Amcr BQ Kec PKL
Amcr BQ Kec PKL
1 Pekerja OH 87,500.00
2 Mandor OH 105,000.00
3 Tukang Kayu OH 95,000.00
4 Kepala Tukang Kayu OH 97,500.00
5 Tukang Batu OH 95,000.00
6 Kepala Tukang Batu OH 97,500.00
7 Tukang Besi OH 95,000.00
8 Kepala Tukang Besi OH 97,500.00
9 Tukang Cat OH 95,000.00
10 Kepala Tukang Cat OH 97,500.00
NUR HIDAYAT, SE
DIREKTUR
DAFTAR HARGA SATUAN BAHAN BANGUNAN
Pekerjaan Konstruksi Paket 1 Di Kabupaten Klaten (SMAN 1 Karangdowo dan SMAN 1 Cawas) Dana Alokasi Khusus (DAK) Fisik SMA (26731042)
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)
I BAHAN DASAR
1 BATU KALI
Batu Bulat Utuh m3 190,000.00
Batu Bulat Belah m3 200,000.00
2 KERIKIL
Batu Split Pecah Mesin (2-3 cm) m3 210,000.00
Batu Split Pecah Mesin (2-3 cm) / Berat Jenis = 1450 kg 103.45
3 BATU BATA
Batu Bata 5 x 11 x 22 (20) bh 650.00
4 PASIR
Pasir Urug m3 160,000.00
Pasir Pasang m3 190,000.00
Pasir Beton / Berat Jenis = 1400 kg 135.71
Pasir Batu (Sirtu) m3 190,000.00
7 PORTLAND CEMENT
Portland Cement (PC) 50 kg kg 1,200.00
Semen warna (40 kg) zak 48,000.00
Semen warna kg 1,100.00
II BAHAN PENUTUP ATAP
5 ASBES GELOMBANG
Asbes Gelombang Kecil
Atap bitumen type Onduvilla: 40cm x 106 cm x 0,3mm Lbr 45,000.00
Nok / Ridge Onduline Lbr 35,000.00
III. BAHAN KAYU
7 DOLKEN
Sedang 8 x 10 x 400 cm bt 10,000.00
Bambu btg 5,000.00
9 LOKAL
Papan m3 1,800,000.00
Balok/pesagen m3 2,000,000.00
Kayu Lokal 5/7 m3 2,000,000.00
IV . BAHAN PENUTUP DINDING/LANTAI
5 KERAMIK
Keramik 25/40, warna (bisa untuk dinding) buah 5,500.00
Keramik 25/25, (anti slip) buah 3,500.00
Keramik Lantai Uk. 40cm x 40cm Polished/Unpolished buah 10,000.00
Keramik Dinding Uk. 40cm x 40cm buah 12,500.00
Plint Granit 10 x 60 cm buah 7,500.00
Stepnosing 10x 60 cm buah 7,500.00
VI . BAHAN BESI
1 BESI BETON
Besi beton polos kg 10,000.00
Besi beton ulir kg 10,000.00
3 BESI PROFIL
Besi Profil kg 13,043.48
Besi Baja IWF kg 13,043.48
c HOLLOW GALVANIS LIPAT -
Hollow galvanis uk.3,6/3,6 cm; tebal : 0,3 mm panj : 4 m btg 21,000.00
Hollow galvanis uk.3,6/3,6 cm; tebal : 0,3 mm m' 5,250.00
6 KAWAT
- Ikat beton/bendrat kg -
7 BAHAN ALUMINIUM
Kusen aluminium uk. 4" Brown (ALEXINDO) ALEXINDO m' 95,000.00
Profil Daun Pintu Aluminium Uk. 2,5" silver ALEXINDO m' 110,000.00
Profil Daun Pintu Aluminium Uk. 2,5" Brown ALEXINDO m' 115,000.00
Allumunium Strip m' 55,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)
Dibuat oleh :
KONTRAKTOR PELAKSANA
PT. / CV. ………………………………………….
……………………………………………
Direktur / Direktris
DAFTAR HARGA SATUAN PERALATAN
BIAYA SEWA
No. URAIAN KODE HP KAP. ALAT/JAM di luar
PPN (Rp.)
Dibuat oleh :
KONTRAKTOR PELAKSANA
PT. / CV. ………………………………………….
……………………………………………
Direktur / Direktris
BREAK DOWN PINTU & JENDELA
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN YAYASAN PENDIDIKAN GEOLOGI
KARANGSEMBUNG (JTGRSN22-07)
LOKASI : Dukuh Banjarsari, Desa Karangsambung, Kecamatan Karangsambung,
Kabupaten Kebumen, Provinsi Jawa Tengah
KELOMPOK KERJA (POKJA) : POKJA PEMILIHAN 172 BP2JK WILAYAH JAWA TENGAH
ALAMAT POKJA : JL. Ngesrep Timur V/100, Sumurboto, Banyumanik, Kota Semarang
SUMBER DANA : APBN TA. 2022
WAKTU PELAKSANAAN : 150 HARI KALENDER
PJ1 m2
10,166,746.83
INSTALASI 5.00% 508,337.34
TOTAL HARGA 10,675,084.17
PJ2 m2
5,513,739.45
INSTALASI 5.00% 275,686.97
TOTAL HARGA 5,789,426.42
PJ3 m2
5,313,621.85
INSTALASI 5.00% 265,681.09
TOTAL HARGA 5,579,302.94
P1 m2
P2 m2
P3 pintu Upvc m2
pintu Upvc profil 4,5x8 cm, baja galvanis/ zincal 2.31 m2 1,450,000.00 3,351,240.00
daun pintu pvc board 3,351,240.00
INSTALASI 5.00% 167,562.00
TOTAL HARGA 3,518,802.00
P4 pintu Upvc m2
pintu Upvc profil 4,5x8 cm, baja galvanis/ zincal 1.70 m2 1,450,000.00 2,466,885.00
daun pintu pvc board 2,466,885.00
INSTALASI 5.00% 123,344.25
TOTAL HARGA 2,590,229.25
P8 m2
5,544,608.62
INSTALASI 5.00% 277,230.43
TOTAL HARGA 5,821,839.05
J1 m2
J2 m2
J3 m2
J4 m2
NUR HIDAYAT, SE
DIREKTUR
Page 13
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
A PEKERJAAN BONGKARAN
1 AHSP BIDANG 1.000 m3 Penggalian 1 m3 Tanah Biasa Sedalam s.d. 1 m Untuk Volume s.d. 200 75,075.00
PEK. UMUM (PU) m3 Dalam Satu Lokasi
2 AHSP BIDANG 1.000 m3 Penggalian 1 m3 tanah biasa sedalam s.d. 1 m volume 200 m3 s.d 60,691.40
PEK. UMUM (PU) 2000 m3
3 AHSP BIDANG 1.000 m3 Galian tanah 0 s.d. 2 m' pakai Excavator Standar 17,679.75
PEK. SDA
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
7 AHSP BIDANG 1.000 kg Penulangan 1 kg baja tulangan dengan tulangan polos atau Sirip 13,011.38
PEK. UMUM (PU)
8 AHSP BIDANG 1.000 kg Pemasangan 1 kg Jaring Anyaman Tulangan Tunggal (Wiremesh) M6- 15,455.55
PEK. UMUM (PU) M8
9 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Bekisting untuk Sloof Beton Bangunan Gedung 101,216.50
KARYA
10 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Bekisting untuk Pondasi Telapak 99,841.50
KARYA
11 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Bekisting untuk Kolom Beton Bangunan Gedung 133,328.25
KARYA
12 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Bekisting untuk Balok Beton Bangunan Gedung 142,375.75
KARYA
13 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Bekisting untuk Plat Lantai Beton Bangunan 141,028.25
KARYA Gedung
14 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Bekisting untuk Dinding Beton Bangunan Gedung 155,740.75
KARYA
15 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Bekisting untuk Tangga Beton Bangunan Gedung 134,785.75
KARYA
Page 15
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
16 AHSP BIDANG CIPTA 1.000 m2 Pembuatan 1 m3 Beton Mutu f’c = 7,4 Mpa (K100) 905,121.64
KARYA
17 AHSP BIDANG CIPTA 1.000 m2 Pembuatan 1 m3 Beton Mutu f’c = 9,8 Mpa (K125) 936,928.23
KARYA
18 AHSP BIDANG CIPTA 1.000 m2 Pembuatan 1 m3 Beton Mutu f’c = 14,5 Mpa (K175) 991,411.40
KARYA
19 AHSP BIDANG CIPTA 1.000 m2 Pembuatan 1 m3 Beton Mutu f’c = 19,3 Mpa (K225) 1,040,738.55
KARYA
20 AHSP BIDANG CIPTA 1.000 m2 Pembuatan 1 m3 Beton Mutu f’c = 21,7 Mpa (K250) 1,055,256.80
KARYA
21 AHSP BIDANG CIPTA 1.000 m2 Pembuatan 1 m3 Beton Mutu f’c = 24,0 Mpa (K275) 1,080,375.21
KARYA
22 AHSP BIDANG CIPTA 1.000 m2 Pembuatan 1 m3 Beton Mutu f’c = 26,4 Mpa (K300) 1,088,123.23
KARYA
23 AHSP BIDANG 1.000 m2 1 m³ Pengecoran Beton menggunakan Ready Mixed dan pompa beton 1,218,222.50
PEK. UMUM (PU) K450
24 AHSP BIDANG 1.000 m2 1 m³ Pengecoran Beton menggunakan Ready Mixed dan pompa beton 1,094,802.50
PEK. UMUM (PU) K300
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
1 AHSP BIDANG CIPTA 1.000 m3 Pemasangan 1 m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas I,II 6,314,110.00
KARYA dan III Bentang Sampai Dengan 6 Meter
2 AHSP BIDANG CIPTA 1.000 m3 Pemasangan 1 m3 Konstruksi Gordeng, Kayu kelas II 6,399,030.00
KARYA
3 AHSP BIDANG CIPTA 1.000 kg Pembuatan 1 kg Baja Profil (iwf, pipa, plat, dll) 24,530.00
KARYA
4 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai 181,474.70
KARYA Dingin) profil C75
5 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Rangka Atap Genteng Beton, Kayu kelas II (USUK 112,750.00
KARYA & RENG)
6 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Rangka Atap Genteng Beton, Baja Ringan (USUK & 96,525.00
KARYA RENG)
7 AHSP BIDANG CIPTA 1.000 m2 Pemasangan1 m2 Atap Genteng Kodok Glazuur 216,557.00
KARYA
8 AHSP BIDANG CIPTA 1.000 m2 Pemasangan kembali 1 m2 Atap Genteng Kodok Glazuur 24,050.75
KARYA
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
9 AHSP PERMEN PUPR 1.000 m2 Pemasangan atap Galvalume Spandek Pasir (Tanpa Rangka) 187,825.00
28 2016
10 AHSP PERMEN PUPR 1.000 m2 Pemasangan atap Genteng Metal Pasir (Tanpa Rangka) 100,650.00
28 2016
11 AHSP PERMEN PUPR 1.000 m2 Pemasangan atap UPVC (Tanpa Rangka) 239,800.00
28 2016
13 AHSP BIDANG CIPTA 1.000 m' Pemasangan 1 m’ Nok/Bubung Genteng Metal 93,051.75
KARYA
15 AHSP BIDANG CIPTA 1.000 m' Pemasangan Talang Datar/Jurai , Seng BJLS 30 Lebar 90 cm 150,455.25
KARYA
D PEKERJAAN PLAFON
1 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, Modul 60 104,695.25
KARYA x 60 cm, untuk Plafon GRC
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
2 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, Modul 60 73,551.50
KARYA x 120 cm, untuk Plafon Gypsum
3 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, Modul 60 x 114,251.50
KARYA 60 cm, untuk Partisi
4 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Langit-Langit Papan Gipsum, Tebal 9 mm 39,120.95
KARYA
5 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Langit-Langit Papan GRC, Tebal 6 mm 41,923.75
KARYA
7 AN. ACP 1.0000 m2 Memasang Aluminium Composite Panel (ACP) rangka besi hollow 40. 770,470.25
A TENAGA 49,427.50
E PEKERJAAN PASANGAN
1 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal ½ Batu 110,512.60
KARYA dengan Campuran 1SP : 5PP)
2 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal 1 Batu 227,282.00
KARYA dengan Campuran 1SP : 5PP)
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
2 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal ½ Batu 115,658.40
KARYA dengan Campuran 1SP : 3PP)
5 AHSP BIDANG 1.000 m2 Pemasangan 1 m’ Plesteran Skoning 1SP : 3PP Lebar 10 cm 67,281.20
PEK. UMUM (PU)
6 AHSP BIDANG 1.000 m2 Plesteran tebal 1 cm, dengan mortar (setara 1 PC : 3 PP) 43,090.22
PEK. UMUM (PU)
7 AHSP BIDANG 1.000 m2 Plesteran tebal 1 cm, dengan mortar (setara 1 PC : 5 PP) 38,313.58
PEK. UMUM (PU)
10 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Dinding Bata Ringan Tebal 10cm dengan Mortar 130,757.99
