REKAPILUTASI DAFTAR KUANTITAS DAN HARGA

SATUAN KERJA : SNVT PELAKSANAAN JARINGAN SUMBER AIR SUMATERA - I


SATUAN KEGIATAN : SUNGAI DAN PANTAI - I (BARAT)
SUPERVISI PEMBANGUNAN PRASARANA PENGENDALIAN BANJIR SUNGAI KRUENG SINGKIL
PEKERJAAN :
DI KABUPATEN ACEH SINGKIL
LOKASI : KABUPATEN ACEH SINGKIL
SUMBER DANA : APBN - SBSN
TAHUN ANGGARAN : 2018
TAHUN PELAKSANAAN : 2018
MASA PELAKSANAAN : 6 Bulan

NO URAIAN PEKERJAAN NILAI PEKERJAAN

I. BIAYA LANGSUNG PERSONIL

A TENAGA PROFESIONAL 204,000,000


B TENAGA SUB PROFESIONAL DAN PENDUKUNG 216,000,000
Sub total I 420,000,000
II. BIAYA LANGSUNG NON PERSONIL

A BIAYA MOBILISASI DAN DEMOBILISASI 5,000,000


B BIAYA PERALATAN KANTOR 11,600,000
C BIAYA PERLENGKAPAN KANTOR (Sewa) 6,600,000
D BIAYA KOMPUTERISASI (Sewa) 7,700,000
E BIAYA KOMUNIKASI 600,000
F BIAYA PERLENGKAPAN KHUSUS 13,160,000
G BIAYA SEWA KANTOR 9,000,000
H BIAYA SEWA KENDARAAN (Roda 4 dan 2) 78,000,000
I BIAYA PELAPORAN (Cetak dan Jilid) 13,250,000
Sub total II 144,910,000

JUMLAH (I+II) 564,910,000


PPN 10 % 56,491,000

TOTAL 621,401,000

DIBULATKAN 621,400,000

Terbilang : ENAM RATUS DUA PULUH SATU JUTA EMPAT RATUS RIBU RUPIAH

Banda Aceh, 23 April 2018


PT. GLOBAL REKAYASA KONSULTAN

Armido, ST
Direktur Utama
DAFTAR KUANTITAS DAN HARGA

SATUAN KERJA : SNVT PELAKSANAAN JARINGAN SUMBER AIR SUMATERA - I


SATUAN KEGIATAN : SUNGAI DAN PANTAI - I (BARAT)
PEKERJAAN : SUPERVISI PEMBANGUNAN PRASARANA PENGENDALIAN BANJIR SUNGAI KRUENG SINGKIL
DI KABUPATEN ACEH SINGKIL.
LOKASI : KABUPATEN ACEH SINGKIL
SUMBER DANA : APBN - SBSN
TAHUN ANGGARAN : 2018
TAHUN PELAKSANAAN : 2018
MASA PELAKSANAAN : 6 BULAN

HARGA JUMLAH
No URAIAN SAT. VOL. SATUAN BIAYA
(Rp) (Rp)
1 2 3 4 5 6
I. BIAYA LANGSUNG PERSONIL 420,000,000
A. TENAGA PROFESIONAL 204,000,000
POSISI PENUGASAN
1 Ketua Tim (Team Leader) / Ahli Muda ( S1 / 3 thn ) ( 1 org × 6 bln) OB 6.00 22,000,000 132,000,000
2 Ahli Sungai / Ahli Muda ( S1 / 1 thn ) ( 1 org × 1 bln) OB 1.00 18,000,000 18,000,000
3 Ahli Konst. Bang. Air (Sungai) / Ahli Muda ( S1 / 1 thn ) ( 1 org × 1 bln) OB 1.00 18,000,000 18,000,000
4 Ahli Geoteknik/Mekanika Tanah / Ahli Muda ( S1 / 1 thn ) ( 1 org × 1 bln) OB 1.00 18,000,000 18,000,000
5 Ahli K3 Konstruksi / Ahli Muda ( S1 / 1 thn ) ( 1 org × 1 bln) OB 1.00 18,000,000 18,000,000

