Progres Kecamatan 2021
Progres Kecamatan 2021
MINGGU KE -
NO. URAIAN PEKERJAAN VOLUME SAT. KETERANGAN
1 2 3 4 5 6 7 8 9
I
A PEKERJAAN GEDUNG
1 LANTAI I 80% 100% 100% 100% 100% 100% 100% 100% 100%
2 80% 100% 100% 100% 100% 100% 100% 100%
B
1
2 40% 80% 100% 100% 100% 100% 100% 100%
3 100% 100% 100% 100% 100% 100%
4 100% 100% 100% 100% 100% 100%
5 40% 80% 100% 100% 100% 100%
C 50% 100% 100% 100% 100% 100% 100%
1 50% 100% 100% 100% 100%
2
3
D 100% 100% 100% 100% 100% 100% 100% 100% 100%
1 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 50% 100% 100% 100% 100% 100% 100% 100% 100%
3
4
E
1
2
3
4
5
6
7
PROGRESS
MINGGU KE -
NO. URAIAN PEKERJAAN VOLUME SAT. KETERANGAN
1 2 3 4 5 6 7 8 9
8
9
10
11
12
13
14
15
16
F
1
5
PROGRESS
MINGGU KE -
NO. URAIAN PEKERJAAN VOLUME SAT. KETERANGAN
1 2 3 4 5 6 7 8 9
10
11
12
PROGRESS
MINGGU KE -
NO. URAIAN PEKERJAAN VOLUME SAT. KETERANGAN
1 2 3 4 5 6 7 8 9
13
14
15
16
17
18
19
G
1
2
3
4
H
1
2
3
I
1
PROGRESS
MINGGU KE -
NO. URAIAN PEKERJAAN VOLUME SAT. KETERANGAN
1 2 3 4 5 6 7 8 9
2
3
4
5
6
7
8
9
J
1
2
3
PEMERINTAH KOTA PEKALONGAN
DINAS PERINDUSTRIAN DAN TENAGA KERJA
LAPORAN
KEGIATAN :
PEMELIHARAAN RUTIN/BERKALA GEDUNG KANTOR
PEKERJAAN :
BELANJA JASA KONSULTAN PENGAWAS
PEMELIHARAAN GEDUNG KANTOR (PERBAIKAN PAGAR KANTOR)
TAHUN ANGGARAN
2020
KONSULTAN PENGAWAS :
JUMLAH TOTAL
MINGGU KE -
KETERANGAN
13 14 15 16 17 18 19 20 21 22
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
PEMERINTAH KOTA PEKALONGAN
DINAS PEKERJAAN UMUM DAN PENATAN RUANG
Jl. Kusuma Bangsa No. 45 Telp. (0285) 423222 Kota Pekalongan
LAPORAN AKHIR
KEGIATAN :
REHABILITASI / PEMELIHARAAN SALURAN PEMATUS JALAN
PEKERJAAN :
REHABILITASI / PEMELIHARAAN SALURAN PEMATUS JALAN SULAWESI
TAHUN ANGGARAN
2020
KONSULTAN PENGAWAS :
URAIAN PEKERJAAN
NO JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT
PEK (%) PEK (%) PEK (%)
( Rp. ) ( Rp. ) ( Rp. )
URAIAN PEKERJAAN
NO JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT
PEK (%) PEK (%) PEK (%)
( Rp. ) ( Rp. ) ( Rp. )
Total Sub Jumlah Harga 155,876,004 86.16 25,033,822.77 13.84 180,909,826.29 100.00
PPN 10 % 15,587,600 2,503,382.28 18,090,982.63
Total 171,463,604 27,537,205.05 199,000,808.92
Dibulatkan 171,463,600 27,537,000.00 199,000,000.00
R
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. Bobot Prest Bulan Lalu P
SATUAN ( Rp ) ( Rp )
% Volume Jml Harga Bobot Volume
A PEKERJAAN TANAH
1 Pekerjaan Pondasi Talud
1. Pek. Galian Tanah Keras 145.73 M3 89,341.20 13,019,693.08 7.20 - - - 145.73
2. Pek. Urugan Tanah Kembali 48.58 M3 15,985.00 776,498.02 0.43 - - - 48.58
Sub Total I 13,796,191.09 7.63 - -
B PEKERJAAN PASANGAN SALURAN DAN PENUTUP
SALURAN PJ. 97,78 m Tg. 1,15 - 1,35 m
1 Pek. Pas. Batu Kali 1 : 5 86.95 m3 952,373.65 82,808,888.87 45.77 - - - 86.95
2 Pek. Plesteran 1 : 5 295.85 m2 54,633.88 16,163,433.40 8.93 - - - 295.85
3 Pek. Acian 295.85 m2 28,717.80 8,496,161.13 4.70 - - - 295.85
4 Pek. Beton Opritan K-175 3.44 m3 1,057,117.86 3,638,151.80 2.01 - - - 2.93
5 Pek. Pipa PVC 3" 14.00 m' 28,000.00 392,000.00 0.22 - - - 14.00
6 Pek. Cover U-Dicth LD U 1000 x 600 161.00 Bh 338,000.00 54,418,000.00 30.08 - - - 88.55
Sub Total II 165,916,635.20 91.71 - -
C PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Bowplank 1.00 Ls 500,000.00 500,000.00 0.28 - - - 1.00
2 Pek. Papan nama proyek 1.00 Ls 197,000.00 197,000.00 0.11 - - - 1.00
3 Pek. Pembongkaran 1.00 Ls 500,000.00 500,000.00 0.28 - - - 1.00
Sub Total III 1,197,000.00 0.66 - -
Jumlah Biaya Konstruksi 180,909,826.29 100.00 - -
PPN 10 % 18,090,982.63 -
Jumlah Total 199,000,808.92 -
Dibulatkan 199,000,000.00 -
Diperiksa Oleh :
Pejabat Pembuat Komitmen
(PPKOM)
PERIODE : Bulan Ke 1
BULAN KE : 1 (SATU)
TANGGAL 25 Juni 2020 s/d 24 Juli 2020
REALISASI
Prest Bulan ini Prest Komulatif KETERANGAN
Jml Harga Bobot Volume Jml Harga Bobot
ASNIEL AMUS, ST
Direktur
LAPORAN BULANAN
REALISASI
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. Bobot Prest Bulan Lalu Prest Bulan ini
SATUAN ( Rp ) ( Rp )
% Volume Jml Harga Bobot Volume Jml Harga
A PEKERJAAN TANAH
1 Pekerjaan Pondasi Talud
1. Pek. Galian Tanah Keras 145.73 M3 89,341.20 13,019,693.08 7.20 145.73 13,019,693.08 7.20 - -
2. Pek. Urugan Tanah Kembali 48.58 M3 15,985.00 776,498.02 0.43 48.58 776,498.02 0.43 - -
Sub Total I 13,796,191.09 7.63 13,796,191.10 7.63 -
PEKERJAAN PASANGAN SALURAN DAN
B PENUTUP SALURAN PJ. 97,78 m Tg. 1,15 -
1,35 m
1 Pek. Pas. Batu Kali 1 : 5 86.95 m3 952,373.65 82,808,888.87 45.77 86.95 82,808,888.87 45.77 - -
2 Pek. Plesteran 1 : 5 295.85 m2 54,633.88 16,163,433.40 8.93 295.85 16,163,433.40 8.93 - -
3 Pek. Acian 295.85 m2 28,717.80 8,496,161.13 4.70 295.85 8,496,161.13 4.70 - -
4 Pek. Beton Opritan K-175 3.44 m3 1,057,117.86 3,638,151.80 2.01 2.93 3,092,429.03 1.71 0.52 545,722.77
5 Pek. Pipa PVC 3" 14.00 m' 28,000.00 392,000.00 0.22 14.00 392,000.00 0.22 - -
6 Pek. Cover U-Dicth LD U 1000 x 600 161.00 Bh 338,000.00 54,418,000.00 30.08 88.55 29,929,900.00 16.54 72.45 24,488,100.00
Sub Total II 165,916,635.20 91.71 140,882,812.43 77.87 25,033,822.77
C PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Bowplank 1.00 Ls 500,000.00 500,000.00 0.28 1.00 500,000.00 0.28 - -
2 Pek. Papan nama proyek 1.00 Ls 197,000.00 197,000.00 0.11 1.00 197,000.00 0.11 - -
3 Pek. Pembongkaran 1.00 Ls 500,000.00 500,000.00 0.28 1.00 500,000.00 0.28 - -
Sub Total III 1,197,000.00 0.66 1,197,000.00 0.66 -
Jumlah Biaya Konstruksi 180,909,826.29 100.00 155,876,003.53 86.16 25,033,822.77
PPN 10 % 18,090,982.63 15,587,600.35 2,503,382.28
Jumlah Total 199,000,808.92 171,463,603.88 27,537,205.05
Dibulatkan 199,000,000.00 171,463,000.00 27,537,000.00
Diperiksa Oleh :
Pejabat Pembuat Komitmen
(PPKOM)
: Bulan Ke 2
: 2 (DUA)
25 Juli 2020 s/d 23 Agustus 2020
REALISASI
Prest Bulan ini Prest Komulatif KETERANGAN
Bobot Volume Jml Harga Bobot
ASNIEL AMUS, ST
Direktur
REKAPITULASI LAPORAN MINGGUAN
Kegiatan
Pekerjaan
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Konsultan Pengawas : CV. COZZY ERGITA
Minggu Ke : Minggu Ke 1
Periode 30 Juni 2021 s/d 06 Juli 2021
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI 1,300,000.00 0.06 1,300,000.00 0.06
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume Jml Harga
I PEKERJAAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Pengukuran 1.00 ls 2,000,000.00 2,000,000.00 0.09 - -
2 Pek. Papan Nama Proyek 1.00 ls 150,000.00 150,000.00 0.01 - -
Sub Total 2,150,000.00 0.10 -
B PEKERJAAN TANAH
1 Pek. Galian tanah biasa 1 m 519.60 m3 66,650.00 34,631,340.00 1.53 - -
2 Pek. Urugan tanah kembali bekas galian 291.55 m3 15,766.67 4,596,771.67 0.20 - -
3 Pek. Pasir bawah pondasi dan lantai 81.92 m3 181,460.00 14,865,203.20 0.66 - -
4 Pek. Urugan tanah baru padat 316.35 m3 61,060.00 19,316,331.00 0.86 - -
5 Pek. Urugan Sirtu Kw. B baru padat 136.10 m3 178,450.00 24,287,045.00 1.08 - -
Sub Total 97,696,690.87 4.33 -
C PEKERJAAN PONDASI
1 Pek. Pasangan batu kosong (anstamping) 41.14 m3 415,621.88 17,098,683.94 0.76 - -
2 Pek. Pas. Batu kali 1ps 6 pp 226.26 m3 721,755.00 163,304,286.30 7.24 - -
3 Pek.crucuk bambu 10 cm pj 1,5 m 819.00 m' 15,000.00 12,285,000.00 0.54 - -
Sub Total 192,687,970.24 8.54 -
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
1 Pek. Pas.batu bata merah 1ps 6 pp tebal 1/2 bata 733.68 m2 113,245.88 83,086,233.57 3.68 - -
2 Pek. Pasangan Plesteran 1 Pc 6 pp 1,467.36 m2 45,865.95 67,301,860.39 2.98 - -
3 Pek. Acian 1,467.36 m2 26,273.00 38,551,949.28 1.71 - -
4 Pek. Sponengan 434.00 m' 18,914.63 8,208,947.25 0.36 - -
Sub Total 197,148,990.49 8.74 -
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
1 Pek. Pintu Panel Type P1 & P1.b 10.00 Unit 3,500,000.00 35,000,000.00 1.55 - -
2 Pek. Pintu Panel Type P1.a 4.00 Unit 3,500,000.00 14,000,000.00 0.62 - -
3 Pek. Pintu Frameless Type P2.a 1.00 Unit 17,000,000.00 17,000,000.00 0.75 - -
4 Pek. Pintu Kupu Tarung Type P2.b 3.00 Unit 7,500,000.00 22,500,000.00 1.00 - -
5 Pek. Pintu Kupu Tarung Type P2.c 5.00 Unit 7,500,000.00 37,500,000.00 1.66 - -
6 Pek. Jendela Type J2 3.00 Unit 2,200,000.00 6,600,000.00 0.29 - -
7 Pek. Jendela Type J3 6.00 Unit 3,050,000.00 18,300,000.00 0.81 - -
8 Pek. Jendela Type J2.a 1.00 Unit 2,200,000.00 2,200,000.00 0.10 - -
9 Pek. Jendela Type J2.b 1.00 Unit 2,200,000.00 2,200,000.00 0.10 - -
10 Pek. Jendela Type J3.a 2.00 Unit 3,050,000.00 6,100,000.00 0.27 - -
11 Pek. Bouven Type BV1 7.00 Unit 700,000.00 4,900,000.00 0.22 - -
12 Pek. Pasangan engsel Jendela kupu kupu 65.00 bh 7,500.00 487,500.00 0.02 - -
13 Pek. Pasangan engsel pintu 12.00 bh 12,000.00 144,000.00 0.01 - -
14 Pek. Pasangan kunci selot 6.00 bh 125,000.00 750,000.00 0.03 - -
15 Pek. Pasangan rambuncis casement 6.00 bh 125,000.00 750,000.00 0.03 - -
16 Pek. Pasang Kaca Bening 5 mm 37.59 m2 125,000.00 4,698,750.00 0.21 - -
Sub Total 173,130,250.00 7.67 -
F PEKERJAAN BETON
1 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 14.69 m2 163,658.00 2,404,136.02 0.11 - -
Pembesian 814.49 kg 11,160.11 9,089,800.03 0.40 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.78 m3 954,042.05 3,606,278.96 0.16 - -
2 Pek. Beton Bertulang Footplat 2,5 x 2,0 m
Bekisting 2x pakai 93.30 m2 163,658.00 15,269,291.40 0.68 - -
Pembesian 12,877.15 kg 11,160.11 143,710,442.68 6.37 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 91.00 m3 954,042.05 86,817,826.75 3.85 - -
3 Pek. Beton Bertulang Sloof 12/18
Bekisting 2x pakai 8.12 m2 120,658.00 979,742.96 0.04 - -
Pembesian 256.55 kg 11,160.11 2,863,126.86 0.13 - -
LAPORAN MINGGUAN
Kegiatan :
Pekerjaan :
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Tahun Anggaran : 2021
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume Jml Harga
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.38 m3 954,042.05 3,224,662.14 0.14 - -
4 Pek. Beton Bertulang Sloof Struktur 20/30
Bekisting 2x pakai 51.24 m2 120,658.00 6,182,515.92 0.27 - -
Pembesian 2,453.20 kg 11,160.11 27,377,987.98 1.21 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 12.81 m3 954,042.05 12,221,278.69 0.54 - -
5 Pek. Beton Bertulang Sloof Struktur 20/60
Bekisting 2x pakai 45.36 m2 120,658.00 5,473,046.88 0.24 - -
Pembesian 1,936.19 kg 11,160.11 21,608,098.22 0.96 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.34 m3 954,042.05 10,818,836.87 0.48 - -
6 Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,5cm (K1)
Bekisting 2x pakai 80.00 m2 178,175.88 14,254,070.00 0.63 - -
Pembesian 5,790.56 kg 11,160.11 64,623,301.04 2.86 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 32.00 m3 954,042.05 30,529,345.67 1.35 - -
7 Pek. Beton Bertulang Kolom Struktur 30 x 30 T = 4,5cm (K2)
Bekisting 2x pakai 14.40 m2 178,175.88 2,565,732.60 0.11 - -
Pembesian 492.62 kg 11,160.11 5,497,694.62 0.24 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.16 m3 954,042.05 2,060,730.83 0.09 - -
8 Pek. Kolom Praktis 15 x 15 (KP)
Bekisting 2x pakai 39.58 m2 155,439.63 6,152,300.36 0.27 - -
Pembesian 645.13 kg 11,160.11 7,199,723.38 0.32 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 5.28 m3 954,042.05 5,037,342.04 0.22 - -
9 Pek. Beton Bertulang Balok 35/70 (B1)
Bekisting 2x pakai 128.35 m2 184,625.88 23,696,731.06 1.05 - -
Pembesian 8,221.72 kg 11,160.11 91,755,320.14 4.07 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 34.51 m3 954,042.05 32,923,991.22 1.46 - -
10 Pek. Beton Bertulang Balok Induk 25 x 40 (B2)
Bekisting 2x pakai 69.40 m2 184,625.88 12,813,035.73 0.57 - -
Pembesian 6,058.73 kg 11,160.11 67,616,108.41 3.00 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.99 m3 954,042.05 11,438,964.21 0.51 - -
11 Pek. Beton Bertulang Balok 20/60 Talang Dak Aula Elv. + 4,00 m Bottom
