FORMULIR - 2B Revisi 0
DAFTAR PERHITUNGAN MATERIAL Halaman 1
PEKERJAAN ELEKTRIKAL Tgl. Terbit 22/12/2017
PROJECT: Pembangunan Workshop dan Warehouse Facility
PAMA - BEKB, Kalimantan Timur Kode Project:
BEKB
NO : 029 /XII/PAMA BEKB/2017
NO JENIS MATERIAL VOLUME SAT MERK TYPE QTY UNIT PRICE TOTAL KETERANGAN

PANEL MAIN WORKSHOP


1 Panel SDP-Workshop 1 unit Simetri/Sier 1 unit 31,400,000 31,400,000
2 PP Office Workshop 1 unit Simetri/Sier 1 unit 11,700,000 11,700,000
3 Panel PP UPS 1 unit Simetri/Sier 1 unit 12,800,000 12,800,000

WORKSOP SARANA
1 Panel PP-Workshop 1 unit Simetri/Sier 1 unit 11,700,000 11,700,000

R. TRAINING PPD
1 Panel PP-R. Training PPD 1 unit Simetri/Sier 1 unit 11,700,000 11,700,000

POS SECURITY
1 Panel PP Office Pengelola 1 unit Simetri/Sier 1 unit 3,500,000 3,500,000

82,800,000

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,

Lilik Muflihun M Soewondo Jaja


Direktur Utama Kepala Divisi Engineering