Anda di halaman 1dari 11

PT ESKA DEKADE ELGAMA

PEKERJAAN ELEKTRIKAL
PROYEK BX-CHANGE BINTARO H
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
A
PROGRESS DAN KURVA S R
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11
G
A TOTAL Rencana Rincian Durasi V0LUME KERJA Rencana Deviasi 4- Des - 2021 12 - Des - 2021 19 - Des - 2021 26 - Des - 2021 2-Jan-22 9-Jan-22 16-Jan-22 1/23/2022 1/30/2022 2/6/2022
Item URAIAN VOL SAT S BOBOT AKTUAL
A dan Terpasang SESUAI KOEFISIEN
Prestasi Bobot 11. Des- 2021 18 . Des- 2021 25 . Des- 2021 01 . january 2022 8. january- 2021 15-Jan-22 22-Jan-21 1/29/2022 2/5/2022 122/02/22
T BOBOT Bobot Kerja S/D Minggu lalu Minggu ini Deviasi satuan dan realisasi
U Realisasi S/D Minngu ini Rencana Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act Pln Act
A
00000 PERSIAPAN/ GUDANG / BEDENG 1.00 N
LOT ### 1.53% 1.53% 1.53% 1.53% 1.53% 1.53% 1.53% 1.53% 1.53% 1.53% 1.53%
Biaya pembuatan gudang, listrik kerja, air kerja dan biaya keamanan
Gudang ( 30% ) Rencana 0.46% Rencana 0.46%
100 45%
Realisasi 100.00 0.00% 100 100 lot Realisasi 0.46 15.3% 15.3% 15.3% 15.3% 15.3% 15.3% 15.3% 15.3% 15.3% 15.3%
Listrik dan Keamanan ( 60% ) Rencana 0.92% Rencana 0.92%
0.00% -0.92%
Realisasi 0% 0.00% - - 0 lot Realisasi 0.00%
BA ( 10% ) Rencana 0.15% Rencana 0.15%
0.00% -0.15%
Realisasi 0% 0.00% - - 0 lot Realisasi 0.00%

54003 PUTM 1.00 Unit ### 1.39% 0.00% 0.00% 0.00% 0.00% 0.00%
54004 PUTM Lengkap - Suplai Panel Chiller 2.00 Unit ### 0.84% 0.00% 0.00% 0.00% 0.00% 0.00%
54005 PUTR Lengkap (sesuai Gambar) 1.00 Unit ### 1.34% 0.00% 0.00% 0.00% 0.00% 0.00%
54006 PUTR Lengkap (untuk suplai Panel Chiller) 1.00 Unit ### 0.22% 0.00% 0.00% 0.00% 0.00% 0.00%
54007 Kapasitor Bank (suplai Panel Chiller) 1.00 Unit ### 0.23% 0.00% 0.00% 0.00% 0.00% 0.00%
54008 Panel Kontrol Genset 5.00 Unit ### 1.04% 0.00% 0.00% 0.00% 0.00% 0.00%

54009 Jasa Pemasangan Panel Distribusi Lantai


Panel Distribusi
Lantai B2
1 P-B2-A 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
2 P-B2-B 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
3 SDP-VAC.B2-A 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
4 SDP-VAC.B2-B 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
5 SDP-FAN.B2-A 1.00 Unit ### 0.02% 0.00% 0.00% 0.00% 0.00% 0.00%
7 P.FAN-B2-2 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%

Lantai B1
8 P-B1-A 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
9 P-B1-B 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
10 P-OCEANARIUM-B1 1.00 Unit ### 0.05% 0.00% 0.00% 0.00% 0.00% 0.00%
11 SDP-TATA UDARA-OCENARIUM 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
12 SDP-VAC.B1-A 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
13 SDP-VAC.B1-B 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
14 P- AHU-B1-1 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
15 P- AHU-B1-2 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
16 P- AHU-B1-3 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
17 P- AHU-B1-4 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
18 P- AHU-B1-5 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
19 P- AHU-B1-6 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
20 P- AHU-B1-7 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
27 P-FAN-B1-1 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
28 P-T.B1-A 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
29 P-T.B1-B 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
30 SDP.POMPA (LANTAI B1) 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
31 SDP-FIRE (LANTAI B1) 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
32 P-O.B1-FIRE 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
35 PANEL-TATA UDARA-POWER HOUSE 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%

Lantai LG
36 P-1-A 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
37 P-1-B 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
38 SDP-VAC.1-A 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
39 SDP-VAC.1-B 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
40 P-AHU-1-1 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
41 P-AHU-1-2 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
42 P-AHU-1-3 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
43 P-AHU-1-4 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
44 P-AHU-1-5 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
45 P-AHU-1-6 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
46 P-AHU-1-7 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
47 P-AHU-1-8 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
52 P-T.1-A 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
53 P-T.1-B 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
55 P-P.PT-1 1.00 Unit ### 0.02% 0.00% 0.00% 0.00% 0.00% 0.00%
56 P-P.WTP-1 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%

Lantai GF
59 P-2A 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
60 P-2B 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
61 SDP-VAC.2-A 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
62 SDP-VAC.2-B 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
63 P-AHU-2-1 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
64 P-AHU-2-2 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
65 P-AHU-2-3 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
66 P-AHU-2-4 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
67 P-AHU-2-5 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
68 P-AHU-2-6 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
69 P-AHU-2-7 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
70 P-AHU-2-8 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
71 P-AHU-2-9 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
79 P-T.2-A 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
80 P-T.2-B 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%

Lantai UG
83 P-3A 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
84 P-3B 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
85 P-AHU-3-1 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
86 P-AHU-3-2 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
87 P-AHU-3-3 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
88 P-AHU-3-4 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
89 P-AHU-3-5 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
90 P-AHU-3-6 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
91 P-AHU-3-7 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
92 P-AHU-3-8 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
93 P-AHU-3-9 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
102 P-T.3-A 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
103 P-T.3-B 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
106 SDP-VAC.3-A 1.00 Unit ### 0.07% 0.00% 0.00% 0.00% 0.00% 0.00%
107 SDP-VAC.3-B 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%