Bekisting 2x pakai 13.80 m2 184,625.88 2,547,837.08 0.11 - -
Pembesian 460.72 kg 11,160.11 5,141,687.03 0.23 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.69 m3 954,042.05 2,566,373.12 0.11 - -
12 Pek. Beton Bertulang Balok Latiu 12/15 Elv. + 3,00 m
Bekisting 2x pakai 24.84 m2 184,625.88 4,586,106.74 0.20 - -
Pembesian 292.87 kg 11,160.11 3,268,462.15 0.14 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.15 m3 954,042.05 1,097,148.36 0.05 - -
13 Pek. Beton Plat Topi - topi tbl. 8 cm Elv. + 3,00 m
Bekisting 2x pakai 14.44 m2 184,625.88 2,665,997.64 0.12 - -
Pembesian 108.12 kg 11,160.11 1,206,631.36 0.05 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.00 m3 954,042.05 954,042.05 0.04 - -
14 Pek. Stek Besi Plat Beton Talang Aula
Pembesian 385.25 kg 36,160.11 13,930,683.34 0.62 - -
15 Pek. Beton Bertulang Balok Anak 25/12
Pembesian 1,392.36 kg 11,160.11 15,538,894.24 0.69 - -
16 Plat Lantai tebal 12 cm
Bondex 0,75 608.20 m2 145,000.00 88,189,000.00 3.91 - -
Pembesian 10,253.44 kg 11,160.11 114,429,543.91 5.07 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 119.92 m3 954,042.05 114,408,722.91 5.07 - -
17 Tangga Umum
Bekisting 2x pakai 21.15 m2 161,653.13 3,418,963.59 0.15 - -
Pembesian 247.82 kg 11,160.11 2,765,699.08 0.12 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.12 m3 954,042.05 2,022,569.15 0.09 - -
18 Lantai Beton Rabat bawah kramik fc=7,4 Mpa (K-100) 14.30 m3 779,478.09 11,146,536.71 0.49 - -
19 Lantai kerja bawah Footplat (K-100) 7.76 m3 779,478.09 6,048,749.99 0.27 - -
LAPORAN MINGGUAN
Kegiatan :
Pekerjaan :
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Tahun Anggaran : 2021
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume Jml Harga
Sub Total 1,125,745,112.11 49.88 -
G PEKERJAAN KERAMIK LANTAI 1
1 Pek. Pasangan keramik 60 x 60 cm motif ex.platinum 426.04 m2 180,148.50 76,750,466.94 3.40 - -
2 Pek. Lantai keramik 25x25 ASIA TILE (bagian toilet) 19.80 m2 176,727.42 3,499,202.92 0.16 - -
3 Pek.Dinding keramik 25x40 ASIA TILE (bagian toilet) 56.00 m2 203,864.08 11,416,388.20 0.51 - -
4 Pek.Keramik Dinding Motif Batik 6.00 m2 275,000.00 1,650,000.00 0.07 - -
Sub Total 93,316,058.06 4.14 -
H PEKERJAAN PLAFOND LANTAI 1
1 Pek. Pasang rangka Langit langit hollow 60 x 60 492.66 m2 43,102.13 21,234,692.90 0.94 - -
2 Pek. Plafond Kalsiboard ex. Elephand 492.66 m2 37,232.63 18,343,025.03 0.81 - -
3 Pekerjaan List Plafond Besar 397.00 m 25,558.13 10,146,575.63 0.45 - -
Sub Total 49,724,293.56 2.20 -
I PEKERJAAN INSTALASI LISTRIK
1 Pek. Penyambungan 1.00 unit 10,000,000.00 10,000,000.00 0.44 - -
2 Pek. pasangan instalasi listrik titik lampu kabel NYM 2X2,5mm pipa counduit 74.00 titik 190,000.00 14,060,000.00 0.62 - -
3 Pek. Lampu Panel LED kubus Slim (18 watt putih),Panasonic 10.00 bh 190,000.00 1,900,000.00 0.08 - -
4 Pek.Lampu Downlight 25.00 bh 225,000.00 5,625,000.00 0.25 - -
5 Pek. Pasangan saklar Ganda 16.00 bh 35,000.00 560,000.00 0.02 - -
6 Pek. Pasangan stop kontak 15.00 bh 40,000.00 600,000.00 0.03 - -
7 Pek.Lampu RMI (2 Lampu 18 watt) Philips 23.00 bh 350,000.00 8,050,000.00 0.36 - -
8 Pek stang caping ,lampu SL 23 watt Philips 6.00 bh 35,000.00 210,000.00 0.01 - -
9 Pek. Pasangan stop kontak AC 10.00 bh 90,000.00 900,000.00 0.04 - -
Sub Total 41,905,000.00 1.86 -
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
1 Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel Kontrol + Asesoris 1.00 unit 4,500,000.00 4,500,000.00 0.20 - -
2 Pekerjaan Pasang MCB 6A/5KA 6.00 bh 155,000.00 930,000.00 0.04 - -
3 Pekerjaan Pasang MCB 10A/5KA 10.00 bh 165,000.00 1,650,000.00 0.07 - -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 750,000.00 750,000.00 0.03 - -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 50,000.00 150,000.00 0.01 - -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 - -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 - -
Sub Total 8,730,000.00 0.39 -
K PEKERJAAN SDP
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 - -
2 Pekerjaan Pasang MCB 20A/5KA 2.00 bh 725,000.00 1,450,000.00 0.06 - -
3 Pekerjaan Pasang MCCB 20A/10KA 3Phase 2.00 bh 750,000.00 1,500,000.00 0.07 - -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 2.00 bh 1,500,000.00 3,000,000.00 0.13 - -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 - -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 - -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 - -
Sub Total 9,950,000.00 0.44 -
L PEKERJAAN PANEL AC LANTAI 1
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 - -
2 Pekerjaan Pasang MCB 20A/10KA 10.00 bh 725,000.00 7,250,000.00 0.32 - -
3 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 1,500,000.00 1,500,000.00 0.07 - -
4 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 - -
5 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 - -
6 Pekerjaan Intaslasi AC 10.00 bh 190,000.00 1,900,000.00 0.08 - -
7 Pekerjaan Instalasi Pipa Refrigrant dan Draine 10.00 bh 500,000.00 5,000,000.00 0.22 - -
8 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 - -
Sub Total 19,650,000.00 0.87 -
M PEKERJAAN SANITASI
1 Pek. Pasangan Kloset Duduk Porselen (setara TOTO) 4.00 bh 3,000,000.00 12,000,000.00 0.53 - -
LAPORAN MINGGUAN
Kegiatan :
Pekerjaan :
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Tahun Anggaran : 2021
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume Jml Harga
2 Pek. Pasang Jet washer 4.00 bh 100,000.00 400,000.00 0.02 - -
3 Pek.Pasang Kran dapur (leher angsa) stenliststeel 1.00 bh 150,000.00 150,000.00 0.01 - -
4 Pek. Pasangan kran air dia.3/4 4.00 bh 125,000.00 500,000.00 0.02 - -
5 Pek. Pasangan floor drain 4.00 bh 55,000.00 220,000.00 0.01 - -
6 Pek. Pasangan pipa PVC dia.4 25.00 m 71,783.13 1,794,578.13 0.08 - -
7 Pek. Pasangan pipa pvc tipe aw dia.3/4 30.00 m 23,878.44 716,353.13 0.03 - -
8 Pek. Sapitanck sederhana 2.00 unit 3,000,000.00 6,000,000.00 0.27 - -
9 Pek. Peresapan Septitank 2.00 unit 1,000,000.00 2,000,000.00 0.09 - -
10 Pek. Peresapan air Kotor 2.00 unit 1,000,000.00 2,000,000.00 0.09 - -
11 Pek. Tandon Pinguin TB110 (isi 1050 lt +asesoris otomatis) 1.00 unit 1,500,000.00 1,500,000.00 0.07 - -
Sub Total 27,280,931.25 1.21 -
N PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan tembok lantai 1 1,467.36 m2 27,660.29 40,587,599.47 1.80 - -
2 Pekerjaan Pengecatan plafond 492.66 m2 17,877.79 8,807,670.79 0.39 - -
Sub Total 49,395,270.26 2.19 -
O PEKERJAAN LAIN - LAIN
1 Pek. Pasang Galvalum Rangka Besi Hollow 4/6 Penutup Void Tangga L 2 18.00 m2 300,000.00 5,400,000.00 0.24 - -
Sub Total 5,400,000.00 0.24 -
PEKERJAAN GEDUNG AULA
A PEKERJAAN TANAH
1 Pek. Galian tanah biasa sedalam 1 m 28.86 m3 66,650.00 1,923,519.00 0.09 - -
2 Pek. Pengurugan tanah kembali bekas galian 16.14 m3 15,766.67 254,474.00 0.01 - -
3 Pek. Pengurugan Tanah Baru Padat 154.35 m3 61,060.00 9,424,611.00 0.42 - -
4 Pek. Pengurugan Sirtu padat kelas B 46.30 m3 178,450.00 8,262,235.00 0.37 - -
5 Pek. Urugan pasir bawah pondasi dan lantai 17.25 m3 181,460.00 3,130,185.00 0.14 - -
6 Pek. Cerucuk bambu 8-10 cm 187.50 m 15,000.00 2,812,500.00 0.12 - -
Sub Total 25,807,524.00 1.14 -
B PEKERJAAN PONDASI
1 Pek. Pasangan pondasi batu kosong/ Aanstamping 5.62 m3 415,621.88 2,335,794.94 0.10 - -
2 Pek. Pasangan pondasi batu kali 16 15.24 m3 721,755.00 10,999,546.20 0.49 - -
Sub Total 13,335,341.14 0.59 -
C PEKERJAAN BETON
1 Pek. Lantai Kerja K.100 12.73 m3 779,478.09 9,922,756.11 0.44 - -
2 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 11.52 m2 163,658.00 1,885,340.16 0.08 - -
Pembesian 573.30 kg 11,160.11 6,398,092.50 0.28 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 4.37 m3 954,042.05 4,169,163.77 0.18 - -
3 Pek. Sloof 15/20
Bekisting 2x pakai 27.16 m2 120,658.00 3,277,071.28 0.15 - -
Pembesian 363.67 kg 11,160.11 4,058,598.11 0.18 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.03 m3 954,042.05 1,936,705.37 0.09 - -
4 Pek. Kolom 30/30
Bekisting 2x pakai 55.21 m2 178,175.88 9,837,090.06 0.44 - -
Pembesian 1,205.31 kg 11,160.11 13,451,395.20 0.60 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 6.26 m3 954,042.05 5,972,303.25 0.26 - -
5 Pek. Kolom Praktis 12/12
Bekisting 2x pakai 11.28 m2 155,439.63 1,753,358.97 0.08 - -
Pembesian 279.47 kg 11,160.11 3,118,916.64 0.14 - -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 0.79 m3 954,042.05 753,693.22 0.03 - -
6 Pek. Balok 15/25 Elv. + 3,00 m
Bekisting 2x pakai 5.72 m2 184,625.88 1,056,060.01 0.05 - -
Pembesian 105.33 kg 11,160.11 1,175,494.65 0.05 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 0.26 m3 954,042.05 248,050.93 0.01 - -
7 Pek. Balok 20/25 Elv. +3,00 m
LAPORAN MINGGUAN
Kegiatan :
Pekerjaan :
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Tahun Anggaran : 2021
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume Jml Harga
Bekisting 2x pakai 29.12 m2 184,625.88 5,376,305.48 0.24 - -
Pembesian 510.14 kg 11,160.11 5,693,219.79 0.25 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.08 m3 954,042.05 1,984,407.47 0.09 - -
8 Pek. Balok 20/35 Elv. + 4,00 m
Bekisting 2x pakai 18.36 m2 184,625.88 3,389,731.07 0.15 - -
Pembesian 472.22 kg 11,160.11 5,270,028.32 0.23 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.43 m3 954,042.05 1,364,280.13 0.06 - -
9 Pek. Balok Konsol Elv. Top + 4,00 m
Pembesian 199.53 kg 11,160.11 2,226,777.25 0.10 - -
10 Pek. Plat Beton Topi-topi Elv. + 3,00 m
Bekisting 2x pakai 39.64 m2 184,625.88 7,318,569.69 0.32 - -
Pembesian 422.92 kg 11,160.11 4,719,834.78 0.21 - -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 2.88 m3 954,042.05 2,747,641.11 0.12 - -
Sub Total 109,104,885.30 4.83 -
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK 1.00 ls 300,000.00 300,000.00 0.01 - -
2 Asuransi dan perijinan 1.00 ls 1,000,000.00 1,000,000.00 0.04 - -
Sub Total 1,300,000.00 0.06 -
IV PEKERJAAN PENCEGAHAN COVID-19
1 Alat Pelindung Kerja dan Pelindung Diri 1.00 ls 7,695,000.00 7,695,000.00 0.34 - -
2 Personil Keselamatan Konstruksi 1.00 ls 3,000,000.00 3,000,000.00 0.13 - -
3 Fasilitas sarana, Prasarana dan Alat kesehatan 1.00 ls 2,565,000.00 2,565,000.00 0.11 - -
( Termasuk Protokol Kesehatan Penanganan COVID 19 )
Sub Total 13,260,000.00 0.59 -
Jumlah Biaya Konstruksi 2,256,718,317.27 100.00 -
PPN 10 % 225,671,831.73 -
Jumlah Total 2,482,390,149.00 -
Dibulatkan 2,482,390,000.00 -
Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)
FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
AN MINGGUAN
PERIODE : Minggu Ke 1
MINGGU KE : 1 (SATU)
TANGGAL 30 Juni 2021 s/d 06 Juli 2021
REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
AN MINGGUAN
PERIODE : Minggu Ke 1
MINGGU KE : 1 (SATU)
TANGGAL 30 Juni 2021 s/d 06 Juli 2021
REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
AN MINGGUAN
PERIODE : Minggu Ke 1
MINGGU KE : 1 (SATU)
TANGGAL 30 Juni 2021 s/d 06 Juli 2021
REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot
- - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - - - -
AN MINGGUAN
PERIODE : Minggu Ke 1
MINGGU KE : 1 (SATU)
TANGGAL 30 Juni 2021 s/d 06 Juli 2021
REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - - - -
- - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - - - -
- - - - - - -
- - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
AN MINGGUAN
PERIODE : Minggu Ke 1
MINGGU KE : 1 (SATU)
TANGGAL 30 Juni 2021 s/d 06 Juli 2021
REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -
M.SAEFULLAH, ST
Pengawas Lapangan
TIME SCHEDULE ( JADWAL WAKTU PELAKSANAAN)
KEGIATAN : PERIODE : Minggu Ke 1
PEKERJAAN : MINGGU KE : 1 ( SATU )
LOKASI : di jalan tondano, Kecamatan Pekalongan Timur TANGGAL : 30 Juni 2021 s/d 06 Juli 2021
