PROGRESS

Kegiatan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan


Pekerjaan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan Sulawesi
Lokasi : di saluran Jalan Sulawesi, Kecamatan Pekalongan Barat:
Tahun Anggaran : 2020

MINGGU KE -
NO. URAIAN PEKERJAAN VOLUME SAT. KETERANGAN
1 2 3 4 5 6 7 8 9
I
A PEKERJAAN GEDUNG
1 LANTAI I 80% 100% 100% 100% 100% 100% 100% 100% 100%
2 80% 100% 100% 100% 100% 100% 100% 100%

B
1
2 40% 80% 100% 100% 100% 100% 100% 100%
3 100% 100% 100% 100% 100% 100%
4 100% 100% 100% 100% 100% 100%
5 40% 80% 100% 100% 100% 100%
C 50% 100% 100% 100% 100% 100% 100%
1 50% 100% 100% 100% 100%
2
3
D 100% 100% 100% 100% 100% 100% 100% 100% 100%
1 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 50% 100% 100% 100% 100% 100% 100% 100% 100%
3
4
E
1
2
3
4
5
6
7
PROGRESS

Kegiatan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan


Pekerjaan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan Sulawesi
Lokasi : di saluran Jalan Sulawesi, Kecamatan Pekalongan Barat:
Tahun Anggaran : 2020

MINGGU KE -
NO. URAIAN PEKERJAAN VOLUME SAT. KETERANGAN
1 2 3 4 5 6 7 8 9
8
9
10
11
12
13
14
15
16
F
1

5
PROGRESS

Kegiatan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan


Pekerjaan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan Sulawesi
Lokasi : di saluran Jalan Sulawesi, Kecamatan Pekalongan Barat:
Tahun Anggaran : 2020

MINGGU KE -
NO. URAIAN PEKERJAAN VOLUME SAT. KETERANGAN
1 2 3 4 5 6 7 8 9

10

11

12
PROGRESS

Kegiatan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan


Pekerjaan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan Sulawesi
Lokasi : di saluran Jalan Sulawesi, Kecamatan Pekalongan Barat:
Tahun Anggaran : 2020

MINGGU KE -
NO. URAIAN PEKERJAAN VOLUME SAT. KETERANGAN
1 2 3 4 5 6 7 8 9
13

14

15

16

17

18
19
G
1
2
3
4
H
1
2
3
I
1
PROGRESS

Kegiatan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan


Pekerjaan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan Sulawesi
Lokasi : di saluran Jalan Sulawesi, Kecamatan Pekalongan Barat:
Tahun Anggaran : 2020

MINGGU KE -
NO. URAIAN PEKERJAAN VOLUME SAT. KETERANGAN
1 2 3 4 5 6 7 8 9
2
3
4
5
6
7
8
9
J
1
2
3
PEMERINTAH KOTA PEKALONGAN
DINAS PERINDUSTRIAN DAN TENAGA KERJA

LAPORAN

KEGIATAN :
PEMELIHARAAN RUTIN/BERKALA GEDUNG KANTOR

PEKERJAAN :
BELANJA JASA KONSULTAN PENGAWAS
PEMELIHARAAN GEDUNG KANTOR (PERBAIKAN PAGAR KANTOR)

LOKASI : KOTA PEKALONGAN

TAHUN ANGGARAN
2020

KONSULTAN PENGAWAS :

CV. KARYA CIPTA MANUNGGAL


MINGGU KE -
NO. URAIAN PEKERJAAN VOLUME SAT.
1 2 3 4 5 6 7 8 9 10 12
I PEKERJAAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Pengukuran 1.00 ls 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 Pek. Papan Nama Proyek 1.00 ls 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
LANTAI 1
B PEKERJAAN TANAH
1 Pek. Galian tanah biasa 1 m 519.60 m3 50% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 Pek. Urugan tanah kembali bekas galian 291.55 m3 50% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3 Pek. Pasir bawah pondasi dan lantai 81.92 m3
4 Pek. Urugan tanah baru padat 316.35 m3
5 Pek. Urugan Sirtu Kw. B baru padat 136.10 m3
C PEKERJAAN PONDASI
1 Pek. Pasangan batu kosong (anstamping) 41.14 m3
2 Pek. Pas. Batu kali 1ps 6 pp 226.26 m3
3 Pek. crucuk bambu 10 cm pj 1,5 m 819.00 m 100% 100% 100% 100% 100% 100% 100% 100% 100%
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
1 Pek. Pas.batu bata merah 1ps 6 pp tebal 1/2 bata 733.68 m2
2 Pek. Pasangan Plesteran 1 Pc 6 pp 1467.36 m2
3 Pek. Acian 1467.36 m2
4 Pek. Sponengan 434.00 m
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
1 Pek. Pintu Panel Type P1 & P1.b 10.00 Unit
2 Pek. Pintu Panel Type P1.a 4.00 Unit
3 Pek. Pintu Frameless Type P2.a 1.00 Unit
4 Pek. Pintu Kupu Tarung Type P2.b 3.00 Unit
5 Pek. Pintu Kupu Tarung Type P2.c 5.00 Unit
6 Pek. Jendela Type J2 3.00 Unit
7 Pek. Jendela Type J3 6.00 Unit
8 Pek. Jendela Type J2.a 1.00 Unit
9 Pek. Jendela Type J2.b 1.00 Unit
10 Pek. Jendela Type J3.a 2.00 Unit
11 Pek. Bouven Type BV1 7.00 Unit
12 Pek. Pasangan engsel Jendela kupu kupu 65.00 bh
13 Pek. Pasangan engsel pintu 12.00 bh
14 Pek. Pasangan kunci selot 6.00 bh
15 Pek. Pasangan rambuncis casement 6.00 bh
16 Pek. Pasang Kaca Bening 5 mm 37.59 m2
F PEKERJAAN BETON
1 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 14.69 m2 60%
Pembesian 814.49 kg 60%
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.78 m3 60%
2 Pek. Beton Bertulang Footplat 2,5 x 2,0 m
Bekisting 2x pakai 93.30 m2 60%
Pembesian 12877.15 kg 60%
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 91.00 m3 60%
3 Pek. Beton Bertulang Sloof 12/18
Bekisting 2x pakai 8.12 m2
Pembesian 256.55 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.38 m3
4 Pek. Beton Bertulang Sloof Struktur 20/30
Bekisting 2x pakai 51.24 m2
Pembesian 2453.20 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 12.81 m3
5 Pek. Beton Bertulang Sloof Struktur 20/60
Bekisting 2x pakai 45.36 m2
Pembesian 1936.19 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.34 m3
6 Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,5cm (K1)
Bekisting 2x pakai 80.00 m2
Pembesian 5790.56 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 32.00 m3
7 Pek. Beton Bertulang Kolom Struktur 30 x 30 T = 4,5cm (K2)
Bekisting 2x pakai 14.40 m2
Pembesian 492.62 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.16 m3
8 Pek. Kolom Praktis 15 x 15 (KP)
Bekisting 2x pakai 39.58 m2
Pembesian 645.13 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 5.28 m3
9 Pek. Beton Bertulang Balok 35/70 (B1)
Bekisting 2x pakai 128.35 m2
Pembesian 8221.72 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 34.51 m3
10 Pek. Beton Bertulang Balok Induk 25 x 40 (B2)
Bekisting 2x pakai 69.40 m2
Pembesian 6058.73 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.99 m3
11 Pek. Beton Bertulang Balok 20/60 Talang Dak Aula Elv. + 4,00 m Bottom
Bekisting 2x pakai 13.80 m2
Pembesian 460.72 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.69 m3
12 Pek. Beton Bertulang Balok Latiu 12/15 Elv. + 3,00 m
Bekisting 2x pakai 24.84 m2
Pembesian 292.87 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.15 m3
13 Pek. Beton Plat Topi - topi tbl. 8 cm Elv. + 3,00 m
Bekisting 2x pakai 14.44 m2
Pembesian 108.12 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.00 m3
14 Pek. Stek Besi Plat Beton Talang Aula
Pembesian 385.25 kg
15 Pek. Beton Bertulang Balok Anak 25/12
Pembesian 1392.36 kg
16 Plat Lantai tebal 12 cm
Bondex 0,75 608.20 m2
Pembesian 10253.44 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 119.92 m3
17 Tangga Umum
Bekisting 2x pakai 21.15 m2
Pembesian 247.82 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.12 m3
18 Lantai Beton Rabat bawah kramik fc=7,4 Mpa (K-100) 14.30 m3
19 Lantai kerja bawah Footplat (K-100) 7.76 m3
G PEKERJAAN KERAMIK LANTAI 1
1 Pek. Pasangan keramik 60 x 60 cm motif ex.platinum 426.04 m2
2 Pek. Lantai keramik 25x25 ASIA TILE (bagian toilet) 19.80 m2
3 Pek.Dinding keramik 25x40 ASIA TILE (bagian toilet) 56.00 m2
4 Pek.Keramik Dinding Motif Batik 6.00 m2
H PEKERJAAN PLAFOND LANTAI 1
1 Pek. Pasang rangka Langit langit hollow 60 x 60 492.66 m2
2 Pek. Plafond Kalsiboard ex. Elephand 492.66 m2
3 Pekerjaan List Plafond Besar 397.00 m
I PEKERJAAN INSTALASI LISTRIK
1 Pek. Penyambungan 1.00 unit
2 Pek. pasangan instalasi listrik titik lampu kabel NYM 2X2,5mm pipa counduit 74.00 titik
3 Pek. Lampu Panel LED kubus Slim (18 watt putih),Panasonic 10.00 bh
4 Pek.Lampu Downlight 25.00 bh
5 Pek. Pasangan saklar Ganda 16.00 bh
6 Pek. Pasangan stop kontak 15.00 bh
7 Pek.Lampu RMI (2 Lampu 18 watt) Philips 23.00 bh
8 Pek stang caping ,lampu SL 23 watt Philips 6.00 bh
9 Pek. Pasangan stop kontak AC 10.00 bh
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
1 Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel Kontrol + Asesoris 1.00 unit
2 Pekerjaan Pasang MCB 6A/5KA 6.00 bh
3 Pekerjaan Pasang MCB 10A/5KA 10.00 bh
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh
5 Pekerjaan Pasang Pilot Lamp 3.00 bh
6 Pekerjaan Pasang Volt Meter 1.00 bh
7 Pekerjaan Pasang Petanahan 1.00 bh
K PEKERJAAN SDP
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit
2 Pekerjaan Pasang MCB 20A/5KA 2.00 bh
3 Pekerjaan Pasang MCCB 20A/10KA 3Phase 2.00 bh
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 2.00 bh
5 Pekerjaan Pasang Pilot Lamp 3.00 bh
6 Pekerjaan Pasang Volt Meter 1.00 bh
7 Pekerjaan Pasang Petanahan 1.00 bh
L PEKERJAAN PANEL AC LANTAI 1
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit
2 Pekerjaan Pasang MCB 20A/10KA 10.00 bh
3 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh
4 Pekerjaan Pasang Pilot Lamp 3.00 bh
5 Pekerjaan Pasang Volt Meter 1.00 bh
6 Pekerjaan Intaslasi AC 10.00 bh
7 Pekerjaan Instalasi Pipa Refrigrant dan Draine 10.00 bh
8 Pekerjaan Pasang Petanahan 1.00 bh
M PEKERJAAN SANITASI
1 Pek. Pasangan Kloset Duduk Porselen (setara TOTO) 4.00 bh
2 Pek. Pasang Jet washer 4.00 bh
3 Pek.Pasang Kran dapur (leher angsa) stenliststeel 1.00 bh
4 Pek. Pasangan kran air dia.3/4 4.00 bh
5 Pek. Pasangan floor drain 4.00 bh
6 Pek. Pasangan pipa PVC dia.4 25.00 m
7 Pek. Pasangan pipa pvc tipe aw dia.3/4 30.00 m
8 Pek. Sapitanck sederhana 2.00 unit
9 Pek. Peresapan Septitank 2.00 unit
10 Pek. Peresapan air Kotor 2.00 unit
11 Pek. Tandon Pinguin TB110 (isi 1050 lt +asesoris otomatis) 1.00 unit
N PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan tembok lantai 1 1467.36 m2
2 Pekerjaan Pengecatan plafond 492.66 m2
O PEKERJAAN LAIN - LAIN
1 Pek. Pasang Galvalum Rangka Besi Hollow 4/6 Penutup Void Tangga L 2 18.00 m2

PEKERJAAN GEDUNG AULA


A PEKERJAAN TANAH
1 Pek. Galian tanah biasa sedalam 1 m 28.86 m3
2 Pek. Pengurugan tanah kembali bekas galian 16.14 m3
3 Pek. Pengurugan Tanah Baru Padat 154.35 m3
4 Pek. Pengurugan Sirtu padat kelas B 46.30 m3
5 Pek. Urugan pasir bawah pondasi dan lantai 17.25 m3
6 Pek. Cerucuk bambu 8-10 cm 187.50 m
B PEKERJAAN PONDASI
1 Pek. Pasangan pondasi batu kosong/ Aanstamping 5.62 m3
2 Pek. Pasangan pondasi batu kali 16 15.24 m3
C PEKERJAAN BETON
1 Pek. Lantai Kerja K.100 12.73 m3
2 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 11.52 m2
Pembesian 573.30 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 4.37 m3
3 Pek. Sloof 15/20
Bekisting 2x pakai 27.16 m2
Pembesian 363.67 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.03 m3
4 Pek. Kolom 30/30
Bekisting 2x pakai 55.21 m2
Pembesian 1205.31 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 6.26 m3
5 Pek. Kolom Praktis 12/12
Bekisting 2x pakai 11.28 m2
Pembesian 279.47 kg
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 0.79 m3
6 Pek. Balok 15/25 Elv. + 3,00 m
Bekisting 2x pakai 5.72 m2
Pembesian 105.33 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 0.26 m3
7 Pek. Balok 20/25 Elv. +3,00 m
Bekisting 2x pakai 29.12 m2
Pembesian 510.14 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.08 m3
8 Pek. Balok 20/35 Elv. + 4,00 m
Bekisting 2x pakai 18.36 m2
Pembesian 472.22 kg
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.43 m3
9 Pek. Balok Konsol Elv. Top + 4,00 m
Pembesian 199.53 kg
10 Pek. Plat Beton Topi-topi Elv. + 3,00 m
Bekisting 2x pakai 39.64 m2
Pembesian 422.92 kg
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 2.88 m3

III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI


1 Penyiapan RKK 1.00 ls
2 Asuransi dan perijinan 1.00 ls

IV PEKERJAAN PENCEGAHAN COVID-19


Alat Pelindung Kerja dan Pelindung Diri 1.00 ls
Personil Keselamatan Konstruksi 1.00 ls
Fasilitas sarana, Prasarana dan Alat kesehatan 1.00 ls
( Termasuk Protokol Kesehatan Penanganan COVID 19 )

JUMLAH TOTAL
MINGGU KE -
KETERANGAN
13 14 15 16 17 18 19 20 21 22

100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
PEMERINTAH KOTA PEKALONGAN
DINAS PEKERJAAN UMUM DAN PENATAN RUANG
Jl. Kusuma Bangsa No. 45 Telp. (0285) 423222 Kota Pekalongan

LAPORAN AKHIR

KEGIATAN :
REHABILITASI / PEMELIHARAAN SALURAN PEMATUS JALAN

PEKERJAAN :
REHABILITASI / PEMELIHARAAN SALURAN PEMATUS JALAN SULAWESI

LOKASI : DI SALURAN JALAN SULAWESI, KECAMATAN PEKALONGAN BARAT


KOTA PEKALONGAN

TAHUN ANGGARAN
2020

KONSULTAN PENGAWAS :

CV. TAKABEYA UTAMA


REKAPITULASI LAPORAN BULANAN

Kegiatan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan


Pekerjaan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan Sulawesi
Lokasi : di saluran Jalan Sulawesi, Kecamatan Pekalongan Barat:
Kontraktor Pelaksana : CV. TAKABEYA UTAMA
Bulan Ke : Bulan Ke 1
Periode 30 Juni 2021 s/d 29 Juli 2021

BULAN LALU PROGRES BULAN INI PROGRES S/D BULAN INI

URAIAN PEKERJAAN
NO JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT
PEK (%) PEK (%) PEK (%)
( Rp. ) ( Rp. ) ( Rp. )

A PEKERJAAN TANAH - - 13,796,191.09 7.63 13,796,191.09 7.63


B PEKERJAAN PASANGAN SALURAN DAN PENUTUP - - 140,882,812.43 77.87 140,882,812.43 77.87
SALURAN PJ. 97,78 m Tg. 1,15 - 1,35 m
C PEKERJAAN PERSIAPAN - - 1,197,000 0.66 1,197,000 0.66

Total Sub Jumlah Harga - - 155,876,003.52 86.16 155,876,003.52 86.16


PPN 10 % - 15,587,600.35 15,587,600.35
Total - 171,463,603.87 171,463,603.87
Dibulatkan - 171,463,000.00 171,463,000.00

PRESTASI PEKERJAAN BULAN LALU 0.00 %


PRESTASI PEKERJAAN BULAN INI 86.16 %
PRESTASI PEKERJAAN SAMPAI DENGAN BULAN INI 86.16 %

Pekalongan , 29 Juli 2021


Disetujui Oleh : dibuat Oleh :
Pejabat Pembuat Komitmen Kontraktor Pelaksana
(PPKOM) CV. TAKABEYA UTAMA

ANDRY MARTHA, S.T., MSi. ASNIEL AMUS, ST


NIP. 19780306 200502 1 004 Direktur
REKAPITULASI LAPORAN BULANAN

Kegiatan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan


Pekerjaan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan Sulawesi
Lokasi : di saluran Jalan Sulawesi, Kecamatan Pekalongan Barat:
Kontraktor Pelaksana : CV. TAKABEYA UTAMA
Bulan Ke : Bulan Ke 2
Periode 25 Juli 2020 s/d 23 Agustus 2020

BULAN LALU PROGRES BULAN INI PROGRES S/D BULAN INI

URAIAN PEKERJAAN
NO JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT
PEK (%) PEK (%) PEK (%)
( Rp. ) ( Rp. ) ( Rp. )

A PEKERJAAN TANAH 13,796,191.10 7.63 - - 13,796,191.09 7.63


B PEKERJAAN PASANGAN SALURAN DAN PENUTUP 140,882,812.43 77.87 25,033,822.77 13.84 165,916,635.20 91.71
SALURAN PJ. 97,78 m Tg. 1,15 - 1,35 m
C PEKERJAAN PERSIAPAN 1,197,000 0.66 - - 1,197,000 0.66

Total Sub Jumlah Harga 155,876,004 86.16 25,033,822.77 13.84 180,909,826.29 100.00
PPN 10 % 15,587,600 2,503,382.28 18,090,982.63
Total 171,463,604 27,537,205.05 199,000,808.92
Dibulatkan 171,463,600 27,537,000.00 199,000,000.00

PRESTASI PEKERJAAN BULAN LALU 86.16 %


PRESTASI PEKERJAAN BULAN INI 13.84 %
PRESTASI PEKERJAAN SAMPAI DENGAN BULAN INI 100.00 %

Pekalongan , 23 Agustus 2020


Disetujui Oleh : dibuat Oleh :
Pejabat Pembuat Komitmen Kontraktor Pelaksana
(PPKOM) CV. TAKABEYA UTAMA

ANDRY MARTHA, S.T., MSi. ASNIEL AMUS, ST


NIP. 19780306 200502 1 004 Direktur
LAPORAN BULANAN

Kegiatan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan


Pekerjaan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan Sulawesi
Lokasi : di saluran Jalan Sulawesi, Kecamatan Pekalongan Barat:
Tahun Anggaran : 2020

R
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. Bobot Prest Bulan Lalu P
SATUAN ( Rp ) ( Rp )
% Volume Jml Harga Bobot Volume
A PEKERJAAN TANAH
1 Pekerjaan Pondasi Talud
1. Pek. Galian Tanah Keras 145.73 M3 89,341.20 13,019,693.08 7.20 - - - 145.73
2. Pek. Urugan Tanah Kembali 48.58 M3 15,985.00 776,498.02 0.43 - - - 48.58
Sub Total I 13,796,191.09 7.63 - -
B PEKERJAAN PASANGAN SALURAN DAN PENUTUP
SALURAN PJ. 97,78 m Tg. 1,15 - 1,35 m
1 Pek. Pas. Batu Kali 1 : 5 86.95 m3 952,373.65 82,808,888.87 45.77 - - - 86.95
2 Pek. Plesteran 1 : 5 295.85 m2 54,633.88 16,163,433.40 8.93 - - - 295.85
3 Pek. Acian 295.85 m2 28,717.80 8,496,161.13 4.70 - - - 295.85
4 Pek. Beton Opritan K-175 3.44 m3 1,057,117.86 3,638,151.80 2.01 - - - 2.93
5 Pek. Pipa PVC 3" 14.00 m' 28,000.00 392,000.00 0.22 - - - 14.00
6 Pek. Cover U-Dicth LD U 1000 x 600 161.00 Bh 338,000.00 54,418,000.00 30.08 - - - 88.55
Sub Total II 165,916,635.20 91.71 - -
C PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Bowplank 1.00 Ls 500,000.00 500,000.00 0.28 - - - 1.00
2 Pek. Papan nama proyek 1.00 Ls 197,000.00 197,000.00 0.11 - - - 1.00
3 Pek. Pembongkaran 1.00 Ls 500,000.00 500,000.00 0.28 - - - 1.00
Sub Total III 1,197,000.00 0.66 - -
Jumlah Biaya Konstruksi 180,909,826.29 100.00 - -
PPN 10 % 18,090,982.63 -
Jumlah Total 199,000,808.92 -
Dibulatkan 199,000,000.00 -

Diperiksa Oleh :
Pejabat Pembuat Komitmen
(PPKOM)

ANDRY MARTHA, S.T., MSi.