Lantai LH1
108 P-4A 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
109 P-4B 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
110 SDP-VAC.4-A 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
111 SDP-VAC.4-B 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
112 P-AHU-4-1 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
113 P-AHU-4-2 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
114 P-AHU-4-3 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
115 P-AHU-4-4 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
116 P-AHU-4-5 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
117 P-AHU-4-6 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
118 P-AHU-4-7 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
125 P-T.4-A 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
126 P-T.4-B 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%

Lantai 2F
129 P-5 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
130 P-FAN-5-1 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
131 P-FAN-5-2 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
132 P-FAN-5-3 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
133 P-FAN-5-4 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%

Lantai ATAP
134 P-PRESS. FAN-1 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
135 P-PRESS. FAN-2 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
136 SDP-VAC.ATAP 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
137 P-FAN-ATAP 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%

Panel Escalator dan Lift


138 SDP-ESC.B2-A 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
140 SDP-ESC.B1-A 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
142 SDP-ESC.1A 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
143 SDP-ESC.1B 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
151 SDP-ESC.2A 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
152 SDP-ESC.2B 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
153 SDP-ESC.3A 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
154 SDP-ESC.3B 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
157 SDP-LIFT-A 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
158 PP-LIFT FIRE.A 1.00 Unit ### 0.05% 0.00% 0.00% 0.00% 0.00% 0.00%
159 PP-LIFT FIRE.B 1.00 Unit ### 0.05% 0.00% 0.00% 0.00% 0.00% 0.00%
167 PANEL LIFT PENUMPANG MALL 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
168 PANEL LIFT SERVICE/FIRE-OCEANARIUM 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%

P.Chiller dan Colling Tower


169 SDP-COOLING TOWER 1.00 Unit ### 0.05% 0.00% 0.00% 0.00% 0.00% 0.00%
171 P.CWP 1.00 Unit ### 0.13% 0.00% 0.00% 0.00% 0.00% 0.00%
172 P.CHWP 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
173 P.CHILLER-1 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
174 P.CHILLER-2 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
175 P.CHILLER-3 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
176 P.CHILLER-4 1.00 Unit ### 0.09% 0.00% 0.00% 0.00% 0.00% 0.00%
177 P-FAN-R. CHILLER 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
178 P.COOLING TOWER-1 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
179 P.COOLING TOWER-2 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
180 P.COOLING TOWER-3 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
181 P.COOLING TOWER-4 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%

P. Smoke Extrak dan Press. Fan


182 P-PRESS. FAN-3 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
183 P-PRESS. FAN-4 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
184 P-PRESS. FAN-5 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
185 P-PRESS. FAN-6 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
186 P-PRESS. FAN-7 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
187 P-PRESS. FAN-8 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
188 P-SMOKE EXTRACT FAN-1 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%
189 P-SMOKE EXTRACT FAN-2 1.00 Unit ### 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%

P.Tangga Kebakaran
196 SDP- TK-A 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
197 SDP- TK-B 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
198 P-TK.1 1.00 Unit ### 0.02% 0.00% 0.00% 0.00% 0.00% 0.00%
199 P-TK.2 1.00 Unit ### 0.02% 0.00% 0.00% 0.00% 0.00% 0.00%
200 P-TK.3 1.00 Unit ### 0.02% 0.00% 0.00% 0.00% 0.00% 0.00%
201 P-TK.4 1.00 Unit ### 0.02% 0.00% 0.00% 0.00% 0.00% 0.00%
202 P-TK.5 1.00 Unit ### 0.02% 0.00% 0.00% 0.00% 0.00% 0.00%
203 P-TK.6 1.00 Unit ### 0.02% 0.00% 0.00% 0.00% 0.00% 0.00%

P.Utilitas
207 PP-KKO (OCENARIUM) 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
208 P-LAMP.O (OCENARIUM) 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
209 PANEL UTILITAS 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
210 P-FH 1.00 Unit ### 0.05% 0.00% 0.00% 0.00% 0.00% 0.00%
211 P-KONTROL 1.00 Unit ### 0.02% 0.00% 0.00% 0.00% 0.00% 0.00%

P.Plumbing
212 SDP STP / PP. STP 1.00 Unit ### 0.05% 0.00% 0.00% 0.00% 0.00% 0.00%
213 PP-P.SUMPPIT-A 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
214 PP-P.SUMPPIT-B 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
215 P-P.PT-2 1.00 Unit ### 0.02% 0.00% 0.00% 0.00% 0.00% 0.00%

BQ Tambah Kurang Material Panel


1 Panel AHU.B2 OC-1 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Panel AHU.B2 OC-2 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Panel AHU.B1 OC-1 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Panel AHU.B1 OC-2 1.00 Unit ### 0.04% 0.00% 0.00% 0.00% 0.00% 0.00%
5 PP SUMPPIT OCEANARIUM MALL 1.00 Unit ### 0.05% 0.00% 0.00% 0.00% 0.00% 0.00%