TH. ANGGARAN : 2021
WAKTU PELAKSANAAN
BOBOT
NO. JENIS PEKERJAAN JUMLAH HARGA (Rp) MINGGU KE KETERANGAN
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
I PEKERJAAN GEDUNG KANTOR
100
A PEKERJAAN PERSIAPAN 2,365,000.00 0.095 0.05 0.05
LANTAI I
B PEKERJAAN TANAH 107,466,359.95 4.329 0.62 0.62 0.62 0.62 0.62 0.62 0.62 90
C PEKERJAAN PONDASI 211,956,767.26 8.538 2.13 2.13 2.13 2.13
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1 216,863,889.54 8.736 1.25 1.25 1.25 1.25 1.25 1.25 1.25
80
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1 190,443,275.00 7.672 1.28 1.28 1.28 1.28 1.28 1.28
F PEKERJAAN BETON 1,238,319,623.33 49.884 4.99 4.99 4.99 4.99 4.99 4.99 4.99 4.99 4.99 4.99
G PEKERJAAN KERAMIK LANTAI 1 102,647,663.86 4.135 1.03 1.03 1.03 1.03 70
H PEKERJAAN PLAFOND LANTAI 1 54,696,722.92 2.203 0.44 0.44 0.44 0.44 0.44
I PEKERJAAN INSTALASI LISTRIK 46,095,500.00 1.857 0.37 0.37 0.37 0.37 0.37
60
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS 9,603,000.00 0.387 0.13 0.13 0.13
K PEKERJAAN SDP 10,945,000.00 0.441 0.22 0.22
L PEKERJAAN PANEL AC LANTAI 1 21,615,000.00 0.871 0.22 0.22 0.22 0.22 50
M PEKERJAAN SANITASI 30,009,024.38 1.209 0.30 0.30 0.30 0.30
N PEKERJAAN PENGECATAN 54,334,797.28 2.189 0.36 0.36 0.36 0.36 0.36 0.36
O PEKERJAAN LAIN - LAIN 5,940,000.00 0.239 0.12 0.12
40
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI 1,430,000.00 0.058 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 10
IV PEKERJAAN PENCEGAHAN COVID-19 14,586,000.00 0.588 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0
Progres Rencana Per minggu 0.08 0.92 5.86 8.15 7.53 8.01 8.40 7.37 7.37 7.37 7.19 7.56 3.61 4.51 3.94 2.64 2.56 2.78 2.24 0.86 0.64 0.39
Komulatif Progres Rencana 0 0.08 1.00 6.87 15.01 22.54 30.55 38.96 46.32 53.69 61.06 68.25 75.81 79.42 83.93 87.87 90.51 93.08 95.86 98.10 98.96 99.61 100.00
Progres Realisasi Per minggu 0.75
Komulatif Progres Realisasi 0 0.75
Deviasi 0.67
Keterangan Mendahului
Kegiatan :
Pekerjaan :
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume
I PEKERJAAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Pengukuran 1.00 ls 2,000,000.00 2,000,000.00 0.09 1.00
2 Pek. Papan Nama Proyek 1.00 ls 150,000.00 150,000.00 0.01 -
Sub Total 2,150,000.00 0.10
B PEKERJAAN TANAH
1 Pek. Galian tanah biasa 1 m 519.60 m3 66,650.00 34,631,340.00 1.53 155.88
2 Pek. Urugan tanah kembali bekas galian 291.55 m3 15,766.67 4,596,771.67 0.20 87.47
3 Pek. Pasir bawah pondasi dan lantai 81.92 m3 181,460.00 14,865,203.20 0.66 -
4 Pek. Urugan tanah baru padat 316.35 m3 61,060.00 19,316,331.00 0.86 -
5 Pek. Urugan Sirtu Kw. B baru padat 136.10 m3 178,450.00 24,287,045.00 1.08 -
Sub Total 97,696,690.87 4.33
C PEKERJAAN PONDASI
1 Pek. Pasangan batu kosong (anstamping) 41.14 m3 415,621.88 17,098,683.94 0.76 -
2 Pek. Pas. Batu kali 1ps 6 pp 226.26 m3 721,755.00 163,304,286.30 7.24 -
3 Pek.crucuk bambu 10 cm pj 1,5 m 819.00 m' 15,000.00 12,285,000.00 0.54 -
Sub Total 192,687,970.24 8.54
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
1 Pek. Pas.batu bata merah 1ps 6 pp tebal 1/2 bata 733.68 m2 113,245.88 83,086,233.57 3.68 -
2 Pek. Pasangan Plesteran 1 Pc 6 pp 1,467.36 m2 45,865.95 67,301,860.39 2.98 -
3 Pek. Acian 1,467.36 m2 26,273.00 38,551,949.28 1.71 -
4 Pek. Sponengan 434.00 m' 18,914.63 8,208,947.25 0.36 -
Sub Total 197,148,990.49 8.74
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
1 Pek. Pintu Panel Type P1 & P1.b 10.00 Unit 3,500,000.00 35,000,000.00 1.55 -
2 Pek. Pintu Panel Type P1.a 4.00 Unit 3,500,000.00 14,000,000.00 0.62 -
3 Pek. Pintu Frameless Type P2.a 1.00 Unit 17,000,000.00 17,000,000.00 0.75 -
4 Pek. Pintu Kupu Tarung Type P2.b 3.00 Unit 7,500,000.00 22,500,000.00 1.00 -
5 Pek. Pintu Kupu Tarung Type P2.c 5.00 Unit 7,500,000.00 37,500,000.00 1.66 -
6 Pek. Jendela Type J2 3.00 Unit 2,200,000.00 6,600,000.00 0.29 -
7 Pek. Jendela Type J3 6.00 Unit 3,050,000.00 18,300,000.00 0.81 -
8 Pek. Jendela Type J2.a 1.00 Unit 2,200,000.00 2,200,000.00 0.10 -
9 Pek. Jendela Type J2.b 1.00 Unit 2,200,000.00 2,200,000.00 0.10 -
10 Pek. Jendela Type J3.a 2.00 Unit 3,050,000.00 6,100,000.00 0.27 -
11 Pek. Bouven Type BV1 7.00 Unit 700,000.00 4,900,000.00 0.22 -
12 Pek. Pasangan engsel Jendela kupu kupu 65.00 bh 7,500.00 487,500.00 0.02 -
13 Pek. Pasangan engsel pintu 12.00 bh 12,000.00 144,000.00 0.01 -
14 Pek. Pasangan kunci selot 6.00 bh 125,000.00 750,000.00 0.03 -
15 Pek. Pasangan rambuncis casement 6.00 bh 125,000.00 750,000.00 0.03 -
16 Pek. Pasang Kaca Bening 5 mm 37.59 m2 125,000.00 4,698,750.00 0.21 -
Sub Total 173,130,250.00 7.67
F PEKERJAAN BETON
1 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 14.69 m2 163,658.00 2,404,136.02 0.11 -
Pembesian 814.49 kg 11,160.11 9,089,800.03 0.40 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.78 m3 954,042.05 3,606,278.96 0.16 -
2 Pek. Beton Bertulang Footplat 2,5 x 2,0 m
Bekisting 2x pakai 93.30 m2 163,658.00 15,269,291.40 0.68 -
Pembesian 12,877.15 kg 11,160.11 143,710,442.68 6.37 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 91.00 m3 954,042.05 86,817,826.75 3.85 -
3 Pek. Beton Bertulang Sloof 12/18
Bekisting 2x pakai 8.12 m2 120,658.00 979,742.96 0.04 -
Pembesian 256.55 kg 11,160.11 2,863,126.86 0.13 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.38 m3 954,042.05 3,224,662.14 0.14 -
4 Pek. Beton Bertulang Sloof Struktur 20/30
Bekisting 2x pakai 51.24 m2 120,658.00 6,182,515.92 0.27 -
Pembesian 2,453.20 kg 11,160.11 27,377,987.98 1.21 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 12.81 m3 954,042.05 12,221,278.69 0.54 -
5 Pek. Beton Bertulang Sloof Struktur 20/60
Bekisting 2x pakai 45.36 m2 120,658.00 5,473,046.88 0.24 -
Pembesian 1,936.19 kg 11,160.11 21,608,098.22 0.96 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.34 m3 954,042.05 10,818,836.87 0.48 -
6 Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,5cm (K1)
Bekisting 2x pakai 80.00 m2 178,175.88 14,254,070.00 0.63 -
Pembesian 5,790.56 kg 11,160.11 64,623,301.04 2.86 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 32.00 m3 954,042.05 30,529,345.67 1.35 -
7 Pek. Beton Bertulang Kolom Struktur 30 x 30 T = 4,5cm (K2)
Bekisting 2x pakai 14.40 m2 178,175.88 2,565,732.60 0.11 -
Pembesian 492.62 kg 11,160.11 5,497,694.62 0.24 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.16 m3 954,042.05 2,060,730.83 0.09 -
8 Pek. Kolom Praktis 15 x 15 (KP)
Bekisting 2x pakai 39.58 m2 155,439.63 6,152,300.36 0.27 -
Pembesian 645.13 kg 11,160.11 7,199,723.38 0.32 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 5.28 m3 954,042.05 5,037,342.04 0.22 -
9 Pek. Beton Bertulang Balok 35/70 (B1)
Bekisting 2x pakai 128.35 m2 184,625.88 23,696,731.06 1.05 -
Pembesian 8,221.72 kg 11,160.11 91,755,320.14 4.07 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 34.51 m3 954,042.05 32,923,991.22 1.46 -
10 Pek. Beton Bertulang Balok Induk 25 x 40 (B2)
Bekisting 2x pakai 69.40 m2 184,625.88 12,813,035.73 0.57 -
Pembesian 6,058.73 kg 11,160.11 67,616,108.41 3.00 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.99 m3 954,042.05 11,438,964.21 0.51 -
11 Pek. Beton Bertulang Balok 20/60 Talang Dak Aula Elv. + 4,00 m Bottom
Bekisting 2x pakai 13.80 m2 184,625.88 2,547,837.08 0.11 -
Pembesian 460.72 kg 11,160.11 5,141,687.03 0.23 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.69 m3 954,042.05 2,566,373.12 0.11 -
12 Pek. Beton Bertulang Balok Latiu 12/15 Elv. + 3,00 m
Bekisting 2x pakai 24.84 m2 184,625.88 4,586,106.74 0.20 -
Pembesian 292.87 kg 11,160.11 3,268,462.15 0.14 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.15 m3 954,042.05 1,097,148.36 0.05 -
13 Pek. Beton Plat Topi - topi tbl. 8 cm Elv. + 3,00 m
Bekisting 2x pakai 14.44 m2 184,625.88 2,665,997.64 0.12 -
Pembesian 108.12 kg 11,160.11 1,206,631.36 0.05 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.00 m3 954,042.05 954,042.05 0.04 -
14 Pek. Stek Besi Plat Beton Talang Aula
Pembesian 385.25 kg 36,160.11 13,930,683.34 0.62 -
15 Pek. Beton Bertulang Balok Anak 25/12
Pembesian 1,392.36 kg 11,160.11 15,538,894.24 0.69 -
16 Plat Lantai tebal 12 cm
Bondex 0,75 608.20 m2 145,000.00 88,189,000.00 3.91 -
Pembesian 10,253.44 kg 11,160.11 114,429,543.91 5.07 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 119.92 m3 954,042.05 114,408,722.91 5.07 -
17 Tangga Umum
Bekisting 2x pakai 21.15 m2 161,653.13 3,418,963.59 0.15 -
Pembesian 247.82 kg 11,160.11 2,765,699.08 0.12 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.12 m3 954,042.05 2,022,569.15 0.09 -
18 Lantai Beton Rabat bawah kramik fc=7,4 Mpa (K-100) 14.30 m3 779,478.09 11,146,536.71 0.49 -
19 Lantai kerja bawah Footplat (K-100) 7.76 m3 779,478.09 6,048,749.99 0.27 -
Sub Total 1,125,745,112.11 49.88
G PEKERJAAN KERAMIK LANTAI 1
1 Pek. Pasangan keramik 60 x 60 cm motif ex.platinum 426.04 m2 180,148.50 76,750,466.94 3.40 -
2 Pek. Lantai keramik 25x25 ASIA TILE (bagian toilet) 19.80 m2 176,727.42 3,499,202.92 0.16 -
3 Pek.Dinding keramik 25x40 ASIA TILE (bagian toilet) 56.00 m2 203,864.08 11,416,388.20 0.51 -
4 Pek.Keramik Dinding Motif Batik 6.00 m2 275,000.00 1,650,000.00 0.07 -
Sub Total 93,316,058.06 4.14
H PEKERJAAN PLAFOND LANTAI 1
1 Pek. Pasang rangka Langit langit hollow 60 x 60 492.66 m2 43,102.13 21,234,692.90 0.94 -
2 Pek. Plafond Kalsiboard ex. Elephand 492.66 m2 37,232.63 18,343,025.03 0.81 -
3 Pekerjaan List Plafond Besar 397.00 m 25,558.13 10,146,575.63 0.45 -
Sub Total 49,724,293.56 2.20
I PEKERJAAN INSTALASI LISTRIK
1 Pek. Penyambungan 1.00 unit 10,000,000.00 10,000,000.00 0.44 -
2 Pek. pasangan instalasi listrik titik lampu kabel NYM 2X2,5mm pipa counduit 74.00 titik 190,000.00 14,060,000.00 0.62 -
3 Pek. Lampu Panel LED kubus Slim (18 watt putih),Panasonic 10.00 bh 190,000.00 1,900,000.00 0.08 -
4 Pek.Lampu Downlight 25.00 bh 225,000.00 5,625,000.00 0.25 -
5 Pek. Pasangan saklar Ganda 16.00 bh 35,000.00 560,000.00 0.02 -
6 Pek. Pasangan stop kontak 15.00 bh 40,000.00 600,000.00 0.03 -
7 Pek.Lampu RMI (2 Lampu 18 watt) Philips 23.00 bh 350,000.00 8,050,000.00 0.36 -
8 Pek stang caping ,lampu SL 23 watt Philips 6.00 bh 35,000.00 210,000.00 0.01 -
9 Pek. Pasangan stop kontak AC 10.00 bh 90,000.00 900,000.00 0.04 -
Sub Total 41,905,000.00 1.86
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
1 Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel Kontrol + Asesoris 1.00 unit 4,500,000.00 4,500,000.00 0.20 -
2 Pekerjaan Pasang MCB 6A/5KA 6.00 bh 155,000.00 930,000.00 0.04 -
3 Pekerjaan Pasang MCB 10A/5KA 10.00 bh 165,000.00 1,650,000.00 0.07 -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 750,000.00 750,000.00 0.03 -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 50,000.00 150,000.00 0.01 -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 8,730,000.00 0.39
K PEKERJAAN SDP
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 -
2 Pekerjaan Pasang MCB 20A/5KA 2.00 bh 725,000.00 1,450,000.00 0.06 -
3 Pekerjaan Pasang MCCB 20A/10KA 3Phase 2.00 bh 750,000.00 1,500,000.00 0.07 -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 2.00 bh 1,500,000.00 3,000,000.00 0.13 -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 9,950,000.00 0.44
L PEKERJAAN PANEL AC LANTAI 1
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 -
2 Pekerjaan Pasang MCB 20A/10KA 10.00 bh 725,000.00 7,250,000.00 0.32 -
3 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 1,500,000.00 1,500,000.00 0.07 -
4 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 -
5 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
6 Pekerjaan Intaslasi AC 10.00 bh 190,000.00 1,900,000.00 0.08 -
