DATA PEKERJAAN PIPANISASI TAHUN 2022 BAGIAN PERENCANAAN SESUAI AJUAN RAB

NILAI RAP
NO. URAIAN LOKASI NILAI RAB + PPN 10% NILAI RAB (TANPA PPN) SELISIH RAB (TANPA PROVIT % TANGGAL AJUAN STATUS SUMBER DANA
JUMLAH PPN) & RAP DILUAR PPN
(PEMBULATAN)
A PERUMAHAN
1 Andara Regency Pendem Rp 71,676,000 Rp 65,159,812 Rp 63,938,000 Rp 1,221,812 1.70% 4 Januari 2022 Finish
2 Alibaba Village Oro-oro ombo Rp 45,078,000 Rp 40,979,813 Rp 30,566,000 Rp 10,413,813 23.10% 10 Januari 2022 Finish

Pengembang Perumahan
3 The Aswindra Hills Oro-oro ombo Rp 28,096,000 Rp 25,540,982 Rp 15,992,000 Rp 9,548,982 33.99% 10 Januari 2022 Finish
4 Cluster Amrita Jalan Terusan Metro Sumberejo Rp 15,813,000 Rp 14,375,145 Rp 5,296,000 Rp 9,079,145 57.42% 7 Februari 2022 Finish
5 Villa Raya Tlekung Rp 17,718,700 Rp 16,107,854 Rp 10,989,000 Rp 5,118,854 28.89% 7 Februari 2022 Finish
6 Villa Sultan Tlekung Rp 63,382,000 Rp 57,619,914 Rp 40,989,000 Rp 16,630,914 26.24% 4 April 2022 Finish
7 AL - Irsyad Mojorejo Rp 17,747,200 Rp 17,747,200 Rp 13,623,000 Rp 4,124,200 23.24% 10 Maret 2022 Finish
8 Griya Harmony Sejati
9
10
11
TOTAL Rp 259,510,900 Rp 237,530,721 Rp 181,393,000 Rp 56,137,721

SELISIH RAB (TANPA PROVIT %


NO. URAIAN LOKASI NILAI RAB + PPN 10% NILAI RAB (TANPA PPN) JUMLAH TANGGAL AJUAN STATUS SUMBER DANA
PPN) & RAP DILUAR PPN
(PEMBULATAN)
B PEMASANGAN JARINGAN YANG LAIN
1 Revitalisasi pipa O.1,5" Wukir Gg IX, Temas, Kota Batu #REF! 12 Maret 2020 Finish
2 Pelanggan atas nama Drs Susetya H Sumberejo #REF! 30 Maret 2020 Finish
3 Revitalisasi pipa O.1" Wukir Gg I, Temas, Kota Batu #REF! 31 Maret 2020 Finish
4 Hotel Ubud Oro-oro ombo Rp 9,237,900 Rp 8,398,073 Rp 7,302,700 Finish
5 Musholla Darussalam Sarimun, Beji #VALUE! Finish
6 Pemasangan jaringan pipa O.3/4" Wukir gg V, Temas Kota Batu Rp 1,625,700 09 Juni 2020 Finish

Revisi Perbaikan & Pemasangan Jalur Pipa Transmisi


O.8" dan O.4" Jalur Pipa Distribusi O.3" dan O.2"
7 Jalan Semeru Depan Kelurahan Sisir Kota Batu Rp 2,770,200 13 Juni 2020 Finish
Dampak Dari Pemasangan Gorong-gorong Oleh Dinas
Cipta Karya Kota Batu
1. Tandon Bedengan-Sumber Darmi
2. Tandon Agro
8 Pemanfaatan Tandon Bedengan Dan Perbaikan Outlet #REF! 24 Agustus 2020 Finish
Tandon Agro
Revisi Jaringan Pipa Ø.1/2" Yang Semula GI Menjadi
9 Jalan Abdul Gani Atas (dibawah Hotel Aston) Rp 1,786,800 03 Juli 2020 Finish
Pipa HDPE PN.10

10 Borring Jalur Pipa Guna Penambahan Debit Pelayanan Jalan Suropati Kelurahan Ngaglik Rp 1,429,300 03 Juli 2020 Finish

11 Gor Gajahmada dan Stadion Brantas Jalan Mustari s/d Lokasi Gor Rp 66,050,000 Rp 60,045,108 Rp 50,887,000 23 November 2020 Pengajuan
12 Kran Umum 25 SR Jalan Anggrek Oro-Oro Ombo Kota Batu Rp 47,320,000 02 Desember 2020 Pengajuan