NIP. 19780306 200502 1 004
AN BULANAN

PERIODE : Bulan Ke 1
BULAN KE : 1 (SATU)
TANGGAL 25 Juni 2020 s/d 24 Juli 2020

REALISASI
Prest Bulan ini Prest Komulatif KETERANGAN
Jml Harga Bobot Volume Jml Harga Bobot

13,019,693.08 7.20 145.73 13,019,693.08 7.20


776,498.02 0.43 48.58 776,498.02 0.43
13,796,191.09 7.63 13,796,191.09 7.63

82,808,888.87 45.77 86.95 82,808,888.87 45.77


16,163,433.40 8.93 295.85 16,163,433.40 8.93
8,496,161.13 4.70 295.85 8,496,161.13 4.70
3,092,429.03 1.71 2.93 3,092,429.03 1.71
392,000.00 0.22 14.00 392,000.00 0.22
29,929,900.00 16.54 88.55 29,929,900.00 16.54
140,882,812.43 77.87 140,882,812.43 77.87

500,000.00 0.28 1.00 500,000.00 0.28


197,000.00 0.11 1.00 197,000.00 0.11
500,000.00 0.28 1.00 500,000.00 0.28
1,197,000.00 0.66 1,197,000.00 0.66
155,876,003.52 86.16 155,876,003.52 86.16
15,587,600.35 15,587,600.35
171,463,603.87 171,463,603.87
171,463,000.00 171,463,000.00

Pekalongan, 24 Juli 2020


dibuat Oleh :
Konsultan Pengawas
CV. TAKABEYA UTAMA

ASNIEL AMUS, ST
Direktur
LAPORAN BULANAN

Kegiatan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan PERIODE


Pekerjaan : Rehabilitasi/Pemeliharaan Saluran Pematus Jalan Sulawesi BULAN KE
Lokasi : di saluran Jalan Sulawesi, Kecamatan Pekalongan Barat: TANGGAL
Tahun Anggaran : 2020

REALISASI
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. Bobot Prest Bulan Lalu Prest Bulan ini
SATUAN ( Rp ) ( Rp )
% Volume Jml Harga Bobot Volume Jml Harga
A PEKERJAAN TANAH
1 Pekerjaan Pondasi Talud
1. Pek. Galian Tanah Keras 145.73 M3 89,341.20 13,019,693.08 7.20 145.73 13,019,693.08 7.20 - -
2. Pek. Urugan Tanah Kembali 48.58 M3 15,985.00 776,498.02 0.43 48.58 776,498.02 0.43 - -
Sub Total I 13,796,191.09 7.63 13,796,191.10 7.63 -
PEKERJAAN PASANGAN SALURAN DAN
B PENUTUP SALURAN PJ. 97,78 m Tg. 1,15 -
1,35 m
1 Pek. Pas. Batu Kali 1 : 5 86.95 m3 952,373.65 82,808,888.87 45.77 86.95 82,808,888.87 45.77 - -
2 Pek. Plesteran 1 : 5 295.85 m2 54,633.88 16,163,433.40 8.93 295.85 16,163,433.40 8.93 - -
3 Pek. Acian 295.85 m2 28,717.80 8,496,161.13 4.70 295.85 8,496,161.13 4.70 - -
4 Pek. Beton Opritan K-175 3.44 m3 1,057,117.86 3,638,151.80 2.01 2.93 3,092,429.03 1.71 0.52 545,722.77
5 Pek. Pipa PVC 3" 14.00 m' 28,000.00 392,000.00 0.22 14.00 392,000.00 0.22 - -
6 Pek. Cover U-Dicth LD U 1000 x 600 161.00 Bh 338,000.00 54,418,000.00 30.08 88.55 29,929,900.00 16.54 72.45 24,488,100.00
Sub Total II 165,916,635.20 91.71 140,882,812.43 77.87 25,033,822.77
C PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Bowplank 1.00 Ls 500,000.00 500,000.00 0.28 1.00 500,000.00 0.28 - -
2 Pek. Papan nama proyek 1.00 Ls 197,000.00 197,000.00 0.11 1.00 197,000.00 0.11 - -
3 Pek. Pembongkaran 1.00 Ls 500,000.00 500,000.00 0.28 1.00 500,000.00 0.28 - -
Sub Total III 1,197,000.00 0.66 1,197,000.00 0.66 -
Jumlah Biaya Konstruksi 180,909,826.29 100.00 155,876,003.53 86.16 25,033,822.77
PPN 10 % 18,090,982.63 15,587,600.35 2,503,382.28
Jumlah Total 199,000,808.92 171,463,603.88 27,537,205.05
Dibulatkan 199,000,000.00 171,463,000.00 27,537,000.00

Diperiksa Oleh :
Pejabat Pembuat Komitmen
(PPKOM)

ANDRY MARTHA, S.T., MSi.


NIP. 19780306 200502 1 004
N BULANAN

: Bulan Ke 2
: 2 (DUA)
25 Juli 2020 s/d 23 Agustus 2020

REALISASI
Prest Bulan ini Prest Komulatif KETERANGAN
Bobot Volume Jml Harga Bobot

- 145.73 13,019,693.08 7.20


- 48.58 776,498.02 0.43
- 13,796,191.09 7.63

- 86.95 82,808,888.87 45.77


- 295.85 16,163,433.40 8.93
- 295.85 8,496,161.13 4.70
0.30 3.44 3,638,151.80 2.01
- 14.00 392,000.00 0.22
13.54 161.00 54,418,000.00 30.08
13.84 165,916,635.20 91.71

- 1.00 500,000.00 0.28


- 1.00 197,000.00 0.11
- 1.00 500,000.00 0.28
- 1,197,000.00 0.66
13.84 180,909,826.29 100.00
18,090,982.63
199,000,808.92
199,000,000.00

Pekalongan, 23 Agustus 2020


dibuat Oleh :
Konsultan Pengawas
CV. TAKABEYA UTAMA

ASNIEL AMUS, ST
Direktur
REKAPITULASI LAPORAN MINGGUAN

Kegiatan
Pekerjaan
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Konsultan Pengawas : CV. COZZY ERGITA
Minggu Ke : Minggu Ke 1
Periode 30 Juni 2021 s/d 06 Juli 2021

MINGGU LALU PROGRES MINGGU INI PROGRES S/D MINGGU INI


URAIAN PEKERJAAN
NO JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT
( Rp. ) PEK (%) ( Rp. ) PEK (%) ( Rp. ) PEK (%)

I PEKERJAAN GEDUNG KANTOR


A PEKERJAAN PERSIAPAN 2,000,000.00 0.09 2,000,000.00 0.09
LANTAI I
B PEKERJAAN TANAH 11,768,433.50 0.52 11,768,433.50 0.52
C PEKERJAAN PONDASI
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
F PEKERJAAN BETON
G PEKERJAAN KERAMIK LANTAI 1
H PEKERJAAN PLAFOND LANTAI 1
I PEKERJAAN INSTALASI LISTRIK
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
K PEKERJAAN SDP
L PEKERJAAN PANEL AC LANTAI 1
M PEKERJAAN SANITASI
N PEKERJAAN PENGECATAN
O PEKERJAAN LAIN - LAIN

II PEKERJAAN GEDUNG AULA


1 PEKERJAAN TANAH
2 PEKERJAAN PONDASI
3 PEKERJAAN BETON

III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI 1,300,000.00 0.06 1,300,000.00 0.06

IV PEKERJAAN PENCEGAHAN COVID-19 1,839,000.00 0.08 1,839,000.00 0.08


Total Sub Jumlah Harga 0.00 0.00 16,907,433.50 0.75 16,907,433.50 0.75
PPN 10 % 0.00 1,690,743.35 1,690,743.35
Total 0.00 18,598,176.85 18,598,176.85
Dibulatkan 0.00 18,598,000.00 18,598,000.00

RENCANA MENURUT TIME SCHEDULE MINGGU INI 0.08 %


PRESTASI PEKERJAAN MINGGU LALU 0.00 %
PRESTASI PEKERJAAN MINGGU INI 0.75 %
PRESTASI PEKERJAAN SAMPAI DENGAN MINGGU INI 0.75 %
DEVIASI ===> 0.67 %

Pekalongan , 06 Juli 2021


di periksa Oleh : dibuat Oleh :
Pejabat Pelaksana Teknik Kegiatan Kontraktor Pelaksana
(PPTK) CV. COZZY ERGITA

FANNY ARDIANSYAH, SE M.SAEFULLAH, ST


NIP. 198211 1720080 1 002 Pengawas Lapangan
LAPORAN MINGGUAN
Kegiatan :
Pekerjaan :
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Tahun Anggaran : 2021

HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume Jml Harga
I PEKERJAAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Pengukuran 1.00 ls 2,000,000.00 2,000,000.00 0.09 - -
2 Pek. Papan Nama Proyek 1.00 ls 150,000.00 150,000.00 0.01 - -
Sub Total 2,150,000.00 0.10 -
B PEKERJAAN TANAH
1 Pek. Galian tanah biasa 1 m 519.60 m3 66,650.00 34,631,340.00 1.53 - -
2 Pek. Urugan tanah kembali bekas galian 291.55 m3 15,766.67 4,596,771.67 0.20 - -
3 Pek. Pasir bawah pondasi dan lantai 81.92 m3 181,460.00 14,865,203.20 0.66 - -
4 Pek. Urugan tanah baru padat 316.35 m3 61,060.00 19,316,331.00 0.86 - -
5 Pek. Urugan Sirtu Kw. B baru padat 136.10 m3 178,450.00 24,287,045.00 1.08 - -
Sub Total 97,696,690.87 4.33 -
C PEKERJAAN PONDASI
1 Pek. Pasangan batu kosong (anstamping) 41.14 m3 415,621.88 17,098,683.94 0.76 - -
2 Pek. Pas. Batu kali 1ps 6 pp 226.26 m3 721,755.00 163,304,286.30 7.24 - -
3 Pek.crucuk bambu 10 cm pj 1,5 m 819.00 m' 15,000.00 12,285,000.00 0.54 - -
Sub Total 192,687,970.24 8.54 -
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
1 Pek. Pas.batu bata merah 1ps 6 pp tebal 1/2 bata 733.68 m2 113,245.88 83,086,233.57 3.68 - -
2 Pek. Pasangan Plesteran 1 Pc 6 pp 1,467.36 m2 45,865.95 67,301,860.39 2.98 - -
3 Pek. Acian 1,467.36 m2 26,273.00 38,551,949.28 1.71 - -
4 Pek. Sponengan 434.00 m' 18,914.63 8,208,947.25 0.36 - -
Sub Total 197,148,990.49 8.74 -
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
1 Pek. Pintu Panel Type P1 & P1.b 10.00 Unit 3,500,000.00 35,000,000.00 1.55 - -
2 Pek. Pintu Panel Type P1.a 4.00 Unit 3,500,000.00 14,000,000.00 0.62 - -
3 Pek. Pintu Frameless Type P2.a 1.00 Unit 17,000,000.00 17,000,000.00 0.75 - -
4 Pek. Pintu Kupu Tarung Type P2.b 3.00 Unit 7,500,000.00 22,500,000.00 1.00 - -
5 Pek. Pintu Kupu Tarung Type P2.c 5.00 Unit 7,500,000.00 37,500,000.00 1.66 - -
6 Pek. Jendela Type J2 3.00 Unit 2,200,000.00 6,600,000.00 0.29 - -
7 Pek. Jendela Type J3 6.00 Unit 3,050,000.00 18,300,000.00 0.81 - -
8 Pek. Jendela Type J2.a 1.00 Unit 2,200,000.00 2,200,000.00 0.10 - -
9 Pek. Jendela Type J2.b 1.00 Unit 2,200,000.00 2,200,000.00 0.10 - -
10 Pek. Jendela Type J3.a 2.00 Unit 3,050,000.00 6,100,000.00 0.27 - -
11 Pek. Bouven Type BV1 7.00 Unit 700,000.00 4,900,000.00 0.22 - -
12 Pek. Pasangan engsel Jendela kupu kupu 65.00 bh 7,500.00 487,500.00 0.02 - -
13 Pek. Pasangan engsel pintu 12.00 bh 12,000.00 144,000.00 0.01 - -
14 Pek. Pasangan kunci selot 6.00 bh 125,000.00 750,000.00 0.03 - -
15 Pek. Pasangan rambuncis casement 6.00 bh 125,000.00 750,000.00 0.03 - -
16 Pek. Pasang Kaca Bening 5 mm 37.59 m2 125,000.00 4,698,750.00 0.21 - -
Sub Total 173,130,250.00 7.67 -
F PEKERJAAN BETON
1 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 14.69 m2 163,658.00 2,404,136.02 0.11 - -
Pembesian 814.49 kg 11,160.11 9,089,800.03 0.40 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.78 m3 954,042.05 3,606,278.96 0.16 - -
2 Pek. Beton Bertulang Footplat 2,5 x 2,0 m
Bekisting 2x pakai 93.30 m2 163,658.00 15,269,291.40 0.68 - -
Pembesian 12,877.15 kg 11,160.11 143,710,442.68 6.37 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 91.00 m3 954,042.05 86,817,826.75 3.85 - -
3 Pek. Beton Bertulang Sloof 12/18
Bekisting 2x pakai 8.12 m2 120,658.00 979,742.96 0.04 - -
Pembesian 256.55 kg 11,160.11 2,863,126.86 0.13 - -
LAPORAN MINGGUAN
Kegiatan :
Pekerjaan :
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Tahun Anggaran : 2021

HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume Jml Harga
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.38 m3 954,042.05 3,224,662.14 0.14 - -
4 Pek. Beton Bertulang Sloof Struktur 20/30
Bekisting 2x pakai 51.24 m2 120,658.00 6,182,515.92 0.27 - -
Pembesian 2,453.20 kg 11,160.11 27,377,987.98 1.21 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 12.81 m3 954,042.05 12,221,278.69 0.54 - -
5 Pek. Beton Bertulang Sloof Struktur 20/60
Bekisting 2x pakai 45.36 m2 120,658.00 5,473,046.88 0.24 - -
Pembesian 1,936.19 kg 11,160.11 21,608,098.22 0.96 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.34 m3 954,042.05 10,818,836.87 0.48 - -
6 Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,5cm (K1)
Bekisting 2x pakai 80.00 m2 178,175.88 14,254,070.00 0.63 - -
Pembesian 5,790.56 kg 11,160.11 64,623,301.04 2.86 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 32.00 m3 954,042.05 30,529,345.67 1.35 - -
7 Pek. Beton Bertulang Kolom Struktur 30 x 30 T = 4,5cm (K2)
Bekisting 2x pakai 14.40 m2 178,175.88 2,565,732.60 0.11 - -
Pembesian 492.62 kg 11,160.11 5,497,694.62 0.24 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.16 m3 954,042.05 2,060,730.83 0.09 - -
8 Pek. Kolom Praktis 15 x 15 (KP)
Bekisting 2x pakai 39.58 m2 155,439.63 6,152,300.36 0.27 - -
Pembesian 645.13 kg 11,160.11 7,199,723.38 0.32 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 5.28 m3 954,042.05 5,037,342.04 0.22 - -
9 Pek. Beton Bertulang Balok 35/70 (B1)
Bekisting 2x pakai 128.35 m2 184,625.88 23,696,731.06 1.05 - -
Pembesian 8,221.72 kg 11,160.11 91,755,320.14 4.07 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 34.51 m3 954,042.05 32,923,991.22 1.46 - -
10 Pek. Beton Bertulang Balok Induk 25 x 40 (B2)
Bekisting 2x pakai 69.40 m2 184,625.88 12,813,035.73 0.57 - -
Pembesian 6,058.73 kg 11,160.11 67,616,108.41 3.00 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.99 m3 954,042.05 11,438,964.21 0.51 - -
11 Pek. Beton Bertulang Balok 20/60 Talang Dak Aula Elv. + 4,00 m Bottom
Bekisting 2x pakai 13.80 m2 184,625.88 2,547,837.08 0.11 - -
Pembesian 460.72 kg 11,160.11 5,141,687.03 0.23 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.69 m3 954,042.05 2,566,373.12 0.11 - -
12 Pek. Beton Bertulang Balok Latiu 12/15 Elv. + 3,00 m
Bekisting 2x pakai 24.84 m2 184,625.88 4,586,106.74 0.20 - -
Pembesian 292.87 kg 11,160.11 3,268,462.15 0.14 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.15 m3 954,042.05 1,097,148.36 0.05 - -
13 Pek. Beton Plat Topi - topi tbl. 8 cm Elv. + 3,00 m
Bekisting 2x pakai 14.44 m2 184,625.88 2,665,997.64 0.12 - -
Pembesian 108.12 kg 11,160.11 1,206,631.36 0.05 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.00 m3 954,042.05 954,042.05 0.04 - -
14 Pek. Stek Besi Plat Beton Talang Aula
Pembesian 385.25 kg 36,160.11 13,930,683.34 0.62 - -
15 Pek. Beton Bertulang Balok Anak 25/12
Pembesian 1,392.36 kg 11,160.11 15,538,894.24 0.69 - -
16 Plat Lantai tebal 12 cm
Bondex 0,75 608.20 m2 145,000.00 88,189,000.00 3.91 - -
Pembesian 10,253.44 kg 11,160.11 114,429,543.91 5.07 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 119.92 m3 954,042.05 114,408,722.91 5.07 - -
17 Tangga Umum
Bekisting 2x pakai 21.15 m2 161,653.13 3,418,963.59 0.15 - -
Pembesian 247.82 kg 11,160.11 2,765,699.08 0.12 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.12 m3 954,042.05 2,022,569.15 0.09 - -
18 Lantai Beton Rabat bawah kramik fc=7,4 Mpa (K-100) 14.30 m3 779,478.09 11,146,536.71 0.49 - -
19 Lantai kerja bawah Footplat (K-100) 7.76 m3 779,478.09 6,048,749.99 0.27 - -
LAPORAN MINGGUAN
Kegiatan :
Pekerjaan :
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Tahun Anggaran : 2021

HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume Jml Harga
Sub Total 1,125,745,112.11 49.88 -
G PEKERJAAN KERAMIK LANTAI 1
1 Pek. Pasangan keramik 60 x 60 cm motif ex.platinum 426.04 m2 180,148.50 76,750,466.94 3.40 - -
2 Pek. Lantai keramik 25x25 ASIA TILE (bagian toilet) 19.80 m2 176,727.42 3,499,202.92 0.16 - -
3 Pek.Dinding keramik 25x40 ASIA TILE (bagian toilet) 56.00 m2 203,864.08 11,416,388.20 0.51 - -
4 Pek.Keramik Dinding Motif Batik 6.00 m2 275,000.00 1,650,000.00 0.07 - -
Sub Total 93,316,058.06 4.14 -
H PEKERJAAN PLAFOND LANTAI 1
1 Pek. Pasang rangka Langit langit hollow 60 x 60 492.66 m2 43,102.13 21,234,692.90 0.94 - -
2 Pek. Plafond Kalsiboard ex. Elephand 492.66 m2 37,232.63 18,343,025.03 0.81 - -
3 Pekerjaan List Plafond Besar 397.00 m 25,558.13 10,146,575.63 0.45 - -
Sub Total 49,724,293.56 2.20 -
I PEKERJAAN INSTALASI LISTRIK
1 Pek. Penyambungan 1.00 unit 10,000,000.00 10,000,000.00 0.44 - -
2 Pek. pasangan instalasi listrik titik lampu kabel NYM 2X2,5mm pipa counduit 74.00 titik 190,000.00 14,060,000.00 0.62 - -
3 Pek. Lampu Panel LED kubus Slim (18 watt putih),Panasonic 10.00 bh 190,000.00 1,900,000.00 0.08 - -
4 Pek.Lampu Downlight 25.00 bh 225,000.00 5,625,000.00 0.25 - -
5 Pek. Pasangan saklar Ganda 16.00 bh 35,000.00 560,000.00 0.02 - -
6 Pek. Pasangan stop kontak 15.00 bh 40,000.00 600,000.00 0.03 - -
7 Pek.Lampu RMI (2 Lampu 18 watt) Philips 23.00 bh 350,000.00 8,050,000.00 0.36 - -
8 Pek stang caping ,lampu SL 23 watt Philips 6.00 bh 35,000.00 210,000.00 0.01 - -
9 Pek. Pasangan stop kontak AC 10.00 bh 90,000.00 900,000.00 0.04 - -
Sub Total 41,905,000.00 1.86 -
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
1 Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel Kontrol + Asesoris 1.00 unit 4,500,000.00 4,500,000.00 0.20 - -
2 Pekerjaan Pasang MCB 6A/5KA 6.00 bh 155,000.00 930,000.00 0.04 - -
3 Pekerjaan Pasang MCB 10A/5KA 10.00 bh 165,000.00 1,650,000.00 0.07 - -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 750,000.00 750,000.00 0.03 - -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 50,000.00 150,000.00 0.01 - -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 - -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 - -
Sub Total 8,730,000.00 0.39 -
K PEKERJAAN SDP
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 - -
2 Pekerjaan Pasang MCB 20A/5KA 2.00 bh 725,000.00 1,450,000.00 0.06 - -
3 Pekerjaan Pasang MCCB 20A/10KA 3Phase 2.00 bh 750,000.00 1,500,000.00 0.07 - -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 2.00 bh 1,500,000.00 3,000,000.00 0.13 - -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 - -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 - -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 - -
Sub Total 9,950,000.00 0.44 -
L PEKERJAAN PANEL AC LANTAI 1
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 - -
2 Pekerjaan Pasang MCB 20A/10KA 10.00 bh 725,000.00 7,250,000.00 0.32 - -
3 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 1,500,000.00 1,500,000.00 0.07 - -
4 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 - -
5 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 - -
6 Pekerjaan Intaslasi AC 10.00 bh 190,000.00 1,900,000.00 0.08 - -
7 Pekerjaan Instalasi Pipa Refrigrant dan Draine 10.00 bh 500,000.00 5,000,000.00 0.22 - -
8 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 - -
Sub Total 19,650,000.00 0.87 -
M PEKERJAAN SANITASI
1 Pek. Pasangan Kloset Duduk Porselen (setara TOTO) 4.00 bh 3,000,000.00 12,000,000.00 0.53 - -
LAPORAN MINGGUAN
Kegiatan :
Pekerjaan :
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Tahun Anggaran : 2021

HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume Jml Harga
2 Pek. Pasang Jet washer 4.00 bh 100,000.00 400,000.00 0.02 - -
3 Pek.Pasang Kran dapur (leher angsa) stenliststeel 1.00 bh 150,000.00 150,000.00 0.01 - -
4 Pek. Pasangan kran air dia.3/4 4.00 bh 125,000.00 500,000.00 0.02 - -
5 Pek. Pasangan floor drain 4.00 bh 55,000.00 220,000.00 0.01 - -
6 Pek. Pasangan pipa PVC dia.4 25.00 m 71,783.13 1,794,578.13 0.08 - -
7 Pek. Pasangan pipa pvc tipe aw dia.3/4 30.00 m 23,878.44 716,353.13 0.03 - -
8 Pek. Sapitanck sederhana 2.00 unit 3,000,000.00 6,000,000.00 0.27 - -
9 Pek. Peresapan Septitank 2.00 unit 1,000,000.00 2,000,000.00 0.09 - -
10 Pek. Peresapan air Kotor 2.00 unit 1,000,000.00 2,000,000.00 0.09 - -
11 Pek. Tandon Pinguin TB110 (isi 1050 lt +asesoris otomatis) 1.00 unit 1,500,000.00 1,500,000.00 0.07 - -
Sub Total 27,280,931.25 1.21 -
N PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan tembok lantai 1 1,467.36 m2 27,660.29 40,587,599.47 1.80 - -
2 Pekerjaan Pengecatan plafond 492.66 m2 17,877.79 8,807,670.79 0.39 - -
Sub Total 49,395,270.26 2.19 -
O PEKERJAAN LAIN - LAIN
1 Pek. Pasang Galvalum Rangka Besi Hollow 4/6 Penutup Void Tangga L 2 18.00 m2 300,000.00 5,400,000.00 0.24 - -
Sub Total 5,400,000.00 0.24 -
PEKERJAAN GEDUNG AULA
A PEKERJAAN TANAH
1 Pek. Galian tanah biasa sedalam 1 m 28.86 m3 66,650.00 1,923,519.00 0.09 - -
2 Pek. Pengurugan tanah kembali bekas galian 16.14 m3 15,766.67 254,474.00 0.01 - -
3 Pek. Pengurugan Tanah Baru Padat 154.35 m3 61,060.00 9,424,611.00 0.42 - -
4 Pek. Pengurugan Sirtu padat kelas B 46.30 m3 178,450.00 8,262,235.00 0.37 - -
5 Pek. Urugan pasir bawah pondasi dan lantai 17.25 m3 181,460.00 3,130,185.00 0.14 - -
6 Pek. Cerucuk bambu 8-10 cm 187.50 m 15,000.00 2,812,500.00 0.12 - -
Sub Total 25,807,524.00 1.14 -
B PEKERJAAN PONDASI
1 Pek. Pasangan pondasi batu kosong/ Aanstamping 5.62 m3 415,621.88 2,335,794.94 0.10 - -
2 Pek. Pasangan pondasi batu kali 16 15.24 m3 721,755.00 10,999,546.20 0.49 - -
Sub Total 13,335,341.14 0.59 -
C PEKERJAAN BETON
1 Pek. Lantai Kerja K.100 12.73 m3 779,478.09 9,922,756.11 0.44 - -
2 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 11.52 m2 163,658.00 1,885,340.16 0.08 - -
Pembesian 573.30 kg 11,160.11 6,398,092.50 0.28 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 4.37 m3 954,042.05 4,169,163.77 0.18 - -
3 Pek. Sloof 15/20
Bekisting 2x pakai 27.16 m2 120,658.00 3,277,071.28 0.15 - -
Pembesian 363.67 kg 11,160.11 4,058,598.11 0.18 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.03 m3 954,042.05 1,936,705.37 0.09 - -
4 Pek. Kolom 30/30
Bekisting 2x pakai 55.21 m2 178,175.88 9,837,090.06 0.44 - -
Pembesian 1,205.31 kg 11,160.11 13,451,395.20 0.60 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 6.26 m3 954,042.05 5,972,303.25 0.26 - -
5 Pek. Kolom Praktis 12/12
Bekisting 2x pakai 11.28 m2 155,439.63 1,753,358.97 0.08 - -
Pembesian 279.47 kg 11,160.11 3,118,916.64 0.14 - -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 0.79 m3 954,042.05 753,693.22 0.03 - -
6 Pek. Balok 15/25 Elv. + 3,00 m
Bekisting 2x pakai 5.72 m2 184,625.88 1,056,060.01 0.05 - -
Pembesian 105.33 kg 11,160.11 1,175,494.65 0.05 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 0.26 m3 954,042.05 248,050.93 0.01 - -
7 Pek. Balok 20/25 Elv. +3,00 m
LAPORAN MINGGUAN
Kegiatan :
Pekerjaan :
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Tahun Anggaran : 2021

HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume Jml Harga
Bekisting 2x pakai 29.12 m2 184,625.88 5,376,305.48 0.24 - -
Pembesian 510.14 kg 11,160.11 5,693,219.79 0.25 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.08 m3 954,042.05 1,984,407.47 0.09 - -
8 Pek. Balok 20/35 Elv. + 4,00 m
Bekisting 2x pakai 18.36 m2 184,625.88 3,389,731.07 0.15 - -
Pembesian 472.22 kg 11,160.11 5,270,028.32 0.23 - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.43 m3 954,042.05 1,364,280.13 0.06 - -
9 Pek. Balok Konsol Elv. Top + 4,00 m
Pembesian 199.53 kg 11,160.11 2,226,777.25 0.10 - -
10 Pek. Plat Beton Topi-topi Elv. + 3,00 m
Bekisting 2x pakai 39.64 m2 184,625.88 7,318,569.69 0.32 - -
Pembesian 422.92 kg 11,160.11 4,719,834.78 0.21 - -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 2.88 m3 954,042.05 2,747,641.11 0.12 - -
Sub Total 109,104,885.30 4.83 -
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK 1.00 ls 300,000.00 300,000.00 0.01 - -
2 Asuransi dan perijinan 1.00 ls 1,000,000.00 1,000,000.00 0.04 - -
Sub Total 1,300,000.00 0.06 -
IV PEKERJAAN PENCEGAHAN COVID-19
1 Alat Pelindung Kerja dan Pelindung Diri 1.00 ls 7,695,000.00 7,695,000.00 0.34 - -
2 Personil Keselamatan Konstruksi 1.00 ls 3,000,000.00 3,000,000.00 0.13 - -
3 Fasilitas sarana, Prasarana dan Alat kesehatan 1.00 ls 2,565,000.00 2,565,000.00 0.11 - -
( Termasuk Protokol Kesehatan Penanganan COVID 19 )
Sub Total 13,260,000.00 0.59 -
Jumlah Biaya Konstruksi 2,256,718,317.27 100.00 -
PPN 10 % 225,671,831.73 -
Jumlah Total 2,482,390,149.00 -
Dibulatkan 2,482,390,000.00 -

Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)

FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
AN MINGGUAN
PERIODE : Minggu Ke 1
MINGGU KE : 1 (SATU)
TANGGAL 30 Juni 2021 s/d 06 Juli 2021

REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot

- 1.00 2,000,000.00 0.09 1.00 2,000,000.00 0.09


- - - - - - -
- 2,000,000.00 0.09 2,000,000.00 0.09

- 155.88 10,389,402.00 0.46 155.88 10,389,402.00 0.46


- 87.47 1,379,031.50 0.06 87.47 1,379,031.50 0.06
- - - - - - -
- - - - - - -
- - - - - - -
- 11,768,433.50 0.52 11,768,433.50 0.52

- - - - - - -
- - - - - - -
- - - - - - -
- - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
AN MINGGUAN
PERIODE : Minggu Ke 1
MINGGU KE : 1 (SATU)
TANGGAL 30 Juni 2021 s/d 06 Juli 2021

REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
AN MINGGUAN
PERIODE : Minggu Ke 1
MINGGU KE : 1 (SATU)
TANGGAL 30 Juni 2021 s/d 06 Juli 2021

REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot
- - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -

- - - - - - -
AN MINGGUAN
PERIODE : Minggu Ke 1
MINGGU KE : 1 (SATU)
TANGGAL 30 Juni 2021 s/d 06 Juli 2021

REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -

- - - - - - -
- - - - - - -
- - - - -

- - - - - - -
- - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - -

- - - - - - -
- - - - - - -
- - - - -

- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -
AN MINGGUAN
PERIODE : Minggu Ke 1
MINGGU KE : 1 (SATU)
TANGGAL 30 Juni 2021 s/d 06 Juli 2021

REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot
- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - -

- 1.00 300,000.00 0.01 1.00 300,000.00 0.01


- 1.00 1,000,000.00 0.04 1.00 1,000,000.00 0.04
- 1,300,000.00 0.06 1,300,000.00 0.06

- 0.10 769,500.00 0.03 0.10 769,500.00 0.03


- 0.10 300,000.00 0.01 0.10 300,000.00 0.01
- 0.30 769,500.00 0.03 0.30 769,500.00 0.03

- 1,839,000.00 0.08 1,839,000.00 0.08


- 16,907,433.50 0.75 16,907,433.50 0.75
1,690,743.35 1,690,743.35
18,598,176.85 18,598,176.85
18,598,000.00 18,598,000.00

Pekalongan, 06 Juli 2021


dibuat Oleh :
Konsultan Pengawas
CV. COZZY ERGITA

M.SAEFULLAH, ST
Pengawas Lapangan
TIME SCHEDULE ( JADWAL WAKTU PELAKSANAAN)
KEGIATAN : PERIODE : Minggu Ke 1
PEKERJAAN : MINGGU KE : 1 ( SATU )
LOKASI : di jalan tondano, Kecamatan Pekalongan Timur TANGGAL : 30 Juni 2021 s/d 06 Juli 2021
TH. ANGGARAN : 2021
WAKTU PELAKSANAAN
BOBOT
NO. JENIS PEKERJAAN JUMLAH HARGA (Rp) MINGGU KE KETERANGAN
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
I PEKERJAAN GEDUNG KANTOR
100
A PEKERJAAN PERSIAPAN 2,365,000.00 0.095 0.05 0.05
LANTAI I
B PEKERJAAN TANAH 107,466,359.95 4.329 0.62 0.62 0.62 0.62 0.62 0.62 0.62 90
C PEKERJAAN PONDASI 211,956,767.26 8.538 2.13 2.13 2.13 2.13
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1 216,863,889.54 8.736 1.25 1.25 1.25 1.25 1.25 1.25 1.25
80
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1 190,443,275.00 7.672 1.28 1.28 1.28 1.28 1.28 1.28
F PEKERJAAN BETON 1,238,319,623.33 49.884 4.99 4.99 4.99 4.99 4.99 4.99 4.99 4.99 4.99 4.99
G PEKERJAAN KERAMIK LANTAI 1 102,647,663.86 4.135 1.03 1.03 1.03 1.03 70
H PEKERJAAN PLAFOND LANTAI 1 54,696,722.92 2.203 0.44 0.44 0.44 0.44 0.44
I PEKERJAAN INSTALASI LISTRIK 46,095,500.00 1.857 0.37 0.37 0.37 0.37 0.37
60
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS 9,603,000.00 0.387 0.13 0.13 0.13
K PEKERJAAN SDP 10,945,000.00 0.441 0.22 0.22
L PEKERJAAN PANEL AC LANTAI 1 21,615,000.00 0.871 0.22 0.22 0.22 0.22 50
M PEKERJAAN SANITASI 30,009,024.38 1.209 0.30 0.30 0.30 0.30
N PEKERJAAN PENGECATAN 54,334,797.28 2.189 0.36 0.36 0.36 0.36 0.36 0.36
O PEKERJAAN LAIN - LAIN 5,940,000.00 0.239 0.12 0.12
40

II PEKERJAAN GEDUNG AULA 30


1 PEKERJAAN TANAH 28,388,276.40 1.144 0.23 0.23 0.23 0.23 0.23
2 PEKERJAAN PONDASI 14,668,875.25 0.591 0.15 0.15 0.15 0.15
3 PEKERJAAN BETON 120,015,373.83 4.835 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 20

III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI 1,430,000.00 0.058 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 10

IV PEKERJAAN PENCEGAHAN COVID-19 14,586,000.00 0.588 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0
Progres Rencana Per minggu 0.08 0.92 5.86 8.15 7.53 8.01 8.40 7.37 7.37 7.37 7.19 7.56 3.61 4.51 3.94 2.64 2.56 2.78 2.24 0.86 0.64 0.39
Komulatif Progres Rencana 0 0.08 1.00 6.87 15.01 22.54 30.55 38.96 46.32 53.69 61.06 68.25 75.81 79.42 83.93 87.87 90.51 93.08 95.86 98.10 98.96 99.61 100.00
Progres Realisasi Per minggu 0.75
Komulatif Progres Realisasi 0 0.75
Deviasi 0.67
Keterangan Mendahului

Pekalongan, 06 Juli 2021


Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknik Kegiatan Konsultan Pengawas
(PPTK) CV. COZZY ERGITA

FANNY ARDIANSYAH, SE M.SAEFULLAH, ST


NIP. 198211 1720080 1 002 Pengawas Lapangan
LAPORAN MINGGUAN

Kegiatan :

Pekerjaan :

Lokasi : di jalan tondano, Kecamatan Pekalongan Timur

Tahun Anggaran : 2021

HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume
I PEKERJAAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Pengukuran 1.00 ls 2,000,000.00 2,000,000.00 0.09 1.00
2 Pek. Papan Nama Proyek 1.00 ls 150,000.00 150,000.00 0.01 -
Sub Total 2,150,000.00 0.10
B PEKERJAAN TANAH
1 Pek. Galian tanah biasa 1 m 519.60 m3 66,650.00 34,631,340.00 1.53 155.88
2 Pek. Urugan tanah kembali bekas galian 291.55 m3 15,766.67 4,596,771.67 0.20 87.47
3 Pek. Pasir bawah pondasi dan lantai 81.92 m3 181,460.00 14,865,203.20 0.66 -
4 Pek. Urugan tanah baru padat 316.35 m3 61,060.00 19,316,331.00 0.86 -
5 Pek. Urugan Sirtu Kw. B baru padat 136.10 m3 178,450.00 24,287,045.00 1.08 -
Sub Total 97,696,690.87 4.33
C PEKERJAAN PONDASI
1 Pek. Pasangan batu kosong (anstamping) 41.14 m3 415,621.88 17,098,683.94 0.76 -
2 Pek. Pas. Batu kali 1ps 6 pp 226.26 m3 721,755.00 163,304,286.30 7.24 -
3 Pek.crucuk bambu 10 cm pj 1,5 m 819.00 m' 15,000.00 12,285,000.00 0.54 -
Sub Total 192,687,970.24 8.54
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
1 Pek. Pas.batu bata merah 1ps 6 pp tebal 1/2 bata 733.68 m2 113,245.88 83,086,233.57 3.68 -
2 Pek. Pasangan Plesteran 1 Pc 6 pp 1,467.36 m2 45,865.95 67,301,860.39 2.98 -
3 Pek. Acian 1,467.36 m2 26,273.00 38,551,949.28 1.71 -
4 Pek. Sponengan 434.00 m' 18,914.63 8,208,947.25 0.36 -
Sub Total 197,148,990.49 8.74
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
1 Pek. Pintu Panel Type P1 & P1.b 10.00 Unit 3,500,000.00 35,000,000.00 1.55 -
2 Pek. Pintu Panel Type P1.a 4.00 Unit 3,500,000.00 14,000,000.00 0.62 -
3 Pek. Pintu Frameless Type P2.a 1.00 Unit 17,000,000.00 17,000,000.00 0.75 -
4 Pek. Pintu Kupu Tarung Type P2.b 3.00 Unit 7,500,000.00 22,500,000.00 1.00 -
5 Pek. Pintu Kupu Tarung Type P2.c 5.00 Unit 7,500,000.00 37,500,000.00 1.66 -
6 Pek. Jendela Type J2 3.00 Unit 2,200,000.00 6,600,000.00 0.29 -
7 Pek. Jendela Type J3 6.00 Unit 3,050,000.00 18,300,000.00 0.81 -
8 Pek. Jendela Type J2.a 1.00 Unit 2,200,000.00 2,200,000.00 0.10 -
9 Pek. Jendela Type J2.b 1.00 Unit 2,200,000.00 2,200,000.00 0.10 -
10 Pek. Jendela Type J3.a 2.00 Unit 3,050,000.00 6,100,000.00 0.27 -
11 Pek. Bouven Type BV1 7.00 Unit 700,000.00 4,900,000.00 0.22 -
12 Pek. Pasangan engsel Jendela kupu kupu 65.00 bh 7,500.00 487,500.00 0.02 -
13 Pek. Pasangan engsel pintu 12.00 bh 12,000.00 144,000.00 0.01 -
14 Pek. Pasangan kunci selot 6.00 bh 125,000.00 750,000.00 0.03 -
15 Pek. Pasangan rambuncis casement 6.00 bh 125,000.00 750,000.00 0.03 -
16 Pek. Pasang Kaca Bening 5 mm 37.59 m2 125,000.00 4,698,750.00 0.21 -
Sub Total 173,130,250.00 7.67
F PEKERJAAN BETON
1 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 14.69 m2 163,658.00 2,404,136.02 0.11 -
Pembesian 814.49 kg 11,160.11 9,089,800.03 0.40 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.78 m3 954,042.05 3,606,278.96 0.16 -
2 Pek. Beton Bertulang Footplat 2,5 x 2,0 m
Bekisting 2x pakai 93.30 m2 163,658.00 15,269,291.40 0.68 -
Pembesian 12,877.15 kg 11,160.11 143,710,442.68 6.37 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 91.00 m3 954,042.05 86,817,826.75 3.85 -
3 Pek. Beton Bertulang Sloof 12/18
Bekisting 2x pakai 8.12 m2 120,658.00 979,742.96 0.04 -
Pembesian 256.55 kg 11,160.11 2,863,126.86 0.13 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.38 m3 954,042.05 3,224,662.14 0.14 -
4 Pek. Beton Bertulang Sloof Struktur 20/30
Bekisting 2x pakai 51.24 m2 120,658.00 6,182,515.92 0.27 -
Pembesian 2,453.20 kg 11,160.11 27,377,987.98 1.21 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 12.81 m3 954,042.05 12,221,278.69 0.54 -
5 Pek. Beton Bertulang Sloof Struktur 20/60
Bekisting 2x pakai 45.36 m2 120,658.00 5,473,046.88 0.24 -
Pembesian 1,936.19 kg 11,160.11 21,608,098.22 0.96 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.34 m3 954,042.05 10,818,836.87 0.48 -
6 Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,5cm (K1)
Bekisting 2x pakai 80.00 m2 178,175.88 14,254,070.00 0.63 -
Pembesian 5,790.56 kg 11,160.11 64,623,301.04 2.86 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 32.00 m3 954,042.05 30,529,345.67 1.35 -
7 Pek. Beton Bertulang Kolom Struktur 30 x 30 T = 4,5cm (K2)
Bekisting 2x pakai 14.40 m2 178,175.88 2,565,732.60 0.11 -
Pembesian 492.62 kg 11,160.11 5,497,694.62 0.24 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.16 m3 954,042.05 2,060,730.83 0.09 -
8 Pek. Kolom Praktis 15 x 15 (KP)
Bekisting 2x pakai 39.58 m2 155,439.63 6,152,300.36 0.27 -
Pembesian 645.13 kg 11,160.11 7,199,723.38 0.32 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 5.28 m3 954,042.05 5,037,342.04 0.22 -
9 Pek. Beton Bertulang Balok 35/70 (B1)
Bekisting 2x pakai 128.35 m2 184,625.88 23,696,731.06 1.05 -
Pembesian 8,221.72 kg 11,160.11 91,755,320.14 4.07 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 34.51 m3 954,042.05 32,923,991.22 1.46 -
10 Pek. Beton Bertulang Balok Induk 25 x 40 (B2)
Bekisting 2x pakai 69.40 m2 184,625.88 12,813,035.73 0.57 -
Pembesian 6,058.73 kg 11,160.11 67,616,108.41 3.00 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.99 m3 954,042.05 11,438,964.21 0.51 -
11 Pek. Beton Bertulang Balok 20/60 Talang Dak Aula Elv. + 4,00 m Bottom
Bekisting 2x pakai 13.80 m2 184,625.88 2,547,837.08 0.11 -
Pembesian 460.72 kg 11,160.11 5,141,687.03 0.23 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.69 m3 954,042.05 2,566,373.12 0.11 -
12 Pek. Beton Bertulang Balok Latiu 12/15 Elv. + 3,00 m
Bekisting 2x pakai 24.84 m2 184,625.88 4,586,106.74 0.20 -
Pembesian 292.87 kg 11,160.11 3,268,462.15 0.14 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.15 m3 954,042.05 1,097,148.36 0.05 -
13 Pek. Beton Plat Topi - topi tbl. 8 cm Elv. + 3,00 m
Bekisting 2x pakai 14.44 m2 184,625.88 2,665,997.64 0.12 -
Pembesian 108.12 kg 11,160.11 1,206,631.36 0.05 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.00 m3 954,042.05 954,042.05 0.04 -
14 Pek. Stek Besi Plat Beton Talang Aula
Pembesian 385.25 kg 36,160.11 13,930,683.34 0.62 -
15 Pek. Beton Bertulang Balok Anak 25/12
Pembesian 1,392.36 kg 11,160.11 15,538,894.24 0.69 -
16 Plat Lantai tebal 12 cm
Bondex 0,75 608.20 m2 145,000.00 88,189,000.00 3.91 -
Pembesian 10,253.44 kg 11,160.11 114,429,543.91 5.07 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 119.92 m3 954,042.05 114,408,722.91 5.07 -
17 Tangga Umum
Bekisting 2x pakai 21.15 m2 161,653.13 3,418,963.59 0.15 -
Pembesian 247.82 kg 11,160.11 2,765,699.08 0.12 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.12 m3 954,042.05 2,022,569.15 0.09 -
18 Lantai Beton Rabat bawah kramik fc=7,4 Mpa (K-100) 14.30 m3 779,478.09 11,146,536.71 0.49 -
19 Lantai kerja bawah Footplat (K-100) 7.76 m3 779,478.09 6,048,749.99 0.27 -
Sub Total 1,125,745,112.11 49.88
G PEKERJAAN KERAMIK LANTAI 1
1 Pek. Pasangan keramik 60 x 60 cm motif ex.platinum 426.04 m2 180,148.50 76,750,466.94 3.40 -
2 Pek. Lantai keramik 25x25 ASIA TILE (bagian toilet) 19.80 m2 176,727.42 3,499,202.92 0.16 -
3 Pek.Dinding keramik 25x40 ASIA TILE (bagian toilet) 56.00 m2 203,864.08 11,416,388.20 0.51 -
4 Pek.Keramik Dinding Motif Batik 6.00 m2 275,000.00 1,650,000.00 0.07 -
Sub Total 93,316,058.06 4.14
H PEKERJAAN PLAFOND LANTAI 1
1 Pek. Pasang rangka Langit langit hollow 60 x 60 492.66 m2 43,102.13 21,234,692.90 0.94 -
2 Pek. Plafond Kalsiboard ex. Elephand 492.66 m2 37,232.63 18,343,025.03 0.81 -
3 Pekerjaan List Plafond Besar 397.00 m 25,558.13 10,146,575.63 0.45 -
Sub Total 49,724,293.56 2.20
I PEKERJAAN INSTALASI LISTRIK
1 Pek. Penyambungan 1.00 unit 10,000,000.00 10,000,000.00 0.44 -
2 Pek. pasangan instalasi listrik titik lampu kabel NYM 2X2,5mm pipa counduit 74.00 titik 190,000.00 14,060,000.00 0.62 -
3 Pek. Lampu Panel LED kubus Slim (18 watt putih),Panasonic 10.00 bh 190,000.00 1,900,000.00 0.08 -
4 Pek.Lampu Downlight 25.00 bh 225,000.00 5,625,000.00 0.25 -
5 Pek. Pasangan saklar Ganda 16.00 bh 35,000.00 560,000.00 0.02 -
6 Pek. Pasangan stop kontak 15.00 bh 40,000.00 600,000.00 0.03 -
7 Pek.Lampu RMI (2 Lampu 18 watt) Philips 23.00 bh 350,000.00 8,050,000.00 0.36 -
8 Pek stang caping ,lampu SL 23 watt Philips 6.00 bh 35,000.00 210,000.00 0.01 -
9 Pek. Pasangan stop kontak AC 10.00 bh 90,000.00 900,000.00 0.04 -
Sub Total 41,905,000.00 1.86
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
1 Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel Kontrol + Asesoris 1.00 unit 4,500,000.00 4,500,000.00 0.20 -
2 Pekerjaan Pasang MCB 6A/5KA 6.00 bh 155,000.00 930,000.00 0.04 -
3 Pekerjaan Pasang MCB 10A/5KA 10.00 bh 165,000.00 1,650,000.00 0.07 -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 750,000.00 750,000.00 0.03 -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 50,000.00 150,000.00 0.01 -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 8,730,000.00 0.39
K PEKERJAAN SDP
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 -
2 Pekerjaan Pasang MCB 20A/5KA 2.00 bh 725,000.00 1,450,000.00 0.06 -
3 Pekerjaan Pasang MCCB 20A/10KA 3Phase 2.00 bh 750,000.00 1,500,000.00 0.07 -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 2.00 bh 1,500,000.00 3,000,000.00 0.13 -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 9,950,000.00 0.44
L PEKERJAAN PANEL AC LANTAI 1
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 -
2 Pekerjaan Pasang MCB 20A/10KA 10.00 bh 725,000.00 7,250,000.00 0.32 -
3 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 1,500,000.00 1,500,000.00 0.07 -
4 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 -
5 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
6 Pekerjaan Intaslasi AC 10.00 bh 190,000.00 1,900,000.00 0.08 -
7 Pekerjaan Instalasi Pipa Refrigrant dan Draine 10.00 bh 500,000.00 5,000,000.00 0.22 -
8 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 19,650,000.00 0.87
M PEKERJAAN SANITASI
1 Pek. Pasangan Kloset Duduk Porselen (setara TOTO) 4.00 bh 3,000,000.00 12,000,000.00 0.53 -
2 Pek. Pasang Jet washer 4.00 bh 100,000.00 400,000.00 0.02 -
3 Pek.Pasang Kran dapur (leher angsa) stenliststeel 1.00 bh 150,000.00 150,000.00 0.01 -
4 Pek. Pasangan kran air dia.3/4 4.00 bh 125,000.00 500,000.00 0.02 -
5 Pek. Pasangan floor drain 4.00 bh 55,000.00 220,000.00 0.01 -
6 Pek. Pasangan pipa PVC dia.4 25.00 m 71,783.13 1,794,578.13 0.08 -
7 Pek. Pasangan pipa pvc tipe aw dia.3/4 30.00 m 23,878.44 716,353.13 0.03 -
8 Pek. Sapitanck sederhana 2.00 unit 3,000,000.00 6,000,000.00 0.27 -
9 Pek. Peresapan Septitank 2.00 unit 1,000,000.00 2,000,000.00 0.09 -
10 Pek. Peresapan air Kotor 2.00 unit 1,000,000.00 2,000,000.00 0.09 -
11 Pek. Tandon Pinguin TB110 (isi 1050 lt +asesoris otomatis) 1.00 unit 1,500,000.00 1,500,000.00 0.07 -
Sub Total 27,280,931.25 1.21
N PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan tembok lantai 1 1,467.36 m2 27,660.29 40,587,599.47 1.80 -
2 Pekerjaan Pengecatan plafond 492.66 m2 17,877.79 8,807,670.79 0.39 -
Sub Total 49,395,270.26 2.19
O PEKERJAAN LAIN - LAIN
1 Pek. Pasang Galvalum Rangka Besi Hollow 4/6 Penutup Void Tangga L 2 18.00 m2 300,000.00 5,400,000.00 0.24 -
Sub Total 5,400,000.00 0.24
PEKERJAAN GEDUNG AULA
A PEKERJAAN TANAH
1 Pek. Galian tanah biasa sedalam 1 m 28.86 m3 66,650.00 1,923,519.00 0.09 -
2 Pek. Pengurugan tanah kembali bekas galian 16.14 m3 15,766.67 254,474.00 0.01 -
3 Pek. Pengurugan Tanah Baru Padat 154.35 m3 61,060.00 9,424,611.00 0.42 -
4 Pek. Pengurugan Sirtu padat kelas B 46.30 m3 178,450.00 8,262,235.00 0.37 -
5 Pek. Urugan pasir bawah pondasi dan lantai 17.25 m3 181,460.00 3,130,185.00 0.14 -
6 Pek. Cerucuk bambu 8-10 cm 187.50 m 15,000.00 2,812,500.00 0.12 -
Sub Total 25,807,524.00 1.14
B PEKERJAAN PONDASI
1 Pek. Pasangan pondasi batu kosong/ Aanstamping 5.62 m3 415,621.88 2,335,794.94 0.10 -
2 Pek. Pasangan pondasi batu kali 16 15.24 m3 721,755.00 10,999,546.20 0.49 -
Sub Total 13,335,341.14 0.59
C PEKERJAAN BETON
1 Pek. Lantai Kerja K.100 12.73 m3 779,478.09 9,922,756.11 0.44 -
2 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 11.52 m2 163,658.00 1,885,340.16 0.08 -
Pembesian 573.30 kg 11,160.11 6,398,092.50 0.28 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 4.37 m3 954,042.05 4,169,163.77 0.18 -
3 Pek. Sloof 15/20
Bekisting 2x pakai 27.16 m2 120,658.00 3,277,071.28 0.15 -
Pembesian 363.67 kg 11,160.11 4,058,598.11 0.18 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.03 m3 954,042.05 1,936,705.37 0.09 -
4 Pek. Kolom 30/30
Bekisting 2x pakai 55.21 m2 178,175.88 9,837,090.06 0.44 -
Pembesian 1,205.31 kg 11,160.11 13,451,395.20 0.60 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 6.26 m3 954,042.05 5,972,303.25 0.26 -
5 Pek. Kolom Praktis 12/12
Bekisting 2x pakai 11.28 m2 155,439.63 1,753,358.97 0.08 -
Pembesian 279.47 kg 11,160.11 3,118,916.64 0.14 -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 0.79 m3 954,042.05 753,693.22 0.03 -
6 Pek. Balok 15/25 Elv. + 3,00 m
Bekisting 2x pakai 5.72 m2 184,625.88 1,056,060.01 0.05 -
Pembesian 105.33 kg 11,160.11 1,175,494.65 0.05 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 0.26 m3 954,042.05 248,050.93 0.01 -
7 Pek. Balok 20/25 Elv. +3,00 m
Bekisting 2x pakai 29.12 m2 184,625.88 5,376,305.48 0.24 -
Pembesian 510.14 kg 11,160.11 5,693,219.79 0.25 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.08 m3 954,042.05 1,984,407.47 0.09 -
8 Pek. Balok 20/35 Elv. + 4,00 m
Bekisting 2x pakai 18.36 m2 184,625.88 3,389,731.07 0.15 -
Pembesian 472.22 kg 11,160.11 5,270,028.32 0.23 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.43 m3 954,042.05 1,364,280.13 0.06 -
9 Pek. Balok Konsol Elv. Top + 4,00 m
Pembesian 199.53 kg 11,160.11 2,226,777.25 0.10 -
10 Pek. Plat Beton Topi-topi Elv. + 3,00 m
Bekisting 2x pakai 39.64 m2 184,625.88 7,318,569.69 0.32 -
Pembesian 422.92 kg 11,160.11 4,719,834.78 0.21 -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 2.88 m3 954,042.05 2,747,641.11 0.12 -
Sub Total 109,104,885.30 4.83
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK 1.00 ls 300,000.00 300,000.00 0.01 1.00
2 Asuransi dan perijinan 1.00 ls 1,000,000.00 1,000,000.00 0.04 1.00
Sub Total 1,300,000.00 0.06
IV PEKERJAAN PENCEGAHAN COVID-19
1 Alat Pelindung Kerja dan Pelindung Diri 1.00 ls 7,695,000.00 7,695,000.00 0.34 0.10
2 Personil Keselamatan Konstruksi 1.00 ls 3,000,000.00 3,000,000.00 0.13 0.10
3 Fasilitas sarana, Prasarana dan Alat kesehatan 1.00 ls 2,565,000.00 2,565,000.00 0.11 0.30
( Termasuk Protokol Kesehatan Penanganan COVID 19 )
Sub Total 13,260,000.00 0.59
Jumlah Biaya Konstruksi 2,256,718,317.27 100.00
PPN 10 % 225,671,831.73
Jumlah Total 2,482,390,149.00
Dibulatkan 2,482,390,000.00

Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)

FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
GGUAN

PERIODE : Minggu Ke 2

MINGGU KE : 2 (DUA)

TANGGAL 07 Juli 2021 s/d 13 Juli 2021

REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Jml Harga Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot

2,000,000.00 0.09 - - - 1.00 2,000,000.00 0.09


- - - - - - - -
2,000,000.00 0.09 - - 2,000,000.00 0.09

10,389,402.00 0.46 103.92 6,926,268.00 0.31 259.80 17,315,670.00 0.77


1,379,031.50 0.06 29.16 459,677.17 0.02 116.62 1,838,708.67 0.08
- - - - - - - -
- - - - - - - -
- - - - - - - -
11,768,433.50 0.52 7,385,945.17 0.33 19,154,378.67 0.85

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -

- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
300,000.00 0.01 - - - 1.00 300,000.00 0.01
1,000,000.00 0.04 - - - 1.00 1,000,000.00 0.04
1,300,000.00 0.06 - - 1,300,000.00 0.06

769,500.00 0.03 0.10 769,500.00 0.03 0.20 1,539,000.00 0.07


300,000.00 0.01 0.10 300,000.00 0.01 0.20 600,000.00 0.03
769,500.00 0.03 0.05 128,250.00 0.01 0.35 897,750.00 0.04

1,839,000.00 0.08 1,197,750.00 0.05 3,036,750.00 0.13


16,907,433.50 0.75 8,583,695.17 0.38 25,491,128.67 1.13
1,690,743.35 858,369.52 2,549,112.87
18,598,176.85 9,442,064.68 28,040,241.53
18,598,000.00 9,442,000.00 28,040,000.00

Pekalongan, 13 Juli 2021


dibuat Oleh :
Konsultan Pengawas
CV. COZZY ERGITA

M.SAEFULLAH, ST
Pengawas Lapangan
REKAPITULASI LAPORAN MINGGUAN

Kegiatan
Pekerjaan
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Konsultan Pengawas : CV. COZZY ERGITA
Minggu Ke : Minggu Ke 1
Periode 07 Juli 2021 s/d

URAIAN PEKERJAAN
NO

I PEKERJAAN GEDUNG KANTOR


A PEKERJAAN PERSIAPAN
LANTAI I
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
F PEKERJAAN BETON
G PEKERJAAN KERAMIK LANTAI 1
H PEKERJAAN PLAFOND LANTAI 1
I PEKERJAAN INSTALASI LISTRIK
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
K PEKERJAAN SDP
L PEKERJAAN PANEL AC LANTAI 1
M PEKERJAAN SANITASI
N PEKERJAAN PENGECATAN
O PEKERJAAN LAIN - LAIN

II PEKERJAAN GEDUNG AULA


1 PEKERJAAN TANAH
2 PEKERJAAN PONDASI
3 PEKERJAAN BETON

III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI

IV PEKERJAAN PENCEGAHAN COVID-19


Total Sub Jumlah Harga
PPN 10 %
Total
Dibulatkan

RENCANA MENURUT TIME SCHEDULE MINGGU INI


PRESTASI PEKERJAAN MINGGU LALU
PRESTASI PEKERJAAN MINGGU INI
PRESTASI PEKERJAAN SAMPAI DENGAN MINGGU INI
DEVIASI ===>

di periksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)

FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
ASI LAPORAN MINGGUAN

13 Juli 2021

MINGGU LALU PROGRES MINGGU INI PROGRES S/D MINGGU INI

JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT


( Rp. ) PEK (%) ( Rp. ) PEK (%) ( Rp. ) PEK (%)

2,000,000.00 0.09 0.00 0.00 2,000,000.00 0.09

11,768,433.50 0.52 7,385,945.17 0.33 19,154,378.67 0.85

1,300,000.00 0.06 0.00 0.00 1,300,000.00 0.06

1,839,000.00 0.08 1,197,750.00 0.05 3,036,750.00 0.13


16,907,433.50 0.75 8,583,695.17 0.38 25,491,128.67 1.13
1,690,743.35 858,369.52 2,549,112.87
18,598,176.85 9,442,064.68 28,040,241.53
18,598,180.00 9,442,000.00 28,040,000.00

1.00 %
0.75 %
0.38 %
1.13 %
0.13 %

Pekalongan , 13 Juli 2021


dibuat Oleh :
Kontraktor Pelaksana
CV. COZZY ERGITA

M.SAEFULLAH, ST
Pengawas Lapangan
KEGIATAN :
PEKERJAAN :
LOKASI : di jalan tondano, Kecamatan Pekalongan Timur
TH. ANGGARAN : 2021

NO. JENIS PEKERJAAN

I PEKERJAAN GEDUNG KANTOR


A PEKERJAAN PERSIAPAN
LANTAI I
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
F PEKERJAAN BETON
G PEKERJAAN KERAMIK LANTAI 1
H PEKERJAAN PLAFOND LANTAI 1
I PEKERJAAN INSTALASI LISTRIK
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
K PEKERJAAN SDP
L PEKERJAAN PANEL AC LANTAI 1
M PEKERJAAN SANITASI
N PEKERJAAN PENGECATAN
O PEKERJAAN LAIN - LAIN

II PEKERJAAN GEDUNG AULA


1 PEKERJAAN TANAH
2 PEKERJAAN PONDASI
3 PEKERJAAN BETON

III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI

IV PEKERJAAN PENCEGAHAN COVID-19

Jumlah Biaya Konstruksi


PPN 10 %
Jumlah Total
Dibulatkan
Progres Rencana Per minggu
Komulatif Progres Rencana
Progres Realisasi Per minggu
Komulatif Progres Realisasi
Deviasi
Keterangan

Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)

FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
TIME SCHEDULE ( JADWAL

BOBOT
JUMLAH HARGA (Rp)
% 1 2 3 4 5

2,365,000.00 0.095 0.05 0.05

107,466,359.95 4.329 0.62 0.62 0.62


211,956,767.26 8.538 2.13 2.13
216,863,889.54 8.736
190,443,275.00 7.672
1,238,319,623.33 49.884 4.99 4.99 4.99
102,647,663.86 4.135
54,696,722.92 2.203
46,095,500.00 1.857
9,603,000.00 0.387
10,945,000.00 0.441
21,615,000.00 0.871
30,009,024.38 1.209
54,334,797.28 2.189
5,940,000.00 0.239

28,388,276.40 1.144 0.23 0.23 0.23 0.23


14,668,875.25 0.591 0.15 0.15
120,015,373.83 4.835

1,430,000.00 0.058 0.003 0.003 0.003 0.003 0.003

14,586,000.00 0.588 0.03 0.03 0.03 0.03 0.03

2,482,390,149.00 100.00
248,239,014.90
2,730,629,163.90
2,730,629,000.00
0.08 0.92 5.86 8.15 7.53
0 0.08 1.00 6.87 15.01 22.54
0.75 0.38
0 0.75 1.13
0.67 0.13
Mendahului Mendahului
CHEDULE ( JADWAL WAKTU PELAKSANAAN)

WAKTU PELAKSANAAN
MINGGU KE
6 7 8 9 10 11 12 13

0.62 0.62 0.62 0.62


2.13 2.13
1.25 1.25 1.25 1.25 1.25 1.25

4.99 4.99 4.99 4.99 4.99 4.99 4.99


1.03
0.44 0.44 0.44
0.37 0.37

0.23
0.15 0.15
0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03


8.01 8.40 7.37 7.37 7.37 7.19 7.56 3.61
30.55 38.96 46.32 53.69 61.06 68.25 75.81 79.42
PERIODE : Minggu Ke 2
MINGGU KE : : 2 (DUA)
TANGGAL : 07 Juli 2021 s/d

14 15 16 17 18 19 20 21

1.25
1.28 1.28 1.28 1.28 1.28 1.28

1.03 1.03 1.03


0.44 0.44
0.37 0.37 0.37
0.13 0.13 0.13
0.22 0.22
0.22 0.22 0.22 0.22
0.30 0.30 0.30 0.30
0.36 0.36 0.36 0.36 0.36
0.12 0.12

0.48 0.48

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03


4.51 3.94 2.64 2.56 2.78 2.24 0.86 0.64
83.93 87.87 90.51 93.08 95.86 98.10 98.96 99.61

Pekalongan, 13 Juli 2021


Dibuat Oleh :
Konsultan Pengawas
CV. COZZY ERGITA

M.SAEFULLAH, ST
Pengawas Lapangan
13 Juli 2021

KETERANGAN
22

100

90

80

70

60

0.36
50

40

30

0.003

20
0.03

10

0
10

0
0.39
100.00

3 Juli 2021

ultan Pengawas
COZZY ERGITA

AEFULLAH, ST
awas Lapangan
LAPORAN MINGGUAN

Kegiatan :

Pekerjaan :