B TENAGA PENDUKUNG (STAF PENUNJANG) 216,000,000


1 Pengawas Utama ( C. I ) ( S1 / 3 thn) ( 1 org × 6 bln) OB 6.00 12,000,000 72,000,000
2 Pengawas Konstruksi ( S1/D3 / 3/5 thn) ( 1 org × 6 bln) OB 6.00 10,000,000 60,000,000
3 Juru Ukur ( D3 / 5 thn) ( 1 org × 2 bln) OB 2.00 9,000,000 18,000,000
4 Draftman AutoCAD ( D3/SMK / 3/5 thn) ( 1 org × 2 bln) OB 2.00 4,500,000 9,000,000
5 Sekretaris / Bendahara ( 1 org × 6 bln) OB 6.00 4,000,000 24,000,000
6 Operator Komputer ( 1 org × 6 bln) OB 6.00 3,000,000 18,000,000
7 Pembantu Kantor OB 6.00 2,500,000 15,000,000
HARGA JUMLAH
No URAIAN SATUAN VOLUME SATUAN BIAYA
(Rp) (Rp)

II. BIAYA LANGSUNG NON PERSONIL 144,910,000


A. BIAYA MOBILISASI DAN DEMOBILISASI 5,000,000
Tiket Penerbangan
1 Ketua Tim ( 1 org × 2.00 kl ) Trip 2.00 500,000 1,000,000
2 Ahli Sungai ( 1 org × 2.00 kl ) Trip 2.00 500,000 1,000,000
3 Ahli Konst. Bang. Air (Sungai) ( 1 org × 2.00 kl ) Trip 2.00 500,000 1,000,000
4 Ahli Geoteknik / Mekanika Tanah ( 1 org × 2.00 kl ) Trip 2.00 500,000 1,000,000
5 Ahli K3 Konstruksi ( 1 org × 2.00 kl ) Trip 2.00 500,000 1,000,000

B. BIAYA PERALATAN KANTOR 11,600,000


Biaya Alat Tulis dan Bahan Pakai Habis
1 Alat Tulis Kantor Ls 1.00 6,600,000 6,600,000
2 Bahan Komputer Ls 1.00 5,000,000 5,000,000

C. BIAYA PERLENGKAPAN KANTOR (Sewa) 6,600,000


1 Meja & Kursi Kerja ( 4 Set × 6 Bln ) SET BLN 24.00 150,000 3,600,000
2 Meja & Kursi Rapat ( 1 Set × 6 Bln ) SET BLN 6.00 300,000 1,800,000
3 White Board ( 1 Set × 6 Bln ) Unit.Bln 6.00 50,000 300,000
4 Filling Kabinet ( 1 Set × 6 Bln ) Unit.Bln 6.00 100,000 600,000
5 Water Dispenser ( 1 Set × 6 Bln ) Unit.Bln 6.00 50,000 300,000

D. BIAYA KOMPUTERISASI (Sewa) 7,700,000


1 Personal Komputer (Operator Kantor) ( 1 Unit × 6 Bln ) Set Bln 6.00 500,000 3,000,000
2 Personal Komputer (Operator Draftman) ( 1 Unit × 2 Bln ) Set Bln 2.00 500,000 1,000,000
3 Printer Ukuran A3 ( 1 Unit × 2 Bln ) Set Bln 2.00 350,000 700,000
4 Printer Ukuran A4 ( 1 Unit × 6 Bln ) Set Bln 6.00 100,000 600,000
5 Note Book ( 1 Unit × 6 Bln ) Set Bln 6.00 400,000 2,400,000

E. BIAYA KOMUNIKASI 600,000


1 Telex/Telepon/Faximile/Telepon Seluler ( 1 Unit × 6 Bln ) Ls 1.00 600,000 600,000

F. BIAYA PERLENGKAPAN KHUSUS 13,160,000


1 Theodolite T-1 - Topografi (sewa) (1 Set × 2 bln) Set Bln 2.00 1,400,000 2,800,000
2 Water Pass (Sewa) (1 Set × 2 bln) Set Bln 2.00 1,500,000 3,000,000
3 Roll Meter 50 m set 1.00 100,000 100,000
4 Kamera Digital & Drone (Editing video) - Dokumentasi (sewa) Unit Bln 6.00 1,000,000 6,000,000
5 Perlengkapan lapangan (paku, cat, spidol, kertas, alas tulis dll) Ls 1.00 1,100,000 1,100,000
6 Patok Kayu Btg 20.00 8,000 160,000