INTERNAL PERUSAHAAN
TOTAL Rp 75,287,900 Rp 68,443,181 #REF! Rp -
SELISIH RAB (TANPA PROVIT %
NO. URAIAN LOKASI NILAI RAB + PPN 10% NILAI RAB (TANPA PPN) JUMLAH TANGGAL AJUAN STATUS SUMBER DANA
PPN) & RAP DILUAR PPN
(PEMBULATAN)
C PROGRAM RKAP 2020
PENGADAAN DAN PEMASANGAN JARINGAN PIPA O.2"
1 DAN O.1" DI JALAN BROMO - GANG PERUSAHAAN SISIR
BROSEM

PENGADAAN DAN PEMASANGAN JARINGAN PIPA O.3"


DARI TANDON (PEMANFAATAN TANDON AGRO)
2 MENUJU JEMBATAN JALIBAR SAMPAI JALAN ABDUL ORO ORO OMBO
GANI ATAS (JALUR AGUS GEMPAR) - JARINGAN
SUMBER DARMI

PENGADAAN DAN PEMASANGAN PIPA O.2" DAN O.1,5"


3 DARI JALAN METRO MENUJU KAMPUNG SAKINAH JALAN METRO - KAMPUNG SAKINAH
(UNTUK CAKUPAN PELANGAN MBR 2020 - 2021)

PEMASANGAN JARINGAN PIPA O.3'' DAN O.1,5" DARI


4 JALAN ABDUL GANI GG 3 SAMPAI ATAS MUSEUM JALAN ABDUL GANI - SULTAN AGUNG
ANGKUT MENUJU JALAN SULTAN AGUNG (JALAN
KEMBAR)

PENGADAAN DAN PEMASANGAN JARINGAN PIPA O.3"


5 PANDANREJO - TEMAS
DAN O.1,5" TEMAS
PENGADAAN DAN PEMASANGAN JARINGAN PIPA O.3"
6 PANDANREJO - TEMAS
DAN O.1,5" DARI PANDANREJO

PENGADAAN DAN PEMASANGAN JARINGAN PIPA O.3"


7 PANDANREJO - TEMAS
DARI JL. SUKARKNO SAMPE PERLIMAN JUNREJO

PEMBUATAN FS PEMBUATAN CECK DAM, PENGADAAN


8 DAAN & PEMASANGAN JARINGAN PIPA DI SUMBER PUNTEN - ABD. GANI
NGESONG S/D T. ABDUL GANI
TOTAL Rp 75,287,900 Rp 68,443,181 #REF! Rp -

SELISIH RAB (TANPA PROVIT %


NO. URAIAN LOKASI NILAI RAB + PPN 10% NILAI RAB (TANPA PPN) JUMLAH TANGGAL AJUAN STATUS
PPN) & RAP DILUAR PPN
(PEMBULATAN)
D PEKERJAAN LAIN-LAIN (NON PIPANISASI)

1 Pembuatan tembok penahan tebing (TPT) Terusan Cemara Intan, Desa Sidomulyo, Kota Batu Rp 11,169,900 9 Maret 2020 Finish

TOTAL Rp 68,443,181 #REF! Rp -


VOLUME PIPA
JARINGAN PIPA HDPE TERPASANG (M') JARINGAN PIPA PVC TERPASANG (M') JARINGAN PIPA GI TERPASANG (M')

Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4 Ø.1/2 Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4 Ø.1/2 Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4

235 125 327


225 242

95
166 45
217 355
130 50

JARINGAN PIPA HDPE TERPASANG (M') JARINGAN PIPA PVC TERPASANG (M') JARINGAN PIPA GI TERPASANG (M')

Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4 Ø.1/2 Ø.6 / Ø.8 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4 Ø.1/2 Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4

30
200
30 24
108
26
57

18 18 18 18

100 20 6

80

20

695
100 300 100
JARINGAN PIPA HDPE TERPASANG (M') JARINGAN PIPA PVC TERPASANG (M') JARINGAN PIPA GI TERPASANG (M')

Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4 Ø.1/2 Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4 Ø.1/2 Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4
JARINGAN PIPA HDPE TERPASANG (M') JARINGAN PIPA PVC TERPASANG (M') JARINGAN PIPA GI TERPASANG (M')

Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4 Ø.1/2 Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4 Ø.1/2 Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4

- - 100 930 385 1,092 1,300 275 18 38 24 18 - - - - - - - - - - -


PROGRES HASIL SURVEY PEKERJAAN PERUMAHAN
BAGIAN PERENCANAAN TAHUN 2019
VOLUME
NO. NAMA PERUMAHAN LOKASI NILAI RAB NILAI RAP SELISIH RAB & RAP PROVIT TANGGAL TOTAL PIPA BENTUK PELAKSANA PROGRES
% AJUAN (m') PEKERJAAN PEKERJAAN PEKERJAAN

