Anda di halaman 1dari 87

JADWAL PELAKSANAAN

PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


KEJURUAN : ( GROUP B )
TAHUN : 2,019

MING
NO ITEM PEKERJAAN TOTAL % 1 2 3 4 5 6 7 8

i START / KONTRAK / TERMIN I

A PEKERJAAN PERSIAPAN - #DIV/0! #DIV/0!

B PEKERJAAN PONDASI & TANAH - #DIV/0! #DIV/0! #DIV/0!

C PEKERJAAN STRUKTUR - #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

D PEKERJAAN PLAFOND - #DIV/0! #DIV/0! #DIV/0!

E PEKERJAAN PASANGAN - #DIV/0! #DIV/0! #DIV/0!

F PEKERJAAN KUSEN PINTU & JENDELA - #DIV/0!

G PEKERJAAN PENGECATAN - #DIV/0!

H PEKERJAAN PLUMBING & SANITAIR - #DIV/0!

I PEKERJAAN LISTRIK - #DIV/0!

J LAIN - LAIN - #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

ii TERMIN II
Bobot Rencana - #DIV/0!
Pimpinan Lembaga #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Akumulasi Rencana --ttd-- #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Stempel
Bobot Realisasi
(Nama Lengkap dan Jelas)
Akumulasi Realisasi
MINGGU KE
9 10 11 12 13 14 15 16 17

100

90

80

70

60

#DIV/0! #DIV/0! #DIV/0! #DIV/0!


50

#DIV/0! #DIV/0! #DIV/0! #DIV/0! 40

#DIV/0! #DIV/0! #DIV/0! 30

#DIV/0! #DIV/0! #DIV/0! 20

#DIV/0! #DIV/0! #DIV/0! #DIV/0! 10

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!


0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

UNIT PENGELOLA TEKNIS

1. Ketua ------------------------- --ttd--

2. Sekertaris ------------------------- --ttd--

3. Anggota ------------------------- --ttd--


REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS
PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO ITEM PEKERJAAN TOTAL

A PEKERJAAN PERSIAPAN -
B PEKERJAAN PONDASI & TANAH -
C PEKERJAAN STRUKTUR -
D PEKERJAAN PLAFOND -
E PEKERJAAN PASANGAN -
F PEKERJAAN KUSEN PINTU & JENDELA -
G PEKERJAAN PENGECATAN -
H PEKERJAAN PLUMBING & SANITAIR -
I PEKERJAAN LISTRIK -
J LAIN - LAIN -

TOTAL -
PEMBULATAN 500,000,000.00
TERBILANG

Pimpinan Lembaga
--ttd--

Stempel
(Nama Lengkap dan Jelas)

Ketua Pengelola Kegiatan


Ketua Pengelola Keuangan
--ttd--
--ttd--
Stempel
Stempel
(Nama Lengkap dan Jelas)
(Nama Lengkap dan Jelas)
RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO. URAIAN PEKERJAAN VOLUME SAT.

A PEKERJAAN PERSIAPAN
1 Papan Proyek 1.00 unt
2 Pek. Pengukuran dan Bowplank 52.00 m'
3 Pek. Listrik & Air Kerja 1.00 ls
4 Pek. Laporan & Dokumentasi 1.00 ls
Sub Total A
B PEKERJAAN PONDASI & TANAH
1 Pek. Galian Tanah Pondasi 77.38 m3
2 Pek. Urug Tanah Kembali 25.79 m3
3 Pek. Urug Tanah Peninggian Peil Lantai (t = 10 cm) 19.55 m3
4 Pek. Pasir Urug
- Bawah Pondasi 11.90 m3
- Bawah Lantai 19.91 m3
5 Pek. Pondasi Tapak P1 (100x100x20-40)
- Beton K-225 3.92 m3
- Pembesian 473.59 kg
- Bekisting 21.28 m2
6 Pek. Pondasi Batu Belah P2 24.26 m3
7 Pek. Sloof Beton (15/30)
- Beton K-225 3.83 m3
- Pembesian 816.72 kg
- Bekisting 51.03 m2
Sub Total B
C PEKERJAAN STRUKTUR
C.1 STRUKTUR BETON
1 Pek. Kolom Beton K1 (30/30)
- Beton K-225 6.91 m3
- Pembesian 1,005.19 kg
- Bekisting 92.16 m2
2 Pek. Kolom Praktis KP (15/15)
- Beton K-175 1.08 m3
- Pembesian 193.78 kg
- Bekisting 28.80 m2
3 Pek. Balok Beton B1 (20/30)
NO. URAIAN PEKERJAAN VOLUME SAT.

- Beton K-225 3.33 m3


- Pembesian 663.71 kg
- Bekisting 44.40 m2
4 Pek. Beton Balok Lintel BL (15/15), RB (15/15)
- Beton K-175 1.80 m3
- Pembesian 408.26 kg
- Bekisting 34.66 m2
5 Pek. Ramp Beton T = 10 cm
- Beton K-175 0.35 m3
- Pembesian 42.24 kg
- Bekisting 0.69 m2
6 Pek. Kolom Sopi Sopi 30/30)
- Beton K-225 0.75 m3
- Pembesian 84.12 kg
- Bekisting 9.96 m2
7 Pek. Ring Balok Praktis Sopi Sopi (15/15)
- Beton K-175 0.96 m3
- Pembesian 194.91 kg
- Bekisting 12.81 m2
8 Pek. Plat Beton Topi Topi (10/60)
- Beton K-225 0.86 m3
- Pembesian 182.42 kg
- Bekisting 12.24 m2
C.2 PEKERJAAN ATAP
1 Rangka Atap Baja Ringan 205.53 m2
2 Atap Spandek t = 0.35 mm 205.53 m2
3 Listplank GRC 73.80 m'
4 Pasang Aluminium Foil, Glaswool, Roofmesh 140.00 m2

Sub Total C
D PEKERJAAN PLAFOND
1 Plafond Gipsum 9 mm + Rangka Hollow 4/4 ; t = 0.35 136.49 m2
2 Plafond Calsiboard 4,5 mm + Rangka 53.31 m2
3 Lis Gipsum 5 cm 94.85 m'
Sub Total D
E PEKERJAAN PASANGAN
1 Pasangan Dinding Bata 250.73 m2
2 Plester + Acian 496.17 m3
3 Pasangan Rolaag Bata 19.80 m'
4 Pasangan Saluran Terbuka (U pasangan bata) 40.00 m'
5 Pekerjaan Rabat Beton t = 5 cm bawah lantai keramik 9.96 m3
NO. URAIAN PEKERJAAN VOLUME SAT.