Lokasi : di jalan tondano, Kecamatan Pekalongan Timur

Tahun Anggaran : 2021

HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume
I PEKERJAAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Pengukuran 1.00 ls 2,000,000.00 2,000,000.00 0.09 1.00
2 Pek. Papan Nama Proyek 1.00 ls 150,000.00 150,000.00 0.01 -
Sub Total 2,150,000.00 0.10
B PEKERJAAN TANAH
1 Pek. Galian tanah biasa 1 m 519.60 m3 66,650.00 34,631,340.00 1.53 259.80
2 Pek. Urugan tanah kembali bekas galian 291.55 m3 15,766.67 4,596,771.67 0.20 116.62
3 Pek. Pasir bawah pondasi dan lantai 81.92 m3 181,460.00 14,865,203.20 0.66 -
4 Pek. Urugan tanah baru padat 316.35 m3 61,060.00 19,316,331.00 0.86 -
5 Pek. Urugan Sirtu Kw. B baru padat 136.10 m3 178,450.00 24,287,045.00 1.08 -
Sub Total 97,696,690.87 4.33
C PEKERJAAN PONDASI
1 Pek. Pasangan batu kosong (anstamping) 41.14 m3 415,621.88 17,098,683.94 0.76 -
2 Pek. Pas. Batu kali 1ps 6 pp 226.26 m3 721,755.00 163,304,286.30 7.24 -
3 Pek.crucuk bambu 10 cm pj 1,5 m 819.00 m' 15,000.00 12,285,000.00 0.54 -
Sub Total 192,687,970.24 8.54
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
1 Pek. Pas.batu bata merah 1ps 6 pp tebal 1/2 bata 733.68 m2 113,245.88 83,086,233.57 3.68 -
2 Pek. Pasangan Plesteran 1 Pc 6 pp 1,467.36 m2 45,865.95 67,301,860.39 2.98 -
3 Pek. Acian 1,467.36 m2 26,273.00 38,551,949.28 1.71 -
4 Pek. Sponengan 434.00 m' 18,914.63 8,208,947.25 0.36 -
Sub Total 197,148,990.49 8.74
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
1 Pek. Pintu Panel Type P1 & P1.b 10.00 Unit 3,500,000.00 35,000,000.00 1.55 -
2 Pek. Pintu Panel Type P1.a 4.00 Unit 3,500,000.00 14,000,000.00 0.62 -
3 Pek. Pintu Frameless Type P2.a 1.00 Unit 17,000,000.00 17,000,000.00 0.75 -
4 Pek. Pintu Kupu Tarung Type P2.b 3.00 Unit 7,500,000.00 22,500,000.00 1.00 -
5 Pek. Pintu Kupu Tarung Type P2.c 5.00 Unit 7,500,000.00 37,500,000.00 1.66 -
6 Pek. Jendela Type J2 3.00 Unit 2,200,000.00 6,600,000.00 0.29 -
7 Pek. Jendela Type J3 6.00 Unit 3,050,000.00 18,300,000.00 0.81 -
8 Pek. Jendela Type J2.a 1.00 Unit 2,200,000.00 2,200,000.00 0.10 -
9 Pek. Jendela Type J2.b 1.00 Unit 2,200,000.00 2,200,000.00 0.10 -
10 Pek. Jendela Type J3.a 2.00 Unit 3,050,000.00 6,100,000.00 0.27 -
11 Pek. Bouven Type BV1 7.00 Unit 700,000.00 4,900,000.00 0.22 -
12 Pek. Pasangan engsel Jendela kupu kupu 65.00 bh 7,500.00 487,500.00 0.02 -
13 Pek. Pasangan engsel pintu 12.00 bh 12,000.00 144,000.00 0.01 -
14 Pek. Pasangan kunci selot 6.00 bh 125,000.00 750,000.00 0.03 -
15 Pek. Pasangan rambuncis casement 6.00 bh 125,000.00 750,000.00 0.03 -
16 Pek. Pasang Kaca Bening 5 mm 37.59 m2 125,000.00 4,698,750.00 0.21 -
Sub Total 173,130,250.00 7.67
F PEKERJAAN BETON
1 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 14.69 m2 163,658.00 2,404,136.02 0.11 -
Pembesian 814.49 kg 11,160.11 9,089,800.03 0.40 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.78 m3 954,042.05 3,606,278.96 0.16 -
2 Pek. Beton Bertulang Footplat 2,5 x 2,0 m
Bekisting 2x pakai 93.30 m2 163,658.00 15,269,291.40 0.68 -
Pembesian 12,877.15 kg 11,160.11 143,710,442.68 6.37 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 91.00 m3 954,042.05 86,817,826.75 3.85 -
3 Pek. Beton Bertulang Sloof 12/18
Bekisting 2x pakai 8.12 m2 120,658.00 979,742.96 0.04 -
Pembesian 256.55 kg 11,160.11 2,863,126.86 0.13 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.38 m3 954,042.05 3,224,662.14 0.14 -
4 Pek. Beton Bertulang Sloof Struktur 20/30
Bekisting 2x pakai 51.24 m2 120,658.00 6,182,515.92 0.27 -
Pembesian 2,453.20 kg 11,160.11 27,377,987.98 1.21 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 12.81 m3 954,042.05 12,221,278.69 0.54 -
5 Pek. Beton Bertulang Sloof Struktur 20/60
Bekisting 2x pakai 45.36 m2 120,658.00 5,473,046.88 0.24 -
Pembesian 1,936.19 kg 11,160.11 21,608,098.22 0.96 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.34 m3 954,042.05 10,818,836.87 0.48 -
6 Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,5cm (K1)
Bekisting 2x pakai 80.00 m2 178,175.88 14,254,070.00 0.63 -
Pembesian 5,790.56 kg 11,160.11 64,623,301.04 2.86 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 32.00 m3 954,042.05 30,529,345.67 1.35 -
7 Pek. Beton Bertulang Kolom Struktur 30 x 30 T = 4,5cm (K2)
Bekisting 2x pakai 14.40 m2 178,175.88 2,565,732.60 0.11 -
Pembesian 492.62 kg 11,160.11 5,497,694.62 0.24 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.16 m3 954,042.05 2,060,730.83 0.09 -
8 Pek. Kolom Praktis 15 x 15 (KP)
Bekisting 2x pakai 39.58 m2 155,439.63 6,152,300.36 0.27 -
Pembesian 645.13 kg 11,160.11 7,199,723.38 0.32 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 5.28 m3 954,042.05 5,037,342.04 0.22 -
9 Pek. Beton Bertulang Balok 35/70 (B1)
Bekisting 2x pakai 128.35 m2 184,625.88 23,696,731.06 1.05 -
Pembesian 8,221.72 kg 11,160.11 91,755,320.14 4.07 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 34.51 m3 954,042.05 32,923,991.22 1.46 -
10 Pek. Beton Bertulang Balok Induk 25 x 40 (B2)
Bekisting 2x pakai 69.40 m2 184,625.88 12,813,035.73 0.57 -
Pembesian 6,058.73 kg 11,160.11 67,616,108.41 3.00 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.99 m3 954,042.05 11,438,964.21 0.51 -
11 Pek. Beton Bertulang Balok 20/60 Talang Dak Aula Elv. + 4,00 m Bottom
Bekisting 2x pakai 13.80 m2 184,625.88 2,547,837.08 0.11 -
Pembesian 460.72 kg 11,160.11 5,141,687.03 0.23 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.69 m3 954,042.05 2,566,373.12 0.11 -
12 Pek. Beton Bertulang Balok Latiu 12/15 Elv. + 3,00 m
Bekisting 2x pakai 24.84 m2 184,625.88 4,586,106.74 0.20 -
Pembesian 292.87 kg 11,160.11 3,268,462.15 0.14 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.15 m3 954,042.05 1,097,148.36 0.05 -
13 Pek. Beton Plat Topi - topi tbl. 8 cm Elv. + 3,00 m
Bekisting 2x pakai 14.44 m2 184,625.88 2,665,997.64 0.12 -
Pembesian 108.12 kg 11,160.11 1,206,631.36 0.05 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.00 m3 954,042.05 954,042.05 0.04 -
14 Pek. Stek Besi Plat Beton Talang Aula
Pembesian 385.25 kg 36,160.11 13,930,683.34 0.62 -
15 Pek. Beton Bertulang Balok Anak 25/12
Pembesian 1,392.36 kg 11,160.11 15,538,894.24 0.69 -
16 Plat Lantai tebal 12 cm
Bondex 0,75 608.20 m2 145,000.00 88,189,000.00 3.91 -
Pembesian 10,253.44 kg 11,160.11 114,429,543.91 5.07 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 119.92 m3 954,042.05 114,408,722.91 5.07 -
17 Tangga Umum
Bekisting 2x pakai 21.15 m2 161,653.13 3,418,963.59 0.15 -
Pembesian 247.82 kg 11,160.11 2,765,699.08 0.12 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.12 m3 954,042.05 2,022,569.15 0.09 -
18 Lantai Beton Rabat bawah kramik fc=7,4 Mpa (K-100) 14.30 m3 779,478.09 11,146,536.71 0.49 -
19 Lantai kerja bawah Footplat (K-100) 7.76 m3 779,478.09 6,048,749.99 0.27 -
Sub Total 1,125,745,112.11 49.88
G PEKERJAAN KERAMIK LANTAI 1
1 Pek. Pasangan keramik 60 x 60 cm motif ex.platinum 426.04 m2 180,148.50 76,750,466.94 3.40 -
2 Pek. Lantai keramik 25x25 ASIA TILE (bagian toilet) 19.80 m2 176,727.42 3,499,202.92 0.16 -
3 Pek.Dinding keramik 25x40 ASIA TILE (bagian toilet) 56.00 m2 203,864.08 11,416,388.20 0.51 -
4 Pek.Keramik Dinding Motif Batik 6.00 m2 275,000.00 1,650,000.00 0.07 -
Sub Total 93,316,058.06 4.14
H PEKERJAAN PLAFOND LANTAI 1
1 Pek. Pasang rangka Langit langit hollow 60 x 60 492.66 m2 43,102.13 21,234,692.90 0.94 -
2 Pek. Plafond Kalsiboard ex. Elephand 492.66 m2 37,232.63 18,343,025.03 0.81 -
3 Pekerjaan List Plafond Besar 397.00 m 25,558.13 10,146,575.63 0.45 -
Sub Total 49,724,293.56 2.20
I PEKERJAAN INSTALASI LISTRIK
1 Pek. Penyambungan 1.00 unit 10,000,000.00 10,000,000.00 0.44 -
2 Pek. pasangan instalasi listrik titik lampu kabel NYM 2X2,5mm pipa counduit 74.00 titik 190,000.00 14,060,000.00 0.62 -
3 Pek. Lampu Panel LED kubus Slim (18 watt putih),Panasonic 10.00 bh 190,000.00 1,900,000.00 0.08 -
4 Pek.Lampu Downlight 25.00 bh 225,000.00 5,625,000.00 0.25 -
5 Pek. Pasangan saklar Ganda 16.00 bh 35,000.00 560,000.00 0.02 -
6 Pek. Pasangan stop kontak 15.00 bh 40,000.00 600,000.00 0.03 -
7 Pek.Lampu RMI (2 Lampu 18 watt) Philips 23.00 bh 350,000.00 8,050,000.00 0.36 -
8 Pek stang caping ,lampu SL 23 watt Philips 6.00 bh 35,000.00 210,000.00 0.01 -
9 Pek. Pasangan stop kontak AC 10.00 bh 90,000.00 900,000.00 0.04 -
Sub Total 41,905,000.00 1.86
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
1 Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel Kontrol + Asesoris 1.00 unit 4,500,000.00 4,500,000.00 0.20 -
2 Pekerjaan Pasang MCB 6A/5KA 6.00 bh 155,000.00 930,000.00 0.04 -
3 Pekerjaan Pasang MCB 10A/5KA 10.00 bh 165,000.00 1,650,000.00 0.07 -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 750,000.00 750,000.00 0.03 -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 50,000.00 150,000.00 0.01 -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 8,730,000.00 0.39
K PEKERJAAN SDP
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 -
2 Pekerjaan Pasang MCB 20A/5KA 2.00 bh 725,000.00 1,450,000.00 0.06 -
3 Pekerjaan Pasang MCCB 20A/10KA 3Phase 2.00 bh 750,000.00 1,500,000.00 0.07 -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 2.00 bh 1,500,000.00 3,000,000.00 0.13 -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 9,950,000.00 0.44
L PEKERJAAN PANEL AC LANTAI 1
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 -
2 Pekerjaan Pasang MCB 20A/10KA 10.00 bh 725,000.00 7,250,000.00 0.32 -
3 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 1,500,000.00 1,500,000.00 0.07 -
4 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 -
5 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
6 Pekerjaan Intaslasi AC 10.00 bh 190,000.00 1,900,000.00 0.08 -
7 Pekerjaan Instalasi Pipa Refrigrant dan Draine 10.00 bh 500,000.00 5,000,000.00 0.22 -
8 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 19,650,000.00 0.87
M PEKERJAAN SANITASI
1 Pek. Pasangan Kloset Duduk Porselen (setara TOTO) 4.00 bh 3,000,000.00 12,000,000.00 0.53 -
2 Pek. Pasang Jet washer 4.00 bh 100,000.00 400,000.00 0.02 -
3 Pek.Pasang Kran dapur (leher angsa) stenliststeel 1.00 bh 150,000.00 150,000.00 0.01 -
4 Pek. Pasangan kran air dia.3/4 4.00 bh 125,000.00 500,000.00 0.02 -
5 Pek. Pasangan floor drain 4.00 bh 55,000.00 220,000.00 0.01 -
6 Pek. Pasangan pipa PVC dia.4 25.00 m 71,783.13 1,794,578.13 0.08 -
7 Pek. Pasangan pipa pvc tipe aw dia.3/4 30.00 m 23,878.44 716,353.13 0.03 -
8 Pek. Sapitanck sederhana 2.00 unit 3,000,000.00 6,000,000.00 0.27 -
9 Pek. Peresapan Septitank 2.00 unit 1,000,000.00 2,000,000.00 0.09 -
10 Pek. Peresapan air Kotor 2.00 unit 1,000,000.00 2,000,000.00 0.09 -
11 Pek. Tandon Pinguin TB110 (isi 1050 lt +asesoris otomatis) 1.00 unit 1,500,000.00 1,500,000.00 0.07 -
Sub Total 27,280,931.25 1.21
N PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan tembok lantai 1 1,467.36 m2 27,660.29 40,587,599.47 1.80 -
2 Pekerjaan Pengecatan plafond 492.66 m2 17,877.79 8,807,670.79 0.39 -
Sub Total 49,395,270.26 2.19
O PEKERJAAN LAIN - LAIN
1 Pek. Pasang Galvalum Rangka Besi Hollow 4/6 Penutup Void Tangga L 2 18.00 m2 300,000.00 5,400,000.00 0.24 -
Sub Total 5,400,000.00 0.24
PEKERJAAN GEDUNG AULA
A PEKERJAAN TANAH
1 Pek. Galian tanah biasa sedalam 1 m 28.86 m3 66,650.00 1,923,519.00 0.09 -
2 Pek. Pengurugan tanah kembali bekas galian 16.14 m3 15,766.67 254,474.00 0.01 -
3 Pek. Pengurugan Tanah Baru Padat 154.35 m3 61,060.00 9,424,611.00 0.42 -
4 Pek. Pengurugan Sirtu padat kelas B 46.30 m3 178,450.00 8,262,235.00 0.37 -
5 Pek. Urugan pasir bawah pondasi dan lantai 17.25 m3 181,460.00 3,130,185.00 0.14 -
6 Pek. Cerucuk bambu 8-10 cm 187.50 m 15,000.00 2,812,500.00 0.12 -
Sub Total 25,807,524.00 1.14
B PEKERJAAN PONDASI
1 Pek. Pasangan pondasi batu kosong/ Aanstamping 5.62 m3 415,621.88 2,335,794.94 0.10 -
2 Pek. Pasangan pondasi batu kali 16 15.24 m3 721,755.00 10,999,546.20 0.49 -
Sub Total 13,335,341.14 0.59
C PEKERJAAN BETON
1 Pek. Lantai Kerja K.100 12.73 m3 779,478.09 9,922,756.11 0.44 -
2 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 11.52 m2 163,658.00 1,885,340.16 0.08 -
Pembesian 573.30 kg 11,160.11 6,398,092.50 0.28 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 4.37 m3 954,042.05 4,169,163.77 0.18 -
3 Pek. Sloof 15/20
Bekisting 2x pakai 27.16 m2 120,658.00 3,277,071.28 0.15 -
Pembesian 363.67 kg 11,160.11 4,058,598.11 0.18 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.03 m3 954,042.05 1,936,705.37 0.09 -
4 Pek. Kolom 30/30
Bekisting 2x pakai 55.21 m2 178,175.88 9,837,090.06 0.44 -
Pembesian 1,205.31 kg 11,160.11 13,451,395.20 0.60 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 6.26 m3 954,042.05 5,972,303.25 0.26 -
5 Pek. Kolom Praktis 12/12
Bekisting 2x pakai 11.28 m2 155,439.63 1,753,358.97 0.08 -
Pembesian 279.47 kg 11,160.11 3,118,916.64 0.14 -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 0.79 m3 954,042.05 753,693.22 0.03 -
6 Pek. Balok 15/25 Elv. + 3,00 m
Bekisting 2x pakai 5.72 m2 184,625.88 1,056,060.01 0.05 -
Pembesian 105.33 kg 11,160.11 1,175,494.65 0.05 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 0.26 m3 954,042.05 248,050.93 0.01 -
7 Pek. Balok 20/25 Elv. +3,00 m
Bekisting 2x pakai 29.12 m2 184,625.88 5,376,305.48 0.24 -
Pembesian 510.14 kg 11,160.11 5,693,219.79 0.25 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.08 m3 954,042.05 1,984,407.47 0.09 -
8 Pek. Balok 20/35 Elv. + 4,00 m
Bekisting 2x pakai 18.36 m2 184,625.88 3,389,731.07 0.15 -
Pembesian 472.22 kg 11,160.11 5,270,028.32 0.23 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.43 m3 954,042.05 1,364,280.13 0.06 -
9 Pek. Balok Konsol Elv. Top + 4,00 m
Pembesian 199.53 kg 11,160.11 2,226,777.25 0.10 -
10 Pek. Plat Beton Topi-topi Elv. + 3,00 m
Bekisting 2x pakai 39.64 m2 184,625.88 7,318,569.69 0.32 -
Pembesian 422.92 kg 11,160.11 4,719,834.78 0.21 -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 2.88 m3 954,042.05 2,747,641.11 0.12 -
Sub Total 109,104,885.30 4.83
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK 1.00 ls 300,000.00 300,000.00 0.01 1.00
2 Asuransi dan perijinan 1.00 ls 1,000,000.00 1,000,000.00 0.04 1.00
Sub Total 1,300,000.00 0.06
IV PEKERJAAN PENCEGAHAN COVID-19
1 Alat Pelindung Kerja dan Pelindung Diri 1.00 ls 7,695,000.00 7,695,000.00 0.34 0.20
2 Personil Keselamatan Konstruksi 1.00 ls 3,000,000.00 3,000,000.00 0.13 0.20
3 Fasilitas sarana, Prasarana dan Alat kesehatan 1.00 ls 2,565,000.00 2,565,000.00 0.11 0.35
( Termasuk Protokol Kesehatan Penanganan COVID 19 )
Sub Total 13,260,000.00 0.59
Jumlah Biaya Konstruksi 2,256,718,317.27 100.00
PPN 10 % 225,671,831.73
Jumlah Total 2,482,390,149.00
Dibulatkan 2,482,390,000.00

Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)

FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
NGGUAN

PERIODE : Minggu Ke 3

MINGGU KE : 3 (TIGA)

TANGGAL 14 Juli 2021 s/d 20 Juli 2021

REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Jml Harga Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot

2,000,000.00 0.09 - - - 1.00 2,000,000.00 0.09


- - - - - - - -
2,000,000.00 0.09 - - 2,000,000.00 0.09

17,315,670.00 0.77 51.96 3,463,134.00 0.15 311.76 20,778,804.00 0.92


1,838,708.67 0.08 29.16 459,677.17 0.02 145.78 2,298,385.83 0.10
- - 24.58 4,459,560.96 0.20 24.58 4,459,560.96 0.20
- - - - - - - -
- - - - - - - -
19,154,378.67 0.85 8,382,372.13 0.37 27,536,750.79 1.22

- - - - - - - -
- - - - - - - -
- - 409.50 6,142,500.00 0.27 409.50 6,142,500.00 0.27
- - 6,142,500.00 0.27 6,142,500.00 0.27

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - 46.65 7,634,645.70 0.34 46.65 7,634,645.70 0.34


- - 6,438.58 71,855,221.34 3.18 6,438.58 71,855,221.34 3.18
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -

- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - 3.88 3,024,375.00 0.13 3.88 3,024,375.00 0.13
- - 82,514,242.04 3.66 82,514,242.04 3.66

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

300,000.00 0.01 - - - 1.00 300,000.00 0.01


1,000,000.00 0.04 - - - 1.00 1,000,000.00 0.04
1,300,000.00 0.06 - - 1,300,000.00 0.06

1,539,000.00 0.07 0.10 769,500.00 0.03 0.30 2,308,500.00 0.10


600,000.00 0.03 0.10 300,000.00 0.01 0.30 900,000.00 0.04
897,750.00 0.04 0.05 128,250.00 0.01 0.40 1,026,000.00 0.05

3,036,750.00 0.13 1,197,750.00 0.05 4,234,500.00 0.19


25,491,128.67 1.13 98,236,864.16 4.35 123,727,992.83 5.48
2,549,112.87 9,823,686.42 12,372,799.28
28,040,241.54 108,060,550.58 136,100,792.11
28,040,000.00 108,060,000.00 136,100,000.00

Pekalongan, 13 Juli 2021


dibuat Oleh :
Konsultan Pengawas
CV. COZZY ERGITA

M.SAEFULLAH, ST
Pengawas Lapangan
KEGIATAN :
PEKERJAAN :
LOKASI : di jalan tondano, Kecamatan Pekalongan Timur
TH. ANGGARAN : 2021

NO. JENIS PEKERJAAN

I PEKERJAAN GEDUNG KANTOR


A PEKERJAAN PERSIAPAN
LANTAI I
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
F PEKERJAAN BETON
G PEKERJAAN KERAMIK LANTAI 1
H PEKERJAAN PLAFOND LANTAI 1
I PEKERJAAN INSTALASI LISTRIK
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
K PEKERJAAN SDP
L PEKERJAAN PANEL AC LANTAI 1
M PEKERJAAN SANITASI
N PEKERJAAN PENGECATAN
O PEKERJAAN LAIN - LAIN

II PEKERJAAN GEDUNG AULA


1 PEKERJAAN TANAH
2 PEKERJAAN PONDASI
3 PEKERJAAN BETON

III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI

IV PEKERJAAN PENCEGAHAN COVID-19

Jumlah Biaya Konstruksi


PPN 10 %
Jumlah Total
Dibulatkan
Progres Rencana Per minggu
Komulatif Progres Rencana
Progres Realisasi Per minggu
Komulatif Progres Realisasi
Deviasi
Keterangan

Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)

FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
TIME SCHEDULE ( JADWAL

BOBOT
JUMLAH HARGA (Rp)
% 1 2 3 4 5

2,365,000.00 0.095 0.05 0.05

107,466,359.95 4.329 0.62 0.62 0.62


211,956,767.26 8.538 2.13 2.13
216,863,889.54 8.736
190,443,275.00 7.672
1,238,319,623.33 49.884 4.99 4.99 4.99
102,647,663.86 4.135
54,696,722.92 2.203
46,095,500.00 1.857
9,603,000.00 0.387
10,945,000.00 0.441
21,615,000.00 0.871
30,009,024.38 1.209
54,334,797.28 2.189
5,940,000.00 0.239

28,388,276.40 1.144 0.23 0.23 0.23 0.23


14,668,875.25 0.591 0.15 0.15
120,015,373.83 4.835

1,430,000.00 0.058 0.003 0.003 0.003 0.003 0.003

14,586,000.00 0.588 0.03 0.03 0.03 0.03 0.03

2,482,390,149.00 100.00
248,239,014.90
2,730,629,163.90
2,730,629,000.00
0.08 0.92 5.86 8.15 7.53
0 0.08 1.00 6.87 15.01 22.54
0.75 0.38 4.35
0 0.75 1.13 5.48
0.67 0.13 -1.38
Mendahului Mendahului Terlambat
CHEDULE ( JADWAL WAKTU PELAKSANAAN)

WAKTU PELAKSANAAN
MINGGU KE
6 7 8 9 10 11 12 13

0.62 0.62 0.62 0.62


2.13 2.13
1.25 1.25 1.25 1.25 1.25 1.25

4.99 4.99 4.99 4.99 4.99 4.99 4.99


1.03
0.44 0.44 0.44
0.37 0.37

0.23
0.15 0.15
0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03


8.01 8.40 7.37 7.37 7.37 7.19 7.56 3.61
30.55 38.96 46.32 53.69 61.06 68.25 75.81 79.42
PERIODE : Minggu Ke 2
MINGGU KE : : 2 (DUA)
TANGGAL : 07 Juli 2021 s/d

14 15 16 17 18 19 20 21

1.25
1.28 1.28 1.28 1.28 1.28 1.28

1.03 1.03 1.03


0.44 0.44
0.37 0.37 0.37
0.13 0.13 0.13
0.22 0.22
0.22 0.22 0.22 0.22
0.30 0.30 0.30 0.30
0.36 0.36 0.36 0.36 0.36
0.12 0.12

0.48 0.48

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03


4.51 3.94 2.64 2.56 2.78 2.24 0.86 0.64
83.93 87.87 90.51 93.08 95.86 98.10 98.96 99.61

Pekalongan, 13 Juli 2021


Dibuat Oleh :
Konsultan Pengawas
CV. COZZY ERGITA

M.SAEFULLAH, ST
Pengawas Lapangan
13 Juli 2021

KETERANGAN
22

100

90

80

70

60

0.36
50

40

30

0.003

20
0.03

10

0
10

0
0.39
100.00

3 Juli 2021

ultan Pengawas
COZZY ERGITA

AEFULLAH, ST
awas Lapangan
REKAPITULASI LAPORAN MINGGUAN

Kegiatan
Pekerjaan
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Konsultan Pengawas : CV. COZZY ERGITA
Minggu Ke : Minggu Ke-3
Periode 07 Juli 2021 s/d

URAIAN PEKERJAAN
NO

I PEKERJAAN GEDUNG KANTOR


A PEKERJAAN PERSIAPAN
LANTAI I
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
F PEKERJAAN BETON
G PEKERJAAN KERAMIK LANTAI 1
H PEKERJAAN PLAFOND LANTAI 1
I PEKERJAAN INSTALASI LISTRIK
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
K PEKERJAAN SDP
L PEKERJAAN PANEL AC LANTAI 1
M PEKERJAAN SANITASI
N PEKERJAAN PENGECATAN
O PEKERJAAN LAIN - LAIN