54010 Jasa Pemasagan Kabel


Include material bantu perapihan kabel (Kabel ties hitam
30cm), penurunan dari truck hingga ke posisi gudang.
Kabel dari PLN ke MVMDP N2XSEBY 3x120mm2 185.00 mtr ### 0.39% 0% 0.00% 0.00% 0% 0.00%
Galian (termasuk timbunan tanah kembali + bak kontrol 4 uni 1.00 ls ### 0.87% 0% 0.00% 0.00% 0% 0.00%
N2XSY 3x1x120mm2 422.80 mtr ### 0.77% 0% 0.00% 0.00% 0% 0.00%
N2XSY 3x1x120mm2 (Prov Sum) 52.00 mtr ### 0.09% 0% 0.00% 0.00% 0% 0.00%
NYYHY 2x2,5 mm2 84.60 mtr ### 0.01% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x 185 mm2 514.60 mtr ### 1.91% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x 95 mm2 695.40 mtr ### 1.32% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x 120 mm2 358.20 mtr ### 0.86% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x 150 mm2 536.50 mtr ### 1.62% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x 240 mm2 639.00 mtr ### 3.05% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x 300 mm2 325.07 mtr ### 1.55% 0% 0.00% 0.00% 0% 0.00%
NYY 4 (1x240) mm2 72.70 mtr ### 0.32% 0% 0.00% 0.00% 0% 0.00%
NYY 8x(1x240)mm2 163.40 mtr ### 1.44% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x 25 mm2 702.30 mtr ### 0.42% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x 25 mm2 (Prov Sum) 100.00 mtr ### 0.06% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x 50 mm2 987.30 mtr ### 1.15% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x 16 mm2 2,621.10 mtr ### 0.97% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x 16 mm2 (Prov Sum) 376.10 mtr ### 0.14% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x 35 mm2 1,188.90 mtr ### 0.99% 0% 0.00% 0.00% 0% 0.00%
NYY 12 x (1x400)mm2 (Prov Sum) 72.10 mtr ### 1.57% 0% 0.00% 0.00% 0% 0.00%
NYY 8 x (1x400)mm2 224.30 mtr ### 3.25% 0% 0.00% 0.00% 0% 0.00%
NYY 16x(1x400)mm2 102.40 mtr ### 2.96% 0% 0.00% 0.00% 0% 0.00%
NYY 8x(1x300)mm2 168.10 mtr ### 1.83% 0% 0.00% 0.00% 0% 0.00%
NYY 5 X 6 mm2 3,599.00 mtr ### 0.67% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x10 mm2 851.57 mtr ### 0.20% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x10 mm2 (Prov Sum) 20.10 mtr ### 0.00% 0% 0.00% 0.00% 0% 0.00%
NYY 3x4mm2 11,798.00 mtr ### 1.09% 0% 0.00% 0.00% 0% 0.00%
NYY 3x6mm2 2,205.90 mtr ### 0.31% 0% 0.00% 0.00% 0% 0.00%
NYY 5 x 4 mm2 3,053.90 mtr ### 0.43% 0% 0.00% 0.00% 0% 0.00%
NYY 4 x 70 mm2 250.00 mtr ### 0.41% 0% 0.00% 0.00% 0% 0.00%
NYY 5 X 16 mm2 623.90 mtr ### 0.29% 0% 0.00% 0.00% 0% 0.00%
NYY 5 X 10 mm2 1,008.40 mtr ### 0.33% 0% 0.00% 0.00% 0% 0.00%
NYY 4x(1x400) mm2 76.90 mtr ### 0.56% 0% 0.00% 0.00% 0% 0.00%
FRC 4x240 mm2 336.40 mtr ### 1.86% 0% 0.00% 0.00% 0% 0.00%
FRC 4 x 25 mm2 1,018.40 mtr ### 0.61% 0% 0.00% 0.00% 0% 0.00%
FRC 4 x 95 mm2 95.80 mtr ### 0.21% 0% 0.00% 0.00% 0% 0.00%
FRC 4x50 mm2 (Provsum) 100.00 mtr ### 0.12% 0% 0.00% 0.00% 0% 0.00%
FRC 4 x 10 mm2 235.40 mtr ### 0.05% 0% 0.00% 0.00% 0% 0.00%
FRC 5x6 mm2 1,940.80 mtr ### 0.36% 0% 0.00% 0.00% 0% 0.00%
FRC 5x4 mm2 8.00 mtr ### 0.00% 0% 0.00% 0.00% 0% 0.00%

54011 Jasa Pemasangan Busduct

Include material support longdrat 10mm, Hollow galvanized


60x60 tebal 2mm dan mur baut, penurunan dari truck hingga
ke posisi gudang dan area pemasangan

Busduct 3500A LVMDP-05 ke PCG-4 14.40 mtr ### 0.37% 0% 0.00% 0.00% 0% 0.00%
LVMDP-9 ke PCG-3 14.40 mtr ### 0.43% 0% 0.00% 0.00% 0% 0.00%
LVMDP-15 ke PCG-2 17.20 mtr ### 0.45% 0% 0.00% 0.00% 0% 0.00%
LVMDP-23 ke PCG-1 23.40 mtr ### 0.67% 0% 0.00% 0.00% 0% 0.00%
PCG 4 ke Genset 4 38.80 mtr ### 1.03% 0% 0.00% 0.00% 0% 0.00%
PCG 3 ke Genset 3 35.60 mtr ### 0.92% 0% 0.00% 0.00% 0% 0.00%
PCG 2 ke Genset 2 33.30 mtr ### 0.96% 0% 0.00% 0.00% 0% 0.00%
PCG 1 ke Genset 1 24.90 mtr ### 0.74% 0% 0.00% 0.00% 0% 0.00%

Busduct 4000A Trafo 1 ke LVMDP-8 33.00 mtr ### 1.03% 0% 0.00% 0.00% 0% 0.00%
Trafo 2 ke LVMDP-4 36.30 mtr ### 1.08% 0% 0.00% 0.00% 0% 0.00%
Trafo 3 ke LVMDP-22 41.70 mtr ### 1.51% 0% 0.00% 0.00% 0% 0.00%
Trafo 4 ke LVMDP-14 38.20 mtr ### 1.33% 0% 0.00% 0.00% 0% 0.00%
Prov Sum Trafo 5 (Step Up) 5.00 mtr ### 0.15% 0% 0.00% 0.00% 0% 0.00%
Prov Sum Kabel dari Trafo Step Down ke Panel LVMDP 4 5.00 mtr ### 0.20% 0% 0.00% 0.00% 0% 0.00%