KARYA Siap Pakai
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
11 AHSP PERMEN PUPR 1.000 m2 Pemasangan 1 m3 Batu Kosong (Aanstamping) untuk Pondasi Gedung 466,661.25
28 2016
12 AHSP PERMEN PUPR 1.000 m3 Pemasangan Pondasi Batu Belah 1SP : 5 PP 725,925.75
28 2016
13 AHSP PERMEN PUPR 1.000 m' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 58,248.28
28
14 AHSP PERMEN PUPR 1.000 m' Membuat Ring Balok Beton Bertulang (10 x 15) cm 98,804.75
28 2016
15 AHSP BIDANG CIPTA 1.000 m2 Memasang Bekisting untuk Kolom Praktis (asumsi 2x pakai) 94,792.50
KARYA
1 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1m2 Lantai Keramik Ukuran 30 s.d. <40cm 210,581.25
KARYA
2 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Dinding Keramik 20cm x 20cm 242,396.55
KARYA
3 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1m2 Lantai Ubin Granit Ukuran 40cm x 40cm 343,037.75
KARYA
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
4 AHSP BIDANG CIPTA 1.000 m Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 60 s.d. <70cm 54,863.05
KARYA (SUB Keramik/Granit)
5 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1m2 Lantai All Variant (SUB Keramik Tile) 139,647.75
KARYA
6 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1m2 Dinding All Variant (SUB Keramik Tile) 154,662.75
KARYA
7 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 60cm x60cm 238,115.78
KARYA (SUB Granit Tile)
8 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Lantai Vynil Ukuran 30cm x 30cm 428,782.75
KARYA
9 AHSP BIDANG CIPTA 1.000 m2 Pemasangan 1 m2 Paving Block (Blok Beton) Natural tebal 6cm-8cm 208,696.40
KARYA
1 AHSP BIDANG CIPTA 1.000 m3 Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela, 6,284,850.00
KARYA Kayu Kelas II atau III
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
2 AHSP BIDANG CIPTA 1.000 m' Pemasangan Kusen Pintu Allumunium 112,460.98
KARYA
3 AHSP BIDANG CIPTA 1.000 m' Pemasangan Rangka Jendela Allumunium 103,385.98
KARYA
5 AHSP BIDANG CIPTA 1.000 m2 Pemasangan Pintu Kaca Bening 5mm Rangka Allumunium 522,021.50
KARYA
6 AHSP BIDANG CIPTA 1.000 m2 Pemasangan Pintu Kaca Warna 5mm Rangka Allumunium 570,421.50
KARYA
H PEKERJAAN PENGECATAN
1 AHSP BIDANG 1.000 m2 Pengecatan 1 m2 Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat 25,863.75
PEK. UMUM (PU) Penutup)
2 AHSP BIDANG 1.000 m2 Pengecatan 1 m2 Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 23,060.68
PEK. UMUM (PU) Lapis Cat Penutup) INTERIOR
3 AHSP BIDANG 1.000 m2 Pengecatan 1 m2 Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 21,058.68
PEK. UMUM (PU) Lapis Cat Penutup) PLAFON
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
4 AHSP BIDANG 1.000 m2 Pengecatan 1 m2 Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 28,780.68
PEK. UMUM (PU) Lapis Cat Penutup) EXTERIOR
5 AHSP BIDANG 1.000 m2 Pengecatan Genteng 1 m2 (1 Lapis Cat Dasar, 2 Lapis Cat 30,813.75
PEK. UMUM (PU) Penutup)
6 AHSP BIDANG 1.000 m2 Pengecatan bidang baja ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 41,365.50
PEK. UMUM (PU)
I PEKERJAAN ELEKTRIKAL
1 AHSP BIDANG CIPTA 1.000 ttk Pemasangan 1 Buah Titik Lampu 226,600.00
KARYA
2 AHSP BIDANG CIPTA 1.000 ttk Pemasangan 1 Buah Titik Stop Kontak 220,000.00
KARYA
8 AN. KBL.1 1.0000 m Instalasi Kabel NYY 4 X 4mm2 + NYA 4mm 69,053.60
Page 24
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
9 AN. KBL.1 1.0000 m Instalasi Kabel NYY 4 X 6mm2 + NYA 4mm 80,603.60
SNI ( Revisi ) 6.8.2 A TENAGA 7,651.00
12 AN. KBL.1 1.0000 m Instalasi Kabel NYY 4 x 70 mm2 + E-NYA 35 mm2 535,096.10
SNI ( Revisi ) 6.8.2 A TENAGA 7,651.00
16 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 Buah ROR \/ Heat Detector 3 Watt 163,350.00
KARYA
17 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 Buah Alarm Bell, SSM 405,350.00
KARYA
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
19 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 Buah Manual Push Button M 500 K 320,650.00
KARYA
J PEKERJAAN MEKANIKAL
5 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 buah Bak Cuci Piring Stainlessteel 473,687.50
KARYA
6 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 buah Kran Diameter ½” atau ¾ ” 185,130.00
KARYA
6 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 buah Stop Kran / Ball Valce PVC 196,130.00
KARYA
Page 26
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
8 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 m’ Pipa PVC tipe AW Diameter ½” 19,519.50
KARYA
9 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 m’ Pipa PVC tipe AW Diameter ¾ ” 21,301.50
KARYA
10 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 m’ Pipa PVC tipe AW Diameter 1” 28,429.50
KARYA
11 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 m’ Pipa PVC tipe AW Diameter 1½” 42,644.25
KARYA
12 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 m’ Pipa PVC tipe AW Diameter 2” 51,554.25
KARYA
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
13 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 m’ Pipa PVC tipe AW Diameter 3” 77,273.63
KARYA
14 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 m’ Pipa PVC tipe AW Diameter 4” 112,913.63
KARYA
15 AHSP BIDANG CIPTA 1.000 bh Pemasangan 1 m’ Pipa PVC tipe AW Diameter 6” 157,463.63
KARYA
16 AHSP BIDANG PEK. 1.000 m Pengeboran sumur dangkal Ø 4", pada Tanah Keras/Cadas Drill_Rig- 426,761.67
SDA WaterW. Tractor; 60 HP, 100 m'
17 AHSP BIDANG PEK. 1.000 m Pemasangan 1 m' Casing Sumur Bor Air Tanah Dangkal GIP ∅ 4" 202,703.74
SDA
18 AHSP BIDANG PEK. 1.000 m Pengeboran sumur dangkal Ø 6", pada Tanah Keras/Cadas Drill_Rig- 627,599.13
SDA WaterW. Tractor; 60 HP, 100 m'
19 AHSP BIDANG PEK. 1.000 m Pemasangan 1 m' Casing Sumur Bor Air Tanah Dangkal GIP ∅ 6" 266,888.74
SDA
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
K PEKERJAAN PERSIAPAN
Page 29
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN JUMLAH
BAHAN/UPAH
1 AHSP BIDANG 1.000 m' Pembuatan 1m Pagar Proyek Sementara Tinggi 2,00 m 187,330.00
PEK. UMUM (PU)
2 AHSP BIDANG 1.000 m2 Pembuatan 1 m2 Kantor Sementara/Rumah Jaga/Gudang Semen dan 860,178.00
PEK. UMUM (PU) Peralatan Lantai Plesteran (Tanpa Dinding 1/2 Tembok) (SEWA)
NUR HIDAYAT, SE
DIREKTUR
Page 30
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN
(LANJUTAN)
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
KELOMPOK KERJA (POKJA) : (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN (LANJUTAN)
: JL. Mataram No 1 Kota Pekalongan Jawa Tengah
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
PEKERJAAN PENYEMPURNAAN LANTAI 1 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PERSIAPAN 0.00 0.00 0.00 0.00 0.00
Pek. Uitzet Dan Pengukuran ls 1.00 500,000.00 11.00 55,000.00 555,000.00
Pek. Papan Nama Proyek ls 1.00 200,000.00 11.00 22,000.00 222,000.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN TANAH 0.00 0.00 0.00 0.00 0.00
Pek. Galian tanah biasa 1 m m3 2.74 75,075.00 11.00 22,627.61 228,333.11
Pek. Urugan tanah kembali bekas galian m3 0.68 25,025.00 11.00 1,871.87 18,888.87
Pek. Pasir bawah pondasi m3 0.40 320,430.00 11.00 14,098.92 142,270.92
Pek. Pasir bawah lantai m3 4.24 320,430.00 11.00 149,448.55 1,508,071.75
Pek. Urugan tanah baru padat m3 3.16 238,150.00 11.00 82,780.94 835,334.94
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PONDASI 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan batu kosong (anstamping) m3 3.99 466,661.25 11.00 204,817.62 2,066,796.01
Pek. Pas. Batu kali 1ps 6 pp m3 1.20 725,925.75 11.00 95,822.20 966,933.10
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1 0.00 0.00 0.00 0.00 0.00
Pek. Pas.batu bata merah 1ps 6 pp tebal 1\/2 bata m2 28.20 110,512.60 11.00 342,810.09 3,459,265.41
Pek. Pasangan Plesteran 1 Pc 6 pp m2 54.28 62,456.13 11.00 372,913.06 3,763,031.80
Pek. Acian m2 54.28 26,592.50 11.00 158,778.50 1,602,219.40
Rooster 20x20 buah 8.00 15,000.00 11.00 13,200.00 133,200.00
Glasblock 20x20 buah 8.00 25,000.00 11.00 22,000.00 222,000.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PINTU TOILET 0.00 0.00 0.00 0.00 0.00
Pek. Pasang Pintu KM Alumunium buah 2.00 850,000.00 11.00 187,000.00 1,887,000.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN BETON 0.00 0.00 0.00 0.00 0.00
Pek. Beton Bertulang Ringbalok 12\/18 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 2.39 142,375.75 11.00 37,430.58 377,708.63
Pembesian kg 57.90 13,011.38 11.00 82,869.46 836,228.22
Beton Cor (Mutu beton K-175) m3 0.25 991,411.40 11.00 27,263.81 275,116.66
Pek. Beton Bertulang Sloof 12\/18 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 2.87 101,216.50 11.00 31,954.05 322,445.40
Pembesian kg 56.70 13,011.38 11.00 81,151.96 818,897.07
Beton Cor (Mutu beton K-175) m3 0.25 991,411.40 11.00 27,263.81 275,116.66
Plat beton toilet tebal 10 cm 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 9.41 141,028.25 11.00 145,978.34 1,473,054.17
Pembesian kg 142.39 13,011.38 11.00 203,795.90 2,056,485.95
Beton Cor (Mutu beton K-175) m3 1.34 991,411.40 11.00 146,134.04 1,474,625.32
Kolom 15\/15 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 5.04 133,328.25 11.00 73,917.18 745,891.56
Pembesian kg 24.48 13,011.38 11.00 35,037.04 353,555.56
Beton Cor (Mutu beton K-175) m3 0.27 991,411.40 11.00 29,444.92 297,126.00
Lantai Beton Rabat bawah lantai toilet fc=7,4 Mpa m3 4.46 905,121.64 11.00 444,052.68 4,480,895.21
