TOTAL :
Terbilang :
Medan , 2022
PT. / CV ….................................
(…................................................)
Direktur
REKAPITULASI PEK. STRUKTUR, ARSITEKTUR, M/E
JUMLAH HARGA
(Rp.)
TOTAL I : -
-
-
TOTAL II : -
1/26
BILL OF QUANTITY (BOQ)
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN SEKOLAH TINGGI TEOLOGI ANUGERAH MISI NIAS
TIPE PROTOTYPE : TIPE 24 PENDEK
JUMLAH LANTAI : 3 LANTAI
TAHUN ANGGARAN : 2022 - 2023
LOKASI : KDS - E
I. PEKERJAAN PERSIAPAN STANDAR DAN PEKERJAAN RK3K KONSTRUKSI
I.A. PEKERJAAN PERSIAPAN
No. URAIAN PEKERJAAN VOL.
- Beton K-300
- Besi beton
- Bekisting
A.2. PEKERJAAN LANTAI 2 ELV. +3.55
1 Kolom K1
2 - Beton K-300
- Besi beton
- Bekisting
Kolom K2
- Beton K-300
- Besi beton
- Bekisting
Balok G1.1
- Beton K-300
- Besi beton
- Bekisting
Balok G2.1
- Beton K-300
- Besi beton
- Bekisting
Balok G3.1
- Beton K-300
- Besi beton
- Bekisting
Balok G4.1
- Beton K-300
- Besi beton
- Bekisting
Balok G5.1
- Beton K-300
- Besi beton
- Bekisting
Balok G7.1
- Beton K-300
- Besi beton
- Bekisting
Balok G8.1
- Beton K-300
- Besi beton
- Bekisting
Balok G9.1
- Beton K-300
- Besi beton
- Bekisting
Balok B1.1
- Beton K-300
- Besi beton
- Bekisting
Balok B2.1
- Beton K-300
- Besi beton
- Bekisting
Balok B3.1
- Beton K-300
- Besi beton
- Bekisting
Balok B4.1
19 - Besi beton
20 - Bekisting
Pelat Tangga Utama lt. 3
- Beton K-300
- Besi beton
- Bekisting
Anak Tangga Utama lt. 3
- Beton K-300
- Besi beton
- Bekisting
Bordes Tangga Utama lt. 3
- Beton K-300
- Besi beton
- Bekisting
Balok Bordes 20x35 cm Tangga Utama
- Beton K-300
- Besi beton
- Bekisting
A.4. PEKERJAAN LANTAI DAK ELV. +10.35
1 Kolom K1
2 - Beton K-300
- Besi beton
- Bekisting
Kolom K2
- Beton K-300
- Besi beton
- Bekisting
Balok G1.1
- Beton K-300
- Besi beton
- Bekisting
Balok G2.1
- Beton K-300
- Besi beton
- Bekisting
Balok G3.1
- Beton K-300
- Besi beton
- Bekisting
Balok G4.1
- Beton K-300
- Besi beton
- Bekisting
Balok G7.1
- Beton K-300
- Besi beton
- Bekisting
Balok G8.1
- Beton K-300
- Besi beton
- Bekisting
Balok G9.1
- Beton K-300
- Besi beton
- Bekisting
Balok B1.1
- Beton K-300
10 - Besi beton
- Bekisting
Pekerjaan Pelat Penutup GWT
- Beton K-300
- Besi beton
- Bekisting
II PEKERJAAN STRUKTUR RUANG POMPA
1 Pekerjaan Pondasi Tiang Pancang 25x25 cm
2 Tipe Tiang Pondasi
Pemotongan kepala tiang
Pile Cap Tipe PC-1 (R.Pompa)
- Beton K-300
