DAFTAR HARGA SATUAN PEKERJAAN

TAHUN 2022

KODE JENIS PEKERJAAN JUMLAH HARGA


Rp

a b c

HARGA SATUAN PEKERJAAN PERSIAPAN


Rp - Rp - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

HARGA SATUAN PEKERJAAN TANAH


Rp - Rp - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

HARGA SATUAN PEKERJAAN PONDASI


Rp - Rp - -
Rp - Rp - -

HARGA SATUAN PEKERJAAN DINDING


Rp - Rp - -
Rp - Rp - -
Rp - Rp - -
Rp - Rp - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

Analisa Harga Satuan Pekerjaan Perencanaan Pembangunan Gedung Kantor Pengadilan Agama Tais 1
KODE JENIS PEKERJAAN JUMLAH HARGA
Rp

a b c
HARGA SATUAN PEKERJAAN BETON
Rp - Rp - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 0% -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP


0 Rp - -
0 Rp - -
0 Rp - -
0 Rp - -
0 Rp - -

ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT


0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -

ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI


0 Rp - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -

ANALISA BIAYA KONSTRUKSI PEKERJAAN SITE


0 Rp - -
0 - -
0 - -

Analisa Harga Satuan Pekerjaan Perencanaan Pembangunan Gedung Kantor Pengadilan Agama Tais 2
KODE JENIS PEKERJAAN JUMLAH HARGA
Rp

a b c
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -

ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMUNIUM


0 Rp - -
0 Rp - -
0 Rp - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -

ANALISA BIAYA KONSTRUKSI PEKERJAAN KUSEN


0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
Rp - - -
0 - -
0 - -
- - -
- - -
0 - -

ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA


L.1 Rp - -
L.2 - -
L.3 - -
L.4 - -
L.5 - -
L.6 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI


0 Rp - -
0 Rp - -

Analisa Harga Satuan Pekerjaan Perencanaan Pembangunan Gedung Kantor Pengadilan Agama Tais 3
KODE JENIS PEKERJAAN JUMLAH HARGA
Rp

a b c
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN


N.1 Rp - -
N.3 - -
0 - -
0 - -
N.5 - -

Analisa Harga Satuan Pekerjaan Perencanaan Pembangunan Gedung Kantor Pengadilan Agama Tais 4
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : PEMBANGUNAN GEDUNG PENGADILAN AGAMA BINTUHAN
LOKASI : KABUPATEN KAUR, PROVINSI BENGKULU
TAHUN : 2022

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE)


II.1. PEKERJAAN PONDASI FOOTPLATE
II.2. PEKERJAAN TIE BEAM

III. PEKERJAAN STRUKTUR ATAS (UPPER STRUCTURE)


III.1. STRUKTUR LANTAI SATU
III.2. STRUKTUR LANTAI DUA
III.3. STRUKTUR LANTAI ATAP

IV. PEKERJAAN ARSITEKTUR


IV.1. PEKERJAAN PASANGAN DAN PLESTERAN
IV.2. PEKERJAAN KAYU,BESI,KACA,KUSEN, DAUN PINTU & JENDELA
IV.3. PEKERJAAN PLAFOND
IV.4. PEKERJAAN PELAPIS LANTAI & DINDING
IV.5. PEKERJAAN SANITAIR
IV.6. PEKERJAAN CAT, FINISHING DINDING, DAN WATERPROOFING
IV.7. PEKERJAAN FASADE DAN TAMPAK

V. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


V.1. PEKERJAAN ELEKTRIKAL
V.2. PEKERJAAN MEKANIKAL
V.3. PEKERJAAN ELEKTRONIK

VI. PEKERJAAN INFRASTRUKTUR DAN BANGUNAN PENDUKUNG


VI.1. PEKERJAAN LANSEKAP DAN BANGUNAN PENDUKUNG
VI.2. PEKERJAAN INTERIOR MELEKAT BANGUNAN
VI.3. PEKERJAAN JEMBATAN
VI.4. PEKERJAAN SALURAN DRAINASE

JUMLAH Rp -
BIAYA PENYAMBUNGAN DAYA LISTRIK Rp -
BIAYA PENYAMBUNGAN TELEFON DAN INTERNET Rp -
JUMLAH TOTAL Rp -
PPN 11 % Rp -
JUMLAH Rp -
DIBULATKAN Rp -
TERBILANG :
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : PEMBANGUNAN GEDUNG PENGADILAN AGAMA BINTUHAN
LOKASI : KABUPATEN KAUR, PROVINSI BENGKULU
TAHUN : 2022

HARGA SATUAN JUMLAH HARGA JUMLAH


NO. URAIAN PEKERJAAN VOLUME
(Rp.) (Rp.) (Rp.)
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Pembuatan papan nama proyek 1 x 1,2 m 1.00 Bh
2 Pembuatan direksikeet 12.00 M2 Rp 1,750,000.00 Rp 21,000,000.00
3 Pekerjaan cut and fill (gali) 3,897.00 M3 Rp 65,000.00 Rp 253,305,000.00
4 Pekerjaan cut and fill (urug) 1,694.00 M3 Rp 65,000.00 Rp 110,110,000.00
5 Pengukuran dan pemasangan bouwplank 114.00 M1 Rp 150,000.00 Rp 17,100,000.00
6 Administrasi dan Dokumentasi Proyek 1.00 Ls
7 Kesehatan dan Keselamatan Kerja (K3)
1 Penyiapan R3K
a pembuatan manual, prosedur, instruksi kerja, ijin kerja 1.00 Ls
2 Sosialisasi dan Promosi K3
a Safety Induction 1.00 Ls
b Pelatihan K3 1.00 Ls
c Simulasi K3 1.00 Ls
d Spanduk (Banner) 1.00 Ls
e Poster 1.00 Ls
f Papan Informasi K3 1.00 Ls
3 Alat Pelindung Kerja
a Jaring Pengaman 1.00 Ls
b Tali Keselamatan 1.00 Ls
c Penahan Jatuh 1.00 Ls
d Pagar Pengaman 1.00 Ls
e Pembatas Area 1.00 Ls
4 Alat Pelindung Diri (APD)
a Topi Pelindung 50.00 Bh
b Pelindung Mata 20.00 Bh
c Pelindung Telinga 15.00 Psg
d Sarung Tangan 50.00 Psg
e Sepatu Keselamatan untuk staff 5.00 Psg
f Sepatu Keselamatan untuk pekerja 50.00 Psg
g Pelindung Covid-19 1.00 Ls
5 Asuransi dan Perijinan
a BPJS Ketenagakerjaan 1.00 Ls
b Surat Ijin Kelayakan Alat 1.00 Ls
6 Personil K3
a Safety Officer 8.00 OB
b Ass. Safety Officer 8.00 OB
7 Fasiltias dan Sarana Kesehatan
a Peralatan P3K 1.00 Ls
b Fogging 1.00 Ls
c Obat Pengasapan 8.00 Kali
Rambu-rambu K3 (Petunjuk, larangan, kewajiban,
8 1.00 Ls
peringatan, informasi)
9 Pengendalian Risiko K3
a APAR (5 Kg) 1.00 Bh
b Sirine 1.00 Bh
c Bendera K3 2.00 Bh
Rp 401,515,000.00
JUMLAH PEKERJAAN PERSIAPAN Rp 401,515,000.00
JUMLAH TOTAL PEKERJAAN PERSIAPAN Rp 401,515,000.00
II. PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE)
II.1. PEKERJAAN PONDASI FOOTPLATE
1 Galian tanah Footplate 197.56 M3 Rp 90,000.00 Rp 17,780,175.00
2 Urugan Tanah Kembali Footplate 65.85 M3 Rp 50,000.00 Rp 3,292,625.00
3 Urugan Pasir Bawah Pile Cap t = 10 cm 26.34 M3 Rp 35,000.00 Rp 921,935.00
4 Lantai Kerja Pile Cap t = 5 cm 13.17 M3 Rp 650,000.00 Rp 8,560,825.00
5 Footplate Type F1 Rp -
a Beton K.300 48.67 M3 Rp 200,000.00 Rp 9,734,400.00
b Begisting 74.88 M2 Rp 80,000.00 Rp 5,990,400.00
c Pembesian 4,422.54 Kg Rp 3,500.00 Rp 15,478,888.32
6 Footplate Type F2 Rp -
a Beton K.300 107.92 M3 Rp 200,000.00 Rp 21,583,200.00
b Begisting 187.68 M2 Rp 80,000.00 Rp 15,014,400.00
c Pembesian 11,289.88 Kg Rp 3,500.00 Rp 39,514,587.84
7 Footplate Type U1 Rp -
a Beton K.300 1.46 M3 Rp 200,000.00 Rp 291,600.00
b Begisting 6.48 M2 Rp 80,000.00 Rp 518,400.00
c Pembesian 125.92 Kg Rp 3,500.00 Rp 440,735.40
Rp 139,122,171.56
JUMLAH PEKERJAAN PILE CAP Rp 139,122,171.56
II.2. PEKERJAAN TIE BEAM
1 Galian tanah Tie Beam 57.92 M3 Rp 90,000.00 Rp 5,212,350.00
2 Urugan Tanah Kembali 19.31 M3 Rp 50,000.00 Rp 965,250.00
3 Lantai Kerja Tie Beam t = 5 cm 6.44 M3 Rp 650,000.00 Rp 4,182,750.00
4 Tie Beam TB 30x40 Rp -
a Beton K.300 51.48 M3 Rp 200,000.00 Rp 10,296,000.00
b Begisting 343.20 M2 Rp 80,000.00 Rp 27,456,000.00
c Pembesian 6,257.56 Kg Rp 3,500.00 Rp 21,901,464.59
Rp 70,013,814.59
JUMLAH PEKERJAAN SLOOF Rp 70,013,814.59
JUMLAH TOTAL PEKERJAAN STRUKTUR BAWAH Rp 209,135,986.15