Lantai Beton Rabat Garasi fc=7,4 Mpa tebal 4 cm m3 4.93 905,121.64 11.00 490,847.47 4,953,097.17
Lantai Beton Utara Aula fc=7,4 Mpa tebal 6 cm m3 3.90 905,121.64 11.00 388,297.18 3,918,271.59
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN KERAMIK 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan Keramik 60 x 60 cm Motif ex.platinum m2 106.78 139,647.75 11.00 1,640,274.54 16,551,861.29
Pek. Dinding keramik motif warna 25x40 ASIA TILE (Toiletm2 12.82 154,662.75 11.00 218,105.41 2,200,881.87
Pek. Lantai keramik motif warna 25x25 ASIA TILE (Toilet)m2 6.86 139,647.75 11.00 105,378.19 1,063,361.76
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN INSTALASI LISTRIK 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan instalasi listrik titik lampu kabel NYM 2X2 titik 4.00 226,600.00 11.00 99,704.00 1,006,104.00
Pek. Lampu Panel LED Downlight (18 watt putih),Panasonbh 2.00 175,000.00 11.00 38,500.00 388,500.00
Pek. Pasangan saklar Tunggal bh 2.00 26,620.00 11.00 5,856.40 59,096.40
Sub Total 0.00 0.00 0.00 0.00 0.00
Page 31
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN
(LANJUTAN)
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
KELOMPOK KERJA (POKJA) : (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN (LANJUTAN)
: JL. Mataram No 1 Kota Pekalongan Jawa Tengah
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
PEKERJAAN SANITASI 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 566,545.95 11.00 62,320.05 628,866.01
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,777,627.50 11.00 195,539.03 1,973,166.53
Pek. Pasang Kran dapur (leher angsa) Stainless steel bh 1.00 658,817.50 11.00 72,469.93 731,287.43
Pek. Pasang Meja Dapur Portable + Bak cuci Stainles stelunit 1.00 1,500,000.00 11.00 165,000.00 1,665,000.00
Pek. Pasangan kran air dia.3\/4 bh 2.00 185,130.00 11.00 40,728.60 410,988.60
Pek. Pasangan floor drain bh 2.00 150,562.50 11.00 33,123.75 334,248.75
Pek. Pasangan pipa PVC AW dia.4 m 15.00 112,913.63 11.00 186,307.48 1,880,011.86
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 21,301.50 11.00 35,147.48 354,669.98
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 1,895,052.50 11.00 833,823.10 8,414,033.10
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PENGECATAN 0.00 0.00 0.00 0.00 0.00
Pekerjaan Pengecatan tembok lantai 1 (Exsisting) m2 240.89 25,863.75 11.00 685,335.06 6,915,653.80
Pekerjaan Pengecatan tembok Toilet m2 54.28 23,060.68 11.00 137,690.68 1,389,424.12
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN LAIN LAIN 0.00 0.00 0.00 0.00 0.00
Tulisan KECAMATAN PEKALONGAN TIMUR KOTA PEKALON unit 1.00 1,500,000.00 11.00 165,000.00 1,665,000.00
Pemasangan Partisi Rangka Metal stud untuk Ruang Frontm2 11.47 114,251.50 11.00 144,151.12 1,454,615.82
Pemasangan Partisi Plywood tebal 9 mm Uk.120x240 Lapm2 11.47 195,000.00 11.00 246,031.50 2,482,681.50
Pemasangan Partisi Rangka Metal stud untuk Ruang Rapa m2 13.86 114,251.50 11.00 174,187.84 1,757,713.63
Pemasangan Partisi Plywood tebal 9 mm Uk.120x240 Lapm2 13.86 195,000.00 11.00 297,297.00 2,999,997.00
Sub Total 0.00 0.00 0.00 0.00 0.00
TOTAL A 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PEMBANGUNAN LANTAI 2 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 2 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan batu bata 1 6 m2 553.82 110,512.60 11.00 6,732,449.69 67,936,537.83
Pek. Plesteran 1 6 m2 1,107.63 62,456.13 11.00 7,609,611.16 76,787,894.43
Pek. Acian m2 1,107.63 26,592.50 11.00 3,240,011.59 32,694,662.36
Pek. Sponengan m 167.20 12,500.00 11.00 229,900.00 2,319,900.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC 0.00 0.00 0.00 0.00 0.00
Pek. Pintu Panel Type P1.a Unit 2.00 2,436,000.00 11.00 535,920.00 5,407,920.00
Pek. Pintu Kupu Tarung Type P2.b Unit 4.00 6,409,000.00 11.00 2,819,960.00 28,455,960.00
Pek. Pintu Kupu Tarung Type P2.c Unit 4.00 5,278,000.00 11.00 2,322,320.00 23,434,320.00
Pek. Jendela Type J3 Unit 16.00 7,653,100.00 11.00 13,469,456.00 135,919,056.00
Pek. Bouven Type BV1 Unit 4.00 580,000.00 11.00 255,200.00 2,575,200.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN BETON 0.00 0.00 0.00 0.00 0.00
Pek. Beton Bertulang Kolom Praktis 15 x 15 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 7.56 133,328.25 11.00 110,875.77 1,118,837.34
Pembesian kg 136.39 13,011.38 11.00 195,208.40 1,969,830.17
Beton Cor (Mutu beton K-175) m3 0.81 991,411.40 11.00 88,334.76 891,377.99
Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,3 m 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 143.36 133,328.25 11.00 2,102,533.17 21,216,471.09
Pembesian kg 2,430.36 13,011.38 11.00 3,478,456.46 35,100,787.88
Beton Cor (Mutu beton K-225) m3 20.48 1,040,738.55 11.00 2,344,575.80 23,658,901.26
Pek. Beton Bertulang Kolom Teras 40 x 30 T = 4,1 m 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 28.49 133,328.25 11.00 417,837.40 4,216,359.25
Pembesian kg 672.04 13,011.38 11.00 961,858.27 9,706,024.41
Beton Cor (Mutu beton K-225) m3 4.44 1,040,738.55 11.00 508,296.71 5,129,175.86
Pek. Beton Bertulang Balok 25\/40 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 68.04 142,375.75 11.00 1,065,597.06 10,752,843.09
Pembesian kg 1,793.10 13,011.38 11.00 2,566,377.11 25,897,078.10
Beton Cor (Mutu beton K-225) m3 12.15 1,040,738.55 11.00 1,390,947.07 14,035,920.42
Pek. Beton Bertulang Balok 20\/30 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 62.72 142,375.75 11.00 982,278.77 9,912,085.81
Pembesian kg 1,641.10 13,011.38 11.00 2,348,826.88 23,701,798.49
Page 32
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN
(LANJUTAN)
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
KELOMPOK KERJA (POKJA) : (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN (LANJUTAN)
: JL. Mataram No 1 Kota Pekalongan Jawa Tengah
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
Beton Cor (Mutu beton K-225) m3 6.72 1,040,738.55 11.00 769,313.93 7,763,076.97
Pek. Beton Bertulang Ring Balok 12\/18 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 2.02 142,375.75 11.00 31,635.89 319,234.91
Pembesian kg 39.79 13,011.38 11.00 56,949.50 574,672.21
Beton Cor (Mutu beton K-175) m3 0.17 991,411.40 11.00 18,539.39 187,079.33
Pek. Beton Bertulang Balok Latiu 12\/15 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 29.02 142,375.75 11.00 454,491.87 4,586,236.13
Pembesian kg 389.54 13,011.38 11.00 557,529.72 5,625,981.71
Beton Cor (Mutu beton K-175) m3 1.78 991,411.40 11.00 194,118.35 1,958,830.65
Pek. Beton Bertulang Balok Balustred 15\/15 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 7.22 142,375.75 11.00 113,074.82 1,141,027.74
Pembesian kg 133.95 13,011.38 11.00 191,716.14 1,934,590.16
Beton Cor (Mutu beton K-175) m3 0.77 991,411.40 11.00 83,972.55 847,359.33
Balok Konsul Aula Lantai 2 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 4.80 142,375.75 11.00 75,174.40 758,578.00
Pembesian kg 101.45 13,011.38 11.00 145,200.47 1,465,204.71
Beton Cor (Mutu beton K-225) m3 0.69 991,411.40 11.00 75,248.13 759,321.99
Plat Topi - Topi tbl. 10 cm Selasar 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 15.43 141,028.25 11.00 239,367.25 2,415,433.15
Pembesian kg 336.60 13,011.38 11.00 481,759.26 4,861,388.93
Beton Cor (Mutu beton K-175) m3 2.77 991,411.40 11.00 302,083.06 3,048,292.65
Plat Topi - Topi tbl. 10 cm Jendela Bouven 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 10.68 141,028.25 11.00 165,679.99 1,671,861.70
Pembesian kg 232.97 13,011.38 11.00 333,438.67 3,364,699.28
Beton Cor (Mutu beton K-175) m3 1.92 991,411.40 11.00 209,386.09 2,112,895.99
Pek. Bertulang Plat beton Tebal 12 cm 0.00 0.00 0.00 0.00 0.00
Bondex 0,75 m2 127.05 141,028.25 11.00 1,970,940.31 19,888,579.47
Pembesian kg 1,197.92 13,011.38 11.00 1,714,524.83 17,301,114.16
Beton Cor (Mutu beton K-225) m3 17.23 991,411.40 11.00 1,879,022.04 18,961,040.54
Pek. Plat beton selasar lantai 2 Tebal 12 cm (Dudukan water tank) 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 3.68 141,028.25 11.00 57,088.24 576,072.20
Pembesian kg 77.25 13,011.38 11.00 110,564.18 1,115,693.09
Beton Cor (Mutu beton K-225) m3 0.75 991,411.40 11.00 81,791.44 825,349.99
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN LANTAI KERAMIK 0.00 0.00 0.00 0.00 0.00
Pek. Lantai Keramik Motif ukuran 25x25 ASIA TILE (Toiletm2 11.84 139,647.75 11.00 181,877.23 1,835,306.59
Pek. Dinding Keramik Motif ukuran 25x40 ASIA TILE (Toilem2 13.68 154,662.75 11.00 232,736.51 2,348,522.93
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00 0.00 0.00 0.00 0.00
Pasang IWF 250.125.6.9 mm (Finishing Menie Besi) kg 710.00 24,530.00 11.00 1,915,793.00 19,332,093.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 24,530.00 11.00 12,421,219.31 125,341,394.81
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 24,530.00 11.00 3,979,398.87 40,155,752.27
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m (Jurai Luarkg 1,150.84 24,530.00 11.00 3,105,311.57 31,335,416.77
Besi C 75 Tebal 1.00 mm double m1 674.60 42,500.00 11.00 3,153,755.00 31,824,255.00
Plat Landas\u00A0(base plate) 10 mm kg 131.06 24,530.00 11.00 353,639.20 3,568,541.00
Plat Buhul 8 mm kg 204.00 24,530.00 11.00 550,453.20 5,554,573.20
Pasang kait angin 12 mm kg 144.74 13,011.38 11.00 207,159.35 2,090,426.13
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 2,500.00 11.00 178,200.00 1,798,200.00