7 Pekerjaan Instalasi Pipa Refrigrant dan Draine 10.00 bh 500,000.00 5,000,000.00 0.22 -
8 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 19,650,000.00 0.87
M PEKERJAAN SANITASI
1 Pek. Pasangan Kloset Duduk Porselen (setara TOTO) 4.00 bh 3,000,000.00 12,000,000.00 0.53 -
2 Pek. Pasang Jet washer 4.00 bh 100,000.00 400,000.00 0.02 -
3 Pek.Pasang Kran dapur (leher angsa) stenliststeel 1.00 bh 150,000.00 150,000.00 0.01 -
4 Pek. Pasangan kran air dia.3/4 4.00 bh 125,000.00 500,000.00 0.02 -
5 Pek. Pasangan floor drain 4.00 bh 55,000.00 220,000.00 0.01 -
6 Pek. Pasangan pipa PVC dia.4 25.00 m 71,783.13 1,794,578.13 0.08 -
7 Pek. Pasangan pipa pvc tipe aw dia.3/4 30.00 m 23,878.44 716,353.13 0.03 -
8 Pek. Sapitanck sederhana 2.00 unit 3,000,000.00 6,000,000.00 0.27 -
9 Pek. Peresapan Septitank 2.00 unit 1,000,000.00 2,000,000.00 0.09 -
10 Pek. Peresapan air Kotor 2.00 unit 1,000,000.00 2,000,000.00 0.09 -
11 Pek. Tandon Pinguin TB110 (isi 1050 lt +asesoris otomatis) 1.00 unit 1,500,000.00 1,500,000.00 0.07 -
Sub Total 27,280,931.25 1.21
N PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan tembok lantai 1 1,467.36 m2 27,660.29 40,587,599.47 1.80 -
2 Pekerjaan Pengecatan plafond 492.66 m2 17,877.79 8,807,670.79 0.39 -
Sub Total 49,395,270.26 2.19
O PEKERJAAN LAIN - LAIN
1 Pek. Pasang Galvalum Rangka Besi Hollow 4/6 Penutup Void Tangga L 2 18.00 m2 300,000.00 5,400,000.00 0.24 -
Sub Total 5,400,000.00 0.24
PEKERJAAN GEDUNG AULA
A PEKERJAAN TANAH
1 Pek. Galian tanah biasa sedalam 1 m 28.86 m3 66,650.00 1,923,519.00 0.09 -
2 Pek. Pengurugan tanah kembali bekas galian 16.14 m3 15,766.67 254,474.00 0.01 -
3 Pek. Pengurugan Tanah Baru Padat 154.35 m3 61,060.00 9,424,611.00 0.42 -
4 Pek. Pengurugan Sirtu padat kelas B 46.30 m3 178,450.00 8,262,235.00 0.37 -
5 Pek. Urugan pasir bawah pondasi dan lantai 17.25 m3 181,460.00 3,130,185.00 0.14 -
6 Pek. Cerucuk bambu 8-10 cm 187.50 m 15,000.00 2,812,500.00 0.12 -
Sub Total 25,807,524.00 1.14
B PEKERJAAN PONDASI
1 Pek. Pasangan pondasi batu kosong/ Aanstamping 5.62 m3 415,621.88 2,335,794.94 0.10 -
2 Pek. Pasangan pondasi batu kali 16 15.24 m3 721,755.00 10,999,546.20 0.49 -
Sub Total 13,335,341.14 0.59
C PEKERJAAN BETON
1 Pek. Lantai Kerja K.100 12.73 m3 779,478.09 9,922,756.11 0.44 -
2 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 11.52 m2 163,658.00 1,885,340.16 0.08 -
Pembesian 573.30 kg 11,160.11 6,398,092.50 0.28 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 4.37 m3 954,042.05 4,169,163.77 0.18 -
3 Pek. Sloof 15/20
Bekisting 2x pakai 27.16 m2 120,658.00 3,277,071.28 0.15 -
Pembesian 363.67 kg 11,160.11 4,058,598.11 0.18 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.03 m3 954,042.05 1,936,705.37 0.09 -
4 Pek. Kolom 30/30
Bekisting 2x pakai 55.21 m2 178,175.88 9,837,090.06 0.44 -
Pembesian 1,205.31 kg 11,160.11 13,451,395.20 0.60 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 6.26 m3 954,042.05 5,972,303.25 0.26 -
5 Pek. Kolom Praktis 12/12
Bekisting 2x pakai 11.28 m2 155,439.63 1,753,358.97 0.08 -
Pembesian 279.47 kg 11,160.11 3,118,916.64 0.14 -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 0.79 m3 954,042.05 753,693.22 0.03 -
6 Pek. Balok 15/25 Elv. + 3,00 m
Bekisting 2x pakai 5.72 m2 184,625.88 1,056,060.01 0.05 -
Pembesian 105.33 kg 11,160.11 1,175,494.65 0.05 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 0.26 m3 954,042.05 248,050.93 0.01 -
7 Pek. Balok 20/25 Elv. +3,00 m
Bekisting 2x pakai 29.12 m2 184,625.88 5,376,305.48 0.24 -
Pembesian 510.14 kg 11,160.11 5,693,219.79 0.25 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.08 m3 954,042.05 1,984,407.47 0.09 -
8 Pek. Balok 20/35 Elv. + 4,00 m
Bekisting 2x pakai 18.36 m2 184,625.88 3,389,731.07 0.15 -
Pembesian 472.22 kg 11,160.11 5,270,028.32 0.23 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.43 m3 954,042.05 1,364,280.13 0.06 -
9 Pek. Balok Konsol Elv. Top + 4,00 m
Pembesian 199.53 kg 11,160.11 2,226,777.25 0.10 -
10 Pek. Plat Beton Topi-topi Elv. + 3,00 m
Bekisting 2x pakai 39.64 m2 184,625.88 7,318,569.69 0.32 -
Pembesian 422.92 kg 11,160.11 4,719,834.78 0.21 -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 2.88 m3 954,042.05 2,747,641.11 0.12 -
Sub Total 109,104,885.30 4.83
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK 1.00 ls 300,000.00 300,000.00 0.01 1.00
2 Asuransi dan perijinan 1.00 ls 1,000,000.00 1,000,000.00 0.04 1.00
Sub Total 1,300,000.00 0.06
IV PEKERJAAN PENCEGAHAN COVID-19
1 Alat Pelindung Kerja dan Pelindung Diri 1.00 ls 7,695,000.00 7,695,000.00 0.34 0.10
2 Personil Keselamatan Konstruksi 1.00 ls 3,000,000.00 3,000,000.00 0.13 0.10
3 Fasilitas sarana, Prasarana dan Alat kesehatan 1.00 ls 2,565,000.00 2,565,000.00 0.11 0.30
( Termasuk Protokol Kesehatan Penanganan COVID 19 )
Sub Total 13,260,000.00 0.59
Jumlah Biaya Konstruksi 2,256,718,317.27 100.00
PPN 10 % 225,671,831.73
Jumlah Total 2,482,390,149.00
Dibulatkan 2,482,390,000.00
Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)
FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
GGUAN
PERIODE : Minggu Ke 2
MINGGU KE : 2 (DUA)
REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Jml Harga Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
300,000.00 0.01 - - - 1.00 300,000.00 0.01
1,000,000.00 0.04 - - - 1.00 1,000,000.00 0.04
1,300,000.00 0.06 - - 1,300,000.00 0.06
M.SAEFULLAH, ST
Pengawas Lapangan
REKAPITULASI LAPORAN MINGGUAN
Kegiatan
Pekerjaan
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Konsultan Pengawas : CV. COZZY ERGITA
Minggu Ke : Minggu Ke 1
Periode 07 Juli 2021 s/d
URAIAN PEKERJAAN
NO
di periksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)
FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
ASI LAPORAN MINGGUAN
13 Juli 2021
1.00 %
0.75 %
0.38 %
1.13 %
0.13 %
M.SAEFULLAH, ST
Pengawas Lapangan
KEGIATAN :
PEKERJAAN :
LOKASI : di jalan tondano, Kecamatan Pekalongan Timur
TH. ANGGARAN : 2021
Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)
FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
TIME SCHEDULE ( JADWAL
BOBOT
JUMLAH HARGA (Rp)
% 1 2 3 4 5
2,482,390,149.00 100.00
248,239,014.90
2,730,629,163.90
2,730,629,000.00
0.08 0.92 5.86 8.15 7.53
0 0.08 1.00 6.87 15.01 22.54
0.75 0.38
0 0.75 1.13
0.67 0.13
Mendahului Mendahului
CHEDULE ( JADWAL WAKTU PELAKSANAAN)
WAKTU PELAKSANAAN
MINGGU KE
6 7 8 9 10 11 12 13
0.23
0.15 0.15
0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48
14 15 16 17 18 19 20 21
1.25
1.28 1.28 1.28 1.28 1.28 1.28
0.48 0.48
M.SAEFULLAH, ST
Pengawas Lapangan
13 Juli 2021
KETERANGAN
22
100
90
80
70
60
0.36
50
40
30
0.003
20
0.03
10
0
10
0
0.39
100.00
3 Juli 2021
ultan Pengawas
COZZY ERGITA
AEFULLAH, ST
awas Lapangan
LAPORAN MINGGUAN
Kegiatan :
Pekerjaan :
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume
I PEKERJAAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Pengukuran 1.00 ls 2,000,000.00 2,000,000.00 0.09 1.00
2 Pek. Papan Nama Proyek 1.00 ls 150,000.00 150,000.00 0.01 -
Sub Total 2,150,000.00 0.10
B PEKERJAAN TANAH
1 Pek. Galian tanah biasa 1 m 519.60 m3 66,650.00 34,631,340.00 1.53 259.80
2 Pek. Urugan tanah kembali bekas galian 291.55 m3 15,766.67 4,596,771.67 0.20 116.62
3 Pek. Pasir bawah pondasi dan lantai 81.92 m3 181,460.00 14,865,203.20 0.66 -
4 Pek. Urugan tanah baru padat 316.35 m3 61,060.00 19,316,331.00 0.86 -
5 Pek. Urugan Sirtu Kw. B baru padat 136.10 m3 178,450.00 24,287,045.00 1.08 -
Sub Total 97,696,690.87 4.33
C PEKERJAAN PONDASI
1 Pek. Pasangan batu kosong (anstamping) 41.14 m3 415,621.88 17,098,683.94 0.76 -
2 Pek. Pas. Batu kali 1ps 6 pp 226.26 m3 721,755.00 163,304,286.30 7.24 -
3 Pek.crucuk bambu 10 cm pj 1,5 m 819.00 m' 15,000.00 12,285,000.00 0.54 -
Sub Total 192,687,970.24 8.54
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
1 Pek. Pas.batu bata merah 1ps 6 pp tebal 1/2 bata 733.68 m2 113,245.88 83,086,233.57 3.68 -
2 Pek. Pasangan Plesteran 1 Pc 6 pp 1,467.36 m2 45,865.95 67,301,860.39 2.98 -
3 Pek. Acian 1,467.36 m2 26,273.00 38,551,949.28 1.71 -
4 Pek. Sponengan 434.00 m' 18,914.63 8,208,947.25 0.36 -
Sub Total 197,148,990.49 8.74
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
1 Pek. Pintu Panel Type P1 & P1.b 10.00 Unit 3,500,000.00 35,000,000.00 1.55 -
2 Pek. Pintu Panel Type P1.a 4.00 Unit 3,500,000.00 14,000,000.00 0.62 -
3 Pek. Pintu Frameless Type P2.a 1.00 Unit 17,000,000.00 17,000,000.00 0.75 -
4 Pek. Pintu Kupu Tarung Type P2.b 3.00 Unit 7,500,000.00 22,500,000.00 1.00 -
5 Pek. Pintu Kupu Tarung Type P2.c 5.00 Unit 7,500,000.00 37,500,000.00 1.66 -
6 Pek. Jendela Type J2 3.00 Unit 2,200,000.00 6,600,000.00 0.29 -
7 Pek. Jendela Type J3 6.00 Unit 3,050,000.00 18,300,000.00 0.81 -
8 Pek. Jendela Type J2.a 1.00 Unit 2,200,000.00 2,200,000.00 0.10 -
9 Pek. Jendela Type J2.b 1.00 Unit 2,200,000.00 2,200,000.00 0.10 -
10 Pek. Jendela Type J3.a 2.00 Unit 3,050,000.00 6,100,000.00 0.27 -
11 Pek. Bouven Type BV1 7.00 Unit 700,000.00 4,900,000.00 0.22 -
12 Pek. Pasangan engsel Jendela kupu kupu 65.00 bh 7,500.00 487,500.00 0.02 -
13 Pek. Pasangan engsel pintu 12.00 bh 12,000.00 144,000.00 0.01 -
14 Pek. Pasangan kunci selot 6.00 bh 125,000.00 750,000.00 0.03 -
15 Pek. Pasangan rambuncis casement 6.00 bh 125,000.00 750,000.00 0.03 -
16 Pek. Pasang Kaca Bening 5 mm 37.59 m2 125,000.00 4,698,750.00 0.21 -
Sub Total 173,130,250.00 7.67
F PEKERJAAN BETON
1 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 14.69 m2 163,658.00 2,404,136.02 0.11 -
Pembesian 814.49 kg 11,160.11 9,089,800.03 0.40 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.78 m3 954,042.05 3,606,278.96 0.16 -
2 Pek. Beton Bertulang Footplat 2,5 x 2,0 m
Bekisting 2x pakai 93.30 m2 163,658.00 15,269,291.40 0.68 -
Pembesian 12,877.15 kg 11,160.11 143,710,442.68 6.37 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 91.00 m3 954,042.05 86,817,826.75 3.85 -
3 Pek. Beton Bertulang Sloof 12/18
Bekisting 2x pakai 8.12 m2 120,658.00 979,742.96 0.04 -
Pembesian 256.55 kg 11,160.11 2,863,126.86 0.13 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.38 m3 954,042.05 3,224,662.14 0.14 -
4 Pek. Beton Bertulang Sloof Struktur 20/30
Bekisting 2x pakai 51.24 m2 120,658.00 6,182,515.92 0.27 -
Pembesian 2,453.20 kg 11,160.11 27,377,987.98 1.21 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 12.81 m3 954,042.05 12,221,278.69 0.54 -
5 Pek. Beton Bertulang Sloof Struktur 20/60
Bekisting 2x pakai 45.36 m2 120,658.00 5,473,046.88 0.24 -
Pembesian 1,936.19 kg 11,160.11 21,608,098.22 0.96 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.34 m3 954,042.05 10,818,836.87 0.48 -
6 Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,5cm (K1)
Bekisting 2x pakai 80.00 m2 178,175.88 14,254,070.00 0.63 -
Pembesian 5,790.56 kg 11,160.11 64,623,301.04 2.86 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 32.00 m3 954,042.05 30,529,345.67 1.35 -
7 Pek. Beton Bertulang Kolom Struktur 30 x 30 T = 4,5cm (K2)
Bekisting 2x pakai 14.40 m2 178,175.88 2,565,732.60 0.11 -
Pembesian 492.62 kg 11,160.11 5,497,694.62 0.24 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.16 m3 954,042.05 2,060,730.83 0.09 -
8 Pek. Kolom Praktis 15 x 15 (KP)
Bekisting 2x pakai 39.58 m2 155,439.63 6,152,300.36 0.27 -
Pembesian 645.13 kg 11,160.11 7,199,723.38 0.32 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 5.28 m3 954,042.05 5,037,342.04 0.22 -
9 Pek. Beton Bertulang Balok 35/70 (B1)
Bekisting 2x pakai 128.35 m2 184,625.88 23,696,731.06 1.05 -
Pembesian 8,221.72 kg 11,160.11 91,755,320.14 4.07 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 34.51 m3 954,042.05 32,923,991.22 1.46 -
10 Pek. Beton Bertulang Balok Induk 25 x 40 (B2)
