CEK HITUNGAN KEBUTUHAN MATERIAL PEKERJAAN EVALUASI SESUAI DI LAPANGAN PROYEK BPGRESIK LT 2

SALDO MASUK 1 (22/08/2022) : Rp 1,000,000.00


SALDO MASUK 2 : Rp -
TOTAL SALDO MASUK : Rp 1,000,000.00
PRESENTASE : 100%
JUMLAH BARANG/
NO TANGGAL JENIS BARANG ANGGARAN DANA KELUAR JUMLAH TOTAL ANGGARAN DANA MASUK PRESENTASE
UKURAN YANG TERBELI
1 NOTA KE 1
22-Aug-2022 CAT KY/BS 1 LTR 143 PRMNT RED 1 UNIT Rp 78,000.00 Rp 144,000.00 Rp 1,000,000.00 14.40%
REFIL KUAS ROL 230MM 2 UNIT Rp 29,000.00
KUAS CAT 4"BLUPUTIH833PRIMA 2 UNIT Rp 37,000.00
2 NOTA KE 2
23-Aug-2022 BOR 4.5 1 UNIT Rp 35,000.00 Rp 217,500.00 Rp 1,000,000.00 21.75%
BOR 4 1 UNIT Rp 30,000.00
KLEM PIPA 15 UNIT Rp 37,500.00
KABEL COLOKAN 5 M 1 UNIT Rp 30,000.00
BAUT BETON 1/2 KG Rp 75,000.00
FISHER BAUT BOR 1 PACK Rp 10,000.00

3 NOTA KE 3
23-Aug-2022 ISARPLAS 2 UNIT Rp 24,000.00 Rp 147,000.00 Rp 1,000,000.00 14.70%
KASA 10 LEMBAR Rp 30,000.00
KNEE3/4 10 UNIT Rp 40,000.00
SOK 3/4 3 UNIT Rp 9,000.00
TEE 3/4 3 UNIT Rp 12,000.00
SPK DRAT 3/4 3 UNIT Rp 12,000.00
SANFLEX 1 UNIT Rp 20,000.00

4 NOTA KE 4
23-Aug-2022 ELASTEX NIPPON PAINT PUTIH 1 UNIT (1KG) Rp 63,000.00 Rp 85,000.00 Rp 1,000,000.00 8.50%
LEM PUTIH 1 UNIT Rp 22,000.00

5 NOTA KE 5
23-Aug-2022 BRBRAND CAT BESI 918 2 UNIT Rp 140,000.00 Rp 164,000.00 Rp 1,000,000.00 16.40%
THINER B 1 UNIT Rp 14,000.00
ELBOW 3/4 2 UNIT Rp 10,000.00

6 NOTA KE 6
23-Aug-2022 CLUB BESAR 2 BOTOL Rp 12,000.00 Rp 28,000.00 Rp 1,000,000.00 2.80%
GORENGAN 16 BIJI Rp 16,000.00

JUMLAH TOTAL KESELURAHAN CASBON DANA KELUAR NOTA 1 S/D 6 ; Rp 785,500.00 78.55%
SISA ANGGARAN CASBON DANA MASUK NOTA 1 S/D 6 ; Rp 214,500.00 21.45%
MINUS CASBON DANA MASUK NOTA 1 S/D 6 ; 0.00%
BUKTI SALDO MASUK UNTUK KEPERLUAN MATERIAL PROYEK BPGRESIK PEKERJAAN PLAFON LT 1