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70.7 mm) buah 1,872.00 2,500.00 11.00 514,800.00 5,194,800.00
Angkur diameter 19 mm panjang 40 cm kg 131.21 13,011.38 11.00 187,794.51 1,895,017.35
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 250.00 11.00 111,375.00 1,123,875.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 dan R m2 663.30 96,525.00 11.00 7,042,753.58 71,067,786.08
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 100,650.00 11.00 7,343,725.95 74,104,870.95
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 93,051.75 11.00 696,027.09 7,023,546.09
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 50,000.00 11.00 780,450.00 7,875,450.00
Pek. Memasang Lisplank WOODPLANK elephant.ukuran m 101.00 25,000.00 11.00 277,750.00 2,802,750.00
Sub Total 0.00 0.00 0.00 0.00 0.00
Page 33
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN
(LANJUTAN)
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
KELOMPOK KERJA (POKJA) : (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN (LANJUTAN)
: JL. Mataram No 1 Kota Pekalongan Jawa Tengah
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
PEKERJAAN INSTALASI LISTRIK 0.00 0.00 0.00 0.00 0.00
Pek. Penangkal petir konvensional (split, arde BC dan assunit 2.00 1,500,000.00 11.00 330,000.00 3,330,000.00
Pek. Stop Kontak bh 17.00 26,620.00 11.00 49,779.40 502,319.40
Pek. Stop Kontak AC bh 11.00 85,000.00 11.00 102,850.00 1,037,850.00
Pek. Saklar Tunggal bh 4.00 26,620.00 11.00 11,712.80 118,192.80
Pek. Saklar Ganda bh 7.00 26,620.00 11.00 20,497.40 206,837.40
Pek. Lampu Panel LED Downlight (18 watt putih),Panasonbh 28.00 175,000.00 11.00 539,000.00 5,439,000.00
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 225,000.00 11.00 495,000.00 4,995,000.00
Pek. Instalasi listrik lampu dan stop kontak NYM Eterna + ttk 65.00 226,600.00 11.00 1,620,190.00 16,349,190.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASES 0.00 0.00 0.00 0.00 0.00
Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel Kontro unit 1.00 1,500,000.00 11.00 165,000.00 1,665,000.00
Pekerjaan Pasang MCB 6A\/5KA bh 6.00 65,000.00 11.00 42,900.00 432,900.00
Pekerjaan Pasang MCB 10A\/5KA bh 10.00 65,000.00 11.00 71,500.00 721,500.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 395,000.00 11.00 43,450.00 438,450.00
Pekerjaan Pasang Pilot Lamp bh 3.00 139,150.00 11.00 45,919.50 463,369.50
Pekerjaan Pasang Volt Meter bh 1.00 85,000.00 11.00 9,350.00 94,350.00
Pekerjaan Pasang Petanahan bh 1.00 750,000.00 11.00 82,500.00 832,500.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN SDP 0.00 0.00 0.00 0.00 0.00
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrolunit 1.00 1,000,000.00 11.00 110,000.00 1,110,000.00
Pekerjaan Pasang MCB 20A\/5KA bh 2.00 65,000.00 11.00 14,300.00 144,300.00
Pekerjaan Pasang MCCB 20A\/10KA 3Phase bh 2.00 395,000.00 11.00 86,900.00 876,900.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 2.00 395,000.00 11.00 86,900.00 876,900.00
Pekerjaan Pasang Pilot Lamp bh 3.00 139,150.00 11.00 45,919.50 463,369.50
Pekerjaan Pasang Volt Meter bh 1.00 85,000.00 11.00 9,350.00 94,350.00
Pekerjaan Pasang Petanahan bh 1.00 750,000.00 11.00 82,500.00 832,500.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PANEL AC LANTAI 2 0.00 0.00 0.00 0.00 0.00
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrolunit 1.00 0.00 11.00 0.00 0.00
Pekerjaan Pasang MCB 20A\/10KA bh 11.00 65,000.00 11.00 78,650.00 793,650.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 395,000.00 11.00 43,450.00 438,450.00
Pekerjaan Pasang Pilot Lamp bh 3.00 139,150.00 11.00 45,919.50 463,369.50
Pekerjaan Pasang Volt Meter bh 1.00 85,000.00 11.00 9,350.00 94,350.00
Pekerjaan Intaslasi AC bh 11.00 350,000.00 11.00 423,500.00 4,273,500.00
Pekerjaan Pasang Petanahan bh 1.00 750,000.00 11.00 82,500.00 832,500.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN SANITASI 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 566,545.95 11.00 62,320.05 628,866.01
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,777,627.50 11.00 195,539.03 1,973,166.53
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 185,130.00 11.00 81,457.20 821,977.20
Pek. Pasangan floor drain stainlesstell bh 2.00 150,562.50 11.00 33,123.75 334,248.75
Pek. Pasangan pipa PVC AW dia.4 m 20.00 112,913.63 11.00 248,409.98 2,506,682.48
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 21,301.50 11.00 58,579.13 591,116.63
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 1,895,052.50 11.00 416,911.55 4,207,016.55
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PENGECATAN 0.00 0.00 0.00 0.00 0.00
Pengecatan tembok interior ex.catylac m2 1,014.80 23,060.68 11.00 2,574,217.03 25,976,190.02
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN LAIN-LAIN 0.00 0.00 0.00 0.00 0.00
Pemasangan Partisi Rangka Metal stud m2 34.65 114,251.50 11.00 435,469.59 4,394,284.07
Pemasangan Partisi Gypsum Board tebal 9 mm Uk.120x2m2 69.30 58,681.43 11.00 447,328.50 4,513,951.26
Sub Total 0.00 0.00 0.00 0.00 0.00
TOTAL B 0.00 0.00 0.00 0.00 0.00
PEKERJAAN GEDUNG PENDOPO 0.00 0.00 0.00 0.00 0.00
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 0.00 0.00 0.00 0.00 0.00
PEKERJAAN TANAH 0.00 0.00 0.00 0.00 0.00
Page 34
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN
(LANJUTAN)
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
KELOMPOK KERJA (POKJA) : (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN (LANJUTAN)
: JL. Mataram No 1 Kota Pekalongan Jawa Tengah
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
Pek. Galian tanah biasa sedalam 1 m m3 1.66 75,075.00 11.00 13,708.70 138,333.20
Pek. Pengurugan tanah kembali bekas galian m3 0.42 25,025.00 11.00 1,156.16 11,666.66
Pek. Pengurugan Sirtu padat kelas A m3 17.64 238,150.00 11.00 462,106.26 4,663,072.26
Pek. Urugan pasir bawah lantai dan teras keliling m3 13.82 320,430.00 11.00 487,117.69 4,915,460.29
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PONDASI 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan pondasi batu kosong\/ Aanstamping m3 1.26 466,661.25 11.00 64,679.25 652,672.42
Pek. Pasangan pondasi batu kali 16 m3 1.00 725,925.75 11.00 79,851.83 805,777.58
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN BETON 0.00 0.00 0.00 0.00 0.00
Pek. Sloof 15\/20 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 3.60 101,216.50 11.00 40,081.73 404,461.13
Pembesian kg 36.47 13,011.38 11.00 52,197.74 526,722.68
Beton K.175 m3 0.27 991,411.40 11.00 29,444.92 297,126.00
Pek. Kolom 30\/30 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 60.48 133,328.25 11.00 887,006.18 8,950,698.74
Pembesian kg 254.32 13,011.38 11.00 363,995.89 3,673,049.41
Beton K.225 m3 6.48 1,040,738.55 11.00 741,838.44 7,485,824.23
Pek. Kolom Praktis 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 5.29 133,328.25 11.00 77,583.71 782,890.15
Pembesian kg 95.47 13,011.38 11.00 136,641.58 1,378,837.79
Beton K.175 m3 0.57 991,411.40 11.00 62,161.50 627,266.00
Pek. Balok DudukanTalang 20\/30 (B4) 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 12.74 142,375.75 11.00 199,525.38 2,013,392.43
Pembesian kg 305.06 13,011.38 11.00 436,617.59 4,405,868.41
Beton K.225 m3 2.73 1,040,738.55 11.00 312,533.79 3,153,750.02
Pek. Balok Aula 20\/25 (B1) 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 31.36 142,375.75 11.00 491,139.39 4,956,042.91
Pembesian kg 412.25 13,011.38 11.00 590,033.44 5,953,973.82
Beton K.225 m3 3.20 1,040,738.55 11.00 366,339.97 3,696,703.32
Pek. Balok Gapura 15\/20 (B3) 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 4.89 142,375.75 11.00 76,583.92 772,801.33
Pembesian kg 67.55 13,011.38 11.00 96,681.04 975,599.59
Beton K.175 m3 0.32 991,411.40 11.00 34,897.68 352,149.33
Pek. Balok Teki-teki 15\/20 (B3) 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 11.95 142,375.75 11.00 187,152.92 1,888,543.14
Pembesian kg 235.77 13,011.38 11.00 337,446.17 3,405,138.65
Beton K.175 m3 1.02 991,411.40 11.00 111,236.36 1,122,475.99
Pek. Balok Aula 20\/35 (B2) 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 13.23 142,375.75 11.00 207,199.43 2,090,830.60
Pembesian kg 418.04 13,011.38 11.00 598,320.39 6,037,596.64
Beton K.225 m3 1.47 1,040,738.55 11.00 168,287.42 1,698,173.09
Pek. Balok Konsul Pendopo Bawah Talang 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 4.50 142,375.75 11.00 70,476.00 711,166.87
Pembesian kg 169.58 13,011.38 11.00 242,711.63 2,449,181.03
Beton K.175 m3 0.46 991,411.40 11.00 50,165.42 506,214.66
Pek. Balok Konsul Topi-Topi 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 4.12 142,375.75 11.00 64,524.69 651,112.78
Pembesian kg 52.04 13,011.38 11.00 74,482.33 751,594.41
Beton K.175 m3 0.59 991,411.40 11.00 64,342.60 649,275.33
Pek. Plat beton talang aula tebal 12 cm 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 23.80 141,028.25 11.00 369,211.96 3,725,684.31
Pembesian kg 1,430.69 13,011.38 11.00 2,047,677.24 20,662,924.92
Beton K.225 m3 3.62 1,040,738.55 11.00 414,422.09 4,181,895.63
Pek. Plat beton topi-topi tebal 10 cm 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 29.24 141,028.25 11.00 453,603.26 4,577,269.29
Pembesian kg 448.41 13,011.38 11.00 641,787.50 6,476,219.28
Page 35
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN
(LANJUTAN)
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