Bekisting 2x pakai 69.40 m2 184,625.88 12,813,035.73 0.57 -
Pembesian 6,058.73 kg 11,160.11 67,616,108.41 3.00 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.99 m3 954,042.05 11,438,964.21 0.51 -
11 Pek. Beton Bertulang Balok 20/60 Talang Dak Aula Elv. + 4,00 m Bottom
Bekisting 2x pakai 13.80 m2 184,625.88 2,547,837.08 0.11 -
Pembesian 460.72 kg 11,160.11 5,141,687.03 0.23 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.69 m3 954,042.05 2,566,373.12 0.11 -
12 Pek. Beton Bertulang Balok Latiu 12/15 Elv. + 3,00 m
Bekisting 2x pakai 24.84 m2 184,625.88 4,586,106.74 0.20 -
Pembesian 292.87 kg 11,160.11 3,268,462.15 0.14 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.15 m3 954,042.05 1,097,148.36 0.05 -
13 Pek. Beton Plat Topi - topi tbl. 8 cm Elv. + 3,00 m
Bekisting 2x pakai 14.44 m2 184,625.88 2,665,997.64 0.12 -
Pembesian 108.12 kg 11,160.11 1,206,631.36 0.05 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.00 m3 954,042.05 954,042.05 0.04 -
14 Pek. Stek Besi Plat Beton Talang Aula
Pembesian 385.25 kg 36,160.11 13,930,683.34 0.62 -
15 Pek. Beton Bertulang Balok Anak 25/12
Pembesian 1,392.36 kg 11,160.11 15,538,894.24 0.69 -
16 Plat Lantai tebal 12 cm
Bondex 0,75 608.20 m2 145,000.00 88,189,000.00 3.91 -
Pembesian 10,253.44 kg 11,160.11 114,429,543.91 5.07 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 119.92 m3 954,042.05 114,408,722.91 5.07 -
17 Tangga Umum
Bekisting 2x pakai 21.15 m2 161,653.13 3,418,963.59 0.15 -
Pembesian 247.82 kg 11,160.11 2,765,699.08 0.12 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.12 m3 954,042.05 2,022,569.15 0.09 -
18 Lantai Beton Rabat bawah kramik fc=7,4 Mpa (K-100) 14.30 m3 779,478.09 11,146,536.71 0.49 -
19 Lantai kerja bawah Footplat (K-100) 7.76 m3 779,478.09 6,048,749.99 0.27 -
Sub Total 1,125,745,112.11 49.88
G PEKERJAAN KERAMIK LANTAI 1
1 Pek. Pasangan keramik 60 x 60 cm motif ex.platinum 426.04 m2 180,148.50 76,750,466.94 3.40 -
2 Pek. Lantai keramik 25x25 ASIA TILE (bagian toilet) 19.80 m2 176,727.42 3,499,202.92 0.16 -
3 Pek.Dinding keramik 25x40 ASIA TILE (bagian toilet) 56.00 m2 203,864.08 11,416,388.20 0.51 -
4 Pek.Keramik Dinding Motif Batik 6.00 m2 275,000.00 1,650,000.00 0.07 -
Sub Total 93,316,058.06 4.14
H PEKERJAAN PLAFOND LANTAI 1
1 Pek. Pasang rangka Langit langit hollow 60 x 60 492.66 m2 43,102.13 21,234,692.90 0.94 -
2 Pek. Plafond Kalsiboard ex. Elephand 492.66 m2 37,232.63 18,343,025.03 0.81 -
3 Pekerjaan List Plafond Besar 397.00 m 25,558.13 10,146,575.63 0.45 -
Sub Total 49,724,293.56 2.20
I PEKERJAAN INSTALASI LISTRIK
1 Pek. Penyambungan 1.00 unit 10,000,000.00 10,000,000.00 0.44 -
2 Pek. pasangan instalasi listrik titik lampu kabel NYM 2X2,5mm pipa counduit 74.00 titik 190,000.00 14,060,000.00 0.62 -
3 Pek. Lampu Panel LED kubus Slim (18 watt putih),Panasonic 10.00 bh 190,000.00 1,900,000.00 0.08 -
4 Pek.Lampu Downlight 25.00 bh 225,000.00 5,625,000.00 0.25 -
5 Pek. Pasangan saklar Ganda 16.00 bh 35,000.00 560,000.00 0.02 -
6 Pek. Pasangan stop kontak 15.00 bh 40,000.00 600,000.00 0.03 -
7 Pek.Lampu RMI (2 Lampu 18 watt) Philips 23.00 bh 350,000.00 8,050,000.00 0.36 -
8 Pek stang caping ,lampu SL 23 watt Philips 6.00 bh 35,000.00 210,000.00 0.01 -
9 Pek. Pasangan stop kontak AC 10.00 bh 90,000.00 900,000.00 0.04 -
Sub Total 41,905,000.00 1.86
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
1 Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel Kontrol + Asesoris 1.00 unit 4,500,000.00 4,500,000.00 0.20 -
2 Pekerjaan Pasang MCB 6A/5KA 6.00 bh 155,000.00 930,000.00 0.04 -
3 Pekerjaan Pasang MCB 10A/5KA 10.00 bh 165,000.00 1,650,000.00 0.07 -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 750,000.00 750,000.00 0.03 -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 50,000.00 150,000.00 0.01 -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 8,730,000.00 0.39
K PEKERJAAN SDP
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 -
2 Pekerjaan Pasang MCB 20A/5KA 2.00 bh 725,000.00 1,450,000.00 0.06 -
3 Pekerjaan Pasang MCCB 20A/10KA 3Phase 2.00 bh 750,000.00 1,500,000.00 0.07 -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 2.00 bh 1,500,000.00 3,000,000.00 0.13 -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 9,950,000.00 0.44
L PEKERJAAN PANEL AC LANTAI 1
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 -
2 Pekerjaan Pasang MCB 20A/10KA 10.00 bh 725,000.00 7,250,000.00 0.32 -
3 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 1,500,000.00 1,500,000.00 0.07 -
4 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 -
5 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
6 Pekerjaan Intaslasi AC 10.00 bh 190,000.00 1,900,000.00 0.08 -
7 Pekerjaan Instalasi Pipa Refrigrant dan Draine 10.00 bh 500,000.00 5,000,000.00 0.22 -
8 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 19,650,000.00 0.87
M PEKERJAAN SANITASI
1 Pek. Pasangan Kloset Duduk Porselen (setara TOTO) 4.00 bh 3,000,000.00 12,000,000.00 0.53 -
2 Pek. Pasang Jet washer 4.00 bh 100,000.00 400,000.00 0.02 -
3 Pek.Pasang Kran dapur (leher angsa) stenliststeel 1.00 bh 150,000.00 150,000.00 0.01 -
4 Pek. Pasangan kran air dia.3/4 4.00 bh 125,000.00 500,000.00 0.02 -
5 Pek. Pasangan floor drain 4.00 bh 55,000.00 220,000.00 0.01 -
6 Pek. Pasangan pipa PVC dia.4 25.00 m 71,783.13 1,794,578.13 0.08 -
7 Pek. Pasangan pipa pvc tipe aw dia.3/4 30.00 m 23,878.44 716,353.13 0.03 -
8 Pek. Sapitanck sederhana 2.00 unit 3,000,000.00 6,000,000.00 0.27 -
9 Pek. Peresapan Septitank 2.00 unit 1,000,000.00 2,000,000.00 0.09 -
10 Pek. Peresapan air Kotor 2.00 unit 1,000,000.00 2,000,000.00 0.09 -
11 Pek. Tandon Pinguin TB110 (isi 1050 lt +asesoris otomatis) 1.00 unit 1,500,000.00 1,500,000.00 0.07 -
Sub Total 27,280,931.25 1.21
N PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan tembok lantai 1 1,467.36 m2 27,660.29 40,587,599.47 1.80 -
2 Pekerjaan Pengecatan plafond 492.66 m2 17,877.79 8,807,670.79 0.39 -
Sub Total 49,395,270.26 2.19
O PEKERJAAN LAIN - LAIN
1 Pek. Pasang Galvalum Rangka Besi Hollow 4/6 Penutup Void Tangga L 2 18.00 m2 300,000.00 5,400,000.00 0.24 -
Sub Total 5,400,000.00 0.24
PEKERJAAN GEDUNG AULA
A PEKERJAAN TANAH
1 Pek. Galian tanah biasa sedalam 1 m 28.86 m3 66,650.00 1,923,519.00 0.09 -
2 Pek. Pengurugan tanah kembali bekas galian 16.14 m3 15,766.67 254,474.00 0.01 -
3 Pek. Pengurugan Tanah Baru Padat 154.35 m3 61,060.00 9,424,611.00 0.42 -
4 Pek. Pengurugan Sirtu padat kelas B 46.30 m3 178,450.00 8,262,235.00 0.37 -
5 Pek. Urugan pasir bawah pondasi dan lantai 17.25 m3 181,460.00 3,130,185.00 0.14 -
6 Pek. Cerucuk bambu 8-10 cm 187.50 m 15,000.00 2,812,500.00 0.12 -
Sub Total 25,807,524.00 1.14
B PEKERJAAN PONDASI
1 Pek. Pasangan pondasi batu kosong/ Aanstamping 5.62 m3 415,621.88 2,335,794.94 0.10 -
2 Pek. Pasangan pondasi batu kali 16 15.24 m3 721,755.00 10,999,546.20 0.49 -
Sub Total 13,335,341.14 0.59
C PEKERJAAN BETON
1 Pek. Lantai Kerja K.100 12.73 m3 779,478.09 9,922,756.11 0.44 -
2 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 11.52 m2 163,658.00 1,885,340.16 0.08 -
Pembesian 573.30 kg 11,160.11 6,398,092.50 0.28 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 4.37 m3 954,042.05 4,169,163.77 0.18 -
3 Pek. Sloof 15/20
Bekisting 2x pakai 27.16 m2 120,658.00 3,277,071.28 0.15 -
Pembesian 363.67 kg 11,160.11 4,058,598.11 0.18 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.03 m3 954,042.05 1,936,705.37 0.09 -
4 Pek. Kolom 30/30
Bekisting 2x pakai 55.21 m2 178,175.88 9,837,090.06 0.44 -
Pembesian 1,205.31 kg 11,160.11 13,451,395.20 0.60 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 6.26 m3 954,042.05 5,972,303.25 0.26 -
5 Pek. Kolom Praktis 12/12
Bekisting 2x pakai 11.28 m2 155,439.63 1,753,358.97 0.08 -
Pembesian 279.47 kg 11,160.11 3,118,916.64 0.14 -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 0.79 m3 954,042.05 753,693.22 0.03 -
6 Pek. Balok 15/25 Elv. + 3,00 m
Bekisting 2x pakai 5.72 m2 184,625.88 1,056,060.01 0.05 -
Pembesian 105.33 kg 11,160.11 1,175,494.65 0.05 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 0.26 m3 954,042.05 248,050.93 0.01 -
7 Pek. Balok 20/25 Elv. +3,00 m
Bekisting 2x pakai 29.12 m2 184,625.88 5,376,305.48 0.24 -
Pembesian 510.14 kg 11,160.11 5,693,219.79 0.25 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.08 m3 954,042.05 1,984,407.47 0.09 -
8 Pek. Balok 20/35 Elv. + 4,00 m
Bekisting 2x pakai 18.36 m2 184,625.88 3,389,731.07 0.15 -
Pembesian 472.22 kg 11,160.11 5,270,028.32 0.23 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.43 m3 954,042.05 1,364,280.13 0.06 -
9 Pek. Balok Konsol Elv. Top + 4,00 m
Pembesian 199.53 kg 11,160.11 2,226,777.25 0.10 -
10 Pek. Plat Beton Topi-topi Elv. + 3,00 m
Bekisting 2x pakai 39.64 m2 184,625.88 7,318,569.69 0.32 -
Pembesian 422.92 kg 11,160.11 4,719,834.78 0.21 -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 2.88 m3 954,042.05 2,747,641.11 0.12 -
Sub Total 109,104,885.30 4.83
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK 1.00 ls 300,000.00 300,000.00 0.01 1.00
2 Asuransi dan perijinan 1.00 ls 1,000,000.00 1,000,000.00 0.04 1.00
Sub Total 1,300,000.00 0.06
IV PEKERJAAN PENCEGAHAN COVID-19
1 Alat Pelindung Kerja dan Pelindung Diri 1.00 ls 7,695,000.00 7,695,000.00 0.34 0.20
2 Personil Keselamatan Konstruksi 1.00 ls 3,000,000.00 3,000,000.00 0.13 0.20
3 Fasilitas sarana, Prasarana dan Alat kesehatan 1.00 ls 2,565,000.00 2,565,000.00 0.11 0.35
( Termasuk Protokol Kesehatan Penanganan COVID 19 )
Sub Total 13,260,000.00 0.59
Jumlah Biaya Konstruksi 2,256,718,317.27 100.00
PPN 10 % 225,671,831.73
Jumlah Total 2,482,390,149.00
Dibulatkan 2,482,390,000.00
Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)
FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
NGGUAN
PERIODE : Minggu Ke 3
MINGGU KE : 3 (TIGA)
REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Jml Harga Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot
- - - - - - - -
- - - - - - - -
- - 409.50 6,142,500.00 0.27 409.50 6,142,500.00 0.27
- - 6,142,500.00 0.27 6,142,500.00 0.27
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - 3.88 3,024,375.00 0.13 3.88 3,024,375.00 0.13
- - 82,514,242.04 3.66 82,514,242.04 3.66
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
M.SAEFULLAH, ST
Pengawas Lapangan
KEGIATAN :
PEKERJAAN :
LOKASI : di jalan tondano, Kecamatan Pekalongan Timur
TH. ANGGARAN : 2021
Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)
FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
TIME SCHEDULE ( JADWAL
BOBOT
JUMLAH HARGA (Rp)
% 1 2 3 4 5
2,482,390,149.00 100.00
248,239,014.90
2,730,629,163.90
2,730,629,000.00
0.08 0.92 5.86 8.15 7.53
0 0.08 1.00 6.87 15.01 22.54
0.75 0.38 4.35
0 0.75 1.13 5.48
0.67 0.13 -1.38
Mendahului Mendahului Terlambat
CHEDULE ( JADWAL WAKTU PELAKSANAAN)
WAKTU PELAKSANAAN
MINGGU KE
6 7 8 9 10 11 12 13
0.23
0.15 0.15
0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48
14 15 16 17 18 19 20 21
1.25
1.28 1.28 1.28 1.28 1.28 1.28
0.48 0.48
M.SAEFULLAH, ST
Pengawas Lapangan
13 Juli 2021
KETERANGAN
22
100
90
80
70
60
0.36
50
40
30
0.003
20
0.03
10
0
10
0
0.39
100.00
3 Juli 2021
ultan Pengawas
COZZY ERGITA
AEFULLAH, ST
awas Lapangan
REKAPITULASI LAPORAN MINGGUAN
Kegiatan
Pekerjaan
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Konsultan Pengawas : CV. COZZY ERGITA
Minggu Ke : Minggu Ke-3
Periode 07 Juli 2021 s/d
URAIAN PEKERJAAN
NO
di periksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)
FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
ASI LAPORAN MINGGUAN
13 Juli 2021
6.87 %
1.13 %
4.35 %
5.48 %
-1.38 %
M.SAEFULLAH, ST
Pengawas Lapangan
