Nomor : HK.02.03-Satker.Bz.RENTAU/08
Tanggal : 20 Februari 2017
PAKET 05
FEASIBILITY STUDI DI LINGKUNGAN BALAI BESAR PELAKSANAAN JALAN N
SATUAN KERJA BALAI BESAR PELAKSANAAN JALAN NASIONAL X
Tahun Anggaran 2017
NO. RINCIAN
Terbilang : Dua Miliar Tiga Ratus Dua Puluh Juta Lima Ratus Lima Ribu Rupiah
PPK BIDANG PE
PEMA
PT. MARATAMA CIPTA MANDIRI SATUAN KER
PELAKSANAAN J
Sudrajat, ST
DIREKTUR Ir. Reno
NIP. 1962060
LAMPIRAN KONTRAK
or : HK.02.03-Satker.Bz.RENTAU/08
Tanggal : 20 Februari 2017
PAKET 05
KUNGAN BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
ALAI BESAR PELAKSANAAN JALAN NASIONAL XI
Tahun Anggaran 2017
HARGA KONTRAK
938,000,000.00
612,500,000.00
231,000,000.00
1,781,500,000.00
129,000,000.00
187,600,000.00
11,450,000.00
328,050,000.00
2,109,550,000.00
210,955,000.00
2,320,505,000.00
2,320,505,000.00
B
PPK BIDANG PERENCANAAN
an DAN
PEMANTAUAN
jar
SATUAN KERJA BALAI BESAR
PELAKSANAAN JALANm NASIONAL XI
as
in,
Ja
Ir. Reno Ginto, M.Sc
nu
NIP. 19620601 199008 1 002
ari
20
16
P
ej
ab
at
I BIAYA LANGSUNG PERSONIL
HARGA KONTRAK
Jumlah TOTAL BIAYA
No. Nama Personil Posisi / Jabatan Satuan Harga Satuan (Rp)
Org Rp
Survey Pengukuran
- Uang Harian (5 orang x 1 Provinsi x 5 hr) 5 3.00 OH 15.00 400,000.00
- Biaya Inap (5 orang x 4 mlm) 5 4.00 OH 20.00 600,000.00
- Labour 10 5.00 OH 50.00 250,000.00
- Sewa Alat Theodolite T2 1 5.00 UH 5.00 350,000.00
- Sewa Alat Theodolite T0 1 5.00 UH 5.00 1,250,000.00
- Sewa Alat Waterpass 1 5.00 UH 5.00 250,000.00
- Patok Benckmark (BM) 15 1.00 BH 15.00 450,000.00
- Patok Kayu 30 1.00 BH 30.00 150,000.00
- Pita Ukur 10 M 1 5.00 UH 5.00 80,000.00
- Pita Ukur 50 M 1 5.00 UH 5.00 150,000.00
- Sewa Kamera Digital 1 1.00 LS 1.00 350,000.00
- Perlengkapan Personil 1 1.00 LS 1.00 1,500,000.00
- Sewa Roda Empat + Operasional 1 6.00 UH 6.00 950,000.00
10,500,000.00
14,000,000.00
2,450,000.00
4,550,000.00
35,000,000.00
17,500,000.00
45,000,000.00
129,000,000.00
HARGA KONTRAK
TOTAL BIAYA
Rp
10,000,000.00
12,000,000.00
150,000.00
350,000.00
1,500,000.00
5,700,000.00
6,000,000.00
12,000,000.00
12,500,000.00
1,750,000.00
6,250,000.00
1,250,000.00
6,750,000.00
4,500,000.00
400,000.00
750,000.00
350,000.00
1,500,000.00
5,700,000.00
8,400,000.00
10,800,000.00
HARGA KONTRAK
TOTAL BIAYA
Rp
7,000,000.00
1,000,000.00
900,000.00
5,700,000.00
-
-
8,400,000.00
10,800,000.00
8,750,000.00
1,000,000.00
900,000.00
5,700,000.00
-
-
5,600,000.00
7,200,000.00
8,750,000.00
1,000,000.00
600,000.00
5,700,000.00
187,600,000.00
HARGA KONTRAK
TOTAL BIAYA
Rp
500,000.00
500,000.00
1,000,000.00
500,000.00
400,000.00
400,000.00
500,000.00
750,000.00
1,350,000.00
750,000.00
300,000.00
4,500,000.00
11,450,000.00
328,050,000.00