KELOMPOK KERJA (POKJA) : (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN (LANJUTAN)
: JL. Mataram No 1 Kota Pekalongan Jawa Tengah
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
Beton K.175 m3 3.63 991,411.40 11.00 395,870.57 3,994,693.97
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 47.60 142,375.75 11.00 745,479.43 7,522,565.13
Pembesian kg 1,088.91 13,011.38 11.00 1,558,504.10 15,726,723.17
Beton K.225 m3 7.07 1,040,738.55 11.00 809,382.37 8,167,403.90
Pek. Balok Konsul Topi-topi 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 4.50 142,375.75 11.00 70,476.00 711,166.87
Pembesian kg 169.58 13,011.38 11.00 242,711.63 2,449,181.03
Beton K.175 m3 0.46 991,411.40 11.00 50,165.42 506,214.66
Pek. Plat deker Gapura Pendopo 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 6.00 141,028.25 11.00 93,078.65 939,248.15
Pembesian kg 107.41 13,011.38 11.00 153,730.73 1,551,282.78
Beton K.225 m3 0.48 1,040,738.55 11.00 54,951.00 554,505.50
Pek. Plat Talang Gapuro tebal 8 cm 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 5.97 141,028.25 11.00 92,613.25 934,551.90
Pembesian kg 56.81 13,011.38 11.00 81,309.40 820,485.75
Beton K.225 m3 0.48 1,040,738.55 11.00 54,951.00 554,505.50
Lantai Beton Rabat Keliling Pendopo fc=7,4 Mpa m3 1.95 905,121.64 11.00 194,148.59 1,959,135.80
Lantai Beton Rabat Bawah Lantai Pendopo fc=7,4 Mpa m3 12.78 905,121.64 11.00 1,272,420.01 12,839,874.60
Pek. Waterproofing dak Talang m2 68.00 50,000.00 11.00 374,000.00 3,774,000.00
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PASANGAN 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan batu bata 1\/2 bata, 16 m2 472.00 110,512.60 11.00 5,737,814.19 57,899,761.39
Pek. Plesteran tbl. 15 mm, 16 m2 944.00 62,456.13 11.00 6,485,444.54 65,444,031.26
Pek. Sekoningan Sudut m 37.50 12,500.00 11.00 51,562.50 520,312.50
Pek. Acian m2 944.00 26,592.50 11.00 2,761,365.20 27,864,685.20
Pek. Ornamen List beton profil 10 cm Pendopo (Teki-teki) m 92.00 24,983.75 11.00 252,835.55 2,551,340.55
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PENUTUP LANTAI 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan Lantai Keramik 40x40 cm, motif warna m2 270.75 139,647.75 11.00 4,159,059.11 41,968,687.43
Pek. Pasangan Granit Tile 60x60 cm, (untuk dinding) m2 36.15 238,115.78 11.00 946,867.39 9,554,752.76
Pek. Pasangan Dinding Batu paras candi (10x20) cm m2 33.11 185,000.00 11.00 673,788.50 6,799,138.50
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN LANGIT- LANGIT 0.00 0.00 0.00 0.00 0.00
Pek. Plafond PVC drop ceilling Lengkap List Plafond + L m2 347.57 146,619.00 11.00 5,605,640.24 56,566,006.07
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN ATAP 0.00 0.00 0.00 0.00 0.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 & Z m2 237.50 96,525.00 11.00 2,521,715.63 25,446,403.13
Pek. Pasangan Genteng metal lapis pasir m2 237.50 100,650.00 11.00 2,629,481.25 26,533,856.25
Pek. Pasangan Nok genteng metal lapis pasir m 34.10 93,051.75 11.00 349,037.11 3,522,101.79
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN SANITASI 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan Pipa PVC tipe AW 3 m 84.00 77,273.63 11.00 714,008.30 7,204,992.80
Pek. Pasangan Saluran beton U-20 cm m 27.00 35,000.00 11.00 103,950.00 1,048,950.00
Pek. Pasangan Gorong-gorong beton 20 cm m 7.50 45,000.00 11.00 37,125.00 374,625.00
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PENGECATAN 0.00 0.00 0.00 0.00 0.00
Pek. Pengecatan tembok baru m2 944.00 23,060.68 11.00 2,394,620.49 24,163,897.69
Pek. Pengecatan topi-topi , Konsul Beton m2 71.11 23,060.68 11.00 180,382.91 1,820,227.51
Pek. Pengecatan Water proofing untuk Talang Beton m2 53.70 50,000.00 11.00 295,350.00 2,980,350.00
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN LISTRIK 0.00 0.00 0.00 0.00 0.00
Pek. Instalasi titik lampu NYA 2x2,5mm+pipa conduit titik 23.00 226,600.00 11.00 573,298.00 5,785,098.00
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 65,000.00 11.00 7,150.00 72,150.00
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 225,000.00 11.00 371,250.00 3,746,250.00
Pek. Lampu LED Downlight 18 Watt setara Phillips + fittin bh 8.00 175,000.00 11.00 154,000.00 1,554,000.00
Pek. Sakelar Ganda (Broco) bh 7.00 26,620.00 11.00 20,497.40 206,837.40
Page 36
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN
(LANJUTAN)
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
KELOMPOK KERJA (POKJA) : (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN (LANJUTAN)
: JL. Mataram No 1 Kota Pekalongan Jawa Tengah
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
Pek. Stop kontak (Broco) bh 3.00 26,620.00 11.00 8,784.60 88,644.60
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN LAIN-LAIN 0.00 0.00 0.00 0.00 0.00
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu le ls 1.00 1,500,000.00 11.00 165,000.00 1,665,000.00
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,500,000.00 11.00 275,000.00 2,775,000.00
Pemasangan Partisi Rangka Metal stud untuk Ruang Laktm2 19.56 114,251.50 11.00 245,823.53 2,480,582.87
Pemasangan Partisi Gypsum Board tebal 9 mm Uk.120x2m2 39.12 58,681.43 11.00 252,517.91 2,548,135.25
Pekerjaan Hand Railling Tangga Besi Hollow Stainless Stee m2 3.52 185,000.00 11.00 71,632.00 722,832.00
Total 0.00 0.00 0.00 0.00 0.00
TOTAL ( C ) 0.00 0.00 0.00 0.00 0.00
PEKERJAAN HALAMAN 0.00 0.00 0.00 0.00 0.00
PEKERJAAN TANAH 0.00 0.00 0.00 0.00 0.00
Pek . Urugan Sirtu Kelas A m3 86.68 238,150.00 11.00 2,270,712.62 22,913,554.62
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PAVING 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 110,512.60 11.00 173,228.50 1,748,033.05
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 62,456.13 11.00 195,799.97 1,975,799.67
Pek. Acian m2 28.50 26,592.50 11.00 83,367.49 841,253.74
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm Tanpa S m2 124.17 208,696.40 11.00 2,850,521.52 28,764,353.51
Sub Total 0.00 0.00 0.00 0.00 0.00
TOTAL D 0.00 0.00 0.00 0.00 0.00
PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELA 0.00 0.00 0.00 0.00 0.00
Penyiapan RKK ls 1.00 500,000.00 11.00 55,000.00 555,000.00
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 500,000.00 11.00 55,000.00 555,000.00
Asuransi dan perijinan ls 1.00 1,000,000.00 11.00 110,000.00 1,110,000.00
Personil Keselamatan Konstruksi ls 1.00 1,526,238.77 11.00 167,886.26 1,694,125.04
Fasilitas sarana, Prasarana dan Alat kesehatan ( Terma ls 1.00 1,000,000.00 11.00 110,000.00 1,110,000.00
TOTAL E 0.00 0.00 0.00 0.00 0.00
NUR HIDAYAT, SE
DIREKTUR
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH 74,545,454.55
BIAYA UMUM 2% 1,490,909.09
KEUNTUNGAN 8% 5,963,636.36
TOTAL 82,000,000.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
BP ( Biaya penyambungan ) VA 66,000.000 969.00 63,954,000.00
UJL ( Uang Jaminan Langanan ) ls 1.000 5,046,000.00 5,046,000.00
Biaya Instalatir Include -
Concuil Include -
Pemasangan dan material yang dibutuhkan, seperti Include -
( kabel, tiang, pondasi, galian & urugan kembali, dll ) -
III PERALATAN
JUMLAH 69,000,000.00
BIAYA UMUM 2% 1,380,000.00
KEUNTUNGAN 8% 5,520,000.00
TOTAL 75,900,000.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.600 87,500.00 52,500.00
Tukang Kayu OH 0.300 95,000.00 28,500.00
Kepala Tukang OH 0.033 97,500.00 3,217.50
Mandor OH 0.033 105,000.00 3,465.00
II BAHAN
Papan/Balok Kayu bekisting m3 0.017 1,600,000.00 26,666.67
Paku 5cm - 10cm kg 0.400 16,000.00 6,400.00
Minyak bekisting ltr 0.200 5,000.00 1,000.00
Triplek 9mm lbr 0.117 90,000.00 10,500.00
Kayu Dolken 4m Dia. 8cm-10cm btg 1.333 7,000.00 9,333.33
III PERALATAN
JUMLAH 141,582.50
BIAYA UMUM 2% 2,831.65
KEUNTUNGAN 8% 11,326.60
TOTAL 155,740.75
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Jasa Perakitan Panel & Wiring unit 1.000 1,500,000.00 1,500,000.00
II BAHAN
Mgs 3P, 63 A bh 3.000 1,000,000.00 3,000,000.00
MCCB 3P, 200 A bh 1.000 650,000.00 650,000.00
MCCB 3P, 80 A bh 3.000 650,000.00 1,950,000.00
MCCB 3P, 32 A bh 6.000 450,000.00 2,700,000.00
MCB 3P, 32 A bh 2.000 450,000.00 900,000.00
Contacto, (timer switch) bh 1.000 350,000.00 350,000.00
Earth Fault Relay bh 1.000 1,000,000.00 1,000,000.00
Over Current Relay bh 1.000 500,000.00 500,000.00
Over \/ Under Voltage Relay bh 1.000 1,100,000.00 1,100,000.00
Power Factor-meter bh 1.000 850,000.00 850,000.00
Frequency-metr bh 1.000 200,000.00 200,000.00
Ampere-meter 300\/5 A bh 1.000 285,000.00 285,000.00
Ampere-meter 50\/5 A bh 1.000 285,000.00 285,000.00
Volt-meter 0-500 Volt bh 1.000 250,000.00 250,000.00
Volt Selector Switch bh 1.000 80,000.00 80,000.00
CT 300\/5 A bh 1.000 350,000.00 350,000.00
CT 50\/5 A bh 1.000 285,000.00 285,000.00
Fuse Carrier 4 A bh 1.000 2,500.00 2,500.00
Indicator Lamp bh 1.000 85,000.00 85,000.00
Rel MCCB 3P bh 1.000 100,000.00 100,000.00
CU Bar 5 x 400 A bh 1.000 145,000.00 145,000.00
Accessories & Termination bh 1.000 50,000.00 50,000.00
Box Panel bh 1.000 3,000,000.00 3,000,000.00
III PERALATAN
Alat bantu ls 1.000 382,500.00 382,500.00
JUMLAH 20,000,000.00
BIAYA UMUM 2% 400,000.00
KEUNTUNGAN 8% 1,600,000.00
TOTAL 22,000,000.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
DAUN PINTU JALUSI KREPYAK/SPANDREL m2 1.000 1,200,000.00 1,200,000.00
III PERALATAN
Alat Bantu Pasang Ls 1.000 27,272.73 27,272.73
JUMLAH 1,227,272.73
BIAYA UMUM 2% 24,545.45
KEUNTUNGAN 8% 98,181.82