6 Pekerjaan Rabat Beton t = 5 cm keliling bang lbr = 60 cm 2.04 m3


7 Pekerjaan Meja Beton Wastafel t = 8 cm 0.10 m3
8 Pasangan Keramik Lantai 40/40 Polished 136.40 m2
9 Pasangan Keramik Lantai 30/30 Polished 52.00 m2
10 Pasangan Keramik Lantai 20/20 Unpolished 3.04 m2
11 Pasangan Plint Keramik Lantai 40/10 polished 97.40 m'
12 Pasangan Keramik Bak & Meja Wastafel 20/20 Polished 1.77 m2
13 Pasangan Keramik Dinding 30/60 Polished 5.29 m2
14 Pasangan Batu Alam Candi Kolom Entrace 7.62 m2
15 Pek. Logo & Tulisan 1.00 ls
16 List Dinding, Kusen 97.36 m1
Sub Total E
F PEKERJAAN KUSEN PINTU & JENDELA
1 Kusen/Pintu type P1 1.00 unt
2 Kusen/Pintu type P2 3.00 unt
3 Kusen/Pintu type P3 (Spandrel) 1.00 unt
4 Kusen/Jendela type J1 2.00 unt
5 Kusen/Jendela type J2 9.00 unt
6 Kusen/Jendela type J3 1.00 unt
7 Kusen/Jendela type BV 1.00 unt
8 Tralis Ventilasi Teras (Besi Hollow) 6.65 m1
Sub Total F
G PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Interior 248.08 m2
2 Pek. Pengecatan Dinding Exterior 248.08 m2
3 Pek. Pengecatan Plafond 189.80 m2
4 Pek. Pengecatan Listplank 22.14 m2
Sub Total G
H PEKERJAAN PLUMBING & SANITAIR
1 Instalasi Pipa PVC AW 4" 16.00 m'
2 Instalasi Pipa PVC AW 2" 12.00 m'
3 Instalasi Pipa PVC AW 3/4" 20.00 m'
4 Instalasi Pipa PVC AW 1/2" 15.00 m'
5 Septic Tank dan Rembesan 1.00 unt
6 Pemasangan Closed Jongkok 1.00 bh
7 Pemasangan Kran Air 2.00 bh
8 Pemasangan Wastafel + Kran 2.00 bh
9 Pemasangan Cermin Wastafel 100x200 1.00 unt
Sub Total H
I PEKERJAAN LISTRIK
1 Penyambungan Daya Listrik 5,500.00 VA
NO. URAIAN PEKERJAAN VOLUME SAT.

2 Perijinan Sertifikat Layak Operasi (SLO) 5,500.00 VA


3 Panel Listrik 1.00 unt
4 Pek. Instalasi Kabel Feeder NYY 4x10 mm2 2.00 m'
5 Pek. Instalasi Penerangan & Power NYM 3x2,5 mm2 + conduit 66.00 ttk
6 Pek. Instalasi Power AC 2.00 ttk
7 Pemasangan Lampu TKI 2x36W 16.00 bh
8 Pemasangan Lampu Baret Kotak 18/22W 7.00 bh
9 Pemasangan Lampu E27ESS 8 Watt + DL 4'' 3.00 bh
10 Pemasangan Saklar Engkle 5.00 bh
11 Pemasangan Saklar Double 4.00 bh
12 Pemasangan Stop Kontak Single 9.00 bh
13 Pemasangan Stop Kontak Ganda 16.00 bh
14 Pemasangan Stop Kontak AC 2.00 bh
15 Pemasangan AC split wall 2 PK 2.00 unit
16 Grounding (max 2 Ohm) 1.00 lot
Sub Total I
L LAIN - LAIN
1 IMB 1.00 dok
2 Transportasi 2.00 paket
3 Ketua Unit Pengelola Teknis 4.00 OB
4 Ketua Unit Pengelola Keuangan 4.00 OB
5 Anggota Pengelola Teknis 8.00 OB
6 Anggota Pengelola Keuangan 8.00 OB
Sub Total L
TOTAL
ENCANA ANGGARAN BIAYA

EDUNG WORKSHOP - BLK KOMUNITAS

HARGA SATUAN JUMLAH HARGA


( Rp. ) ( Rp. )

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00

0.00 0.00
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00
ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

No Uraian

PEKERJAAN GALIAN

1 1 m3 Galian Untuk Tanah Biasa sedalam maks. 2 m


Upah An. SNI ( Revisi ) 6.2.1
1.2000 OH Pekerja

2 1 m3 Urugan kembali
Bahan - m3 Tanah Urug

Upah An. SNI ( Revisi ) 6.9.1


0.2500 OH Pekerja

3 1 m3 Urugan pasir dengan pasir urug


Bahan An. SNI ( Revisi ) 6.11.1
1.1000 m3 Pasir urug

Upah An. SNI ( Revisi ) 6.11.2


0.5000 OH Pekerja

4 1 m3 Urugan dengan kerikil


Bahan An. SNI ( Revisi ) 6.11.1
1.1000 m3 Split

Upah An. SNI ( Revisi ) 6.11.2


0.5000 OH Pekerja

5 1 m3 Urugan tanah pilihan


ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

No Uraian
Bahan An. SNI ( Revisi ) 6.11.1
1.2000 m3 Tanah campur

Upah An. SNI ( Revisi ) 6.11.2


0.2500 OH Pekerja

6 1 m3 Pemadatan tanah
Upah An. SNI ( Revisi ) 6.11.2
0.2500 OH Pekerja

Alat
0.0210 jam Sewa Stamper

1 m2 Pemadatan tanah

PEKERJAAN BETON

1 1 m3 beton mutu f'c = 14.5 Mpa (K175), slump (12 +/- 2), w/c = 0.66 sitemix
Bahan
326.000 kg Portland Cement
0.543 m3 Pasir Beton
0.762 m3 Kerikil (maks.imum 30 mm)
215.000 ltr Air

Upah
1.650 OH Pekerja
0.275 OH Tukang batu

2 1 m3 beton mutu f'c = 19.3 Mpa (K225), slump (12 +/- 2), w/c = 0.58
Bahan
ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

No Uraian
371.000 kg Portland Cement
0.499 m3 Pasir Beton
0.776 m3 Kerikil (maks.imum 30 mm)
215.000 ltr Air

Upah
1.650 OH Pekerja
0.275 OH Tukang batu

3 Pembesian 10 kg dengan besi ulir


Pembesian 1 kg
Bahan
10.500 kg Besi Ulir
0.150 kg Kawat Beton

Upah
0.070 OH Pekerja
0.070 OH Tukang besi

4 Pembesian 10 kg dengan besi polos


Pembesian 1 kg
Bahan
10.500 kg Besi Polos
0.150 kg Kawat Beton

Upah
0.070 OH Pekerja
0.070 OH Tukang besi
ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

No Uraian

5 Memasang 1 m2 bekisting untuk pondasi


Bahan
0.040 m3 Kayu kelas III
0.100 kg Paku 5 cm - 10 cm
0.100 ltr Minyak Bekisting

Penggunaan Bekisting dipakai 2x

Upah
0.520 OH Pekerja
0.260 OH Tukang Kayu

6 Memasang 1 m2 bekisting untuk Sloof


Bahan
0.045 m3 Kayu kelas III
0.300 kg Paku 5 cm - 10 cm
0.100 ltr Minyak Bekisting

Penggunaan Bekisting dipakai3x

Upah
0.520 OH Pekerja
0.260 OH Tukang Kayu

7 Memasang 1 m2 bekisting untuk Kolom


Bahan
0.040 m3 Kayu kelas III
ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

