Anda di halaman 1dari 1

RENCANA KERJA NOVEMBER 2022 - SELLING DAY CABANG SIMPANG PEMATANG

Nomor : 001/BBH-SPG/XI/2022
Kepada : Bp. Ade Candra (Ka. Area Tulang Bawang Raya)
Dari : Deny Afriansyah Passa (BBH)
Cc : Ibu Sri Lestari (BBSM Tuba Raya)
: Ibu Elsa Kirana (BBSHC)
: Bp. Ismar Pramudia (RBSM Sum 6)
Perihal : Proposal Pengajuan Biaya Selling Day Cab. Simpang Pematang Bulan November 2022

A. Planning Selling Day Cab Simpang Pematang


Jml PIC Target KPM
Hari/Tgl Lokasi
Sales Team Surveyor Operation Pendataan Kons Leads Target Booking Booking Rp Biaya
Senin/ 07 Nov 2022 Desa Gedung Ram 5 1 0 84 20 6 42,000,000 560,000
Senin/ 14 Nov 2022 Desa Brabasan 5 1 0 84 20 6 42,000,000 560,000
Senin/ 21 Nov 2022 Desa Gedung Ram 5 1 0 84 20 6 42,000,000 560,000
Senin/ 28 Nov 2022 Desa Brabasan 5 1 0 84 20 6 42,000,000 560,000
Grand Total Kegiatan Selling Day Bulan November 2022 336 80 24 168,000,000 2,240,000

B. Check List Kegiatan Selling Day-Cab Simpang Pematang

Kebutuhan Check List Keterangan

Lokasi/ijin v Desa Gedung Ram & Brabasan


PIC Pelaksana v Deny Afriansyah Passa/BBH
Biaya Kegiatan v Rp560,000
Promotion Material:
1. Price list v 100 lembar
2. X-Banner v 1 buah
3. Meja v 1 buah
4. Tenda v 1 buah
5. Dll x x
Camera/Hp v 1 buah Hp
Form pengajuan aplikasi v Via WhatsApp
Uang cash x x

C. Rincian Biaya Selama Bulan November 2022

Nama/Ket Jumlah Biaya satuan Total

Minyak Goreng 84 Rp5,000 Rp420,000


Kantong Plastik 1 Rp10,000 Rp10,000
Air Mineral 2 Rp20,000 Rp40,000
Konsumsi Team (K-1) 6 Rp15,000 Rp90,000
Konsumsi Team (K-2)
Grand Total Rp560,000

Simpang Pematang, 02 November 2022


Dibuat Oleh, Diketahui Oleh, Disetujui Oleh,

Eko Saputra Deny Afriansyah Passa Ade Candra


Koordinator KPM BBH Kepala Area Tulang Bawang Raya

Anda mungkin juga menyukai