Anda di halaman 1dari 2

CEK HITUNGAN KEBUTUHAN MATERIAL PEKERJAAN PLAFON SESUAI DI LAPANGAN PROYEK BPGRESIK LT 1

SALDO MASUK 1 (09/08/2022) Rp 2,000,000.00


SALDO MASUK 2 (12/08/2022) Rp 500,000.00
TOTAL SALDO MASUK : Rp 2,500,000.00
PRESENTASE : 100%
JUMLAH BARANG/
NO TANGGAL JENIS BARANG ANGGARAN DANA KELUAR JUMLAH TOTAL ANGGARAN DANA MASUK PRESENTASE
UKURAN YANG TERBELI
1 NOTA KE 1
9-Aug-2022 KALSIBOARD 10 LEMBAR Rp 650,000.00 Rp 680,000.00 Rp 2,500,000.00 27.20%
KAPI 3 " 2 PCS Rp 10,000.00
ONGKIR PICKUP Rp 20,000.00
2 NOTA KE 2
9-Aug-2022 CAT PARAGON PUTIH 1 PIL Rp 460,000.00 Rp 1,085,000.00 Rp 2,500,000.00 43.40%
CAT WALL SEALER NIPON PAINT 1 PIL Rp 625,000.00
3 NOTA KE 3
9-Aug-2022 BAK CAT 1 UNIT Rp 20,000.00 Rp 133,000.00 Rp 2,500,000.00 5.32%
BAK CAT ORI 1 UNIT Rp 25,000.00
KUAS 4" 2 UNIT Rp 40,000.00
LEM RAJAWALI 2 UNIT Rp 48,000.00
4 NOTA KE 4
9-Aug-2022 KUAS ROLL BESAR 2 UNIT Rp 74,000.00 Rp 119,000.00 Rp 2,500,000.00 4.76%
REVIL KUAS ROL BESAR B 1 UNIT Rp 25,000.00
REVIL KUAS ROL BESAR B KW 1 UNIT Rp 20,000.00
5 NOTA KE 5
11-Aug-2022 PERBAN GYPSUM 2 UNIT Rp 40,000.00 Rp 40,000.00 Rp 2,500,000.00 1.60%
6 NOTA KE 6
12-Aug-2022 APLUS KOMPON PUTIH 1 ZAK Rp 75,000.00 Rp 102,500.00 Rp 2,500,000.00 4.10%
GERGAJI BESI 1 UNIT Rp 20,000.00
KERTAS GOSOK 1 LEMBAR Rp 7,500.00
7 NOTA KE 7
4-Aug-2022 SKRUP 2" 20 UNIT Rp 10,000.00 Rp 55,000.00 Rp 2,500,000.00 2.20%
FISHER S8 20 UNIT Rp 8,000.00
BOR S8 1 UNIT Rp 37,000.00
8 NOTA KE 8
13-Aug-2022 CAT PARAGON PUTIH 1 UNIT (5KG) Rp 140,000.00 Rp 140,000.00 Rp 2,500,000.00 5.60%
9 NOTA KE 9
15-Aug-2022 PLAFON GYPSUM 1 LEMBAR Rp 85,000.00 Rp 85,000.00 Rp 2,500,000.00 3.40%

JUMLAH TOTAL KESELURAHAN CASBON DANA KELUAR NOTA 1 S/D 8 ; Rp 2,439,500.00 97.58%
SISA ANGGARAN CASBON DANA MASUK NOTA 1 S/D 8 ; Rp 60,500.00 2.42%
MINUS CASBON DANA MASUK NOTA 1 S/D 8 ; 0.00%
BUKTI SALDO MASUK UNTUK KEPERLUAN MATERIAL PROYEK BPGRESIK PEKERJAAN PLAFON LT 1
SALDO MASUK KE 1 : SALDO MASUK KE 2 :