No Uraian
0.400 kg Paku 5 cm - 10 cm
0.200 ltr Minyak Bekisting
0.015 m3 Balok Kayu Kelas II
0.350 lbr Plywood tebal 9 mm
2.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m

Penggunaan Bekisting dipakai 2x

Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu

8 Memasang 1 m2 bekisting untuk Balok


Bahan
0.040 m3 Kayu kelas III
0.400 kg Paku 5 cm - 10 cm
0.200 ltr Minyak Bekisting
0.018 m3 Balok Kayu Kelas II
0.350 lbr Plywood tebal 9 mm
2.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m

Penggunaan Bekisting dipakai 2x

Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu

9 Memasang 1 m2 bekisting untuk Lantai


Bahan
0.040 m3 Kayu kelas III
ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

No Uraian
0.400 kg Paku 5 cm - 10 cm
0.200 ltr Minyak Bekisting
0.015 m3 Balok Kayu Kelas II
0.350 lbr Plywood tebal 9 mm
6.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m

Penggunaan Bekisting dipakai 2x

Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu

10 Memasang 1 m2 bekisting untuk Dinding / Lisplang


Bahan
0.030 m3 Kayu kelas III
0.400 kg Paku 5 cm - 10 cm
0.200 ltr Minyak Bekisting
0.020 m3 Balok Kayu Kelas II
0.350 lbr Plywood tebal 9 mm
3.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m

Penggunaan Bekisting dipakai 3x

Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu

11 Memasang 1 m2 bekisting untuk Tangga


Bahan
0.030 m3 Kayu kelas III
ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

No Uraian
0.400 kg Paku 5 cm - 10 cm
0.150 ltr Minyak Bekisting
0.015 m3 Balok Kayu Kelas II
0.350 lbr Plywood tebal 9 mm
2.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m

Penggunaan Bekisting dipakai 3x

Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu

12 Memasang 1 m' Kolom Praktis Beton Bertulang (11x11) cm


Bahan
0.002 m3 Kayu kelas III
0.010 kg Paku 5 cm - 10 cm
3.000 kg Besi Beton Polos
0.450 kg Kawat Beton
4.000 kg Portland Cement
0.006 m3 Pasir Beton
0.009 m3 Kerikil

Upah
0.180 OH Pekerja
0.020 OH Tukang Kayu
0.020 OH Tukang Batu
0.020 OH Tukang Besi

PEKERJAAN ATAP
1 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP ASBES/SPANDEK
ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

No Uraian
Bahan
1.5 m1 Profil C-75.08
2.2 m1 Profil C-75.06
28 bh Baut (Srew driver
1.5 bh Dinabolt
3.4 m1 Reng

Upah
0.2 OH Pekerja
0.45 OH Tukang Kayu

2 1 M2 Atap Spandek Zincalume


Bahan
1.1 m2 Atap Spandek Zincalume
6 bh Screw Cteks 12-4 x 5
2 bh Screw Cteks 10 x 16-16

Upah
0.2 OH Pekerja
0.1 OH Tukang Kayu

3 1 M^1 Papan Lisplang GRC


Bahan An. SNI ( Revisi ) 6.50.1
1.050 m Lisplank GRC
0.05 Kg Paku biasa 2" - 5"

Upah An. SNI ( Revisi ) 6.50.2


0.11 OH Pekerja
0.22 OH Tukang kayu
ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

No Uraian

4 1 M2 Peredam Panas Atap


Bahan
1.1 m2 Aluminium foil 3mm
1.1 m2 Glass wool tebal 2,5 cm
1.1 m2 Roofmesh Type 2215 dia 1,6mm ( 50x50 mm)

Upah
0.2 OH Pekerja
0.1 OH Tukang Kayu
LISA HARGA SATUAN STRUKTUR

GUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

Harga Satuan Jumlah Harga

Rp -

Rp - Rp -

Sub total : Rp -

Rp -
Rp - Rp -
Sub total : Rp -

Rp - Rp -

Sub total : Rp -

Rp -

Rp - Rp -
Sub total : Rp -

Rp - Rp -

Sub total : Rp -

Rp -

Rp - Rp -
Sub total : Rp -

Rp - Rp -

Sub total : Rp -

Rp -
LISA HARGA SATUAN STRUKTUR

GUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

Harga Satuan Jumlah Harga

Rp - Rp -
Sub total : Rp -

Rp - Rp -

Sub total : Rp -

Rp -

Rp - Rp -

Sub total : Rp -

Rp - Rp -
Sub total : Rp -
20 cm Rp -

175), slump (12 +/- 2), w/c = 0.66 sitemix Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub total : Rp -

Rp - Rp -
Rp - Rp -

Sub total : Rp -

Rp -
LISA HARGA SATUAN STRUKTUR

GUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

Harga Satuan Jumlah Harga


Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub total : Rp -

Rp - Rp -
Rp - Rp -

Sub total : Rp -

Rp -
Rp -

Rp - Rp -
Rp - Rp -
Sub total : Rp -

Rp - Rp -
Rp - Rp -

Sub total : Rp -

Rp -
Rp -

Rp - Rp -
Rp - Rp -
Sub total : Rp -

Rp - Rp -
Rp - Rp -
LISA HARGA SATUAN STRUKTUR

GUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

Harga Satuan Jumlah Harga

Sub total : Rp -

Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub total : Rp -
Rp -

Rp - Rp -
Rp - Rp -

Sub total : Rp -

Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub total : Rp -
Rp -

Rp - Rp -
Rp - Rp -

Sub total : Rp -

Rp -

Rp - Rp -
LISA HARGA SATUAN STRUKTUR

GUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

Harga Satuan Jumlah Harga


Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub total : Rp -
Rp -

Rp - Rp -
Rp - Rp -

Sub total : Rp -

Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub total : Rp -
Rp -

Rp - Rp -
Rp - Rp -

Sub total : Rp -

Rp -

Rp - Rp -
LISA HARGA SATUAN STRUKTUR

GUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

Harga Satuan Jumlah Harga


Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub total : Rp -
Rp -

Rp - Rp -
Rp - Rp -

Sub total : Rp -

Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub total : Rp -
Rp -

Rp - Rp -
Rp - Rp -

Sub total : Rp -

Rp -

Rp - Rp -
LISA HARGA SATUAN STRUKTUR

GUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

Harga Satuan Jumlah Harga


Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub total : Rp -
Rp -

Rp - Rp -
Rp - Rp -

Sub total : Rp -

Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub total : Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -

