Tampak Potongan Dan Situasi - Abdul-Model
Tampak Potongan Dan Situasi - Abdul-Model
MATERIAL
KERAMIK MOTIF
BATU ALAM
MATERIAL
KERAMIK MOTIF
BATU ALAM
FINISHING
CAT TEMBOK
120
Parapet +17.40 MESIN Parapet +17.40
100 100 R. MESIN LIFT
120
120
DAK BETON LIFT DAK BETON
+16.20 Lantai R.M.Lift +16.20 +16.20 +16.20 Lantai R.M.Lift +16.20
390
390
K. TIDUR R. SANTAI K. TIDUR UTAMA LOBBY LIFT KM/WC K. TIDUR UTAMA
+12.30 +12.30 +12.30 Lantai 4 +12.30 +12.30 +12.25 +12.30 Lantai 4 +12.30
390
390
R. LABORATORIUM R. LABORATORIUM
PATOLOGI ANATOMI PATOLOGI ANATOMI
R. DOKTER ( 5 SD 6 ORG ) LOBBY LIFT TOILET WANITA ( 5 SD 6 ORG )
+8.40 +8.40 Lantai 3 +8.40 +8.40 +8.35 +8.40 Lantai 3 +8.40
390
390
LAB PARASITOLOGI LAB PARASITOLOGI
KLINIK KLINIK
R. DOKTER (5 SD 6 ORG ) LOBBY LIFT TOILET WANITA (5 SD 6 ORG )
+4.50 +4.50 Lantai 2 +4.50 +4.50 +4.45 +4.50 Lantai 2 +4.50
LIFT
260
30
450
450
300
300
300
LOCKER/R.GANTI
PRIA TOILET PRIA TERAS LOBBY LIFT TOILET WANITA TOILET PRIA
150
±0.00 -0.05 Lantai 1 ±0.00 -0.05 ±0.00 -0.05 -0.05 Lantai 1 ±0.00
200
280
280
PARKIR LOBBY LIFT PARKIR
-2.80 -2.80 -2.80 -2.80 -2.80 PROYEK
300 330 513 177 380 300 1010 470 370 230 350 350 400 342
KLINIK
1400 1770
U T A RA
05. 001. C. 1
TABEL RINCIAN INTENSITAS skala 1:1000
KOEFISIENSI LANTAI BANGUNAN (KLB) 1.37 2 -DIWAJIBKAN MENANAM POHON PELINDUNG SESUAI KEPUTUSAN GUBERNUR DKI JAKARTA NO. 1220/1.823. 8 POTONGAN 1 : 100
TANGGAL 8 JULI 1998
KETINGGIAN BANGUNAN (KB) 4 LANTAI 4 LANTAI -PERATURAN GUB. PROV. DKI JAKARTA NO. 122 TAHUN 2005 TENTANG : PENERAPAN RENCANA INSTALASI AIR S.RESAPAN 1 : 100
LIMBAH DOMESTIK
PARKIR 8 MOBIL 8 MOBIL 1.00 -INSTRUKSI GUBERNUR PROV. DKI JAKARTA NO. 197 TAHUN 2008 TENTANG PERCEPATAN PEMBUATAN LUBANG POT.WATER TRAP 1 : 100
36.20
RESAPAN BIOPORI
35.00
KOEFISIENSI DASAR HIJAU 30.78 % 30 % LUAS KDH= 218.91 M -PERKERASAN HALAMAN/PARKIR DAN JALAN LINGKUNGAN TERBUAT DARI STRUKTUR BAHAN RESAP AIR PAGAR 1 : 100
-DIWAJIBKAN MENYEDIAKAN TEMPAT SAMPAH
KOEFISIENSI TAPAK BASEMENT 42.73% 55 % LUAS KTB= 303.80 M SR -SURAT EDARAN KEPALA BADAN PTSP PROV. DKI JAKARTA NO. 14/SE/2015 TENTANG : PENERBITAN SURAT IZIN RUMAH KOST BARU DAN PERPANJANGAN SITUASI 1 : 1000
20.00
-BANGUNAN YANG TIDAK SESUAI GAMBAR PERENCANAAN ARSITEKTUR HARUS DI BONGKAR OLEH PEMOHON
KEGIATAN LABORATORIUM - HUNIAN & FASILITASNYA -JENIS USAHA / KEGIATAN YANG WAJIB DILENGKAPI DENGAN DOKUMEN LINGKUNGAN DARI PEMPROV DKI
JAKARTA ( SPPL / UKL - UPL / ANDAL )
sUMUR REsAPAN PERENCANA
sKALA 1:100 sITUAsI
PROPORSI PENGGUNAAN RUANG Pagar sKALA 1:1000
1:100
KETERANGAN
KLB BATASAN RENCANA
YANG BELUM DI MANFAATKAN Water Trap
HUNIAN KOMERSIL HUNIAN KOMERSIL
TABEL PERHITUNGAN PINTU LIPAT
1.422.00 M2
497.70 M2 924.30 M2 236.07 M2 739.46 M2 HUNIAN : 261.63 ( 18.40 % ) M2
Plat Beton Pipa VOLUME SUMUR RESAPAN AIR HUJAN PILAR BETON
100% 35 % 65 % 16.60 % 52 % KOMERSIL : 184.84 ( 13.00 % ) M2
Sal. Kota TRALIs BEsI
25 M² LUAS BIDANG. ATAP = 1M³ SRAH
Sumur Resapan Luas Bidang Atap 334.85 M²
50 100
150