Anda di halaman 1dari 1

FORMULIR PENGAJUAN ANGGARAN DAN REALISASI PENGELUARAN OPERASIONAL

ADVANCE REQUEST - EXPENSE REPORT FORM


NAMA SUPIANNOOR JOB. NO WO-03.0000 /DSL/JHONLIN GROUP. PT /2022

NIK PROJECT MV. RUI NING 7 (Cargo 50.000 MT)

DIVISI Marine LOKASI TANJUNG PEMANCINGAN

SHIPPER JHONLIN GROUP. PT

NO. PENGAJUAN : 0015/ADM-FN/BJB/IV/2022 (Diisi Finance)

PENGAJUAN REALISASI
TANGGAL DESKRIPSI JUMLAH KETERANGAN TANGGAL DESKRIPSI JUMLAH KETERANGAN
08 April 2022 UHPD Surveyor Rp 1.600.000 Estimasi 8 Hari

08 April 2022 UHPD Sampler @ Rp 200.000 X 3 Org Rp 4.800.000 Estimasi 8 Hari

08 April 2022 Carter Mobil Rp 1.600.000 Antar Jemput Team

08 April 2022 Antigen @ Rp 100.000 Rp 400.000 4 Orang

08 April 2022 Biaya Speed @ Rp 1.800.000 Rp 2.400.000 Initial + Final

08 April 2022 Biaya Speed @ Rp 1.800.000 Rp 2.400.000 Delivery Sample 2 Kali

08 April 2022 Ongkos angkut Sample @ Rp 2.000/bag Rp 100.000 Estimasi 50 Bag

08 April 2022 Biaya Karung + Plastik @ Rp 6.000 Rp 300.000 Estimasi 50 Bag

08 April 2022 Lakban + Spidol Rp 60.000

TOTAL Rp 13.660.000 TOTAL Rp -

DISETUJUI OLEH DITERIMA OLEH, DI BUAT DISETUJUI OLEH DITERIMA OLEH, DIBUAT OLEH,

( GUSTIAR MUSLIM ) ( DIMAS WIJANARKO ) SUPIANNOOR ( GUSTIAR MUSLIM ) ( DIMAS WIJANARKO ) SUPIANNOOR

Anda mungkin juga menyukai