Sub total : Rp -

NGAN + RENG UNTUK ATAP ASBES/SPANDEK Rp -


LISA HARGA SATUAN STRUKTUR

GUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

Harga Satuan Jumlah Harga

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub Total Rp -

Rp - Rp -
Rp - Rp -

Sub Total Rp -

Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub Total Rp -

Rp - Rp -
Rp - Rp -

Sub Total Rp -

Rp -

Rp - Rp -
Rp - Rp -
Sub Total Rp -

Rp - Rp -
Rp - Rp -
LISA HARGA SATUAN STRUKTUR

GUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

Harga Satuan Jumlah Harga

Sub Total Rp -

Rp -

Rp - Rp -
Rp - Rp -
Rp - Rp -
Sub Total Rp -

Rp - Rp -
Rp - Rp -

Sub Total Rp -
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN

I. PEKERJAAN PERSIAPAN
MEMASANG BOWPLANK M'
Kayu kaso 5x7x400 Meranti campur 0.0050 m3
Kayu papan 3x20x400 meranti 0.0050 m3
paku rata-rata 0.0350 kg
pekerja 0.1000 org/hr

MEMASANG PAPAN NAMA PROYEK unit


Papan Kamper Samarinda 3/30 0.0250 m3
Balok kamper 0.0900 m3
Paku biasa 2" - 5 " 0.6000 kg
Meni kayu 0.7500 kg
Dempul kayu 1.0000 kg
Amplas 2.0000 lbr
Kuas 0.5000 bh
Cat kayu 3.0000 kg
Semen Portland 0.5000 sak
Pasir beton 0.0600 m3
Koral beton 0.1000 m3
Pekerja 1.0000 org/hr
Tukang Batu 0.0175 org/hr
Tukang Kayu 0.1000 org/hr
Tukang Cat 0.1000 org/hr

PENGADAAN LISTRIK DAN AIR KERJA LS


Air kerja 4.0000 bulan
Listrik kerja 4.0000 bulan

PENYUSUNAN LAPORAN & DOKUMENTASI LS


Kamera SLR (Digital) 4.0000 sewa/hr
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN


CD copy soft file foto image 2.0000 bh
Foto printing uk.3R 30.0000 lbr
Foto album 4.0000 bh
Tukang foto 2.0000 OH

II PEKERJAAN PONDASI
CERUCUK DOLKEN TTK
dolken 0.5000 btg
pekerja 0.1000 org/hr

MEMASANG PONDASI AANSTAMPING M3


batu kali 1.1000 m3
pasir urug 0.4320 m3
tukang batu 0.3900 org/hr

pekerja 0.7800 org/hr

MEMASANG PONDASI BATU KALI 1:4 M3


batu kali 1.1000 m3
semen PC ( 50 kg ) tiga roda 2.6056 zak
pasir pasang 0.5200 m3
tukang batu 0.6000 org/hr

pekerja 1.5000 org/hr

MEMASANG ROLAG BATA t=20 CM M'


batu bata merah (press) 24.7934 bh
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN


semen PC ( 50 kg ) tiga roda 0.6000 zak
pasir pasang 0.1040 m3
tukang batu 0.1000 org/hr

pekerja 0.1000 org/hr

III PEKERJAAN PASANGAN


DINDING 1/2 BATU BATA 1:2 M2
(BATA PRESS)
batu bata merah 70.0000 bh
semen PC ( 50 kg ) tiga roda 0.3790 zak
pasir pasang 0.0380 m3
alat bantu pas bata 1.0000 ls
tukang batu 0.1000 org/hr

pekerja 0.3200 org/hr

DINDING 1/2 BATU BATA 1:4 M2


(bata press)
batu bata merah 70.0000 bh
semen PC ( 50 kg ) tiga roda 0.1936 zak
pasir pasang 0.0450 m3
alat bantu pas bata 1.0000 ls
tukang batu 0.1000 org/hr

pekerja 0.3200 org/hr

PLESTERAN DINDING 1:5 M2


tebal 15 mm
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN


semen PC ( 50 kg ) tiga roda 0.2400 zak
pasir pasang 0.0190 m3
alat bantu plester ddg 1.0000 ls
tukang batu 0.1500 org/hr

pekerja 0.2000 org/hr

PLESTERAN BETON ad 1:3 tebal 15 mm M2


semen PC ( 50 kg ) tiga roda 0.2400 zak
pasir pasang 0.0190 m3
alat bantu plester ddg 1.0000 ls
tukang batu 0.2000 org/hr

pekerja 0.1500 org/hr

ACIAN M2
semen PC ( 50 kg ) tiga roda 0.1400 zak
alat bantu acian 1.0000 ls
tukang batu 0.1000 org/hr

pekerja 0.0500 org/hr

TALI AIR, SIKUAN, SKONENGAN, BENANGAN M'


semen PC ( 50 kg ) tiga roda 0.0300 zak
alat bantu tali air 1.0000 ls
tukang batu 0.0800 org/hr

pekerja 0.0600 org/hr


ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN

IV PEKERJAAN BETON
MEMBUAT LANTAI KERJA ad 1:3:5 M3
semen PC ( 50 kg ) tiga roda 2.5000 zak
pasir beton 0.5200 m3
split 0.8700 m3
tukang batu 0.8000 org/hr

pekerja 0.8000 org/hr

Lantai kerja 1:3:5 , t 5 cm ; 1 M2 0.0500 m3

BEKISTING BETON PRAKTIS M2


triplek 4x8 ft, 9 mm 0.2333 lbr
paku rata-rata 0.4000 kg
Kayu kaso 5x7x400 Meranti campur 0.0204 m3
kayu balok 8x12x400 Meranti campur 0.0300 m3
form tie type B 0.2500 bh
beton decking 4.0000 bh
tukang kayu 0.3000 org/hr

pekerja 0.2000 org/hr

V PEKERJAAN PINTU DAN JENDELA


MEMASANG KUSEN ALUMUNIUM 3 INCH M'
alumunium profil 3" 1.0000 m'
sekrup fixer 2.0000 bh
sealant 0.0600 tube
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN


pekerja 0.0430 org/hr
tukang alumunium 0.0430 org/hr

MEMASANG ALUMUNIUM KISI KREPYAK M2


profil alumunium kisi /krepyak 1.0000 m'
pekerja 0.0150 org/hr
tukang kaca/alumunium 0.0150 org/hr

MEMASANG KACA CLEAR 5 MM M2


kaca clear 5 mm ; asahimas, mulia setara 1.0500 m2
sealant - tube
pekerja 0.0150 org/hr
tukang kaca/alumunium 0.1500 org/hr