III. PEKERJAAN STRUKTUR ATAS (UPPER STRUCTURE)


III.1. STRUKTUR LANTAI SATU
1 Rabat Lantai 1 10cm
a Beton K.300 109.00 M3 Rp 200,000.00 Rp 21,800,000.00
c Pembesian 13,080.00 Kg Rp 3,500.00 Rp 45,780,000.00
2 Kolom K0 60x60 Rp -
a Beton K.300 23.33 M3 Rp 200,000.00 Rp 4,665,600.00
b Begisting 2x pakai 155.52 M2 Rp 80,000.00 Rp 12,441,600.00
c Pembesian 3,815.95 Kg Rp 3,500.00 Rp 13,355,816.54
3 Kolom K1 50x50 Rp -
a Beton K.300 45.90 M3 Rp 200,000.00 Rp 9,180,000.00
b Begisting 2x pakai 367.20 M2 Rp 80,000.00 Rp 29,376,000.00
c Pembesian 8,258.30 Kg Rp 3,500.00 Rp 28,904,045.18
4 Kolom KP 30x30 Rp -
a Beton K.300 1.15 M3 Rp 200,000.00 Rp 229,022.10
b Begisting 2x pakai 19.44 M2 Rp 80,000.00 Rp 1,555,200.00
c Pembesian 370.24 Kg Rp 3,500.00 Rp 1,295,829.97
5 Kolom KP 2 13x13 Rp -
a Beton K.300 5.95 M3 Rp 200,000.00 Rp 1,189,812.24
b Begisting 2x pakai 233.06 M2 Rp 80,000.00 Rp 18,645,120.00
c Pembesian 1,219.93 Kg Rp 3,500.00 Rp 4,269,747.55
6 Balok B0 35x70 Rp -
a Beton K.300 21.56 M3 Rp 200,000.00 Rp 4,312,000.00
b Begisting 2x pakai 123.20 M2 Rp 197,500.00 Rp 24,332,000.00
c Pembesian 8,357.85 Kg Rp 3,500.00 Rp 29,252,461.39
7 Balok B1 30x50 Rp -
a Beton K.300 63.63 M3 Rp 200,000.00 Rp 12,726,000.00
b Begisting 2x pakai 466.62 M2 Rp 197,500.00 Rp 92,157,450.00
c Pembesian 15,712.08 Kg Rp 3,500.00 Rp 54,992,278.40
8 Balok BA 25x40 Rp -
a Beton K.300 23.60 M3 Rp 200,000.00 Rp 4,720,000.00
b Begisting 2x pakai 212.40 M2 Rp 197,500.00 Rp 41,949,000.00
c Pembesian 5,026.82 Kg Rp 3,500.00 Rp 17,593,861.95
9 Balok BC1 30x50 Rp -
a Beton K.300 1.88 M3 Rp 200,000.00 Rp 375,000.00
b Begisting 2x pakai 16.25 M2 Rp 197,500.00 Rp 3,209,375.00
c Pembesian 485.49 Kg Rp 3,500.00 Rp 1,699,228.13
10 Balok BL 20x50 Rp -
a Beton K.300 5.00 M3 Rp 200,000.00 Rp 1,000,000.00
b Begisting 2x pakai 60.00 M2 Rp 197,500.00 Rp 11,850,000.00
c Pembesian 1,371.71 Kg Rp 3,500.00 Rp 4,800,993.75
11 Tangga Utama Rp -
a Beton K.300 2.42 M3 Rp 200,000.00 Rp 484,400.00
b Begisting 2x pakai 19.34 M2 Rp 80,000.00 Rp 1,547,200.00
c Pembesian 307.44 Kg Rp 3,500.00 Rp 1,076,040.00
12 Tangga Belakang Rp -
a Beton K.300 2.45 M3 Rp 200,000.00 Rp 490,000.00
b Begisting 2x pakai 21.08 M2 Rp 80,000.00 Rp 1,686,400.00
c Pembesian 446.40 Kg Rp 3,500.00 Rp 1,562,400.00
Rp 504,503,882.21
JUMLAH PEKERJAAN LANTAI SATU Rp 504,503,882.21
III.2. STRUKTUR LANTAI DUA
1 Pelat Lantai 2
a Beton K.300 118.97 M3 Rp 200,000.00 Rp 23,793,000.00
b Begisting 2x pakai 951.72 M2 Rp 197,500.00 Rp 187,964,700.00
c Pembesian 14,275.80 Kg Rp 3,500.00 Rp 49,965,300.00
2 Kolom K0 60x60 Rp -
a Beton K.300 18.14 M3 Rp 200,000.00 Rp 3,628,800.00
b Begisting 2x pakai 120.96 M2 Rp 80,000.00 Rp 9,676,800.00
c Pembesian 2,967.96 Kg Rp 3,500.00 Rp 10,387,857.31
3 Kolom K1 50x50 Rp -
a Beton K.300 29.40 M3 Rp 200,000.00 Rp 5,880,000.00
b Begisting 2x pakai 235.20 M2 Rp 80,000.00 Rp 18,816,000.00
c Pembesian 5,289.63 Kg Rp 3,500.00 Rp 18,513,702.14
4 Kolom KP1 30x30 Rp -
a Beton K.300 5.95 M3 Rp 200,000.00 Rp 1,189,812.24
b Begisting 2x pakai 233.06 M2 Rp 80,000.00 Rp 18,645,120.00
c Pembesian 1,219.93 Kg Rp 3,500.00 Rp 4,269,747.55
5 Kolom KP2 13x13 Rp -
a Beton K.300 4.74 M3 Rp 200,000.00 Rp 947,708.55
b Begisting 2x pakai 185.64 M2 Rp 80,000.00 Rp 14,851,200.00
c Pembesian 971.70 Kg Rp 3,500.00 Rp 3,400,936.80
6 Ring Balk RB0 30x50 Rp -
a Beton K.300 10.80 M3 Rp 200,000.00 Rp 2,160,000.00
b Begisting 2x pakai 93.60 M2 Rp 80,000.00 Rp 7,488,000.00
c Pembesian 1,960.62 Kg Rp 3,500.00 Rp 6,862,162.86
7 Ring Balk RB1 25x40 Rp -
a Beton K.300 36.44 M3 Rp 200,000.00 Rp 7,288,000.00
b Begisting 2x pakai 382.62 M2 Rp 80,000.00 Rp 30,609,600.00
c Pembesian 8,225.28 Kg Rp 3,500.00 Rp 28,788,481.85
Rp 455,126,929.30
JUMLAH PEKERJAAN LANTAI DUA Rp 455,126,929.30
III.3. STRUKTUR LANTAI ATAP
1 Pelat Dak
a Beton K.300 25.07 M3 Rp 200,000.00 Rp 5,013,200.00
b Begisting 2x pakai 200.53 M2 Rp 165,000.00 Rp 33,087,120.00
c Pembesian 3,007.92 Kg Rp 3,500.00 Rp 10,527,720.00
2 Pelat Lisplang Beton
a Beton K.300 20.48 M3 Rp 200,000.00 Rp 4,095,000.00
b Begisting 2x pakai 163.80 M2 Rp 165,000.00 Rp 27,027,000.00
c Pembesian 2,457.00 Kg Rp 3,500.00 Rp 8,599,500.00
3 Kuda-Kuda Baja
Kuda-Kuda K-1
a WF 250x25x6x9 5,300.77 Kg Rp 7,000.00 Rp 37,105,376.00
b Pelat Stiffner t=10mm 891.52 Kg Rp 7,000.00 Rp 6,240,607.76
c Base Plate t=10mm 279.77 Kg Rp 7,000.00 Rp 1,958,418.00
d Angkur, D22 L=40cm 176.00 bh Rp 15,000.00 Rp 2,640,000.00
e Baut D16 462.00 bh Rp 15,000.00 Rp 6,930,000.00
Kuda-Kuda KU-1
a WF 250x25x6x9 1,873.09 Kg Rp 7,000.00 Rp 13,111,616.00
b Pelat Stiffner t=10mm 324.19 Kg Rp 7,000.00 Rp 2,269,311.91
c Base Plate t=10mm 101.74 Kg Rp 7,000.00 Rp 712,152.00
d Angkur, D22 L=40cm 16.00 bh Rp 15,000.00 Rp 240,000.00
e Baut D16 56.00 bh Rp 15,000.00 Rp 840,000.00
Kuda-Kuda K-1/2
a WF 250x25x6x9 937.14 Kg Rp 7,000.00 Rp 6,559,952.00
b Pelat Stiffner t=10mm 162.09 Kg Rp 7,000.00 Rp 1,134,655.96
c Base Plate t=10mm 67.82 Kg Rp 7,000.00 Rp 474,768.00
d Angkur, D22 L=40cm 16.00 bh Rp 15,000.00 Rp 240,000.00
e Baut D16 112.00 bh Rp 15,000.00 Rp 1,680,000.00
Kuda-Kuda K-1/4
a WF 250x25x6x9 1,609.06 Kg Rp 7,000.00 Rp 11,263,392.00
b Pelat Stiffner t=10mm 270.16 Kg Rp 7,000.00 Rp 1,891,093.26
c Base Plate t=10mm 203.47 Kg Rp 7,000.00 Rp 1,424,304.00
d Angkur, D22 L=40cm 48.00 bh Rp 15,000.00 Rp 720,000.00
e Baut D16 264.00 bh Rp 15,000.00 Rp 3,960,000.00
Kuda-Kuda KX-1
a WF 250x25x6x9 664.22 Kg Rp 7,000.00 Rp 4,649,568.00
b Pelat Stiffner t=10mm 108.06 Kg Rp 7,000.00 Rp 756,437.30
c Base Plate t=10mm 25.43 Kg Rp 7,000.00 Rp 178,038.00
d Angkur, D22 L=40cm 16.00 bh Rp 15,000.00 Rp 240,000.00
e Baut D16 72.00 bh Rp 15,000.00 Rp 1,080,000.00
Kuda-Kuda KU-2
a WF 250x25x6x9 365.12 Kg Rp 7,000.00 Rp 2,555,812.00
b Pelat Stiffner t=10mm 63.04 Kg Rp 7,000.00 Rp 441,255.09
c Base Plate t=10mm 8.48 Kg Rp 7,000.00 Rp 59,346.00
d Angkur, D22 L=40cm 8.00 bh Rp 15,000.00 Rp 120,000.00
e Baut D16 40.00 bh Rp 15,000.00 Rp 600,000.00
Kuda-Kuda K2
a WF 250x25x6x9 371.04 Kg Rp 7,000.00 Rp 2,597,252.00
b Pelat Stiffner t=10mm 63.04 Kg Rp 7,000.00 Rp 441,255.09
c Base Plate t=10mm 8.48 Kg Rp 7,000.00 Rp 59,346.00
d Angkur, D22 L=40cm 8.00 bh Rp 15,000.00 Rp 120,000.00
e Baut D16 40.00 bh Rp 15,000.00 Rp 600,000.00
4 Gording
a Canal LC 150x50x20x3 5,817.51 Kg Rp 7,000.00 Rp 40,722,544.33
5 Jurai Luar WF 200x100x5,5x8
a JL1 994.28 Kg Rp 7,000.00 Rp 6,959,988.00
b JL2 241.12 Kg Rp 7,000.00 Rp 1,687,812.00
6 Jurai Dalam WF 200x100x5,5x8
a JD1 460.58 Kg Rp 7,000.00 Rp 3,224,032.00
b JD2 241.12 Kg Rp 7,000.00 Rp 1,687,812.00
7 Diafragma WF 250x125x6x9
a DF1 236.80 Kg Rp 7,000.00 Rp 1,657,600.00
b DF2 265.22 Kg Rp 7,000.00 Rp 1,856,512.00
8 Penutup Atap
a Rangka Atap Baja Ringan (usuk dan reng) 1,176.98 M2 Rp 45,000.00 Rp 52,963,903.71
b Pasangan Genteng Keramik setara KANMURI 1,176.98 M2 Rp 65,000.00 Rp 76,503,416.47
c Aluminum Foil + Kawat Nyamuk 1,176.98 M2 Rp 15,000.00 Rp 17,654,634.57
9 Ruang Tangga
Tangga Putar 1.00 Ls Rp 2,500,000.00 Rp 2,500,000.00
Kolom 20x20
a Beton K.300 0.48 M3 Rp 200,000.00 Rp 96,000.00
b Begisting 2x pakai 2.40 M2 Rp 80,000.00 Rp 192,000.00
c Pembesian 96.00 Kg Rp 3,500.00 Rp 336,000.00
Balok 15x20
a Beton K.300 0.30 M3 Rp 200,000.00 Rp 60,000.00
b Begisting 2x pakai 5.50 M2 Rp 197,500.00 Rp 1,086,250.00
c Pembesian 54.00 Kg Rp 3,500.00 Rp 189,000.00
Pelat Atap 12cm
a Beton K.300 1.05 M3 Rp 200,000.00 Rp 210,000.00
b Begisting 2x pakai 8.75 M2 Rp 197,500.00 Rp 1,728,125.00
c Pembesian 126.00 Kg Rp 3,500.00 Rp 441,000.00
Rp 416,000,126.47
JUMLAH PEKERJAAN LANTAI ATAP Rp 416,000,126.47
JUMLAH TOTAL PEKERJAAN STRUKTUR ATAS Rp 1,375,630,937.99
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA JUMLAH

1 2 4 5 6 7

IV. PEKERJAAN ARSITEKTUR


IV.1. PEKERJAAN PASANGAN DAN PLESTERAN
A. LANTAI SATU
1 Pasangan Bata ringan 10 cm, ad. 1Pc : 5Ps 1,044.87 M2 Rp 45,000.00 Rp 47,019,105.00
2 Pasangan Bata ringan 10 cm, ad. 1Pc : 3Ps 417.16 M2 Rp 45,000.00 Rp 18,772,200.00
3 Plesteran 1Pc : 5Ps, tebal 15 mm + acian 2,684.36 M2 Rp 35,000.00 Rp 93,952,600.00
4 Plesteran Dinding 1 : 3 (toilet) 834.32 M2 Rp 35,000.00 Rp 29,201,200.00
5 Acian Dinding bata ringan 1,462.03 M2 Rp 20,000.00 Rp 29,240,580.00
6 Pasangan Dinding Partisi Gypsum 74.25 M2 Rp 35,000.00 Rp 2,598,750.00
Rp 220,784,435.00
B. LANTAI DUA
1 Pasangan Bata ringan 10 cm, ad. 1Pc : 5Ps 1,075.12 M 2
Rp 45,000.00 Rp 48,380,355.00
2 Pasangan Bata ringan 10 cm, ad. 1Pc : 3Ps 463.95 M2 Rp 45,000.00 Rp 20,877,750.00
3 Plesteran 1Pc : 5Ps, tebal 15 mm + acian 2,825.10 M2 Rp 35,000.00 Rp 98,878,500.00
4 Plesteran Dinding 1 : 3 (toilet) 927.90 M2 Rp 35,000.00 Rp 32,476,500.00
5 Acian beton 1,539.07 M2 Rp 20,000.00 Rp 30,781,380.00
6 Pasangan Dinding Partisi Gypsum 141.75 M2 Rp 35,000.00 Rp 4,961,250.00
Rp 236,355,735.00
JUMLAH PEKERJAAN PASANGAN & PLESTERAN Rp 457,140,170.00