- Besi beton
- Bekisting
Tie Beam / Sloof TB1
- Beton K-300
- Besi beton
- Bekisting
Pekerjaan Galian tanah :
Pile Cap Tipe PC-1 (R.Pompa)
Tie Beam / Sloof TB1
Pekerjaan Urugan Pasir tebal 10 cm :
Pile Cap Tipe PC-1 (R.Pompa)
Tie Beam / Sloof TB1
Pekerjaan Lantai Kerja tebal 5 cm :
Pile Cap Tipe PC-1 (R.Pompa)
Tie Beam / Sloof TB1
Urugan Tanah Kembali Bekas Galian
Pemadatan tanah CBR > 6%
Pekerjaan Lantai Dasar R.Pompa
- Beton K-300
- Besi beton
- Bekisting
Pekerjaan Pelat Dak R.Pompa
- Beton K-300
- Besi beton
- Bekisting
Kolom K1 (R. Pompa)
- Beton K-300
- Besi beton
- Bekisting
Balok B1 (R. Pompa)
- Beton K-300
- Besi beton
- Bekisting
Lantai Ramp
- Beton K-300
- Besi beton
- Besi Wireme
- Bekisting
III PEKERJAAN STRUKTUR DAN PONDASI SAPTICK TANK DAN RESAPAN
1 Pekerjaan Galian tanah (Saptick Tank dan Resapan) :
2 Pekerjaan Urugan tanah kembali bekas galian
Pasir urug diatas tanah urug
Cor beton lantai kerja fc 7,4 Mpa t=5 cm
Pasang Kolom Praktis Sumur Resapan
II. PEKERJAAN STRUKTUR
II.B. PEKERJAAN STRUKTUR NON STANDART
No. URAIAN PEKERJAAN
4 PEMIPAAN VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser )
5 INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.2, dengan komponen panel, sbb :
- MCCB 3P, 63 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel
- KW-meter/1ph/6A
Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb :
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh
6 INSTALASI KABEL FEEDER
a. Kabel Distribusi Daya dari MDP :
- NYY 4 x 10 mm2 + E-NYA 6 mm2 ke PP-LT.2
b. Kabel Distribusi Daya dari PP-LT.2 ke :
- NYM 3 x 4 mm2 ke P-Unit/1
- NYM 3 x 4 mm2 ke P-Unit/2
- NYM 3 x 4 mm2 ke P-Unit/3
- NYM 3 x 4 mm2 ke P-Unit/4
- NYM 3 x 4 mm2 ke P-Unit/5
- NYM 3 x 4 mm2 ke P-Unit/6
- NYM 3 x 4 mm2 ke P-Unit/7
- NYM 3 x 4 mm2 ke P-Unit/8
- NYM 3 x 4 mm2 ke P-Unit/9
- NYM 3 x 4 mm2 ke P-Unit/10
- NYM 3 x 4 mm2 ke P-Unit/11
- NYM 3 x 4 mm2 ke P-Unit/12
- NYM 3 x 4 mm2 ke P-Unit/13
- NYM 3 x 4 mm2 ke P-Unit/14
- NYM 3 x 4 mm2 ke P-Unit/15
7 INSTALASI KABEL TRAY
- Kabel Tray W200 x H100
Fitting-Fitting :
- Elbow W200 x H100
- Tee W200 x H100
- Material bantu ( mur, baut, hanger rod, supporting, dll )
8 INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
- Lampu LED 7 Watt
- Lampu LED 7 Watt, c/w battery charger (Selasar)
- Lampu baret isi TL Bulat-32 watt c/w battery charger
- Exit Lamp-18 watt c/w battery charger
