PROGRES PEMBANGUNAN RUMAH PER MINGGU a
i
4
Agustus
Kavling / Type### b
Sisa Hari
No. SPK Tanggal Mulai Tanggal Selesai Pekerjaan Mandor Pengawas

###
u
l
37 235 Salim Subhan I-25 / 38 ### a
48 241 Monday, June 20, 2022 Tuesday, December 20, 2022 -22 Mora Zam J-02 / 38 ### n
51 243 ### Tuesday, December 20, 2022 -22 Mora Zam J-03 / 38 ###
PROGRES INFRASTRUKTUR PER MINGGU
Maret Oktober November Desember KENAIKAN
PROGRESS
No. No. SPK Pengawas Mandor Jenis Pekerjaan 24-Oct-22 31-Oct-22 7-Nov-22 14-Nov-22 21-Nov-22 28-Nov-22 5-Dec-22 12-Dec-22 19-Dec-22
MINGGU KETERANGAN
###
31-Oct-22 7-Nov-22 14-Nov-22 21-Nov-22 28-Nov-22 5-Dec-22 12-Dec-22 19-Dec-22 26-Dec-22 TERAKHIR

1 260 Andika Jeri DPB Blok Q 18.71% 36.71% 44.38% 44.38% 44.38% 50.72% 83.07% 93.44% 100.00% 6.56% Perapihan dan perbaikan panel precast

Perbaikan pagar
3 269 Andika Jeri PC panel Blok L 11.54% 22.98% 38.03% 15.05% Menunggu material kolom dan panel precast (Blok O dan
s/d O N), gali pondasi batu kali (Blok L)
Jumlah Pekerja Bulan Juli
Total Jumlah Rumah yg
No. Mandor
dibangun Tanggal
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
16 Rumah (type 38)
1 Supri 6 6 6 6 6 4 4 4 0 0 2 3 3 4 4 4 4 4 4 4 4 4 3 3 3 2 2 2 2 0 0
2 Rumah (type 45)
16 Rumah (type 38)
2 Salim 23 22 21 18 18 18 18 18 0 0 0 0 0 1 2 1 0 2 3 3 3 7 7 7 7 7 7 7 7 7 7
1 Rumah (type 45)
7 Rumah (type 38)
3 Mora 17 20 20 20 20 20 20 20 6 6 13 13 13 13 13 13 13 13 18 18 18 18 18 18 18 19 19 19 19 19 19
1 Rumah (type 45)
JUMLAH 46 48 47 44 44 42 42 42 6 6 15 16 16 18 19 18 17 19 25 25 25 29 28 28 28 28 28 28 28 26 26