TOTAL 1,350,000.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
DAUN PINTU ENGINEERING DOOR HONEYCOMB m2 1.000 1,250,000.00 1,250,000.00
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH 1,277,272.73
BIAYA UMUM 2% 25,545.45
KEUNTUNGAN 8% 102,181.82
TOTAL 1,405,000.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.043 87,500.00 3,762.50
Tukang Alumunium OH 0.043 95,000.00 4,085.00
Kepala Tukang OH 0.004 97,500.00 419.25
Mandor OH 0.002 105,000.00 220.50
II BAHAN
Profil Kusen Alumunium 3" Warna m' 1.100 82,500.00 90,750.00
Skrup Fixer buah 2.000 150.00 300.00
Sealant Non Asam Tube 0.060 45,000.00 2,700.00
III PERALATAN
JUMLAH 102,237.25
BIAYA UMUM 2% 2,044.75
KEUNTUNGAN 8% 8,178.98
TOTAL 112,460.98
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.043 87,500.00 3,762.50
Tukang Alumunium OH 0.043 95,000.00 4,085.00
Kepala Tukang OH 0.004 97,500.00 419.25
Mandor OH 0.002 105,000.00 220.50
II BAHAN
Profil Jendela Allumunium m' 1.100 75,000.00 82,500.00
Skrup Fixer buah 2.000 150.00 300.00
Sealant Tube 0.060 45,000.00 2,700.00
III PERALATAN
JUMLAH 93,987.25
BIAYA UMUM 2% 1,879.75
KEUNTUNGAN 8% 7,518.98
TOTAL 103,385.98
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
Pemasangan Kusen Pintu Allumunium m' 11.870 112,460.98 1,334,911.77
Pemasangan Rangka Jendela Allumunium m' 12.460 103,385.98 1,288,189.25
CASEMENT bh 5.000 65,000.00 325,000.00
RAMBUNCIS bh 5.000 30,000.00 150,000.00
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
III PERALATAN
Instalasi (5% - 8%) Ls 1.000 187,478.88 187,478.88
JUMLAH 3,926,143.90
BIAYA UMUM 0% -
KEUNTUNGAN 0% -
TOTAL 3,926,143.90
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
Pemasangan Kusen Pintu Allumunium m' 5.930 112,460.98 666,893.58
PINTU ENGINEERING DOOR HONEYCOMB m2 2.091 1,405,000.00 2,937,855.00
SEALENT m' 11.860 9,000.00 106,740.00
HANDLE SET 1.000 211,000.00 211,000.00
ENGSEL PSG 3.000 30,000.00 90,000.00
TATAPAN PINTU m' 5.930 18,500.00 109,705.00
III PERALATAN
Instalasi (5% - 8%) Ls 1.000 256,747.00 256,747.00
JUMLAH 4,378,940.58
BIAYA UMUM 0% -
KEUNTUNGAN 0% -
TOTAL 4,378,940.58
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
Pemasangan Kusen Pintu Allumunium m' 6.700 112,460.98 753,488.53
Pemasangan Rangka Jendela Allumunium (BV Kaca) m' 2.460 103,385.98 254,329.50
PINTU ENGINEERING DOOR HONEYCOMB m2 1.700 1,405,000.00 2,388,500.00
SEALENT m' 11.860 9,000.00 106,740.00
HANDLE SET 1.000 211,000.00 211,000.00
ENGSEL PSG 3.000 30,000.00 90,000.00
TATAPAN PINTU m' 7.550 18,500.00 139,675.00
CASEMENT bh 2.000 65,000.00 130,000.00
RAMBUNCIS bh 1.000 30,000.00 30,000.00
KACA 5MM JENDELA m2 0.219 105,000.00 22,995.00
III PERALATAN
Instalasi (5% - 8%) Ls 1.000 250,763.82 250,763.82
JUMLAH 4,377,491.85
BIAYA UMUM 0% -
KEUNTUNGAN 0% -
TOTAL 4,377,491.85
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
II BAHAN
Pemasangan Kusen Pintu Allumunium m' 6.400 112,460.98 719,750.24
Pemasangan Rangka Jendela Allumunium (BV Kaca) m' 2.000 103,385.98 206,771.95
PINTU ENGINEERING DOOR HONEYCOMB m2 1.400 1,405,000.00 1,967,000.00
SEALENT m' 11.400 9,000.00 102,600.00
HANDLE SET 1.000 211,000.00 211,000.00
ENGSEL PSG 3.000 30,000.00 90,000.00
TATAPAN PINTU m' 6.400 18,500.00 118,400.00
CASEMENT bh 2.000 65,000.00 130,000.00
RAMBUNCIS bh 1.000 30,000.00 30,000.00
KACA 5MM JENDELA m2 0.174 105,000.00 18,270.00
III PERALATAN
Instalasi (5% - 8%) Ls 1.000 208,817.04 208,817.04
JUMLAH 3,802,609.23
BIAYA UMUM 0% -
KEUNTUNGAN 0% -
TOTAL 3,802,609.23
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
Pemasangan Kusen Pintu Allumunium m' 3.520 112,460.98 395,862.63
pintu jalusi krepyak m2 0.603 1,350,000.00 814,320.00
HANDLE SET 1.000 211,000.00 211,000.00
ENGSEL PSG 2.000 30,000.00 60,000.00
SEALENT m' 3.520 9,000.00 31,680.00
III PERALATAN
Instalasi (5% - 8%) Ls 1.000 124,681.06 124,681.06
JUMLAH 1,637,543.69
BIAYA UMUM 0% -
KEUNTUNGAN 0% -
TOTAL 1,637,543.69
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.500 87,500.00 43,750.00
Tukang Batu OH 1.100 95,000.00 104,500.00
Kepala Tukang OH 0.010 97,500.00 975.00
Mandor OH 0.160 105,000.00 16,800.00
II BAHAN
Closet Duduk Porselen INA set 1.000 1,450,000.00 1,450,000.00
III PERALATAN
JUMLAH 1,616,025.00
BIAYA UMUM 2% 32,320.50
KEUNTUNGAN 8% 129,282.00
TOTAL 1,777,627.50
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.400 87,500.00 35,000.00
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH 1,107,475.00
BIAYA UMUM 2% 22,149.50
KEUNTUNGAN 8% 88,598.00
TOTAL 1,218,222.50
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 1.650 87,500.00 144,375.00
Tukang Batu OH 0.275 95,000.00 26,125.00
Kepala Tukang OH 0.028 97,500.00 2,730.00
Mandor OH 0.083 105,000.00 8,715.00
II BAHAN
Koral Beton kg 999.000 155.56 155,400.00
Semen Portland kg 247.000 1,200.00 296,400.00
Pasir Beton Lokal m3 869.000 192.86 167,592.86
Air ltr 215.000 100.00 21,500.00
III PERALATAN
JUMLAH 822,837.86
BIAYA UMUM 2% 16,456.76
KEUNTUNGAN 8% 65,827.03
TOTAL 905,121.64
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.400 87,500.00 35,000.00
Tukang Batu OH 0.100 95,000.00 9,500.00
Kepala Tukang OH 0.010 97,500.00 975.00
Mandor OH 0.040 105,000.00 4,200.00
II BAHAN
Beton Mutu K300 m3 1.020 780,000.00 795,600.00
III PERALATAN
Alat Bantu Cor ls 1.000 150,000.00 150,000.00
JUMLAH 995,275.00
BIAYA UMUM 2% 19,905.50
KEUNTUNGAN 8% 79,622.00
TOTAL 1,094,802.50
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH 0.075 200,000.00 15,000.00
#REF! OH 0.075 150,000.00 11,250.00
#REF! OH 0.075 87,500.00 6,562.50
II BAHAN
III PERALATAN
Sewa Alat Bore Pile Machine jam 0.600 376,818.18 226,090.91
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH 258,903.41
BIAYA UMUM 2% 5,178.07
KEUNTUNGAN 8% 20,712.27
TOTAL 284,793.75
JENIS PEKERJAAN : NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak
SATUAN MATA PEMBAYARAN : Titik AHSP BIDANG CIPTA KARYA
VOLUME : A.6.2.1.1 PAGE. 1209
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
TENAGA % 100.000 100,000.00 100,000.00
(100% x BAHAN)
II BAHAN
Pipa listrik btg 1.667 9,000.00 15,000.00
Kabel NYM 3x2,5mm m 5.000 12,000.00 60,000.00
T Dus bh 3.000 1,000.00 3,000.00
L Bow bh 4.000 1,000.00 4,000.00
Las Dop bh 3.000 1,000.00 3,000.00
Klem bh 24.000 300.00 7,200.00
Mongkok bh 1.000 300.00 300.00
Stop Kontak Tunggal/Ganda bh 0.000 - -
Fitting biasa bh 1.000 7,500.00 7,500.00
III PERALATAN
JUMLAH 200,000.00
BIAYA UMUM 2% 4,000.00
KEUNTUNGAN 8% 16,000.00
TOTAL 220,000.00
JENIS PEKERJAAN : Pek. Pasang Homogenous Tile Polish lantai Unit Hunian, R. Serbaguna, Koridor, Tangga Utama dan Tangg
SATUAN MATA PEMBAYARAN : m2 AHSP BIDANG CIPTA KARYA
VOLUME : A.4.4.3.13. PAGE. 1114
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.240 87,500.00 21,000.00
Tukang Batu OH 0.120 95,000.00 11,400.00
Kepala Tukang OH 0.012 97,500.00 1,170.00
Mandor OH 0.012 105,000.00 1,260.00
II BAHAN
Granit Lantai Uk. 60cm x 60cm bh 2.778 50,000.00 138,888.89
Perekat Mortar Instan kg 9.600 1,800.00 17,280.00
Portalnd Semen kg 9.600 1,200.00 11,520.00
Pasir Pasang m3 0.045 270,000.00 12,150.00
Semen Warna kg 1.500 1,200.00 1,800.00
III PERALATAN
JUMLAH 216,468.89
BIAYA UMUM 2% 4,329.38
KEUNTUNGAN 8% 17,317.51
TOTAL 238,115.78
JENIS PEKERJAAN : Penutup Atap Transparant , UPVC , Skylight semi transparant (20% tembus cahaya)
SATUAN MATA PEMBAYARAN : m2 AHSP PERMEN PUPR NO. 28 2016
VOLUME : A.4.5.2.41
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.150 87,500.00 13,125.00
OH 0.075 95,000.00 7,125.00
OH 0.080 97,500.00 7,800.00
OH 0.006 105,000.00 630.00
II BAHAN
UPVC Skylight semi transparant Lbr 1.050 180,000.00 189,000.00
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH 218,000.00
BIAYA UMUM 2% 4,360.00
KEUNTUNGAN 8% 17,440.00
TOTAL 239,800.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.081 87,500.00 7,087.50
OH 0.135 95,000.00 12,825.00
OH 0.014 97,500.00 1,316.25
OH 0.004 105,000.00 420.00
II BAHAN
PVC Rucika 6" AW m 1.200 75,000.00 90,000.00
Accesories ls 1.000 31,500.00 31,500.00
III PERALATAN
JUMLAH 143,148.75
BIAYA UMUM 2% 2,862.98
KEUNTUNGAN 8% 11,451.90
TOTAL 157,463.63
JENIS PEKERJAAN : Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, Modul 60 x 120 cm, untuk Plafon Gypsum
SATUAN MATA PEMBAYARAN : m2 AHSP BIDANG CIPTA KARYA
VOLUME : A.4.2.1.21 PAGE. 1091
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.175 87,500.00 15,312.50
Tukang Kayu OH 0.350 95,000.00 33,250.00
Kepala Tukang OH 0.035 97,500.00 3,412.50
Mandor OH 0.018 105,000.00 1,890.00
II BAHAN
Rangka metal hollow 40.40.0,3mm m 2.000 6,500.00 13,000.00
III PERALATAN
JUMLAH 66,865.00
BIAYA UMUM 2% 1,337.30
KEUNTUNGAN 8% 5,349.20
TOTAL 73,551.50
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.100 87,500.00 8,750.00
Tukang Kayu OH 0.050 95,000.00 4,750.00
Kepala Tukang OH 0.005 97,500.00 487.50
Mandor OH 0.005 105,000.00 525.00
II BAHAN
Papan Gypsum 120x240x9mm lbr 0.364 53,000.00 19,292.00
Paku Skrup kg 0.110 16,000.00 1,760.00
III PERALATAN
JUMLAH 35,564.50
BIAYA UMUM 2% 711.29
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
A Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, Modul m2
untuk Plafon Gypsum
I UPAH
Pekerja OH 0.175 87,500.00 15,312.50
Tukang Kayu OH 0.350 95,000.00 33,250.00
Kepala Tukang OH 0.035 97,500.00 3,412.50
Mandor OH 0.018 105,000.00 1,890.00
II BAHAN
Rangka metal hollow 40.40.0,3mm m 2.000 6,500.00 13,000.00
III PERALATAN
JUMLAH 66,865.00