LAMPU, TITIK LAMPU, SAKLAR, STOP KONTAK, TRAY & RAK KABEL

54012 Jasa Pemasangan Kabel Instalasi


Include material bantu fischer dan staping, lasdop, isolasi
Kabel Instalasi LT.B2
Kabel NYA 3x2.5mm² + PVC Conduit ø ¾" untuk Instalasi Lampu 1,069.00 ttk ### 1.88% 1.88% 1.88% 1.88% 1.88% 1.88% 1.88% 1.88% 1.88% 1.88% 1.88%
Piiping instalasi ( 20% ) REN 0.38% REN 0.38%
14.0% -0.3%
REL 150 - 150 - 919 Tik REL 0.05% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
werring cabling ( 70 ) REN 1.32% REN 1.32%
9.4% -1.20%
REL 100 - 100 - 969 Tik REL 0.12% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
Tescom ( 10% ) REN 0.19% REN 0.19%
0.00% -0.19%
REL - - - - 1,069 Tik REL -
Kabel NYA 3x4mm² + PVC Conduit ø ¾" untuk Instalasi Stop Kontak Publik 108.00 ttk ### 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31%
Piiping instalasi ( 20% ) REN 0.06% REN 0.06%
37% -0.04%
REL 40 - 40 - 68 Tik REL 0.02% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
werring cabling ( 70 ) REN 0.22% REN 0.22%
-26% -0.27%
REL 35 45 80 - 28 Tik REL -0.06% -0.02% -0.02% -0.02% -0.02% -0.02% -0.02% -0.02% -0.02% -0.02% -0.02%
Tescom ( 10% ) REN 0.03% REN 0.03%
- - 0
REL - - - - 108 Tik REL -
Kabel Instalasi LT.B1
Kabel NYA 3x2.5mm² + PVC Conduit ø ¾" untuk Instalasi Lampu 503.00 ttk ### 0.89% 0.89% 0.89% 0.89% 0.89% 0.89% 0.89% 0.89% 0.89% 0.89% 0.89%
Piiping instalasi ( 20% ) REN 0.18% REN 0.18%
29.8% -0.12%
REL 150 - 150 - 353 Tik REL 0.05% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
werring cabling ( 70 ) REN 0.62% REN 0.62%
19.88% -0.50%
REL 100 - 100 - 403 Tik REL 0.12%
Tescom ( 10% ) REN 0.09% REN 0.09%
0.0% 0.09%
REL - - - - 503 Tik REL -
Kabel NYA 3x4mm² + PVC Conduit ø ¾" untuk Instalasi Stop Kontak Publik 78.00 ttk ### 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Piiping instalasi ( 20% ) REN 0.04% REN 0.04%
0.00% 0.0%
REL 40 - 40 - 38 Tik REL 0.02% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
werring cabling ( 70 ) REN 0.16% REN 0.16%
83.3% 0.0%
REL 30 35 65 Tik REL 0.13% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
Tescom ( 10% ) REN 0.02% REN 0.02%
0.0% 0.0%
REL - - - - 78 Tik REL -

Kabel Instalasi LT.LG


Kabel NYA 3x2.5mm² + PVC Conduit ø ¾" untuk Instalasi Lampu 356.00 ttk ### 0.63% 0.63% 0.63% 0.63% 0.63% 0.63% 0.63% 0.63% 0.63% 0.63% 0.63%
Piiping instalasi ( 20% ) REN 0.13% REN 0.13%
17% -0.10%
REL 60 - 60 - 296 Tik REL 0.02% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
werring cabling ( 70 ) REN 0.44% REN 0.44%
14% -0.38%
REL 50 - 50 - 306 Tik REL 0.06% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
Tescom ( 10% ) REN 0.06% REN 0.06%
0% -0.06%
REL - - - - 356 Tik REL -
Kabel NYA 3x4mm² + PVC Conduit ø ¾" untuk Instalasi Stop Kontak Publik 54.00 ttk ### 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.01% 0.01% 0.01% 0.01%
Piiping instalasi ( 20% ) REN 0.03% REN 0.03%
74% 0%
REL 40 0% 40 - 14.00 Tik REL 0.02% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
werring cabling ( 70 ) REN 0.11% REN 0.11%
56% 0%
REL 30 0% 30 - 24.00 Tik REL 0.06% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
Tescom ( 10% ) REN 0.02% REN 0.02%
0% 0%
REL - - - - 54.00 Tik REL -

Kabel Instalasi LT.GF


Kabel NYA 3x2.5mm² + PVC Conduit ø ¾" untuk Instalasi Lampu 238.00 ttk ### 0.42%
Piiping instalasi ( 20% ) REN 0.08%
REL
werring cabling ( 70 ) REN 0.29%
REL
Tescom ( 10% ) REN 0.04%
REL

Kabel NYA 3x4mm² + PVC Conduit ø ¾" untuk Instalasi Stop Kontak Publik 52.00 ttk ### 0.15%
Piiping instalasi ( 20% ) REN 0.03%
REL
werring cabling ( 70 ) REN 0.10%
REL
Tescom ( 10% ) REN 0.01%
REL

Kabel Instalasi LT.UG


Kabel NYA 3x2.5mm² + PVC Conduit ø ¾" untuk Instalasi Lampu 129.00 ttk ### 0.23%
Piiping instalasi ( 20% ) REN 0.05%
REL
werring cabling ( 70 ) REN 0.16%
REL
Tescom ( 10% ) REN 0.02%
REL
Kabel NYA 3x4mm² + PVC Conduit ø ¾" untuk Instalasi Stop Kontak Publik 55.00 ttk ### 0.16%
Piiping instalasi ( 20% ) REN 0.03%
REL
werring cabling ( 70 ) REN 0.11%
REL
Tescom ( 10% ) REN 0.02%
REL
Kabel Instalasi LT.LH1
Kabel NYA 3x2.5mm² + PVC Conduit ø ¾" untuk Instalasi Lampu 140.00 ttk ### 0.25%
Piiping instalasi ( 20% ) REN 0.05%
REL
werring cabling ( 70 ) REN 0.17%
REL
Tescom ( 10% ) REN 0.02%
REL
Kabel NYA 3x4mm² + PVC Conduit ø ¾" untuk Instalasi Stop Kontak Publik 44.00 ttk ### 0.13%
Piiping instalasi ( 20% ) REN 0.03%
REL
werring cabling ( 70 ) REN 0.09%
REL
Tescom ( 10% ) REN 0.01%
REL

Kabel Instalasi LT.2F


Kabel NYA 3x2.5mm² + PVC Conduit ø ¾" untuk Instalasi Lampu 92.00 ttk ### 0.16%
Piiping instalasi ( 20% ) REN 0.03%
REL
werring cabling ( 70 ) REN 0.11%
REL
Tescom ( 10% ) REN 0.02%
REL
Kabel NYA 3x4mm² + PVC Conduit ø ¾" untuk Instalasi Stop Kontak Publik 41.00 ttk ### 0.12%
Piiping instalasi ( 20% ) REN 0.02%
REL
werring cabling ( 70 ) REN 0.08%
REL
Tescom ( 10% ) REN 0.01%
REL