G. BIAYA SEWA KANTOR 9,000,000


1 Sewa Kantor/Mess UNIT BLN 6.00 1,000,000 6,000,000
2 Biaya Operasional Kantor Proyek (termasuk Listrik, Air, Kebersihan dan Perawatan) UNIT BLN 6.00 500,000 3,000,000

H. BIAYA SEWA KANTOR 78,000,000


1 Sewa & Ops. Kenderaan Roda 4 (1 Unit × 6 bln) UB 6.00 10,000,000 60,000,000
2 Sewa & Ops. Kenderaan Roda 2 (C.I) (1 Unit × 6 bln) UB 6.00 1,500,000 9,000,000
3 Sewa & Ops. Kenderaan Roda 2 (Inspektor) (1 Unit × 6 bln) UB 6.00 1,500,000 9,000,000

I. BIAYA PELAPORAN (Cetak dan Jilid) 13,250,000


1 Laporan Rencana Mutu Kontrak Bk 3.00 150,000 450,000
2 Draft Laporan Pendahuluan Bk 3.00 100,000 300,000
3 Laporan Pendahuluan Bk 3.00 150,000 450,000
4 Laporan Hasil Kerja Tenaga Ahli (4 OB × 3 bk) Bk 12.00 150,000 1,800,000
5 Laporan bulanan @ 3 bk (3 Bk × 6 bln) Bk 18.00 100,000 1,800,000
6 Laporan Mingguan (24 Ming × 3 bln) Bk 72.00 50,000 3,600,000
7 Draft Laporan Akhir Bk 3.00 150,000 450,000
8 Laporan Akhir dan Penunjang Bk 3.00 200,000 600,000
9 Penggandaan Gambar A3 (As - Built Drawing) Bk 3.00 250,000 750,000
10 Laporan Hasil Pengukuran MC Bk 3.00 150,000 450,000
11 Dokumentasi/ Album Photo Bk 3.00 200,000 600,000
12 Cetak Bookleft + CD-R Bk 25.00 20,000 500,000
13 External Memory 1 TB (Berisi Laporan, File Photo, Video Situasi Drone, Dok. Lapangan & Gambar) Unit 1.00 1,500,000 1,500,000
JADWAL PELAKSANAAN KONSULTAN SUPERVISI

PEKERJAAN : SUPERVISI PEMBANGUNAN PRASARANA PENGENDALIAN BANJIR SUNGAI KRUENG SINGKIL DI KABUPATEN ACEH SINGKIL
KONSULTAN : PT GLOBAL REKAYASA KONSULTAN
TAHUN ANGGARAN : 2018

TAHUN 201
Harga Satuan Jumlah Harga BOBOT Bulan Ke-1 Bulan Ke-2 Bulan Ke-3
No. URAIAN VOLUME SATUAN
11 MEI - 09 JUNI 10 JUNI - 09JULI 10 JULI - 08 AGUSTUS
(Rp.) (Rp.) (%) 11 - 17 18 - 24 25 - 01 02 - 09 10 - 16 17 - 23 24 - 01 02 - 09 10 - 16 17 - 23 24 - 31 01 - 08

I. BIAYA LANGSUNG PERSONIL


A. BIAYA TENAGA AHLI
22,000,000 132,000,000.00 0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974
1 Ketua Tim 6.00 OB 23.367
0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974
18,000,000 18,000,000.00 0.398 0.398 0.398 0.398 0.398 0.398 0.398 0.398
2 Ahli Sungai 1.00 OB 3.186
0.398 0.398 0.398 0.398 0.398 0.398 0.398 0.398
18,000,000 18,000,000.00 0.797 0.797 0.797 0.797
3 Ahli Konstruksi Bangunan Air 1.00 OB 3.186
0.797 0.797 0.797 0.797
18,000,000 18,000,000.00 0.797 0.797 0.797 0.797
4 Ahli Geoteknik 1.00 OB 3.186
0.797 0.797 0.797 0.797
18,000,000 18,000,000.00 0.797 0.797
5 Ahli K3 Konstruksi 1.00 OB 3.186
0.797 0.797