MEMASANG KUSEN DAN DAUN PINTU TYPE P1 BH


Daun pintu double teakwood finish HPL - unit
Kusen Alumunium 3" CA 9.1200 m'
Jalusi Alumunium Krepyak 1.2600 m2
Frame pintu aluminium 11.2000 m'
Kaca clear 5 mm 2.1808 m2
Sealant kaca 9.8400 m'
Sealant kusen 7.6400 m'
Lever Handle pintu ex.lokal 2.0000 psg
Engsel pintu 4" S/S 2BB ex.lokal 2.0000 psg
Kunci pintu ex.lokal 1.0000 bh
tukang kaca/aluminium 4.2500 org/hr
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN

pekerja 6.3750 org/hr

MEMASANG KUSEN DAN DAUN PINTU TYPE P2 BH


Daun pintu double triplek 6mm finish duco - unit
Kusen Alumunium 3" CA 6.9200 m'
frame pintu allumunium 2.0640 m2
Kaca clear 5 mm 1.4448 m2
Sealant kaca 10.1200 m'
Sealant kusen 6.0400 m'
Lever Handle pintu ex.lokal 1.0000 psg
Engsel pintu 4" S/S 2BB ex.lokal 1.0000 psg
Engsel jendela 3" S/S 2BB ex.lokal 1.0000 psg
Kunci pintu ex.lokal 1.0000 bh
Rambuncis ex.dekson 1.0000 bh
tukang kaca 2.1250 org/hr

pekerja 3.1875 org/hr

MEMASANG KUSEN DAN DAUN PINTU TYPE P3 (S BH


Daun pintu alumunium spandrel 1.0000 unit
Kusen Alumunium 3" CA 6.9200 m'
frame pintu allumunium - m2
Kaca clear 5 mm 0.2800 m2
Sealant kaca 2.2000 m'
Sealant kusen 6.0400 m'
Lever Handle pintu ex.lokal - psg
Engsel pintu 4" S/S 2BB ex.lokal 1.0000 psg
Engsel jendela 3" S/S 2BB ex.lokal - psg
Kunci pintu ex.lokal - bh
tukang kaca 0.5000 org/hr
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN


pekerja 0.7500 org/hr

MEMASANG KUSEN DAN DAUN JENDELA TYPE J BH


Kusen Alumunium 3" CA 11.0100 m'
frame jendela allumunium 2.2400 m2
Kaca clear 5 mm 2.3680 m2
Sealant kaca 11.4400 m'
Sealant kusen 5.8200 m'
Engsel Casement 24" 2.0000 set
rambuncis lokal 2.0000 bh
tukang kaca 0.5000 org/hr

pekerja 0.7500 org/hr

MEMASANG JENDELA BOVENLICH B1 1BH


alumunium 3" 2.1600 m'
kaca clear 5 mm 0.2176 m2
sealant kaca 2.1600 m'

MEMASANG KUSEN DAN DAUN JENDELA TYPE J BH


Kusen Alumunium 3" CA 13.2300 m'
frame jendela allumunium 1.1200 m2
Kaca clear 5 mm 4.2194 m2
Sealant kaca 14.8720 m'
Sealant kusen 7.5660 m'
Engsel Casement 24" 1.0000 set
rambuncis lokal 1.0000 bh
tukang kaca 0.5000 org/hr

pekerja 0.7500 org/hr


ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN

MEMASANG KUSEN DAN DAUN JENDELA TYPE J BH


Kusen Alumunium 3" CA 7.5400 m'
frame jendela allumunium - m2
Kaca clear 5 mm 2.3220 m2
Sealant kaca 8.6200 m'
Sealant kusen 6.4600 m'
Engsel Casement 24" - set
rambuncis lokal - bh
tukang kaca 0.5000 org/hr

pekerja 0.7500 org/hr

VI PEKERJAAN PLAFOND
MEMASANG PLAFOND GYPSUM TILE M2
gypsum board 4x8 ft , t = 9 mm 0.3472 lbr
hollow 20 x 40 x 0.35 mm 0.8000 btg
hollow 40 x 40 x 0.35 mm 0.5000 btg
penggantung plafond 1.0000 bh
compound 0.1000 sak
textile tape 0.2000 rol
skrup gypsum 15.0000 bh
tukang gypsum 0.1000 org/hr

pekerja 0.1000 org/hr

PLAFOND GRC + RANGKA HOLLOW GALVALUM M2


panel GRC 4x8 ft , t - 4.5 mm 0.3472 lbr
hollow 20 x 40 x 0.4 mm 0.8000 btg
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN


hollow 40 x 40 x 0.4 mm 0.5000 btg
penggantung plafond 1.0000 bh
compound 0.1000 kg
textile tape 0.2000 rol
skrup gypsum 15.0000 bh
tukang gypsum 0.1000 org/hr

pekerja 0.1000 org/hr

LIST GYPSUM UK. 5x5 CM M'


List gypsum 5 x 5 1.0500 m'
compound 0.0250 kg
tukang gypsum 0.0600 org/hr

pekerja 0.0200 org/hr

VII PEKERJAAN PELAPIS LANTAI DAN DINDING


MEMASANG LANTAI KERAMIK 20x20 m2
adukan 1:5, tebal 5 cm
lantai keramik 20x20 1.1000 m2
pasir pasang 0.0300 m3
semen PC ( 50 kg ) tiga roda 0.2300 zak
semen isian naat 0.2000 kg
tukang batu 0.1350 org/hr

pekerja 0.2700 org/hr

MEMASANG LANTAI KERAMIK 30x30 m2


adukan 1:5, tebal 5 cm
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN


lantai keramik 30x30 1.1000 m2
pasir pasang 0.0300 m3
semen PC ( 50 kg ) tiga roda 0.2300 zak
semen isian naat 0.2000 kg
tukang batu 0.1350 org/hr

pekerja 0.2700 org/hr

MEMASANG KERAMIK LANTAI UK. 40x40 M2


adukan 1:5, tebal 5 cm
lantai keramik 40x40 1.1000 m2
pasir pasang 0.0300 m3
semen PC ( 50 kg ) tiga roda 0.2300 zak
semen isian naat 0.2000 kg
tukang batu 0.1350 org/hr

pekerja 0.2700 org/hr

MEMASANG DINDING KERAMIK 30 x 60 M2


adukan 1:5, tebal 5 cm
dinding keramik 20 x 40 1.0500 m2
pasir pasang 0.0180 m3
semen PC ( 50 kg ) tiga roda 0.1860 zak
semen isian naat 0.1000 kg
tukang batu 0.3200 org/hr

pekerja 0.5000 org/hr

MEMASANG PLINT KERAMIK UK. 10x40 M'


ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN


lantai keramik 10x40 2.5000 bh
pasir pasang 0.0020 m3
semen PC ( 50 kg ) tiga roda 0.0200 zak
tukang batu 0.0900 org/hr

pekerja 0.0900 org/hr

MEMASANG BATU ALAM M2


adukan 1:5, tebal 5 cm
batu alam candi 1.0500 m2
pasir pasang 0.0180 m3
semen PC ( 50 kg ) tiga roda 0.1860 zak
tukang batu 0.3200 org/hr

pekerja 0.5000 org/hr

VIII PEKERJAAN PENGECATAN


CAT DINDING DALAM CATYLAC M2
(dinding baru , 3 lapis)
plamur tembok 0.3000 kg
amplas 0.5000 lbr
cat dasar alkali 0.1000 kg
cat tembok dalam Catylac 0.3000 kg
kuas roll 0.0250 bh
tukang cat 0.0800 org/hr

pekerja 0.0400 org/hr

CAT DINDING LUAR MOWILEX M2


ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN


(dinding baru , 3 lapis)
plamur tembok 0.1905 kg
amplas 0.2500 lbr
cat dasar alkali 0.0952 kg
cat tembok mowilex 0.3000 kg
kuas roll 0.0238 bh
tukang cat 0.0800 org/hr

pekerja 0.0400 org/hr

CAT PLAFOND VINILEX M2


(dinding baru , 3 lapis)
amplas 0.5000 lbr
cat vililex putih 0.3000 kg
kuas roll 0.0250 bh
tukang cat 0.0800 org/hr