IV.2. PEKERJAAN KAYU,BESI,KACA,KUSEN, DAUN PINTU & JENDELA


A. LANTAI SATU
1 Pintu Tipe PD1 1.00 unit
2 Pintu Tipe PD2 1.00 unit
3 Pintu Tipe PD3 1.00 unit
4 Pintu Tipe PD4 3.00 unit
5 Pintu Tipe PD5 6.00 unit
6 Pintu Jendela Tipe PJ1 3.00 unit
7 Pintu Jendela Tipe PJ2 unit
8 Pintu Jendela Tipe PJ5 1.00 unit
9 Pintu Jendela Tipe PJ6 1.00 unit
10 Pintu Tipe P1 4.00 unit
11 Pintu Tipe P2 4.00 unit
12 Pintu Tipe P3 1.00 unit
13 Pintu Tipe P4 1.00 unit
14 Pintu Tipe PG 1.00 unit
15 Pintu Tipe PT1 16.00 unit
16 Pintu Tipe PT2 1.00 unit
17 Jendela Tipe J1 11.00 unit
18 Jendela Tipe J2 5.00 unit
19 Jendela Tipe J3 3.00 unit
20 Jendela Tipe J4 7.00 unit
21 Jendela Tipe BV 2 1.00 unit
22 Jendela Tipe BV 3 11.00 unit
23 Jendela Tipe BV 4 5.00 unit
Rp -
B. LANTAI 2
1 Pintu Tipe PD5 13.00 unit
2 Pintu Jendela Tipe PJ3 2.00 unit
3 Pintu Jendela Tipe PJ4 2.00 unit
4 Pintu Jendela Tipe PJ5 1.00 unit
5 Pintu Tipe P1 13.00 unit
6 Pintu Tipe P3 1.00 unit
7 Pintu Tipe PT1 14.00 unit
8 Jendela Tipe J1 29.00 unit
9 Jendela Tipe J2 2.00 unit
10 Jendela Tipe J3 5.00 unit
11 Jendela Tipe J4 4.00 unit
12 Jendela Tipe J5 3.00 unit
13 Jendela Tipe J6 2.00 unit
14 Jendela Tipe J7 2.00 unit
15 Jendela Tipe J8 5.00 unit
16 Jendela Tipe BV 1 13.00 unit
17 Jendela Tipe BV 2 8.00 unit
Rp -
C. LANTAI ATAP
1 Pintu Tipe PT1 1.00 unit Rp - Rp -
Rp -
JUMLAH PEKERJAAN KAYU, BESI, KACA, KUSEN DAUN PINTU dan J Rp -
IV.3. PEKERJAAN PLAFOND
A. LANTAI SATU
1 Pasang Rangka plafond hollo galvanis untuk gypsumboard 621.00 M2
2 Pasang Rangka plafond hollo galvanis untuk calsiumboard 75.80 M2
3 Pasang Rangka plafond hollo galvanis untuk pvc 190.50 M2
4 Pasang Rangka plafond hollo galvanis untuk akustik 120.00 M2
5 Pasang penutup plafond Gypsumboard t = 9mm 621.00 M2
6 Pasang penutup plafond Calsiumboard t = 6mm 75.80 M2
7 Pasang penutup plafond PVC 190.50 M2
8 Pasang penutup plafond Akustik 120.00 M2
9 Pasang rockwoll plafond akustik 120.00 M2
10 List Plafond gypsum profil 10 cm 841.50 M1
Rp -
B. LANTAI DUA
1 Pasang Rangka plafond hollo galvanis untuk gypsumboard 698.89 M 2

2 Pasang Rangka plafond hollo galvanis untuk calsiumboard 71.00 M2


3 Pasang Rangka plafond hollo galvanis untuk pvc 223.49 M2
4 Pasang penutup plafond Gypsumboard t = 9mm 698.89 M2
5 Pasang penutup plafond Calsiumboard t = 6mm 71.00 M2
6 Pasang penutup plafond PVC 223.49 M2
7 List Plafond gypsum profil 10 cm 20.88 M1
Rp -
C. LANTAI ATAP
1 Pasang Rangka plafond hollo galvanis untuk gypsumboard 6.00 M 2

2 Pasang penutup plafond Calsiumboard t = 6mm 6.00 M2


Rp -
JUMLAH PEKERJAAN PLAFOND Rp -

IV.4. PEKERJAAN PELAPIS LANTAI & DINDING


A. LANTAI SATU
1 Pasang Granite Tile Warna Ivory / Indogres Topaz 60x60 877.09 M2
2 Pasang Keramik Lantai 40/40 unpolish untuk lantai dan dinding km 303.10 M2
3 Pasang List Granite Tile 10x60 713.40 M1
4 Pasang Braille Block 133.00 M1
Rp -
B. LANTAI DUA
1 Pasang Granite Tile Warna Ivory / Indogres Topaz 60x60 672.89 M2
2 Pasang Keramik Lantai 40/40 unpolish untuk lantai dan dinding km 233.40 M2
3 Pasang List Granite Tile 10x60 596.80 M2
Rp -
C. LANTAI ATAP
1 Keramik 40x40 6.00 M2
Rp -
- Rp -

IV.5. PEKERJAAN SANITAIR


A. LANTAI SATU
1 Pasang Wastafel sekualitas TOTO lengkap dg asesoriesnya 8.00 Unit
2 Pasang Kran wastafel sekualitas TOTO 8.00 Unit
3 Pasang Kloset Duduk sekualitas TOTO lengkap dg asesorisnya 6.00 Unit
4 Pasang Kloset Jongkok sekualitas TOTO lengkap dg asesorisnya 6.00 Unit
5 Pasang Urinal sekualitas TOTO lengkap dg asesorisnya 4.00 Unit
6 Pasang Jet Shower sekualitas TOTO + stop kran 6.00 Unit
7 Pasang Kran air sekualitas TOTO 7.00 Unit
8 Pasang Floor drain 12.00 Unit
9 Pasang Paper holder 6.00 Unit
10 Handrail stainless steel 1.00 Unit
11 Pasang Cermin diatas wastafel 80x140 cm 8.00 Unit
Rp -
B. LANTAI DUA
1 Pasang Wastafel sekualitas TOTO lengkap dg asesoriesnya 9.00 Unit
2 Pasang Kran wastafel sekualitas TOTO 11.00 Unit
3 Pasang Kloset Duduk sekualitas TOTO lengkap dg asesorisnya 11.00 Unit
4 Pasang Urinal sekualitas TOTO lengkap dg asesorisnya 2.00 Unit
5 Pasang Jet Shower sekualitasTOTO + stop kran 11.00 Unit
6 Pasang Kran air sekualitas TOTO 3.00 Unit
7 Pasang Floor drain 11.00 Unit
8 Pasang Paper holder 11.00 Unit
9 Handrail stainless steel 1.00 Unit
10 Pasang Cermin diatas wastafel 80x140 cm 11.00 Unit
11 Shower 2.00 Unit
12 Kitchen Zink 1.00 Unit
Rp -
JUMLAH PEKERJAAN SANITAIR Rp -
IV.6. PEKERJAAN CAT, FINISHING DINDING, DAN WATERPROOFING
A. LANTAI SATU
1 Cat Dinding luar (weathershield) 567.00 M2
2 Cat Dinding dalam (acrylic emulsion) 2,951.68 M2
3 Cat Dinding Gypsum 148.50 M2
4 Cat Plafond (acrylic emulsion) 887.29 M2
5 Fin. Dinding Vinyl 352.70 M2
6 Fin. Dinding Wallpaper 27.00 M2
7 Waterproofing pada toilet 417.16 M2
Rp -
B.. LANTAI DUA
1 Cat Dinding luar (weathershield) 531.00 M2
2 Cat Dinding dalam (acrylic emulsion) 3,222.00 M2
3 Cat Dinding Gypsum 283.50 M2
4 Cat Plafond (acrylic emulsion) 993.38 M2
5 Fin. Dinding Vinyl 114.70 M2
6 Waterproofing pada toilet 463.95 M2
Rp -
G. LANTAI ATAP
1 Waterproofing dak atap 682.59 M2
2 Cat Dinding luar (weathershield) 30.00 M2
3 Cat Dinding dalam (acrylic emulsion) 30.00 M2
4 Cat Plafond (acrylic emulsion) 6.00 M2
Rp -
JUMLAH PEKERJAAN CAT dan WATERPROOFING Rp -

IV.6. PEKERJAAN FASADE DAN TAMPAK


F. PEKERJAAN FASADE
1 Pasang Alumunium Composit Panel (ACP) pada kanopi (rangka plaf 17.85 M2
2 Pasang Alumunium Composit Panel (ACP) pada Fasade utama ged 464.40 M2
4 Pasangan Batu Alam 171.36 M2
Rp -
JUMLAH FASADE DAN TAMPAK Rp -
JUMLAH TOTAL PEKERJAAN ARSITEKTUR Rp 457,140,170.00
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA JUMLAH

1 2 3 4 5 6

V. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


V.1. PEKERJAAN ELEKTRIKAL
A. PEKERJAAN PANEL
1 Panel PUTR ATS -AMF + Capasitor Bank 1.00 unit
2 Panel PP-1 1.00 unit
3 Panel PP-2 1.00 unit
4 Panel LP-0L 1.00 unit
5 Panel PP-AC Lt.1 1.00 unit
6 Panel PP-AC Lt.2 1.00 unit
Rp -
B. PEKERJAAN KABEL FEEDER
1 Dari APP- KWH Meter PLN ke Panel PUTR- 10.00 mtr
ATS-AMF+Capasitor Bank NYF gby 4 x 95 mm ² + NYA 50mm
2 Kabel Feeder dari Panel PUTR-ATS-AMF ke :
a Ke Panel PP-1 NYY 4x 16mm + BC 10mm 67.00 mtr
b Ke Panel PP-2 NYY 4x 16mm + BC 10mm 75.00 mtr
c Ke Panel PP-AC Lt.1 NYY 4x 25mm + BC 16mm 68.00 mtr
d Ke Panel PP-AC Lt.2 NYY 4x 25mm + BC 16mm 77.00 mtr
e Ke Panel LP-OL (Lampu Taman) NYF gby 4x 4mm + BC 2,5mm 55.00 mtr
Rp -
C. PEKERJAAN GROUNDING SISTEM
1 Grounding System Elektrikal
a Grounding riser BC 1x50mm dari Grounding PIT menuju Grounding Box 25.00 mtr
b Grounding PIT untuk mencapai tahanan pentanahan 1 ohm 1.00 ttk
Grounding dari Grounding riser menuju kesetiap panel (ukuran sesuai
20.00 mtr
c dengan BC terlampir diatas)
2 Grounding System Elektronik
a Grounding riser BC 1x50mm dari Grounding PIT menuju Grounding Box 30.00 mtr
Grounding dari Grounding riser menuju kesetiap peralatan utama BC
b 6mm 35.00 mtr
c Grounding PIT untuk mencapai tahanan pentanahan 1 ohm 1.00 ttk