1 Perumahan Darsono Ngaglik - Kota Batu Rp 35,482,000 Rp 27,077,000 Rp 8,405,000 31% 2/20/2019 687 100%
2 Jalibar land Dresel - Oro-oro Ombo Rp 58,485,000 Rp 41,770,000 Rp 16,715,000 40% 12/02/2019 #VALUE! Ajuan
3 Pesona Mojorejo - Junrejo Rp 56,189,000 Rp 30,746,000 Rp 25,443,000 83% Th. 2018 95 100%
4 Kayana Mojorejo - Junrejo Rp 198,047,000 Rp 68,886,000 Rp 129,161,000 187% Th. 2018 2207 100%
SWAKELOLA DISTRIBUSI
5 D'Cordoba Oro-oro Ombo - Kota Batu Rp 89,759,000 Rp 63,015,120 Rp 26,743,880 42% Th. 2018 1031 100%
6 D'Bamboo Temas - Kota Batu Rp 47,899,000 Rp 30,276,000 Rp 17,623,000 58% Th. 2018 670 100%
7 Griya Emas BNS (Belakang BNS) Oro-oro Ombo - Kota Batu Rp 99,510,900 Rp 73,338,000 Rp 26,172,900 36% 13/05/2019 166 Ajuan
8 BCI Temas Temas - Kota Batu Rp 43,469,300 Rp 33,413,000 Rp 10,056,300 30% 15/05/2019 217 Ajuan
TOTAL Rp 628,841,200 Rp 368,521,120 Rp 260,320,080 #VALUE!

PROGRES HASIL SURVEY PEKERJAAN SR BARU


BAGIAN PERENCANAAN TAHUN 2019
JUMLAH SR PELAKSANA
NO. BULAN JUMLAH SR AJUAN TERPASANG PEKERJAAN SR
1 JANUARI 31 28
2 FEBRUARI 49 12
3 MARET 77 71 DISTRIBUSI
4 APRIL 101 87
5 MEI 75 73
TOTAL 333 271
Ket: Data terlampir
PROGRES HASIL SURVEY "INVESTASI" PEKERJAAN MBR 2019
BAGIAN PERENCANAAN TAHUN 2019
VOLUME
NO. LOKASI NILAI RAB TANGGAL TOTAL PIPA BENTUK PELAKSANA CAKUPAN PROGRES PEKERJAAN
AJUAN PEKERJAAN PEKERJAAN PELANGGAN
(m')
1 CARU Rp - 1386 100%
348
2 BANGKON Rp - 2202 100%
3 MOJOREJO (KAJANG SANTREN) Rp - 2352 124 AJUAN
4 BEJI Rp - 1000 96 AJUAN
5 TEMAS Rp - 961 AJUAN
193
6 GLONGGONG Rp - 2991 AJUAN
7 JUNREJO - JEDING Rp - 236 7 AJUAN
8 NDRESEL - ORO-ORO OMBO Rp - 2/12/2019 641 SWAKELOLA DISTRIBUSI AJUAN
212
9 ORO-ORO OMBO Rp - 1481 AJUAN
10 SISIR Rp - 2223 225 90%
11 NGAGLIK (LESTI UTARA) Rp - 1592 147 90%
12 PESANGGRAHAN (LAHOR) Rp - 897 14 AJUAN
13 SANTREAN Rp - 660 AJUAN
14 SUMBERSARI Rp - 572 213 AJUAN
15 SUMBEREJO Rp - 591 AJUAN
TOTAL Rp - 19785 1579
PROGRES HASIL SURVEY PEKERJAAN SR BARU
BAGIAN PERENCANAAN TAHUN 2019

JUMLAH SR JUMLAH SR PELAKSANA


NO. BULAN PEKERJAAN SR
AJUAN TERPASANG

1 JANUARI 31 28
2 FEBRUARI 49 12
3 MARET 77 71 DISTRIBUSI
4 APRIL 101 87
5 MEI 75 73
TOTAL 333 271
Ket: Data terlampir
1,196,200
4,746,415
REKAPITULASI VOLUME PIPA SELAMA TAHUN 2019
REKAPITULASI VOLUME PIPA HDPE (M')

Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4 Ø.1/2

0 179 1034 5405 1403 16429 7279 5142


REKAPITULASI VOLUME PIPA PVC (M')

Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4 Ø.1/2

190 0 0 2 0 0 0 2
REKAPITULASI VOLUME PIPA GI (M')

Ø.6 Ø.4 Ø.3 Ø.2 Ø.1,5 Ø.1 Ø.3/4 Ø.1/2

8 0 0 25 0 0 0 0

TOTAL VOLUME
19

TOTAL

36871

TOTAL

194

TOTAL

33 ONGKOS MASANG PIPA RATA2 TOTAL

37098 x 10365 = Rp 384,520,770


Rp 499,877,001
Rp 115,356,231