LAPORAN MINGGUAN
Kegiatan :
Pekerjaan :
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume
I PEKERJAAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Pengukuran 1.00 ls 2,000,000.00 2,000,000.00 0.09 1.00
2 Pek. Papan Nama Proyek 1.00 ls 150,000.00 150,000.00 0.01 -
Sub Total 2,150,000.00 0.10
B PEKERJAAN TANAH
1 Pek. Galian tanah biasa 1 m 519.60 m3 66,650.00 34,631,340.00 1.53 311.76
2 Pek. Urugan tanah kembali bekas galian 291.55 m3 15,766.67 4,596,771.67 0.20 145.78
3 Pek. Pasir bawah pondasi dan lantai 81.92 m3 181,460.00 14,865,203.20 0.66 24.58
4 Pek. Urugan tanah baru padat 316.35 m3 61,060.00 19,316,331.00 0.86 -
5 Pek. Urugan Sirtu Kw. B baru padat 136.10 m3 178,450.00 24,287,045.00 1.08 -
Sub Total 97,696,690.87 4.33
C PEKERJAAN PONDASI
1 Pek. Pasangan batu kosong (anstamping) 41.14 m3 415,621.88 17,098,683.94 0.76 -
2 Pek. Pas. Batu kali 1ps 6 pp 226.26 m3 721,755.00 163,304,286.30 7.24 -
3 Pek.crucuk bambu 10 cm pj 1,5 m 819.00 m' 15,000.00 12,285,000.00 0.54 409.50
Sub Total 192,687,970.24 8.54
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
1 Pek. Pas.batu bata merah 1ps 6 pp tebal 1/2 bata 733.68 m2 113,245.88 83,086,233.57 3.68 -
2 Pek. Pasangan Plesteran 1 Pc 6 pp 1,467.36 m2 45,865.95 67,301,860.39 2.98 -
3 Pek. Acian 1,467.36 m2 26,273.00 38,551,949.28 1.71 -
4 Pek. Sponengan 434.00 m' 18,914.63 8,208,947.25 0.36 -
Sub Total 197,148,990.49 8.74
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
1 Pek. Pintu Panel Type P1 & P1.b 10.00 Unit 3,500,000.00 35,000,000.00 1.55 -
2 Pek. Pintu Panel Type P1.a 4.00 Unit 3,500,000.00 14,000,000.00 0.62 -
3 Pek. Pintu Frameless Type P2.a 1.00 Unit 17,000,000.00 17,000,000.00 0.75 -
4 Pek. Pintu Kupu Tarung Type P2.b 3.00 Unit 7,500,000.00 22,500,000.00 1.00 -
5 Pek. Pintu Kupu Tarung Type P2.c 5.00 Unit 7,500,000.00 37,500,000.00 1.66 -
6 Pek. Jendela Type J2 3.00 Unit 2,200,000.00 6,600,000.00 0.29 -
7 Pek. Jendela Type J3 6.00 Unit 3,050,000.00 18,300,000.00 0.81 -
8 Pek. Jendela Type J2.a 1.00 Unit 2,200,000.00 2,200,000.00 0.10 -
9 Pek. Jendela Type J2.b 1.00 Unit 2,200,000.00 2,200,000.00 0.10 -
10 Pek. Jendela Type J3.a 2.00 Unit 3,050,000.00 6,100,000.00 0.27 -
11 Pek. Bouven Type BV1 7.00 Unit 700,000.00 4,900,000.00 0.22 -
12 Pek. Pasangan engsel Jendela kupu kupu 65.00 bh 7,500.00 487,500.00 0.02 -
13 Pek. Pasangan engsel pintu 12.00 bh 12,000.00 144,000.00 0.01 -
14 Pek. Pasangan kunci selot 6.00 bh 125,000.00 750,000.00 0.03 -
15 Pek. Pasangan rambuncis casement 6.00 bh 125,000.00 750,000.00 0.03 -
16 Pek. Pasang Kaca Bening 5 mm 37.59 m2 125,000.00 4,698,750.00 0.21 -
Sub Total 173,130,250.00 7.67
F PEKERJAAN BETON
1 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 14.69 m2 163,658.00 2,404,136.02 0.11 -
Pembesian 814.49 kg 11,160.11 9,089,800.03 0.40 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.78 m3 954,042.05 3,606,278.96 0.16 -
2 Pek. Beton Bertulang Footplat 2,5 x 2,0 m
Bekisting 2x pakai 93.30 m2 163,658.00 15,269,291.40 0.68 46.65
Pembesian 12,877.15 kg 11,160.11 143,710,442.68 6.37 6,438.58
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 91.00 m3 954,042.05 86,817,826.75 3.85 -
3 Pek. Beton Bertulang Sloof 12/18
Bekisting 2x pakai 8.12 m2 120,658.00 979,742.96 0.04 -
Pembesian 256.55 kg 11,160.11 2,863,126.86 0.13 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.38 m3 954,042.05 3,224,662.14 0.14 -
4 Pek. Beton Bertulang Sloof Struktur 20/30
Bekisting 2x pakai 51.24 m2 120,658.00 6,182,515.92 0.27 -
Pembesian 2,453.20 kg 11,160.11 27,377,987.98 1.21 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 12.81 m3 954,042.05 12,221,278.69 0.54 -
5 Pek. Beton Bertulang Sloof Struktur 20/60
Bekisting 2x pakai 45.36 m2 120,658.00 5,473,046.88 0.24 -
Pembesian 1,936.19 kg 11,160.11 21,608,098.22 0.96 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.34 m3 954,042.05 10,818,836.87 0.48 -
6 Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,5cm (K1)
Bekisting 2x pakai 80.00 m2 178,175.88 14,254,070.00 0.63 -
Pembesian 5,790.56 kg 11,160.11 64,623,301.04 2.86 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 32.00 m3 954,042.05 30,529,345.67 1.35 -
7 Pek. Beton Bertulang Kolom Struktur 30 x 30 T = 4,5cm (K2)
Bekisting 2x pakai 14.40 m2 178,175.88 2,565,732.60 0.11 -
Pembesian 492.62 kg 11,160.11 5,497,694.62 0.24 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.16 m3 954,042.05 2,060,730.83 0.09 -
8 Pek. Kolom Praktis 15 x 15 (KP)
Bekisting 2x pakai 39.58 m2 155,439.63 6,152,300.36 0.27 -
Pembesian 645.13 kg 11,160.11 7,199,723.38 0.32 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 5.28 m3 954,042.05 5,037,342.04 0.22 -
9 Pek. Beton Bertulang Balok 35/70 (B1)
Bekisting 2x pakai 128.35 m2 184,625.88 23,696,731.06 1.05 -
Pembesian 8,221.72 kg 11,160.11 91,755,320.14 4.07 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 34.51 m3 954,042.05 32,923,991.22 1.46 -
10 Pek. Beton Bertulang Balok Induk 25 x 40 (B2)
Bekisting 2x pakai 69.40 m2 184,625.88 12,813,035.73 0.57 -
Pembesian 6,058.73 kg 11,160.11 67,616,108.41 3.00 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.99 m3 954,042.05 11,438,964.21 0.51 -
11 Pek. Beton Bertulang Balok 20/60 Talang Dak Aula Elv. + 4,00 m Bottom
Bekisting 2x pakai 13.80 m2 184,625.88 2,547,837.08 0.11 -
Pembesian 460.72 kg 11,160.11 5,141,687.03 0.23 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.69 m3 954,042.05 2,566,373.12 0.11 -
12 Pek. Beton Bertulang Balok Latiu 12/15 Elv. + 3,00 m
Bekisting 2x pakai 24.84 m2 184,625.88 4,586,106.74 0.20 -
Pembesian 292.87 kg 11,160.11 3,268,462.15 0.14 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.15 m3 954,042.05 1,097,148.36 0.05 -
13 Pek. Beton Plat Topi - topi tbl. 8 cm Elv. + 3,00 m
Bekisting 2x pakai 14.44 m2 184,625.88 2,665,997.64 0.12 -
Pembesian 108.12 kg 11,160.11 1,206,631.36 0.05 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.00 m3 954,042.05 954,042.05 0.04 -
14 Pek. Stek Besi Plat Beton Talang Aula
Pembesian 385.25 kg 36,160.11 13,930,683.34 0.62 -
15 Pek. Beton Bertulang Balok Anak 25/12
Pembesian 1,392.36 kg 11,160.11 15,538,894.24 0.69 -
16 Plat Lantai tebal 12 cm
Bondex 0,75 608.20 m2 145,000.00 88,189,000.00 3.91 -
Pembesian 10,253.44 kg 11,160.11 114,429,543.91 5.07 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 119.92 m3 954,042.05 114,408,722.91 5.07 -
17 Tangga Umum
Bekisting 2x pakai 21.15 m2 161,653.13 3,418,963.59 0.15 -
Pembesian 247.82 kg 11,160.11 2,765,699.08 0.12 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.12 m3 954,042.05 2,022,569.15 0.09 -
18 Lantai Beton Rabat bawah kramik fc=7,4 Mpa (K-100) 14.30 m3 779,478.09 11,146,536.71 0.49 -
19 Lantai kerja bawah Footplat (K-100) 7.76 m3 779,478.09 6,048,749.99 0.27 3.88
Sub Total 1,125,745,112.11 49.88
G PEKERJAAN KERAMIK LANTAI 1
1 Pek. Pasangan keramik 60 x 60 cm motif ex.platinum 426.04 m2 180,148.50 76,750,466.94 3.40 -
2 Pek. Lantai keramik 25x25 ASIA TILE (bagian toilet) 19.80 m2 176,727.42 3,499,202.92 0.16 -
3 Pek.Dinding keramik 25x40 ASIA TILE (bagian toilet) 56.00 m2 203,864.08 11,416,388.20 0.51 -
4 Pek.Keramik Dinding Motif Batik 6.00 m2 275,000.00 1,650,000.00 0.07 -
Sub Total 93,316,058.06 4.14
H PEKERJAAN PLAFOND LANTAI 1
1 Pek. Pasang rangka Langit langit hollow 60 x 60 492.66 m2 43,102.13 21,234,692.90 0.94 -
2 Pek. Plafond Kalsiboard ex. Elephand 492.66 m2 37,232.63 18,343,025.03 0.81 -
3 Pekerjaan List Plafond Besar 397.00 m 25,558.13 10,146,575.63 0.45 -
Sub Total 49,724,293.56 2.20
I PEKERJAAN INSTALASI LISTRIK
1 Pek. Penyambungan 1.00 unit 10,000,000.00 10,000,000.00 0.44 -
2 Pek. pasangan instalasi listrik titik lampu kabel NYM 2X2,5mm pipa counduit 74.00 titik 190,000.00 14,060,000.00 0.62 -
3 Pek. Lampu Panel LED kubus Slim (18 watt putih),Panasonic 10.00 bh 190,000.00 1,900,000.00 0.08 -
4 Pek.Lampu Downlight 25.00 bh 225,000.00 5,625,000.00 0.25 -
5 Pek. Pasangan saklar Ganda 16.00 bh 35,000.00 560,000.00 0.02 -
6 Pek. Pasangan stop kontak 15.00 bh 40,000.00 600,000.00 0.03 -
7 Pek.Lampu RMI (2 Lampu 18 watt) Philips 23.00 bh 350,000.00 8,050,000.00 0.36 -
8 Pek stang caping ,lampu SL 23 watt Philips 6.00 bh 35,000.00 210,000.00 0.01 -
9 Pek. Pasangan stop kontak AC 10.00 bh 90,000.00 900,000.00 0.04 -
Sub Total 41,905,000.00 1.86
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
1 Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel Kontrol + Asesoris 1.00 unit 4,500,000.00 4,500,000.00 0.20 -
2 Pekerjaan Pasang MCB 6A/5KA 6.00 bh 155,000.00 930,000.00 0.04 -
3 Pekerjaan Pasang MCB 10A/5KA 10.00 bh 165,000.00 1,650,000.00 0.07 -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 750,000.00 750,000.00 0.03 -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 50,000.00 150,000.00 0.01 -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 8,730,000.00 0.39
K PEKERJAAN SDP
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 -
2 Pekerjaan Pasang MCB 20A/5KA 2.00 bh 725,000.00 1,450,000.00 0.06 -
3 Pekerjaan Pasang MCCB 20A/10KA 3Phase 2.00 bh 750,000.00 1,500,000.00 0.07 -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 2.00 bh 1,500,000.00 3,000,000.00 0.13 -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 9,950,000.00 0.44
L PEKERJAAN PANEL AC LANTAI 1
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 -
2 Pekerjaan Pasang MCB 20A/10KA 10.00 bh 725,000.00 7,250,000.00 0.32 -
3 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 1,500,000.00 1,500,000.00 0.07 -
4 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 -
5 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
6 Pekerjaan Intaslasi AC 10.00 bh 190,000.00 1,900,000.00 0.08 -
7 Pekerjaan Instalasi Pipa Refrigrant dan Draine 10.00 bh 500,000.00 5,000,000.00 0.22 -
8 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 19,650,000.00 0.87
M PEKERJAAN SANITASI
1 Pek. Pasangan Kloset Duduk Porselen (setara TOTO) 4.00 bh 3,000,000.00 12,000,000.00 0.53 -
2 Pek. Pasang Jet washer 4.00 bh 100,000.00 400,000.00 0.02 -
3 Pek.Pasang Kran dapur (leher angsa) stenliststeel 1.00 bh 150,000.00 150,000.00 0.01 -
4 Pek. Pasangan kran air dia.3/4 4.00 bh 125,000.00 500,000.00 0.02 -
5 Pek. Pasangan floor drain 4.00 bh 55,000.00 220,000.00 0.01 -
6 Pek. Pasangan pipa PVC dia.4 25.00 m 71,783.13 1,794,578.13 0.08 -
7 Pek. Pasangan pipa pvc tipe aw dia.3/4 30.00 m 23,878.44 716,353.13 0.03 -
8 Pek. Sapitanck sederhana 2.00 unit 3,000,000.00 6,000,000.00 0.27 -
9 Pek. Peresapan Septitank 2.00 unit 1,000,000.00 2,000,000.00 0.09 -
10 Pek. Peresapan air Kotor 2.00 unit 1,000,000.00 2,000,000.00 0.09 -
11 Pek. Tandon Pinguin TB110 (isi 1050 lt +asesoris otomatis) 1.00 unit 1,500,000.00 1,500,000.00 0.07 -
Sub Total 27,280,931.25 1.21
N PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan tembok lantai 1 1,467.36 m2 27,660.29 40,587,599.47 1.80 -
2 Pekerjaan Pengecatan plafond 492.66 m2 17,877.79 8,807,670.79 0.39 -
Sub Total 49,395,270.26 2.19
O PEKERJAAN LAIN - LAIN
1 Pek. Pasang Galvalum Rangka Besi Hollow 4/6 Penutup Void Tangga L 2 18.00 m2 300,000.00 5,400,000.00 0.24 -
Sub Total 5,400,000.00 0.24
PEKERJAAN GEDUNG AULA
A PEKERJAAN TANAH
1 Pek. Galian tanah biasa sedalam 1 m 28.86 m3 66,650.00 1,923,519.00 0.09 -
2 Pek. Pengurugan tanah kembali bekas galian 16.14 m3 15,766.67 254,474.00 0.01 -
3 Pek. Pengurugan Tanah Baru Padat 154.35 m3 61,060.00 9,424,611.00 0.42 -
4 Pek. Pengurugan Sirtu padat kelas B 46.30 m3 178,450.00 8,262,235.00 0.37 -
5 Pek. Urugan pasir bawah pondasi dan lantai 17.25 m3 181,460.00 3,130,185.00 0.14 -
6 Pek. Cerucuk bambu 8-10 cm 187.50 m 15,000.00 2,812,500.00 0.12 -
