Anda di halaman 1dari 2

Bts Lahan

CATATAN / LEGENDA

Bts Lahan
PANJANG PAGAR = 361.05 M'
LAH Luas area baru = 4.112,41 M2
A
SEL N CADA Luas total rumah dinas = 264 m2
UAS N

PAN
334,6 GAN

RESA
Bts Lahan

3 m2 3.50

Km/W
5.00

4.00
c
2X1
ANK
1.00

ICT
SEPT

2.00

Km/W
1.50 3.75
2.00

Kela
1.25

4.00
11.99

SE

s III
PTICT

1.0

c
0
AN
K 2X
1

1.50
1.50 Kelas
II
Teras
Bts Lahan

Bts Lahan
1.50 Kelas
I
RE

1.25
SAPA

Rum Tera
ah G
N

AH
4.10 uru

(SUD
Teras
9.00

INAH S)
A
6.00
13.80

BEB
s VI
9.00
1.50

9.00

Kela
300

s
Tera
15 15
5.00

+ 140,00

M
9.00
Bts Lahan

A
36.47

ST

120
Bts Lahan

saluran terbuka

140

140
1.50

50 pas. batubata
Rum
1.25

ah
Guru 44
Kelas

20
1.50 + 20,00 30 20 Muka Tanah Rencana
s
Tera

60
0.5000

42
1.50

12
1 .50

- 80,00
1.25

1.50 Muka Tanah asli


s IV

28.0

40
- 120,00
Kela

60
s
Tera

100

Rencana Pagar A Potongan A-A SHOP DRAWING


Skala 1 : 20 Skala 1 : 20 DISETUJUI NAMA TANDA TANGAN
SALURAN DRAINAGE UK.20 X 30
TYPE-1

20 S/D 30 CM
GARIS BATAS LAHAN

plat jalan masuk tebal 10 cm

RENCANA SLOPE = 0,2 % KONSULTAN


Teras
Teras SALURAN DRAINAGE UK.30 X 40
TYPE-2
R.Perpusta 50
kaan PLAT PENUTUP SALURAN TEBAL 12 CM
Kantor Muka Tanah
Rencana

12 30
DIPERIKSA NAMA TANDA TANGAN

0.2
0.2 0.3
20
2.00
Rencana Saluran Drainage type-1 40
Bts Lahan

PENGE TEAM LEADER


3.00

M
SELUA BANGAN
S 174,00
m2 Skala 1 : 20

30 S/D 40 CM
ENGINEER
Bts Lahan

RENCANA SLOPE = 0,2 % KONTRAKTOR

Muka Tanah
Rencana

20 40
DIBUAT NAMA TANDA TANGAN

30
Rencana Saluran Drainage type-2
POJECT Ir.ROBERT SILALAHI
70 MANAGER

Skala 1 : 20 SITE MANAGER ARIPUDDIN, BA


RODA 2

DI GAMBAR AWALUDDIN, S,T

salu
ran PROYEK
umu
m
30 150 30 PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK
60 MAKASSAR s/d PARE PARE

15
"PEKERJAAN JALAN REL KM. 32+600 s/d 36+600
60
RODA 4

100
TIAP 1 M

NO.KONTRAK : TANGGAL :
Pagar Area Sekolah
CT.407

20
Saluran Drainage
NAMA GAMBAR :
Rencana Tampang Gorong-Gorong RENCANA PAGAR AREA SEKOLAH
Skala 1 : 20
DAN RENCANA DRAINAGE
RUMAH

POS
SKALA JUMLAH GAMBAR NOMOR GAMBAR
Kios

Kios

5,00
Tl
CATATAN / LEGENDA

ELEVASI RENCANA

KA
+ 3.400
ELEVASI EXISTING

R
+ 1.875

ALU
AS J
TEMBOK PENAHAN
TANAH TYPE-2

R KA
ELEVASI RENCANA
+ 3.400

JALU
ELEVASI EXISTING
+1.907 30
ELEV.Muka Tanah Rencana + 3.400
ELEVASI RENCANA
+ 3.400

ROW
ELEVASI EXISTING
+ 1.956

105.0
132.5
TANAH MERAH

ELEV.Muka Tanah asli + 2.350

40
27
LIME STONE

50
52
1510
60 URUGAN PASIR
100 COBEL STONE

TEMBOK PENAHAN TANAH TYPE-1 (143,63 m' )


Skala 1 : 10 SHOP DRAWING
DISETUJUI NAMA TANDA TANGAN

ELEVASI RENCANA
+ 3.400 30.0
ELEV.Muka Tanah Rencana + 3.400
ELEVASI EXISTING
+ 2.305

KONSULTAN

144.4

144
172.5
TANAH MERAH
DIPERIKSA NAMA TANDA TANGAN
ELEV.Muka Tanah asli + 1.875

40.0

28.1
TEAM LEADER

50
LIME STONE

1510
TEMBOK PENAHAN
TANAH TYPE-1
ENGINEER
100.0 URUGAN PASIR
100.0 COBEL STONE
ELEVASI RENCANA
+ 3.400 KONTRAKTOR
ELEVASI EXISTING
TEMBOK PENAHAN TANAH TYPE-2
+ 2.350
Skala 1 : 10
DIBUAT NAMA TANDA TANGAN

POJECT
MANAGER

SITE MANAGER

DI GAMBAR
RUMAH

PROYEK
POS

Kios

Kios

Sa Sa
Sb
Tl
Jl

NO.KONTRAK : TANGGAL :
tang

ELEVASI EXISTING
TR melin

+ 3.400
NAMA GAMBAR :
Jl
A1

SKALA JUMLAH GAMBAR NOMOR GAMBAR

Anda mungkin juga menyukai