pekerja 0.0400 org/hr

CAT MINYAK M2
amplas 0.5000 lbr
cat besi Glotex 0.2500 kg
meni besi 0.1670 kg
thinner impala 0.1500 ltr
kuas besar 0.0476 bh
tukang cat 0.0667 org/hr

pekerja 0.0333 org/hr


ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN


IX PEKERJAAN SANITAIR
WASTAFEL TANAM BH
wastafel gantung + accessories ex.lokal 1.0000 bh
sealant 0.5000 bh
tukang plambing 1.2500 org/hr

pekerja 0.2500 org/hr

CLOSED JONGKOK BH
closed jongkok 1.0000 bh
semen putih ( 50 kg ) 0.0200 zak
pas bata 1.6000 m2
plesteran 1:2 1.0000 m2
tukang batu 0.3000 org/hr

pekerja 0.3000 org/hr

MEMASANG KRAN AIR LOKAL BH


kran air lokal 1.0000 bh
seal tape 0.5000 bh
tukang plambing 0.0300 org/hr

pekerja 0.2500 org/hr

MEMASANG CERMIN WASTAFEL (Uk. 100x200) BH


kaca cermin 5 mm 1.0000 m2
sekrup fisher 6.0000 bh
bevel kaca 3.0000 m'
tukang plambing 0.4000 org/hr
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN

pekerja 0.3000 org/hr

X PEKERJAAN LAIN-LAIN
LOGO DAN TULISAN unit
Logo (tampak muka gedung) 1.0000 set

TRALIS VENTILASI m1
Besi Hollow 40 x 40 4.0000 btng
Besi Hollow 20 x 40 8.0000 btng
Finishing Cat minyak 3.3250 m2
upah pabrikasi dan pasang 6.6500 m1

harga per meter

LIST PROFILAN DINDING, KUSEN LEBAR 10 CM m1


Pesteran Profilan lebar 10 cm tebal 5 cm 0.2000 m2
Acian Profilan 0.2000 m2

MEMASANG BUIS BETON 30 M'


galian tanah 0.6400 m3
urug tanah kembali 0.1850 m3
urug pasir 0.0650 m3
buis beton ø 30 cm, panj.0.50 m 0.8333 m'
pasir pasang 0.0200 m3
semen PC ( 50 kg ) tiga roda 0.1000 zak
upah pas saluran 1.0000 m'
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO JENIS PEKERJAAN VOLUME SATUAN


MEMASANG SALURAN KELILING M'
galian tanah 0.2000 m3
urug tanah kembali 0.0600 m3
urug pasir 0.0200 m3
pasangan Batu bata 0.7000 m2
Plesteran 1.1000 m2
Acian 1.1000 m2

SEPTIC TANK DAN REMBESAN unit


Galian tanah Septictank & rembesan 7.5000 m3
Pasir urug 0.2100 m3
Lantai kerja 2.2500 m3
Pasang bata 1 Pc : 2 Psr 15.0000 m2
Pelat beton penutup dan balok 0.3000 m3
Pipa PVC 3" AW & perlengkapannya 7.5000 m'
Plesteran 1 Pc : 3 Psr 30.0000 m2
Pasangan ijuk 5.0000 ikat
Urugan kerikil 3,5 cm 1.0500 m3
Pipa PVC 1½" AW di lubang 3.0000 m'
Urugan kembali 1.1300 m3
Pembantu Tukang 4.0000 org
Tukang batu 3.0000 org

Upah pabrikasi dan Pemasangan tralis m1


sewa alat las 0.1500 hr
tukang besi 0.1500 org/hr

pekerja 0.1000 org/hr


HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH

- -
- -
- -
- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
jumlah -
dibulatkan -

- -
- -
jumlah -
dibulatkan -

- -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH
- -
- -
- -
- -
jumlah -
dibulatkan -

- -
- -

jumlah -
dibulatkan -

- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH
- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -

- -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH

jumlah -
dibulatkan -

- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
dibulatkan -

- -
- -
- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH
- -
- -

jumlah -
dibulatkan -

- -
- -
- -

jumlah -
dibulatkan -

- -
- -
- -
- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH

- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH
- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
jumlah -
dibulatkan -

- -
- -
- -
- -
- -
- -
- -
- -

- -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH

jumlah -
dibulatkan -

- -
- -
- -
- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH
- -
- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH
- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH
- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH

- -
- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH

- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -

- -

jumlah -
dibulatkan -

- -
- -
- -
- -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH

- -

jumlah -
dibulatkan -

- -
jumlah -
dibulatkan -

- -
- -
- -
- -
jumlah -
-
dibulatkan -

- -
- -
jumlah -
dibulatkan -

- -
- -
- -
- -
- -
- -
- -
jumlah -
dibulatkan -
HARGA SATUAN ARSITEKTUR

NGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS

HARGA JUMLAH

- -
- -
- -
- -
- -
- -
jumlah -
dibulatkan -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
jumlah -
dibulatkan -

- -
- -

- -

jumlah -
dibulatkan -
ANALISA GEDUNG
PEMBANGUNAN HARGA PEK. ELEKTRIKAL
WORKSHOP - BLK
PEKERJAAN : KOMUNITAS
PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO KOEFISIEN SAT URAIAN HARGA

1 Memasang 1 buah instalasi titik lampu / penerangan


Bahan An. SNI ( Revisi ) 6.1.1
8.000 m Kabel NYM 3x2,5 mm2 @ Rp. - = Rp
8.000 m Conduit pipa dia. 20 @ Rp. - = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.1.2
0.200 OH Pekerja @ Rp. - = Rp
0.180 OH Tukang listrik @ Rp. - = Rp

Sub total : = Rp
Total upah+bahan : = Rp

2 Memasang 1 buah instalasi titik AC


Bahan An. SNI ( Revisi ) 6.1.1
8.000 m Kabel NYM 3x2,5 mm2 @ Rp. - = Rp
8.000 m Conduit pipa dia. 20 @ Rp. - = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.1.2
0.200 OH Pekerja @ Rp. - = Rp
0.180 OH Tukang listrik @ Rp. - = Rp

Sub total : = Rp
Total upah+bahan : = Rp

3 Memasang 1 m' instalasi kabel feeder NYY 4x10 mm2


Bahan An. SNI ( Revisi ) 6.1.1
1.000 m Kabel NYY 4x10 mm2 @ Rp. - = Rp
1.000 m Conduit pipa dia. 20 @ Rp. - = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.1.2
0.200 OH Pekerja @ Rp. - = Rp
0.180 OH Tukang listrik @ Rp. - = Rp

Sub total : = Rp
Total upah+bahan : = Rp
NO KOEFISIEN SAT URAIAN HARGA

4 Memasang Stop Kontak daya


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak 6 A @ Rp. - = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. - = Rp
0.070 OH Tukang listrik @ Rp. - = Rp

Sub total : = Rp
Total upah+bahan : = Rp

5 Memasang Stop Kontak Ganda


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak Ganda @ Rp. - = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. - = Rp
0.070 OH Tukang listrik @ Rp. - = Rp