II PEKERJAAN GEDUNG AULA


1 PEKERJAAN TANAH
2 PEKERJAAN PONDASI
3 PEKERJAAN BETON

III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI

IV PEKERJAAN PENCEGAHAN COVID-19


Total Sub Jumlah Harga
PPN 10 %
Total
Dibulatkan

RENCANA MENURUT TIME SCHEDULE MINGGU INI


PRESTASI PEKERJAAN MINGGU LALU
PRESTASI PEKERJAAN MINGGU INI
PRESTASI PEKERJAAN SAMPAI DENGAN MINGGU INI
DEVIASI ===>

di periksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)

FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
ASI LAPORAN MINGGUAN

13 Juli 2021

MINGGU LALU PROGRES MINGGU INI PROGRES S/D MINGGU INI

JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT


( Rp. ) PEK (%) ( Rp. ) PEK (%) ( Rp. ) PEK (%)

2,000,000.00 0.09 0.00 0.00 2,000,000.00 0.09

19,154,378.67 0.85 8,382,372.13 0.37 27,536,750.79 1.22


6,142,500.00 0.27 6,142,500.00 0.27

82,514,242.04 3.66 82,514,242.04 3.66

1,300,000.00 0.06 0.00 0.00 1,300,000.00 0.06

3,036,750.00 0.13 1,197,750.00 0.05 4,234,500.00 0.19


25,491,128.67 1.13 98,236,864.16 4.35 123,727,992.83 5.48
2,549,112.87 9,823,686.42 12,372,799.28
28,040,241.54 108,060,550.58 136,100,792.11
28,040,240.00 108,060,000.00 136,100,000.00

6.87 %
1.13 %
4.35 %
5.48 %
-1.38 %

Pekalongan , 13 Juli 2021


dibuat Oleh :
Kontraktor Pelaksana
CV. COZZY ERGITA

M.SAEFULLAH, ST
Pengawas Lapangan
LAPORAN MINGGUAN

Kegiatan :

Pekerjaan :

Lokasi : di jalan tondano, Kecamatan Pekalongan Timur

Tahun Anggaran : 2021

HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume
I PEKERJAAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Pengukuran 1.00 ls 2,000,000.00 2,000,000.00 0.09 1.00
2 Pek. Papan Nama Proyek 1.00 ls 150,000.00 150,000.00 0.01 -
Sub Total 2,150,000.00 0.10
B PEKERJAAN TANAH
1 Pek. Galian tanah biasa 1 m 519.60 m3 66,650.00 34,631,340.00 1.53 311.76
2 Pek. Urugan tanah kembali bekas galian 291.55 m3 15,766.67 4,596,771.67 0.20 145.78
3 Pek. Pasir bawah pondasi dan lantai 81.92 m3 181,460.00 14,865,203.20 0.66 24.58
4 Pek. Urugan tanah baru padat 316.35 m3 61,060.00 19,316,331.00 0.86 -
5 Pek. Urugan Sirtu Kw. B baru padat 136.10 m3 178,450.00 24,287,045.00 1.08 -
Sub Total 97,696,690.87 4.33
C PEKERJAAN PONDASI
1 Pek. Pasangan batu kosong (anstamping) 41.14 m3 415,621.88 17,098,683.94 0.76 -
2 Pek. Pas. Batu kali 1ps 6 pp 226.26 m3 721,755.00 163,304,286.30 7.24 -
3 Pek.crucuk bambu 10 cm pj 1,5 m 819.00 m' 15,000.00 12,285,000.00 0.54 409.50
Sub Total 192,687,970.24 8.54
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
1 Pek. Pas.batu bata merah 1ps 6 pp tebal 1/2 bata 733.68 m2 113,245.88 83,086,233.57 3.68 -
2 Pek. Pasangan Plesteran 1 Pc 6 pp 1,467.36 m2 45,865.95 67,301,860.39 2.98 -
3 Pek. Acian 1,467.36 m2 26,273.00 38,551,949.28 1.71 -
4 Pek. Sponengan 434.00 m' 18,914.63 8,208,947.25 0.36 -
Sub Total 197,148,990.49 8.74
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
1 Pek. Pintu Panel Type P1 & P1.b 10.00 Unit 3,500,000.00 35,000,000.00 1.55 -
2 Pek. Pintu Panel Type P1.a 4.00 Unit 3,500,000.00 14,000,000.00 0.62 -
3 Pek. Pintu Frameless Type P2.a 1.00 Unit 17,000,000.00 17,000,000.00 0.75 -
4 Pek. Pintu Kupu Tarung Type P2.b 3.00 Unit 7,500,000.00 22,500,000.00 1.00 -
5 Pek. Pintu Kupu Tarung Type P2.c 5.00 Unit 7,500,000.00 37,500,000.00 1.66 -
6 Pek. Jendela Type J2 3.00 Unit 2,200,000.00 6,600,000.00 0.29 -
7 Pek. Jendela Type J3 6.00 Unit 3,050,000.00 18,300,000.00 0.81 -
8 Pek. Jendela Type J2.a 1.00 Unit 2,200,000.00 2,200,000.00 0.10 -
9 Pek. Jendela Type J2.b 1.00 Unit 2,200,000.00 2,200,000.00 0.10 -
10 Pek. Jendela Type J3.a 2.00 Unit 3,050,000.00 6,100,000.00 0.27 -
11 Pek. Bouven Type BV1 7.00 Unit 700,000.00 4,900,000.00 0.22 -
12 Pek. Pasangan engsel Jendela kupu kupu 65.00 bh 7,500.00 487,500.00 0.02 -
13 Pek. Pasangan engsel pintu 12.00 bh 12,000.00 144,000.00 0.01 -
14 Pek. Pasangan kunci selot 6.00 bh 125,000.00 750,000.00 0.03 -
15 Pek. Pasangan rambuncis casement 6.00 bh 125,000.00 750,000.00 0.03 -
16 Pek. Pasang Kaca Bening 5 mm 37.59 m2 125,000.00 4,698,750.00 0.21 -
Sub Total 173,130,250.00 7.67
F PEKERJAAN BETON
1 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 14.69 m2 163,658.00 2,404,136.02 0.11 -
Pembesian 814.49 kg 11,160.11 9,089,800.03 0.40 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.78 m3 954,042.05 3,606,278.96 0.16 -
2 Pek. Beton Bertulang Footplat 2,5 x 2,0 m
Bekisting 2x pakai 93.30 m2 163,658.00 15,269,291.40 0.68 46.65
Pembesian 12,877.15 kg 11,160.11 143,710,442.68 6.37 6,438.58
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 91.00 m3 954,042.05 86,817,826.75 3.85 -
3 Pek. Beton Bertulang Sloof 12/18
Bekisting 2x pakai 8.12 m2 120,658.00 979,742.96 0.04 -
Pembesian 256.55 kg 11,160.11 2,863,126.86 0.13 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.38 m3 954,042.05 3,224,662.14 0.14 -
4 Pek. Beton Bertulang Sloof Struktur 20/30
Bekisting 2x pakai 51.24 m2 120,658.00 6,182,515.92 0.27 -
Pembesian 2,453.20 kg 11,160.11 27,377,987.98 1.21 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 12.81 m3 954,042.05 12,221,278.69 0.54 -
5 Pek. Beton Bertulang Sloof Struktur 20/60
Bekisting 2x pakai 45.36 m2 120,658.00 5,473,046.88 0.24 -
Pembesian 1,936.19 kg 11,160.11 21,608,098.22 0.96 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.34 m3 954,042.05 10,818,836.87 0.48 -
6 Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,5cm (K1)
Bekisting 2x pakai 80.00 m2 178,175.88 14,254,070.00 0.63 -
Pembesian 5,790.56 kg 11,160.11 64,623,301.04 2.86 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 32.00 m3 954,042.05 30,529,345.67 1.35 -
7 Pek. Beton Bertulang Kolom Struktur 30 x 30 T = 4,5cm (K2)
Bekisting 2x pakai 14.40 m2 178,175.88 2,565,732.60 0.11 -
Pembesian 492.62 kg 11,160.11 5,497,694.62 0.24 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.16 m3 954,042.05 2,060,730.83 0.09 -
8 Pek. Kolom Praktis 15 x 15 (KP)
Bekisting 2x pakai 39.58 m2 155,439.63 6,152,300.36 0.27 -
Pembesian 645.13 kg 11,160.11 7,199,723.38 0.32 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 5.28 m3 954,042.05 5,037,342.04 0.22 -
9 Pek. Beton Bertulang Balok 35/70 (B1)
Bekisting 2x pakai 128.35 m2 184,625.88 23,696,731.06 1.05 -
Pembesian 8,221.72 kg 11,160.11 91,755,320.14 4.07 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 34.51 m3 954,042.05 32,923,991.22 1.46 -
10 Pek. Beton Bertulang Balok Induk 25 x 40 (B2)
Bekisting 2x pakai 69.40 m2 184,625.88 12,813,035.73 0.57 -
Pembesian 6,058.73 kg 11,160.11 67,616,108.41 3.00 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.99 m3 954,042.05 11,438,964.21 0.51 -
11 Pek. Beton Bertulang Balok 20/60 Talang Dak Aula Elv. + 4,00 m Bottom
Bekisting 2x pakai 13.80 m2 184,625.88 2,547,837.08 0.11 -
Pembesian 460.72 kg 11,160.11 5,141,687.03 0.23 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.69 m3 954,042.05 2,566,373.12 0.11 -
12 Pek. Beton Bertulang Balok Latiu 12/15 Elv. + 3,00 m
Bekisting 2x pakai 24.84 m2 184,625.88 4,586,106.74 0.20 -
Pembesian 292.87 kg 11,160.11 3,268,462.15 0.14 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.15 m3 954,042.05 1,097,148.36 0.05 -
13 Pek. Beton Plat Topi - topi tbl. 8 cm Elv. + 3,00 m
Bekisting 2x pakai 14.44 m2 184,625.88 2,665,997.64 0.12 -
Pembesian 108.12 kg 11,160.11 1,206,631.36 0.05 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.00 m3 954,042.05 954,042.05 0.04 -
14 Pek. Stek Besi Plat Beton Talang Aula
Pembesian 385.25 kg 36,160.11 13,930,683.34 0.62 -
15 Pek. Beton Bertulang Balok Anak 25/12
Pembesian 1,392.36 kg 11,160.11 15,538,894.24 0.69 -
16 Plat Lantai tebal 12 cm
Bondex 0,75 608.20 m2 145,000.00 88,189,000.00 3.91 -
Pembesian 10,253.44 kg 11,160.11 114,429,543.91 5.07 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 119.92 m3 954,042.05 114,408,722.91 5.07 -
17 Tangga Umum
Bekisting 2x pakai 21.15 m2 161,653.13 3,418,963.59 0.15 -
Pembesian 247.82 kg 11,160.11 2,765,699.08 0.12 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.12 m3 954,042.05 2,022,569.15 0.09 -
18 Lantai Beton Rabat bawah kramik fc=7,4 Mpa (K-100) 14.30 m3 779,478.09 11,146,536.71 0.49 -
19 Lantai kerja bawah Footplat (K-100) 7.76 m3 779,478.09 6,048,749.99 0.27 3.88
Sub Total 1,125,745,112.11 49.88
G PEKERJAAN KERAMIK LANTAI 1
1 Pek. Pasangan keramik 60 x 60 cm motif ex.platinum 426.04 m2 180,148.50 76,750,466.94 3.40 -
2 Pek. Lantai keramik 25x25 ASIA TILE (bagian toilet) 19.80 m2 176,727.42 3,499,202.92 0.16 -
3 Pek.Dinding keramik 25x40 ASIA TILE (bagian toilet) 56.00 m2 203,864.08 11,416,388.20 0.51 -
4 Pek.Keramik Dinding Motif Batik 6.00 m2 275,000.00 1,650,000.00 0.07 -
Sub Total 93,316,058.06 4.14
H PEKERJAAN PLAFOND LANTAI 1
1 Pek. Pasang rangka Langit langit hollow 60 x 60 492.66 m2 43,102.13 21,234,692.90 0.94 -
2 Pek. Plafond Kalsiboard ex. Elephand 492.66 m2 37,232.63 18,343,025.03 0.81 -
3 Pekerjaan List Plafond Besar 397.00 m 25,558.13 10,146,575.63 0.45 -
Sub Total 49,724,293.56 2.20
I PEKERJAAN INSTALASI LISTRIK
1 Pek. Penyambungan 1.00 unit 10,000,000.00 10,000,000.00 0.44 -
2 Pek. pasangan instalasi listrik titik lampu kabel NYM 2X2,5mm pipa counduit 74.00 titik 190,000.00 14,060,000.00 0.62 -
3 Pek. Lampu Panel LED kubus Slim (18 watt putih),Panasonic 10.00 bh 190,000.00 1,900,000.00 0.08 -
4 Pek.Lampu Downlight 25.00 bh 225,000.00 5,625,000.00 0.25 -
5 Pek. Pasangan saklar Ganda 16.00 bh 35,000.00 560,000.00 0.02 -
6 Pek. Pasangan stop kontak 15.00 bh 40,000.00 600,000.00 0.03 -
7 Pek.Lampu RMI (2 Lampu 18 watt) Philips 23.00 bh 350,000.00 8,050,000.00 0.36 -
8 Pek stang caping ,lampu SL 23 watt Philips 6.00 bh 35,000.00 210,000.00 0.01 -
9 Pek. Pasangan stop kontak AC 10.00 bh 90,000.00 900,000.00 0.04 -
Sub Total 41,905,000.00 1.86
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
1 Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel Kontrol + Asesoris 1.00 unit 4,500,000.00 4,500,000.00 0.20 -
2 Pekerjaan Pasang MCB 6A/5KA 6.00 bh 155,000.00 930,000.00 0.04 -
3 Pekerjaan Pasang MCB 10A/5KA 10.00 bh 165,000.00 1,650,000.00 0.07 -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 750,000.00 750,000.00 0.03 -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 50,000.00 150,000.00 0.01 -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 8,730,000.00 0.39
K PEKERJAAN SDP
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 -
2 Pekerjaan Pasang MCB 20A/5KA 2.00 bh 725,000.00 1,450,000.00 0.06 -
3 Pekerjaan Pasang MCCB 20A/10KA 3Phase 2.00 bh 750,000.00 1,500,000.00 0.07 -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 2.00 bh 1,500,000.00 3,000,000.00 0.13 -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 9,950,000.00 0.44
L PEKERJAAN PANEL AC LANTAI 1
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 -
2 Pekerjaan Pasang MCB 20A/10KA 10.00 bh 725,000.00 7,250,000.00 0.32 -
3 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 1,500,000.00 1,500,000.00 0.07 -
4 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 -
5 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 -
6 Pekerjaan Intaslasi AC 10.00 bh 190,000.00 1,900,000.00 0.08 -
7 Pekerjaan Instalasi Pipa Refrigrant dan Draine 10.00 bh 500,000.00 5,000,000.00 0.22 -
8 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 -
Sub Total 19,650,000.00 0.87
M PEKERJAAN SANITASI
1 Pek. Pasangan Kloset Duduk Porselen (setara TOTO) 4.00 bh 3,000,000.00 12,000,000.00 0.53 -
2 Pek. Pasang Jet washer 4.00 bh 100,000.00 400,000.00 0.02 -
3 Pek.Pasang Kran dapur (leher angsa) stenliststeel 1.00 bh 150,000.00 150,000.00 0.01 -
4 Pek. Pasangan kran air dia.3/4 4.00 bh 125,000.00 500,000.00 0.02 -
5 Pek. Pasangan floor drain 4.00 bh 55,000.00 220,000.00 0.01 -
6 Pek. Pasangan pipa PVC dia.4 25.00 m 71,783.13 1,794,578.13 0.08 -
7 Pek. Pasangan pipa pvc tipe aw dia.3/4 30.00 m 23,878.44 716,353.13 0.03 -
8 Pek. Sapitanck sederhana 2.00 unit 3,000,000.00 6,000,000.00 0.27 -
9 Pek. Peresapan Septitank 2.00 unit 1,000,000.00 2,000,000.00 0.09 -
10 Pek. Peresapan air Kotor 2.00 unit 1,000,000.00 2,000,000.00 0.09 -
11 Pek. Tandon Pinguin TB110 (isi 1050 lt +asesoris otomatis) 1.00 unit 1,500,000.00 1,500,000.00 0.07 -
Sub Total 27,280,931.25 1.21
N PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan tembok lantai 1 1,467.36 m2 27,660.29 40,587,599.47 1.80 -
2 Pekerjaan Pengecatan plafond 492.66 m2 17,877.79 8,807,670.79 0.39 -
Sub Total 49,395,270.26 2.19
O PEKERJAAN LAIN - LAIN
1 Pek. Pasang Galvalum Rangka Besi Hollow 4/6 Penutup Void Tangga L 2 18.00 m2 300,000.00 5,400,000.00 0.24 -
Sub Total 5,400,000.00 0.24
PEKERJAAN GEDUNG AULA
A PEKERJAAN TANAH
1 Pek. Galian tanah biasa sedalam 1 m 28.86 m3 66,650.00 1,923,519.00 0.09 -
2 Pek. Pengurugan tanah kembali bekas galian 16.14 m3 15,766.67 254,474.00 0.01 -
3 Pek. Pengurugan Tanah Baru Padat 154.35 m3 61,060.00 9,424,611.00 0.42 -
4 Pek. Pengurugan Sirtu padat kelas B 46.30 m3 178,450.00 8,262,235.00 0.37 -
5 Pek. Urugan pasir bawah pondasi dan lantai 17.25 m3 181,460.00 3,130,185.00 0.14 -
6 Pek. Cerucuk bambu 8-10 cm 187.50 m 15,000.00 2,812,500.00 0.12 -
Sub Total 25,807,524.00 1.14
B PEKERJAAN PONDASI
1 Pek. Pasangan pondasi batu kosong/ Aanstamping 5.62 m3 415,621.88 2,335,794.94 0.10 -
2 Pek. Pasangan pondasi batu kali 16 15.24 m3 721,755.00 10,999,546.20 0.49 -
Sub Total 13,335,341.14 0.59
C PEKERJAAN BETON
1 Pek. Lantai Kerja K.100 12.73 m3 779,478.09 9,922,756.11 0.44 -
2 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 11.52 m2 163,658.00 1,885,340.16 0.08 -
Pembesian 573.30 kg 11,160.11 6,398,092.50 0.28 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 4.37 m3 954,042.05 4,169,163.77 0.18 -
3 Pek. Sloof 15/20
Bekisting 2x pakai 27.16 m2 120,658.00 3,277,071.28 0.15 -
Pembesian 363.67 kg 11,160.11 4,058,598.11 0.18 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.03 m3 954,042.05 1,936,705.37 0.09 -
4 Pek. Kolom 30/30
Bekisting 2x pakai 55.21 m2 178,175.88 9,837,090.06 0.44 -
Pembesian 1,205.31 kg 11,160.11 13,451,395.20 0.60 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 6.26 m3 954,042.05 5,972,303.25 0.26 -
5 Pek. Kolom Praktis 12/12
Bekisting 2x pakai 11.28 m2 155,439.63 1,753,358.97 0.08 -
Pembesian 279.47 kg 11,160.11 3,118,916.64 0.14 -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 0.79 m3 954,042.05 753,693.22 0.03 -
6 Pek. Balok 15/25 Elv. + 3,00 m
Bekisting 2x pakai 5.72 m2 184,625.88 1,056,060.01 0.05 -
Pembesian 105.33 kg 11,160.11 1,175,494.65 0.05 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 0.26 m3 954,042.05 248,050.93 0.01 -
7 Pek. Balok 20/25 Elv. +3,00 m
Bekisting 2x pakai 29.12 m2 184,625.88 5,376,305.48 0.24 -
Pembesian 510.14 kg 11,160.11 5,693,219.79 0.25 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.08 m3 954,042.05 1,984,407.47 0.09 -
8 Pek. Balok 20/35 Elv. + 4,00 m
Bekisting 2x pakai 18.36 m2 184,625.88 3,389,731.07 0.15 -
Pembesian 472.22 kg 11,160.11 5,270,028.32 0.23 -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.43 m3 954,042.05 1,364,280.13 0.06 -
9 Pek. Balok Konsol Elv. Top + 4,00 m
Pembesian 199.53 kg 11,160.11 2,226,777.25 0.10 -
10 Pek. Plat Beton Topi-topi Elv. + 3,00 m
Bekisting 2x pakai 39.64 m2 184,625.88 7,318,569.69 0.32 -
Pembesian 422.92 kg 11,160.11 4,719,834.78 0.21 -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 2.88 m3 954,042.05 2,747,641.11 0.12 -
Sub Total 109,104,885.30 4.83
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK 1.00 ls 300,000.00 300,000.00 0.01 1.00
2 Asuransi dan perijinan 1.00 ls 1,000,000.00 1,000,000.00 0.04 1.00
Sub Total 1,300,000.00 0.06
IV PEKERJAAN PENCEGAHAN COVID-19
1 Alat Pelindung Kerja dan Pelindung Diri 1.00 ls 7,695,000.00 7,695,000.00 0.34 0.30
2 Personil Keselamatan Konstruksi 1.00 ls 3,000,000.00 3,000,000.00 0.13 0.30
3 Fasilitas sarana, Prasarana dan Alat kesehatan 1.00 ls 2,565,000.00 2,565,000.00 0.11 0.40
( Termasuk Protokol Kesehatan Penanganan COVID 19 )
Sub Total 13,260,000.00 0.59
Jumlah Biaya Konstruksi 2,256,718,317.27 100.00
PPN 10 % 225,671,831.73
Jumlah Total 2,482,390,149.00
Dibulatkan 2,482,390,000.00

Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)

FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
NGGUAN

PERIODE : Minggu Ke 4

MINGGU KE : 4 (EMPAT)

TANGGAL 21 Juli 2021 s/d 27 Juli 2021

REALISASI
Prest Minggu Lalu Prest Minggu ini Prest Komulatif KETERANGAN
Jml Harga Bobot Volume Jml Harga Bobot Volume Jml Harga Bobot

2,000,000.00 0.09 - - - 1.00 2,000,000.00 0.09


- - - - - - - -
2,000,000.00 0.09 - - 2,000,000.00 0.09

20,778,804.00 0.92 51.96 3,463,134.00 0.15 363.72 24,241,938.00 1.07


2,298,385.83 0.10 29.16 459,677.17 0.02 174.93 2,758,063.00 0.12
4,459,560.96 0.20 24.58 4,459,560.96 0.20 49.15 8,919,121.92 0.40
- - - - - - - -
- - - - - - - -
27,536,750.79 1.22 8,382,372.13 0.37 35,919,122.92 1.59