Sub Total 25,807,524.00 1.14
B PEKERJAAN PONDASI
1 Pek. Pasangan pondasi batu kosong/ Aanstamping 5.62 m3 415,621.88 2,335,794.94 0.10 -
2 Pek. Pasangan pondasi batu kali 16 15.24 m3 721,755.00 10,999,546.20 0.49 -
Sub Total 13,335,341.14 0.59
C PEKERJAAN BETON
1 Pek. Lantai Kerja K.100 12.73 m3 779,478.09 9,922,756.11 0.44 -
2 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 11.52 m2 163,658.00 1,885,340.16 0.08 -
Pembesian 573.30 kg 11,160.11 6,398,092.50 0.28 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 4.37 m3 954,042.05 4,169,163.77 0.18 -
3 Pek. Sloof 15/20
Bekisting 2x pakai 27.16 m2 120,658.00 3,277,071.28 0.15 -
Pembesian 363.67 kg 11,160.11 4,058,598.11 0.18 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.03 m3 954,042.05 1,936,705.37 0.09 -
4 Pek. Kolom 30/30
Bekisting 2x pakai 55.21 m2 178,175.88 9,837,090.06 0.44 -
Pembesian 1,205.31 kg 11,160.11 13,451,395.20 0.60 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 6.26 m3 954,042.05 5,972,303.25 0.26 -
5 Pek. Kolom Praktis 12/12
Bekisting 2x pakai 11.28 m2 155,439.63 1,753,358.97 0.08 -
Pembesian 279.47 kg 11,160.11 3,118,916.64 0.14 -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 0.79 m3 954,042.05 753,693.22 0.03 -
6 Pek. Balok 15/25 Elv. + 3,00 m
Bekisting 2x pakai 5.72 m2 184,625.88 1,056,060.01 0.05 -
Pembesian 105.33 kg 11,160.11 1,175,494.65 0.05 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 0.26 m3 954,042.05 248,050.93 0.01 -
7 Pek. Balok 20/25 Elv. +3,00 m
Bekisting 2x pakai 29.12 m2 184,625.88 5,376,305.48 0.24 -
Pembesian 510.14 kg 11,160.11 5,693,219.79 0.25 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.08 m3 954,042.05 1,984,407.47 0.09 -
8 Pek. Balok 20/35 Elv. + 4,00 m
Bekisting 2x pakai 18.36 m2 184,625.88 3,389,731.07 0.15 -
Pembesian 472.22 kg 11,160.11 5,270,028.32 0.23 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.43 m3 954,042.05 1,364,280.13 0.06 -
9 Pek. Balok Konsol Elv. Top + 4,00 m
Pembesian 199.53 kg 11,160.11 2,226,777.25 0.10 -
10 Pek. Plat Beton Topi-topi Elv. + 3,00 m
Bekisting 2x pakai 39.64 m2 184,625.88 7,318,569.69 0.32 -
Pembesian 422.92 kg 11,160.11 4,719,834.78 0.21 -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 2.88 m3 954,042.05 2,747,641.11 0.12 -
Sub Total 109,104,885.30 4.83
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK 1.00 ls 300,000.00 300,000.00 0.01 1.00
2 Asuransi dan perijinan 1.00 ls 1,000,000.00 1,000,000.00 0.04 1.00
Sub Total 1,300,000.00 0.06
IV PEKERJAAN PENCEGAHAN COVID-19
1 Alat Pelindung Kerja dan Pelindung Diri 1.00 ls 7,695,000.00 7,695,000.00 0.34 0.30
2 Personil Keselamatan Konstruksi 1.00 ls 3,000,000.00 3,000,000.00 0.13 0.30
3 Fasilitas sarana, Prasarana dan Alat kesehatan 1.00 ls 2,565,000.00 2,565,000.00 0.11 0.40
( Termasuk Protokol Kesehatan Penanganan COVID 19 )
Sub Total 13,260,000.00 0.59
Jumlah Biaya Konstruksi 2,256,718,317.27 100.00
PPN 10 % 225,671,831.73
Jumlah Total 2,482,390,149.00
Dibulatkan 2,482,390,000.00
Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)
FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
NGGUAN
PERIODE : Minggu Ke 4
MINGGU KE : 4 (EMPAT)
REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Jml Harga Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot
- - - - - - - -
- - - - - - - -
6,142,500.00 0.27 163.80 2,457,000.00 0.11 573.30 8,599,500.00 0.38
6,142,500.00 0.27 2,457,000.00 0.11 8,599,500.00 0.38
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
3,024,375.00 0.13 1.55 1,209,750.00 0.05 5.43 4,234,125.00 0.19
82,514,242.04 3.66 85,096,392.87 3.77 167,610,634.90 7.43
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
M.SAEFULLAH, ST
Pengawas Lapangan
KEGIATAN :
PEKERJAAN :
LOKASI : di jalan tondano, Kecamatan Pekalongan Timur
TH. ANGGARAN : 2021
Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)
FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
TIME SCHEDULE ( JADWAL
BOBOT
JUMLAH HARGA (Rp)
% 1 2 3 4 5
2,482,390,149.00 100.00
248,239,014.90
2,730,629,163.90
2,730,629,000.00
0.08 0.92 5.86 8.15 7.53
0 0.08 1.00 6.87 15.01 22.54
0.75 0.38 4.35 4.25
0 0.75 1.13 5.48 9.73
0.67 0.13 -1.38 -5.28
Mendahului Mendahului Terlambat Terlambat
CHEDULE ( JADWAL WAKTU PELAKSANAAN)
WAKTU PELAKSANAAN
MINGGU KE
6 7 8 9 10 11 12 13
0.23
0.15 0.15
0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48
14 15 16 17 18 19 20 21
1.25
1.28 1.28 1.28 1.28 1.28 1.28
0.48 0.48
M.SAEFULLAH, ST
Pengawas Lapangan
27 Juli 2021
KETERANGAN
22
100
90
80
70
60
0.36
50
40
30
0.003
20
0.03
10
0
10
0
0.39
100.00
7 Juli 2021
ultan Pengawas
COZZY ERGITA
AEFULLAH, ST
awas Lapangan
REKAPITULASI LAPORAN MINGGUAN
Kegiatan
Pekerjaan
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Konsultan Pengawas : CV. COZZY ERGITA
Minggu Ke : Minggu Ke 4
Periode 21 Juli 2021 s/d 27 Juli 2021
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI 1,300,000.00 0.06 0.00 0.00 1,300,000.00 0.06
24
LAPORAN MINGGUAN
Kegiatan :
REALIS
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume Jml Harga Bobot
I PEKERJAAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Pengukuran 1.00 ls 2,000,000.00 2,000,000.00 0.09 1.00 2,000,000.00 0.09
2 Pek. Papan Nama Proyek 1.00 ls 150,000.00 150,000.00 0.01 - - -
Sub Total 2,150,000.00 0.10 2,000,000.00 0.09
B PEKERJAAN TANAH
1 Pek. Galian tanah biasa 1 m 519.60 m3 66,650.00 34,631,340.00 1.53 363.72 24,241,938.00 1.07
2 Pek. Urugan tanah kembali bekas galian 291.55 m3 15,766.67 4,596,771.67 0.20 174.93 2,758,063.00 0.12
3 Pek. Pasir bawah pondasi dan lantai 81.92 m3 181,460.00 14,865,203.20 0.66 49.15 8,919,121.92 0.40
4 Pek. Urugan tanah baru padat 316.35 m3 61,060.00 19,316,331.00 0.86 - - -
5 Pek. Urugan Sirtu Kw. B baru padat 136.10 m3 178,450.00 24,287,045.00 1.08 - - -
Sub Total 97,696,690.87 4.33 35,919,122.92 1.59
C PEKERJAAN PONDASI
1 Pek. Pasangan batu kosong (anstamping) 41.14 m3 415,621.88 17,098,683.94 0.76 - - -
2 Pek. Pas. Batu kali 1ps 6 pp 226.26 m3 721,755.00 163,304,286.30 7.24 - - -
3 Pek.crucuk bambu 10 cm pj 1,5 m 819.00 m' 15,000.00 12,285,000.00 0.54 573.30 8,599,500.00 0.38
Sub Total 192,687,970.24 8.54 8,599,500.00 0.38
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
1 Pek. Pas.batu bata merah 1ps 6 pp tebal 1/2 bata 733.68 m2 113,245.88 83,086,233.57 3.68 - - -
2 Pek. Pasangan Plesteran 1 Pc 6 pp 1,467.36 m2 45,865.95 67,301,860.39 2.98 - - -
3 Pek. Acian 1,467.36 m2 26,273.00 38,551,949.28 1.71 - - -
4 Pek. Sponengan 434.00 m' 18,914.63 8,208,947.25 0.36 - - -
Sub Total 197,148,990.49 8.74 - -
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
1 Pek. Pintu Panel Type P1 & P1.b 10.00 Unit 3,500,000.00 35,000,000.00 1.55 - - -
2 Pek. Pintu Panel Type P1.a 4.00 Unit 3,500,000.00 14,000,000.00 0.62 - - -
3 Pek. Pintu Frameless Type P2.a 1.00 Unit 17,000,000.00 17,000,000.00 0.75 - - -
4 Pek. Pintu Kupu Tarung Type P2.b 3.00 Unit 7,500,000.00 22,500,000.00 1.00 - - -
5 Pek. Pintu Kupu Tarung Type P2.c 5.00 Unit 7,500,000.00 37,500,000.00 1.66 - - -
6 Pek. Jendela Type J2 3.00 Unit 2,200,000.00 6,600,000.00 0.29 - - -
7 Pek. Jendela Type J3 6.00 Unit 3,050,000.00 18,300,000.00 0.81 - - -
8 Pek. Jendela Type J2.a 1.00 Unit 2,200,000.00 2,200,000.00 0.10 - - -
9 Pek. Jendela Type J2.b 1.00 Unit 2,200,000.00 2,200,000.00 0.10 - - -
10 Pek. Jendela Type J3.a 2.00 Unit 3,050,000.00 6,100,000.00 0.27 - - -
11 Pek. Bouven Type BV1 7.00 Unit 700,000.00 4,900,000.00 0.22 - - -
12 Pek. Pasangan engsel Jendela kupu kupu 65.00 bh 7,500.00 487,500.00 0.02 - - -
13 Pek. Pasangan engsel pintu 12.00 bh 12,000.00 144,000.00 0.01 - - -
14 Pek. Pasangan kunci selot 6.00 bh 125,000.00 750,000.00 0.03 - - -
15 Pek. Pasangan rambuncis casement 6.00 bh 125,000.00 750,000.00 0.03 - - -
16 Pek. Pasang Kaca Bening 5 mm 37.59 m2 125,000.00 4,698,750.00 0.21 - - -
Sub Total 173,130,250.00 7.67 - -
F PEKERJAAN BETON
1 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 14.69 m2 163,658.00 2,404,136.02 0.11 - - -
Pembesian 814.49 kg 11,160.11 9,089,800.03 0.40 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.78 m3 954,042.05 3,606,278.96 0.16 - - -
2 Pek. Beton Bertulang Footplat 2,5 x 2,0 m
Bekisting 2x pakai 93.30 m2 163,658.00 15,269,291.40 0.68 65.31 10,688,503.98 0.47
Pembesian 12,877.15 kg 11,160.11 143,710,442.68 6.37 9,014.01 100,597,309.88 4.46
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 91.00 m3 954,042.05 86,817,826.75 3.85 54.60 52,090,696.05 2.31
3 Pek. Beton Bertulang Sloof 12/18
Bekisting 2x pakai 8.12 m2 120,658.00 979,742.96 0.04 - - -
Pembesian 256.55 kg 11,160.11 2,863,126.86 0.13 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.38 m3 954,042.05 3,224,662.14 0.14 - - -
4 Pek. Beton Bertulang Sloof Struktur 20/30
Bekisting 2x pakai 51.24 m2 120,658.00 6,182,515.92 0.27 - - -
Pembesian 2,453.20 kg 11,160.11 27,377,987.98 1.21 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 12.81 m3 954,042.05 12,221,278.69 0.54 - - -
5 Pek. Beton Bertulang Sloof Struktur 20/60
Bekisting 2x pakai 45.36 m2 120,658.00 5,473,046.88 0.24 - - -
Pembesian 1,936.19 kg 11,160.11 21,608,098.22 0.96 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.34 m3 954,042.05 10,818,836.87 0.48 - - -
6 Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,5cm (K1)
Bekisting 2x pakai 80.00 m2 178,175.88 14,254,070.00 0.63 - - -
Pembesian 5,790.56 kg 11,160.11 64,623,301.04 2.86 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 32.00 m3 954,042.05 30,529,345.67 1.35 - - -
7 Pek. Beton Bertulang Kolom Struktur 30 x 30 T = 4,5cm (K2)
Bekisting 2x pakai 14.40 m2 178,175.88 2,565,732.60 0.11 - - -
Pembesian 492.62 kg 11,160.11 5,497,694.62 0.24 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.16 m3 954,042.05 2,060,730.83 0.09 - - -
8 Pek. Kolom Praktis 15 x 15 (KP)
Bekisting 2x pakai 39.58 m2 155,439.63 6,152,300.36 0.27 - - -
Pembesian 645.13 kg 11,160.11 7,199,723.38 0.32 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 5.28 m3 954,042.05 5,037,342.04 0.22 - - -
9 Pek. Beton Bertulang Balok 35/70 (B1)
Bekisting 2x pakai 128.35 m2 184,625.88 23,696,731.06 1.05 - - -
Pembesian 8,221.72 kg 11,160.11 91,755,320.14 4.07 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 34.51 m3 954,042.05 32,923,991.22 1.46 - - -
10 Pek. Beton Bertulang Balok Induk 25 x 40 (B2)
Bekisting 2x pakai 69.40 m2 184,625.88 12,813,035.73 0.57 - - -
Pembesian 6,058.73 kg 11,160.11 67,616,108.41 3.00 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.99 m3 954,042.05 11,438,964.21 0.51 - - -
11 Pek. Beton Bertulang Balok 20/60 Talang Dak Aula Elv. + 4,00 m Bottom
Bekisting 2x pakai 13.80 m2 184,625.88 2,547,837.08 0.11 - - -
Pembesian 460.72 kg 11,160.11 5,141,687.03 0.23 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.69 m3 954,042.05 2,566,373.12 0.11 - - -
12 Pek. Beton Bertulang Balok Latiu 12/15 Elv. + 3,00 m
Bekisting 2x pakai 24.84 m2 184,625.88 4,586,106.74 0.20 - - -
Pembesian 292.87 kg 11,160.11 3,268,462.15 0.14 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.15 m3 954,042.05 1,097,148.36 0.05 - - -
13 Pek. Beton Plat Topi - topi tbl. 8 cm Elv. + 3,00 m
Bekisting 2x pakai 14.44 m2 184,625.88 2,665,997.64 0.12 - - -
Pembesian 108.12 kg 11,160.11 1,206,631.36 0.05 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.00 m3 954,042.05 954,042.05 0.04 - - -
14 Pek. Stek Besi Plat Beton Talang Aula
Pembesian 385.25 kg 36,160.11 13,930,683.34 0.62 - - -
15 Pek. Beton Bertulang Balok Anak 25/12
Pembesian 1,392.36 kg 11,160.11 15,538,894.24 0.69 - - -
16 Plat Lantai tebal 12 cm
Bondex 0,75 608.20 m2 145,000.00 88,189,000.00 3.91 - - -