Kabel Instalasi LT.ATAP


Kabel NYA 3x2.5mm² + PVC Conduit ø ¾" untuk Instalasi Lampu 10.00 ttk ### 0.02%
Piiping instalasi ( 20% ) REN 0.00%
REL
werring cabling ( 70 ) REN 0.01%
REL
Tescom ( 10% ) REN 0.00%
REL
Kabel NYA 5x4mm² + PVC Conduit ø ¾" untuk Instalasi Stop Kontak Gondola 15.00 ttk ### 0.07%
Piiping instalasi ( 20% ) REN 0.00%
REL
werring cabling ( 70 ) REN 0.05%
REL
Tescom ( 10% ) REN 0.01%
REL

54013 Jasa Pemasangan Typical Box Retail Tenant/ Retail


Include Bobokan dan perapihan kembali, terminasi, labelling group
instalasi
Typical Box Panel 10A 23.00 bh ### 0.32% 0.00% 0% 0.00% 0% 0.00%
Typical Box Panel 16A 125.00 bh ### 1.97% 0.00% 0% 0.00% 0% 0.00%
Typical Box Panel 20A 24.00 bh ### 0.38% 0.00% 0% 0.00% 0% 0.00%
Typical Box Panel 40A 1.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
Typical Box Panel 63A 2.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%
Typical Box Panel 100A 2.00 bh ### 0.04% 0.00% 0% 0.00% 0% 0.00%
Typical Box Panel 160A 2.00 bh ### 0.05% 0.00% 0% 0.00% 0% 0.00%
Typical Box Panel 500A 1.00 bh ### 0.07% 0.00% 0% 0.00% 0% 0.00%
Typical Box Panel 125A 1.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%
Typical Box Panel 250A 2.00 bh ### 0.09% 0.00% 0% 0.00% 0% 0.00%
Typical Box Panel 350A 1.00 bh ### 0.06% 0.00% 0% 0.00% 0% 0.00%

Lantai LG
LAK 100 mm 108.29 mtr ### 0.29% 0.29% 0.29% 0.29% 0.29% 0.29% 0.29% 0.29%
SUPORT 20% mtr REN 0.06% REN 0.00059
0.46 - 0.00032
REL 50 - 50 - 58 MTR REL 0.00027 0.00009 0.00009 0.00009 0.00009 0.00009 0.00009 0.00009

DKD-808 | Hal :1/11


PT ESKA DEKADE ELGAMA
PEKERJAAN ELEKTRIKAL
PROYEK BX-CHANGE BINTARO H
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
A
PROGRESS DAN KURVA S R
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11
G
A TOTAL Rencana Rincian Durasi V0LUME KERJA Rencana Deviasi 4- Des - 2021 12 - Des - 2021 19 - Des - 2021 26 - Des - 2021 2-Jan-22 9-Jan-22 16-Jan-22 1/23/2022 1/30/2022 2/6/2022
Item URAIAN VOL SAT S BOBOT AKTUAL
A dan Terpasang SESUAI KOEFISIEN
Prestasi Bobot 11. Des- 2021 18 . Des- 2021 25 . Des- 2021 01 . january 2022 8. january- 2021 15-Jan-22 22-Jan-21 1/29/2022 2/5/2022 122/02/22
T BOBOT Bobot Kerja S/D Minggu lalu Minggu ini Deviasi satuan dan realisasi
TRAY 70% mtr U REN 0.21% REN 0.00206
0.46 - 0.00111
A REL 50 - 50 - 58.3 MTR REL 0.00095 0.00032 0.00032 0.00032 0.00032 0.00032 0.00032 0.00032
N
BA 10% mtr REN 0.03% REN 0.00029
- - 0.00029
REL - - - - 108 MTR REL -
LAK 200 mm 385.00 mtr ### 1.04% 1.04%
SUPORT 20% REN 0.21% REN 0.00209 0.0034831962
0.39 - 0.00128
REL 150 - 150 REL
- 235 MTR 0.00081
TRAY 70% REN 0.73% REN 0.00731 0.0034831962
0.39 - 0.00446
REL 150 - 150 REL
- 235 MTR 0.00285
BA 10% REN 0.10% REN 0.00104
- - 0.00104
REL - - - - 385 MTR REL -

LAL 200 mm 289.00 MTR ### 0.78%


SUPORT 20% MTR REN 0.16% REN 0.00157
0.35 - 0.00103
REL 100 0% 100 - 189 MTR REL 0.00054
TRAY 70% MTR REN 0.55% REN 0.00549
0.35 - 0.00359
REL 100 0% 100 - 189 MTR REL 0.00190
BA 10% MTR REN 7.84% REN 0.07844
41.3 - 0.07844
REL - 0% - - 289 MTR REL -

LAK 300 mm 36.00 MTR ### 0.10%


SUPORT 20% REN 0.00020 REN 0.00020
0.56 - 0.00
REL 20 - 20 - 16 MTR REL 0.00011
TRAY 70% REN 0.07074 REN 0.07074
0.56 - 0.03
REL 20 - 20 - 16 MTR REL 0.03930
BA 10% REN 0.00010 REN 0.00010
- - 0.00
REL - - - - 36 MTR REL -

Cable Ladder 600 mm 182.00 MTR ### 0.55%


SUPORT 20% REN 0 REN 0.00111
- 128,369.86 - 142.00
REL 40 - 40 - 142 MTR REL - 142.00000
TRAY 70% REN 0 REN 0.00387
0.22 - 0.00
REL 40 - 40 - 142 MTR REL 0.00085
BA 10% REN 0 REN 0.00055
- - 0.00
REL - - - - 182 MTR REL -