- - - - - - - -
- - - - - - - -
6,142,500.00 0.27 163.80 2,457,000.00 0.11 573.30 8,599,500.00 0.38
6,142,500.00 0.27 2,457,000.00 0.11 8,599,500.00 0.38

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

7,634,645.70 0.34 18.66 3,053,858.28 0.14 65.31 10,688,503.98 0.47


71,855,221.34 3.18 2,575.43 28,742,088.54 1.27 9,014.01 100,597,309.88 4.46
- - 54.60 52,090,696.05 2.31 54.60 52,090,696.05 2.31

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -

- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
3,024,375.00 0.13 1.55 1,209,750.00 0.05 5.43 4,234,125.00 0.19
82,514,242.04 3.66 85,096,392.87 3.77 167,610,634.90 7.43

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - -

300,000.00 0.01 - - - 1.00 300,000.00 0.01


1,000,000.00 0.04 - - - 1.00 1,000,000.00 0.04
1,300,000.00 0.06 - - 1,300,000.00 0.06

2,308,500.00 0.10 - - - 0.30 2,308,500.00 0.10


900,000.00 0.04 - - - 0.30 900,000.00 0.04
1,026,000.00 0.05 - - - 0.40 1,026,000.00 0.05

4,234,500.00 0.19 - - 4,234,500.00 0.19


123,727,992.83 5.48 95,935,764.99 4.25 219,663,757.82 9.73
12,372,799.28 9,593,576.50 21,966,375.78
136,100,792.11 105,529,341.49 241,630,133.61
136,100,000.00 105,529,000.00 241,630,000.00

Pekalongan, 27 Juli 2021


dibuat Oleh :
Konsultan Pengawas
CV. COZZY ERGITA

M.SAEFULLAH, ST
Pengawas Lapangan
KEGIATAN :
PEKERJAAN :
LOKASI : di jalan tondano, Kecamatan Pekalongan Timur
TH. ANGGARAN : 2021

NO. JENIS PEKERJAAN

I PEKERJAAN GEDUNG KANTOR


A PEKERJAAN PERSIAPAN
LANTAI I
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
F PEKERJAAN BETON
G PEKERJAAN KERAMIK LANTAI 1
H PEKERJAAN PLAFOND LANTAI 1
I PEKERJAAN INSTALASI LISTRIK
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
K PEKERJAAN SDP
L PEKERJAAN PANEL AC LANTAI 1
M PEKERJAAN SANITASI
N PEKERJAAN PENGECATAN
O PEKERJAAN LAIN - LAIN

II PEKERJAAN GEDUNG AULA


1 PEKERJAAN TANAH
2 PEKERJAAN PONDASI
3 PEKERJAAN BETON

III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI

IV PEKERJAAN PENCEGAHAN COVID-19

Jumlah Biaya Konstruksi


PPN 10 %
Jumlah Total
Dibulatkan
Progres Rencana Per minggu
Komulatif Progres Rencana
Progres Realisasi Per minggu
Komulatif Progres Realisasi
Deviasi
Keterangan

Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)

FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
TIME SCHEDULE ( JADWAL

BOBOT
JUMLAH HARGA (Rp)
% 1 2 3 4 5

2,365,000.00 0.095 0.05 0.05

107,466,359.95 4.329 0.62 0.62 0.62


211,956,767.26 8.538 2.13 2.13
216,863,889.54 8.736
190,443,275.00 7.672
1,238,319,623.33 49.884 4.99 4.99 4.99
102,647,663.86 4.135
54,696,722.92 2.203
46,095,500.00 1.857
9,603,000.00 0.387
10,945,000.00 0.441
21,615,000.00 0.871
30,009,024.38 1.209
54,334,797.28 2.189
5,940,000.00 0.239

28,388,276.40 1.144 0.23 0.23 0.23 0.23


14,668,875.25 0.591 0.15 0.15
120,015,373.83 4.835

1,430,000.00 0.058 0.003 0.003 0.003 0.003 0.003

14,586,000.00 0.588 0.03 0.03 0.03 0.03 0.03

2,482,390,149.00 100.00
248,239,014.90
2,730,629,163.90
2,730,629,000.00
0.08 0.92 5.86 8.15 7.53
0 0.08 1.00 6.87 15.01 22.54
0.75 0.38 4.35 4.25
0 0.75 1.13 5.48 9.73
0.67 0.13 -1.38 -5.28
Mendahului Mendahului Terlambat Terlambat
CHEDULE ( JADWAL WAKTU PELAKSANAAN)

WAKTU PELAKSANAAN
MINGGU KE
6 7 8 9 10 11 12 13

0.62 0.62 0.62 0.62


2.13 2.13
1.25 1.25 1.25 1.25 1.25 1.25

4.99 4.99 4.99 4.99 4.99 4.99 4.99


1.03
0.44 0.44 0.44
0.37 0.37

0.23
0.15 0.15
0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03


8.01 8.40 7.37 7.37 7.37 7.19 7.56 3.61
30.55 38.96 46.32 53.69 61.06 68.25 75.81 79.42
PERIODE : Minggu Ke 2
MINGGU KE : : 2 (DUA)
TANGGAL : 21 Juli 2021 s/d

14 15 16 17 18 19 20 21

1.25
1.28 1.28 1.28 1.28 1.28 1.28

1.03 1.03 1.03


0.44 0.44
0.37 0.37 0.37
0.13 0.13 0.13
0.22 0.22
0.22 0.22 0.22 0.22
0.30 0.30 0.30 0.30
0.36 0.36 0.36 0.36 0.36
0.12 0.12

0.48 0.48

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03


4.51 3.94 2.64 2.56 2.78 2.24 0.86 0.64
83.93 87.87 90.51 93.08 95.86 98.10 98.96 99.61

Pekalongan, 27 Juli 2021


Dibuat Oleh :
Konsultan Pengawas
CV. COZZY ERGITA

M.SAEFULLAH, ST
Pengawas Lapangan
27 Juli 2021

KETERANGAN
22

100

90

80

70

60

0.36
50

40

30

0.003

20
0.03

10

0
10

0
0.39
100.00

7 Juli 2021

ultan Pengawas
COZZY ERGITA

AEFULLAH, ST
awas Lapangan
REKAPITULASI LAPORAN MINGGUAN

Kegiatan
Pekerjaan
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Konsultan Pengawas : CV. COZZY ERGITA
Minggu Ke : Minggu Ke 4
Periode 21 Juli 2021 s/d 27 Juli 2021

MINGGU LALU PROGRES MINGGU INI PROGRES S/D MINGGU INI


URAIAN PEKERJAAN
NO JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT
( Rp. ) PEK (%) ( Rp. ) PEK (%) ( Rp. ) PEK (%)

I PEKERJAAN GEDUNG KANTOR


A PEKERJAAN PERSIAPAN 2,000,000.00 0.09 0.00 0.00 2,000,000.00 0.09
LANTAI I
B PEKERJAAN TANAH 27,536,750.79 1.22 8,382,372.13 0.37 35,919,122.92 1.59
C PEKERJAAN PONDASI 6,142,500.00 0.27 6,142,500.00 0.11 8,599,500.00 0.38
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
F PEKERJAAN BETON 82,514,242.04 3.66 85,096,392.87 3.77 167,610,634.90 7.43
G PEKERJAAN KERAMIK LANTAI 1
H PEKERJAAN PLAFOND LANTAI 1
I PEKERJAAN INSTALASI LISTRIK
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
K PEKERJAAN SDP
L PEKERJAAN PANEL AC LANTAI 1
M PEKERJAAN SANITASI
N PEKERJAAN PENGECATAN
O PEKERJAAN LAIN - LAIN

II PEKERJAAN GEDUNG AULA


1 PEKERJAAN TANAH
2 PEKERJAAN PONDASI
3 PEKERJAAN BETON

III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI 1,300,000.00 0.06 0.00 0.00 1,300,000.00 0.06

IV PEKERJAAN PENCEGAHAN COVID-19 4,234,500.00 0.19 0.00 0.00 4,234,500.00 0.19


Total Sub Jumlah Harga 123,727,992.83 5.48 99,621,264.99 4.25 219,663,757.82 9.73
PPN 10 % 12,372,799.28 9,962,126.50 21,966,375.78
Total 136,100,792.11 109,583,391.49 241,630,133.61
Dibulatkan 136,100,790.00 109,583,000.00 241,630,000.00

RENCANA MENURUT TIME SCHEDULE MINGGU INI 15.01 %


PRESTASI PEKERJAAN MINGGU LALU 5.48 %
PRESTASI PEKERJAAN MINGGU INI 4.25 %
PRESTASI PEKERJAAN SAMPAI DENGAN MINGGU INI 9.73 %
DEVIASI ===> -5.28 %

Pekalongan , 27 Juli 2021


di periksa Oleh : dibuat Oleh :
Pejabat Pelaksana Teknik Kegiatan Kontraktor Pelaksana
(PPTK) CV. COZZY ERGITA

FANNY ARDIANSYAH, SE M.SAEFULLAH, ST


NIP. 198211 1720080 1 002 Pengawas Lapangan
6/30/2021
7/1/2021
7/2/2021
7/3/2021
7/4/2021
7/5/2021
7/6/2021 1
7/7/2021
7/8/2021
7/9/2021
7/10/2021
7/11/2021
7/12/2021
7/13/2021 2
7/14/2021
7/15/2021
7/16/2021
7/17/2021
7/18/2021
7/19/2021
7/20/2021 3
7/21/2021
7/22/2021
7/23/2021
7/24/2021
7/25/2021
7/26/2021
7/27/2021 4
7/28/2021
7/29/2021
7/30/2021
7/31/2021
8/1/2021
8/2/2021
8/3/2021 5
8/4/2021
8/5/2021
8/6/2021
8/7/2021
8/8/2021
8/9/2021
8/10/2021 6
8/11/2021
8/12/2021
8/13/2021
8/14/2021
8/15/2021
8/16/2021
8/17/2021 7
8/18/2021
8/19/2021
8/20/2021
8/21/2021
8/22/2021
8/23/2021
8/24/2021 8
8/25/2021
8/26/2021
8/27/2021
8/28/2021
8/29/2021
8/30/2021
8/31/2021 9
9/1/2021
9/2/2021
9/3/2021
9/4/2021
9/5/2021
9/6/2021
9/7/2021 10
9/8/2021
9/9/2021
9/10/2021
9/11/2021
9/12/2021
9/13/2021
9/14/2021 11
9/15/2021
9/16/2021
9/17/2021
9/18/2021
9/19/2021
9/20/2021
9/21/2021 12
9/22/2021
9/23/2021
9/24/2021
9/25/2021
9/26/2021
9/27/2021
9/28/2021 13
9/29/2021
9/30/2021
10/1/2021
10/2/2021
10/3/2021
10/4/2021
10/5/2021 14
10/6/2021
10/7/2021
10/8/2021
10/9/2021
10/10/2021
10/11/2021
10/12/2021 15
10/13/2021
10/14/2021
10/15/2021
10/16/2021
10/17/2021
10/18/2021
10/19/2021 16
10/20/2021
10/21/2021
10/22/2021
10/23/2021
10/24/2021
10/25/2021
10/26/2021 17
10/27/2021
10/28/2021
10/29/2021
10/30/2021
10/31/2021
11/1/2021
11/2/2021 18
11/3/2021
11/4/2021
11/5/2021
11/6/2021
11/7/2021
11/8/2021
11/9/2021 19
11/10/2021
11/11/2021
11/12/2021
11/13/2021
11/14/2021
11/15/2021
11/16/2021 20
11/17/2021
11/18/2021
11/19/2021
11/20/2021
11/21/2021
11/22/2021
11/23/2021 21
11/24/2021
11/25/2021
11/26/2021
11/27/2021
11/28/2021
11/29/2021
11/30/2021 22
12/1/2021
12/2/2021
12/3/2021
12/4/2021
12/5/2021
12/6/2021
12/7/2021 23
12/8/2021
12/9/2021

24
LAPORAN MINGGUAN

Kegiatan :