B BIAYA TENAGA pendukung


12,000,000 72,000,000.00 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531
1 Pengawas Utama 6.00 OB 12.745
0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531
10,000,000 60,000,000.00 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443
2 Pengawas Konstruksi 6.00 OB 10.621
0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443
9,000,000 18,000,000.00 0.398 0.398 0.398 0.398 0.398 0.398 0.398 0.398
3 Juru Ukur 2.00 OB 3.186
0.398 0.398 0.398 0.398
4,500,000 9,000,000.00 0.199 0.199 0.199 0.199 0.199 0.199
4 Draftman AutoCAD 2.00 OB 1.593
0.199 0.199 0.199 0.199
4,000,000 24,000,000.00 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177
5 Sekretaris/Bendahara 6.00 OB 4.248
0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177
3,000,000 18,000,000.00 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133
6 Operator Komputer 6.00 OB 3.186
0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133
2,500,000 15,000,000.00 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111
7 Pembantu Kantor 6.00 OB 2.655
0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111

II. BIAYA LANGSUNG NON PERSONIL


A. BIAYA MOBILISASI DAN DEMOBILISASI
Tiket penerbangan
500,000 1,000,000.00 0.089
1 Ketua Tim 2.00 Trip 0.177

500,000 1,000,000.00 0.089 0.089


2 Ahli Sungai 2.00 Trip 0.177

500,000 1,000,000.00 0.089 0.089


3 Ahli Konstruksi Bangunan Air 2.00 Trip 0.177

500,000 1,000,000.00 0.089 0.089


4 Ahli Geoteknik 2.00 Trip 0.177

500,000 1,000,000.00 0.089


5 Ahli K3 Konstruksi 2.00 Trip 0.177

B BIAYA PERALATAN KANTOR


Biaya Alat Tulis dan Bahan Habis Pakai
6,600,000 6,600,000.00 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049
1 Alat Tulis Kantor 1.00 Ls 1.168
0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049
5,000,000 5,000,000.00 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037
2 Bahan Komputer 1.00 Ls 0.885
0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037

C BIAYA PERLENGKAPAN KANTOR (Sewa)


150,000 3,600,000.00 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
1 Meja & Kursi Kerja 24.00 SET BLN 0.637
0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
300,000 1,800,000.00 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
2 Meja & Kursi Rapat 6.00 SET BLN 0.319
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
50,000 300,000.00 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
3 White Board 6.00 Unit.Bln 0.053
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
100,000 600,000.00 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
4 Filling Kabinet 6.00 Unit.Bln 0.106
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
50,000 300,000.00 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
5 Water Dispenser 6.00 Unit.Bln 0.053
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

D BIAYA KOMPUTERISASI (Sewa)


500,000 3,000,000.00 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
1 Personal Komputer (Operator Komputer) 6.00 Set Bln 0.531
0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
500,000 1,000,000.00 0.022 0.022 0.022 0.022
2 Personal Komputer (Operator Draftman) 2.00 Set Bln 0.177
0.022 0.022 0.022 0.022
350,000 700,000.00 0.015 0.015
3 Printer A3 2.00 Set Bln 0.124
0.015 0.015 0.015 0.015 0.015 0.015
100,000 600,000.00 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
4 Printer A4 6.00 Set Bln 0.106
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
400,000 2,400,000.00 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
5 Note Book 6.00 Set Bln 0.425
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018

E BIAYA KOMUNIKASI
600,000 600,000.00 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
1 Telepon/Faximile/Telepon Selular 1.00 Ls 0.106
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

F BIAYA PERLENGKAPAN KHUSUS REALISASI


1,400,000 2,800,000.00 0.062 0.062 0.062 0.062 0.062 0.062 0.062 0.062
1 Theodolite (Sewa) 2.00 Set Bln 0.496
REALISASI