- Stop Kontak 1P, 220 Volt, 10A, Wall Type
- Saklar 1 gang
- Saklar 2 gang
- Saklar Hotel 1 gang
9 INSTALASI PENERANGAN & STOP KONTAK
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak
A.3. PEKERJAAN LANTAI 3
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material 1.00
- Kabel BC 50 mm2 30.00
- Testing & Commissioning 1.00
b. Body Peralatan pada Sistem Elektronik
Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) 1.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material 1.00
- Kabel BC 50 mm2 30.00
- Testing & Commissioning 1.00
A.7. PEKERJAAN PENANGKAL PETIR (FARADAY)
1 AIR TERMINAL & TERMINATION NETWORK
a. 15 x 500mm alumunium air rod 16.00
b. 15 mm Air terminal base 16.00
c. 25 x 3mm Bare Alumunium Tape 110.00
d. Grey 25x3mm Non-Metallic DC tape clip 20.00
e. 25 x 3mm Alumunium Square tape clamp 18.00
2 DOWN CONDUCTOR
a. 25 x 3mm Bare Alumunium Tape 8.00
b. Grey 25 x 3mm Non-Metallic DC tape clip 8.00
c. 25 x 3mm Alumunium Square tape clamp 15.00
d. Test Connection Link 8.00
3 GROUNDING SYSTEM
a. Polymer Inspection Pit 4.00
b. 5/8" x 1800 mm Extensible Copperbond Rod 4.00
c. 5/8" Rod Coupling 4.00
d. Exothermic weilding 6.00
e. Stranded Bar copper conductor 70 mm 365.00
4 MATERIAL SUPPORT
a. Mould for looping 1.00
b. Powder 6.00
c. Handle Clamp 1.00
d. flint gun 1.00
5 TESTING & COMMISSIONING
a. Testing & Commissioning 1.00
b. Biaya Perijinan Depnaker 1.00
Org -
Org -
Org -
Lb -
Lb -
Bh -
Ls -
Ls -
Ls -
Ls -
Bh -
Psg -
Bh -
Psg -
Bh -
Psg -
Psg -
Psg -
Bh -
Bh -
Bh -
Ls -
Ls -
ls -
Bh -
Bh -
Bh -
Ls -
Bh -
Org -
Ls -
31.93 M³ -
5,806.05 Kg -
283.86 M² -
0.75 M³ -
169.09 Kg -
9.96 M² -
204.83 M³ -
68.28 M³ -
34.14 M³ -
69.37 M³ -
23.12 M³ -
11.56 M³ -
92.27 M³ -
922.70 M² -
1,489.26 Kg -
8.58 M³ -
1,201.69 Kg -
107.31 M² -
1.11 M³ -
248.42 Kg -
18.97 M² -
1.46 M³ -
94.32 Kg -
11.89 M² -
2.93 M³ -
629.15 Kg -
19.51 M² -
0.24 M³ -
238.76 Kg -
1.48 M² -
4.33 M³ -
1,448.92 Kg -
70.84 M² -
0.61 M³ -
142.75 Kg -
8.16 M² -
7.57 M³ -
1,566.10 Kg -
74.32 M² -
4.73 M³ -
1,296.11 Kg -
48.36 M² -
2.92 M³ -
563.44 Kg -
25.92 M² -
10.77 M³ -
1,691.07 Kg -
85.50 M² -
0.64 M³ -
105.93 Kg -
5.83 M² -
6.05 M³ -
1,198.22 Kg -
51.31 M² -
2.19 M³ -
387.31 Kg -
12.89 M² -
2.97 M³ -
369.72 Kg -
12.38 M² -
2.84 M³ -
635.97 Kg -
22.56 M² -
5.95 M³ -
1,329.20 Kg -
60.86 M² -
10.35 M³ -
1,642.78 Kg -