Lantai GF
LAK 100 mm 174.00 mtr ### 0.47% 0.00% 0% 0.00% 0% 0.00%
LAK 200 mm 438.00 mtr ### 1.19% 0.00% 0% 0.00% 0% 0.00%
LAL 200 mm 436.00 mtr ### 1.18% 0.00% 0% 0.00% 0% 0.00%
LAK 300 mm 66.00 mtr ### 0.19% 0.00% 0% 0.00% 0% 0.00%
LAL 300 mm 82.00 mtr ### 0.23% 0.00% 0% 0.00% 0% 0.00%

Lantai UG
LAK 200 mm 109.00 mtr ### 0.30% 0.00% 0% 0.00% 0% 0.00%
LAL 200 mm 574.00 mtr ### 1.56% 0.00% 0% 0.00% 0% 0.00%
LAK 300 mm 552.00 mtr ### 1.55% 0.00% 0% 0.00% 0% 0.00%
LAL 300 mm 84.00 mtr ### 0.24% 0.00% 0% 0.00% 0% 0.00%
LAK 400 mm 89.00 mtr ### 0.25% 0.00% 0% 0.00% 0% 0.00%

Lantai LH.1
LAK 100 mm 206.00 mtr ### 0.56% 0.00% 0% 0.00% 0% 0.00%
LAK 200 mm 466.00 mtr ### 1.26% 0.00% 0% 0.00% 0% 0.00%
LAL 200 mm 412.00 mtr ### 1.12% 0.00% 0% 0.00% 0% 0.00%
LAK 300 mm 85.00 mtr ### 0.23% 0.00% 0% 0.00% 0% 0.00%
LAL 300 mm 90.00 mtr ### 0.25% 0.00% 0% 0.00% 0% 0.00%
LAK 400 mm 10.00 mtr ### 0.03% 0.00% 0% 0.00% 0% 0.00%

Jasa Kabel Tray & Kabel Ladder Tambahan


Tray Data 100 mm 3,500.00 mtr ### 9.50% 0.00% 0% 0.00% 0% 0.00%
Tray Kabel TM 200 mm 76.24 mtr ### 0.21% 0.00% 0% 0.00% 0% 0.00%

54015 Jasa Pemasangan Lampu lengkap peralatan bantu sesuai spesifikasi


dan gambar Include material longdrat meyesuaikan level balok

Lantai B2
TL BALOK LED 1 x 14.5 WATT 465.00 bh ### 0.88% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 1 x 14.5 WATT c/w Batere Nicad 90.00 bh ### 0.17% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 1 x 14.5 WATT 7.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 1 x 14.5 WATT c/w Batere Nicad 7.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 2 x 14.5 WATT c/w Batere Nicad 18.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%

DKD-808 | Hal :2/11


PT ESKA DEKADE ELGAMA
PEKERJAAN ELEKTRIKAL
PROYEK BX-CHANGE BINTARO H
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
A
PROGRESS DAN KURVA S R
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11
G
A TOTAL Rencana Rincian Durasi V0LUME KERJA Rencana Deviasi 4- Des - 2021 12 - Des - 2021 19 - Des - 2021 26 - Des - 2021 2-Jan-22 9-Jan-22 16-Jan-22 1/23/2022 1/30/2022 2/6/2022
Item URAIAN VOL SAT S BOBOT AKTUAL
A dan Terpasang SESUAI KOEFISIEN
Prestasi Bobot 11. Des- 2021 18 . Des- 2021 25 . Des- 2021 01 . january 2022 8. january- 2021 15-Jan-22 22-Jan-21 1/29/2022 2/5/2022 122/02/22
T BOBOT Bobot Kerja S/D Minggu lalu Minggu ini Deviasi satuan dan realisasi
LAMPU EXIT 2 x 8 WATT 27.00 bh ###
U 0.04% 0.00% 0% 0.00% 0% 0.00%
A
N

DKD-808 | Hal :3/11


PT ESKA DEKADE ELGAMA
PEKERJAAN ELEKTRIKAL
PROYEK BX-CHANGE BINTARO H
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
A
PROGRESS DAN KURVA S R
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11
G
A TOTAL Rencana Rincian Durasi V0LUME KERJA Rencana Deviasi 4- Des - 2021 12 - Des - 2021 19 - Des - 2021 26 - Des - 2021 2-Jan-22 9-Jan-22 16-Jan-22 1/23/2022 1/30/2022 2/6/2022
Item URAIAN VOL SAT S BOBOT AKTUAL
A dan Terpasang SESUAI KOEFISIEN
Prestasi Bobot 11. Des- 2021 18 . Des- 2021 25 . Des- 2021 01 . january 2022 8. january- 2021 15-Jan-22 22-Jan-21 1/29/2022 2/5/2022 122/02/22
T BOBOT Bobot Kerja S/D Minggu lalu Minggu ini Deviasi satuan dan realisasi
TL BALOK LED 2 x 14.5 WATT 96.00 bh ###
U 0.18% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 2 x 14.5 WATT c/w Batere Nicad 28.00 bh A 0.05%
### 0.00% 0% 0.00% 0% 0.00%
N
DOWN LIGHT LED 1100 LUMEN 11.5WATT 25.00 bh ### 0.04% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 1100 LUMEN 11.5WATT Batere Nicad 9.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
Wall Lamp PL 18 W 29.00 bh ### 0.17% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 600 LUMEN 8 WATT 17.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 600 LUMEN 8 WATT c/w Batere 3.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT, Dichroic 7 WATT - 12 VOLT (Eye Ball) 48.00 bh ### 0.08% 0.00% 0% 0.00% 0% 0.00%

Lantai B1
Downlight LED 2300 L 22W 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Downlight LED 2300 L 22W c/w Batere 1.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Downlight LED 1100 L 11,5W 10.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
Downlight LED 1100 L 11,5W c/w Batere 5.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
Downlight LED 600 L 8W 35.00 bh ### 0.06% 0.00% 0% 0.00% 0% 0.00%
Downlight LED 600 L 8W c/w Batere 15.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
Downlight Dicroic 7W 12 V Eye Ball 10.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL Balok LED 1x14,5 Watt 160.00 bh ### 0.30% 0.00% 0% 0.00% 0% 0.00%
TL Balok LED 1x14,5 Watt c/w Batere 48.00 bh ### 0.09% 0.00% 0% 0.00% 0% 0.00%
TL Bracket LED 2x14,5 Watt c/w Batere 20.00 bh ### 0.04% 0.00% 0% 0.00% 0% 0.00%
Wall Lamp PL 18 W 12.00 bh ### 0.07% 0.00% 0% 0.00% 0% 0.00%
TL Bracket LED 1x14,5 Watt c/w Batere 8.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL Balok LED 2x14,5 Watt c/w Batere 20.00 bh ### 0.04% 0.00% 0% 0.00% 0% 0.00%
TL Balok LED 2x14,5 Watt 32.00 bh ### 0.06% 0.00% 0% 0.00% 0% 0.00%
TL Bracket LED 1x14,5 Watt 7.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
Lampu Exit 2x8 W 18.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%