1 Theodolite (Sewa) 2.00 Set Bln 0.496


0.062 0.062 0.062 0.062
1,500,000 3,000,000.00 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066
2 Waterpass (Sewa) 2.00 Set Bln 0.531
0.066 0.066 0.066 0.066
100,000 100,000.00 0.018
3 Roll Meter 50 m 1.00 set 0.018
0.018
1,000,000 6,000,000.00 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044
4 Kamera Digital & Drone (Editing video) - Dokumentasi (sewa) 6.00 Unit Bln 1.062
0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044
1,100,000 1,100,000.00 0.195
Perlengkapan Lapangan (Paku, cat, Spidol, kertas, alat tulis,
5 1.00 Ls 0.195
dll)
0.195
8,000 160,000.00 0.028
6 Patok Kayu 20.00 Btg 0.028
0.028

RENCANA
G BIAYA SEWA KANTOR
1,000,000 6,000,000.00 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044
1 Sewa Kantor/Mess 6.00 UNIT BLN 1.062
0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044

Biaya Operasional Kantor Proyek (termasuk Listrik, Air, 500,000 3,000,000.00 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
2 6.00 UNIT BLN 0.531
Kebersihan dan Perawatan) 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
H BIAYA SEWA KENDARAAN (Roda 4 dan 2)
10,000,000 60,000,000.00 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443
1 Sewa & Ops. Kendaraan roda 4 6.00 UB 10.621
0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443
1,500,000 9,000,000.00 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066
2 Sewa & Ops. Kendaraan roda 2 (CI) 6.00 UB 1.593
0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066
1,500,000 9,000,000.00 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066
3 Sewa & Ops. Kendaraan roda 2 (Inspektor) 6.00 UB 1.593
0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066

I BIAYA PELAPORAN (Cetak dan Jilid)


150,000 450,000.00 0.080
1 Rencana Mutu Kontrak 3.00 Bk 0.080
0.080
100,000 300,000.00 0.053
2 Draft Laporan Pendahuluan 3.00 Bk 0.053
0.053
150,000 450,000.00 0.080
3 Laporan Pendahuluan 3.00 Bk 0.080
0.080
150,000 1,800,000.00 0.319
4 Laporan Hasil Kerja Tenaga Ahli 12.00 Bk 0.319
0.319
100,000 1,800,000.00 0.053 0.053 0.053
5 Laporan Bulanan @3 bk 18.00 Bk 0.319
0.053 0.053 0.053
50,000 3,600,000.00 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
6 Laporan Mingguan 72.00 Bk 0.637
0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
150,000 450,000.00
7 Draft Laporan Akhir 3.00 Bk 0.080

200,000 600,000.00
8 Laporan Akhir dan Penunjang 3.00 Bk 0.106

250,000 750,000.00
9 Penggandaan Gambar A3 (As Built Drawing) 3.00 Bk 0.133

150,000 450,000.00
10 Laporan hasil Pengukuran MC 3.00 Bk 0.080

200,000 600,000.00
11 Dokumentasi/Album Foto 3.00 Bk 0.106

20,000 500,000.00
12 Cetak Bookleft 25.00 Bk 0.089

1,500,000 1,500,000.00
13 Eksternal Memory 1 TB 1.00 Unit 0.266

Jumlah 564,910,000.00 0100.000 10

Rencana 3.352 3.396 4.030 3.922 4.276 4.188 5.272 5.325 6.091 6.091 5.580 5.952

Kumulatif Rencana - - 3.352 6.747 10.778 14.700 18.977 23.165 28.437 33.762 39.853 45.944 51.524 57.476

Realisasi 3.26 3.40 3.50 3.92 4.98 4.98 6.00 5.52 4.69 4.69 4.50 4.87

Kumulatif Realisasi - - 3.26 6.66 10.16 14.09 19.07 24.05 30.05 35.57 40.27 44.96 49.46 54.32

Deviasi -0.09 -0.09 -0.62 -0.62 0.09 0.89 1.61 1.81 0.41 -0.98 -2.07 -3.15

Pejabat Pembuat Komitmen


Sungai dan Pantai - I (Barat)
Provinsi Aceh
Suherman, ST
NIP. 19710616 200212 1 003
ANAAN KONSULTAN SUPERVISI

