Anda di halaman 1dari 3

Volume

Elemen Area (m2) Panjang (m) Lebar (m) Tebal (m) Jumlah Berat (kg)
(m3)
Wall 7.75 14.4 4 446.4
Bored Pile 0.283 20 96 542.867
Pile Cap 47.79 2 4 382.32
Slab Transfer 133.483 0.4 4 213.5728

Rekap
No Elemen Biaya (Rp)
1 Wall 4,069,110,627
2 Bored Pile #VALUE!
3 Pile Cap #VALUE!
4 Slab Transfer 1,182,093,399
Total 11,019,895,883
Berat
Harga Satuan Asumsi jumlah tulangan
Biaya (Rp) No Elemen Tulangan
(Rp) (kg/m3 beton)
(kg)
1.954.308,69 872,403,399 1 Wall 300 133920
1.954.308,69 #VALUE! 2 Bored Pile 200 108573
1.954.308,69 #VALUE! 3 Pile Cap 150 57348
1.954.308,69 417,387,179 4 Slab Transfer 150 32036
Total 3,097,891,984 Total 331877
Harga Satuan
Pekerjaan
Biaya (Rp)
Kab. Bogor
2020 (Rp)
23,870.28 3,196,707,228
23,870.28 2,591,677,921
23,870.28 1,368,912,531
23,870.28 764,706,220
23,870.28 7,922,003,900