SUB TOTAL (A) (50%x Rangka) 33,432.50
JUMLAH 51,214.75
BIAYA UMUM 2% 1,024.30
KEUNTUNGAN 8% 4,097.18
TOTAL 56,336.23
JENIS PEKERJAAN : Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 cm
SATUAN MATA PEMBAYARAN : #NAME? AHSP BIDANG CIPTA KARYA
VOLUME : A.4.2.1.21 A.4.5.1.7
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
A Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, Modul m2
untuk Plafon Gypsum
I UPAH
Pekerja OH 0.175 87,500.00 15,312.50
Tukang Kayu OH 0.350 95,000.00 33,250.00
Kepala Tukang OH 0.035 97,500.00 3,412.50
Mandor OH 0.018 105,000.00 1,890.00
II BAHAN
Rangka metal hollow 40.40.0,3mm m 2.000 6,500.00 13,000.00
III PERALATAN
JUMLAH 102,429.50
BIAYA UMUM 2% 2,048.59
KEUNTUNGAN 8% 8,194.36
TOTAL 112,672.45
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
TENAGA % 10.000 142,083.33 14,208.33
(10% x BAHAN)
II BAHAN
Kabel Tray W200 x H100 x 2400mm UCP btg 0.417 227,000.00 94,583.33
Jointing pcs 1.000 12,500.00 12,500.00
Bracket (Rod drat, Siku, dll) ls 1.000 35,000.00 35,000.00
III PERALATAN
Alat bantu Pasang ls 1.000 48,253.79 48,253.79
JUMLAH 204,545.45
BIAYA UMUM 2% 4,090.91
KEUNTUNGAN 8% 16,363.64
TOTAL 225,000.00
JENIS PEKERJAAN : Pekerjaan Rollag Bata, Pas, 1bt (dibawah dinding bata)
SATUAN MATA PEMBAYARAN : #NAME? AHSP BIDANG CIPTA KARYA
VOLUME : A.4.4.1.4. PAGE. 1096
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.600 87,500.00 52,500.00
Tukang Batu OH 0.200 95,000.00 19,000.00
Kepala Tukang OH 0.020 97,500.00 1,950.00
Mandor OH 0.030 105,000.00 3,150.00
II BAHAN
Bata Merah bh 140.000 600.00 84,000.00
Semen Portland kg 22.200 1,200.00 26,640.00
Pasir Pasang m3 0.102 190,000.00 19,380.00
III PERALATAN
JUMLAH 206,620.00
BIAYA UMUM 2% 4,132.40
KEUNTUNGAN 8% 16,529.60
TOTAL 227,282.00
JENIS PEKERJAAN : Tanah urug peninggian lantai t=45 cm (dalam bangunan) + pemadatan CBR 5%
SATUAN MATA PEMBAYARAN : #NAME? AHSP BIDANG PEK. UMUM (PU)
VOLUME : 1.7.2.e PAGE. 185
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.250 87,500.00 21,875.00
Mandor OH 0.025 105,000.00 2,625.00
II BAHAN
Tanah Urug Padas m3 1.100 80,000.00 88,000.00
III PERALATAN
Alat bantu pemadatan Vibro
ls 1.000 15,000.00 15,000.00
JUMLAH 127,500.00
BIAYA UMUM 2% 2,550.00
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Sub Bas Borong m2 1.000 36,000.00 36,000.00
II BAHAN
Baja Ringan Canai dingin C.75 btg 0.873 96,500.00 84,244.50
III PERALATAN
Alat bantu ls 1.000 2,482.77 2,482.77
JUMLAH 122,727.27
BIAYA UMUM 2% 2,454.55
KEUNTUNGAN 8% 9,818.18
TOTAL 135,000.00
JENIS PEKERJAAN : Pek. Pasangan Dinding Bata Ringan t=10 cm Termasuk Dinding Railling Tangga
SATUAN MATA PEMBAYARAN : #NAME? AHSP BIDANG CIPTA KARYA
VOLUME : A. 4.4.1.26. PAGE. 1105
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.670 87,500.00 58,625.00
Tukang Batu OH 0.130 95,000.00 12,350.00
Kepala Tukang OH 0.013 97,500.00 1,267.50
Mandor OH 0.003 105,000.00 315.00
II BAHAN
Bata Ringan Tb.10cm bh 8.400 5,500.00 46,200.00
Mortar Perekat Bata Ringan kg 0.063 1,800.00 113.40
III PERALATAN
JUMLAH 118,870.90
BIAYA UMUM 2% 2,377.42
KEUNTUNGAN 8% 9,509.67
TOTAL 130,757.99
JENIS PEKERJAAN : NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
SATUAN MATA PEMBAYARAN : Titik AHSP BIDANG CIPTA KARYA
VOLUME : A.6.2.1.1 PAGE. 1209
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
TENAGA % 100.000 103,000.00 103,000.00
(100% x BAHAN)
II BAHAN
Pipa listrik btg 2.000 9,000.00 18,000.00
Kabel NYM 3x2,5mm m 5.000 12,000.00 60,000.00
T Dus bh 3.000 1,000.00 3,000.00
L Bow bh 4.000 1,000.00 4,000.00
Las Dop bh 3.000 1,000.00 3,000.00
Klem bh 24.000 300.00 7,200.00
Mongkok bh 1.000 300.00 300.00
Saklar Tunggal/Ganda bh 0.000 - -
Fitting biasa bh 1.000 7,500.00 7,500.00
III PERALATAN
JUMLAH 206,000.00
BIAYA UMUM 2% 4,120.00
KEUNTUNGAN 8% 16,480.00
TOTAL 226,600.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.375 87,500.00 32,812.50
Tukang Batu OH 0.500 95,000.00 47,500.00
Kepala Tukang OH 0.050 97,500.00 4,875.00
Mandor OH 0.001 105,000.00 136.50
II BAHAN
Paving Blok standar 6-8cm K350 m2 1.010 90,000.00 90,900.00
Pasir Beton Lokal kg 0.050 270,000.00 13,500.00
III PERALATAN
JUMLAH 189,724.00
BIAYA UMUM 2% 3,794.48
KEUNTUNGAN 8% 15,177.92
TOTAL 208,696.40
JENIS PEKERJAAN : Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, Modul 60 x 60 cm, untuk Plafon GRC
SATUAN MATA PEMBAYARAN : #NAME? AHSP BIDANG CIPTA KARYA
VOLUME : A.4.2.1.21 PAGE. 1091
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.350 87,500.00 30,625.00
Tukang Kayu OH 0.350 95,000.00 33,250.00
Kepala Tukang OH 0.035 97,500.00 3,412.50
Mandor OH 0.018 105,000.00 1,890.00
II BAHAN
Rangka metal hollow 40.40.0,3mm m 4.000 6,500.00 26,000.00
III PERALATAN
JUMLAH 95,177.50
BIAYA UMUM 2% 1,903.55
KEUNTUNGAN 8% 7,614.20
TOTAL 104,695.25
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.100 87,500.00 8,750.00
Tukang Kayu OH 0.050 95,000.00 4,750.00
Kepala Tukang OH 0.005 97,500.00 487.50
Mandor OH 0.005 105,000.00 525.00
II BAHAN
Papan GRC 120x240x6mm lbr 0.364 60,000.00 21,840.00
Paku Skrup kg 0.110 16,000.00 1,760.00
III PERALATAN
JUMLAH 38,112.50
BIAYA UMUM 2% 762.25
KEUNTUNGAN 8% 3,049.00
TOTAL 41,923.75
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
A Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, Modu m2
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH 133,290.00
BIAYA UMUM 2% 2,665.80
KEUNTUNGAN 8% 10,663.20
TOTAL 146,619.00
JENIS PEKERJAAN : Pek. Keramik 20x25 Dinding KM/WC, R. Cuci + Dinding Dapur
SATUAN MATA PEMBAYARAN : #NAME? AHSP BIDANG CIPTA KARYA
VOLUME : A.4.4.3.14. PAGE. 1115
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.250 87,500.00 21,875.00
Tukang Batu OH 0.125 95,000.00 11,875.00
Kepala Tukang OH 0.013 97,500.00 1,267.50
Mandor OH 0.013 105,000.00 1,365.00
II BAHAN
Keramik Dinding Uk. 20cm s.d 50cm (persegi) m2 1.050 75,000.00 78,750.00
Portalnd Semen kg 9.800 1,200.00 11,760.00
Pasir Pasang m3 0.045 270,000.00 12,150.00
Semen Warna kg 1.300 1,200.00 1,560.00
III PERALATAN
JUMLAH 140,602.50
BIAYA UMUM 2% 2,812.05
KEUNTUNGAN 8% 11,248.20
TOTAL 154,662.75
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.600 87,500.00 52,500.00
Tukang Kayu OH 0.300 95,000.00 28,500.00
Kepala Tukang OH 0.033 97,500.00 3,217.50
Mandor OH 0.033 105,000.00 3,465.00
II BAHAN
Papan/Balok Kayu bekisting m3 0.014 500,000.00 6,875.00
Paku 5cm - 10cm kg 0.400 16,000.00 6,400.00
Minyak bekisting ltr 0.200 5,000.00 1,000.00
Triplek 9mm lbr 0.175 90,000.00 15,750.00
Kayu Dolken 4m Dia. 8cm-10cm btg 1.500 7,000.00 10,500.00
III PERALATAN
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH 128,207.50
BIAYA UMUM 2% 2,564.15
KEUNTUNGAN 8% 10,256.60
TOTAL 141,028.25
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.600 87,500.00 52,500.00
Tukang Kayu OH 0.300 95,000.00 28,500.00
Kepala Tukang OH 0.033 97,500.00 3,217.50
Mandor OH 0.033 105,000.00 3,465.00
II BAHAN
Balok Kayu bekisting Sewa (Suri - Suri) m3 0.015 800,000.00 11,600.00
Paku 5cm - 10cm kg 0.400 16,000.00 6,400.00
Minyak bekisting ltr 0.200 5,000.00 1,000.00
Triplek 9mm lbr 0.175 90,000.00 15,750.00
Kayu Dolken 4m Dia. 8cm-10cm btg 0.426 7,000.00 2,980.00
III PERALATAN
JUMLAH 125,412.50
BIAYA UMUM 2% 2,508.25
KEUNTUNGAN 8% 10,033.00
TOTAL 137,953.75
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.600 87,500.00 52,500.00
Tukang Kayu OH 0.300 95,000.00 28,500.00
Kepala Tukang OH 0.033 97,500.00 3,217.50
Mandor OH 0.033 105,000.00 3,465.00
II BAHAN
Papan/Balok Kayu bekisting m3 0.014 500,000.00 6,875.00
Paku 5cm - 10cm kg 0.400 16,000.00 6,400.00
Minyak bekisting ltr 0.200 5,000.00 1,000.00
Triplek 9mm lbr 0.175 90,000.00 15,750.00
Kayu Dolken 4m Dia. 8cm-10cm btg 0.500 7,000.00 3,500.00
III PERALATAN
JUMLAH 121,207.50
BIAYA UMUM 2% 2,424.15
KEUNTUNGAN 8% 9,696.60
TOTAL 133,328.25
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.100 87,500.00 8,750.00
Tukang Batu OH 0.100 95,000.00 9,500.00
Kepala Tukang OH 0.010 97,500.00 975.00
Mandor OH 0.010 105,000.00 1,050.00
II BAHAN
Semen Portland kg 6.946 1,200.00 8,334.73
Mortar Plester Bata Ringan kg 3.456 1,800.00 6,220.80
III PERALATAN
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH 34,830.53
BIAYA UMUM 2% 696.61
KEUNTUNGAN 8% 2,786.44
TOTAL 38,313.58
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.100 87,500.00 8,750.00
Tukang Batu OH 0.100 95,000.00 9,500.00
Kepala Tukang OH 0.010 97,500.00 975.00
Mandor OH 0.010 105,000.00 1,050.00
II BAHAN
Mortar Acian Bata Ringan kg 3.250 1,800.00 5,850.00
III PERALATAN
JUMLAH 26,125.00
BIAYA UMUM 2% 522.50
KEUNTUNGAN 8% 2,090.00
TOTAL 28,737.50
JENIS PEKERJAAN : Pek. Plester + Aci Mortar Dinding Exterior/dind. Terluar dan Interior/Dind. Bag. Dalam
SATUAN MATA PEMBAYARAN : m2 AHSP BIDANG PEK. UMUM (PU)
VOLUME : 3.2.2.2.5. 3.2.2.2.35.(a)
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
Plesteran tebal 1 cm, dengan mortar (setara 1 PC : 5 PP) m2 1.000 34,830.53 34,830.53
Pemasangan 1 m2 Acian Semen Mortar m2 1.000 26,125.00 26,125.00
III PERALATAN
JUMLAH 60,955.53
BIAYA UMUM 2% 1,219.11
KEUNTUNGAN 8% 4,876.44
TOTAL 67,051.08
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.150 87,500.00 13,125.00
Tukang Kayu OH 0.075 95,000.00 7,125.00
Kepala Tukang OH 0.080 97,500.00 7,800.00
Mandor OH 0.006 105,000.00 630.00
II BAHAN
Galvalume Spandek Pasir Tebal 0,35mm Lbr 1.050 135,000.00 141,750.00
Paku hak panjang 15 cm Kg 0.020 16,000.00 320.00
III PERALATAN
