F-E
FORMULIR - 2B Revisi 0
DAFTAR PERHITUNGAN MATERIAL Halaman 1
PEKERJAAN ELEKTRIKAL Tgl. Terbit 22/12/2017
PROJECT: Pembangunan Workshop dan Warehouse Facility
PAMA - BEKB, Kalimantan Timur Kode Project:
BEKB
NO : 029 /XII/PAMA BEKB/2017
NO JENIS MATERIAL VOLUME SAT MERK TYPE QTY UNIT PRICE TOTAL KETERANGAN
WORKSOP SARANA
1 Panel PP-Workshop 1 unit Simetri/Sier 1 unit 11,700,000 11,700,000
R. TRAINING PPD
1 Panel PP-R. Training PPD 1 unit Simetri/Sier 1 unit 11,700,000 11,700,000
POS SECURITY
1 Panel PP Office Pengelola 1 unit Simetri/Sier 1 unit 3,500,000 3,500,000
82,800,000