengah) 2 0.0130 0.00013273
Lapangan (tengah) 3 0.0130 0.00013273
Sk 7 0.0080 5.0265E-05 0.15
Tumpuan (kanan) 3 0.0130 0.00013273
Tumpuan (kanan) 3 0.0130 0.00013273
Sk 4 0.0080 5.0265E-05 0.15

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 25.07 kg
c) Bekisting : 1.08 m2
10 m2/m3
Jml Vol bekisting = 1.08 m2

3 SLOOF S1 20/30 AS 1.6


Jumlah : 4.00
Dimensi : 0.20 x 0.30 m
Panjang : 4.00 m 53.333
T. Plat : 0.00 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.24 m3
Jml Volume Beton = 0.96 m3
b) Tulangan : Jml D As s
Tul n m m2 m
Bj. Besi Beton Tumpuan (kiri) 3 0.0130 0.00013273
= 7850 kg/m3 Tumpuan (kiri) 3 0.0130 0.00013273
Sk 8 0.0080 5.0265E-05 0.15
Lapangan (tengah) 2 0.0130 0.00013273
Lapangan (tengah) 3 0.0130 0.00013273
Sk 15 0.0080 5.0265E-05 0.15
Tumpuan (kanan) 3 0.0130 0.00013273
Tumpuan (kanan) 3 0.0130 0.00013273
Sk 8 0.0080 5.0265E-05 0.15

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 171.73 kg
c) Bekisting : 2.4 m2
10 m2/m3
Jml Vol bekisting = 9.60 m2

4 SLOOF S1 20/30 AS 1,3,4,5,6


Jumlah : 5.00
Dimensi : 0.20 x 0.3 m
Panjang : 2.00 m
T. Plat : 0 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.12 m3
Jml Volume Beton = 0.60 m3
b) Tulangan : Jml D As s
Tul n m m2 m
Bj. Besi Beton Tumpuan (kiri) 3 0.0130 0.00013273
= 7850 kg/m3 Tumpuan (kiri) 3 0.0130 0.00013273
Sk 5 0.0080 5.0265E-05 0.15
Lapangan (tengah) 2 0.0130 0.00013273
Lapangan (tengah) 3 0.0130 0.00013273
Sk 8 0.0080 5.0265E-05 0.15
Tumpuan (kanan) 3 0.0130 0.00013273
Tumpuan (kanan) 3 0.0130 0.00013273
Sk 5 0.0080 5.0265E-05 0.15

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 135.90 kg
c) Bekisting : 1.2 m2
10 m2/m3
Jml Vol bekisting = 6 m2

5 SLOOF S1 20/30 AS 4
Jumlah : 1.00
Dimensi : 0.20 x 0.3 m
Panjang : 3.00 m
T. Plat : 0 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.18 m3
Jml Volume Beton = 0.18 m3
b) Tulangan : Jml D As s
Tul n m m2 m
Bj. Besi Beton Tumpuan (kiri) 3 0.0130 0.00013273
= 7850 kg/m3 Tumpuan (kiri) 3 0.0130 0.00013273
Sk 6 0.0080 5.0265E-05 0.15
Lapangan (tengah) 2 0.0130 0.00013273
Lapangan (tengah) 3 0.0130 0.00013273
Sk 11 0.0080 5.0265E-05 0.15
Tumpuan (kanan) 3 0.0130 0.00013273
Tumpuan (kanan) 3 0.0130 0.00013273
Sk 6 0.0080 5.0265E-05 0.15

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 34.59 kg
c) Bekisting : 1.8 m2
10 m2/m3
Jml Vol bekisting = 1.8 m2

Beton 4.49 m3
Besi 839.54 kg
Bekisting 44.88 m2
Berat Pnjg Hak Ovrlap T.Pnjg Vol Vol
kg/m m m m m kg kg
1.041948 1.00 0.156 0.39 4.638 4.8326
1.041948 1.00 0.156 0.39 4.638 4.8326
0.394584 0.68 0.096 0.00 6.208 2.4496
1.041948 2.00 0.156 0.39 5.092 5.3056
1.041948 2.00 0.156 0.39 7.638 7.9584
0.394584 0.68 0.096 0.00 11.640 4.5930
1.041948 1.00 0.156 0.39 4.638 4.8326
1.041948 1.00 0.156 0.39 4.638 4.8326
0.394584 0.68 0.096 0.00 6.208 2.4496
Jumlah 32.5942 9.4921
0.3259 0.0949
32.9202 9.5870
0.3292 0.0959
33.2494 9.6829
138.5391 40.3454