JUMLAH 170,750.00
BIAYA UMUM 2% 3,415.00
KEUNTUNGAN 8% 13,660.00
TOTAL 187,825.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.081 87,500.00 7,087.50
Tukang Batu OH 0.135 95,000.00 12,825.00
Kepala Tukang OH 0.014 97,500.00 1,316.25
Mandor OH 0.004 105,000.00 420.00
II BAHAN
PVC Rucika 4" AW m 1.200 50,000.00 60,000.00
Accesories ls 1.000 21,000.00 21,000.00
III PERALATAN
JUMLAH 102,648.75
BIAYA UMUM 2% 2,052.98
KEUNTUNGAN 8% 8,211.90
TOTAL 112,913.63
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.180 87,500.00 15,750.00
Tukang batu OH 0.020 95,000.00 1,900.00
Tukang Kayu OH 0.020 95,000.00 1,900.00
Tukang Besi OH 0.020 95,000.00 1,900.00
Kepala Tukang OH 0.006 97,500.00 585.00
Mandor OH 0.009 105,000.00 945.00
II BAHAN
Kayu/Papan (Kayu Kebon @2mtr) **Sewa m3 0.002 500,000.00 1,000.00
Paku Biasa 2" - 5" Kg 0.010 16,000.00 160.00
Besi Beton Polos Kg 1.870 10,300.00 19,265.69
Kawat Beton Kg 0.045 16,000.00 720.00
Portland Semen Kg 4.000 1,200.00 4,800.00
Pasir Beton m3 0.006 270,000.00 1,620.00
Kerikil Beton m3 0.011 210,000.00 2,407.29
III PERALATAN
JUMLAH 52,952.98
BIAYA UMUM 2% 1,059.06
KEUNTUNGAN 8% 4,236.24
TOTAL 58,248.28
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.520 87,500.00 45,500.00
Tukang Kayu OH 0.260 95,000.00 24,700.00
Kepala Tukang OH 0.026 97,500.00 2,535.00
Mandor OH 0.026 105,000.00 2,730.00
II BAHAN
Papan/Kayu bekisting m3 0.023 500,000.00 11,250.00
Paku 5cm - 10cm kg 0.300 16,000.00 4,800.00
Minyak bekisting ltr 0.100 5,000.00 500.00
III PERALATAN
JUMLAH 92,015.00
BIAYA UMUM 2% 1,840.30
KEUNTUNGAN 8% 7,361.20
TOTAL 101,216.50
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.520 87,500.00 45,500.00
Tukang Kayu OH 0.260 95,000.00 24,700.00
Kepala Tukang OH 0.026 97,500.00 2,535.00
Mandor OH 0.026 105,000.00 2,730.00
II BAHAN
Papan/Kayu bekisting m3 0.020 500,000.00 10,000.00
Paku 5cm - 10cm kg 0.300 16,000.00 4,800.00
Minyak bekisting ltr 0.100 5,000.00 500.00
III PERALATAN
JUMLAH 90,765.00
BIAYA UMUM 2% 1,815.30
KEUNTUNGAN 8% 7,261.20
TOTAL 99,841.50
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.100 87,500.00 8,750.00
Tukang Batu OH 0.100 95,000.00 9,500.00
Kepala Tukang OH 0.010 97,500.00 975.00
Mandor OH 0.010 105,000.00 1,050.00
II BAHAN
Semen Portland kg 6.816 1,200.00 8,179.20
Pasir Pasang m3 0.013 270,000.00 3,618.00
III PERALATAN ls 1.000 6,940.73 6,940.73
JUMLAH 39,012.93
BIAYA UMUM 2% 780.26
KEUNTUNGAN 8% 3,121.03
TOTAL 42,914.22
JENIS PEKERJAAN : Pek. Cat Dinding dan Dak Bag. Luar (exterior)
SATUAN MATA PEMBAYARAN : m2 AHSP BIDANG PEK. UMUM (PU)
VOLUME : 3.3.10.(c) PAGE. 323
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.020 87,500.00 1,750.00
Tukang Cat OH 0.063 95,000.00 5,985.00
Kepala Tukang OH 0.006 97,500.00 614.25
Mandor OH 0.003 105,000.00 315.00
II BAHAN
Plamuur kg 0.100 9,500.00 950.00
Cat Tembok Dasar Emultion kg 0.100 22,500.00 2,250.00
Cat Exterior Wheater Shield kg 0.260 55,000.00 14,300.00
III PERALATAN
JUMLAH 26,164.25
BIAYA UMUM 2% 523.29
KEUNTUNGAN 8% 2,093.14
TOTAL 28,780.68
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.060 87,500.00 5,250.00
Tukang Besi OH 0.060 95,000.00 5,700.00
Kepala Tukang OH 0.006 97,500.00 585.00
Mandor OH 0.003 105,000.00 315.00
II BAHAN
Besi Strip (Siku, Plat dll) kg 1.100 9,500.00 10,450.00
III PERALATAN
JUMLAH 22,300.00
BIAYA UMUM 2% 446.00
KEUNTUNGAN 8% 1,784.00
TOTAL 24,530.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.050 87,500.00 4,375.00
Tukang Kayu OH 0.050 95,000.00 4,750.00
Kepala Tukang OH 0.005 97,500.00 487.50
Mandor OH 0.003 105,000.00 315.00
II BAHAN
List Gypsum m 1.050 10,500.00 11,025.00
Paku Skrup kg 0.110 16,000.00 1,760.00
III PERALATAN
JUMLAH 22,712.50
BIAYA UMUM 2% 454.25
KEUNTUNGAN 8% 1,817.00
TOTAL 24,983.75
JENIS PEKERJAAN : Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior)
SATUAN MATA PEMBAYARAN : m2 AHSP BIDANG PEK. UMUM (PU)
VOLUME : 3.3.10.(c) PAGE. 323
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.020 87,500.00 1,750.00
Tukang Cat OH 0.063 95,000.00 5,985.00
Kepala Tukang OH 0.006 97,500.00 614.25
Mandor OH 0.003 105,000.00 315.00
II BAHAN
Plamuur kg 0.100 9,500.00 950.00
Cat Tembok Dasar Emultion kg 0.100 22,500.00 2,250.00
Cat Interior Tembok Emultion kg 0.260 35,000.00 9,100.00
III PERALATAN
JUMLAH 20,964.25
BIAYA UMUM 2% 419.29
KEUNTUNGAN 8% 1,677.14
TOTAL 23,060.68
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.020 87,500.00 1,750.00
Tukang Cat OH 0.063 95,000.00 5,985.00
Kepala Tukang OH 0.006 97,500.00 614.25
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH 19,144.25
BIAYA UMUM 2% 382.89
KEUNTUNGAN 8% 1,531.54
TOTAL 21,058.68
JENIS PEKERJAAN : Besi beton Untuk pembesian kolom, balok, ring balk dan sloof (Ulir)
SATUAN MATA PEMBAYARAN : kg AHSP BIDANG PEK. UMUM (PU)
VOLUME : 2.2.6.1.(a) PAGE. 279
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.007 87,500.00 612.50
Tukang Besi OH 0.007 95,000.00 665.00
Kepala Tukang OH 0.000 97,500.00 6.83
Mandor OH 0.000 105,000.00 4.20
II BAHAN
Besi Beton Polos/Ulir kg 1.000 10,300.00 10,300.00
Kawat Bendrat kg 0.015 16,000.00 240.00
III PERALATAN
JUMLAH 11,828.53
BIAYA UMUM 2% 236.57
KEUNTUNGAN 8% 946.28
TOTAL 13,011.38
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.007 87,500.00 612.50
Tukang Besi OH 0.007 95,000.00 665.00
Kepala Tukang OH 0.000 97,500.00 6.83
Mandor OH 0.000 105,000.00 4.20
II BAHAN
Besi Beton Polos/Ulir kg 1.000 10,300.00 10,300.00
Kawat Bendrat kg 0.015 16,000.00 240.00
III PERALATAN
JUMLAH 11,828.53
BIAYA UMUM 2% 236.57
KEUNTUNGAN 8% 946.28
TOTAL 13,011.38
JENIS PEKERJAAN : Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga, Bordes, Canopi Jendela
SATUAN MATA PEMBAYARAN : m2 AHSP BIDANG PEK. UMUM (PU)
VOLUME : 3.2.2.2.35.(a) PAGE. 318
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.100 87,500.00 8,750.00
Tukang Batu OH 0.100 95,000.00 9,500.00
Kepala Tukang OH 0.010 97,500.00 975.00
Mandor OH 0.010 105,000.00 1,050.00
II BAHAN
Mortar Acian Bata Ringan kg 3.250 1,800.00 5,850.00
III PERALATAN
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Pekerja OH 0.010 87,500.00 875.00
Tukang Batu OH 0.400 95,000.00 38,000.00
Kepala Tukang OH 0.040 97,500.00 3,900.00
Mandor OH 0.005 105,000.00 525.00
II BAHAN
Diameter 20mm (Ball Valve & Gate Valve) bh 1.000 67,010.00 67,010.00
Sealtape bh 0.145 5,000.00 726.36
III PERALATAN
JUMLAH 111,036.36
BIAYA UMUM 2% 2,220.73
KEUNTUNGAN 8% 8,882.91
TOTAL 122,140.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Tukang Batu OH 0.010 95,000.00 950.00
Kepala Tukang OH 0.400 97,500.00 39,000.00
Mandor OH 0.040 105,000.00 4,200.00
BAHAN OH 0.005 - -
II BAHAN
Diameter 40mm (Ball Valve & Gate Valve) bh 1.000 117,650.00 117,650.00
Sealtape bh 0.146 5,000.00 731.82
III PERALATAN
JUMLAH 162,531.82
BIAYA UMUM 2% 3,250.64
KEUNTUNGAN 8% 13,002.55
TOTAL 178,785.00
DAFTAR HARGA BAHAN/MATERIAL
Ready Mix
Beton Mutu K225 m3 Rp 720,000.00
Beton Mutu K250 m3 Rp 760,000.00
Beton Mutu K300 m3 Rp 780,000.00
Beton Mutu K350 m3 Rp 820,000.00
Beton Mutu K450 m3 Rp 890,000.00
Page 61
SPESIFIKASI TEKNIS
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN
(LANJUTAN)
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
KELOMPOK KERJA (POKJA) : PEMBANGUNAN GEDUNG KANTOR KECAMATAN (LANJUTAN)
: JL. Mataram No 1 Kota Pekalongan Jawa Tengah
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
C WATER PROOFING
1. Plat atap dan area rooftank Water Proof Coating Penetron, Fosroc
2. Kanopi Water Proof Coating Penetron, Fosroc
3. Toilet dan tempat wudhu Water Proof Coating Penetron, Fosroc
4. Lantai balkon Water Proof Coating Penetron, Fosroc
D PASANGAN BATA
1. Dinding Pasang bata merah tebal ½ bata 1PC : 5PP Lokal
2. Plesteran Plesteran tebal 15mm 1PC : 5PP dan acian Pasir Lokal
3. Rolag bata Bata merah Lokal
E PELAPIS LANTAI
a. Ruang umum Lantai Ukuran 40 x 40 cm polos putih ( R. Pendopo ) Mulia, Asia
b. Lantai Toilet Ukuran 25 x 25 cm motif (Toilet Lantai 2) Asia Tile Mulia, Asia
c. Dinding Toilet dinding ukuran 25 x 40 cm Motif warna Asia Tile Mulia, Asia
e. Dinding Homogenous tile uk. ( 60 x 60 ) cm Granito, Indogress
F AKSESORIES
a.Listplank GRC motif kayu
- Ukuran 2x2/20cm GRC Board
b.Logo PU stainless steel ukuran sesuai gambar
2.Daun Pintu semua ruang Wood plastic composit, finishing melamin DUMA
Aluminium warna Natural / Silver Alumunium ALEXINDO
3.Lubang Angin Plat ram Expanda dengan Rangka Holo 4cm x 4cm Lokal
Finishing cat
H KACA
1.Kaca jendela/pintu Kaca bening t=5mm & 8mm Mulia
SPESIFIKASI TEKNIS
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN
(LANJUTAN)
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
KELOMPOK KERJA (POKJA) : PEMBANGUNAN GEDUNG KANTOR KECAMATAN (LANJUTAN)
: JL. Mataram No 1 Kota Pekalongan Jawa Tengah
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
K PENGECATAN
1.Cat dinding
a.Dinding bagian luar Cat dinding Weather Shield Catylac
b.Dindin bagian dalam Cat dinding interior acrilic emulsion Catylac
2.Cat plafond
a.Seluruh Ruangan cat plafond Catylac
putih standart,doff
L SANITARY
1.Kloset duduk Pipa buangan belakang(dinding) INA
2.kran air SanEi, Onda
3.Jet Washer TP SanEi, Onda
4.Tempat sabun polos, ukuran 10x20cm SanEi, Onda
5.Kran cuci solid SanEi, Onda
6.Kran sink solid SanEi, Onda
7.Sink ukuran 50x50 (1lubang) Royal
8.Washtafel ukuran panjang 40-50cm,lebar 30-45cm INA
9.Kran Washtafel solid SanEi, Onda
NUR HIDAYAT, SE
DIREKTUR