Pekerjaan : Pembangunan Gedung Kantor Kecamatan Pekalongan Timur

Lokasi : di jalan tondano, Kecamatan Pekalongan Timur

Tahun Anggaran : 2021

REALIS
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. JUMLAH HARGA ( Rp ) Bobot Prest Minggu Lalu
( Rp )
% Volume Jml Harga Bobot
I PEKERJAAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN
1 Pek. Uitzet Dan Pengukuran 1.00 ls 2,000,000.00 2,000,000.00 0.09 1.00 2,000,000.00 0.09
2 Pek. Papan Nama Proyek 1.00 ls 150,000.00 150,000.00 0.01 - - -
Sub Total 2,150,000.00 0.10 2,000,000.00 0.09
B PEKERJAAN TANAH
1 Pek. Galian tanah biasa 1 m 519.60 m3 66,650.00 34,631,340.00 1.53 363.72 24,241,938.00 1.07
2 Pek. Urugan tanah kembali bekas galian 291.55 m3 15,766.67 4,596,771.67 0.20 174.93 2,758,063.00 0.12
3 Pek. Pasir bawah pondasi dan lantai 81.92 m3 181,460.00 14,865,203.20 0.66 49.15 8,919,121.92 0.40
4 Pek. Urugan tanah baru padat 316.35 m3 61,060.00 19,316,331.00 0.86 - - -
5 Pek. Urugan Sirtu Kw. B baru padat 136.10 m3 178,450.00 24,287,045.00 1.08 - - -
Sub Total 97,696,690.87 4.33 35,919,122.92 1.59
C PEKERJAAN PONDASI
1 Pek. Pasangan batu kosong (anstamping) 41.14 m3 415,621.88 17,098,683.94 0.76 - - -
2 Pek. Pas. Batu kali 1ps 6 pp 226.26 m3 721,755.00 163,304,286.30 7.24 - - -
3 Pek.crucuk bambu 10 cm pj 1,5 m 819.00 m' 15,000.00 12,285,000.00 0.54 573.30 8,599,500.00 0.38
Sub Total 192,687,970.24 8.54 8,599,500.00 0.38
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
1 Pek. Pas.batu bata merah 1ps 6 pp tebal 1/2 bata 733.68 m2 113,245.88 83,086,233.57 3.68 - - -
2 Pek. Pasangan Plesteran 1 Pc 6 pp 1,467.36 m2 45,865.95 67,301,860.39 2.98 - - -
3 Pek. Acian 1,467.36 m2 26,273.00 38,551,949.28 1.71 - - -
4 Pek. Sponengan 434.00 m' 18,914.63 8,208,947.25 0.36 - - -
Sub Total 197,148,990.49 8.74 - -
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
1 Pek. Pintu Panel Type P1 & P1.b 10.00 Unit 3,500,000.00 35,000,000.00 1.55 - - -
2 Pek. Pintu Panel Type P1.a 4.00 Unit 3,500,000.00 14,000,000.00 0.62 - - -
3 Pek. Pintu Frameless Type P2.a 1.00 Unit 17,000,000.00 17,000,000.00 0.75 - - -
4 Pek. Pintu Kupu Tarung Type P2.b 3.00 Unit 7,500,000.00 22,500,000.00 1.00 - - -
5 Pek. Pintu Kupu Tarung Type P2.c 5.00 Unit 7,500,000.00 37,500,000.00 1.66 - - -
6 Pek. Jendela Type J2 3.00 Unit 2,200,000.00 6,600,000.00 0.29 - - -
7 Pek. Jendela Type J3 6.00 Unit 3,050,000.00 18,300,000.00 0.81 - - -
8 Pek. Jendela Type J2.a 1.00 Unit 2,200,000.00 2,200,000.00 0.10 - - -
9 Pek. Jendela Type J2.b 1.00 Unit 2,200,000.00 2,200,000.00 0.10 - - -
10 Pek. Jendela Type J3.a 2.00 Unit 3,050,000.00 6,100,000.00 0.27 - - -
11 Pek. Bouven Type BV1 7.00 Unit 700,000.00 4,900,000.00 0.22 - - -
12 Pek. Pasangan engsel Jendela kupu kupu 65.00 bh 7,500.00 487,500.00 0.02 - - -
13 Pek. Pasangan engsel pintu 12.00 bh 12,000.00 144,000.00 0.01 - - -
14 Pek. Pasangan kunci selot 6.00 bh 125,000.00 750,000.00 0.03 - - -
15 Pek. Pasangan rambuncis casement 6.00 bh 125,000.00 750,000.00 0.03 - - -
16 Pek. Pasang Kaca Bening 5 mm 37.59 m2 125,000.00 4,698,750.00 0.21 - - -
Sub Total 173,130,250.00 7.67 - -
F PEKERJAAN BETON
1 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 14.69 m2 163,658.00 2,404,136.02 0.11 - - -
Pembesian 814.49 kg 11,160.11 9,089,800.03 0.40 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.78 m3 954,042.05 3,606,278.96 0.16 - - -
2 Pek. Beton Bertulang Footplat 2,5 x 2,0 m
Bekisting 2x pakai 93.30 m2 163,658.00 15,269,291.40 0.68 65.31 10,688,503.98 0.47
Pembesian 12,877.15 kg 11,160.11 143,710,442.68 6.37 9,014.01 100,597,309.88 4.46
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 91.00 m3 954,042.05 86,817,826.75 3.85 54.60 52,090,696.05 2.31
3 Pek. Beton Bertulang Sloof 12/18
Bekisting 2x pakai 8.12 m2 120,658.00 979,742.96 0.04 - - -
Pembesian 256.55 kg 11,160.11 2,863,126.86 0.13 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 3.38 m3 954,042.05 3,224,662.14 0.14 - - -
4 Pek. Beton Bertulang Sloof Struktur 20/30
Bekisting 2x pakai 51.24 m2 120,658.00 6,182,515.92 0.27 - - -
Pembesian 2,453.20 kg 11,160.11 27,377,987.98 1.21 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 12.81 m3 954,042.05 12,221,278.69 0.54 - - -
5 Pek. Beton Bertulang Sloof Struktur 20/60
Bekisting 2x pakai 45.36 m2 120,658.00 5,473,046.88 0.24 - - -
Pembesian 1,936.19 kg 11,160.11 21,608,098.22 0.96 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.34 m3 954,042.05 10,818,836.87 0.48 - - -
6 Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,5cm (K1)
Bekisting 2x pakai 80.00 m2 178,175.88 14,254,070.00 0.63 - - -
Pembesian 5,790.56 kg 11,160.11 64,623,301.04 2.86 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 32.00 m3 954,042.05 30,529,345.67 1.35 - - -
7 Pek. Beton Bertulang Kolom Struktur 30 x 30 T = 4,5cm (K2)
Bekisting 2x pakai 14.40 m2 178,175.88 2,565,732.60 0.11 - - -
Pembesian 492.62 kg 11,160.11 5,497,694.62 0.24 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.16 m3 954,042.05 2,060,730.83 0.09 - - -
8 Pek. Kolom Praktis 15 x 15 (KP)
Bekisting 2x pakai 39.58 m2 155,439.63 6,152,300.36 0.27 - - -
Pembesian 645.13 kg 11,160.11 7,199,723.38 0.32 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 5.28 m3 954,042.05 5,037,342.04 0.22 - - -
9 Pek. Beton Bertulang Balok 35/70 (B1)
Bekisting 2x pakai 128.35 m2 184,625.88 23,696,731.06 1.05 - - -
Pembesian 8,221.72 kg 11,160.11 91,755,320.14 4.07 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 34.51 m3 954,042.05 32,923,991.22 1.46 - - -
10 Pek. Beton Bertulang Balok Induk 25 x 40 (B2)
Bekisting 2x pakai 69.40 m2 184,625.88 12,813,035.73 0.57 - - -
Pembesian 6,058.73 kg 11,160.11 67,616,108.41 3.00 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 11.99 m3 954,042.05 11,438,964.21 0.51 - - -
11 Pek. Beton Bertulang Balok 20/60 Talang Dak Aula Elv. + 4,00 m Bottom
Bekisting 2x pakai 13.80 m2 184,625.88 2,547,837.08 0.11 - - -
Pembesian 460.72 kg 11,160.11 5,141,687.03 0.23 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.69 m3 954,042.05 2,566,373.12 0.11 - - -
12 Pek. Beton Bertulang Balok Latiu 12/15 Elv. + 3,00 m
Bekisting 2x pakai 24.84 m2 184,625.88 4,586,106.74 0.20 - - -
Pembesian 292.87 kg 11,160.11 3,268,462.15 0.14 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.15 m3 954,042.05 1,097,148.36 0.05 - - -
13 Pek. Beton Plat Topi - topi tbl. 8 cm Elv. + 3,00 m
Bekisting 2x pakai 14.44 m2 184,625.88 2,665,997.64 0.12 - - -
Pembesian 108.12 kg 11,160.11 1,206,631.36 0.05 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.00 m3 954,042.05 954,042.05 0.04 - - -
14 Pek. Stek Besi Plat Beton Talang Aula
Pembesian 385.25 kg 36,160.11 13,930,683.34 0.62 - - -
15 Pek. Beton Bertulang Balok Anak 25/12
Pembesian 1,392.36 kg 11,160.11 15,538,894.24 0.69 - - -
16 Plat Lantai tebal 12 cm
Bondex 0,75 608.20 m2 145,000.00 88,189,000.00 3.91 - - -
Pembesian 10,253.44 kg 11,160.11 114,429,543.91 5.07 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 119.92 m3 954,042.05 114,408,722.91 5.07 - - -
17 Tangga Umum
Bekisting 2x pakai 21.15 m2 161,653.13 3,418,963.59 0.15 - - -
Pembesian 247.82 kg 11,160.11 2,765,699.08 0.12 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.12 m3 954,042.05 2,022,569.15 0.09 - - -
18 Lantai Beton Rabat bawah kramik fc=7,4 Mpa (K-100) 14.30 m3 779,478.09 11,146,536.71 0.49 - - -
19 Lantai kerja bawah Footplat (K-100) 7.76 m3 779,478.09 6,048,749.99 0.27 5.43 4,234,125.00 0.19
Sub Total 1,125,745,112.11 49.88 167,610,634.91 7.43
G PEKERJAAN KERAMIK LANTAI 1
1 Pek. Pasangan keramik 60 x 60 cm motif ex.platinum 426.04 m2 180,148.50 76,750,466.94 3.40 - - -
2 Pek. Lantai keramik 25x25 ASIA TILE (bagian toilet) 19.80 m2 176,727.42 3,499,202.92 0.16 - - -
3 Pek.Dinding keramik 25x40 ASIA TILE (bagian toilet) 56.00 m2 203,864.08 11,416,388.20 0.51 - - -
4 Pek.Keramik Dinding Motif Batik 6.00 m2 275,000.00 1,650,000.00 0.07 - - -
Sub Total 93,316,058.06 4.14 - -
H PEKERJAAN PLAFOND LANTAI 1
1 Pek. Pasang rangka Langit langit hollow 60 x 60 492.66 m2 43,102.13 21,234,692.90 0.94 - - -
2 Pek. Plafond Kalsiboard ex. Elephand 492.66 m2 37,232.63 18,343,025.03 0.81 - - -
3 Pekerjaan List Plafond Besar 397.00 m 25,558.13 10,146,575.63 0.45 - - -
Sub Total 49,724,293.56 2.20 - -
I PEKERJAAN INSTALASI LISTRIK
1 Pek. Penyambungan 1.00 unit 10,000,000.00 10,000,000.00 0.44 - - -
2 Pek. pasangan instalasi listrik titik lampu kabel NYM 2X2,5mm pipa counduit 74.00 titik 190,000.00 14,060,000.00 0.62 - - -
3 Pek. Lampu Panel LED kubus Slim (18 watt putih),Panasonic 10.00 bh 190,000.00 1,900,000.00 0.08 - - -
4 Pek.Lampu Downlight 25.00 bh 225,000.00 5,625,000.00 0.25 - - -
5 Pek. Pasangan saklar Ganda 16.00 bh 35,000.00 560,000.00 0.02 - - -
6 Pek. Pasangan stop kontak 15.00 bh 40,000.00 600,000.00 0.03 - - -
7 Pek.Lampu RMI (2 Lampu 18 watt) Philips 23.00 bh 350,000.00 8,050,000.00 0.36 - - -
8 Pek stang caping ,lampu SL 23 watt Philips 6.00 bh 35,000.00 210,000.00 0.01 - - -
9 Pek. Pasangan stop kontak AC 10.00 bh 90,000.00 900,000.00 0.04 - - -
Sub Total 41,905,000.00 1.86 - -
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
1 Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel Kontrol + Asesoris 1.00 unit 4,500,000.00 4,500,000.00 0.20 - - -
2 Pekerjaan Pasang MCB 6A/5KA 6.00 bh 155,000.00 930,000.00 0.04 - - -
3 Pekerjaan Pasang MCB 10A/5KA 10.00 bh 165,000.00 1,650,000.00 0.07 - - -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 750,000.00 750,000.00 0.03 - - -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 50,000.00 150,000.00 0.01 - - -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 - - -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 - - -
Sub Total 8,730,000.00 0.39 - -
K PEKERJAAN SDP
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 - - -
2 Pekerjaan Pasang MCB 20A/5KA 2.00 bh 725,000.00 1,450,000.00 0.06 - - -
3 Pekerjaan Pasang MCCB 20A/10KA 3Phase 2.00 bh 750,000.00 1,500,000.00 0.07 - - -
4 Pekerjaan Pasang MCCB 80A/10KA 3Phase 2.00 bh 1,500,000.00 3,000,000.00 0.13 - - -
5 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 - - -
6 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 - - -
7 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 - - -
Sub Total 9,950,000.00 0.44 - -
L PEKERJAAN PANEL AC LANTAI 1
1 Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + Asesoris 1.00 unit 2,500,000.00 2,500,000.00 0.11 - - -
2 Pekerjaan Pasang MCB 20A/10KA 10.00 bh 725,000.00 7,250,000.00 0.32 - - -
3 Pekerjaan Pasang MCCB 80A/10KA 3Phase 1.00 bh 1,500,000.00 1,500,000.00 0.07 - - -
4 Pekerjaan Pasang Pilot Lamp 3.00 bh 250,000.00 750,000.00 0.03 - - -
5 Pekerjaan Pasang Volt Meter 1.00 bh 250,000.00 250,000.00 0.01 - - -
6 Pekerjaan Intaslasi AC 10.00 bh 190,000.00 1,900,000.00 0.08 - - -
7 Pekerjaan Instalasi Pipa Refrigrant dan Draine 10.00 bh 500,000.00 5,000,000.00 0.22 - - -
8 Pekerjaan Pasang Petanahan 1.00 bh 500,000.00 500,000.00 0.02 - - -
Sub Total 19,650,000.00 0.87 - -
M PEKERJAAN SANITASI
1 Pek. Pasangan Kloset Duduk Porselen (setara TOTO) 4.00 bh 3,000,000.00 12,000,000.00 0.53 - - -
2 Pek. Pasang Jet washer 4.00 bh 100,000.00 400,000.00 0.02 - - -
3 Pek.Pasang Kran dapur (leher angsa) stenliststeel 1.00 bh 150,000.00 150,000.00 0.01 - - -
4 Pek. Pasangan kran air dia.3/4 4.00 bh 125,000.00 500,000.00 0.02 - - -
5 Pek. Pasangan floor drain 4.00 bh 55,000.00 220,000.00 0.01 - - -
6 Pek. Pasangan pipa PVC dia.4 25.00 m 71,783.13 1,794,578.13 0.08 - - -
7 Pek. Pasangan pipa pvc tipe aw dia.3/4 30.00 m 23,878.44 716,353.13 0.03 - - -
8 Pek. Sapitanck sederhana 2.00 unit 3,000,000.00 6,000,000.00 0.27 - - -
9 Pek. Peresapan Septitank 2.00 unit 1,000,000.00 2,000,000.00 0.09 - - -
10 Pek. Peresapan air Kotor 2.00 unit 1,000,000.00 2,000,000.00 0.09 - - -
11 Pek. Tandon Pinguin TB110 (isi 1050 lt +asesoris otomatis) 1.00 unit 1,500,000.00 1,500,000.00 0.07 - - -
Sub Total 27,280,931.25 1.21 - -
N PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan tembok lantai 1 1,467.36 m2 27,660.29 40,587,599.47 1.80 - - -
2 Pekerjaan Pengecatan plafond 492.66 m2 17,877.79 8,807,670.79 0.39 - - -
Sub Total 49,395,270.26 2.19 - -
O PEKERJAAN LAIN - LAIN
1 Pek. Pasang Galvalum Rangka Besi Hollow 4/6 Penutup Void Tangga L 2 18.00 m2 300,000.00 5,400,000.00 0.24 - - -
Sub Total 5,400,000.00 0.24 - -
PEKERJAAN GEDUNG AULA
A PEKERJAAN TANAH
1 Pek. Galian tanah biasa sedalam 1 m 28.86 m3 66,650.00 1,923,519.00 0.09 - - -
2 Pek. Pengurugan tanah kembali bekas galian 16.14 m3 15,766.67 254,474.00 0.01 - - -
3 Pek. Pengurugan Tanah Baru Padat 154.35 m3 61,060.00 9,424,611.00 0.42 - - -
4 Pek. Pengurugan Sirtu padat kelas B 46.30 m3 178,450.00 8,262,235.00 0.37 - - -
5 Pek. Urugan pasir bawah pondasi dan lantai 17.25 m3 181,460.00 3,130,185.00 0.14 - - -
6 Pek. Cerucuk bambu 8-10 cm 187.50 m 15,000.00 2,812,500.00 0.12 - - -
Sub Total 25,807,524.00 1.14 - -
B PEKERJAAN PONDASI
1 Pek. Pasangan pondasi batu kosong/ Aanstamping 5.62 m3 415,621.88 2,335,794.94 0.10 - - -
2 Pek. Pasangan pondasi batu kali 16 15.24 m3 721,755.00 10,999,546.20 0.49 - - -
Sub Total 13,335,341.14 0.59 - -
C PEKERJAAN BETON
1 Pek. Lantai Kerja K.100 12.73 m3 779,478.09 9,922,756.11 0.44 - - -
2 Pek. Beton Bertulang Footplate 1,2 x 1,2 m
Bekisting 2x pakai 11.52 m2 163,658.00 1,885,340.16 0.08 - - -
Pembesian 573.30 kg 11,160.11 6,398,092.50 0.28 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 4.37 m3 954,042.05 4,169,163.77 0.18 - - -
3 Pek. Sloof 15/20
Bekisting 2x pakai 27.16 m2 120,658.00 3,277,071.28 0.15 - - -
Pembesian 363.67 kg 11,160.11 4,058,598.11 0.18 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.03 m3 954,042.05 1,936,705.37 0.09 - - -
4 Pek. Kolom 30/30
Bekisting 2x pakai 55.21 m2 178,175.88 9,837,090.06 0.44 - - -
Pembesian 1,205.31 kg 11,160.11 13,451,395.20 0.60 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 6.26 m3 954,042.05 5,972,303.25 0.26 - - -
5 Pek. Kolom Praktis 12/12
Bekisting 2x pakai 11.28 m2 155,439.63 1,753,358.97 0.08 - - -
Pembesian 279.47 kg 11,160.11 3,118,916.64 0.14 - - -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 0.79 m3 954,042.05 753,693.22 0.03 - - -
6 Pek. Balok 15/25 Elv. + 3,00 m
Bekisting 2x pakai 5.72 m2 184,625.88 1,056,060.01 0.05 - - -
Pembesian 105.33 kg 11,160.11 1,175,494.65 0.05 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 0.26 m3 954,042.05 248,050.93 0.01 - - -
7 Pek. Balok 20/25 Elv. +3,00 m
Bekisting 2x pakai 29.12 m2 184,625.88 5,376,305.48 0.24 - - -
Pembesian 510.14 kg 11,160.11 5,693,219.79 0.25 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 2.08 m3 954,042.05 1,984,407.47 0.09 - - -
8 Pek. Balok 20/35 Elv. + 4,00 m
Bekisting 2x pakai 18.36 m2 184,625.88 3,389,731.07 0.15 - - -
Pembesian 472.22 kg 11,160.11 5,270,028.32 0.23 - - -
Beton mutu fc = 19,3 MPa, slump (120 20) mm K.225 1.43 m3 954,042.05 1,364,280.13 0.06 - - -
9 Pek. Balok Konsol Elv. Top + 4,00 m
Pembesian 199.53 kg 11,160.11 2,226,777.25 0.10 - - -
10 Pek. Plat Beton Topi-topi Elv. + 3,00 m
Bekisting 2x pakai 39.64 m2 184,625.88 7,318,569.69 0.32 - - -
Pembesian 422.92 kg 11,160.11 4,719,834.78 0.21 - - -
Beton mutu fc = 14,5 Mpa , slump (120 20) mm K175 2.88 m3 954,042.05 2,747,641.11 0.12 - - -
Sub Total 109,104,885.30 4.83 - -
III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK 1.00 ls 300,000.00 300,000.00 0.01 1.00 300,000.00 0.01
2 Asuransi dan perijinan 1.00 ls 1,000,000.00 1,000,000.00 0.04 1.00 1,000,000.00 0.04
Sub Total 1,300,000.00 0.06 1,300,000.00 0.06
IV PEKERJAAN PENCEGAHAN COVID-19
1 Alat Pelindung Kerja dan Pelindung Diri 1.00 ls 7,695,000.00 7,695,000.00 0.34 0.30 2,308,500.00 0.10
2 Personil Keselamatan Konstruksi 1.00 ls 3,000,000.00 3,000,000.00 0.13 0.30 900,000.00 0.04
3 Fasilitas sarana, Prasarana dan Alat kesehatan 1.00 ls 2,565,000.00 2,565,000.00 0.11 0.40 1,026,000.00 0.05
( Termasuk Protokol Kesehatan Penanganan COVID 19 )
Sub Total 13,260,000.00 0.59 4,234,500.00 0.19
Jumlah Biaya Konstruksi 2,256,718,317.27 100.00 219,663,757.83 9.73
PPN 10 % 225,671,831.73 21,966,375.78
Jumlah Total 2,482,390,149.00 241,630,133.61
Dibulatkan 2,482,390,000.00 241,630,000.00

Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan 0.9
(PPTK) 31.59 11.7
78
109.59 11.7 121.29
39.00
FANNY ARDIANSYAH, SE 1.29
NIP. 198211 1720080 1 002
PERIODE : Minggu Ke 5

MINGGU KE : 5 (LIMA)

TANGGAL 28 Juli 2021 s/d 03 Agustus 2021

REALISASI
Prest Minggu ini Prest Komulatif KETERANGAN
Volume Jml Harga Bobot Volume Jml Harga Bobot

- - - 1.00 2,000,000.00 0.09


1.00 150,000.00 0.01 1.00 150,000.00 0.01
150,000.00 0.01 2,150,000.00 0.10

136.33 9,086,394.50 0.40 500.05 33,328,332.50 1.48


50.12 790,225.33 0.04 225.05 3,548,288.33 0.16
29.32 5,320,407.20 0.24 78.47 14,239,529.12 0.63
- - - - - -
- - - - - -
15,197,027.03 0.67 51,116,149.95 2.27

11.17 4,642,496.34 0.21 11.17 4,642,496.34 0.21


109.99 79,385,832.45 3.52 109.99 79,385,832.45 3.52
155.70 2,335,500.00 0.10 729.00 10,935,000.00 0.48
86,363,828.79 3.83 94,963,328.79 4.21

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
14.69 2,404,136.02 0.11 14.69 2,404,136.02 0.11
814.49 9,089,800.03 0.40 814.49 9,089,800.03 0.40
3.78 3,606,278.96 0.16 3.78 3,606,278.96 0.16

25.19 4,122,708.68 0.18 90.50 14,811,212.66 0.66


3,863.15 43,113,132.80 1.91 12,877.15 143,710,442.68 6.37
33.67 32,122,595.90 1.42 88.27 84,213,291.95 3.73

- - - - - -
- - - - - -
- - - - - -
-
- - - - - -
817.74 9,126,070.40 0.40 817.74 9,126,070.40 0.40
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.81 629,818.30 0.03 6.24 4,863,943.29 0.22
104,214,541.08 4.62 271,825,175.99 12.05

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -

- - - - - -
- - - - - -
- - - - - -
- - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -

- - - - - -
- - - - - -
- - - -

- - - - - -
- - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -
- - - - - -
- - - - - -
- - - -

- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - -
- - - 1.00 300,000.00 0.01
- - - 1.00 1,000,000.00 0.04
- - 1,300,000.00 0.06

- - - 0.30 2,308,500.00 0.10


- - - 0.30 900,000.00 0.04
- - - 0.40 1,026,000.00 0.05

- - 4,234,500.00 0.19
205,925,396.91 9.12 425,589,154.73 18.86
20,592,539.69 42,558,915.47
226,517,936.60 468,148,070.21
226,517,000.00 468,148,000.00

Pekalongan, 3 Agustus 2021


dibuat Oleh :
Konsultan Pengawas
CV. COZZY ERGITA

M.SAEFULLAH, ST
Pengawas Lapangan
REKAPITULASI LAPORAN MINGGUAN

Kegiatan
Pekerjaan : Pembangunan Gedung Kantor Kecamatan Pekalongan Timur
Lokasi : di jalan tondano, Kecamatan Pekalongan Timur
Konsultan Pengawas : CV. COZZY ERGITA
Minggu Ke : Minggu Ke 5
Periode 28 Juli 2021 s/d 03 Agustus 2021

MINGGU LALU PROGRES MINGGU INI PROGRES S/D MINGGU INI


URAIAN PEKERJAAN
NO JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT JUMLAH BIAYA BOBOT
( Rp. ) PEK (%) ( Rp. ) PEK (%) ( Rp. ) PEK (%)

I PEKERJAAN GEDUNG KANTOR


A PEKERJAAN PERSIAPAN 2,000,000.00 0.09 0.00 0.00 2,150,000.00 0.10
LANTAI I
B PEKERJAAN TANAH 35,919,122.92 1.59 15,197,027.03 0.67 51,116,149.95 2.27
C PEKERJAAN PONDASI 8,599,500.00 0.38 86,363,828.79 3.83 94,963,328.79 4.21
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
F PEKERJAAN BETON 167,610,634.91 7.43 104,214,541.08 4.62 271,825,175.99 12.05
G PEKERJAAN KERAMIK LANTAI 1
H PEKERJAAN PLAFOND LANTAI 1
I PEKERJAAN INSTALASI LISTRIK
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
K PEKERJAAN SDP
L PEKERJAAN PANEL AC LANTAI 1
M PEKERJAAN SANITASI
N PEKERJAAN PENGECATAN
O PEKERJAAN LAIN - LAIN

II PEKERJAAN GEDUNG AULA


1 PEKERJAAN TANAH
2 PEKERJAAN PONDASI
3 PEKERJAAN BETON

III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI 1,300,000.00 0.06 0.00 0.00 1,300,000.00 0.06

IV PEKERJAAN PENCEGAHAN COVID-19 4,234,500.00 0.19 0.00 0.00 4,234,500.00 0.19


Total Sub Jumlah Harga 219,663,757.83 9.73 205,775,396.91 9.12 425,589,154.73 18.86
PPN 10 % 21,966,375.78 20,577,539.69 42,558,915.47
Total 241,630,133.61 226,352,936.60 468,148,070.21
Dibulatkan 241,630,130.00 226,352,000.00 468,148,000.00

RENCANA MENURUT TIME SCHEDULE MINGGU INI 22.54 %


PRESTASI PEKERJAAN MINGGU LALU 9.73 %
PRESTASI PEKERJAAN MINGGU INI 9.12 %
PRESTASI PEKERJAAN SAMPAI DENGAN MINGGU INI 18.86 %
DEVIASI ===> -3.68 %

Pekalongan , 03 Agustus 2021


di periksa Oleh : dibuat Oleh :
Pejabat Pelaksana Teknik Kegiatan Kontraktor Pelaksana
(PPTK) CV. COZZY ERGITA

FANNY ARDIANSYAH, SE M.SAEFULLAH, ST


NIP. 198211 1720080 1 002 Pengawas Lapangan
KEGIATAN :
PEKERJAAN : Pembangunan Gedung Kantor Kecamatan Pekalongan Timur
LOKASI : di jalan tondano, Kecamatan Pekalongan Timur
TH. ANGGARAN : 2021

NO. JENIS PEKERJAAN

I PEKERJAAN GEDUNG KANTOR


A PEKERJAAN PERSIAPAN
LANTAI I
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1
E PEKERJAAN PASANGAN KUSEN DAN DAUN JENDELA UPVC LT.1
F PEKERJAAN BETON
G PEKERJAAN KERAMIK LANTAI 1
H PEKERJAAN PLAFOND LANTAI 1
I PEKERJAAN INSTALASI LISTRIK
J PEKERJAAN PENERANGAN - BUSBAR, KABEL KONTROL, ASESORIS
K PEKERJAAN SDP
L PEKERJAAN PANEL AC LANTAI 1
M PEKERJAAN SANITASI
N PEKERJAAN PENGECATAN
O PEKERJAAN LAIN - LAIN

II PEKERJAAN GEDUNG AULA


1 PEKERJAAN TANAH
2 PEKERJAAN PONDASI
3 PEKERJAAN BETON

III PEKERJAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI

IV PEKERJAAN PENCEGAHAN COVID-19

Jumlah Biaya Konstruksi


PPN 10 %
Jumlah Total
Dibulatkan
Progres Rencana Per minggu
Komulatif Progres Rencana
Progres Realisasi Per minggu
Komulatif Progres Realisasi
Deviasi
Keterangan

Diperiksa Oleh :
Pejabat Pelaksana Teknik Kegiatan
(PPTK)

FANNY ARDIANSYAH, SE
NIP. 198211 1720080 1 002
TIME SCHEDULE ( JADWAL

BOBOT
JUMLAH HARGA (Rp)
% 1 2 3 4 5

2,365,000.00 0.095 0.05 0.05

107,466,359.95 4.329 0.62 0.62 0.62


211,956,767.26 8.538 2.13 2.13
216,863,889.54 8.736
190,443,275.00 7.672
1,238,319,623.33 49.884 4.99 4.99 4.99
102,647,663.86 4.135
54,696,722.92 2.203
46,095,500.00 1.857
9,603,000.00 0.387
10,945,000.00 0.441
21,615,000.00 0.871
30,009,024.38 1.209
54,334,797.28 2.189
5,940,000.00 0.239

28,388,276.40 1.144 0.23 0.23 0.23 0.23


14,668,875.25 0.591 0.15 0.15
120,015,373.83 4.835

1,430,000.00 0.058 0.003 0.003 0.003 0.003 0.003

14,586,000.00 0.588 0.03 0.03 0.03 0.03 0.03

2,482,390,149.00 100.00
248,239,014.90
2,730,629,163.90
2,730,629,000.00
0.08 0.92 5.86 8.15 7.53
0 0.08 1.00 6.87 15.01 22.54
0.75 0.38 4.35 4.25 9.12
0 0.75 1.13 5.48 9.73 18.86
0.67 0.13 -1.38 -5.28 -3.68
Mendahului Mendahului Terlambat Terlambat Terlambat
CHEDULE ( JADWAL WAKTU PELAKSANAAN)

WAKTU PELAKSANAAN
MINGGU KE
6 7 8 9 10 11 12 13

0.62 0.62 0.62 0.62


2.13 2.13
1.25 1.25 1.25 1.25 1.25 1.25

4.99 4.99 4.99 4.99 4.99 4.99 4.99


1.03
0.44 0.44 0.44
0.37 0.37

0.23
0.15 0.15
0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03


8.01 8.40 7.37 7.37 7.37 7.19 7.56 3.61
30.55 38.96 46.32 53.69 61.06 68.25 75.81 79.42
PERIODE : Minggu Ke 5
MINGGU KE : : 5 (LIMA)
TANGGAL : 28 Juli 2021 s/d

14 15 16 17 18 19 20 21

1.25
1.28 1.28 1.28 1.28 1.28 1.28

1.03 1.03 1.03


0.44 0.44
0.37 0.37 0.37
0.13 0.13 0.13
0.22 0.22
0.22 0.22 0.22 0.22
0.30 0.30 0.30 0.30
0.36 0.36 0.36 0.36 0.36
0.12 0.12

0.48 0.48

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03


4.51 3.94 2.64 2.56 2.78 2.24 0.86 0.64
83.93 87.87 90.51 93.08 95.86 98.10 98.96 99.61

Pekalongan, 03 Agustus 2021


Dibuat Oleh :
Konsultan Pengawas
CV. COZZY ERGITA

M.SAEFULLAH, ST
Pengawas Lapangan
03 Agustus 2021

KETERANGAN
22

100

90

80

70

60

0.36
50

40

30

0.003

20
0.03

10

0
10

0
0.39
100.00

3 Agustus 2021

ultan Pengawas
COZZY ERGITA