Berat Pnjg Hak Ovrlap T.Pnjg Vol Vol


kg/m m m m m kg kg
1.041948 0.45 0.156 0.39 2.988 3.1133
1.041948 0.45 0.156 0.39 2.988 3.1133
0.394584 0.68 0.096 0.00 3.104 1.2248
1.041948 0.90 0.156 0.39 2.892 3.0133
1.041948 0.90 0.156 0.39 4.338 4.5200
0.394584 0.68 0.096 0.00 5.432 2.1434
1.041948 0.45 0.156 0.39 2.988 3.1133
1.041948 0.45 0.156 0.39 2.988 3.1133
0.394584 0.68 0.096 0.00 3.104 1.2248
Jumlah 19.9867 4.5930
0.1999 0.0459
20.1865 4.6389
0.2019 0.0464
20.3884 4.6853
188.7814 43.3822

Berat Pnjg Hak Ovrlap T.Pnjg Vol Vol


kg/m m m m m kg kg
1.041948 1.00 0.156 0.39 4.638 4.83256
1.041948 1.00 0.156 0.39 4.638 4.83256
0.394584 0.68 0.096 0.00 6.208 2.4496
1.041948 2.00 0.156 0.39 5.092 5.30560
1.041948 2.00 0.156 0.39 7.638 7.95840
0.394584 0.68 0.096 0.00 11.640 4.5930
1.041948 1.00 0.156 0.39 4.638 4.83256
1.041948 1.00 0.156 0.39 4.638 4.83256
0.394584 0.68 0.096 0.00 6.208 2.4496
Jumlah 32.59423 9.4921
0.32594 0.0949
32.92017 9.5870
0.32920 0.0959
33.24938 9.6829
138.53907 40.3454

Berat Pnjg Hak Ovrlap T.Pnjg Vol Vol


kg/m m m m m kg kg
1.041948 0.50 0.156 0.39 3.138 3.2696
1.041948 0.50 0.156 0.39 3.138 3.2696
0.394584 0.68 0.096 0.00 3.880 1.5310
1.041948 1.00 0.156 0.39 3.092 3.2217
1.041948 1.00 0.156 0.39 4.638 4.8326
0.394584 0.68 0.096 0.00 6.208 2.4496
1.041948 0.50 0.156 0.39 3.138 3.2696
1.041948 0.50 0.156 0.39 3.138 3.2696
0.394584 0.68 0.096 0.00 3.880 1.5310
Jumlah 21.1328 5.5115
0.2113 0.0551
21.3441 5.5667
0.2134 0.0557
21.5576 5.6223
179.6464 46.8528

Berat Pnjg Hak Ovrlap T.Pnjg Vol Vol


kg/m m m m m kg kg
1.041948 0.75 0.156 0.39 3.888 4.0511
1.041948 0.75 0.156 0.39 3.888 4.0511
0.394584 0.68 0.096 0.00 4.656 1.8372
1.041948 1.50 0.156 0.39 4.092 4.2637
1.041948 1.50 0.156 0.39 6.138 6.3955
0.394584 0.68 0.096 0.00 8.536 3.3682
1.041948 0.75 0.156 0.39 3.888 4.0511
1.041948 0.75 0.156 0.39 3.888 4.0511
0.394584 0.68 0.096 0.00 4.656 1.8372
Jumlah 26.8635 7.0425
0.2686 0.0704
27.1322 7.1130
0.2713 0.0711
27.4035 7.1841
152.2415 39.9116
VOLUME KOLOM LANTAI SATU

1 KOLOM K1 (30x45) ; 24 UNIT


Jumlah : 24
Dimensi : #REF! x #REF! m
Tinggi : 4 m
Cover beton : 0.025 m
Volume :
a) Beton : #REF! m3
Jml Volume Beton = #REF! m3
b) Tulangan : Jml D As s Berat Pnjg Hak
Tul n m m2 m kg/m m m
Bj. Besi Beton Tumpuan (bawah) #REF! 0.016 0 1.578 1 0.192
= 7850 kg/m3 Sk 8 0.01 8E-05 0.15 0.617 #REF! 0.12
Lapangan (tengah) #REF! 0.016 0 1.578 2 0.192
Sk 15 0.01 8E-05 0.15 0.617 #REF! 0.12
Tumpuan (atas) #REF! 0.016 0 1.578 1 0.192
Sk 8 0.01 8E-05 0.15 0.617 #REF! 0.12

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = #REF! kg
c) Bekisting : #REF! m2
#REF! m2/m3
Jml Vol bekisting = #REF! m2