Lantai LG
TL BALOK LED 1 x 14.5 WATT 16.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 1 x 14.5 WATT c/w Batere Nicad 7.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 1 x 14.5 WATT 8.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 1 x 14.5 WATT c/w Batere Nicad 8.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 2 x 14.5 WATT c/w Batere Nicad 26.00 bh ### 0.05% 0.00% 0% 0.00% 0% 0.00%
TL BOX ARMATURE LED 2 x 14.5 WATT C/W LOUVER & MIR 7.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
TL BOX ARMATURE LED 2 x 14.5 WATT C/W LOUVER & MIRRO 4.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
LAMPU EXIT 2 x 8 WATT 9.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 2 x 14.5 WATT 10.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 2 x 14.5 WATT c/w Batere Nicad 4.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 1100 LUMEN 11.5WATT 33.00 bh ### 0.05% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 1100 LUMEN 11.5WATT c/w Batere Nicad 17.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 2300 LUMEN 22 WATT 87.00 bh ### 0.14% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 2300 LUMEN 22 WATT c/w Batere Nicad 20.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%

Lantai GF
TL BALOK LED 1 x 14.5 WATT 27.00 bh ### 0.05% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 1 x 14.5 WATT c/w Batere Nicad 13.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 1 x 14.5 WATT 8.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 1 x 14.5 WATT c/w Batere Nicad 8.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 2 x 14.5 WATT c/w Batere Nicad 16.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%
LAMPU EXIT 2 x 8 WATT 8.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 2 x 14.5 WATT 3.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 2 x 14.5 WATT c/w Batere Nicad 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 600 LUMEN 8 WATT 4.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 600 LUMEN 8 WATT c/w Batere Nicad 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 1100 LUMEN 11.5WATT 15.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 1100 LUMEN 11.5WATT c/w Batere Nicad 11.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 2300 LUMEN 22 WATT 11.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 2300 LUMEN 22 WATT c/w Batere Nicad 4.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT, Dichroic 7 WATT - 12 VOLT (Eye Ball) 6.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%

Lantai UG
TL BALOK LED 1 x 14.5 WATT 23.00 bh ### 0.04% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 1 x 14.5 WATT c/w Batere Nicad 13.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 1 x 14.5 WATT 9.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 1 x 14.5 WATT c/w Batere Nicad 9.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 2 x 14.5 WATT c/w Batere Nicad 18.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%
LAMPU EXIT 2 x 8 WATT 9.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 2 x 14.5 WATT 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 2 x 14.5 WATT c/w Batere Nicad 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 600 LUMEN 8 WATT 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 600 LUMEN 8 WATT c/w Batere Nicad 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 1100 LUMEN 11.5WATT 12.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 1100 LUMEN 11.5WATT c/w Batere Nicad 10.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 2300 LUMEN 22 WATT 10.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 2300 LUMEN 22 WATT c/w Batere Nicad 5.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT, Dichroic 7 WATT - 12 VOLT (Eye Ball) 3.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%

Lantai LH1
TL BALOK LED 1 x 14.5 WATT 21.00 bh ### 0.04% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 1 x 14.5 WATT c/w Batere Nicad 8.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 1 x 14.5 WATT 9.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 1 x 14.5 WATT c/w Batere Nicad 9.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 2 x 14.5 WATT c/w Batere Nicad 18.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%
LAMPU EXIT 2 x 8 WATT 9.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 2 x 14.5 WATT 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 2 x 14.5 WATT c/w Batere Nicad 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 600 LUMEN 8 WATT 5.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 600 LUMEN 8 WATT c/w Batere Nicad 3.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 1100 LUMEN 11.5WATT 23.00 bh ### 0.04% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 1100 LUMEN 11.5WATT c/w Batere Nicad 11.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 2300 LUMEN 22 WATT 10.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT LED 2300 LUMEN 22 WATT c/w Batere Nicad 5.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
DOWN LIGHT, Dichroic 7 WATT - 12 VOLT (Eye Ball) 5.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%

Lantai 2F
TL BRACKET LED 1 x 14.5 WATT 4.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 1 x 14.5 WATT c/w Batere Nicad 7.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
TL BRACKET LED 2 x 14.5 WATT c/w Batere Nicad 8.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
LAMPU EXIT 2 x 8 WATT 5.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 2 x 14.5 WATT 20.00 bh ### 0.04% 0.00% 0% 0.00% 0% 0.00%
TL BALOK LED 2 x 14.5 WATT c/w Batere Nicad 16.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%
SPOT LIGHT LED 90 WATT 32.00 bh ### 0.19% 0.00% 0% 0.00% 0% 0.00%

Lantai Atap
Tambahan Jasa Lampu lengkap peralatan bantu sesuai spesifikasi dan
gambar
Downlight LED 2300 L 22W c/w Batere 1.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Downlight LED 1100 L 11,5W 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Downlight LED 1100 L 11,5W c/w Batere 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Downlight LED 600 L 8W 4.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
TL Bracket LED 2x14,5 Watt c/w Batere 5.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%

54016 Jasa Pemasangan Kotak kontak


Lantai B2
Stop Kontak 16 A/1P 300mm AFF 106.00 bh ### 0.08% 0.00% 0% 0.00% 0% 0.00%
Saklar Tunggal 16.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
Saklar Ganda 49.00 bh ### 0.04% 0.00% 0% 0.00% 0% 0.00%
Grid Switch 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%

