SKEMA PEMIPAAN
Air Masuk
Manual Air Masuk
1 3/4 IN Ke Pompa
PDAM
1/2 IN
3,4 IN
TALANG IN GWT
1,5 IN 2 6
1/2 IN
3 5
TAMAN
3/4 IN
1/2 IN
PDAM POMPA TANDON
7
4 3/4 IN
8
3/4 IN 3/4 IN 3/4 IN 3/4 IN
8A 8B 8C
FLOOR
1/2 IN SALURAN SALURAN MUHAMMAD ARPIN,A.Md.Ars
4 IN 1/2 IN LIMPAHAN
CLOSET SEPTITANK
IPAL
THN. ANGGARAN JUMLAH GAMBAR NO. LEMBAR
2021