2 KOLOM K1A (30x45) ; 8 UNIT


Jumlah : #REF!
Dimensi : #REF! x #REF! m
Tinggi : 4 m
Cover beton : 0.025 m
Volume :
a) Beton : #REF! m3
Jml Volume Beton = #REF! m3
b) Tulangan : Jml D As s Berat Pnjg Hak
Tul n m m2 m kg/m m m
Bj. Besi Beton Tumpuan (bawah) #REF! 0.016 0 1.578 1 0.192
= 7850 kg/m3 Sk 11 0.01 8E-05 0.1 0.617 #REF! 0.12
Lapangan (tengah) #REF! 0.016 0 1.578 2 0.192
Sk 15 0.01 8E-05 0.15 0.617 #REF! 0.12
Tumpuan (atas) #REF! 0.016 0 1.578 1 0.192
Sk 11 0.01 8E-05 0.1 0.617 #REF! 0.12

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = #REF! kg
c) Bekisting : #REF! m2
#REF! m2/m3
Jml Vol bekisting = #REF! m2

Grand Tot. Vol


Vol (kg/m3)
Jml Volume Besi = #REF! kg
c) Bekisting : #REF! m2
#REF! m2/m3
Jml Vol bekisting = #REF! m2
VOLUME KOLOM

1 KOLOM K1 (30x30) ; 16 UNIT


Jumlah : 16.00
Dimensi : 0.30 x 0.30 m
Tinggi : 4.80 m
Cover beton : 0.03 m
Volume :
a) Beton : 0.43 m3
Jml Volume Beton = 6.912 m3
Ovrlap T.Pnjg Vol b) Tulangan : Jml
m m kg Tul n
0 #REF! #REF! Bj. Besi Beton Tumpuan (bawah) 10
0 #REF! #REF! = 7850 kg/m3 Sk 9
0 #REF! #REF! Lapangan (tengah) 10
0 #REF! #REF! Sk 17
0.64 #REF! #REF! Tumpuan (atas) 10
0 #REF! #REF! Sk 9
Jumlah #REF!
#REF! Bendrat (1%)
#REF! Tot. Vol
#REF! Waste (1%)
#REF! Grand Tot. Vol
#REF! Vol (kg/m3)
Jml Volume Besi = 1143 kg
c) Bekisting : 5.76 m2
13.33 m2/m3
Jml Vol bekisting = 92.16 m2

2 KOLOM PRAKTIS KP (15x15) ; 6 UNIT


Jumlah : 6
Dimensi : 0.15 x 0.15 m
Tinggi : 4.05 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.091 m3
Jml Volume Beton = 0.547 m3
Ovrlap T.Pnjg Vol b) Tulangan : Jml
m m kg Tul n
0 #REF! #REF! Bj. Besi Beton Tumpuan (bawah) 4
0 #REF! #REF! = 7850 kg/m3 Sk 7
0 #REF! #REF! Lapangan (tengah) 4
0 #REF! #REF! Sk 12
0.64 #REF! #REF! Tumpuan (atas) 4
0 #REF! #REF! Sk 7
Jumlah #REF!
#REF! Bendrat (1%)
#REF! Tot. Vol
#REF! Waste (1%)
#REF! Grand Tot. Vol
#REF! Vol (kg/m3)
Jml Volume Besi = 118.5 kg
c) Bekisting : 2.43 m2
26.67 m2/m3
Jml Vol bekisting = 14.58 m2

#REF!
#REF!
D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
m m2 m kg/m m m m m kg
0.013 0.000133 1.041948 1.2 0.156 0 13.56 14.13
0.008 5.03E-05 0.15 0.394584 1 0.096 0 9.86 3.89
0.013 0.000133 1.041948 2.4 0.156 0 25.56 26.63
0.008 5.03E-05 0.15 0.394584 1 0.096 0 18.63 7.35
0.013 0.000133 1.041948 1.2 0.156 0 13.56 14.13
0.008 5.03E-05 0.15 0.394584 1 0.096 0 9.86 3.89
Jumlah 70.03
0.70
70.73
0.71
71.43
165.36

D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol


m m2 m kg/m m m m m kg
0.01 7.85E-05 0.616538 1.0125 0.12 0 4.53 2.7929151
0.008 5.03E-05 0.2 0.394584 0.4 0.096 0 3.472 1.3699958
0.012 0.000113 0.887814 2.025 0.144 0 8.676 7.702675
0.008 5.03E-05 0.2 0.394584 0.4 0.096 0 5.952 2.3485642
0.01 7.85E-05 0.616538 1.0125 0.12 0.4 6.13 3.7793752
0.008 5.03E-05 0.2 0.394584 0.4 0.096 0 3.472 1.3699958
Jumlah 19.363521
0.1936352
19.557156
0.1955716
19.752728
216.76519
VOLUME BALOK B1