Sub total : = Rp
Total upah+bahan : = Rp

6 Memasang Stop Kontak AC


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak AC @ Rp. - = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. - = Rp
0.070 OH Tukang listrik @ Rp. - = Rp

Sub total : = Rp
Total upah+bahan : = Rp

7 Memasang Grounding (max 2 Ohm)


Bahan An. SNI ( Revisi ) 6.18.1
10.000 m' NYA 1 x 50 mm2 @ Rp. - = Rp
3.000 m' Pipa galvanis ø 1 1/2" @ Rp. - = Rp
2.000 bh Split tembaga @ Rp. - = Rp
4.000 bh Klem tembaga @ Rp. - = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. - = Rp
0.070 OH Tukang listrik @ Rp. - = Rp
Sub total : = Rp
Total upah+bahan : = Rp

NO KOEFISIEN SAT URAIAN HARGA

8 Memasang Saklar Tunggal


Bahan An. SNI ( Revisi ) 6.21.1
1.000 bh Saklar Tunggal @ Rp. - = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.21.2
0.150 OH Pekerja @ Rp. - = Rp
0.115 OH Tukang listrik @ Rp. - = Rp

Sub total : = Rp
Total upah+bahan : = Rp

9 Memasang Saklar Ganda


Bahan An. SNI ( Revisi ) 6.22.1
1.000 bh Saklar ganda @ Rp. - = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.22.2
0.150 OH Pekerja @ Rp. - = Rp
0.115 OH Tukang listrik @ Rp. - = Rp

Sub total : = Rp
Total upah+bahan : = Rp

10 Memasang Lampu TKI 2x36 W


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu TKI 2 x 36 W @ Rp. - = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.22.2
0.166 OH Pekerja @ Rp. - = Rp
0.166 OH Tukang listrik @ Rp. - = Rp

Sub total : = Rp
Total upah+bahan : = Rp

11 Memasang AC split wall 2 PK


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh AC split wall 2 PK @ Rp. - = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. - = Rp
0.166 OH Tukang listrik @ Rp. - = Rp

Sub total : = Rp
Total upah+bahan : = Rp

NO KOEFISIEN SAT URAIAN HARGA

12 Memasang Lampu Baret 18 W / 22 W


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu Baret 18 W / 22W @ Rp. - = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. - = Rp
0.166 OH Tukang listrik @ Rp. - = Rp

Sub total : = Rp
Total upah+bahan : = Rp

13 Memasang Downlight E27ESS 8 Watt + Fitting


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Downlight E27ESS 8 Watt @ Rp. - = Rp
1.000 bh Fitting @ Rp. - = Rp
5.000 % Perlengkapan instalasi @ Rp. = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. - = Rp
0.166 OH Tukang listrik @ Rp. - = Rp

Sub total : = Rp
Total upah+bahan : = Rp

13 Memasang Panel Distribusi


Bahan An. SNI ( Revisi ) 6.55.1
1.000 bh Panel Distribusi @ Rp. - = Rp
5.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI ( Revisi ) 6.55.2
2.500 OH Pekerja @ Rp. - = Rp
3.500 OH Tukang listrik @ Rp. - = Rp

Sub total : = Rp
Total upah+bahan : = Rp

ANALISA HARGA PEK. PLUMBING

Pekerjaan : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS


Lokasi :
KEJURUAN : ( GROUP B )
Tahun Anggaran : 2018

NO KOEFISIEN SAT URAIAN HARGA

1 Memasang 1 m' Pipa PVC tipe AW dia 1/2"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 1/2" @ Rp. - = Rp
35.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI RSNIT-15-2002
0.036 OH Pekerja @ Rp. - = Rp
0.060 OH Tukang Plumbing @ Rp. - = Rp
Sub total : = Rp
Total upah+bahan : = Rp

2 Memasang 1 m' Pipa PVC tipe AW dia 3/4"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 3/4" @ Rp. - = Rp
35.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI RSNIT-15-2002
0.036 OH Pekerja @ Rp. - = Rp
0.060 OH Tukang Plumbing @ Rp. - = Rp
Sub total : = Rp
Total upah+bahan : = Rp

3 Memasang 1 m' Pipa PVC tipe AW dia 1 1/2"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 1 1/2" @ Rp. - = Rp
35.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI RSNIT-15-2002
0.036 OH Pekerja @ Rp. - = Rp
0.060 OH Tukang Plumbing @ Rp. - = Rp
Sub total : = Rp
Total upah+bahan : = Rp

NO KOEFISIEN SAT URAIAN HARGA

4 Memasang 1 m' Pipa PVC tipe AW dia 2"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 2" @ Rp. - = Rp
35.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI RSNIT-15-2002
0.054 OH Pekerja @ Rp. - = Rp
0.090 OH Tukang Plumbing @ Rp. - = Rp
Sub total : = Rp
Total upah+bahan : = Rp

5 Memasang 1 m' Pipa PVC tipe AW dia 3"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 3" @ Rp. - = Rp
35.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI RSNIT-15-2002
0.081 OH Pekerja @ Rp. - = Rp
0.135 OH Tukang Plumbing @ Rp. - = Rp
Sub total : = Rp
Total upah+bahan : = Rp

6 Memasang 1 m' Pipa PVC tipe AW dia 4"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 4" @ Rp. - = Rp
35.000 % Perlengkapan instalasi = Rp
Sub total : = Rp
Upah An. SNI RSNIT-15-2002
0.081 OH Pekerja @ Rp. - = Rp
0.135 OH Tukang Plumbing @ Rp. - = Rp
Sub total : = Rp
Total upah+bahan : = Rp
LISA HARGA PEK. ELEKTRIKAL

JUMLAH

-
-
-
-

-
-

-
-

-
-
-
-

-
-

-
-

-
-
-
-

-
-

-
-
JUMLAH

-
-
-

-
-

-
-

-
-
-

-
-

-
-

-
-
-

-
-

-
-

-
-
-
-
-
-

-
-
-
-

JUMLAH

-
-
-

-
-

-
-

-
-
-

-
-

-
-

-
-
-

-
-

-
-

-
-
-

-
-

-
-

JUMLAH

-
-
-

-
-

-
-

-
-
-
-

-
-

-
-

-
-
-

-
-

-
-
JUMLAH

-
-
-

-
-
-
-

-
-
-

-
-
-
-

-
-
-

-
-
-
-

JUMLAH

-
-
-

-
-
-
-

-
-
-

-
-
-
-

-
-
-

-
-
-
-
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS
PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO. JENIS BAHAN SATUAN

I. MATERIAL ALAM
batu bata merah bh
batu kali m3
split m3
beton decking bh
pasir beton m3
pasir pasang m3
pasir urug m3
tanah urug (lokal) m3

