GAMMA'91
CV. GAMMA’ 91
DINAS PERUMAHAN KAWASAN ARCHITECCT, PLANNER, CURVEYING, SOIL INVESTIGATION SUPERVISI,
Kolom Praktis
1 Pek. Bekisting, Besi & Beton 132.80 m1 Rp 118,366.05 Rp 15,719,011.44 1.541 - - - - - - -
Subtotal B Rp 88,290,382.27 8.65 0.00 0.00 0.00
NO URAIAN PEKERJAAN VOLUME SAT. HARGA SAT. (Rp.) JUMLAH HARGA (Rp.) BOBOT PRESENTASE
VOLUME BOBOT (%) VOLUME BOBOT (%) PRESENTASE (%) VOLUME BOBOT (%) PRESENTASE (%)
(%)
1 2 3 4 6 7 8 9 10 11
D PEKERJAAN PEMBALOKAN
Balok BL uk - 15x20 cm ; Elev +2,350, + 2,800
1 Pek. Bekisting Balok 33.48 m2 Rp 349,715.00 Rp 11,708,458.20 1.147 - - - - - - -
2 Pek. Pembesian Besi Ulir / Tul Utama 348.82 kg Rp 23,207.00 Rp 8,095,065.74 0.793 - - - - - - -
3 Pek. Pembesian Besi Polos/ Tul Sengkang 52.90 kg Rp 19,584.50 Rp 1,036,020.05 0.102 - - - - - - -
4 Pekerjaan Cor Mutu F'C = 21.7 Mpa (K.250) 2.01 m3 Rp 1,462,386.00 Rp 2,939,395.86 0.288 - - - - - - -
Ikhwanza Syahputra, ST., MT Fahli A.I Pohan, ST Fitriani, ST Salman Alfarisi, ST Henry W Manik, ST
NIP. 19750712 200604 1 011 NIP. 19820321 200502 1 001 NIP. 19780313 201001 2 012 NIP. 19770524 201001 1 017 Team Leader