1 BALOK B1 (20X30) ; L= 4 M ; 13 UNIT


Jumlah : 13.00
Dimensi : 0.20 x 0.30 m
Panjang : 4.00 m
T. Plat : 0.00 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.24 m3
Jml Volume Beton = 3.12 m3
b) Tulangan : Jml D As s Berat Pnjg
Tul n m m2 m kg/m m
Bj. Besi Beton Tumpuan (kiri) 5 0.0130 0 1.042 1
= 7850 kg/m3 Sk 8 0.0080 5E-05 0.15 0.395 0.8
Lapangan (tengah) 5 0.0130 0 1.042 2
Sk 11 0.0080 5E-05 0.20 0.395 0.8
Tumpuan (kanan) 5 0.0130 0 1.042 1
Sk 8 0.0080 5E-05 0.15 0.395 0.8
Pinggang 2 0.0100 8E-05 0.617 4

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 590.5 kg
c) Bekisting : 3.2 m2
13.33 m2/m3
Jml Vol bekisting = 41.6 m2

2 BALOK B1 (20X30) ; L= 2,00 M ; 4 UNIT


Jumlah : 4.00
Dimensi : 0.20 x 0.30 m
Panjang : 2.00 m
T. Plat : 0.00 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.12 m3
Jml Volume Beton = 0.48 m3
b) Tulangan : Jml D As s Berat Pnjg
Tul n m m2 m kg/m m
Bj. Besi Beton Tumpuan (kiri) 5 0.0130 0 1.042 0.5
= 7850 kg/m3 Sk 5 0.0080 5E-05 0.15 0.395 0.8
Lapangan (tengah) 5 0.0130 0 1.042 1
Sk 6 0.0080 5E-05 0.20 0.395 0.8
Tumpuan (kanan) 5 0.0130 0 1.042 0.5
Sk 5 0.0080 5E-05 0.15 0.395 0.8
Pinggang 2 0.0100 8E-05 0.617 2

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 113.2 kg
c) Bekisting : 1.6 m2
13.33 m2/m3
Jml Vol bekisting = 6.4 m2
TOTAL
Beton = 3.6
Besi = 703.7
Bekisting = 48
VOLUME BALOK RB

1 BALOK RB (15X25) ; L= 4 M ; 14 UNIT


Jumlah : 14.00
Dimensi : 0.15 x
Panjang : 4.00
T. Plat : 0.00 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.15 m3
Jml Volume Beton = 2.1
Hak Ovrlap T.Pnjg Vol b) Tulangan :
m m m kg Tul
0.156 0.39 7.73 8.054 Bj. Besi Beton Tumpuan (kiri)
0.096 0 7.168 2.828 = 7850 kg/m3 Sk
0.156 0.52 13.38 13.941 Lapangan (tengah)
0.096 0 9.856 3.889 Sk
0.156 0.39 7.73 8.054 Tumpuan (kanan)
0.096 0 7.168 2.828 Sk
0 0 8 4.932 Pinggang
Jumlah 44.528
0.445 Bendrat (1%)
44.973 Tot. Vol
0.450 Waste (1%)
45.423 Grand Tot. Vol
189.262 Vol (kg/m3)
Jml Volume Besi = 294.7
c) Bekisting : 2.6 m2
17.33333 m2/m3
Jml Vol bekisting = 36.4

2 BALOK RB (15X25) ; L= 2,00 M ; 5 UNIT


Jumlah : 5.00
Dimensi : 0.15 x
Panjang : 2.00
T. Plat : 0.00 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.075 m3
Jml Volume Beton = 0.375
b) Tulangan :
Hak Ovrlap T.Pnjg Vol Tul
m m m kg Bj. Besi Beton Tumpuan (kiri)
0.156 0.39 5.23 5.449 = 7850 kg/m3 Sk
0.096 0 4.48 1.768 Lapangan (tengah)
0.156 0.52 8.38 8.732 Sk
0.096 0 5.376 2.121 Tumpuan (kanan)
0.156 0.39 5.23 5.449 Sk
0.096 0 4.48 1.768 Pinggang
0 0 4 2.466
Jumlah 27.753 Bendrat (1%)
0.278 Tot. Vol
28.031 Waste (1%)
0.280 Grand Tot. Vol
28.311 Vol (kg/m3)
235.925 Jml Volume Besi = 64.68
c) Bekisting : 1.3 m2
17.33333 m2/m3
Jml Vol bekisting = 6.5