Pembesian 10,253.44 kg 11,160.11 114,429,543.91 5.07 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 119.92 m3 954,042.05 114,408,722.91 5.07 - - -
17 Tangga Umum
Bekisting 2x pakai 21.15 m2 161,653.13 3,418,963.59 0.15 - - -
Pembesian 247.82 kg 11,160.11 2,765,699.08 0.12 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.12 m3 954,042.05 2,022,569.15 0.09 - - -
18 Lantai Beton Rabat bawah kramik fc=7,4 Mpa (K-100) 14.30 m3 779,478.09 11,146,536.71 0.49 - - -
19 Lantai kerja bawah Footplat (K-100) 7.76 m3 779,478.09 6,048,749.99 0.27 5.43 4,234,125.00 0.19
Sub Total 1,125,745,112.11 49.88 167,610,634.91 7.43
G PEKERJAAN KERAMIK LANTAI 1
1 Pek. Pasangan keramik 60 x 60 cm motif ex.platinum 426.04 m2 180,148.50 76,750,466.94 3.40 - - -
2 Pek. Lantai keramik 25x25 ASIA TILE (bagian toilet) 19.80 m2 176,727.42 3,499,202.92 0.16 - - -
3 Pek.Dinding keramik 25x40 ASIA TILE (bagian toilet) 56.00 m2 203,864.08 11,416,388.20 0.51 - - -
4 Pek.Keramik Dinding Motif Batik 6.00 m2 275,000.00 1,650,000.00 0.07 - - -
Sub Total 93,316,058.06 4.14 - -
H PEKERJAAN PLAFOND LANTAI 1
1 Pek. Pasang rangka Langit langit hollow 60 x 60 492.66 m2 43,102.13 21,234,692.90 0.94 - - -
2 Pek. Plafond Kalsiboard ex. Elephand 492.66 m2 37,232.63 18,343,025.03 0.81 - - -
3 Pekerjaan List Plafond Besar 397.00 m 25,558.13 10,146,575.63 0.45 - - -
Sub Total 49,724,293.56 2.20 - -
I PEKERJAAN INSTALASI LISTRIK
1 Pek. Penyambungan 1.00 unit 10,000,000.00 10,000,000.00 0.44 - - -
2 Pek. pasangan instalasi listrik titik lampu kabel NYM 2X2,5mm pipa counduit 74.00 titik 190,000.00 14,060,000.00 0.62 - - -
3 Pek. Lampu Panel LED kubus Slim (18 watt putih),Panasonic 10.00 bh 190,000.00 1,900,000.00 0.08 - - -
4 Pek.Lampu Downlight 25.00 bh 225,000.00 5,625,000.00 0.25 - - -
5 Pek. Pasangan saklar Ganda 16.00 bh 35,000.00 560,000.00 0.02 - - -
6 Pek. Pasangan stop kontak 15.00 bh 40,000.00 600,000.00 0.03 - - -
7 Pek.Lampu RMI (2 Lampu 18 watt) Philips 23.00 bh 350,000.00 8,050,000.00 0.36 - - -
8 Pek stang caping ,lampu SL 23 watt Philips 6.00 bh 35,000.00 210,000.00 0.01 - - -
9 Pek. Pasangan stop kontak AC 10.00 bh 90,000.00 900,000.00 0.04 - - -
Sub Total 41,905,000.00 1.86 - -
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
1 Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel Kontrol + Asesoris 1.00 unit 4,500,000.00 4,500,000.00 0.20 - - -
2 Pekerjaan Pasang MCB 6A/5KA 6.00 bh 155,000.00 930,000.00 0.04 - - -
3 Pekerjaan Pasang MCB 10A/5KA 10.00 bh 165,000.00 1,650,000.00 0.07 - - -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 750,000.00 750,000.00 0.03 - - -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 50,000.00 150,000.00 0.01 - - -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 - - -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 - - -
Sub Total 8,730,000.00 0.39 - -
K PEKERJAAN SDP
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 - - -
2 Pekerjaan Pasang MCB 20A/5KA 2.00 bh 725,000.00 1,450,000.00 0.06 - - -
3 Pekerjaan Pasang MCCB 20A/10KA 3Phase 2.00 bh 750,000.00 1,500,000.00 0.07 - - -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 2.00 bh 1,500,000.00 3,000,000.00 0.13 - - -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 - - -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 - - -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 - - -
Sub Total 9,950,000.00 0.44 - -
L PEKERJAAN PANEL AC LANTAI 1
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 - - -
2 Pekerjaan Pasang MCB 20A/10KA 10.00 bh 725,000.00 7,250,000.00 0.32 - - -
3 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 1,500,000.00 1,500,000.00 0.07 - - -
4 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 - - -
5 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 - - -
6 Pekerjaan Intaslasi AC 10.00 bh 190,000.00 1,900,000.00 0.08 - - -
7 Pekerjaan Instalasi Pipa Refrigrant dan Draine 10.00 bh 500,000.00 5,000,000.00 0.22 - - -
8 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 - - -
Sub Total 19,650,000.00 0.87 - -
M PEKERJAAN SANITASI
1 Pek. Pasangan Kloset Duduk Porselen (setara TOTO) 4.00 bh 3,000,000.00 12,000,000.00 0.53 - - -
2 Pek. Pasang Jet washer 4.00 bh 100,000.00 400,000.00 0.02 - - -
3 Pek.Pasang Kran dapur (leher angsa) stenliststeel 1.00 bh 150,000.00 150,000.00 0.01 - - -
4 Pek. Pasangan kran air dia.3/4 4.00 bh 125,000.00 500,000.00 0.02 - - -
5 Pek. Pasangan floor drain 4.00 bh 55,000.00 220,000.00 0.01 - - -
6 Pek. Pasangan pipa PVC dia.4 25.00 m 71,783.13 1,794,578.13 0.08 - - -
7 Pek. Pasangan pipa pvc tipe aw dia.3/4 30.00 m 23,878.44 716,353.13 0.03 - - -
8 Pek. Sapitanck sederhana 2.00 unit 3,000,000.00 6,000,000.00 0.27 - - -
9 Pek. Peresapan Septitank 2.00 unit 1,000,000.00 2,000,000.00 0.09 - - -
10 Pek. Peresapan air Kotor 2.00 unit 1,000,000.00 2,000,000.00 0.09 - - -
11 Pek. Tandon Pinguin TB110 (isi 1050 lt +asesoris otomatis) 1.00 unit 1,500,000.00 1,500,000.00 0.07 - - -
Sub Total 27,280,931.25 1.21 - -
N PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan tembok lantai 1 1,467.36 m2 27,660.29 40,587,599.47 1.80 - - -
2 Pekerjaan Pengecatan plafond 492.66 m2 17,877.79 8,807,670.79 0.39 - - -
Sub Total 49,395,270.26 2.19 - -
O PEKERJAAN LAIN - LAIN
1 Pek. Pasang Galvalum Rangka Besi Hollow 4/6 Penutup Void Tangga L 2 18.00 m2 300,000.00 5,400,000.00 0.24 - - -
Sub Total 5,400,000.00 0.24 - -
PEKERJAAN GEDUNG AULA
A PEKERJAAN TANAH
1 Pek. Galian tanah biasa sedalam 1 m 28.86 m3 66,650.00 1,923,519.00 0.09 - - -
2 Pek. Pengurugan tanah kembali bekas galian 16.14 m3 15,766.67 254,474.00 0.01 - - -
3 Pek. Pengurugan Tanah Baru Padat 154.35 m3 61,060.00 9,424,611.00 0.42 - - -
4 Pek. Pengurugan Sirtu padat kelas B 46.30 m3 178,450.00 8,262,235.00 0.37 - - -
5 Pek. Urugan pasir bawah pondasi dan lantai 17.25 m3 181,460.00 3,130,185.00 0.14 - - -
6 Pek. Cerucuk bambu 8-10 cm 187.50 m 15,000.00 2,812,500.00 0.12 - - -
Sub Total 25,807,524.00 1.14 - -
B PEKERJAAN PONDASI
1 Pek. Pasangan pondasi batu kosong/ Aanstamping 5.62 m3 415,621.88 2,335,794.94 0.10 - - -
2 Pek. Pasangan pondasi batu kali 16 15.24 m3 721,755.00 10,999,546.20 0.49 - - -
Sub Total 13,335,341.14 0.59 - -
C PEKERJAAN BETON
1 Pek. Lantai Kerja K.100 12.73 m3 779,478.09 9,922,756.11 0.44 - - -
2 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 11.52 m2 163,658.00 1,885,340.16 0.08 - - -
Pembesian 573.30 kg 11,160.11 6,398,092.50 0.28 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 4.37 m3 954,042.05 4,169,163.77 0.18 - - -
3 Pek. Sloof 15/20
Bekisting 2x pakai 27.16 m2 120,658.00 3,277,071.28 0.15 - - -
Pembesian 363.67 kg 11,160.11 4,058,598.11 0.18 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.03 m3 954,042.05 1,936,705.37 0.09 - - -
4 Pek. Kolom 30/30
Bekisting 2x pakai 55.21 m2 178,175.88 9,837,090.06 0.44 - - -
Pembesian 1,205.31 kg 11,160.11 13,451,395.20 0.60 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 6.26 m3 954,042.05 5,972,303.25 0.26 - - -
5 Pek. Kolom Praktis 12/12
Bekisting 2x pakai 11.28 m2 155,439.63 1,753,358.97 0.08 - - -
Pembesian 279.47 kg 11,160.11 3,118,916.64 0.14 - - -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 0.79 m3 954,042.05 753,693.22 0.03 - - -
6 Pek. Balok 15/25 Elv. + 3,00 m
Bekisting 2x pakai 5.72 m2 184,625.88 1,056,060.01 0.05 - - -
Pembesian 105.33 kg 11,160.11 1,175,494.65 0.05 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 0.26 m3 954,042.05 248,050.93 0.01 - - -
7 Pek. Balok 20/25 Elv. +3,00 m
Bekisting 2x pakai 29.12 m2 184,625.88 5,376,305.48 0.24 - - -
Pembesian 510.14 kg 11,160.11 5,693,219.79 0.25 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.08 m3 954,042.05 1,984,407.47 0.09 - - -
8 Pek. Balok 20/35 Elv. + 4,00 m
Bekisting 2x pakai 18.36 m2 184,625.88 3,389,731.07 0.15 - - -
Pembesian 472.22 kg 11,160.11 5,270,028.32 0.23 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.43 m3 954,042.05 1,364,280.13 0.06 - - -
9 Pek. Balok Konsol Elv. Top + 4,00 m
Pembesian 199.53 kg 11,160.11 2,226,777.25 0.10 - - -
10 Pek. Plat Beton Topi-topi Elv. + 3,00 m
Bekisting 2x pakai 39.64 m2 184,625.88 7,318,569.69 0.32 - - -
Pembesian 422.92 kg 11,160.11 4,719,834.78 0.21 - - -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 2.88 m3 954,042.05 2,747,641.11 0.12 - - -
Sub Total 109,104,885.30 4.83 - -
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK 1.00 ls 300,000.00 300,000.00 0.01 1.00 300,000.00 0.01
2 Asuransi dan perijinan 1.00 ls 1,000,000.00 1,000,000.00 0.04 1.00 1,000,000.00 0.04
Sub Total 1,300,000.00 0.06 1,300,000.00 0.06
IV PEKERJAAN PENCEGAHAN COVID-19
1 Alat Pelindung Kerja dan Pelindung Diri 1.00 ls 7,695,000.00 7,695,000.00 0.34 0.30 2,308,500.00 0.10
2 Personil Keselamatan Konstruksi 1.00 ls 3,000,000.00 3,000,000.00 0.13 0.30 900,000.00 0.04
3 Fasilitas sarana, Prasarana dan Alat kesehatan 1.00 ls 2,565,000.00 2,565,000.00 0.11 0.40 1,026,000.00 0.05
( Termasuk Protokol Kesehatan Penanganan COVID 19 )
Sub Total 13,260,000.00 0.59 4,234,500.00 0.19
Jumlah Biaya Konstruksi 2,256,718,317.27 100.00 219,663,757.83 9.73
PPN 10 % 225,671,831.73 21,966,375.78
Jumlah Total 2,482,390,149.00 241,630,133.61
Dibulatkan 2,482,390,000.00 241,630,000.00
Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan 0.9
(PPTK) 31.59 11.7
78
109.59 11.7 121.29
39.00
FANNY ARDIANSYAH, SE 1.29
NIP. 198211 1720080 1 002
PERIODE : Minggu Ke 5
MINGGU KE : 5 (LIMA)
REALISASI
Prest Minggu ini Prest Komulatif KETERANGAN
Volume Jml Harga Bobot Volume Jml Harga Bobot
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
14.69 2,404,136.02 0.11 14.69 2,404,136.02 0.11
814.49 9,089,800.03 0.40 814.49 9,089,800.03 0.40
3.78 3,606,278.96 0.16 3.78 3,606,278.96 0.16
- - - - - -
- - - - - -
- - - - - -
-
- - - - - -
817.74 9,126,070.40 0.40 817.74 9,126,070.40 0.40
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.81 629,818.30 0.03 6.24 4,863,943.29 0.22
104,214,541.08 4.62 271,825,175.99 12.05
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
- - - - - -
- - - - - -
- - - -
- - - - - -
- - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
- - - - - -
- - - - - -
- - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
- - - 1.00 300,000.00 0.01
- - - 1.00 1,000,000.00 0.04
- - 1,300,000.00 0.06
- - 4,234,500.00 0.19
205,925,396.91 9.12 425,589,154.73 18.86
20,592,539.69 42,558,915.47
226,517,936.60 468,148,070.21
226,517,000.00 468,148,000.00
M.SAEFULLAH, ST
Pengawas Lapangan
REKAPITULASI LAPORAN MINGGUAN
Kegiatan
Pekerjaan : Pembangunan Gedung Kantor Kecamatan Pekalongan Timur
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Konsultan Pengawas : CV. COZZY ERGITA
Minggu Ke : Minggu Ke 5
Periode 28 Juli 2021 s/d 03 Agustus 2021
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI 1,300,000.00 0.06 0.00 0.00 1,300,000.00 0.06
Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)
FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
TIME SCHEDULE ( JADWAL
BOBOT
JUMLAH HARGA (Rp)
% 1 2 3 4 5
2,482,390,149.00 100.00
248,239,014.90
2,730,629,163.90
2,730,629,000.00
0.08 0.92 5.86 8.15 7.53
0 0.08 1.00 6.87 15.01 22.54
0.75 0.38 4.35 4.25 9.12
0 0.75 1.13 5.48 9.73 18.86
0.67 0.13 -1.38 -5.28 -3.68
Mendahului Mendahului Terlambat Terlambat Terlambat
CHEDULE ( JADWAL WAKTU PELAKSANAAN)
WAKTU PELAKSANAAN
MINGGU KE
6 7 8 9 10 11 12 13
0.23
0.15 0.15
0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48
14 15 16 17 18 19 20 21
1.25
1.28 1.28 1.28 1.28 1.28 1.28
0.48 0.48
M.SAEFULLAH, ST
Pengawas Lapangan
03 Agustus 2021
KETERANGAN
22
100
90
80
70
60
0.36
50
40
30
0.003
20
0.03
10
0
10
0
0.39
100.00
3 Agustus 2021
ultan Pengawas
COZZY ERGITA
AEFULLAH, ST
awas Lapangan