Rp -
D. PEKERJAAN PENERANGAN INSTALASI 2 STOP KONTAK
SITE PLAN
Lampu taman LED bulb 19 watt type globe acrylic 12" (milk) c/w pole,
1 22.00 bh
GIP Medium d2" H2m
2 Lampu jalan (PJU) LED 100 watt Hexagonal pole H 7 meter(single arm) 9.00 bj
3 Instalasi Lampu Taman 22.00 ttk
a NYF Gby 4x4mm
b NY 3x2,5mm
c Galian + Urug
4 Instalasi Lampu PJU 9.00 ttk
a NYF Gby 4x4mm
b NY 3x2,5mm
c Galian + Urug
LANTAI 1
1 Instalasi
a Instalasi Penerangan 268.00 ttk
b Instalasi Stop Kontak Dinding 53.00 ttk
c Instalasi Exhaust Fan 26.00 ttk
d Instalasi Stop Kontak Lantai 41.00 ttk
2 Fixture & Armature
a Saklar Tunggal 53.00 bh
b Saklar Seri 43.00 bh
c Saklar Hotel 4.00 bh
d Stop Kontak Dinding 19.00 bh
e Stop Kontak Lantai type A ( 2 outlet stop kontak, 1 telp & 1 data ) 19.00 bh
f Stop Kontak Lantai type B ( 2 outlet stop kontak, 1 data ) 26.00 bh
3 Lampu
a Lampu TL 2 x 8 watt LED M5 18.00 bh
b Lampu TL 4 x 8 watt LED M5 20.00 bh
c Lampu TL 4 x 8 watt LED M5 + Battery Nicad 3.00 bh
d Lampu Down Light LED 1 x 19 watt 78.00 bh
e Lampu Down Light LED 1 x 7 watt 27.00 bh
f Lampu Baret LED 2 x 6 watt + Battery Nicad 4.00 bh
g Lampu indirect cove Led 13 watt 72.00 bh
h Lampu exit 3.00 bh
i Down Light LED 5 watt ( MR-16 ) Spot Light 6.00 bh
j Lampu Sorot Led Taman (tancap) Cob 7 watt 11.00 bh
k Lampu Sorot Led 15 watt PAR 38 4.00 bh

LANTAI 2
1 Instalasi
a Instalasi Penerangan 218.00 Bh
b Instalasi Stop Kontak Dinding 36.00 Bh
c Instalasi Stop Kontak Lantai 26.00 Bh
d Instalasi Exhaust Fan 46.00 Bh
2 Fixture & Armature
a Saklar Tunggal 38.00 bh
b Saklar Seri 20.00 bh
c Saklar Hotel 3.00 bh
d Stop Kontak Dinding 36.00 bh
e Stop Kontak Lantai type A ( 2 outlet stop kontak, 1 telp & 1 data ) 13.00 bh
f Stop Kontak Lantai type B ( 2 outlet stop kontak, 1 data ) 33.00 bh

3 Lampu
a Lampu TL 2 x 8 watt LED M5 21.00 bh
b Lampu TL 4 x 8 watt LED M5 19.00 bh
c Lampu Down Light LED 1 x 19 w 94.00 bh
d Lampu Down Light LED 1 x 19 w + Battery Nicad 4.00 bh
e Lampu Down Light LED 1 x 7 w 23.00 bh
f Lampu Baret LED 2 x 6 w + Battery Nicad 6.00 bh
g Lampu exit 5.00 bh
Rp -
E. PEKERJAAN KABEL TRAY ELEKTRIKAL DAN ELEKTRONIK

LANTAI 1
1 Rak Kabel Elektrikal (vertikal dalam shaft listrik)
a Kabel Ledderr 30 x 10 cm 12.00 m
b Cover kabel Ledder 30 cm 12.00 m
2 Rak Kabel Elektrikal (horizontal)
a cable Tray 300 x 100 mm 62.00 m
b elbow 300 4.00 Bh
c Cross Tee 300 mm 1.00 Bh
3 Rak Kabel Elektronik (vertikal dalam shaft elektronik)
a Kabel Ledderr 30 x 10 cm 12.00 m
b Cover kabel Ledder 30 cm 12.00 m
4 Rak Kabel Elektronik (horizontal)
a cable Tray 300 x 100 mm 64.00 m
b elbow 300 64.00 bh
c Cross Tee 300 mm 1.00 bh

LANTAI 2
1 Rak Kabel Elektrikal (horizontal)
a Cable ladder 300 x 100 mm 62.00 M
b Elbow 300 4.00 bh
c Cross Tee 300 mm 2.00 bh

2 Rak Kabel Elektrikal (horizontal)


a cable Tray 300 x 100 mm 59.00 m
b elbow 300 4.00 bh
c Cross Tee 300 mm 2.00 bh
Rp -
F. INSTALASI PENANGKAL PETIR
1 tiang pipa GIP DIM 2" H 3Meterengkap dengan support dan pondasi 3.00 m
2 Air terminal Radius 110 meter (Phillips Lightning) Type PL 60ms 1.00 bh
3 Lighting Counter 1.00 bh
4 Obtruction Light LED 18WATT C/W Photo cell 1.00 bh
5 Down Conductor Nyy 1x70mm + Pipa Conduit 40.00 m'
Instalasi pembumian lengkap dengan elecrtrode pembumian terbuat dari
6 1.00 bh
Copper rod dia.25 mm panjang minimal 12 m
7 Bak Kontrol (uk. 400 x 400 mm) + Plat bordes 3mm 1.00 bh
8 Material bantu 1.00 lot
Rp -
F. PEKERJAAN DIESEL GENERATOR SET
Termasuk pengadaan, pengangkutan ke lokasi, pemasangan dan pengujian
diesel genset dan panel kontrol termasuk seluruh perlengkapan atau,
accessoris sesuai dengan gambar dan spesifikasi teknis dan semua biaya
untuk pengangkutan laut dan darat, asuransi, bea masuk, pajak-pajak, biaya
pelabuhan, clearence dsb.
1 Disel Genset Kapasitas 150Kva 400/230V, 50 Hz, 3 phase, 1500 kpm (pr 1.00 unit
2 Pengadaan dan pemasangan tank, harian 500 liter (tebal plat 4mm) 1.00 unit
3 Pengadaan bahan bakar solar resmi pertamina untuk test dan serah teri 500.00 liter
Pemipaan bahan bakar dari genset ke tanah, harian lengkap dengan
4 1.00 lot
fitting dan accesoris lainnya di cat dasar anti karat dan finishing

5 Manual Hand Pump 1.00 unit

6 Pengadaan dan pemasangan ducting exhaust radiator dan jaketing pipa 1.00 lot

7 Water Separator 1.00 unit


7 Grounding System Genset 1.00 lot
Rp -
JUMLAH PEKERJAAN ELEKTRIKAL Rp -
V.2. PEKERJAAN MEKANIKAL
A. PEKERJAAN AIR CONDITIONER DAN SYSTEM
LANTAI 1
I. PERALATAN UTAMA
Pengadaan dan pemasangan :
1 Pipa Refrigrant type medium tebal isolasi tebal 1/2 '
a Kap 0,5 PK : ( 1/4" + 3/8" ) 50.00 m'
b Kap 1 PK : ( 1/4" + 3/8" ) 25.00 m'
c Kap 1,5 PK : ( 1/4" + 3/8" ) 20.00 m'
d Kap 2 PK : ( 1/4" + 3/8" ) 75.00 m'
e Kap 2,5 PK : ( 1/4" + 3/8" ) 85.00 m'
f Kap 3 PK : ( 1/4" + 3/8" ) 22.00 m'
g Pipa diameter 20mm 110.00 m'
h Pipa drain PVC Ø 1" dengan Isolasi tebal 3/8 " 305.00 m'
2 Braket Out door (Split Wall) 10.00 bh
3 Braket Out door (Cassette Wall) 15.00 bh
4 Kabel Power AC Cassette, Kap 0,5 - 1 PK NYY 3 x 2,5 mm 165.00 m'
5 Kabel Power AC Cassette, Kap 2 - 3 PK NYY 3 x 4 mm 315.00 m'
6 Kabel Kontrol dari Indoor ke Outdoor NYM 3 x 1,5 mm 200.00 m'

II. PEKERJAAN VENTILASI


Pengadaan Unit Fan
1 Ceiling Exhaus Fan (Type Siroco) Kap 150 CFM
a Toilet Wanita 6.00 bh
b Toilet Pria 7.00 bh
c Toilet Tangga 2.00 bh
d Toilet R Panitera 1.00 bh
e Janitor 1.00 bh
f Gudang 1.00 bh
g Ruang Arsip 4.00 bh
2 Flexible duct Ø 3" 25.00 m
3 Pipa PVC (D) Ø3" 85.00 m
4 Fitting dan accessories 1.00 ls
5 Material Bantu 1.00 ls

LANTAI 2
I. PERALATAN UTAMA
1 Pipa Refrigrant type medium tebal isolasi tebal 1/2 '
a Kap 1/2 PK : ( 1/4" + 3/8" ) 120.00 m'
b Kap 1,5 PK : ( 1/4" + 3/8" ) 145.00 m'
c Kap 2 PK : ( 1/4" + 3/8" ) 55.00 m'
d Kap 2,5 PK : ( 1/4" + 3/8" ) 15.00 m'
e Pipa Drain PVC (AW ) Ø 3/4" dengan isolasi tebal 3/8" 125.00 m'
f Pipa drain PVC Ø 1" dengan Isolasi tebal 3/8 " 210.00 m'
2 Braket Out door (Split Wall) 11.00 bh
3 Braket Out door (Cassette Wall) 22.00 bh
4 Kabel Power AC Cassette, Kap 0,5 - 1 PK NYY 3 x 2,5 mm 175.00 m'
5 Kabel Power AC Cassette, Kap 2 - 3 PK NYY 3 x 4 mm 425.00 m'
6 Kabel Kontrol dari Indoor ke Outdoor NYM 3 x 1,5 mm 250.00 m'