108.68 M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
-
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
1.11 M³ -
248.42 Kg -
18.97 M² -
1.46 M³ -
94.32 Kg -
11.89 M² -
2.93 M³ -
629.15 Kg -
19.51 M² -
6.72 M³ -
1,594.60 Kg -
67.66 M² -
-
7.70 M³ -
1,505.83 Kg -
68.40 M² -
0.17 M³ -
40.03 Kg -
2.28 M² -
0.74 M³ -
151.86 Kg -
7.29 M² -
5.95 M³ -
1,522.35 Kg -
60.78 M² -
3.89 M³ -
723.19 Kg -
34.56 M² -
4.79 M³ -
751.86 Kg -
38.00 M² -
2.53 M³ -
491.55 Kg -
21.49 M² -
1.46 M³ -
253.11 Kg -
8.71 M² -
1.49 M³ -
184.86 Kg -
6.44 M² -
2.38 M³ -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
-
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
M³ -
Kg -
M² -
-
M³ -
Kg -
M² -
M³ -
Kg -
M² -
-
-
M² -
-
Kg -
1.00 Trip -
1,848.00 M¹ -
154.00 Nos -
0.77 M³ -
119.55 Kg -
3.84 M² -
19.97 M³ -
2,533.40 Kg -
74.88 M² -
5.38 M³ -
694.82 Kg -
13.89 M² -
9.22 M³ -
936.41 Kg -
23.04 M² -
12.29 M³ -
1,835.28 Kg -
19.20 M² -
12.48 M³ -
1,426.90 Kg -
18.59 M² -
12.80 M³ -
1,375.93 Kg -
19.20 M² -
32.10 M³ -
5,417.98 Kg -
256.82 M² -
3.65 M³ -
629.17 Kg -
24.30 M² -
202.78 M² -
48.62 M² -
334.97 Kg -
2.38 M³ -
50.41 M³ -
14.01 M³ -
19.01 M³ -
21.10 M³ -
20.46 M³ -
19.95 M³ -
94.17 M³ -
9.48 M³ -
0.13 M³ -
3.33 M³ -
0.90 M³ -
1.54 M³ -
2.05 M³ -
1.25 M³ -
1.28 M³ -
7.13 M³ -
0.73 M³ -
0.06 M³ -
1.66 M³ -
0.45 M³ -
0.77 M³ -
1.02 M³ -
0.62 M³ -
0.64 M³ -
3.57 M³ -
0.36 M³ -
223.46 M³ -
223.46 M³ -
2.00 Titik -
-
-
72.00 M¹ -
6.00 Nos -
1.08 M³ -
200.78 Kg -
7.92 M² -
8.82 M³ -
1.64 M³ -
0.82 M³ -
1.46 M³ -
1.46 M³ -
3.83 M³ -
469.40 Kg -
4.35 M² -
11.96 M³ -
2.39 M³ -
500.64 Kg -
13.76 M² -
-
48.00 M¹ -
4.00 Nos -
0.72 M³ -
133.85 Kg -
5.28 M² -
1.27 M³ -
195.69 Kg -
10.17 M² -
4.25 M³ -
2.37 M³ -
0.92 M³ -
0.28 M³ -
0.46 M³ -
0.14 M³ -
2.83 M³ -
2.83 M³ -
1.60 M³ -
272.71 Kg -
2.26 M² -
2.77 M³ -
325.30 Kg -
21.24 M² -
0.88 M³ -
138.54 Kg -
14.00 M² -
1.46 M³ -
259.35 Kg -
11.69 M² -
0.28 M³ -
33.57 Kg -
1.50 M² -
1.20 M² -
-
83.70 M³ -
37.20 M³ -
3.96 M³ -
0.98 M³ -
20.00 M1 -
VOL. SAT. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)
3.96 M³ -
39.56 M² -
3.90 M² -
9.62 M³ -
1,442.86 Kg -
100.24 M² -
1.80 M³ -
24.10 M² -
12.04 M² -
1.56 M³ -
11.56 M² -
5.78 M² -
0.74 M³ -
160.40 M² -
9.92 M² -
21.84 M² -
21.84 M² -
HARGA SATUAN
JUMLAH HARGA
(Rp.) (Rp.)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
HARGA SATUAN
JUMLAH HARGA
(Rp.)
TOTAL (Rp.)