TAHUN 2018
Bulan Ke-4 Bulan Ke-5 Bulan Ke-6
KET
09 AGUSTUS - 07 SEPTEMBER 08 SEPTEMBER - 07 OKTOBER 08 OKTOBER - 06 NOPEMBER
09 - 15 16 - 22 23 - 30 31 - 07 08 - 14 15 - 21 22 - 29 30 - 07 08 - 14 15- 21 22 - 29 30 - 06

0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974 0.974 100
0.974 0.974 0.974 0.974

0.797 0.797
0.797 0.797

0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531
90
0.531 0.531 0.531 0.531
0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443
0.443 0.443 0.443 0.443

0.199 0.199

0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177
0.177 0.177 0.177 0.177
0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133
0.133 0.133 0.133 0.133
0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111 0.111
0.111 0.111 0.111 0.111 80
0.089

0.089 70

0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049
0.049 0.049 0.049 0.049
0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037
0.037 0.037 0.037 0.037

0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
0.027 0.027 0.027 0.027
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 60
0.013 0.013 0.013 0.013
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.004 0.004 0.004 0.004
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002

0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
0.022 0.022 0.022 0.022
0.022 0.022 0.022 0.022
0.022 0.022 0.022 0.022
50
0.015 0.015 0.015 0.015 0.015 0.015
0.015 0.015
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.004 0.004 0.004 0.004
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.018 0.018 0.018 0.018

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.004 0.004 0.004 0.004

REALISASI

40
REALISASI

40

0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044
0.044 0.044 0.044 0.044

RENCANA
30
0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044
0.044 0.044 0.044 0.044

0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022

0.022 0.022 0.022 0.022

20

10
0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443 0.443
0.443 0.443 0.443 0.443
0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066
0.066 0.066 0.066 0.066
0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066
0.066 0.066 0.066 0.066
20

0.053 0.053 0.053


0.053
0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
0.027 0.027 0.027 0.027 10
0.080

0.106

0.133

0.080

0.106

0.089

0.266
-
10 20

4.296 4.385 3.301 3.354 3.279 3.279 3.263 3.396 3.263 3.263 4.042 3.405

61.772 66.157 69.458 72.811 76.090 79.368 82.631 86.027 89.290 92.553 96.595 100.000

4.10 4.10 3.29 3.34

58.42 62.52 65.80 69.14

-3.35 -3.64 -3.65 -3.67

Banda Aceh, September 2018


PT. Global Rekayasa Konsultan
Armido, ST
Direktur Utama
PROGRESS KEGIATAN 11 MEI 2018 S/D 07 SEPTEMBER 2018

PEKERJAAN : SUPERVISI PEMBANGUNAN PRASARANA PENGENDALIAN BANJIR SUNGAI KRUENG SINGKIL DI KABUPATEN ACEH SINGKIL
KONSULTAN : PT GLOBAL REKAYASA KONSULTAN
TAHUN ANGGARAN : 2018

KEMAJUAN PEKERJAAN
BULAN LALU BULAN INI S/D BULAN INI
BOBOT
No. URAIAN VOLUME SATUAN Bobot Terhadap Bobot Terhadap Bobot Terhadap Bobot Terhadap Bobot Terhadap Bobot Terhadap KET
Pekerjaan Kontrak Pekerjaan Kontrak Pekerjaan Kontrak