II. PEKERJAAN VENTILASI


Pengadaan Unit Fan
1 Ceiling Exhaus Fan (Type Siroco) Kap 150 CFM
a Toilet Wanita 3.00 bh
b Toilet Pria 1.00 bh
c Toilet Tangga 1.00 bh
d Janitor 4.00 bh
e Gudang 2.00 bh
2 Flexible duct Ø 3" 25.00 m
3 Pipa PVC (D) Ø3" 85.00 m
4 Louvre 20x20cm 7.00 bh
5 Fitting dan accessories 1.00 ls
6 Material Bantu 1.00 ls
Rp -
B. PEKERJAAN PLUMBING
PEKERJAAN UTAMA
1 Pompa Pengisi Bak Air Atas 2.00 unit
Type : Centrifugal
Kapasitas50 Lpm
Head : 40 m
Daya : 1,5 Kw
Putaran : 2900 Rpm
Status :
Lokasi : R. Pompa
2 Pompa Booster 1.00 unit
Type : Centrifugal
Kapasitas2x30Lpm
Head : 15 m
Daya :
Putaran : 2900 Rpm
Status :
Lokasi : Lt. Atas
3 Roof Tank (type cylinder) 1.00 unit
Kapasitas2x3m3
Type : Fiber Glass
Lokasi : Lt. Atas
3 Instalasi dan Accesoris R. Pompa
Gate valve d32 2.00 bh
Gate valve d40 2.00 bh
Check Valve 32 2.00 bh
Check Valve 40 2.00 bh
Flexible Joint 32 2.00 bh
Flexible Joint 40 2.00 bh
Pressure Gauge 1.00 bh
Header d3" (gip) 3.00 mtr
Pipa GIP d32mm 10.00 mtr
Pipa GIP d40mm 12.00 mtr
Rp -
PEKERJAAN GROUND WATER TANK (± 12 M3)
1 PEKERJAAN TANAH, BETON DAN KERAMIK
aGalian Tanah Ground Tank (mekanik) dibuang keluar 48.00 M3
bPek. Urugan Pasir Dibawah Beton Lantai t=10 cm 1.60 M3
cPek. Lantai Kerja Dibawah Beton Lantai t=5 cm 0.80 M3
dUrugan Tanah Kembali Bekas Galian
gBeton plat lantai t=30 cm
- Beton K.300 3.89 M3
- Pembesian 466.56 Kg
h Beton plat dinding t=20 cm
- Beton K.300 8.82 M3
- Begisting 2x pakai 88.20 M2
- Pembesian 1058.40 Kg
j Beton plat tutup t=20 cm
- Beton K.300 2.21 M3
- Begisting 2x pakai 12.96 M2
- Pembesian 264.96 Kg
k Waterproofing ground tank bagian luar dan dalam 189.36 M2
m Pasang keramik lantai dan dinding 20 x 20 cm 189.36 M2
2 PEMIPAAN/SPARING
a Globe Valve dia. 4" + stang pipa GIP 1" (2,5 m) 2.00 bh
3 MANHOLE DAN TANGGA
a Manhole 80/80 cm, pintu stainless steel, lengkap dg engsel & gembok 3.00 bh
b Tangga Besi d25 3.00 Unit
4 Water level control ( WLC ) lengkap kabel 3.00 set
Rp -
PEKERJAAN AIR BERSIH
1 Pekerjaan Site Plan
PipPipa Air Bersih (PPR-PN10)
- Pipa Diameter 20 45.00 mtr
- Pipa Diameter 25 30.00 mtr
- Pipa Diameter 32 40.00 mtr
- Fittting-fitting 1.00 lot
- Gate Valve d32 1.00 bh
- Gate Valve d40 1.00 bh
2 Pekerjaan Lantai 1
Pipa Air Bersih (PPR-PN10)
- Pipa Diameter 20 25.00 mtr
- Pipa Diameter 25 30.00 mtr
- Pipa Diameter 32 10.00 mtr
- Pipa Diameter 50 72.00 mtr
- Fittting-fitting 1.00 lot
- Gate Valve d32 1.00 bh
- Gate Valve d40 2.00 bh
- Gate Valve d50 1.00 bh
3 Pekerjaan Lantai 2
Pipa Air Bersih (PPR-PN10)
- Pipa Diameter 20 55.00 mtr
- Pipa Diameter 25 42.00 mtr
- Pipa Diameter 32 18.00 mtr
- Fittting-fitting 1.00 lot
- Gate Valve d40 1.00 bh
4 Pekerjaan Lantai Atap
Pipa Air Bersih (GIP medium)
- Pipa Diameter 40 22.00 mtr
- Pipa Diameter 32 28.00 mtr
- Fittting-fitting 1.00 lot
- Gate Valve d40 6.00 bh
- Gate Valve d32 3.00 bh
5 Pekerjaan Dalam Shaft
Pipa Air Bersih (PPR-PN10)
- Pipa Diameter 40 18.00 mtr
- Pipa Diameter 50 22.00 mtr
- Fittting-fitting 1.00 lot
6 Pekerjaan Air Hujan
- Roof Drain cast iron d100mm 24.00 bh
- Pipa Tegak dlm hujan d100mm 120.00 mtr
- Fittting-fitting 1.00 lot
4 Pekerjaan Pengeberan Sumur Jet Pump (Shallow Well)
- Bor Sumur Jet Pump Kedalaman 60m lengkap dengan casing pipa pv 1.00 titik
- Pemipaan Sumur Jet Pump (BIP Medium d40m-B5 1387) 1.00 lot
- Pompa Submersible 1.00 unit
- Check Valve d40mm 1.00 bh
- Gate Valve d40mm 1.00 bh
- Meter Air 1.00 bh
- Electrode Water Control dan Instalasi 1.00 set
- Lapisan Koral Jagung 14.00 m3
- Lapisan Pasir Urug 6.00 m3
- Bak Kontrol Lengkap dgn tutup plat bordes tb 3mm 1.00 bh
5 STP Bio Tech Kap 8m3 Lengkap degnan panel dan blower 1.00 unit
Diffuser pompa submersible
6 SP Bio Tech Kap 1m3 (untuk pos security) 1.00 unite
Rp -
PEKERJAAN AIR KOTOR, BELAS & VENT
1 Lantai 1
a Pipa Air Kotor & bekas PVC (class aw)
- D150mm ke STP Bio Tech 30.00 mtr
- D100mm 65.00 mtr
- D80mm 50.00 mtr
- D50mm 22.00 mtr
- D40mm 40.00 mtr
- D32mm 25.00 mtr
- Fitting-fitting 1.00 lot
- Floor clean out d100mm 2.00 bh
- Floor clean out d800mm 1.00 bh
b Pipa Vent (Class D)
- D80mm (Pipa tegak vent) 22.00 mtr
- D50mm (Pipa tegak air bekas) 16.00 mtr
- D32mm 20.00 mtr
- Fitting-fitting 1.00 lot
2 Lantai 2
a Pipa Air Kotor & bekas PVC (class aw)
- D100mm (Pipa tegak air kotor) 8.00 mtr
- D80mm (Pipa tegak air bekas) 8.00 mtr
- D100mm 35.00 mtr
- D80mm 46.00 mtr
- D50mm 15.00 mtr
- D40mm 20.00 mtr
- D32mm 19.00 mtr
- Fitting-fitting 1.00 lot
- Floor clean out d100mm 1.00 bh
- Floor clean out d800mm 1.00 bh
b Pipa Vent (Class D)
- D100mm (Pipa tegak air vent) 10.00 mtr
- D50mm 10.00 mtr
- D32mm 1.00 mtr
- Fitting-fitting 1.00 lot
Rp -
JUMLAH PEKERJAAN MEKANIKAL Rp -
V.3. PEKERJAAN ELEKTRONIK
A. PEKERJAAN FIRE ALARM

I. PERALATAN UTAMA
1 MACFA kap 10 zone (Type Konvensional) lengkap dengan 1.00 unit
a Rectifier
b Power Surge Arrester
c Power Supply
2 Announciator 1.00 unit

II. KABEL FEEDER


1 Dari MCFA ke :
a TBFA 1 NYA 5 (2x1,5mm2) 10.00 mtr
b TBFA 1 NYA 5 (2x1,5mm2) 22.00 mtr
2 Pengkabelan Announciator (NYA 2x22,5 mm2 + AW6 18 (1 pair) + cound 100.00 mtr
3 Material Bantu 1.00 ls
LANTAI 1
1 TBFA
a ROR Heat Detector 5.00 bh
b Photo electric smoke detector 29.00 bh
c Alarm Bell 2.00 bh
d Indicator Lamp 2.00 bh
e Manual Push Button + Jack Phone 2.00 bh
f Instalasi titik Detector 34.00 ttk
g Instalasi titik Indicator Lamp & Bell 2.00 ttk
h Instalasi titik Push Button 2.00 ttk
i Instalasi titik Jack Intercom 2.00 ttk
2 Alat Pemadam Api Ringan (APAR) 3,5 Kg 10.00 Bh
LANTAI 2
1 TBFA
a ROR Heat Detector 3.00 bh
b Photo electric smoke detector 33.00 bh
c Alarm Bell 2.00 bh
d Indicator Lamp 2.00 bh
e Manual Push Button + Jack Phone 2.00 bh
f Instalasi titik Detector 36.00 ttk
g Instalasi titik Indicator Lamp & Bell 2.00 ttk
h Instalasi titik Push Button 2.00 ttk
i Instalasi titik Jack Intercom 2.00 ttk
2 Alat Pemadam Api Ringan (APAR) 3,5 Kg 8.00 Bh
Rp -
B. PEKERJAAN TATA SUARA (SOUND SYSTEM)
I. PERALATAN UTAMA
1 Back ground musik dan paging
a Mixer Pre Amplifier. 1.00 Unit
b Power apliifier 240 Watt 1.00 Unit
c CD / DVD Player 1.00 Unit
d Paging Microphone 1.00 Unit
e UPS 1 KVA 1.00 Unit
f Rack Cabinet - 1 Acessories C/W Power Supply 220 V, 50 Hz & Lighth 1.00 Unit
g Arester 10 KV 1.00 Unit
h MDF-SS 1.00 Unit
2 Car Call
a Mixer Pre Applifier. 1.00 Unit
b Power apliifier 240 Watt 1.00 Unit
c Paging Microphone 1.00 Unit
d TBSS-Cal Call 1.00 Unit
3 Kabel Feeder
Dari MDF-SS ke
a TBSS - 1 (NYMHY 3 x 1,5 mm + Conduit + Ø 20 mm) 25.00 m'
b TBSS - 2 (NYMHY 3 x 1,5 mm + Conduit + Ø 20 mm) 15.00 m'
II. INSTALASI TATA SUARA
I. LANTAI 1
a TBSS-1 1.00 Unit
b Celing Speaker 3 W 16.00 Titik
c Wall Speaker 6 W 3.00 Titik
d Horn Speaker 15 W 6.00 Titik
e Volume Control (Attenuator) 6 W 13.00 Titik
f Instalasi Ceiling Speaker 16.00 Titik
g Instalasi Wall Speaker 3.00 Titik
h Instalasi Horn Speaker 8.00 Titik

2. RUANG SIDANG UTAMA


1 Peralatan Utama
a Power Mixer Amplifier 240 W ( 6 mic input) 1.00 Unit
b Mic Meja Podium 5.00 bh
c Mic Kabel (Dynamic Microphone + Stand Mic) 1.00 bh
d Wall Speaker 30 Watt 2.00 bh
e Instalasi Kabel MIC 6.00 bh
f Instalasi Wall Speaker 2.00 bh

3. RUANG SIDANG 1 DAN 2


1 Peralatan Utama
a Power Mixer Amplifier 240 W ( 6 mic input) 2.00 Unit
b Mic Meja Podium 10.00 bh
c Mic Kabel (Dynamic Microphone + Stand Mic) 2.00 bh
d Wall Speaker 30 Watt 4.00 bh
e Instalasi Kabel MIC 12.00 bh
f Instalasi Wall Speaker 4.00 bh
4. LANTAI 2
1 Peralatan Utama
a TBSS-2 1.00 Unit
b Celing Speaker 3 W 22.00 Unit
c Wall Speaker 6 W 3.00 bh
d Volume Control (Attenuator) 6 W 19.00 bh
e Instalasi Ceiling Speaker 22.00 bh
f Instalasi Wall Speaker 3.00 bh
Rp -
C. PEKERJAAN TELEPHONE
1 PERALATAN UTAMA
b MDF Kap 100 pairs 1.00 Unit
c Grounding System 1.00 Lot

2 Kabel Feeder
Dari PABX ke MDF 100 pair Jelly cable 100 x 2 x 0,6 mm 10.00 m'
Dari MDF ke
a IDF Lantai 1 ITC 20x2x0,6 mm 20.00 m'
b IDF Lantai 2 ITC 20x2x0,6 mm 20.00 m'

3 Instalasi Telephone
Lantai 1
a IDF 20 Pairs 1.00 unit
b Socket outlet (Wall type) 5.00 bh
c Socket outlet (Floor socket) 19.00 bh
d Instalasi Telephone (ITC 2 x 2 x 0,8 mm) 20.00 ttk