3 BALOK RB (15X25) ; L= 3,00 M ; 1 UNIT


Jumlah : 1.00
Dimensi : 0.15 x
Panjang : 3.00
T. Plat : 0.00 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.1125 m3
Jml Volume Beton = 0.113
b) Tulangan :
Tul
Bj. Besi Beton Tumpuan (kiri)
= 7850 kg/m3 Sk
Lapangan (tengah)
Sk
Tumpuan (kanan)
Sk
Pinggang

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 16.85
c) Bekisting : 1.95 m2
17.33333 m2/m3
Jml Vol bekisting = 1.95

4 BALOK RB (15X25) ; L= 1,80 M ; 1 UNIT


Jumlah : 1.00
Dimensi : 0.15 x
Panjang : 1.80
T. Plat : 0.00 m
Cover beton : 0.025 m
Volume :
a) Beton : 0.054 m3
Jml Volume Beton = 0.054
b) Tulangan :
Tul
Bj. Besi Beton Tumpuan (kiri)
= 7850 kg/m3 Sk
Lapangan (tengah)
Sk
Tumpuan (kanan)
Sk
Pinggang

Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 11.31
c) Bekisting : 0.99 m2
18.33333 m2/m3
Jml Vol bekisting = 0.99

TOTAL
Beton = 2.64
Besi = 387.51
Bekisting = 45.84
M ; 14 UNIT

0.25 m
m

m3
Jml D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
Tul n m m2 m kg/m m m m m kg
4 0.0100 8E-05 0.61654 1 0.12 0.3 5.68 3.502
8 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 5.568 2.197
ngan (tengah) 4 0.0100 8E-05 0.61654 2 0.12 0.4 10.08 6.215
11 0.0080 5E-05 0.20 0.39458 0.6 0.096 0 7.656 3.021
puan (kanan) 4 0.0100 8E-05 0.61654 1 0.12 0.3 5.68 3.502
8 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 5.568 2.197
0 0.0100 8E-05 0.61654 4 0 0 0 0.000
Jumlah 20.634
0.206
20.840
0.208
21.048
140.322
kg

m2/m3
m2

,00 M ; 5 UNIT

0.25 m
m

m3
Jml D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
Tul n m m2 m kg/m m m m m kg
4 0.0100 8E-05 0.61654 0.5 0.12 0.3 3.68 2.269
5 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 3.48 1.373
ngan (tengah) 4 0.0100 8E-05 0.61654 1 0.12 0.4 6.08 3.749
6 0.0080 5E-05 0.20 0.39458 0.6 0.096 0 4.176 1.648
puan (kanan) 4 0.0100 8E-05 0.61654 0.5 0.12 0.3 3.68 2.269
5 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 3.48 1.373
0 0.0100 8E-05 0.61654 2 0 0 0 0.000
Jumlah 12.680
0.127
12.807
0.128
12.935
172.470
kg

m2/m3
m2

,00 M ; 1 UNIT

0.25 m
m

m3
Jml D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
Tul n m m2 m kg/m m m m m kg
4 0.0100 8E-05 0.61654 0.75 0.12 0.3 4.68 2.885
6 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 4.176 1.648
ngan (tengah) 4 0.0100 8E-05 0.61654 1.5 0.12 0.4 8.08 4.982
9 0.0080 5E-05 0.20 0.39458 0.6 0.096 0 6.264 2.472
puan (kanan) 4 0.0100 8E-05 0.61654 0.75 0.12 0.3 4.68 2.885
6 0.0080 5E-05 0.15 0.39458 0.6 0.096 0 4.176 1.648
0 0.0100 8E-05 0.61654 3 0 0 0 0.000
Jumlah 16.520
0.165
16.685
0.167
16.852
149.793
kg

m2/m3
m2

,80 M ; 1 UNIT

0.20 m
m

m3
Jml D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
Tul n m m2 m kg/m m m m m kg
4 0.0100 8E-05 0.61654 0.45 0.12 0.3 3.48 2.146
4 0.0080 5E-05 0.15 0.39458 0.5 0.096 0 2.384 0.941
ngan (tengah) 4 0.0100 8E-05 0.61654 0.9 0.12 0.4 5.68 3.502
6 0.0080 5E-05 0.20 0.39458 0.5 0.096 0 3.576 1.411
puan (kanan) 4 0.0100 8E-05 0.61654 0.45 0.12 0.3 3.48 2.146
4 0.0080 5E-05 0.15 0.39458 0.5 0.096 0 2.384 0.941
0 0.0100 8E-05 0.61654 1.8 0 0 0 0.000
Jumlah 11.085
0.111
11.196
0.112
11.308
209.412
kg

m2/m3
m2

Anda mungkin juga menyukai