(%) % % % %

I. BIAYA LANGSUNG PERSONIL


A. BIAYA TENAGA AHLI - 28.32 28.32

1 Ketua Tim 6.00 OB 23.367 - - 66.67 15.58 66.67 15.58 BELUM SELESAI

2 Ahli Sungai 1.00 OB 3.186 - - 100.00 3.19 100.00 3.19 SELESAI

3 Ahli Konstruksi Bangunan Air 1.00 OB 3.186 - - 100.00 3.19 100.00 3.19 SELESAI

4 Ahli Geoteknik 1.00 OB 3.186 - - 100.00 3.19 100.00 3.19 SELESAI

5 Ahli K3 Konstruksi 1.00 OB 3.186 - - 100.00 3.19 100.00 3.19 BELUM SELESAI

B BIAYA TENAGA pendukung - 24.69 24.69

1 Pengawas Utama 6.00 OB 12.745 - - 66.67 8.50 66.67 8.50 BELUM SELESAI

2 Pengawas Konstruksi 6.00 OB 10.621 - - 66.67 7.08 66.67 7.08 BELUM SELESAI

3 Juru Ukur 2.00 OB 3.186 - - 50.00 1.59 50.00 1.59 BELUM SELESAI

4 Draftman AutoCAD 2.00 OB 1.593 - - 50.00 0.80 50.00 0.80 BELUM SELESAI

5 Sekretaris/Bendahara 6.00 OB 4.248 - - 66.67 2.83 66.67 2.83 BELUM SELESAI

6 Operator Komputer 6.00 OB 3.186 - - 66.67 2.12 66.67 2.12 BELUM SELESAI

7 Pembantu Kantor 6.00 OB 2.655 - - 66.67 1.77 66.67 1.77 BELUM SELESAI

II. BIAYA LANGSUNG NON PERSONIL


A. BIAYA MOBILISASI DAN DEMOBILISASI 0.00 0.00 0.00
Tiket penerbangan

1 Ketua Tim 2.00 Trip 0.177 - - - - - - BELUM SELESAI

2 Ahli Sungai 2.00 Trip 0.177 - - - - - - BELUM SELESAI

3 Ahli Konstruksi Bangunan Air 2.00 Trip 0.177 - - - - - - BELUM SELESAI

4 Ahli Geoteknik 2.00 Trip 0.177 - - - - - - SELESAI

5 Ahli K3 Konstruksi 2.00 Trip 0.177 - - - - - - SELESAI

B BIAYA PERALATAN KANTOR 0.00 1.37 1.37


Biaya Alat Tulis dan Bahan Habis Pakai

1 Alat Tulis Kantor 1.00 Ls 1.168 - - 66.67 0.78 66.67 0.78 BELUM SELESAI

2 Bahan Komputer 1.00 Ls 0.885 - - 66.67 0.59 66.67 0.59 BELUM SELESAI

C BIAYA PERLENGKAPAN KANTOR (Sewa) - 0.78 0.78

1 Meja & Kursi Kerja 24.00 SET BLN 0.637 - - 66.67 0.42 66.67 0.42 BELUM SELESAI

2 Meja & Kursi Rapat 6.00 SET BLN 0.319 - - 66.67 0.21 66.67 0.21 BELUM SELESAI

3 White Board 6.00 Unit.Bln 0.053 - - 66.67 0.04 66.67 0.04 BELUM SELESAI

4 Filling Kabinet 6.00 Unit.Bln 0.106 - - 66.67 0.07 66.67 0.07 BELUM SELESAI

5 Water Dispenser 6.00 Unit.Bln 0.053 - - 66.67 0.04 66.67 0.04 BELUM SELESAI

D BIAYA KOMPUTERISASI (Sewa) - 1.01 1.01

1 Personal Komputer (Operator Komputer) 6.00 Set Bln 0.531 - - 66.67 0.35 66.67 0.35 BELUM SELESAI

2 Personal Komputer (Operator Draftman) 2.00 Set Bln 0.177 - - 100.00 0.18 100.00 0.18 BELUM SELESAI

3 Printer A3 2.00 Set Bln 0.124 - - 100.00 0.12 100.00 0.12 BELUM SELESAI

4 Printer A4 6.00 Set Bln 0.106 - - 66.67 0.07 66.67 0.07 BELUM SELESAI

5 Note Book 6.00 Set Bln 0.425 - - 66.67 0.28 66.67 0.28 BELUM SELESAI

E BIAYA KOMUNIKASI - 0.07 0.07

1 Telepon/Faximile/Telepon Selular 1.00 Ls 0.106 - - 66.67 0.07 66.67 0.07 BELUM SELESAI

F BIAYA PERLENGKAPAN KHUSUS - 1.46 1.46

1 Theodolite (Sewa) 2.00 Set Bln 0.496 - - 50.00 0.25 50.00 0.25 BELUM SELESAI

2 Waterpass (Sewa) 2.00 Set Bln 0.531 - - 50.00 0.27 50.00 0.27 BELUM SELESAI

3 Roll Meter 50 m 1.00 set 0.018 - - 100.00 0.02 100.00 0.02 BELUM SELESAI

4 Kamera Digital & Drone (Editing video) - Dokumentasi (sewa) 6.00 Unit Bln 1.062 - - 66.67 0.71 66.67 0.71 BELUM SELESAI