Lantai 2
a IDF 20 Pairs 1.00 unit
b Socket outlet (Wall type) 1.00 bh
c Socket outlet (Floor socket) 17.00 bh
d Instalasi Telephone (ITC 2 x 2 x 0,8 mm) 18.00 ttk
Rp -
D. PEKERJAAN CCTV
I. PERALATAN UTAMA
1 Digital Network Vidio Recorder 32 Chanel : 16 TB Hardist Resolution Cap 1.00 bh
720 x 488 Pixel network interface, key board dan mouse
2 PC Monitoring dan LED Monitor 17 ". 2.00 bh
3 PC Monitoring dan LED Monitor 32 ".(security) 1.00 bh
4 UPS 2000 VA 1.00 bh
5 Pengkabelan peralatan utama. 2.00 bh
6 Grounding 1.00 lot
7 Cadweild or Crimped Connection 1.00 bh
8 Test Link 1.00 bh
9 Raiser 1.00 bh
2. INTALASI
Lantai 1
a Instalasi Kabel Transmisi Camera. 185.00 bh
b Instalasi Kabel Power Camera. 185.00 bh
c Indoor Fixed Dome Camera 14.00 bh
d Indoor Fixed Camera 2.00 bh
Lantai 2
a Instalasi Kabel Transmisi Camera. 105.00 bh
b Instalasi Kabel Power Camera. 105.00 bh
c Indoor Fixed Dome Camera 7.00 bh
-
E. PEKERJAAN DATA
I. PERALATAN UTAMA
1 Close rack 25U 1.00 Set
2 Server ( Model Rack Mount ) 1.00 Set
3 Monitor 19" 1.00 Set
4 Keyboard + Mouse 1.00 Set
5 Coreswitch 24 Port 1.00 Set
6 Router / Mikrotik 1.00 Set
7 Power Supply c/w UPS + Back Up battery ( 2000VA ) 1.00 Set
8 Surge Arrester 1.00 Set
9 Grounding Max 1 Ohm 1.00 Set
10 OTB 24 Core + Accesorues 1.00 Set
11 System Pengkabel, Patcore, Wiring Managent, Patchanepel 1.00 Set
II. KABEL PENGHUBUNG
1 Dari Peralatan Utama ke :
a HUB LT.1 : Kabel Fiber Optik 4 core 1.00 ls
b HUB LT.2 : Kabel Fiber Optik 4 core 1.00 Ls
III. SWITCH HUB DISTRIBUSI
1 HUB 1 Lantai Dasar
a Switch HUB Managed POE 24 Port + SFP 2.00 Set
b Patch Panel 24 Port 2.00 Set
c Wallmount rack 12U 1.00 Set
d OTB 8 PORT 1.00 Set
e Patchcord UTP Cat 6 1 Meter 33.00 Pcs
f Patcore Fo ( SC LC ) 2.00 Pcs
2 HUB 2 Lantai Dasar
a Switch HUB Managed POE 24 Port + SFP 2.00 Set
b Patch Panel 24 Port 2.00 Set
c Wallmount rack 12U 1.00 Set
d OTB 8 PORT 1.00 Set
e Patchcord UTP Cat 6 1 Meter 40.00 Pcs
f Patcore Fo ( SC LC ) 2.00 Pcs
IV. FIXTURES DAN INSTALASI
1 LANTAI 1
a Outlet Data Rj45 26.00 Unit
b Wireles acces point 7.00 Unit
2 INSTALASI
a Instalasi Cable UTP cat6 dalam Pipa - Outlet Data 26.00 Titik
b Instalasi Cable UTP cat6 dalam Pipa - Wireles AccesPoint 7.00 Titik
3 LANTAI 2
a Outlet Data Rj45 33.00 Unit
b Wireles acces point 7.00 Unit
4 INSTALASI
a Instalasi Cable UTP cat6 dalam Pipa - Outlet Data 33.00 Titik
b Instalasi Cable UTP cat6 dalam Pipa - Wireles AccesPoint 7.00 Titik

Rp -
JUMLAH PEKERJAAN ELEKTRONIK Rp -
JUMLAH TOTAL PEKERJAAN MEKANIKAL ELEKTRIKAL Rp -
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

1 2 3 4 5
VI. PEKERJAAN INFRASTRUKTUR DAN BANGUNAN PENDUKUNG
VI.1. PEKERJAAN LANSEKAP DAN BANGUNAN PENDUKUNG
1 Perkuatan Jalan
a Pasir Urug t=10cm 196.08 M3 Rp 35,000.00 Rp 6,862,913.67
b Lantai Lerja t=5cm 98.04 M3 Rp 650,000.00 Rp 63,727,055.54
c Wiremesh M7 1 lapis 1,960.83 M2 Rp 25,000.00 Rp 49,020,811.95
d Perkuatan Beton t=25cm 490.21 M3 Rp 200,000.00 Rp 98,041,623.90
2 Pagar Bangunan (Panel Precast) 469.95 M' Rp -
3 Turap (Dinding Penahan Tanah) 560.25 M3 Rp325,000.00 Rp 182,081,250.00
4 Ruang Genset dan Pompa Air 24.00 M2 Rp1,500,000.00 Rp 36,000,000.00
5 Pos Penjaga Security (Di area jembatan) termasuk elektrikal, mekanikal dl 22.75 M2 Rp 1,500,000.00 Rp 34,125,000.00
6 Pagar Dinding beserta tulisan "Pengadilan Agama Bintuhan" 1.00 Ls Rp -
JUMLAH PEKERJAAN LANSEKAP DAN BANGUNAN PENDUKUNG
VI.2. PEKERJAAN INTERIOR MELEKAT BANGUNAN
1 Interior Lobby Uama 21.25 M2
2 Interior PTSP 41.30 M2
3 Interior Lobby Ruang Sidang Utama 27.48 M2
4 Interior Ruang Sidang Kecil 1 20.42 M2
5 Interior Ruang Sidang Kecil 2 20.42 M2
6 Interior Ruang Ketua Pengadilan Agama 1.36 M2
8 Interior Ruang Wakil Ketua Pengadilan Agama 16.36 M2
JUMLAH PEKERJAAN INTERIOR
VI.3. PEKERJAAN JEMBATAN
1 Bored Pile
a Galian Bored Pile 192.00 M'
b Beton K-350 13.56 Kg Rp 200,000.00 Rp 2,712,960.00
c Pembesian 1,627.78 Kg Rp 3,500.00 Rp 5,697,216.00
2 Cobble Stone 34.44 M 3
Rp -
3 Lantai Kerja (LC) 17.22 M3 Rp 650,000.00 Rp 11,194,300.00
4 Saluran Bawah Jembatan Rp -
a Beton K-350 247.87 M3 Rp 200,000.00 Rp 49,573,200.00
b Pembesian Kg Rp -
4 Wingwall Rp -
a Beton K-350 13.75 M3 Rp 200,000.00 Rp 2,750,400.00
b Pembesian 1,650.24 Kg Rp - Rp -
5 Pelat Jembatan Rp -
a Beton K-350 49.98 M 3
Rp 200,000.00 Rp 9,996,000.00
b Pembesian 5,997.60 Kg Rp - Rp -
6 Pelat Injak Rp -
a Beton K-350 29.43 M3 Rp 200,000.00 Rp 5,886,000.00
b Pembesian 3,531.60 Kg Rp - Rp -
7 Railing Jembatan 28.00 M' Rp -
JUMLAH PEKERJAAN JEMBATAN
VI.3. PEKERJAAN SALURAN DRAINASE
1 1/2 Buis Beton diameter 30cm
a SKB 1 35.98 M Rp 75,000.00 Rp 2,698,268.24
b SKB 2 22.03 M Rp 75,000.00 Rp 1,652,545.85
2 U-Ditch 30x30 Rp -
a ST 1 42.62 M Rp 150,000.00 Rp 6,393,450.00
b ST 2 43.20 M Rp 150,000.00 Rp 6,479,400.00
c ST 3 15.92 M Rp 150,000.00 Rp 2,387,550.00
d ST 4 15.96 M Rp 150,000.00 Rp 2,393,700.00
e ST 5 12.86 M Rp 150,000.00 Rp 1,928,850.00
f ST 6 12.86 M Rp 150,000.00 Rp 1,928,850.00
g ST 7 14.04 M Rp 150,000.00 Rp 2,105,250.00
h ST 8 14.50 M Rp 150,000.00 Rp 2,174,850.00
i ST 9 45.98 M Rp 150,000.00 Rp 6,896,850.00
3 U-Ditch 30x40 Rp -
a SS 1 24.37 M Rp 200,000.00 Rp 4,874,600.00
b SS 2 46.22 M Rp 200,000.00 Rp 9,243,400.00
4 Tutup Beton untuk saluran lebar 30cm 346.53 M Rp 75,000.00 Rp 25,989,439.08
5 Bak Kontrol 19.00 Titik Rp 750,000.00 Rp 14,250,000.00
JUMLAH PEKERJAAN SALURAN DRAINASE
JUMLAH TOTAL PEKERJAAN LAIN-LAIN
JUMLAH

Rp 469,858,655.06

Rp -

Rp 87,810,076.00

Rp 91,397,003.16
Rp 649,065,734.22
DAFTAR HARGA SATUAN UPAH & BAHAN
-

HARGA SATUAN
NO. MATERIAL SATUAN
(Rp.)
L PEKERJAAN PLAMBING
1 Pompa Transfer Set 45,540,000.00
3 Pompa Booster Set 31,680,000.00
4 Pompa Submersible Set 35,640,000.00
9 Biofilter Kapasitas 1 m3 Lengkap dengan Pemasangan Unit 3,200,000.00
7 Biofilter Kapasitas 3 m3 Lengkap dengan Pemasangan Unit 8,500,000.00
5 Tangki Air Fibre Glass (FRP) Kap. 4 m 3 Buah 13,000,000.00
6 Tangki Air Fibre Glass (FRP) Kap. 2 m 3 Buah 3,500,000.00
7 Pipa Pralon PVC. ( AW ) Dia. 1 " Btg 44,750.00
8 Pipa Pralon PVC. ( AW ) Dia. 2 " Btg 101,200.00
9 Pipa Pralon PVC. ( AW ) Dia. 3 " Btg 207,800.00
9 Pipa Pralon PVC. ( AW ) Dia. 4 " Btg 345,000.00
10 Pipa Pralon PVC. ( AW ) Dia. 6 " Btg 731,600.00
11 Pipa Pralon PVC. ( D ) Dia. 4 " Btg 146,000.00
12 Pipa PPR PN 10 Dia. 3/4" Btg 57,310.00
13 Pipa PPR PN 10 Dia. 1" Btg 92,180.00
14 Pipa PPR PN 10 Dia. 2" Btg 358,710.00
15 Pipa Stainless Steel Dia. 1" Btg 366,283.33
16 Pipa Stainless Steel Dia. 2" Btg 1,457,650.00
17 Pipa Stainless Steel Dia. 3" Btg 3,274,050.00
18 Gate Valve (Screw) Class 125, Brass Diameter 2" Buah 388,500.00
19 Gate Valve (Screw) Class 125, Brass Diameter 4" Buah 3,052,500.00
20 Swing Check (Screw) Valve Class 125, Bronze Diameter 2" Buah 499,500.00
21 Sealtape Buah 1,100.00
22 Header Pipa Diameter 4" Buah 3,500,000.00
23 Header Pipa Diameter 6" Buah 5,250,000.00
24 Header Pipa Diameter 8" Buah 7,000,000.00
25 Sand Filter Kapasitas 400 lpm Buah 15,000,000.00
26 Chemical Tank + Dosing Pump Buah 7,500,000.00
27 Pipa Stainless steel 4" m' 521,640.00
28 Waterstop PVC m' 99,000.00

M PEKERJAAN HYDRANT DAN SPRINKLER


5 Fire Extinguisher (Dry Chemical) Kap. 6 kg Unit 2,450,000.00

N PEKERJAAN PANEL DAYA


4 Kapasitor Bank 25 kVAR Unit 2,400,000.00
5 Panel ATS 200 A Unit 37,500,000.00

O PEKERJAAN INSTALASI ELEKTRIKAL


1 Kabel, NYM 3 x 2,5 mm2 m 10,800.00
2 Kabel, NYM 3 x 4 mm2 m 17,600.00
3 Kabel, NYM 4 x 4 mm2 m 28,900.00
4 Kabel NYY 4 x 2,5 mm2 m 17,500.00
5 Kabel NYY 3 x 2,5 mm2 m 15,500.00
6 Kabel NYY 4 x 1,5 mm2 m 12615.72
7 Kabel, NYY 1 x 185 mm2 m 795,000.00
8 Kabel, NYY 4 x 4 mm2 m 30,000.00
9 Kabel, NYY 4 x 6 mm2 m 42,000.00
10 Kabel, NYY 4 x 10 mm2 m 67,000.00
11 Kabel, NYY 4 x 16 mm2 m 80,175.00
12 Kabel, NYY 4 x 25 mm2 m 130,000.00
13 Kabel, NYY 4 x 35 mm2 m 175,000.00
14 Kabel, NYY 4 x 50 mm2 m 225,000.00
15 Kabel, NYY 4 x 70 mm2 m 310,000.00