-
SUB TOTAL -
-
-
-
-
-
-
-
-
-
-
-
-
SUB TOTAL -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SUB TOTAL -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SUB TOTAL -
-
-
-
-
78.05 M1 -
76.18 M1 -
113.10 M1 -
10.80 M1 -
14.00 bh -
1.00 bh -
14.00 bh -
-
116.36 M1 -
108.69 M1 -
56.00 M1 -
89.24 M1 -
8.00 bh -
2.00 bh -
-
64.12 M1 -
6.59 M1 -
-
13.00 bh -
-
57.93 M1 -
-
1.00 unit -
15.00 bh -
15.00 unit -
: 1 bh
: 2 bh
: 1 bh
-
10.00 M1 -
-
10.65 M1 -
11.87 M1 -
18.92 M1 -
20.37 M1 -
27.42 M1 -
31.67 M1 -
33.12 M1 -
40.17 M1 -
41.62 M1 -
7.07 M1 -
14.20 M1 -
17.83 M1 -
24.48 M1 -
28.41 M1 -
35.52 M1 -
-
73.13 M1 -
2.00 bh -
1.00 bh -
1.00 lot -
-
91.00 bh -
7.00 bh -
2.00 bh -
2.00 bh -
87.00 bh -
27.00 bh -
19.00 bh -
10.00 bh -
-
102.00 ttk -
87.00 ttk -
-
-
86.01 M1 -
82.52 M1 -
114.00 M1 -
7.20 M1 -
1.00 bh -
15.00 bh -
15.00 bh -
-
64.92 M1 -
125.98 M1 -
2.00 bh -
-
40.80 M1 -
11.43 M1 -
15.00 bh -
-
1.00 unit -
15.00 bh -
15.00 unit -
16.00 M1 -
8.66 M1 -
10.19 M1 -
17.16 M1 -
18.69 M1 -
25.66 M1 -
29.91 M1 -
31.47 M1 -
38.41 M1 -
39.94 M1 -
7.81 M1 -
14.78 M1 -
16.31 M1 -
27.53 M1 -
29.06 M1 -
36.03 M1 -
-
72.73 M1 -
2.00 bh -
1.00 bh -
0.02 1.00 lot -
-
87.00 bh -
6.00 bh -
2.00 bh -
2.00 bh -
92.00 bh -
30.00 bh -
19.00 bh -
10.00 bh -
-
97.00 ttk -
92.00 ttk -
-
86.01 M1 -
82.52 M1 -
114.00 M1 -
3.80 M1 -
1.00 bh -
15.00 bh -
15.00 bh -
-
7.26 M1 -
67.76 M1 -
2.00 bh -
-
56.23 M1 -
11.43 M1 -
15.00 bh -
-
62.07 M1 -
-
1.00 unit -
15.00 bh -
15.00 unit -
22.00 M1 -
8.66 M1 -
10.19 M1 -
17.16 M1 -
18.69 M1 -
25.66 M1 -
29.91 M1 -
31.47 M1 -
38.41 M1 -
39.94 M1 -
7.81 M1 -
14.78 M1 -
16.31 M1 -
2.00 bh -
1.00 bh -
1.00 lot -
-
87.00 bh -
6.00 bh -
2.00 bh -
2.00 bh -
92.00 bh -
30.00 bh -
19.00 bh -
10.00 bh -
-
97.00 ttk -
92.00 ttk -
-
-
77.00 M1 -
4.00 M1 -
2.00 bh -
6.00 bh -
-
84.08 M1 -
10.00 bh -
-
-
1.00 unit -
1.00 unit -
1.00 bh -
1.00 unit -
-
50.00 M1 -
10.00 M1 -
40.00 M1 -
40.00 M1 -
-
2.00 bh -
1.00 bh -
2.00 bh -
-
2.00 ttk -
1.00 ttk -
1.00 lot -
-
-
-
1.00 bh -
lot -
M1 -
lot -
-
bh -
lot -
M1 -
lot -
-
-
bh -
bh -
M1 -
bh -
bh -
-
M1 -
bh -
bh -
bh -
-
bh -
bh -
bh -
bh -
M1 -
-
unit -
unit -
unit -
unit -
-
lot -
lot -
8.00 bh -
6.00 bh -
6.00 bh -
-
53.00 unit -
210.91 m -
53.00 bh -
-
-
1.00 unit -
1.00 set -
1.00 bh -
1.00 bh -
1.00 bh -
1.00 lot -
28.00 m -
0.20 m -
29.77 m -
33.22 m -
16.00 bh -
1.00 bh -
1.00 bh -
1.00 bh -
2.00 bh -
1.00 bh -
16.00 bh -
1.00 bh -
1.00 bh -
1.00 bh -
TOTAL HARGA