5 Perlengkapan Lapangan (Paku, cat, Spidol, kertas, alat tulis, dll) 1.00 Ls 0.195 - - 100.00 0.19 100.00 0.19 BELUM SELESAI

6 Patok Kayu 20.00 Btg 0.028 - - 100.00 0.03 100.00 0.03 BELUM SELESAI

G BIAYA SEWA KANTOR - 1.06 1.06

1 Sewa Kantor/Mess 6.00 UNIT BLN 1.062 - - 66.67 0.71 66.67 0.71 BELUM SELESAI

Biaya Operasional Kantor Proyek (termasuk Listrik, Air,


2 6.00 UNIT BLN 0.531 - - 66.67 0.35 66.67 0.35 BELUM SELESAI
Kebersihan dan Perawatan)

H BIAYA SEWA KENDARAAN (Roda 4 dan 2) - 9.21 9.21

1 Sewa & Ops. Kendaraan roda 4 6.00 UB 10.621 - - 66.67 7.08 66.67 7.08 BELUM SELESAI

2 Sewa & Ops. Kendaraan roda 2 (CI) 6.00 UB 1.593 - - 66.67 1.06 66.67 1.06 BELUM SELESAI

3 Sewa & Ops. Kendaraan roda 2 (Inspektor) 6.00 UB 1.593 - - 66.67 1.06 66.67 1.06 BELUM SELESAI

I BIAYA PELAPORAN (Cetak dan Jilid) - 1.17 1.17

1 Rencana Mutu Kontrak 3.00 Bk 0.080 - - 100.00 0.08 100.00 0.08 SELESAI

2 Draft Laporan Pendahuluan 3.00 Bk 0.053 - - 100.00 0.05 100.00 0.05 BELUM SELESAI
3 Laporan Pendahuluan 3.00 Bk 0.080 - - 100.00 0.08 100.00 0.08 BELUM SELESAI
4 Laporan Hasil Kerja Tenaga Ahli 12.00 Bk 0.319 - - 100.00 0.32 100.00 0.32 BELUM SELESAI
5 Laporan Bulanan @3 bk 18.00 Bk 0.319 - - 66.67 0.21 66.67 0.21 BELUM SELESAI
6 Laporan Mingguan 72.00 Bk 0.637 - - 66.67 0.42 66.67 0.42 BELUM SELESAI
7 Draft Laporan Akhir 3.00 Bk 0.080 - - - - - - BELUM SELESAI
8 Laporan Akhir dan Penunjang 3.00 Bk 0.106 - - - - - - BELUM SELESAI
9 Penggandaan Gambar A3 (As Built Drawing) 3.00 Bk 0.133 - - - - - - BELUM SELESAI
10 Laporan hasil Pengukuran MC 3.00 Bk 0.080 - - - - - - BELUM SELESAI
11 Dokumentasi/Album Foto 3.00 Bk 0.106 - - - - - - BELUM SELESAI
12 Cetak Bookleft 25.00 Bk 0.089 - - - - - - BELUM SELESAI

13 Eksternal Memory 1 TB 1.00 Unit 0.266 - - - - - - SELESAI


Jumlah 100.000
Realisasi - 69.14 69.14
Rencana - 72.81 72.81
Deviasi 0.00 -3.67 -3.67

Pejabat Pembuat Komitmen Banda Aceh, September 2018


Sungai dan Pantai - I (Barat) PT. Global Rekayasa Konsultan
Provinsi Aceh

Suherman, ST Armido, ST
NIP. 19710616 200212 1 003 Direktur Utama