Harga Satuan Bahan Pekerjaan Perencanaan Pembangunan Gedung Kantor Pengadilan Agama Tais 6
HARGA SATUAN
NO. MATERIAL SATUAN
(Rp.)
16 Kabel, NYY 4 x 95 mm2 m 425,000.00
17 Kabel, NYY 4 x 120 mm2 m 535,000.00
18 Kabel, NYY 4 x 150 mm2 m 665,000.00
19 Kabel, NYA 1 x 6 mm2 m 8,400.00
20 Kabel, NYA 1 x 10 mm2 m 14,000.00
21 Kabel, NYA 1 x 16 mm2 m 13,000.00
22 Kabel, NYA 1 x 95 mm2 m 75,000.00
23 Kabel, NYFGbY 4 x 2,5 mm 2 m 20,000.00
24 Kabel, NYFGbY 4 x 4 mm2 m 29,000.00
25 Kabel, NYFGbY 4 x 10 mm2 m 49,000.00
26 Kabel, NYFGbY 4 x 16 mm2 m 65,000.00
27 Kabel, NYFGbY 4 x 25 mm2 m 95,000.00
28 Kabel, NYFGbY 4 x 35 mm2 m 125,000.00
29 Kabel, NYFGbY 4 x 50 mm2 m 165,000.00
30 Kabel, NYFGbY 4 x 120 mm2 m 668,500.00
31 Kabel, NYFGbY 4 x 95 mm2 m 520,000.00
32 Kabel, N2XSY (3 x 35 mm2) m 210,000.00
33 Kabel, NYFGbY 4 x 300 mm2 m 2,261,500.00
34 Kabel, UTP Cat 5e m 7,200.00
35 Kabel, UTP Cat 6e m 9,600.00
36 Kabel, Coaxial RG 6 m 6,000.00
37 Kabel, Coaxial RG 8 m 24,000.00
38 BC 6-10 mm2 m 15,000.00
39 BC 16 mm3 m 30,000.00
40 BC 50 mm2 m 55,200.00
41 BC 70 mm2 m 60,000.00
42 BC 95 mm2 m 90,000.00
43 Pipa Conduit (Ex. Ega) m 6,500.00
44 Socket Pipa Buah 1,210.00
45 Tee Doos Buah 3,300.00
46 Klem Pipa Buah 550.00
47 Fisher Buah 330.00
48 Las Doop Buah 440.00
49 Isolasi Ban Buah 17,600.00
50 Saklar Tunggal Standard (1 Phase) Buah 33,270.00
51 Saklar Ganda Standard (1 Phase) Buah 38,900.00
52 Stop Kontak Standard (1 Phase) Buah 28,210.00
53 Greed Switch 4 Gang Buah 44,500.00
54 Stop Kontak AC 3 Pin Set 100,000.00
55 Stop Kontak lantai Set 428,000.00
56 Instalasi Titik Lampu / Stop Kontak (Upah dan Alat) Titik 217,500.00
57 Power Monitoring (PM 820) Buah 9,717,246.00
58 Pilot Lamp Buah 128,865.00
59 Selector Switch M-O-A 2P Buah 161,535.00
60 Fuse & Indicator Buah 202,070.00
61 Arrester Buah 1,100,000.00
61 Box Panel (180 x 80 x 60) cm Buah 5,319,765.00
62 Box Panel (43 x 33 x 20) cm Buah 480,000.00
63 Rel MCB AIumunium m 10,000.00
64 MCB Domae 1 Kutub 4 A (Kap. < 4.5 KA) Buah 83,000.00
65 MCB Domae 1 Kutub 6 A (Kap. < 4.5 KA) Buah 83,000.00
66 MCB Domae 1 Kutub 10 A (Kap. 6 KA) Buah 83,000.00
67 MCB Domae 1 Kutub 16 A (Kap. 6 KA) Buah 83,000.00
68 MCB Domae 1 Kutub 20 A (Kap. 10 KA) Buah 83,000.00
69 MCB Domae 1 Kutub 25 A (Kap. 10 KA) Buah 92,400.00
70 MCB Domae 1 Kutub 32 A (Kap. 10 KA) Buah 96,800.00
71 MCB Domae 1 Kutub 35 A (Kap. 10 KA) Buah 135,520.00
72 MCB Domae 1 Kutub 40 A (Kap. 10 KA) Buah 140,965.00
73 MCB Domae 3 Kutub 10 A (Kap. 6 KA) Buah 381,150.00
74 MCB Domae 3 Kutub 16 A (Kap. 6 KA) Buah 381,150.00
74 MCB Domae 3 Kutub 20 A (Kap. 10 KA) Buah 381,150.00

Harga Satuan Bahan Pekerjaan Perencanaan Pembangunan Gedung Kantor Pengadilan Agama Tais 7
HARGA SATUAN
NO. MATERIAL SATUAN
(Rp.)
75 MCB Domae 3 Kutub 25 A (Kap. 10 KA) Buah 403,150.00
76 MCB Domae 3 Kutub 32 A (Kap. 15 KA) Buah 442,200.00
77 MCB Domae 3 Kutub 35 A (Kap. 15 KA) Buah 499,400.00
78 MCB Domae 3 Kutub 40 A (Kap. 15 KA) Buah 535,700.00
79 MCB Domae 3 Kutub 50 A (Kap. 20 KA) Buah 749,650.00
80 MCB Domae 3 Kutub 63 A (Kap. 20 KA) Buah 911,350.00
81 MCB Domae 3 Kutub 82 A (Kap. 20 KA) Buah 911,350.00
82 MCB Domae 3 Kutub 160 A (Kap. 20 KA) Buah 1,000,000.00
83 MCCB EZC100 F 3 Kutub 10 A (Kap. 10 KA) Buah 607,200.00
84 MCCB EZC100 F 3 Kutub 16 A (Kap. 10 KA) Buah 568,700.00
85 MCCB EZC100 F 3 Kutub 20 A (Kap. 10 KA) Buah 568,700.00
86 MCCB EZC100 F 3 Kutub 25 A (Kap. 10 KA) Buah 568,700.00
87 MCCB EZC100 F 3 Kutub 30 A (Kap. 15 KA) Buah 568,700.00
88 MCCB EZC100 F 3 Kutub 35 A (Kap. 15 KA) Buah 568,700.00
89 MCCB EZC100 F 3 Kutub 40 A (Kap. 15 KA) Buah 568,700.00
90 MCCB EZC100 F 3 Kutub 50 A (Kap. 20 KA) Buah 705,430.00
91 MCCB EZC100 F 3 Kutub 60 A (Kap. 20 KA) Buah 780,450.00
92 MCCB EZC100 N 3 Kutub 75 A (Kap. 20 KA) Buah 671,550.00
93 MCCB EZC100 N 3 Kutub 80 A (Kap. 20 KA) Buah 955,295.00
94 MCCB EZC100 N 3 Kutub 100 A (Kap. 20 KA) Buah 1,399,200.00
95 MCCB EZC100 N 3 Kutub 160 A (Kap. 20 KA) Buah 1,889,800.00
96 MCCB EZC100 N 3 Kutub 200 A (Kap. 20 KA) Buah 2,267,760.00
97 MCCB EZC100 N 3 Kutub 250 A (Kap. 20 KA) Buah 2,494,536.00
98 MCCB EZC100 N 3 Kutub 320 A (Kap. 20 KA) Buah 2,619,262.80
95 MCCB EZC100 N 3 Kutub 900A (Kap. 20 KA) Buah 13,600,000.00
96 ACB EZC100 N 3 Kutub 1250A (Kap. 50 KA) Buah 30,978,000.00
97 Box Panel MCB Sek. Presto Unit 39,500.00
98 Panel Unit + KWH Unit 3,000,000.00
98 Kabel Tray 30 x 30 cm m' 155,333.33
99 Kabel Tray 50 x 50 cm m' 360,000.00
99 Kabel Ladder 50 x 50 cm m' 181,333.33
100 Mangkok Listrik bh 3,000.00

P LAMPU DAN ARMATUR


1 Lampu Led Strip 12 W Buah 106,080.00
2 Lampu Spot Maresca LED 5 W Buah 295,900.00
3 Lampu Gantung Buah 990,000.00
4 Lampu LED DL 12 W + Aksesories Buah 95,000.00
5 Lampu DO ART LED 7 W Buah 633,333.33
6 Lampu Explotion TL LED 1 x 14 W Buah 1,088,235.00
7 Lampu Elektra 1 x 16 W Buah 275,000.00
8 Lampu Dimmer Buah 320,000.00
9 Lampu RMI 2 x 18 W Buah 665,400.00
10 Lampu LED Panel 40 W Buah 751,909.00
11 Lampu LED DL 5 W + Aksesories Buah 501,800.00
12 Lampu Sorot 5 W Buah 309,600.00
13 Lampu Sorot 8 W Buah 380,000.00
14 Lampu Exit Buah 860,000.00
15 Tiang PJU + Lampu penerangan Solar Cell 30 Watt Buah 26,000,000.00
DC Setara 250 Watt AC (Tiang Oktagonal Double tinggi 7m)
Material pelengkap ls 1,500,000.00
16 Tiang PJU Oktagonal 7 meter Buah 2,000,000.00
17 Lampu PJU LED 50 Watt Hinolux 220 V AC. Buah 2,160,000.00

Q GENSET
1 Unit Utama :
Unit Genset, Kapasitas :180 KVA c/w Panel Kontrol AMF & ATS Unit 290,000,000.00
Pemindahan Genset ke Pondasi unit 450,000.00
Grounding Body Genset titik 350,000.00
Ducting Pengarah Udara Panas unit 400,000.00
2 Sistem Bahan Bakar :

Harga Satuan Bahan Pekerjaan Perencanaan Pembangunan Gedung Kantor Pengadilan Agama Tais 8
HARGA SATUAN
NO. MATERIAL SATUAN
(Rp.)
Daily Storage Tank, Kapasitas : 200 Liter unit 1,500,000.00
Weekly Storage Tank, Kapasitas : 1000 Liter unit 3,500,000.00
Electric Transfer Pump 30 lpm / Gear Pump unit 2,500,000.00
Hand Pump 8 lpm unit 1,750,000.00
Pemipaan Bahan Bakar Pipa Black Steel Sch. 40 :
- Diameter 25 mm m' 64,000.00
- Gate Valve, Strainer, Check Valve + Aksesoris ls 2,500,000.00
- Level Switch + Kabel unit 3,000,000.00
3 Sistem Elektrikal
Panel Pompa Solar unit 2,000,000.00

R PENANGKAL PETIR
1 Air Terminal (R = 35 m), EF System Unit 7,000,000.00
2 Kabel XLPE 70 m2 m 259,200.00
3 Obstruction Lamp dan Instalasi m 3,000,000.00
4 Grounding System Set 2,000,000.00
- Copper Road
Pentanahan Max. 2 Ohm Bahan GSP Diameter 50 mm 2 + BC 70 mm2
Bak Kontrol (40 x 40 x 40) cm Lengkap dengan Cover
Material Bantu dan Aksesoris
5 Testing / Pengukuran Pentanahan Titik 2,000,000
6 Tiang / Menara - Dudukan EF Unit 1,050,000

S PEKERJAAN TELEPON
1 Peralatan Utama :
PABX 16/120 Extension set 19,900,000.00
Include :
- Billing System
- Battery Back Up
- Operator Console
- Biaya Pemasangan dan Setting Program PABX
- Battery + Charger
2 Main Distribution Frame (MDF) unit 978,500.00
3 CTBT 20 Pairs Unit 950,000.00
4 Terminal Box Telepon 10 Pairs Unit 272,250.00
5 Kabel, ITC 4 x 0,6 mm2 m 6,000.00
6 Kabel, ITC 2 Pairs m 4,500.00
7 Kabel, ITC 10 Pairs m 28,500.00
8 Kabel, ITC 20 Pairs m 43,500.00
9 Kabel, ITC 30 Pairs m 55,500.00
10 Kabel, ITC 40 Pairs m 69,000.00
11 Kabel, ITC 50 Pairs m 82,500.00
12 Kabel, ITC 60 Pairs m 96,000.00
13 Kabel, ITC 70 Pairs m 112,500.00
14 Kabel, ITC 80 Pairs m 130,500.00
15 Kabel, ITC 90 Pairs m 144,000.00
16 Kabel, ITC 100 Pairs m 156,000.00
17 Socket Telepon (RJ-11) Buah 87,500.00
18 Hand Set Analog Buah 854,700.00
19 Patch Panel + Switch HUB 12 Port Buah 835,000.00

T PEKERJAAN FIRE ALARM


1 MCFA Tipe Konvensional Kapasitas 20 Zone c/w Baterai dan Charger Unit 8,000,000.00
2 Main Distribution Frame (MDF) Fire Alarm 50 Pairs Unit 665,500.00
3 Announciator Panel 30 Zone Unit 7,623,000.00
4 Terminal Box Fire Alarm 24 Pairs Unit 544,500.00
5 Kabel, Twisted Shelded 18 PAR + NYM 2 x 2,5 mm 2 m 27,500.00
6 Rate Of Rise Heat Detector Buah 126,900.00
7 Independent Smoke Detector Buah 209,250.00
8 Manual Break Glass Buah 356,950.00
9 Alarm Bell 24 V DC Buah 326,700.00
10 Indicator Lamp Buah 53,240.00

Harga Satuan Bahan Pekerjaan Perencanaan Pembangunan Gedung Kantor Pengadilan Agama Tais 9
HARGA SATUAN
NO. MATERIAL SATUAN
(Rp.)