Lantai B1
Stop Kontak 16A/1P 300 mm 72.00 bh ### 0.05% 0.00% 0% 0.00% 0% 0.00%
Stop Kontak 16A/1P 1200 mm 5.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Saklar Tunggal 13.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
Saklar Ganda 39.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%
Grid Switch 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%

Lantai LG
Stop Kontak 16 A/1P 300mm AFF 28.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
Stop Kontak 16A/1P 1200mm AFF 3.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Stop Kontak Lantai 20A/1P (1 Modular) 8.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
Saklar Tunggal 4.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Saklar Ganda 26.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
Grid Switch 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%

Lantai GF
Stop Kontak 16 A/1P 300mm AFF 43.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%
Stop Kontak 16A/1P 1200mm AFF 9.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
Saklar Tunggal 6.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Saklar Ganda 21.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
Grid Switch 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%

Lantai UG
Stop Kontak 16 A/1P 300mm AFF 47.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%
Stop Kontak 16A/1P 1200mm AFF 8.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
Saklar Tunggal 3.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Saklar Ganda 24.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
Grid Switch 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%

Lantai LH1
Stop Kontak 16 A/1P 300mm AFF 39.00 bh ### 0.03% 0.00% 0% 0.00% 0% 0.00%
Stop Kontak 16A/1P 1200mm AFF 5.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Saklar Tunggal 4.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Saklar Ganda 22.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
Grid Switch 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%

Lantai 2F
Stop Kontak 16 A/1P 300mm AFF 24.00 bh ### 0.02% 0.00% 0% 0.00% 0% 0.00%
Stop Kontak Gondola 16A/3P (Waterproofing) 17.00 bh ### 0.04% 0.00% 0% 0.00% 0% 0.00%
Saklar Tunggal 6.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Saklar Ganda 9.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
Grid Switch 1.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%

Jasa Kotak kontak tambahan


Stop Kontak 16A/1P 1200 mm 2.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Saklar Tunggal 7.00 bh ### 0.01% 0.00% 0% 0.00% 0% 0.00%
Saklar Ganda 6.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%
Grid Switch 1.00 bh ### 0.00% 0.00% 0% 0.00% 0% 0.00%

54017 JASA PERALATAN UTAMA GROUNDING


Include Dinabold, sepatu kabel/schoon kabel, vinyl kabel, alat torsi,
penurunan dari truck hingga ke posisi pemasangan serta alat tes
yang sudah dikalibrasi

MPEB LV 1.00 Unit ### 0.03% 0.00% 0% 0.00% 0% 0.00%


MPEB MV 1.00 Unit ### 0.03% 0.00% 0% 0.00% 0% 0.00%
SPEB 1.00 Unit ### 0.03% 0.00% 0% 0.00% 0% 0.00%
MPEB 1.00 Unit ### 0.03% 0.00% 0% 0.00% 0% 0.00%
PEB B2 2.00 Unit ### 0.06% 0.00% 0% 0.00% 0% 0.00%
PEB B1 2.00 Unit ### 0.06% 0.00% 0% 0.00% 0% 0.00%
PEB LG 2.00 Unit ### 0.06% 0.00% 0% 0.00% 0% 0.00%
PEB GF 2.00 Unit ### 0.06% 0.00% 0% 0.00% 0% 0.00%
PEB UG 2.00 Unit ### 0.06% 0.00% 0% 0.00% 0% 0.00%
PEB 1 2.00 Unit ### 0.06% 0.00% 0% 0.00% 0% 0.00%
PEB Atap 2.00 Unit ### 0.06% 0.00% 0% 0.00% 0% 0.00%
PEB MV (di lantai atap) 2.00 Unit ### 0.06% 0.00% 0% 0.00% 0% 0.00%
Bak Kontrol 18.00 Unit ### 0.63% 0.00% 0% 0.00% 0% 0.00%

54017 JASA PEMASANGAN KABEL BC UNTUK INSTALASI GROUNDING


Include material bantu perapihan kabel (Kabel ties hitam 30cm),
penurunan dari truck hingga ke posisi gudang.
Kabel BC 70mm2 untuk instalasi grounding : 11,453.30 mtr ### 2.28%

Total 100.00% REALISASI 50.76% 0.00% - 141.73


Rencanan Mingguan 6.74% 0.06
Akumulasi Rencana Minnguan 0.06735 0.05547

Realisasi rencana Minnguan 0.162


Akumulasi rencana minnguan 0.16220

Deviasi Mingguan 0.09485


Akumulasi DeviasiMingguan 0.09485

DKD-808 | Hal :4/11


DKD-808 | Hal :5/11
DKD-808 | Hal :6/11
DKD-808 | Hal :7/11
DKD-808 | Hal :8/11
PERHITUNGAN BOBOT DAN PRE
PEKERJAAN INSTALASI LISTRIK
PROGRESS KE :1
BULAN : DESEMBER

PENJUMLAHAN TOTAL

DAFTATR NO 1 PEKERJAAN PERSIAPAN

DAFTATR NO 2 PEKERJAAN INSTALASI LISTRIK

SUB TOTAL

TANGERANG 21 - 12 - 2021
DI AJUKAN OLEH :
SUB KONTRAKTOR

ACHMAD IQBAL
PT.DEKADE ESKA ELGAMA
PERHITUNGAN BOBOT DAN PRESTASI

PROGRESS BULAN LALU PROGRESS BULAN INI


TOTAL BOBOT
BOBOT BOBOT
1.53% 0.02% 0.61%

98.47% 0.00% 2.35%

100.00% 0.02% 2.96%

TANGERANG 21 - 12 - 2021 TANGERANG 21 - 12 - 2021


DI AJUKAN OLEH : DI AJUKAN OLEH :
SUB KONTRAKTOR SUB KONTRAKTOR

ACHMAD IQBAL H.NASRUDIN


PT.DEKADE ESKA ELGAMA PT.DEKADE ESKA ELGAMA
TOTAL
BOBOT
0.63%

2.35%

2.98%

RANG 21 - 12 - 2021
AJUKAN OLEH :
B KONTRAKTOR

H.NASRUDIN
ADE ESKA ELGAMA

Anda mungkin juga menyukai