II. SEMEN
semen PC ( 50 kg ) kg
semen PC ( 50 kg ) zak
semen putih ( 50 kg ) zak
semen isian naat / warna kg

III. BESI , BAJA & ASESORIES


wiremesh M8 (2.1 x 5.4 m) lmbr
besi beton polos rata2 kg
besi beton ulir rata2 kg
besi polos 10 mm btng
besi polos 12 mm btng
kawat beton kg
paku rata-rata kg
form tie type B bh
Besi Hollow 40 x 40 btng
Besi Hollow 20 x 40 btng

IV. KAYU & MULTIPLEKS


dolken btg
kayu balok 8x12x400 Meranti klas II campur / kayu kampung m3
kayu kaso 5x7x400 Meranti klas II campur / kayu kampung m3
kayu papan 3x20x400 Meranti campur / kayu kampung m3
kayu papan 3x30x400 Meranti campur / kayu kampung m3
triplek 122x244, 9 mm lbr
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS
PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO. JENIS BAHAN SATUAN

V. PINTU DAN JENDELA


Pintu :
Daun pintu double teakwood finish HPL bh
Daun pintu double triplek 6mm finish duco bh
Daun pintu alumunium spandrel bh
Asesories :
engsel casement 24" psg
engsel pintu 4" S/S 2BB ex.lokal psg
engsel jendela 3" S/S 2BB ex.lokal psg
lever handle pintu ex.lokal psg
kunci pintu ex.lokal set
kunci pintu keet bh
rambuncis ex.dekson bh
Kaca :
bevel kaca m'
kaca clear 5 mm m2
kaca cermin 5 mm m2
Alumunium / Frame :
jalusi/kisi/krepyak m'
frame pintu alumunium m'
kusen alumunium 3" CA m'
kusen alumunium 4" CA m'
sealant kusen m'
sealant kaca m'
sealant kusen/jendela tube
sekrup fischer bh

VI. ATAP
nok galvalum m'
atap spandek galvalum t=0.35 mm m2
Atap Spandek Zincalume m2
Screw Cteks 12-4 x 5 bh
Screw Cteks 10 x 16-16 bh
Paku biasa 2" - 5" kg
Profil C-75.08 m1
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS
PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO. JENIS BAHAN SATUAN

Profil C-75.06 m1
Baut (Srew driver bh
Dinabolt bh
Reng m1
Aluminium foil 3mm m2
Glass wool tebal 2,5 cm m2
Roofmesh Type 2215 dia 1,6mm ( 50x50 mm) m2

VII. PLAFOND
gypsum board 4x8 ft , t = 9 mm lbr
penggantung plafond bh
hollow 20 x 40 x 0.35 mm btg
hollow 40 x 40 x 0.35 mm btg
List gypsum 5 x 5 m'
panel GRC 4x8 ft , t - 4.5 mm lbr
Lisplang GRC 20 cm m'
compound zak
skrup gypsum bh
textile tape roll

VIII. MATERIAL LANTAI


dinding keramik 20 x 20 unpolished m2
dinding keramik 30 x 60, Asia Tile/KIA/Mulia m2
lantai keramik 30x30, Asia Tile/KIA/Mulia m2
lantai keramik 40x40, Asia Tile/KIA/Setara m2
plint keramik uk.10x40 bh
batu alam candi m2

IX. CAT
cat dasar alkali Catylac kg
amplas lbr
cat besi Glotex kg
meni kayu kg
meni besi kg
cat tembok dalam Catylac kg
cat tembok mowilex (interior) kg
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS
PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO. JENIS BAHAN SATUAN

cat tembok catylac (luar) kg


cat plafond putih vinilex kg
plamur tembok kg
thinner impala ltr
plamur kayu kg
kuas besar bh
kuas roll bh

X. SANITAIR
closet jongkok INA bh
wastafel tanam + accessories ex.lokal bh
kran air lokal bh
seal tape bh
sealant silicon tube

XI. JALAN & LANDSCAPE


buis beton ø 30 cm, panj.0.50 m m'

XII. BBM & LISTRIK


Oli / Pelumas ltr
Penyambungan Daya Listrik VA
Perijinan Sertifikat Layak Operasi (SLO) VA
Air kerja m3
Air kerja ltr
Listrik kerja W

XIII BAHAN KABEL


Kabel NYY 3 x 2,5 mm2 m'
Kabel NYY 4 x 10 mm2 m'
Kabel NYA 1 x 50 mm2 m'

XIV BAHAN LAMPU, SAKLAR & STOP KONTAK


Lampu TL TKI 2 x 36 watt + rumah bh
Lampu Baret 17W Philip bh
Downlight E27ESS 8 Watt bh
Fitting bh
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS
PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO. JENIS BAHAN SATUAN

Stop kontak bh
Saklar Seri/Ganda bh
Stop kontak Ganda bh
Stop kontak AC bh
AC split wall 2 PK bh

XV BAHAN PANEL
Box Panel Standard unt
MCB : 1 P , 6/10/16/25 A unt

XVI ASESORIES & LAIN-LAIN


Logo (tampak muka gedung) set
Flexible conduit 20 mm m'
Splitzen 3/4" bh
Klem Penyambung Kabel BC bh
Kamera SLR (Digital) sewa/hr
CD copy soft file foto image bh
Foto printing uk.3R lbr
Foto album bh
Ijuk ikat
IMB dok
Transportasi paket
Stamper jam
alat las sewa/hr

XVII BAHAN PIPA


Pipa PVC tipe AW diameter 1/2" @4m btg
Pipa PVC tipe AW diameter 3/4" @4m btg
Pipa PVC tipe AW diameter 1 1/2" @4m btg
Pipa PVC tipe AW diameter 2" @4m btg
Pipa PVC tipe AW diameter 3" @4m btg
Pipa PVC tipe AW diameter 4" @4m btg
Pipa GIP Medium diameter 1 1/2" @6m btg
A SATUAN BAHAN & ALAT

HARGA SATUAN
(Rp.)
A SATUAN BAHAN & ALAT

HARGA SATUAN
(Rp.)
A SATUAN BAHAN & ALAT

HARGA SATUAN
(Rp.)
A SATUAN BAHAN & ALAT

HARGA SATUAN
(Rp.)
A SATUAN BAHAN & ALAT

HARGA SATUAN
(Rp.)
HARGA SATUAN UPAH
PEKERJAAN : PEMBANGUNAN GEDUNG WORKSHOP - BLK KOMUNITAS
PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : ( GROUP B )
TAHUN ANGGARAN : 2019

NO. PEKERJA SATUAN

1 Tukang Galian Org / hr


2 Tukang Batu Org / hr
3 Tukang Las Org / hr
4 Tukang Besi Org / hr
5 Tukang Kaca/Alumunium/Gipsum Org / hr
6 Tukang Kayu Org / hr
7 Tukang Cat Org / hr
8 Tukang Plumbing Org / hr
9 Pembantu Instalator / Tukang Listrik Org / hr
10 Pekerja / Kenek Org / hr
11 Tukang foto Org / hr
12 Ketua Unit Pengelola Teknis Org / hr
13 Ketua Unit Pengelola Keuangan Org / hr
14 Anggota Pengelola Teknis Org / hr
15 Anggota Pengelola Keuangan Org / hr
HARGA SATUAN UPAH

HARGA UPAH