U PEKERJAAN LAN (DATA)


1 PC Lengkap dengan Peralatan untuk Instalasi Jaringan LAN dan Power Supply sebagai Server Set 15,000,000.00
2 Main Switch Unit 3,187,800.00
3 Socket Data Buah 105,000.00
4 Mikrotik RB1100ahx2 Wireless Router Buah 5,500,000.00
5 Switch Hub 16 Port Dalam Rack Buah 1,600,000.00
6 Pek. Pemasangan UPS 5 KVA / 2700 W Single Phase online Double Conversion Unit 42,500,000.00
Set. Vertiv Liebert GXT4-500RT230
7 Rack Server 19" Standing Close Rack Unit 9,130,000.00

V PEKERJAAN CCTV
1 Server Intel I3, 4 GB Ram HDD 3x4 TB, NVR R/W Unit 7,000,000.00
2 Network Video Recorder 32 Channel 100 MBPS Unit 6,050,000.00
3 Network Video Recorder 32 Channel 100 MBPS Unit 4,235,000.00
4 Switch Hub LINKSYS 8 Port Unit 869,000.00
5 Switch Hub LINKSYS 24 Port Unit 2,370,000.00
6 DVR CCTV HDD (32 Channel) Unit 14,172,000.00
7 Monitor CCTV + CPU Unit 12,000,000.00
8 Kamera CCTV Indoor Dome Camera Buah 680,000.00
9 Kamera CCTV Buah 803,000.00

X PEKERJAAN TATA SUARA


1 Power Amplifier 300 W Unit 9,000,000.00
2 Equalizer Unit 3,480,000.00
3 Mixer Pree Amp Unit 4,020,000.00
4 CD / MP3 Unit 330,000.00
5 Radio Tunner Unit 462,000.00
6 Emergency Microphone Unit 1,920,000.00
7 Pagging Microphone Unit 1,920,000.00
8 Main Distribution Frame (MDF) Sound System Unit 665,500.00
9 Cabinet Rack dan Aksesoris Set 2,750,000.00
10 Terminal Box - Sound System Unit 544,500.00
11 Kabel, NYMHY 3 x 1,5 mm2 m 12,000.00
12 Ceiling Speaker 3 W Buah 121,000.00
13 Volume Control Buah 128,150.00
14 Column Control Buah 828,000.00
15 Horn Speaker TOA Buah 765,000.00
16 Amplifier 100 V Buah 3,200,000.00
17 CD/MMC/USB player with FM Tunner Buah 5,201,000.00
18 Remote Microphone Buah 21,839,000.00
19 Fireman's Microphone Buah 16,762,000.00
20 Car Call Mic w/chime Buah 7,566,000.00
21 Voice Announcement Board w/ CF card (for Evac) Buah 12,532,000.00
22 System Manager w/ Modules Buah 69,751,000.00
23 Surveillance Frame w/ Modules Buah 110,226,000.00
24 10x420W Power Amplifier Buah 253,894,000.00
25 3x240W Power Amplifier (Car Call) Buah 60,867,000.00
26 Speaker Selector 3x10 ch Buah 14,904,000.00
27 Cabinet Rack w/Acc. Buah 60,962,000.00
28 Change Over Switch Buah 759,000.00
29 BOX 200 X 300 MM Buah 673,000.00
30 BOX MDF Buah 1,122,000.00

AA TATA UDARA DAN VENTILASI


1 Twining Kit Outdoor 76400 btuh Buah 26,820,300.00
2 Twining Kit Outdoor 191.000 btuh Buah 41,155,400.00
3 Ducting PU m2 480,000.00
4 Return Air Grille Buah 395,000.00
5 Box plenum Buah 650,000.00

Harga Satuan Bahan Pekerjaan Perencanaan Pembangunan Gedung Kantor Pengadilan Agama Tais 10
HARGA SATUAN
NO. MATERIAL SATUAN
(Rp.)
6 Flexible Duct m' 120,000.00
7 Remote Wired Buah 1,560,000.00
9 Wireles Remocon Buah 1,122,000.00
8 Exhaust Fan, Kapasitas 16 W / Ceiling Type Buah 560,000.00
9 Axial Fan Buah 23,166,000.00
10 Air Curtain Buah 1,415,700.00
11 Axian Fan Roof Buah 13,513,500.00
17 AC Split Wall Mounted 5800 btuh Buah 8,010,000.00
18 AC Split Wall Mounted 7500 btuh Buah 8,359,650.00
19 AC Split Wall Mounted 9600 btuh Buah 8,751,600.00
20 AC Split Wall Mounted 12300 btuh Buah 9,407,970.00
21 AC Split Wall Mounted 15400 btuh Buah 9,543,690.00
22 AC Split Wall Mounted 19100 btuh Buah 10,167,300.00
23 AC Cassette 12300 btuh Buah 10,400,000.00
24 AC Cassette 19100 btuh Buah 10,797,930.00
25 AC Cassette 24200 btuh Buah 12,213,630.00
26 AC Cassette 30700 btuh Buah 12,638,340.00
27 AC Cassette 47800 btuh Buah 16,519,230.00
28 AC Cassette Split 30700 btuh Buah 21,114,990.00
29 Outdoor Unit VRF 38.200 btuh Unit 31,185,000.00
29 Outdoor Unit VRF 133.800 btuh Unit 79,000,000.00
30 Outdoor Unit VRF 152.900 btuh Unit 88,000,000.00
31 Outdoor Unit VRF 191.100 btuh Unit 115,000,000.00
30 Outdoor Unit VRF 229.300 btuh Unit 132,500,000.00
36 Hight static ducted Indoor Drainpump 95500 btuh m 34,813,350.00
37 Pipa Refrigerant 1/4" - 5/8" ARTIC m 120,000.00
38 Pipa Refrigerant 1/4" - 3/8" TATEYAMA m 66,000.00
39 Pipa Refrigerant 1/4" - 1/2" TATEYAMA m 88,000.00
40 Y- Branch (Indoor Unit Connection) bh 1,200,000.00
41 Y- Branch (Outdoor Unit Connection) bh 1,200,000.00
42 Water Heater Wika EWH 30 Buah 4,400,000.00

AD PEKERJAAN UTAMA SUMUR BOR


1 Jasa pengeboran m 900,000
Persiapan Di Lapangan
- Mobilisasi Dan Demobilisasi Mesin
- Permbuatan Spull Bak/ Bak Sirkulasi
- Pembuatan Sumur Pantek
- Transportasi Bahan Dan Peralatan Kecil
- Transportasi Tenaga Kerja
- Jasa Konstruksi
- Jasa Bor Pilot Hole ( Sesuai Gambar Dan Spesifikasi )
- Jasa Reaming Pilot Hole ( Sesuai Gambar Dan Spesifikasi )
- Solar/Oli/Bensin/Bahan Las
2 Material Pemipaan
Pipa piso GIP Kelas Medium Dia. 2" m' 160,000.00
Stainless Steel Sreen Dia. 3" m' 95,000.00
Gravel pack/kerikil jagung ls 3,000,000.00
Pasir, semen dll ls 200,000.00
Grouting well ls 1,500,000.00
Test Geolistrik ls 7,500,000.00

Harga Satuan Bahan Pekerjaan Perencanaan Pembangunan Gedung Kantor Pengadilan Agama Tais 11

Anda mungkin juga menyukai

  • Metpel 14
    Metpel 14
    Dokumen5 halaman
    Metpel 14
    sugiyanto
    Belum ada peringkat
  • Metpel 16
    Metpel 16
    Dokumen2 halaman
    Metpel 16
    sugiyanto
    Belum ada peringkat
  • Metpel 18
    Metpel 18
    Dokumen3 halaman
    Metpel 18
    sugiyanto
    Belum ada peringkat
  • Metpel 15
    Metpel 15
    Dokumen3 halaman
    Metpel 15
    sugiyanto
    Belum ada peringkat
  • Metpel 13
    Metpel 13
    Dokumen5 halaman
    Metpel 13
    sugiyanto
    Belum ada peringkat
  • Metpel 11
    Metpel 11
    Dokumen5 halaman
    Metpel 11
    sugiyanto
    Belum ada peringkat
  • Metpel 10
    Metpel 10
    Dokumen4 halaman
    Metpel 10
    sugiyanto
    Belum ada peringkat
  • Metpel 17
    Metpel 17
    Dokumen4 halaman
    Metpel 17
    sugiyanto
    Belum ada peringkat
  • METPEL6
    METPEL6
    Dokumen5 halaman
    METPEL6
    sugiyanto
    Belum ada peringkat
  • Metpel PP 2
    Metpel PP 2
    Dokumen10 halaman
    Metpel PP 2
    sugiyanto
    Belum ada peringkat
  • Metpel 12
    Metpel 12
    Dokumen5 halaman
    Metpel 12
    sugiyanto
    Belum ada peringkat
  • Metpel PP 8
    Metpel PP 8
    Dokumen7 halaman
    Metpel PP 8
    sugiyanto
    Belum ada peringkat
  • Metpel PP 9
    Metpel PP 9
    Dokumen5 halaman
    Metpel PP 9
    sugiyanto
    Belum ada peringkat
  • Metpel 5
    Metpel 5
    Dokumen4 halaman
    Metpel 5
    sugiyanto
    Belum ada peringkat
  • Metpel 7
    Metpel 7
    Dokumen5 halaman
    Metpel 7
    sugiyanto
    Belum ada peringkat
  • Schedule - Bedah Ke 2
    Schedule - Bedah Ke 2
    Dokumen17 halaman
    Schedule - Bedah Ke 2
    sugiyanto
    Belum ada peringkat
  • METPEL4
    METPEL4
    Dokumen5 halaman
    METPEL4
    sugiyanto
    Belum ada peringkat
  • Bab V
    Bab V
    Dokumen20 halaman
    Bab V
    sugiyanto
    Belum ada peringkat
  • Metpel PP3
    Metpel PP3
    Dokumen10 halaman
    Metpel PP3
    sugiyanto
    Belum ada peringkat
  • RS Ende Bab 1
    RS Ende Bab 1
    Dokumen6 halaman
    RS Ende Bab 1
    sugiyanto
    Belum ada peringkat
  • Diagram RSUD BOB BAZAR
    Diagram RSUD BOB BAZAR
    Dokumen15 halaman
    Diagram RSUD BOB BAZAR
    sugiyanto
    Belum ada peringkat
  • Kebutuhan Luas Ruang
    Kebutuhan Luas Ruang
    Dokumen11 halaman
    Kebutuhan Luas Ruang
    sugiyanto
    Belum ada peringkat
  • Bab 6. Rekomendasi
    Bab 6. Rekomendasi
    Dokumen2 halaman
    Bab 6. Rekomendasi
    sugiyanto
    Belum ada peringkat
  • Bab 5. Pentahapan Pembangunan
    Bab 5. Pentahapan Pembangunan
    Dokumen5 halaman
    Bab 5. Pentahapan Pembangunan
    sugiyanto
    Belum ada peringkat
  • Rencana Sistem Saluran Air Bersih
    Rencana Sistem Saluran Air Bersih
    Dokumen1 halaman
    Rencana Sistem Saluran Air Bersih
    sugiyanto
    Belum ada peringkat
  • Bab 4. Konsep Masterplan
    Bab 4. Konsep Masterplan
    Dokumen40 halaman